An optimization operation method for coal mine multi-energy station architecture under dynamic resource evolution

Through the multi-energy station architecture of coal mines under the dynamic evolution of resources, the cascade utilization and coordinated supply of coal mine energy resources are realized, which solves the problems of unsatisfactory utilization of associated energy and volatility of photovoltaic power generation in the coal mining process, reduces operating costs and improves level of renewable energy consumption.

CN118586731BActive Publication Date: 2024-10-29JIANGSU HUAWANG ELECTRIC POWER TECH RES INST CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410654416.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-24
Publication Date
2024-10-29
Estimated Expiration
2044-05-24

AI Technical Summary

Technical Problem

The utilization effect of associated energy during coal mining is not ideal, and photovoltaic power generation is greatly affected by light intensity and temperature, making it difficult to dispatch coal mine energy systems and affecting the cascade utilization of energy and the level of renewable energy consumption.

Method used

The multi-energy station architecture of coal mines under the dynamic evolution of resources is adopted, including small and medium-load prosumer energy stations, large-load prosumer energy stations and energy production energy stations. By establishing an in-station operating load model and constraint relationships, an optimized operation objective function is constructed , using the Gurobi solver for calculations to realize interconnection and collaborative supply between energy stations.

Benefits of technology

It realizes the cascade utilization and coordinated supply of coal mine energy resources, reduces system operating costs, improves the economics of multi-scenario operation of coal mine energy and the level of renewable energy consumption. Simulation verification shows that interconnected operation of multiple energy stations is better than independent operation. The energy purchase cost was saved by 62,525 yuan, and the local consumption of photovoltaic power generation exceeded 12MWh.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118586731B_ABST
    Figure CN118586731B_ABST
Patent Text Reader

Abstract

The present invention discloses an optimization operation method of a coal mine multi-energy station architecture under the dynamic evolution of resources. The coal mine multi-energy station architecture under the dynamic evolution of resources includes small and medium load production and consumption type energy stations, large load production and consumption type energy stations, energy production type energy stations and interconnected power lines; the optimization operation method includes: establishing in-station operation load models of small and medium load production and consumption type energy stations, large load production and consumption type energy stations and energy production type energy stations respectively; based on the in-station operation load model, determining known parameters and decision variables, and constructing constraint relationships; constructing an optimization operation objective function for the interconnection of coal mine multi-energy stations, and performing calculations and solutions to obtain the minimum energy cost. The present invention can realize the cascade utilization and coordinated supply of energy resources between multiple coal mining areas, improve the economy of coal mine energy multi-scenario operation and the level of renewable energy consumption, and can provide a theoretical basis and data support for the efficient and economical production and operation of coal mine multi-energy stations interconnection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to an energy complementary optimization scheduling operation method, specifically to an optimization operation method of a coal mine multi-energy station architecture under dynamic resource evolution, and belongs to the technical field of energy low-carbon production. Background Art

[0002] my country is rich in coal resources, and coal is one of the main energy sources in my country. According to the Statistical Bulletin of China's National Economic and Social Development in 2021, my country's coal consumption accounts for 56% of total energy consumption. Coal mining includes multiple links such as excavation, transportation, drainage, ventilation, etc. The industry has the characteristics of high energy consumption, high energy consumption cost and strong dependence on fossil energy. How to achieve energy-saving and economical production in coal mines is a concern of the industry.

[0003] Coal mining is a combination of energy consumption and production capacity. There are multiple energy demands for electricity, heat and cold in the process of coal mining. Although the operation of drainage pumps, ventilators and other energy conversion equipment will bring about the generation of associated energy such as coal mine water inrush, lack of wind and equipment waste heat, which can be "turned into treasure" through power generation, heat pumps and other technologies, with the extension of underground working face mining and changes in geological environment, the amount of associated energy outflow is difficult to predict, and the utilization effect of associated energy is not ideal. In addition, my country's major coal-producing provinces include Shanxi, Inner Mongolia, Shaanxi, Xinjiang, Guizhou, Anhui, Ningxia, etc., mainly in the northwest region. Although the geographical location of the northwest region is rich in light resources, in order to accelerate the realization of the goal of green and low-carbon economic cycle development of coal mines, considering that photovoltaic power generation has the characteristics of no pollution and no carbon emissions, photovoltaic power generation has long been the first choice for the construction of new energy in many mining areas. However, photovoltaic power generation is affected by factors such as light intensity and temperature, and the output has great randomness and volatility, and the utilization effect of photovoltaic power generation in mining areas is not ideal. In addition, the mining methods and mining stages of each coal mining area are different, and the levels of energy consumption and energy output are also different, which brings huge challenges to the overall scheduling of the coal mine comprehensive energy system. Summary of the invention

[0004] In response to the problems existing in the above-mentioned prior art, the present invention provides an optimized operation method for a coal mine multi-energy station architecture under the dynamic evolution of resources, which can realize the cascaded utilization and coordinated supply of coal mine energy resources among multiple coal mining areas, improve the economy of coal mine energy multi-scenario operation and the consumption level of renewable energy, and provide a theoretical basis and data support for the efficient interconnection and economical production operation of coal mine multi-energy stations in different scenarios.

[0005] To achieve the above objectives, the coal mine multi-energy station architecture under the dynamic evolution of resources includes small and medium-load production and consumption energy stations for coal mines in the initial mining stage, large-load production and consumption energy stations for coal mines in the continuous mining stage, energy production energy stations for coal mines in the abandoned stage, and interconnected power lines between energy stations;

[0006] The method for optimizing the operation of the coal mine multi-energy station architecture under the dynamic evolution of resources specifically includes the following steps:

[0007] Step 1. Based on the coal mine multi-energy station architecture under the dynamic evolution of resources, the station operation load models of small and medium load production and consumption type energy stations, large load production and consumption type energy stations and energy production type energy stations are established respectively;

[0008] The station operation load models of small and medium-load production and consumption energy stations and large-load production and consumption energy stations include coal mining equipment load model, tunneling equipment load model, conveyor load model, drainage pump load model, ground water tank load model, ventilator load model, winter wellhead antifreeze load model, air conditioning unit load model, absorption chiller load model, water source heat pump unit load model, exhaust air source heat pump load model;

[0009] Energy production type energy station includes underground pumped storage unit load model and ground photovoltaic power station load model;

[0010] Step 2. Based on the station operation load model, determine the known parameters and decision variables and build constraint relationships;

[0011] The power balance constraint of the joint operation of energy stations is expressed as follows:

[0012]

[0013] Where: is the electric power exchanged between the ith energy station and the external power grid at time t, in kW; is the power generation unit of the k-type power generation equipment in the i-th energy station at time t, kW; P i-j,t is the electric power exchanged between energy station i and energy station j at time t, in kW; The power of the z-type energy load in the i-th energy station at time t, in kW;

[0014] The constraints also include constraints on the power generation part, constraints on the heating and cooling parts, constraints on the equipment operating power, constraints on the drainage system, constraints on the drainage flow of the drainage pump, state constraints during the maintenance period, constraints on the ventilation system, constraints on the ground water tank, constraints on the underground pumped storage unit, and constraints on the balance of hot and cold power in the station, as follows:

