A zero-void top and zero-void side drilling and anchoring integrated machine and drilling and anchoring method
By designing a sliding platform and a multi-stage telescopic structure for a zero-open-roof and zero-open-side tunneling and anchoring integrated machine, the problems of blind spots and advanced support of existing tunneling and anchoring integrated machines have been solved, realizing all-round and timely support of the roadway roof and sides, and improving the quality and safety of roadway support.
Patent Information
- Application Number
- CN202411073964.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-07
AI Technical Summary
Existing tunneling and anchoring machines have support blind spots, cannot support the center of the roof, cannot support the sidewalls in a timely manner, and cannot achieve advanced support, which makes the roadway prone to roof deformation and sidewall spalling under harsh geological conditions.
Design a zero-open-roof and zero-open-side integrated excavation and anchoring machine, including a sliding platform, a telescopic shield, and a front anchoring machine assembly with a multi-stage telescopic structure. It can achieve all-round support for the roof and sides, and through the multiple movements and rotations of the sliding platform and the anchoring machine, it can achieve timely and advanced support for zero-open-roof and zero-open-side structures.
It enables comprehensive and timely support for the roof and sides of the roadway, avoids blind spots in support, improves the quality of roadway support and operational safety, and ensures the stability of the roadway under harsh geological conditions.
Smart Images

Figure CN118582223B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mine tunnel excavation and support, and specifically relates to a zero-void top and zero-void side excavation and anchoring integrated machine and an excavation and anchoring method. Background Art
[0002] During the mining and construction of coal mine tunnels, when the tunnel surrounding rock is under great pressure, the traditional tunneling support method often causes a series of adverse consequences due to untimely support because the support point is far away from the head, which makes the surrounding rock or coal seam prone to roof collapse. Therefore, a device is needed to support the tunnel roof and two sides in time, and support as the tunnel is excavated. At the same time, the distance between the empty top and the empty side should be small enough to prevent the roof from falling and the side from collapsing, so as to meet the quality requirements of support and avoid continuous deformation of subsequent tunnels.
[0003] The existing technology can achieve support while digging through an integrated digging and anchoring machine. The integrated digging and anchoring machine is an integrated machine that integrates a tunnel boring machine and an anchor bolter. It can provide support while digging. The principle is to first dig the tunnel through the tunnel boring machine, and then support the tunnel through the anchor bolter during the digging process. The existing integrated digging and anchoring machine installs a front anchor bolter at the rear of the shovel plate, and a middle digging and anchoring machine is installed in the middle of the integrated digging and anchoring machine. The distance from the front position to the head is generally more than 2m. However, the existing integrated digging and anchoring machine still has the following problems: First, due to the influence of the width of the cutting arm, a support blind spot will be formed in the middle of the tunnel roof, and the anchor bolts and cables cannot be supported. Second, the front anchor bolter can only move left and right due to the influence of space, and cannot fully support the side anchor bolts. The side anchor bolts need to be supported by the middle anchor bolter, which will cause a 2-3 hour lag in the support of the side. If the tunnel conditions are poor and the roof and the two sides are unstable, it is very easy for the roof to deform and the side to spall.
[0004] In addition, when the geological conditions are relatively bad, it is necessary to drive oblique anchors into the unexcavated area at the front end of the cutting surface to achieve advance support and pre-reinforcement before cutting. However, the existing excavator-anchor machine only supports the excavated cutting surface and cannot achieve advance support for the unexcavated area at the front end of the cutting surface.
[0005] Therefore, in view of the above shortcomings, it is necessary to provide an integrated drilling and anchoring machine that can provide timely and sufficient support to the roof and the side, improve the support quality of the tunnel, achieve the support effect of zero empty top and zero empty side in the head direction of the tunnel, and realize advanced support. Summary of the invention
[0006] 1. Technical issues to be resolved
[0007] In order to solve the problems in the prior art that the integrated digging and anchoring machine has a blind spot in support, cannot support the middle of the top plate, cannot provide timely support to the side plate, and cannot achieve advanced support, the present invention provides a zero-empty top and zero-empty side digging and anchoring machine and a digging and anchoring method.
[0008] (II) Technical solution
[0009] In order to achieve the above object, the main technical solutions adopted by the present invention include:
[0010] A zero-empty top and zero-empty side drilling and anchoring machine comprises a chassis, sliding platforms symmetrically arranged on both sides of the chassis and a telescopic shield arranged on the chassis, a front bolter assembly is arranged on the sliding platform; the sliding platform can move forward and backward relative to the chassis; the telescopic shield is located above the front bolter assembly;
[0011] The front bolter assembly includes a connecting plate connected to the sliding platform, a first telescopic structure arranged on the connecting plate, a bottom plate connected to the first telescopic structure, a telescopic adjustment structure of a main body hinged to the bottom plate, a first telescopic platform, a second telescopic structure arranged on the first telescopic platform, a second telescopic platform connected to the second telescopic structure, a first rotating structure arranged on the second telescopic platform, a second rotating structure arranged on the first rotating structure, and an anchor drill connected to the second rotating structure; the telescopic end of the telescopic adjustment structure is hinged to the bottom of the first telescopic platform;
[0012] The telescopic direction of the first telescopic structure and the second telescopic structure is perpendicular to the excavation direction of the tunnel, and the anchor drilling rig is used to install anchors on the roof and side of the tunnel;
[0013] The first rotating structure is used to drive the second rotating structure and the anchor drill to rotate around a first rotating axis perpendicular to the telescopic direction of the second telescopic structure; the second rotating structure is used to drive the anchor drill to rotate around a second rotating axis parallel to the telescopic direction of the second telescopic structure;
[0014] The front bolter assembly also includes a chain assembly, which is connected to the first telescopic platform and the second telescopic platform respectively, and the second telescopic structure is connected to the chain assembly and is used to drive the chain assembly to rotate.
