A load-constrained charging control method and storage medium for an AC charging pile

By judging whether the AC charging pile is connected to the optical storage system, a charging strategy is generated, and combining the green electric residual electric power and the maximum allowable power withdrawal power, load balancing charging of the AC charging pile is achieved, solving the difficulty in realizing charging efficiency and load balancing in the existing technology. The problem.

CN118596920BActive Publication Date: 2024-11-12西安星源博锐新能源技术有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411081007.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-12
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

Existing AC charging piles cannot achieve accurate charging power distribution when charging, and cannot take into account the power consumption needs of other equipment in the power grid, making charging efficiency and load balancing difficult to achieve.

Method used

By determining whether the AC charging pile is connected to the optical storage system, entering the green power priority mode or dynamic constrained charging mode, generating a charging strategy based on the green power residual power and the maximum allowable power withdrawal power, and adjusting the charging power in combination with the real-time charging state to achieve load balancing charging.

Benefits of technology

The load balancing of AC charging piles during charging is realized, ensuring the precise allocation of charging power, meeting the charging needs of electric vehicles, and taking into account the reasonable use of power grid and photoelectric energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118596920B_ABST
    Figure CN118596920B_ABST
Patent Text Reader

Abstract

The present invention discloses a load-constrained charging control method and storage medium for an AC charging pile, wherein the load-constrained charging control method comprises: step S1, judging whether the AC charging pile is connected to a photovoltaic storage system, if connected, controlling the AC charging pile to enter a green power priority mode, and in the green power priority mode, obtaining the green power surplus power and the maximum allowable power draw, generating a green power constraint charging strategy for the AC charging pile according to the green power surplus power and the maximum allowable power draw, otherwise executing step S2; step S2, obtaining the grid connection point current reported by the meter through the AC charging pile when the AC charging pile establishes a communication connection with the meter in the power grid; step S3, generating a dynamic constraint charging strategy according to dynamic evaluation parameters. In the present invention, by reasonably using the power grid and photovoltaic storage power, the load-balanced charging of the AC charging pile can be fully and flexibly realized, ensuring accurate power distribution when charging electric vehicles.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric vehicle charging, and in particular to a load-constrained charging control method for an AC charging pile, an electronic device, and a computer-readable storage medium. Background Art

[0002] In recent years, due to the booming development of new energy electric vehicles, the daily application of charging piles has gradually formed a large scale, which greatly meets the users' demand for electric vehicles. Among them, the widely used AC charging piles can be divided into home charging piles and commercial charging piles according to the usage scenarios. Home charging piles usually need to share power with other loads in the home, or share power with other charging piles in the community. Commercial AC charging piles usually need to share power with other power-consuming equipment. While ensuring the charging efficiency of the charging pile as much as possible, it is necessary to take into account the power demand of other equipment in the power grid, and it is necessary to impose certain restrictions on the output power of the charging pile. At present, AC charging piles usually perform load balancing control based on the power provided by the power grid when charging. This control method is relatively simple, that is, it only considers the impact of power grid load balancing and cannot achieve accurate charging power distribution. Summary of the invention

[0003] The present invention aims to solve at least one of the technical problems in the related art to a certain extent. To this end, the present invention proposes a load-constrained charging control method for an AC charging pile, an electronic device and a computer-readable storage medium, which can comprehensively and flexibly realize load-balanced charging of an AC charging pile.

[0004] In a first aspect, an embodiment of the present invention provides a load-constrained charging control method for an AC charging pile, comprising the following steps:

[0005] Step S1, judging whether the AC charging pile is connected to the photovoltaic storage system, if connected, controlling the AC charging pile to enter the green power priority mode, and in the green power priority mode, obtaining the green power surplus power and the maximum allowable power consumption, and generating a green power constraint charging strategy for the AC charging pile according to the green power surplus power and the maximum allowable power consumption, otherwise executing step S2;

[0006] The green power surplus power represents the power of the photovoltaic storage system that can be used by the AC charging pile, and the maximum allowable power represents the maximum power that the AC charging pile is allowed to draw from the power grid;

[0007] Step S2: when the AC charging pile establishes a communication connection with an electric meter in the power grid, obtaining the grid connection point current reported by the electric meter through the AC charging pile;

[0008] Step S3: generating a dynamic constraint charging strategy for the AC charging pile according to a dynamic evaluation parameter, wherein the dynamic evaluation parameter is a difference between a preset household circuit breaker current and a grid connection point current.