[0015] The constraints of the power generation part are expressed as follows:

[0016] 0≤P i,t ≤P i,max

[0017] Where: P i,t is the power generation capacity of the i-th type of power generation equipment at time t, in kW; Pi,max is the maximum power generation capacity of the i-th type of power generation equipment, in kW;

[0018] The constraints for the heating and cooling parts are expressed as follows:

[0019] 0≤H i,t ≤H i,max

[0020] 0≤C i,t ≤C i,max

[0021] Where: H i,t is the heating power of the i-th type of heating equipment at time t, in kW; H i,max is the maximum heating power of the i-th type of heating equipment, in kW; C i,t is the cooling power of the i-th type of refrigeration equipment at time t, in kW; C i,max is the maximum cooling power of the refrigeration equipment of type i, in kW;

[0022] The equipment operating power constraints are expressed as follows:

[0023] 0≤P k,t ≤P k,max

[0024] Where: P k,t is the operating power of the kth type of equipment at time t, in kW; P k,max is the maximum operating power of the kth category equipment, in kW;

[0025] The drainage system constraints are expressed as follows:

[0026] V c =8Q,Q≤1000

[0027] V c =2(Q+3000), Q>1000

[0028] V K ≥0.5V

[0029] Where: V c is the water tank capacity, in m 3 ; V K The empty tank capacity of the water tank, in m 3 ; Q is the average water inflow of the coal mine, unit: m 3 / h; 8 and 2 represent 8 hours and 2 hours respectively;

[0030] The drainage flow constraint of the drainage pump is expressed as follows:

[0031]

[0032] Where: Q is the average water inflow of the coal mine, unit: m 3 / h; W G , W B , W J They are the flow rates of the working water pump, standby water pump and maintenance water pump, in m 3 / h;

[0033] When in the maintenance period, only the maintenance pump is started, and the constraint is expressed as:

[0034] U z+1,t (P z,max -P z,t )=0

[0035] Where: U z+1,t is the operating state of a type of water pump after time t, which is a 0-1 variable; P z,max is the maximum operating power of the previous type of water pump, in kW; P z,t is the operating power of the previous type of water pump at time t, in kW;

[0036] The state constraints during the maintenance period are expressed as follows:

[0037]

[0038] Where: U G,t , U B,t , U J,t They are the operating status of the working water pump, standby water pump and maintenance water pump, which are 0-1 variables;

[0039] The ventilation system constraints are expressed as follows:

[0040] Q f,min ≤Q f,t ≤Q f,max

[0041] Where: Q f,min , Q f,max Respectively minimum and maximum ventilation volume, unit m 3 / h;Q f,t is the air intake volume of the fan at time t, in m 3 / h;

[0042] The ground water tank constraint is expressed as follows:

[0043] 0≤V dm,t ≤V dm,max

[0044] Where: V dm,t is the water storage capacity of the ground water tank at time t, in m 3 ; V dm,max is the maximum water storage capacity of the water tank, in m 3;

[0045] The constraints of underground pumped storage units are expressed as follows:

[0046]

[0047] Where: P c,max , P disc,max They are the maximum charging power and the maximum discharging power of the water storage unit, in kW; E PH,max E is the maximum storage capacity of the water storage unit, in kWh; PH,t is the power storage capacity of the unit at time t, in kWh;

[0048] The hot and cold power balance constraints in the station are expressed as follows:

[0049]

[0050] Where: is the heating power of the k-type heating equipment in the i-th energy station at time t, in kW; is the heat load power of type z inside the i-th energy station at time t, in kW; is the cooling power of the k-type refrigeration equipment in the i-th energy station at time t, in kW; is the cooling load power of type z inside the i-th energy station at time t, in kW;

[0051] Step 3. Construct the objective function of the interconnected optimization operation of multiple energy stations in coal mines, and use the Gurobi solver to calculate and solve to obtain the minimum energy cost;

[0052] The objective function of the interconnected optimization operation of multiple energy stations in coal mines is expressed as follows:

[0053] minF=F1+F2+F3

[0054]

[0055] Where: F is the total operating cost, in RMB; F1, F2, and F3 are the system external energy cost, system energy interactive operation and maintenance cost, and renewable energy power station abandonment penalty cost, in RMB; C grid,t is the grid electricity price at time t, in RMB / kWh; P grid,t is the amount of electricity purchased from and to the customer during period t, in kWh; C ntrgas is the price of purchased natural gas, unit: RMB / m 3 ; V ntrgas,t is the amount of natural gas purchased during period t, in m 3 ; C line is the unit operation and maintenance cost of the energy exchange line, unit: RMB / m; L iis the length of the ith energy interaction line, in meters; P i,t is the transmission power of the ith energy interaction line, in kW; C l P is the penalty cost of abandoned solar power, in RMB / kWh; l,t It is the total abandoned photovoltaic power in period t, in kWh.

[0056] Furthermore, the station operation load models of small and medium load production and consumption type energy stations and large load production and consumption type energy stations are as follows:

[0057] The coal mining equipment load model is expressed as follows:

[0058] P s,t =BHV s,t γ s

[0059] Where: P s,t is the operating power of the coal mining equipment at time t, in kW; B is the cutting depth of the coal mining machine, in m; H is the cutting height of the coal mining machine, in m; V s,t is the cutting speed of the coal mining machine at time t, in m / h; γ s is the conversion coefficient of coal mining machine energy consumption, which takes a value of 0.98;

[0060] The load model of tunneling equipment is expressed as follows:

[0061]

[0062] Where: P j,t is the cutting power of the roadheader at time t, in kW; ICR is the pure cutting capacity of the roadheader, in m 3 / h; SE opt is the optimal cutting specific energy consumption, unit is kWh / m 3 ; ρ1 is the energy transfer efficiency, unit %; ρ2 is the actual work efficiency, unit %;

[0063] The conveyor load model is expressed as follows:

[0064]

[0065] Where: P tr,t is the mechanical power of the conveyor, in kW; V tr is the transmission speed of the belt, in m / s; T tr is the coal feeding rate of the belt conveyor, in tons / h; θ1, θ2, θ3, θ4 are constant parameters respectively;

[0066] The drainage pump load model is expressed as follows:

[0067]

[0068] Where: P z,t is the operating power of the z type pump at time t, in kW; p is the specific gravity of the medium, water is 1000 kg / m 3 ; g is the acceleration due to gravity, unit is N / kg, and the value is 9.8; W z,t is the operating flow rate of type z pump at time t, in m 3 / h; H z For the Z type water pump, the head is in m; η z is the operating efficiency of the z type water pump, which takes a value of 0.6;

[0069] The ground water tank load model is expressed as follows:

[0070]

[0071] Where: C ws,t is the amount of water stored in the water tank at time t, in m 3 ; W out,t is the amount of water flowing out of the water tank at time t, in m 3 / h; 1 means 1 hour;

[0072] The fan load model is expressed as follows:

[0073]

[0074] Where: P f,t is the operating power of the fan at time t, in kW; Q f,t is the air intake volume of the fan at time t, in m 3 / h;p f is the total wind pressure of the fan, in Pa; η f The fan operating efficiency is 0.9;