[0015] As described above, in the zero-empty top and zero-empty side integrated drilling and anchoring machine, preferably, the first telescopic structure is a first telescopic cylinder, the second telescopic structure is a second telescopic cylinder, the telescopic adjustment structure is a swing arm cylinder, the body of the swing arm cylinder is hinged to the base plate, the telescopic end of the swing arm cylinder is hinged to the bottom of the first telescopic platform, the first rotating structure is a first rotating motor, and the second rotating structure is a second rotating motor.
[0016] As described above, the zero-empty top and zero-empty side drilling and anchoring integrated machine, preferably, a middle anchor bolt machine assembly is also provided on the chassis;
[0017] The middle anchor bolter assembly is located at the rear end of the front anchor bolter assembly;
[0018] The middle anchor bolter assembly is symmetrically arranged on both sides of the chassis;
[0019] The middle anchor bolter assembly includes a first plate arranged on the sliding platform, a first translation rail arranged on the first plate, a first translation cylinder having one end arranged on the sliding platform and the other end slidably connected to the first translation rail, a second plate connected to the telescopic end of the first translation cylinder, a first lifting rail arranged on the second plate, a first lifting cylinder having one end arranged on the second plate and the other end slidably connected to the first lifting rail, a first support plate connected to the first lifting cylinder, a third rotary motor arranged on the first support plate, and a middle anchor bolter; the middle anchor bolter is connected to the third rotary motor; the telescopic direction of the first translation cylinder is parallel to the excavation direction of the tunnel.
[0020] As described above, the zero-empty top and zero-empty side drilling and anchoring integrated machine, preferably, a tail bolter assembly is also provided on the chassis;
[0021] The tail bolter assembly is located at the rear end of the middle bolter assembly;
[0022] The tail bolter assembly is symmetrically arranged on both sides of the chassis;
[0023] The tail anchor machine assembly includes a third plate arranged on the chassis, a second translation track arranged on the third plate, a second translation cylinder having one end arranged on the chassis and the other end slidably connected to the second translation track, a fourth plate connected to the telescopic end of the second translation cylinder, a second lifting track arranged on the fourth plate, a second lifting cylinder having one end arranged on the fourth plate and the other end slidably connected to the second lifting track, a second support plate connected to the second lifting cylinder, a fourth rotary motor arranged on the second support plate, and a tail anchor drilling rig; the tail anchor drilling rig is connected to the fourth rotary motor; the telescopic direction of the second translation cylinder is parallel to the excavation direction of the tunnel.
[0024] The zero-empty top and zero-empty side anchoring integrated machine as described above preferably further comprises a cutting device arranged at the front end of the chassis, and a loading and transporting device arranged at the rear end of the cutting device;
[0025] The cutting device and the loading and transporting device are located at the front end of the sliding platform.
[0026] As described above, the zero-empty top and zero-empty side drilling and anchoring integrated machine, preferably, the telescopic shield includes a shield support seat, a first connecting structure, a second connecting structure, a shield body, a telescopic sleeve, a jacking cylinder, and a front and rear adjustment cylinder;
[0027] The shield support seat is arranged at the rear end of the chassis, one end of the first connection structure and the second connection structure is hinged to the shield support seat, and the other end is hinged to the shield body; the lower end of the telescopic sleeve is hinged to the front end of the chassis, and the upper end is hinged to the shield body; the lower end of the lifting cylinder is hinged to the front end of the chassis, and the upper end is hinged to the shield body;
[0028] The lifting cylinder is located at the front end of the telescopic sleeve;
[0029] The front and rear adjustment oil cylinder is connected to the shield body.
[0030] As described above, the zero-empty top and zero-empty side mining and anchoring integrated machine, preferably, the shield body comprises a shield upper base, a telescopic body and a shield lower base, the shield upper base is arranged at the upper end of the shield lower base through a connecting pin, the front and rear adjustment cylinder is arranged on the shield upper base, and the piston rod of the front and rear adjustment cylinder is connected to the telescopic body;
[0031] The first connection structure, the second connection structure, the telescopic sleeve and the lifting cylinder are respectively hinged to the lower base of the shield;
[0032] The first connecting structure includes a hinged first link and a second link, the other end of the first link is hinged to the shield support seat, and the other end of the second link is hinged to the lower base of the shield; the second connecting structure includes a hinged third link and a fourth link, the other end of the third link is hinged to the shield support seat, and the other end of the fourth link is hinged to the lower base of the shield.
[0033] The zero-empty top and zero-empty side anchoring integrated machine as described above preferably further comprises an electrical system and a hydraulic system arranged on the chassis;
[0034] A sliding oil cylinder is also arranged on the chassis, and the sliding platform is connected to the sliding oil cylinder.
[0035] The present invention also provides a method for excavating and anchoring using the above-mentioned zero-empty top and zero-empty side excavating and anchoring integrated machine, comprising the following steps:
[0036] S1: cutting the working face of the tunnel to be mined by a cutting device until the tunnel reaches a predetermined depth;
[0037] S2: The front and rear adjustment cylinders adjust the shield body to just below the surface to be supported, and the lifting cylinder drives the shield body up and applies pressure to the shield body to provide temporary support for the surface to be supported;
[0038] S3: The sliding cylinder drives the sliding platform and the front anchor bolt assembly to move to the front end until the front anchor bolt assembly is located below the surface to be supported;
[0039] S4: The first telescopic cylinder and the second telescopic cylinder drive the anchor drill to support the roof of the tunnel by telescoping; then the swing arm cylinder and the first rotary motor drive the anchor drill to support the side of the tunnel until the roof and side of the supported surface are fully supported;
[0040] S5: The first telescopic oil cylinder, the second telescopic oil cylinder and the second rotary motor drive the anchor drill to perform advance support on the top plate of the unexcavated area at the front end of the cutting surface, and then the first rotary motor and the second rotary motor drive the anchor drill to perform advance support on the side of the unexcavated area at the front end of the cutting surface;
[0041] S6: The sliding cylinder drives the sliding platform and the front anchor bolt assembly to move to the rear end and return to the initial position. The lifting cylinder drives the shield body to descend to leave the tunnel, and then the front and rear adjustment cylinders drive the shield body to move to the rear end to the initial position.