[0009] Optionally, in an embodiment of the present invention, the step in step S1, generating a green electricity constrained charging strategy for the AC charging pile according to the green electricity surplus power and the maximum allowed power consumption, includes the following steps:

[0010] Step S11, obtaining the photovoltaic power and the minimum charging power of the AC charging pile, wherein the photovoltaic power represents the power that the AC charging pile is allowed to obtain from the photovoltaic storage system;

[0011] Step S12: When the green power surplus power is greater than the photovoltaic power, and the sum of the green power surplus power and the maximum allowable power is greater than or equal to the minimum charging power, control the AC charging pile to start charging;

[0012] Step S13: During the charging process of the AC charging pile, the real-time charging status of the AC charging pile is obtained, and according to the real-time charging status of the AC charging pile, the green power surplus power, the maximum allowable power consumption and the minimum charging power are combined to generate a green power constraint charging strategy for the AC charging pile.

[0013] Optionally, in one embodiment of the present invention, when the AC charging pile is in a single-phase charging state and the maximum allowable power is greater than or equal to the minimum charging power, step S13 includes the following steps:

[0014] When the green power surplus power is greater than or equal to the maximum allowable power, controlling the AC charging pile to charge with the green power surplus power;

[0015] or,

[0016] When the green power surplus power is less than the maximum allowable power consumption, the AC charging pile is controlled to perform mixed charging with the green power surplus power and the first target grid power, wherein the first target grid power is the difference between the maximum allowable power consumption and the green power surplus power.

[0017] Optionally, in one embodiment of the present invention, when the AC charging pile is in a single-phase charging state and the maximum allowable power is less than the minimum charging power, step S13 includes the following steps:

[0018] When the green power surplus power is greater than or equal to the minimum charging power, controlling the AC charging pile to charge with the green power surplus power;

[0019] or,

[0020] When the green power surplus power is less than the minimum charging power, and the sum of the green power surplus power and the maximum allowed power consumption is greater than or equal to the minimum charging power, the AC charging pile is controlled to perform mixed charging with the green power surplus power and the second target grid power, wherein the second target grid power is the difference between the minimum charging power and the green power surplus power;

[0021] or,

[0022] When the green power surplus power is less than the minimum charging power, and the sum of the green power surplus power and the maximum allowed power consumption is less than the minimum charging power, the AC charging pile is controlled to stop charging.

[0023] Optionally, in one embodiment of the present invention, when the AC charging pile is in a three-phase charging state, step S13 includes the following steps:

[0024] When the green power surplus power is greater than or equal to the maximum allowable power, and the maximum allowable power is greater than or equal to the three-phase minimum charging power, the AC charging pile is controlled to charge with the green power surplus power, wherein the three-phase minimum charging power is 3 times the minimum charging power;

[0025] or,

[0026] When the green electricity surplus power is less than the maximum allowable power consumption, and the maximum allowable power consumption is greater than or equal to the three-phase minimum charging power, the AC charging pile is controlled to perform mixed charging with the green electricity surplus power and the third target grid power, wherein the third target grid power is the difference between the maximum allowable power consumption and the green electricity surplus power.

[0027] Optionally, in one embodiment of the present invention, when the AC charging pile is in a three-phase charging state, and the green power surplus power and the maximum allowable power are both less than the three-phase minimum charging power, step S13 includes the following steps:

[0028] In the case where the AC charging pile starts the three-phase-single-phase switching, when the first switching condition or the second switching condition is met, the AC charging pile is controlled to switch to the single-phase charging state, wherein the first switching condition is that the green power surplus power is greater than or equal to the maximum allowable power supply power and the minimum charging power at the same time, and the second switching condition is that the green power surplus power and the maximum allowable power supply power are both less than the minimum charging power, and the sum of the green power surplus power and the maximum allowable power supply power is greater than or equal to the minimum charging power;

[0029] or,

[0030] In the case where the three-phase-single-phase switching is turned off on the AC charging pile, when the sum of the green power surplus power and the maximum allowed power is greater than or equal to the three-phase minimum charging power, the AC charging pile is controlled to perform mixed charging with the green power surplus power and the fourth target grid power, wherein the fourth target grid power is the difference between the three-phase minimum charging power and the green power surplus power;

[0031] or,

[0032] In the case where the three-phase-to-single-phase switching is turned off on the AC charging pile, when the sum of the green power surplus power and the maximum allowed power is less than the three-phase minimum charging power, the AC charging pile is controlled to stop charging.