[0075] The winter wellhead antifreeze load model is expressed as follows:

[0076] H fd =Q f ×ρ air ×C p ×(T h -T w )

[0077] Where: H fd Q is the wellhead antifreeze heat load power, unit kW; f is the air volume at the wellhead, in m 3 / s;ρ air is the air density, in kg / m 3 , the value is 1.28; C p is the specific heat capacity of air at constant pressure, in kJ / (kg·℃), with a value of 1.01; Th T is the temperature after the cold and hot air are mixed, in °C; w is the lowest ambient temperature in winter, in °C;

[0078] The load model of the air conditioning unit is expressed as follows:

[0079] CL EC,t =η EC ×P EC,t

[0080] H EC,t =η H ×P H,t

[0081] Where: CL EC,t , H EC,t are respectively the cooling and heating power at time t, in kW; η EC , η H are cooling and heating energy efficiency coefficients respectively; P EC,t , P H,t are the electric power consumed by cooling and heating at time t, in kW;

[0082] The load model of absorption chiller is expressed as follows:

[0083] CL AC,t =η AC ×H AC,t

[0084] Where: CL AC,t is the cooling power of the absorption chiller at time t, in kW; η AC is the energy efficiency coefficient of the absorption chiller at time t; H AC,t The heat power absorbed by the absorption chiller at time t, in kW;

[0085] The load model of the water source heat pump unit is expressed as follows:

[0086]

[0087] Where: P hp,t is the electric power consumed by the water source heat pump unit in time period t, in kW; H P,t is the electric heating capacity of the water source heat pump unit in time period t, in kW; COP is the heating performance coefficient of the water source heat pump unit; H h,t is the heat absorbed by the water source heat pump unit from the heat source side during the period t, in kW; c is the specific heat capacity of the circulating working fluid, in J / (kg·℃); q is the mass flow rate of the circulating working fluid, in kg / s; T hp,in 、T hp,out are the inlet and outlet temperatures of the water source heat pump evaporator, in °C;

[0088] The load model of the exhaust air source heat pump is expressed as follows:

[0089] H vshp,t =Δh vam ×V vam,t ε vam / (1-1 / COP vshp )

[0090] P vshp,t =H vshp,t / COP vshp

[0091] Where: H vshp,t is the heating power of the exhaust air source heat pump at time t, in kW; Δh vam V is the enthalpy difference of the exhaust air before and after heat exchange, in kJ / kg; vam,t Mine ventilation velocity, unit: m 3 / s; ε vam is the density of the exhaust air, in kg / m 3 ; COP vshp is the energy efficiency ratio of the exhaust air source heat pump; P vshp,t The operating power of the exhaust air source heat pump, unit: kW;

[0092] The load model of underground pumped storage unit is expressed as follows:

[0093] E PH,t =E PH,t-1 +(χ c P c,t -x disc P disc,t )

[0094] Where: E PH,t 、E PH,t-1 are the electricity stored in the water storage unit at time t and time t-1, in kWh; P c,t , P disc,t are the charging and discharging power of the water storage unit at time t, in kW; c , χ disc They are the charging and discharging efficiency of the water storage unit, and the value is 0.75;

[0095] The load model of ground photovoltaic power station is expressed as follows:

[0096]

[0097] Where: P pv,t is the photovoltaic power generation at time t, in kW; P pv,cap is the installed capacity of photovoltaic power, in kW; G pv,t is the light intensity at time t, in kW / m2 κ pv is the photovoltaic temperature coefficient, unit / ℃; T borad,t is the temperature of the photovoltaic panel at time t, in °C; T stp is the working temperature of the photovoltaic panel, in °C; G stp is the light intensity under working conditions, unit: kW / m 2 ; T env,t is the ambient temperature at time t, in °C; V env,t is the ambient wind speed at time t, in m / s; T max 、T min are the highest and lowest temperatures of the day, in °C; t ave is the daily average temperature at that moment, unit…

[0098] Furthermore, the in-station operation model of the large-load production and consumption energy station also includes the load model of the wind-lack thermal oxidation power generation and waste heat recovery unit, the load model of the gas turbine and waste heat utilization unit, the load model of the gas boiler, and the load model of the ground photovoltaic power station.

[0099] Furthermore, the load models of the wind-deficient thermal oxidation power generation and waste heat recovery units, the load models of the gas turbine and waste heat utilization units, and the load models of the gas boilers are as follows:

[0100] The load model of the wind-deficient thermal storage oxidation power generation and waste heat recovery unit is as follows:

[0101] P rto,t =η rto ×C gas ×n vam ×V vam,t ×(1-η ploss )

[0102] H rto,t =γ rec ×η rtoT ×P rto,t

[0103] Where: P rto,t is the power generation of the thermal storage oxidation unit at time t, in kW; η rto is the power generation efficiency of the thermal storage oxidation unit; C gas is the calorific value of coalbed methane, unit is kJ / m 3 ;n vam V is the concentration of coalbed methane in the air-deficient environment, unit: %; V vam,t is the flow rate of the exhaust air at time t, in m3 / h; η ploss is the self-loss coefficient of the thermal storage oxidation unit, unit %; H rto,t is the thermal power of waste heat recovery from the thermal storage oxidation unit at time t, in kW; γ recis the waste heat recovery efficiency of the thermal storage oxidation unit, unit: %; η rtoT is the heating efficiency of the thermal storage oxidation unit, unit: %;

[0104] The load model of gas turbine and waste heat utilization unit is expressed as follows:

[0105]

[0106] H rec,t =λ rec H gt,t

[0107] Where: P gt,t is the power generated by the gas turbine at time t, in kW; η gt is the power generation efficiency of gas turbine, unit: %; C gas is the calorific value of gas, unit is kJ / m 3 ;n gas V is the gas concentration in %; gas,t is the gas flow rate at time t, in m3 / h; H gt,t is the heat generation power of the gas turbine at time t, in kW; η gt,loss is the heat loss coefficient of the gas turbine, which is 0.02; H rec,t is the thermal power of waste heat recovery at time t, in kW; rec is the efficiency of waste heat recovery, which takes a value of 0.8;

[0108] The gas boiler load model is expressed as follows:

[0109] H GB,t =V GB,t η ng q GB

[0110] Where: H GB,t is the heat generation power of the gas boiler in time period t, in kW; V GB,t is the volume of natural gas input into the gas boiler during period t, in m 3 ; η ng is the natural gas calorific value conversion coefficient, unit kW / m 3 ;q GB is the gas boiler conversion efficiency, which takes a value of 0.9.

[0111] Compared with the existing technology, the optimization operation method of the coal mine multi-energy station architecture under the dynamic evolution of resources has the following advantages:

[0112] 1. It can realize the cascade utilization and coordinated supply of coal mine energy resources. Combined with the mining stage of coal mines, the different characteristics of coal mine energy consumption and associated energy output, and considering the energy-resource recovery-processing-reuse of abandoned coal mines, energy stations are built in different mining areas to form source-load integration within the station and energy complementarity between stations.