[0042] (III) Beneficial effects
[0043] The beneficial effects of the present invention are:
[0044] The integrated digging and anchoring machine of the present invention can realize temporary support of the tunnel through the telescopic shield, and then realize all-round support of the roof and the side of the tunnel through the sliding platform and the front anchor assembly. The sliding platform can drive the front anchor assembly to move to the position of the support surface for support, and can minimize the distance between the drilling point of the front anchor assembly and the head to zero space, meeting the requirements of tunnel digging and supporting in the case of soft surrounding rock, and can improve the support quality of the tunnel. In the front anchor machine assembly, the first telescopic structure can drive the base plate, the telescopic adjustment structure, the first telescopic platform, the second telescopic structure, the second telescopic platform, the first rotating structure, the second rotating structure and the anchor drilling rig as a whole to telescopically move along the width direction of the tunnel. The second telescopic structure can drive the second telescopic platform, the first rotating structure, the second rotating structure and the anchor drilling rig to telescopically move along the width direction of the tunnel. The anchor drilling rig is used to drill holes in the roof and side of the tunnel and install anchors. The first telescopic structure and the second telescopic structure can realize two-stage telescopic movement of the anchor drilling rig in the width direction of the tunnel, thereby increasing the support range of the tunnel roof and being able to provide all-round support to the tunnel roof, especially to achieve support in the middle of the roof, thereby eliminating the support blind spot in the middle of the roof. The present invention can also adjust the height and angle of the anchor drilling rig by telescoping the telescopic adjustment structure, and can drive the second rotating structure and the anchor drilling rig to rotate in a wide range of angles through the first rotating structure, so that the anchor drilling rig can be adjusted to a variety of heights and angles. Therefore, the present invention can also support the side part through the front anchor machine assembly, realize the support of the side part as the excavation is carried out, and can effectively avoid the safety hazards caused by the delay in the support of the side part.
[0045] Therefore, the present invention can achieve timely support of zero-empty top and zero-empty side in the head direction of the tunnel by controlling the multiple movements and rotations of the front anchor drill, thereby improving the tunnel support quality and operation safety.
[0046] In addition, the present invention can also drive the anchor drill to rotate around a second rotating axis parallel to the telescopic direction of the second telescopic structure through the second rotating structure, thereby pre-reinforcing the top plate and side of the tunnel before cutting, thereby realizing advanced support for the area that has not yet been excavated at the front end of the cutting surface. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 It is a schematic diagram of the overall structure of the zero-empty top and zero-empty side drilling and anchoring integrated machine in the present invention;
[0048] Figure 2 It is a structural schematic diagram of the front bolter assembly of the present invention;
[0049] Figure 3 It is a schematic diagram of the structure of the telescopic shield in the present invention;
[0050] Figure 4It is a structural schematic diagram of the middle anchor bolter assembly in the present invention;
[0051] Figure 5 A schematic diagram of the support status of the excavated cutting surface;
[0052] Figure 6 Schematic diagram of the support status for advance support of the area at the front end of the cutting surface that has not yet been excavated.
[0053] [Description of Reference Numerals]
[0054] 1: front anchor bolter assembly; 2: middle anchor bolter assembly; 3: tail anchor bolter assembly; 4: telescopic shield; 5: cutting device; 6: loading and transporting device; 7: electrical system; 8: hydraulic system; 9: chassis; 10: sliding platform; 11: connecting plate; 12: first telescopic structure; 13: bottom plate; 14: swing arm cylinder; 15: first telescopic platform; 16: second telescopic structure; 17: second telescopic platform; 18: first rotary motor; 19: anchor drilling machine; 20: chain assembly; 21: shield support seat; 22: first connecting structure; 221: first connecting rod; 222: second connecting rod; 23: second connecting rod Structure; 231: third connecting rod; 232: fourth connecting rod; 24: shield body; 241: upper base of shield; 242: telescopic body; 25: telescopic sleeve; 26: lifting cylinder; 27: front and rear adjustment cylinder; 28: cutting arm; 29: lower base of shield; 30: connecting pin; 31: second rotary motor; 201: first plate; 202: first translation track; 203: first translation cylinder; 204: second plate; 205: first lifting track; 206: first lifting cylinder; 207: first support plate; 208: third rotary motor; 209: middle anchor drilling rig; 210: connecting seat. DETAILED DESCRIPTION
[0055] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.
[0056] like Figure 1-3 As shown, the present invention provides a zero-empty top and zero-empty side anchoring integrated machine, comprising a chassis 9, a sliding platform 10 symmetrically arranged on both sides of the chassis 9, and a telescopic shield 4 arranged on the chassis 9. The sliding platform 10 in the present invention can move forward and backward relative to the chassis 9. A front anchor bolter assembly 1 is also arranged on the sliding platform 10, and the telescopic shield 4 is located above the front anchor bolter assembly 1.
[0057] like Figure 1 As shown, in the present invention, the forward direction of the anchoring and digging machine is the front end, and the end opposite to the forward direction is the rear end.
[0058] like Figure 2As shown, the front bolter assembly 1 includes a connecting plate 11, a first telescopic structure 12, a bottom plate 13, a telescopic adjustment structure, a first telescopic platform 15, a second telescopic structure 16, a second telescopic platform 17, a first rotating structure, a second rotating structure arranged on the first rotating structure, and an anchor drill 19 connected to the second rotating structure. The connecting plate 11 is connected to the sliding platform 10, the body of the first telescopic structure 12 is arranged on the connecting plate 11, and the telescopic end of the first telescopic structure 12 is connected to the bottom plate 13. The body of the telescopic adjustment structure is arranged on the bottom plate 13 and is hinged to the bottom plate 13, and the telescopic end of the telescopic adjustment structure is hinged to the bottom of the first telescopic platform 15. The body of the second telescopic structure 16 is arranged on the first telescopic platform 15, and the telescopic end of the second telescopic structure 16 is connected to the second telescopic platform 17. The first rotating structure is also arranged on the second telescopic platform 17. In the present invention, the telescopic direction of the first telescopic structure 12 and the second telescopic structure 16 is perpendicular to the excavation direction of the tunnel, and the anchor drill 19 is used to install anchors on the roof and side of the tunnel. The telescopic shield 4 is used to temporarily support the tunnel before the anchor drill 19 drills holes in the roof and side of the tunnel and installs anchors.