[0033] Optionally, in one embodiment of the present invention, step S3 includes the following steps:

[0034] When the dynamic evaluation parameter is greater than the minimum charging current of the AC charging pile, controlling the AC charging pile to charge with the dynamic evaluation parameter;

[0035] or,

[0036] When the dynamic evaluation parameter is less than or equal to the minimum charging current of the AC charging pile, the AC charging pile is controlled to stop charging.

[0037] Optionally, in one embodiment of the present invention, the following steps are also included:

[0038] Step S4: When the AC charging pile has not established a communication connection with an electric meter in a power grid, control the AC charging pile to charge with a minimum charging current.

[0039] In a second aspect, an embodiment of the present invention provides an electronic device, including:

[0040] at least one processor;

[0041] at least one memory for storing at least one program;

[0042] When at least one of the programs is executed by at least one of the processors, the load-constrained charging control method for the AC charging pile as described in the first aspect is implemented.

[0043] In a third aspect, an embodiment of the present invention provides a computer-readable storage medium, which stores a program executable by a processor, and when the program executable by the processor is executed by the processor, it is used to implement the load-constrained charging control method of the AC charging pile as described in the first aspect.

[0044] The present invention proposes a load-constrained charging control method, electronic device and computer-readable storage medium for an AC charging pile. The method determines the charging mode corresponding to the AC charging pile by judging whether the AC charging pile is connected to a photovoltaic storage system. That is, if the AC charging pile is connected to the photovoltaic storage system, the AC charging pile is controlled to enter a green power priority mode, and a green power-constrained charging strategy is generated according to the green power surplus power and the maximum allowable power. The AC charging pile charges the electric vehicle according to the principle of maximizing the use of green power based on the green power-constrained charging strategy, thereby realizing load-balanced charging in the energy storage state. On the contrary, if the AC charging pile is not connected to the photovoltaic storage system, a dynamic constraint charging strategy is generated according to the difference between the acquired preset household circuit breaker current and the grid connection point current, thereby realizing load-balanced charging in the grid state. That is to say, by reasonably using the grid and photovoltaic storage power, the load-balanced charging of the AC charging pile can be fully and flexibly realized, thereby ensuring that the AC charging pile can realize accurate charging power distribution when charging the electric vehicle. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 is a flow chart of a load-constrained charging control method for an AC charging pile provided by an embodiment of the present invention;

[0046] Figure 2 It is a schematic diagram of the execution flow of the dynamic constraint charging strategy provided by one embodiment of the present invention;

[0047] Figure 3 yes Figure 1 Flow chart of step S3 in FIG.

[0048] Figure 4 yes Figure 1 A partial flow chart of the step S1 in step “generating a green power constraint charging strategy for an AC charging pile according to the green power surplus power and the maximum allowed power consumption”;

[0049] Figure 5 yes Figure 4 A flow chart of step S13 in FIG.

[0050] Figure 6 yes Figure 4 Another flow chart of step S13 in ;

[0051] Figure 7 It is a schematic diagram of the execution flow of the green electricity constraint charging strategy provided by an embodiment of the present invention;

[0052] Figure 8 It is a structural schematic diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0053] Figure 1This is a flow chart of a load-constrained charging control method for an AC charging pile provided by an embodiment of the present invention. Figure 1 As shown, the load-constrained charging control method may include but is not limited to steps S1 to S3.

[0054] Step S1, determine whether the AC charging pile is connected to the photovoltaic storage system. If connected, control the AC charging pile to enter the green power priority mode, and in the green power priority mode, obtain the green power surplus power and the maximum allowable power consumption, and generate a green power constraint charging strategy for the AC charging pile according to the green power surplus power and the maximum allowable power consumption, otherwise execute step S2;

[0055] Among them, the green power surplus power represents the power of the photovoltaic storage system that can be used by the AC charging pile, and the maximum allowable power represents the maximum power that the AC charging pile is allowed to draw from the grid;

[0056] Step S2: When the AC charging pile is in communication with the electric meter in the power grid, the grid connection point current reported by the electric meter is obtained through the AC charging pile;

[0057] Step S3: Generate a dynamic constraint charging strategy for the AC charging pile according to the dynamic evaluation parameter, wherein the dynamic evaluation parameter is the difference between the preset household circuit breaker current and the grid connection point current.