[0113] 2. It can improve the economic efficiency of coal mine energy stations in multiple scenarios and the level of renewable energy consumption. After simulation verification, the interconnected operation of multiple energy stations reduced the energy purchase cost by 625,250 yuan compared with the independent operation of substations, and the local consumption of photovoltaic power generation exceeded 12MWh, which can provide theoretical and data support for the efficient and economical production operation of coal mine multi-energy stations in different scenarios. BRIEF DESCRIPTION OF THE DRAWINGS

[0114] Figure 1 It is a schematic diagram of the multi-energy station architecture of coal mines based on the dynamic evolution of resources;

[0115] Figure 2 It is the relationship diagram between power output and load of multiple energy stations in coordinated operation;

[0116] Figure 3 It is a schematic diagram of heat balance of a single station in winter;

[0117] Figure 4 It is a schematic diagram of the cold balance of a single station in summer;

[0118] Figure 5 It is the drainage system maintenance dispatching operation diagram;

[0119] Figure 6 It is a schematic diagram of the coordinated optimization operation process of multiple energy stations. DETAILED DESCRIPTION

[0120] The present invention will be further described below in conjunction with the accompanying drawings.

[0121] Considering the dynamic evolution of natural resources, associated energy, land resources and underground space resources in the mining area, as well as the different source-load demands of the mining area at different stages of the evolution process, the composition and output characteristics of regional resources will undergo dynamic changes. Figure 1As shown in the figure, a coal mine multi-energy station architecture based on the dynamic evolution of resources is constructed, including small and medium-load production and consumption type energy stations for coal mines in the initial mining stage, large-load production and consumption type energy stations for coal mines in the continuous mining stage, energy production type energy stations for coal mines in the abandoned stage, and interconnected power lines between energy stations. The production capacity of coal mines in the initial mining stage is low, the energy demand in the mining area is lower than that in the full production stage, the output of associated energy is relatively low, the utilization rate of natural resources and land resources is low, and the proportion of energy self-supply is low; the production capacity of coal mines in the continuous mining stage reaches the expected level, and it is in the stage of stable energy consumption in the mining period, with large energy demand, large associated energy output, and improved utilization rate of natural resources, associated resources and land resources in the mining area, which can achieve local energy self-balance; coal mines in the abandoned stage can use the above-ground land resources of abandoned coal mines to build photovoltaic power stations and underground space resources to build pumped storage power stations, forming the main renewable energy power stations in the region.

[0122] The small and medium-load production and consumption energy stations for coal mines in the initial mining stage and the large-load production and consumption energy stations for coal mines in the continuous mining stage both include power supply networks and heating / cooling networks. The power supply network includes the external power grid supply part, the mining area power load part, the production guarantee power load part, etc. The production guarantee power load part includes the mining-digging-transmission power load, the mine ventilation power load, the mine drainage power load, the mine heating / cooling power load, etc. The heating / cooling network includes electric heating / cooling machines that can be used for heating or cooling and the mining area heat / cooling load part. It can also include water source heat pumps, exhaust air source heat pumps, etc. for heating, and absorption chillers for cooling, etc.

[0123] For coal mines in the continuous mining stage, the power supply network of large-load production and consumption energy stations can also include wind-lack thermal oxidation power generation, ground photovoltaic power generation, gas turbine power generation and other power generation parts. The heating / cooling network of large-load production and consumption energy stations can also include gas boilers for heating.

[0124] The energy production station for abandoned coal mines includes ground photovoltaic power generation, external power grid supply, underground pumped storage power station, operation and maintenance power load and other parts.

[0125] The flowchart of the optimization operation method of coal mine multi-energy station architecture under the dynamic evolution of resources is as follows: Figure 6 As shown, the specific steps include:

[0126] Step 1. Based on the multi-energy station architecture of coal mines under the dynamic evolution of resources, the station operation load models of small and medium-load production and consumption energy stations, large-load production and consumption energy stations and energy production energy stations are established respectively.

[0127] The station operation load model for small and medium-load production and consumption type energy stations in coal mines in the initial mining stage and large-load production and consumption type energy stations in coal mines in the continuous mining stage may include coal mining equipment load model, tunneling equipment load model, conveyor load model, drainage pump load model, ground water tank load model, ventilator load model, winter wellhead antifreeze load model, air conditioning unit load model, absorption chiller load model, water source heat pump unit load model, exhaust air source heat pump load model, as follows:

[0128] ① The coal mining equipment load model is expressed as follows:

[0129] P s,t =BHV s,t γ s

[0130] Where: P s,t is the operating power of the coal mining equipment at time t, in kW; B is the cutting depth of the coal mining machine, in m, generally 0.8 m; H is the cutting height of the coal mining machine, in m, generally 5 m; V s,t is the cutting speed of the coal mining machine at time t, in m / h. Considering factors such as the coal seam structure, the general value range is 110-150 m / h; γ s It is the conversion coefficient of coal mining machine energy consumption, and its value is 0.98.

[0131] ② The tunneling equipment load model is expressed as follows:

[0132]

[0133] Where: P j,t is the cutting power of the roadheader at time t, in kW; ICR is the pure cutting capacity of the roadheader, in m 3 / h; SE opt is the optimal cutting specific energy consumption, unit is kWh / m 3 ; ρ1 is the energy transfer efficiency, unit is %; ρ2 is the actual work efficiency, unit is %.

[0134] ③The conveyor load model is expressed as follows:

[0135]

[0136] Where: P tr,t is the mechanical power of the conveyor, in kW; V tr is the transmission speed of the belt, which is a fixed value in m / s; T tr is the coal feeding rate of the belt conveyor, in tons / h; θ1, θ2, θ3, θ4 are constant parameters, which are determined by the structure and composition of the conveyor (according to standard ISO5048).

[0137] ④The drainage pump load model is expressed as follows:

[0138]

[0139] Where: P z,t is the operating power of the z type pump at time t, in kW; p is the specific gravity of the medium, water is 1000 kg / m 3 ; g is the acceleration due to gravity, unit is N / kg, and the value is 9.8; W z,t is the operating flow rate of type z pump at time t, in m 3 / h; H z For the Z type water pump, the head is in m; η z is the operating efficiency of the z type water pump, and its value is 0.6.

[0140] ⑤The ground water tank load model is expressed as follows:

[0141]

[0142] Where: C ws,t is the amount of water stored in the water tank at time t, in m 3 ; W out,t is the amount of water flowing out of the water tank at time t, in m 3 / h; 1 means 1 hour.

[0143] ⑥The fan load model is expressed as follows:

[0144]

[0145] Where: P f,t is the operating power of the fan at time t, in kW; Q f,t is the air intake volume of the fan at time t, in m 3 / h;p f is the total wind pressure of the fan, in Pa; η f The fan operating efficiency is 0.9.

[0146] ⑦ The winter wellhead antifreeze load model is expressed as follows:

[0147] H fd =Q f ×ρ air ×C p ×(T h -T w )

[0148] Where: H fd Q is the wellhead antifreeze heat load power, unit kW; f is the air volume at the wellhead, in m 3 / s;ρ air is the air density, in kg / m 3, the value is 1.28; C p is the specific heat capacity of air at constant pressure, in kJ / (kg·℃), with a value of 1.01; T h T is the temperature after the cold and hot air are mixed, in °C; w It is the lowest ambient temperature in winter, in ℃.