[0059] The first rotating structure is used to drive the second rotating structure and the anchor drill 19 to rotate around the first rotating axis perpendicular to the extension direction of the second telescopic structure 16, so that the rotating surface formed by the anchor drill 19 is parallel to the extension direction of the second telescopic structure 16. The second rotating structure is used to drive the anchor drill 19 to rotate around the second rotating axis parallel to the extension direction of the second telescopic structure 16, so that the rotating surface formed by the anchor drill 19 is perpendicular to the extension direction of the second telescopic structure 16.
[0060] In the prior art, since a cutting arm 28 is also provided at the rear end of the cutting device 5, however, the existence of the cutting arm 28 will cause a support blind spot to be formed in the middle of the roof. The integrated drilling and anchoring machine of the present invention can achieve all-round support for the roof and the side of the tunnel through the sliding platform 10 and the front anchor assembly 1. Specifically, the sliding platform can drive the front anchor assembly 1 to move to the position of the surface to be supported. The present invention sets the front anchor assembly 1 on the sliding platform 10. By sliding the sliding platform 10 forward a certain distance, the distance between the drilling point of the anchor drill rig 19 and the tunnel excavation head can be adjusted to zero, thereby achieving zero empty top and zero empty side support in the tunnel excavation head direction. The front anchor machine assembly 1 includes a two-stage telescopic sliding structure, in which the first telescopic structure 12 can push the base plate 13, the telescopic adjustment structure, the second telescopic structure 16, the first telescopic platform 15, the second telescopic platform 17, the first rotating structure, the second rotating structure and the anchor drill rig 19 to telescopically move along the width direction of the tunnel, and the second telescopic structure 16 can push the second telescopic platform 17, the first rotating structure, the second rotating structure and the anchor drill rig 19 to further telescopically move along the width direction of the tunnel. Through this two-stage telescopic sliding method, the anchor drill rig has a wider coverage range and can provide all-round support for the roof of the tunnel, especially the support in the middle of the roof, eliminating the support blind spot in the middle of the roof.
[0061] The integrated digging and anchoring machine of the present invention can also adjust the height and angle of the anchor drill 19 by telescoping the telescopic adjustment structure, and drive the anchor drill to rotate in a wide range of angles through the first rotating structure. Since the main body of the telescopic adjustment structure is hinged to the bottom plate 13, and its telescopic end is hinged to the bottom of the first telescopic platform 15, when the telescopic adjustment structure is telescoping, the first telescopic platform 15, the second telescopic platform 17, and the first rotating structure can not only change in height, but also rotate in a certain range, thereby achieving the angle and height adjustment of the anchor drill 19. The first rotating structure can further drive the anchor drill 19 to rotate in a wide range of angles, thereby adjusting the anchor drill 19 to the angle required for the side support. Since the telescopic adjustment structure and the first rotating structure can adjust the anchor drill 19 to a variety of required heights and angles, the present invention can also achieve basic support for the side through the front anchor machine assembly 1, thereby achieving the side support as the side is dug, which can effectively avoid the safety hazards caused by the delay in the side support.
[0062] Therefore, the present invention can achieve timely support of zero-empty top and zero-empty side in the head direction of the tunnel by controlling the movement and rotation of the front anchor drill rig 19 in multiple directions, thereby improving the tunnel support quality and operation safety.
[0063] like Figure 5As shown, A represents the area where the coal mine tunnel has been excavated, which can be supported by driving vertical and horizontal anchor rods into the roof and side of the excavated cutting surface respectively. Figure 5 In the figure, the vertical line segments in the area where the section line is located represent the vertical anchors driven into the top plate, and the horizontal line segments represent the horizontal anchors driven into the side plate. Figure 6 As shown, A represents the excavated area, the arrow represents the excavation direction of the tunnel, and the section line portion where B is located represents the unexcavated area at the front end of the cutting surface. Advance support of the unexcavated area at the front end of the cutting surface can be achieved by driving oblique anchor rods into the top plate and side of the unexcavated area at the front end of the cutting surface. Figure 6 In the figure, the oblique line segment represents the oblique anchor rod driven into the top plate and the side of the unexcavated area at the front end of the cutting surface, and the vertical line segment above A and Figure 5 The vertical line segments in the figure represent the vertical anchors driven into the top plate where the excavated cutting surface is located.
[0064] In the present invention, the second rotating structure can drive the anchor drill to rotate around a second rotating axis parallel to the telescopic direction of the second telescopic structure, thereby pre-reinforcing the top plate and side of the tunnel before cutting, thereby realizing advance support for the area that has not yet been excavated at the front end of the cutting surface.
[0065] Preferably, a sliding cylinder may be further provided on the chassis 9, and the sliding platform 10 may be connected to the sliding cylinder to achieve sliding.
[0066] Preferably, the first telescopic structure 12 in the present invention may be a first telescopic oil cylinder, the second telescopic structure 16 may be a second telescopic oil cylinder, and the telescopic adjustment structure may be a swing arm oil cylinder 14, the body of the swing arm oil cylinder 14 is hinged to the bottom plate 13, and the telescopic end of the swing arm oil cylinder 14 is hinged to the bottom of the first telescopic platform 15. When the telescopic end of the swing arm oil cylinder 14 is extended and retracted, the first telescopic platform 15, the second telescopic platform 17, the first rotating structure and the second rotating structure can not only change in height, but also rotate within a certain range, thereby realizing the angle and height adjustment of the anchor drill 19. The first rotating structure may be a first rotating motor 18, and the second rotating structure may be a second rotating motor 31, which may be fixedly arranged on the first rotating motor 18. The first rotating motor 18 can simultaneously drive the second rotating motor 31 and the anchor drill 19 to rotate, and the second rotating motor 31 can drive the anchor drill 19 to swing to the front end by about 30°-45°, thereby realizing the advanced support of the unexcavated area at the front end of the cutting face.