[0058] In this step, the charging mode corresponding to the AC charging pile is determined by judging whether the AC charging pile is connected to the photovoltaic storage system. That is, if it is connected to the photovoltaic storage system, the AC charging pile is controlled to enter the green power priority mode, and a green power constraint charging strategy is generated according to the green power surplus power and the maximum allowable power consumption, so that the AC charging pile charges the electric vehicle according to the principle of maximizing the use of green power based on the green power constraint charging strategy, thereby realizing load-balanced charging in the energy storage state. On the contrary, if it is not connected to the photovoltaic storage system, a dynamic constraint charging strategy is generated according to the difference between the preset household circuit breaker current and the grid connection point current, thereby realizing load-balanced charging in the grid state. In other words, by reasonably using the grid and photovoltaic storage energy, the load-balanced charging of the AC charging pile can be fully and flexibly realized, thereby ensuring that the AC charging pile can achieve accurate charging power distribution when charging the electric vehicle.

[0059] It should be noted that the green electricity priority mode is to give priority to the use of the electricity of the photovoltaic storage system. In actual applications, when the photovoltaic storage system and the AC charging pile are connected to the same power station, it can be considered that the AC charging pile is connected to the photovoltaic storage system. At this time, the option of the green electricity priority mode can be set. If this option is selected, the AC charging pile will be controlled to enter the green electricity priority mode. The priority of the green electricity priority mode is higher than that of other charging modes. That is, after the green electricity priority mode is turned on, the dynamic charging mode and the static charging mode are invalid. After turning off the green electricity priority mode, if the dynamic charging mode was set before and the relevant conditions of the dynamic charging mode are currently met, it will be restored to the dynamic charging mode; if the dynamic charging mode is not set, it will be restored to the static charging mode. Among them, the static charging mode is a related existing technology that is widely used in this field. For example, a three-phase AC charging pile with a charging power of 22KW can have a maximum charging current of 32A. However, based on the overall power limitation of the home and considering the use of other loads at the same time, the maximum charging current can be limited to 16A, that is, the charging pile is actually used as 11KW.

[0060] In one embodiment, in step S2, there may be multiple ways to obtain the grid connection point current reported by the electric meter through the AC charging pile. In addition to reporting the grid connection point current, the electric meter may also report more relevant real-time data of the power grid. The following are multiple examples for specific explanation, but they are not the only limitation. For example, the electric meter adopts a smart meter, the AC charging pile and other loads are connected to the power grid, the smart meter is connected to the back end of the inverter, the smart meter and the inverter communicate through RS485, and the inverter and the AC charging pile communicate through RS485. Then, the AC charging pile can read the voltage, current, power and other parameters obtained by the smart meter through the inverter. Alternatively, the electric meter uses a smart meter, the AC charging pile and other loads are connected to the power grid, the smart meter is connected to the back end of the inverter, the smart meter and the AC charging pile communicate through RS485, and the AC charging pile can directly read the voltage, current, power and other parameters obtained by the smart meter, or the AC charging pile and other loads are connected to the power grid, and the current transformer is connected to the input end of other loads and the AC charging pile. The current transformer is equivalent to the electric meter, and the AC charging pile reads the current data through the current transformer, etc. Technical personnel in this field can choose to configure the corresponding components according to their own situation, and flexibly realize the effective acquisition of real-time data of the power grid.

[0061] In one embodiment, if Figure 2 As shown, the grid connection point current in step S2 can be determined by, but is not limited to, the following method: when the specific value of the current of each single phase of the AC charging pile is determined, that is, the current of each single phase of the three phases has been read, the maximum value of the three is selected as the grid connection point current.

[0062] In one embodiment, the grid-connected point current is compared with the preset household circuit breaker current to obtain the difference between the preset household circuit breaker current and the grid-connected point current, which is used as a dynamic evaluation parameter. The purpose is to dynamically control the charging power of the AC charging pile to prevent the household circuit breaker from tripping. The preset household circuit breaker current, that is, the rated current of the household circuit breaker, needs to be adaptively set according to actual conditions. If the set value is much larger than the actual value, it may cause the circuit breaker to trip due to overcurrent; if the set value is too low, it may cause the AC charging pile to be unable to charge or the charging power to be low. Therefore, before installing the AC charging pile, it is necessary to evaluate whether the household load and the load of the AC charging pile exceed 150% of the rated capacity of the household circuit breaker. If so, the dynamic control may not respond in time, which may easily cause frequent tripping of the circuit breaker or low charging power of the AC charging pile. At this time, it is necessary to replace the circuit breaker with a larger capacity.

[0063] An embodiment of the present invention, please refer to Figure 3 , step S3 may include but is not limited to step S31.