[0149] ⑧The load model of the air conditioning unit is expressed as follows:

[0150] CL EC,t =η EC ×P EC,t

[0151] H EC,t =η H ×P H,t

[0152] Where: CL EC,t , H EC,t are respectively the cooling and heating power at time t, in kW; η EC , η H are cooling and heating energy efficiency coefficients respectively; P EC,t , P H,t They are the electric power consumed by cooling and heating at time t, in kW.

[0153] ⑨The load model of absorption chiller is expressed as follows:

[0154] CL AC,t =η AC ×H AC,t

[0155] Where: CL AC,t is the cooling power of the absorption chiller at time t, in kW; η AC is the energy efficiency coefficient of the absorption chiller at time t; H AC,t The thermal power absorbed by the absorption chiller at time t, in kW.

[0156] ⑩The load model of the water source heat pump unit is expressed as follows:

[0157]

[0158] Where: P hp,t is the electric power consumed by the water source heat pump unit in time period t, in kW; H P,t is the electric heating capacity of the water source heat pump unit in time period t, in kW; COP is the heating performance coefficient of the water source heat pump unit; H h,t is the heat absorbed by the water source heat pump unit from the heat source side during the period t, in kW; c is the specific heat capacity of the circulating working fluid, in J / (kg·℃); q is the mass flow rate of the circulating working fluid, in kg / s; Thp,in 、T hp,out They are the inlet and outlet temperatures of the water source heat pump evaporator, respectively, in °C.

[0159] The load model of the exhaust air source heat pump is expressed as follows:

[0160] H vshp,t =Δh vam ×V vam,t ε vam / (1-1 / COP vshp )

[0161] P vshp,t =H vshp,t / COP vshp

[0162] Where: H vshp,t is the heating power of the exhaust air source heat pump at time t, in kW; Δh vam V is the enthalpy difference of the exhaust air before and after heat exchange, in kJ / kg; vam, x is the mine ventilation velocity, in m3 / s; ε vam is the density of the exhaust air, in kg / m 3 ; COP vshp is the energy efficiency ratio of the exhaust air source heat pump; P vshp,t It is the operating power of the exhaust air source heat pump, in kW.

[0163] The in-station operation model of a large-load production and consumption energy station can also include the load model of the wind-exhaust thermal storage oxidation power generation and waste heat recovery unit, the load model of the gas turbine and waste heat utilization unit, the load model of the gas boiler, and the load model of the ground photovoltaic power station, as follows:

[0164] The load model of the wind-deficient thermal storage oxidation power generation and waste heat recovery unit is as follows:

[0165] P rto,t =η rto ×C gas ×n vam ×V vam,t ×(1-η ploss )

[0166] H rto,t =γ rec ×η rtoT ×P rto,t

[0167] Where: P rto,t is the power generation of the thermal storage oxidation unit at time t, in kW; η rto is the power generation efficiency of the thermal storage oxidation unit; C gas is the calorific value of coalbed methane, unit is kJ / m3 ;n vam V is the concentration of coalbed methane in the air-deficient environment, unit: %; V vam,t is the flow rate of the lack of air at time t, in m 3 / h; η ploss is the self-loss coefficient of the thermal storage oxidation unit, unit %; H rto,t is the thermal power of waste heat recovery from the thermal storage oxidation unit at time t, in kW; γ rec is the waste heat recovery efficiency of the thermal storage oxidation unit, unit: %; η rtoT It is the heating efficiency of the thermal storage oxidation unit, in %.

[0168] The load model of gas turbine and waste heat utilization unit is expressed as follows:

[0169]

[0170] H rec,t =λ rec H gt,t

[0171] Where: P gt,t is the power generated by the gas turbine at time t, in kW; η gt is the power generation efficiency of gas turbine, unit: %; C gas is the calorific value of gas, unit is kJ / m 3 ;n gas V is the gas concentration in %; gas,t is the gas flow rate at time t, in m 3 / h; H gt,t is the heat generation power of the gas turbine at time t, in kW; η gt,loss is the heat loss coefficient of the gas turbine, which is 0.02; H rec,t is the thermal power of waste heat recovery at time t, in kW; rec is the efficiency of waste heat recovery, and its value is 0.8.

[0172] The gas boiler load model is expressed as follows:

[0173] H GB,t =V GB,t η ng q GB

[0174] Where: H GB,t is the heat generation power of the gas boiler in time period t, in kW; V GB,t is the volume of natural gas input into the gas boiler during period t, in m 3 ; η ng is the natural gas calorific value conversion coefficient, unit kW / m3 ;q GB is the gas boiler conversion efficiency, which takes a value of 0.9.

[0175] The load model of ground photovoltaic power station is expressed as follows:

[0176]

[0177] Where: P pv,t is the photovoltaic power generation at time t, in kW; P pv,cap is the installed capacity of photovoltaic power, in kW; G pv,t is the light intensity at time t, in kW / m 2 κ pv is the photovoltaic temperature coefficient, unit / ℃; T borad,t is the temperature of the photovoltaic panel at time t, in °C; T stp is the working temperature of the photovoltaic panel, in °C; G stp is the light intensity under working conditions, unit: kW / m 2 ; T env,t is the ambient temperature at time t, in °C; V env,t is the ambient wind speed at time t, in m / s; T max 、T min are the highest and lowest temperatures of the day, in °C; t ave is the daily average temperature time, for example, 10:00am, then t ave is 10.

[0178] Energy production stations for abandoned coal mines can include underground pumped storage unit load models and The load model of the ground photovoltaic power station is as follows:

[0179] The load model of underground pumped storage unit is expressed as follows:

[0180] E PH,t =E PH,t-1 +(χ c P c,t -x disc P disc,t )

[0181] Where: E PH,t 、E PH,t-1 are the electricity stored in the water storage unit at time t and time t-1, in kWh; P c,t , P disc,t are the charging and discharging power of the water storage unit at time t, in kW; c , χ discThey are respectively the charging and discharging efficiency of the water storage unit, and their value is 0.75.

[0182] Step 2. Based on the station operation load model, determine the known parameters and decision variables and build the constraint relationship. The constraint relationship is as follows:

[0183] ① The constraints of the power generation part are expressed as follows:

[0184] 0≤P i,t ≤P i,max

[0185] Where: P i,t is the power generation capacity of the i-th type of power generation equipment at time t, in kW; P i,max It is the maximum power generation capacity of the i-th type of power generation equipment, in kW.

[0186] ②The constraints of heating and cooling are expressed as follows:

[0187] 0≤H i,t ≤H i,max

[0188] 0≤C i,t ≤C i,max

[0189] Where: H i,t is the heating power of the i-th type of heating equipment at time t, in kW; H i,max is the maximum heating power of the i-th type of heating equipment, in kW; C i,t is the cooling power of the i-th type of refrigeration equipment at time t, in kW; C i,max is the maximum cooling power of the i-th type of refrigeration equipment, in kW.