[0067] Further preferably, the front bolter assembly 1 further includes a chain assembly 20, which is connected to the first telescopic platform 15 and the second telescopic platform 17 respectively, and the second telescopic structure 16 is connected to the chain assembly 20 and is used to drive the chain assembly 20 to rotate. Specifically, one end of the chain assembly 20 is fixed to the first telescopic platform 15, and the other end is connected to the second telescopic platform 17, and the piston rod of the second telescopic oil cylinder is connected to the chain assembly 20, and the piston rod of the second telescopic oil cylinder drives the chain assembly 20 to move by telescoping, and transmits power to the second telescopic platform 17 to move along the width direction of the lane.
[0068] The present invention connects the second telescopic oil cylinder with the second telescopic platform 17 through the chain assembly 20, and uses the chain assembly 20 as an intermediate medium to transmit the thrust of the second telescopic oil cylinder to the second telescopic platform 17, which has the following advantages:
[0069] First, providing the chain assembly 20 can achieve more precise motion control, because the chain assembly 20 can provide smoother motion transmission, reducing the impact and vibration caused by the direct contact between the second telescopic cylinder and the second telescopic platform 17.
[0070] Second, by directly pushing the second telescopic platform 17 to move through the second telescopic oil cylinder, the movement range of the anchor drill 19 may be limited by the oil cylinder stroke, because in this case, the telescopic distance of the piston rod directly determines the maximum movement range of the second telescopic platform 17. However, by connecting the second telescopic oil cylinder with the second telescopic platform 17 through the chain assembly 20, the movement range of the second telescopic platform 17 can be further increased, ensuring that the middle position of the roof can be effectively supported, so as to achieve all-round support for the roof.
[0071] Third, directly pushing the second telescopic platform 17 to move by the second telescopic oil cylinder requires a complex mechanism to ensure the stability of the second telescopic platform during movement. However, the chain assembly 20 can directly absorb part of the energy in the motion transmission process during the movement of the second telescopic platform to increase stability.
[0072] Fourth, directly pushing the second telescopic platform 17 to move by the second telescopic cylinder may require the use of a second telescopic cylinder with greater power to cope with a greater load and a greater range of motion, which will result in higher costs and greater weight. By providing a chain assembly, a second telescopic cylinder with less power can be used, and the chain assembly can share part of the load, thereby reducing costs and weight.
[0073] Preferably, a middle anchor bolter assembly 2 and a tail anchor bolter assembly 3 are also arranged on the chassis 9. The middle anchor bolter assembly 2 is located at the rear end of the front anchor bolter assembly 1, and the tail anchor bolter assembly 3 is located at the rear end of the middle anchor bolter assembly 2. The middle anchor bolter assembly 2 is symmetrically arranged on both sides of the chassis 9, and similarly, the tail anchor bolter assembly 3 is also symmetrically arranged on both sides of the chassis 9.
[0074] like Figure 4 As shown, the middle anchor bolter assembly 2 includes a first plate 201 arranged on the sliding platform 10, a first translation track 202 arranged on the first plate 201, a first translation oil cylinder 203 having one end arranged on the sliding platform 10 through a connecting seat 210 and the other end slidably connected to the first translation track 202, a second plate 204 connected to the telescopic end of the first translation oil cylinder 203, a first lifting track 205 arranged on the second plate 204, a first lifting oil cylinder 206 having one end arranged on the second plate 204 and the other end slidably connected to the first lifting track 205, a first support plate 207 connected to the first lifting oil cylinder 206, a third rotary motor 208 arranged on the first support plate 207, and a middle anchor bolter 209. The middle anchor bolter 209 is connected to the third rotary motor 208, and the telescopic direction of the first translation oil cylinder 203 is parallel to the excavation direction of the tunnel.
[0075] Similar to the structure of the middle anchor bolter assembly 2, the tail anchor bolter assembly 3 includes a third plate arranged on the chassis 9, a second translation track arranged on the third plate, a second translation cylinder having one end arranged on the chassis 9 and the other end slidably connected to the second translation track, a fourth plate connected to the telescopic end of the second translation cylinder, a second lifting track arranged on the fourth plate, a second lifting cylinder having one end arranged on the fourth plate and the other end slidably connected to the second lifting track, a second support plate connected to the second lifting cylinder, a fourth rotary motor arranged on the second support plate, and a tail anchor bolter. The tail anchor bolter is connected to the fourth rotary motor, and the telescopic direction of the second translation cylinder is parallel to the excavation direction of the tunnel.
[0076] The middle anchor bolt assembly 2 and the tail anchor bolt assembly 3 can be used as auxiliary support devices. When the tunnel conditions partially or completely improve, the front anchor bolt assembly 1 supports a part of the anchor bolts and plays a basic support role. The remaining anchor bolts that need to be supported can continue to be supported by the middle and tail anchor bolt assemblies. This support method can improve the excavation efficiency of the equipment. Furthermore, a certain distance can be set between the middle anchor bolt assembly 2 and the front anchor bolt assembly 1 according to the actual excavation situation. Similarly, a certain distance can be set between the tail anchor bolt assembly 3 and the middle anchor bolt assembly 2 according to the actual excavation situation.
[0077] Preferably, the integrated anchor miner of the present invention further comprises a cutting device 5 arranged at the front end of the chassis 9, a loading and transporting device 6 arranged at the rear end of the cutting device 5, and an electrical system 7 and a hydraulic system 8 arranged on the chassis 9. The cutting device 5 and the loading and transporting device 6 are located at the front end of the sliding platform 10. The electrical system 7 and the hydraulic system 8 are located at the rear end of the chassis 9. After the cutting device 5 completes the cutting work and descends, the sliding platform 10 can bring the front anchor bolt assembly 1 to the right below the working surface that needs to be supported, so as to carry out the support work.