[0190] ③ Equipment operating power constraints are expressed as follows:

[0191] 0≤P k,t ≤P k,max

[0192] Where: P k,t is the operating power of the kth type of equipment at time t, in kW; P k,max It is the maximum operating power of the kth category equipment, in kW.

[0193] ④ The drainage system constraints are expressed as follows:

[0194] V c =8Q,Q≤1000

[0195] V c =2(Q+3000), Q>1000

[0196] V K≥0.5V

[0197] Where: V c is the water tank capacity, in m 3 ; V K The empty tank capacity of the water tank, in m 3 ; Q is the average water inflow of the coal mine, unit: m 3 / h; 8 and 2 represent 8 hours and 2 hours respectively.

[0198] ⑤ The drainage flow constraint of the drainage pump is expressed as follows:

[0199]

[0200] Where: Q is the average water inflow of the coal mine, unit: m 3 / h; W G , W B , W J They are the flow rates of the working water pump, standby water pump and maintenance water pump, in m 3 / h.

[0201] When in the maintenance period, only the maintenance pump is started, and the constraint is expressed as:

[0202] U z+1,t (P z,max -P z,t )=0

[0203] Where: U z+1,t is the operating state of a type of water pump after time t, which is a 0-1 variable; P z,max is the maximum operating power of the previous type of water pump, in kW; P z,t It is the operating power of the previous type of water pump at time t, in kW.

[0204] ⑥The state constraints during the maintenance period are expressed as follows:

[0205]

[0206] Where: U G,t , U B,t , U J,t They are the operating status of the working water pump, standby water pump and maintenance water pump respectively, which are 0-1 variables.

[0207] ⑦The ventilation system constraints are expressed as follows:

[0208] Q f,min ≤Q f,t ≤Q f,max

[0209] Where: Q f,min , Q f,max Respectively minimum and maximum ventilation volume, unit m3 / h;Q f,t is the air intake volume of the fan at time t, in m 3 / h.

[0210] ⑧The ground water tank constraint is expressed as follows:

[0211] 0≤V dm,t ≤V dm,max

[0212] Where: V dm,t is the water storage capacity of the ground water tank at time t, in m 3 ; V dm,max is the maximum water storage capacity of the water tank, in m 3 .

[0213] ⑨ The constraints of underground pumped storage units are expressed as follows:

[0214]

[0215] Where: P c,max , P disc,max They are the maximum charging power and the maximum discharging power of the water storage unit, in kW; E PH,max E is the maximum storage capacity of the water storage unit, in kWh; PH,t It is the power storage capacity of the unit at time t, in kWh.

[0216] ⑩ The hot and cold power balance constraints within the station are expressed as follows:

[0217]

[0218] Where: is the heating power of the k-type heating equipment in the i-th energy station at time t, in kW; is the heat load power of type z inside the i-th energy station at time t, in kW; is the cooling power of the k-type refrigeration equipment in the i-th energy station at time t, in kW; It is the cooling load power of type z inside the ith energy station at time t, in kW.

[0219] The power balance constraint of the joint operation of energy stations is expressed as follows:

[0220]

[0221] Where: is the electric power exchanged between the ith energy station and the external power grid at time t, in kW; is the power generation unit of the k-type power generation equipment in the i-th energy station at time t, kW; P i-j,tis the electric power exchanged between energy station i and energy station j at time t, in kW; It is the electric power of the z-type energy load inside the ith energy station at time t, in kW.

[0222] Step 3. Construct the objective function of the interconnected optimization operation of multiple energy stations in coal mines, and use the Gurobi solver to calculate and solve it. The objective function of the interconnected optimization operation of multiple energy stations in coal mines is expressed as follows:

[0223] minF=F1+F2+F3

[0224]

[0225] Where: F is the total operating cost, in RMB; F1, F2, and F3 are the system external energy cost, system energy interactive operation and maintenance cost, and renewable energy power station abandonment penalty cost, in RMB; C grid,t is the grid electricity price at time t, in RMB / kWh; P grid,t is the amount of electricity purchased from and to the customer during period t, in kWh; C ntrgas is the price of purchased natural gas, unit: RMB / m 3 ; V ntrgas,t is the amount of natural gas purchased during period t, in m 3 ; C line is the unit operation and maintenance cost of the energy exchange line, unit: RMB / m; L i is the length of the ith energy interaction line, in meters; P i,t is the transmission power of the ith energy interaction line, in kW; C l P is the penalty cost of abandoned solar power, in RMB / kWh; l,t It is the total abandoned photovoltaic power in period t, in kWh.

[0226] The following simulation is based on the operating data of a coal mine in Shanxi Province. The normal water inflow is set to 1000m 3 / h, the water source heat pump takes heat at a temperature difference of 5°C, and uses MATLAB_R2021b to call the Gurobi10.0.1 solver for simulation and solution. The power purchase, power generation, abandoned light and electric load power of each energy station in the system are as follows Figure 2 As shown in the figure, the power curves of wellhead antifreeze, conventional heat load and purchased heat, water source heat pump heat generation, gas waste heat, and thermal storage oxidation waste heat in large-load production and consumption energy stations are as follows: Figure 3 As shown in Figure 2, further simulation analysis is carried out for scenarios such as the difference in energy production and demand in winter and summer and the arrangement of drainage maintenance. The power curve of the cooling load in the large-load production and consumption energy station in summer, the cooling power of the water source heat pump, the power of the absorption chiller, and the power of the air-conditioning unit are shown in Figure 2. Figure 4 As shown in the figure, the water inflow curve, the operating power of the water pump after drainage maintenance, and the water storage capacity of the water tank are as follows Figure 5Through simulation analysis, the system economic comparison results of the interconnected operation of multiple energy stations and the independent operation of energy stations are shown in Table 1. Compared with the independent operation of energy stations, the interconnected operation of multiple energy stations can reduce the energy purchase cost by 625,250 yuan, and the penalty for abandoned light can be reduced by 315,300 yuan (equivalent to more than 12MWh of electricity).

[0227] Table 1 System economic comparison results

[0228]

[0229] It can be seen that the optimized operation method of the coal mine multi-energy station architecture under the dynamic evolution of resources can realize the cascade utilization and coordinated supply of coal mine energy resources among multiple coal mining areas, reduce the system operation cost, reduce the waste of associated energy and natural resources, improve the economy of coal mine energy multi-scenario operation and the absorption level of renewable energy, and provide theoretical basis and data support for the efficient interconnection and economical production operation of coal mine multi-energy stations in different scenarios.

Claims

1. A method for optimizing the operation of a coal mine multi-energy station architecture under dynamic resource evolution, characterized in that: The multi-energy station architecture of coal mines under the dynamic evolution of resources includes small and medium-load production and consumption energy stations for coal mines in the initial mining stage, large-load production and consumption energy stations for coal mines in the continuous mining stage, energy production energy stations for coal mines in the abandoned stage, and interconnected power lines between energy stations; The method for optimizing the operation of coal mine multi-energy station architecture under dynamic resource evolution specifically includes the following steps: Step 1. Based on the coal mine multi-energy station architecture under the dynamic evolution of resources, the station operation load models of small and medium load production and consumption type energy stations, large load production and consumption type energy stations and energy production type energy stations are established respectively; The station operation load models of small and medium-load production and consumption energy stations and large-load production and consumption energy stations include coal mining equipment load model, tunneling equipment load model, conveyor load model, drainage pump load model, ground water tank load model, ventilator load model, winter wellhead antifreeze load model, air conditioning unit load model, absorption chiller load model, water source heat pump unit load model, exhaust air source heat pump load model; Energy production type energy station includes underground pumped storage unit load model and ground photovoltaic power station load model; Step 2. Based on the station operation load model, determine the known parameters and decision variables and build constraint relationships; The power balance constraint of the joint operation of energy stations is expressed as follows: Where: is the electric power exchanged between the i-th energy station and the external power grid at time t, in kW; is the power generation unit of the k-type power generation equipment in the i-th energy station at time t, kW; P i-j,t is the electric power exchanged between energy station i and energy station j at time t, in kW; The power of the z-type energy load in the i-th energy station at time t, in kW; The constraints also include constraints on the power generation part, constraints on the heating and cooling parts, constraints on the equipment operating power, constraints on the drainage system, constraints on the drainage flow of the drainage pump, state constraints during the maintenance period, constraints on the ventilation system, constraints on the ground water tank, constraints on the underground pumped storage unit, and constraints on the balance of hot and cold power in the station, as follows: The constraints of the power generation part are expressed as follows: 0≤P i,t ≤P i,max Where: P i,t is the power generation capacity of the i-th type of power generation equipment at time t, in kW; P i,max is the maximum power generation capacity of the i-th type of power generation equipment, in kW; The constraints for the heating and cooling parts are expressed as follows: 0≤H i,t ≤H i,max 0≤C i,t ≤C i,max Where: H i,t is the heating power of the i-th type of heating equipment at time t, in kW; H i,max is the maximum heating power of the i-th type of heating equipment, in kW; C i,t is the cooling power of the i-th type of refrigeration equipment at time t, in kW; C i,max is the maximum cooling power of the refrigeration equipment of type i, in kW; The equipment operating power constraints are expressed as follows: 0≤P k,t ≤P k,max Where: P k,t is the operating power of the kth type of equipment at time t, in kW; P k,max is the maximum operating power of the kth category equipment, in kW; The drainage system constraints are expressed as follows: V c =8Q,Q≤1000 V c =2(Q+3000),Q>1000 V K ≥0.5V Where: V c is the water tank capacity, in m 3 ; V K The empty tank capacity of the water tank, in m 3 ; Q is the average water inflow of the coal mine, unit: m 3 / h; 8 and 2 represent 8 hours and 2 hours respectively; The drainage flow constraint of the drainage pump is expressed as follows: Where: Q is the average water inflow of the coal mine, unit: m 3 / h; W G , W B , W J They are the flow rates of the working water pump, standby water pump and maintenance water pump, in m 3 / h; When in the maintenance period, only the maintenance pump is started, and the constraint is expressed as: U z+1,t (P z,max -P z,t )=0 Where: U z+1,t is the operating state of a type of water pump after time t, which is a 0-1 variable; P z,max is the maximum operating power of the previous type of water pump, in kW; P z,t is the operating power of the previous type of water pump at time t, in kW; The state constraints during the maintenance period are expressed as follows: Where: U G,t , U B,t , U J,t They are the operating status of the working water pump, standby water pump and maintenance water pump, which are 0-1 variables; The ventilation system constraints are expressed as follows: Q f,min ≤Q f,t ≤Q f,max Where: Q f,min , Q f,max Respectively minimum and maximum ventilation volume, unit m 3 / h;Q f,t is the air intake volume of the fan at time t, in m 3 / h; The ground water tank constraint is expressed as follows: 0≤V dm,t ≤V dm,max Where: V dm,t is the water storage capacity of the ground water tank at time t, in m 3 ; V dm,max is the maximum water storage capacity of the water tank, in m 3 ; The constraints of underground pumped storage units are expressed as follows: Where: P c,max , P disc,max They are the maximum charging power and the maximum discharging power of the water storage unit, in kW; E PH,max E is the maximum storage capacity of the water storage unit, in kWh; PH,t is the power storage capacity of the unit at time t, in kWh; The hot and cold power balance constraints in the station are expressed as follows: Where: is the heating power of the k-type heating equipment in the i-th energy station at time t, in kW; is the heat load power of type z inside the i-th energy station at time t, in kW; is the cooling power of the k-type refrigeration equipment in the i-th energy station at time t, in kW; is the cooling load power of type z inside the i-th energy station at time t, in kW; Step 3. Construct the objective function of the interconnected optimization operation of multiple energy stations in coal mines, and use the Gurobi solver to calculate and solve to obtain the minimum energy cost; The objective function of the interconnected optimization operation of multiple energy stations in coal mines is expressed as follows: min F=F1+F2+F3 Where: F is the total operating cost, in RMB; F1, F2, and F3 are the system external energy cost, system energy interactive operation and maintenance cost, and renewable energy power station abandonment penalty cost, in RMB; C grid,t is the grid electricity price at time t, in RMB / kWh; P grid,t is the amount of electricity purchased from and to the customer during period t, in kWh; C ntrgas is the price of purchased natural gas, unit: RMB / m 3 ; V ntrgas,t is the amount of natural gas purchased during period t, in m 3 ; C line is the unit operation and maintenance cost of the energy exchange line, unit: RMB / m; L i is the length of the i-th energy interaction line, in meters; P i,t is the transmission power of the ith energy interaction line, in kW; C l P is the penalty cost of abandoned solar power, in RMB / kWh; l,t It is the total abandoned photovoltaic power in period t, in kWh.