[0078] The cutting device 5 can cut the working face to be mined in the tunnel, and the loading and transporting device 6 can transport the materials cut by the cutting device 5 to the scraper. The electrical system 7 is used to control the actions of the front anchor bolter assembly 1, the middle anchor bolter assembly 2 and the rear anchor bolter assembly 3, and the hydraulic system 8 is used to provide power to the front anchor bolter assembly 1, the middle anchor bolter assembly 2 and the rear anchor bolter assembly 3 when performing anchoring work.
[0079] Preferably, if Figure 3 As shown, the telescopic shield 4 specifically includes a shield support seat 21, a first connection structure 22, a second connection structure 23, a shield body 24, a telescopic sleeve 25, a lifting cylinder 26 and a front-and-rear adjustment cylinder 27. Among them, the shield support seat 21 is arranged at the rear end of the chassis 9, and one end of the first connection structure 22 and the second connection structure 23 is hinged to the shield support seat 21, and the other end is hinged to the shield body 24. The first connection structure 22 and the second connection structure 23 are symmetrically arranged on both sides of the shield body 24. The lower end of the telescopic sleeve 25 is hinged to the front end of the chassis 9, and the upper end is hinged to the shield body 24. The lower end of the lifting cylinder 26 is hinged to the front end of the chassis 9, and the upper end is hinged to the shield body 24. The lifting cylinder 26 is located at the front end of the telescopic sleeve 25, and the front-and-rear adjustment cylinder 27 is connected to the shield body 24, which is used to adjust the shield body 24 to move forward and backward.
[0080] Further preferably, the shield body 24 includes a shield upper base 241 and a telescopic body 242, the front and rear adjustment cylinder 27 is arranged on the shield upper base 241, and the piston rod of the front and rear adjustment cylinder 27 is connected to the telescopic body 242. In addition, the shield body 24 also includes a shield lower base 29, the shield upper base 241 is arranged on the upper end of the shield lower base 29 through a connecting pin 30, and the first connecting structure 22, the second connecting structure 23, the telescopic sleeve 25 and the lifting cylinder 26 are respectively hinged to the shield lower base 29. In the present invention, the first connecting structure 22 includes a first connecting rod 221 and a second connecting rod 222 connected by a pin shaft, the other end of the first connecting rod 221 is hinged to the shield support seat 21 through a pin shaft, and the other end of the second connecting rod 222 is hinged to the shield lower base 29 through a pin shaft. The second connection structure 23 includes a third connecting rod 231 and a fourth connecting rod 232 connected by a pin shaft, the other end of the third connecting rod 231 is hinged to the shield support seat 21 through the pin shaft, and the other end of the fourth connecting rod 232 is hinged to the shield lower base 29 through the pin shaft.
[0081] Furthermore, the function of the telescopic shield 4 in the present invention is to temporarily support the tunnel through the shield body 24 before the anchor drill 19 is set to drill holes in the roof and the side and install the anchor. Specifically, the telescopic body 242 can be moved forward and backward by the front and rear adjustment cylinder 27. After the cutting device 5 cuts the tunnel, the telescopic body 242 moves to the front end under the extension of the front and rear adjustment cylinder 27 until the telescopic body 242 is directly below the tunnel roof. Then, the telescopic body 242 is pushed upward and maintained at a certain pressure by the extension of the jacking cylinder 26, so that the shield body 24 can achieve temporary support. In the process of extending the jacking cylinder 26, the telescopic sleeve 25 automatically extends synchronously. In addition, in the present invention, the upper shield base 241 is arranged on the upper end of the lower shield base 29 through the connecting pin 30, thereby realizing the hinge between the upper shield base 241 and the lower shield base 29. In this way, when the top plate of the tunnel surface to be supported is a non-horizontal plane, for example, when there is a certain angle between the top plate of the surface to be supported and the horizontal plane, under the pushing action of the lifting cylinder 26, the upper shield base 241 and the telescopic body 242 can move relative to the lower shield base 29, so that the telescopic body 242 can adaptively fit the surface where the top plate of the surface to be supported is located, so that the telescopic shield 4 can better play a temporary support function.
[0082] Preferably, two telescopic sleeves 25, two front and rear adjusting cylinders 27 and two lifting cylinders 26 are provided in the present invention, and the two telescopic sleeves 25, the two lifting cylinders 26 and the two front and rear adjusting cylinders 27 are symmetrically distributed on the shield body 24 to ensure that the shield body 24 is stable during the forward and backward movement and the pressure is uniform during the temporary support process.
[0083] In actual operation, after the cutting device 5 cuts the tunnel and descends, the front and rear adjustment cylinders 27 push the telescopic body 242 to slide forward to just below the roof to be supported, and then the lifting cylinder 26 extends to allow the shield body 24 to provide temporary support, and then the sliding platform 10 moves forward again, and the front anchor drilling rig assembly 1 supports the tunnel. Figure 3 As shown, the shield body 24 is in a grid shape. When the anchor drill rig 19 completes the anchor support work of the top plate and the side and returns to its original position, the lifting cylinder 26 retracts, the telescopic sleeve 25 shortens synchronously, the telescopic body 242 leaves the tunnel top plate and descends, and then the front and rear adjustment cylinders 27 retract, driving the telescopic body 242 to slide backward until the telescopic body 242 returns to its initial position.
[0084] The telescopic shield of the present invention has an advanced sliding function, and can extend the shield body in advance to temporarily protect the roof before the front bolter assembly performs support, which can prevent operators from performing dangerous operations without protection and ensure the safety of construction. In addition, when the front bolter assembly performs support work, the telescopic shield can also effectively prevent coal gangue and the like from falling.
[0085] Further preferably, the width of the shield body 24 should be consistent with the cutting width of the cutting device 5 at one time to achieve an effective temporary protection effect.