2. The method for optimizing the operation of a coal mine multi-energy station architecture under dynamic resource evolution according to claim 1, characterized in that: The station operation load models of small and medium load production and consumption type energy stations and large load production and consumption type energy stations are as follows: The coal mining equipment load model is expressed as follows: P s,t =BHV s,t γ s Where: P s,t is the operating power of the coal mining equipment at time t, in kW; B is the cutting depth of the coal mining machine, in m; H is the cutting height of the coal mining machine, in m; V s,t is the cutting speed of the coal mining machine at time t, in m / h; γ s is the conversion coefficient of coal mining machine energy consumption, which takes a value of 0.98; The load model of tunneling equipment is expressed as follows: Where: P j,t is the cutting power of the roadheader at time t, in kW; ICR is the pure cutting capacity of the roadheader, in m 3 / h; SE opt is the optimal cutting specific energy consumption, unit is kWh / m 3 ; ρ1 is the energy transfer efficiency, unit %; ρ2 is the actual work efficiency, unit %; The conveyor load model is expressed as follows: Where: P tr,t is the mechanical power of the conveyor, in kW; V tr is the transmission speed of the belt, in m / s; T tr is the coal feeding rate of the belt conveyor, in tons / h; θ1, θ2, θ3, θ4 are constant parameters respectively; The drainage pump load model is expressed as follows: Where: P z,t is the operating power of the z type pump at time t, in kW; p is the specific gravity of the medium, water is 1000 kg / m 3 ; g is the acceleration due to gravity, unit is N / kg, and the value is 9.8; W z,t is the operating flow rate of type z pump at time t, in m 3 / h; H z For the Z type water pump, the head is in m; η z is the operating efficiency of the z type water pump, which takes a value of 0.6; The ground water tank load model is expressed as follows: Where: C ws,t is the amount of water stored in the water tank at time t, in m 3 ; W out,t is the amount of water flowing out of the water tank at time t, in m 3 / h; 1 means 1 hour; The fan load model is expressed as follows: Where: P f,t is the operating power of the fan at time t, in kW; Q f,t is the air intake volume of the fan at time t, in m 3 / h;p f is the total wind pressure of the fan, in Pa; η f The fan operating efficiency is 0.9; The winter wellhead antifreeze load model is expressed as follows: H fd =Q f ×ρ air ×C p ×(T h -T w ) Where: H fd Q is the wellhead antifreeze heat load power, unit kW; f is the air volume at the wellhead, in m 3 / s;ρ air is the air density, in kg / m 3 , the value is 1.28; C p is the specific heat capacity of air at constant pressure, in kJ / (kg·℃), with a value of 1.01; T h T is the temperature after the cold and hot air are mixed, in °C; w is the lowest ambient temperature in winter, in °C; The load model of the air conditioning unit is expressed as follows: CL EC,t =η EC ×P EC,t H EC,t =the H ×P H,t Where: CL EC,t , H EC,t They are respectively the cooling and heating power at time t, in kW; η EC , η H are cooling and heating energy efficiency coefficients respectively; P EC,t , P H,t are the electric power consumed by cooling and heating at time t, in kW; The load model of absorption chiller is expressed as follows: CL AC,t =η AC ×H AC,t Where: CL AC,t is the cooling power of the absorption chiller at time t, in kW; η AC is the energy efficiency coefficient of the absorption chiller at time t; H AC,t The heat power absorbed by the absorption chiller at time t, in kW; The load model of the water source heat pump unit is expressed as follows: Where: P hp,t is the electric power consumed by the water source heat pump unit in time period t, in kW; H P,t is the electric heating capacity of the water source heat pump unit in time period t, in kW; COP is the heating performance coefficient of the water source heat pump unit; H h,t is the heat absorbed by the water source heat pump unit from the heat source side during the period t, in kW; c is the specific heat capacity of the circulating working fluid, in J / (kg·℃); q is the mass flow rate of the circulating working fluid, in kg / s; T hp,in , T hp,out are the inlet and outlet temperatures of the water source heat pump evaporator, in °C; The load model of the exhaust air source heat pump is expressed as follows: H vshp,t =Δh vam ×V vam,t ε vam / (1-1 / COP vshp ) P vshp,t =H vshp,t / COP vshp Where: H vshp,t is the heating power of the exhaust air source heat pump at time t, in kW; Δh vam V is the enthalpy difference of the exhaust air before and after heat exchange, in kJ / kg; vam,t Mine ventilation velocity, unit: m 3 / s; ε vam is the density of the exhaust air, in kg / m 3 ; COP vshp is the energy efficiency ratio of the exhaust air source heat pump; P vshp,t The operating power of the exhaust air source heat pump, unit: kW; The load model of underground pumped storage unit is expressed as follows: E PH,t =E PH,t-1 +(x c P c,t -x disc P disc,t ) Where: E PH,t 、E PH,t-1 are the electricity stored in the water storage unit at time t and time t-1, in kWh; P c,t , P disc,t are the charging and discharging power of the water storage unit at time t, in kW; c , χ disc They are the charging and discharging efficiency of the water storage unit, and the value is 0.75; The load model of ground photovoltaic power station is expressed as follows: Where: P pv,t is the photovoltaic power generation at time t, in kW; P pv,cap is the installed capacity of photovoltaic power, in kW; G pv,t is the light intensity at time t, in kW / m 2 ; κ pv is the photovoltaic temperature coefficient, unit / ℃; T borad,t is the temperature of the photovoltaic panel at time t, in °C; T stp is the working temperature of the photovoltaic panel, in °C; G stp is the light intensity under working conditions, unit kW / m 2 ; T env,t is the ambient temperature at time t, in °C; V env,t is the ambient wind speed at time t, in m / s; T max , T min are the highest and lowest temperatures of the day, in °C; t ave is the daily average temperature at that time, unit… 3. The method for optimizing the operation of a coal mine multi-energy station architecture under dynamic resource evolution according to claim 2, characterized in that: The on-site operation model of a large-load production and consumption energy station also includes the load model of the wind-lack thermal oxidation power generation and waste heat recovery units, the load model of the gas turbine and waste heat utilization units, the load model of the gas boiler, and the load model of the ground photovoltaic power station.

4. The method for optimizing the operation of a coal mine multi-energy station architecture under dynamic resource evolution according to claim 3 is characterized in that: The load models of wind-deficient thermal oxidation power generation and waste heat recovery units, gas turbine and waste heat utilization units, and gas boiler load models are as follows: The load model of the wind-deficient thermal storage oxidation power generation and waste heat recovery unit is as follows: P rto,t =the rto ×C gas ×n vam ×V vam,t ×(1-n) ploss ) H rto,t =c rec ×h rtoT ×P rto,t Where: P rto,t is the power generation of the thermal storage oxidation unit at time t, in kW; η rto is the power generation efficiency of the thermal storage oxidation unit; C gas is the calorific value of coalbed methane, unit is kJ / m 3 ;n vam V is the concentration of coalbed methane in the air-deficient environment, unit: %; V vam,t is the flow rate of the lack of air at time t, in m 3 / h; η ploss is the self-loss coefficient of the thermal storage oxidation unit, unit: %; H rto,t is the thermal power of waste heat recovery from the thermal storage oxidation unit at time t, in kW; γ rec is the waste heat recovery efficiency of the thermal storage oxidation unit, unit: %; η rtoT is the heating efficiency of the thermal storage oxidation unit, unit: %; The load model of gas turbine and waste heat utilization unit is expressed as follows: H rec,t =λ rec H gt,t Where: P gt,t is the power generation of the gas turbine at time t, in kW; η gt is the power generation efficiency of gas turbine, unit: %; C gas is the calorific value of gas, unit is kJ / m 3 ;n gas V is the gas concentration in %; gas,t is the gas flow rate at time t, in m 3 / h; H gt,t is the heat generation power of the gas turbine at time t, in kW; η gt,loss is the heat loss coefficient of the gas turbine, which is 0.02; H rec,t is the thermal power of waste heat recovery at time t, in kW; rec is the efficiency of waste heat recovery, which takes a value of 0.8; The gas boiler load model is expressed as follows: H GB,t =V GB,t η ng q GB Where: H GB,t is the heat generation power of the gas boiler in time period t, in kW; V GB,t is the volume of natural gas input into the gas boiler during period t, in m 3 ; η ng is the natural gas calorific value conversion coefficient, unit kW / m 3 ;q GB is the gas boiler conversion efficiency, which takes a value of 0.9.

Citation Information

Patent Citations

  • Energy-saving optimization automatic control method and system for enterprise-level motor system

    CN113344192A

  • Coal mine energy system low-carbon operation method based on material flow-energy flow cooperation

    CN115310651A