[0086] In addition, the present invention also provides a method for excavating and anchoring using the above-mentioned zero-empty top and zero-empty side excavating and anchoring integrated machine, comprising the following steps:
[0087] S1: The working face of the tunnel to be mined is cut by the cutting device 5 until the tunnel reaches a predetermined depth. The cut materials are then transported to the scraper by the loading and transporting device 6. After the cutting and material loading are completed, the cutting device 5 descends to leave space for the tunnel to be supported.
[0088] S2: Under the extension of the front and rear adjustment cylinders 27, the telescopic body 242 moves forward to the surface to be supported, that is, directly below the roof. At this time, the front and rear adjustment cylinders 27 stop moving, and the lifting cylinders 26 extend outward, driving the shield body 24 to move upward until the telescopic body 242 contacts the tunnel roof. The lifting cylinders 26 still apply a certain pressure to the shield body 24 to temporarily support the roof position. The surface to be supported in the present invention refers to the excavated cutting surface.
[0089] S3: The sliding cylinder pushes the sliding platform 10 and the front anchor bolt assembly 1 arranged on the sliding platform 10 to move toward the front end until the front anchor bolt assembly 1 is located directly below the shield body 24 .
[0090] S4: The first telescopic cylinder and the second telescopic cylinder respectively drive the anchor drill 19 to move along the left and right directions, that is, the width direction of the tunnel, to support the roof of the tunnel. Specifically, the left and right directions are perpendicular to the front and rear directions. After the roof is supported, the swing arm cylinder 14 and the first rotary motor 18 adjust the height and angle of the anchor drill 19 so that the anchor drill 19 supports the side of the tunnel until the roof and side of the supported surface are fully supported. This step can achieve complete support of the roof and basic support of the side. If the tunnel is in good condition, the front anchor machine assembly 1 can support a part of the anchor rods to play a basic supporting role. The remaining anchor rods that need to be supported in the side can continue to be supported by the middle anchor machine assembly 2 and the tail anchor machine assembly 3 to improve the excavation efficiency. If the tunnel is in poor condition, all or most of the anchor rods can be supported by the front anchor machine assembly 1. In this step, the anchor drill 19 supports the top plate of the tunnel, specifically including drilling holes in the top plate and then installing anchors, etc. The anchor drill 19 supports the side of the tunnel, specifically including drilling holes in the side and then installing anchors, etc.
[0091] S5: The first telescopic cylinder, the second telescopic cylinder and the second rotary motor 31 drive the anchor drill 19 to provide advance support to the top plate of the unexcavated area at the front end of the cutting surface. Then the first rotary motor 18 first adjusts the direction of the second rotary motor 31 to turn it toward the side of the unexcavated area at the front end of the cutting surface, and then the second rotary motor 31 drives the anchor drill 19 to provide advance support to the side of the unexcavated area at the front end of the cutting surface.
[0092] S5: After the front bolter assembly 1 completes the support of the surface to be supported and completes the advance support, the sliding cylinder drives the sliding platform 10 and the front bolter assembly 1 to move to the rear end until the sliding platform 10 and the front bolter assembly 1 return to the initial position. Then the lifting cylinder 26 drives the shield body 24 down to leave the top plate of the tunnel, and then the front and rear adjustment cylinders 27 retract, driving the telescopic body 242 to move backward to the initial position, completing the excavation and support of a surface to be supported.
[0093] The above embodiments are only used to explain the present invention and do not constitute a limitation on the protection scope of the present invention. Those skilled in the art may make various deformations or modifications within the scope of the technical solution, which belong to the essential content of the present invention.
Claims
1. A zero-empty top and zero-empty side digging and anchoring machine, characterized in that: The invention comprises a chassis (9), a sliding platform (10) symmetrically arranged on both sides of the chassis (9), and a telescopic shield (4) arranged on the chassis (9); a front anchor bolt machine assembly (1) is arranged on the sliding platform (10); the sliding platform (10) can move forward and backward relative to the chassis (9); and the telescopic shield (4) is located above the front anchor bolt machine assembly (1); The front bolter assembly (1) comprises a connecting plate (11) connected to a sliding platform (10), a first telescopic structure (12) arranged on the connecting plate (11), a bottom plate (13) connected to the first telescopic structure (12), a telescopic adjustment structure in which a main body and the bottom plate (13) are hingedly connected, a first telescopic platform (15), a second telescopic structure (16) arranged on the first telescopic platform (15), a second telescopic platform (17) connected to the second telescopic structure (16), a first rotating structure arranged on the second telescopic platform (17), a second rotating structure arranged on the first rotating structure, and an bolter (19) connected to the second rotating structure; the telescopic end of the telescopic adjustment structure is hingedly connected to the bottom of the first telescopic platform (15); the telescopic directions of the first telescopic structure (12) and the second telescopic structure (16) are perpendicular to the excavation direction of the tunnel; the bolter (19) is used to install bolts on the top plate and the side of the tunnel; The first rotating structure is used to drive the second rotating structure and the anchor drill (19) to rotate around a first rotating axis perpendicular to the telescopic direction of the second telescopic structure (16); the second rotating structure is used to drive the anchor drill (19) to rotate around a second rotating axis parallel to the telescopic direction of the second telescopic structure (16); The front bolter assembly (1) further comprises a chain assembly (20), wherein the chain assembly (20) is connected to the first telescopic platform (15) and the second telescopic platform (17) respectively, and the second telescopic structure (16) is connected to the chain assembly (20) and is used to drive the chain assembly (20) to rotate; The first telescopic structure (12) is a first telescopic cylinder, the second telescopic structure (16) is a second telescopic cylinder, the telescopic adjustment structure is a swing arm cylinder (14), the body of the swing arm cylinder (14) is hinged to the bottom plate (13), the telescopic end of the swing arm cylinder (14) is hinged to the bottom of the first telescopic platform (15), the first rotating structure is a first rotating motor (18); and the second rotating structure is a second rotating motor (31); The telescopic shield (4) comprises a shield support seat (21), a first connection structure (22), a second connection structure (23), a shield body (24), a telescopic sleeve (25), a lifting cylinder (26), and a front and rear adjustment cylinder (27); The shield support seat (21) is arranged at the rear end of the chassis (9); one end of the first connection structure (22) and the second connection structure (23) is hinged to the shield support seat (21), and the other end is hinged to the shield body (24); the lower end of the telescopic sleeve (25) is hinged to the front end of the chassis (9), and the upper end is hinged to the shield body (24); the lower end of the lifting cylinder (26) is hinged to the front end of the chassis (9), and the upper end is hinged to the shield body (24); The lifting cylinder (26) is located at the front end of the telescopic sleeve (25); The front and rear adjustment oil cylinder (27) is connected to the shield body (24); The shield body (24) comprises an upper shield base (241), a telescopic body (242) and a lower shield base (29); the upper shield base (241) is arranged on the upper end of the lower shield base (29) via a connecting pin (30); the front and rear adjustment cylinder (27) is arranged on the upper shield base (241); and the piston rod of the front and rear adjustment cylinder (27) is connected to the telescopic body (242); The first connection structure (22), the second connection structure (23), the telescopic sleeve (25), and the lifting cylinder (26) are respectively hinged to the shield lower base (29); The first connecting structure (22) comprises a hinged first connecting rod (221) and a second connecting rod (222), the other end of the first connecting rod (221) being hinged to the shield support seat (21), and the other end of the second connecting rod (222) being hinged to the shield lower base (29); the second connecting structure (23) comprises a hinged third connecting rod (231) and a fourth connecting rod (232), the other end of the third connecting rod (231) being hinged to the shield support seat (21), and the other end of the fourth connecting rod (232) being hinged to the shield lower base (29).
2. The zero-empty top and zero-empty side drilling and anchoring machine according to claim 1 is characterized in that: A middle anchor bolt machine assembly (2) is also arranged on the chassis (9); the middle anchor bolt machine assembly (2) is located at the rear end of the front anchor bolt machine assembly (1); the middle anchor bolt machine assembly (2) is symmetrically arranged on both sides of the chassis (9); The middle anchor bolter assembly (2) comprises a first plate (201) arranged on the sliding platform (10), a first translation track (202) arranged on the first plate (201), a first translation cylinder (203) having one end arranged on the sliding platform (10) and the other end slidably connected to the first translation track (202), a second plate (204) connected to the telescopic end of the first translation cylinder (203), a first lifting track (205) arranged on the second plate (204), and a first lifting track (206) arranged on the second plate (206). A first lifting cylinder (206) is arranged on the second flat plate (204) and the other end of which is slidably connected to the first lifting rail (205), a first support plate (207) connected to the first lifting cylinder (206), a third rotary motor (208) arranged on the first support plate (207), and a middle anchor drill (209); the middle anchor drill (209) is connected to the third rotary motor (208); the extension direction of the first translation cylinder (203) is parallel to the excavation direction of the tunnel.
3. The zero-empty top and zero-empty side drilling and anchoring machine according to claim 2 is characterized in that: A tail bolter assembly (3) is also arranged on the chassis (9); the tail bolter assembly (3) is located at the rear end of the middle bolter assembly (2); the tail bolter assembly (3) is symmetrically arranged on both sides of the chassis (9); The tail bolter assembly (3) comprises a third plate arranged on the chassis (9), a second translation track arranged on the third plate, a second translation cylinder having one end arranged on the chassis (9) and the other end slidably connected to the second translation track, a fourth plate connected to the telescopic end of the second translation cylinder, a second lifting track arranged on the fourth plate, a second lifting cylinder having one end arranged on the fourth plate and the other end slidably connected to the second lifting track, a second support plate connected to the second lifting cylinder, a fourth rotary motor arranged on the second support plate, and a tail bolter; the tail bolter is connected to the fourth rotary motor; the telescopic direction of the second translation cylinder is parallel to the excavation direction of the tunnel.
4. The zero-empty top and zero-empty side drilling and anchoring machine according to claim 1, characterized in that: It also includes a cutting device (5) arranged at the front end of the chassis (9), and a loading and transporting device (6) arranged at the rear end of the cutting device (5); The cutting device (5) and the loading and transporting device (6) are located at the front end of the sliding platform (10).
5. The zero-empty top and zero-empty side drilling and anchoring machine according to claim 1, characterized in that: It also includes an electrical system (7) and a hydraulic system (8) arranged on the chassis (9); A sliding oil cylinder is also provided on the chassis (9), and the sliding platform (10) is connected to the sliding oil cylinder.
6. A method for excavating and anchoring using the zero-void top and zero-void side excavator and anchoring machine according to any one of claims 1 to 5, characterized in that: The steps include: S1: cutting the working face of the tunnel to be mined by means of a cutting device (5) until the tunnel reaches a predetermined depth; S2: The front and rear adjustment cylinders (27) adjust the shield body (24) to be directly below the surface to be supported, and the lifting cylinder (26) drives the shield body (24) to rise and applies pressure to the shield body (24) to temporarily support the surface to be supported; S3: The sliding oil cylinder drives the sliding platform (10) and the front anchor bolt assembly (1) to move toward the front end until the front anchor bolt assembly (1) is located below the surface to be supported; S4: the first telescopic oil cylinder and the second telescopic oil cylinder drive the anchor drill (19) to support the roof of the tunnel by telescoping; then the swing arm oil cylinder (14) and the first rotary motor (18) drive the anchor drill (19) to support the side of the tunnel until the roof and side of the supported surface are fully supported; S5: the first telescopic oil cylinder, the second telescopic oil cylinder and the second rotary motor (31) drive the anchor drill (19) to perform advance support on the top plate of the unexcavated area at the front end of the cutting surface, and then the first rotary motor (18) and the second rotary motor (31) drive the anchor drill (19) to perform advance support on the side of the unexcavated area at the front end of the cutting surface; S6: The sliding cylinder drives the sliding platform (10) and the front bolter assembly (1) to move to the rear end and return to the initial position, the lifting cylinder (26) drives the shield body (24) to descend to leave the tunnel, and then the front and rear adjustment cylinder (27) drives the shield body (24) to move to the rear end to the initial position.