[0064] Step S31: When the dynamic evaluation parameter is greater than the minimum charging current of the AC charging pile, the AC charging pile is controlled to charge with the dynamic evaluation parameter; or, when the dynamic evaluation parameter is less than or equal to the minimum charging current of the AC charging pile, the AC charging pile is controlled to stop charging.

[0065] In this step, if Figure 2 As shown, when the dynamic evaluation parameter is greater than the minimum charging current of the AC charging pile (for example, but not limited to Figure 2 6A shown in the figure), indicating the grid-connected current (i.e. Figure 2 Q2) shown in the figure is compared with the preset household circuit breaker current (i.e. Figure 2 Q1) shown in is small. At this time, the load provided to the AC charging pile for charging based on the preset household circuit breaker current is relatively light. Therefore, the AC charging pile can be controlled to charge with the dynamic evaluation parameter, thereby realizing the dynamic load balancing of the AC charging pile under the current conditions; when the dynamic evaluation parameter is less than or equal to the minimum charging current of the AC charging pile, it means that the grid current is close to the preset household circuit breaker current. At this time, the load provided to the AC charging pile for charging based on the preset household circuit breaker current is relatively heavy. Therefore, the AC charging pile is controlled to stop charging, thereby realizing the dynamic load balancing of the AC charging pile under the current conditions.

[0066] It can be seen that when the minimum charging current and the preset household circuit breaker current are determined, the dynamic evaluation parameters can be adjusted by adjusting the grid connection point current, that is, the output current of the AC charging pile itself, so as to meet the total power demand to the greatest extent while ensuring its own normal operation and prevent the circuit breaker from tripping; when all loads (including AC charging piles) are running at the same time, the moment the total current exceeds the maximum current of the circuit breaker, the AC charging pile can stop charging automatically, achieving effective protection and preventing the circuit breaker from tripping.

[0067] In one embodiment of the present invention, the load-constrained charging control method may further include but is not limited to step S4.

[0068] Step S4: When the AC charging pile has not established a communication connection with the electric meter in the power grid, the AC charging pile is controlled to charge with a minimum charging current.

[0069] In this step, if Figure 2 As shown, when it is detected that the AC charging pile is disconnected from the electric meter, the relevant real-time data of the power grid cannot be obtained, and the charging power of the AC charging pile cannot be dynamically controlled. In this case, it switches to the minimum current mode, so that the AC charging pile can be charged under the premise of ensuring safety. It should be noted that the above detection or judgment is in real time. That is to say, even if the AC charging pile is detected to be disconnected from the electric meter at the previous moment, it is not certain what the connection status of the AC charging pile and the electric meter will be at the next moment. It needs to be confirmed according to the actual scenario. For example, when the AC charging pile is disconnected from the electric meter, if the real-time situation of the power grid cannot be accurately determined, it can be considered not to charge. At this time, fault information is generated and reported to the next level to inform that there is a fault problem in the current power grid and maintenance is required.

[0070] An embodiment of the present invention, please refer to Figure 4 The steps in step S1, generating a green power constraint charging strategy for an AC charging pile according to the green power surplus power and the maximum allowed power consumption, may include but are not limited to the following steps:

[0071] Step S11, obtaining the photovoltaic power and minimum charging power of the AC charging pile, wherein the photovoltaic power represents the power that the AC charging pile is allowed to obtain from the photovoltaic storage system;

[0072] Step S12: When the green power surplus power is greater than the photovoltaic power, and the sum of the green power surplus power and the maximum allowable power is greater than or equal to the minimum charging power, control the AC charging pile to start charging;

[0073] Step S13: During the charging process of the AC charging pile, the real-time charging status of the AC charging pile is obtained, and according to the real-time charging status of the AC charging pile, the green power surplus power, the maximum allowable power consumption and the minimum charging power are combined to generate a green power constraint charging strategy for the AC charging pile.

[0074] In this step, by judging that the green power surplus power is greater than the photovoltaic power, and the sum of the green power surplus power and the maximum allowable power is greater than or equal to the minimum charging power, that is, when these two conditions are met at the same time, the AC charging pile is controlled to start charging, and then during the charging process of the AC charging pile, according to the determined real-time charging state of the AC charging pile, the corresponding green power constraint charging strategy is generated in combination with the green power surplus power, the maximum allowable power and the minimum charging power, so as to facilitate the real-time adjustment of the green power and the grid power according to the green power constraint charging strategy while ensuring the normal operation of the AC charging pile, so as to maximize the use of the green power. The electric vehicle is charged on the principle of green electricity power; wherein, the green electricity surplus power is greater than the photovoltaic power, and the sum of the green electricity surplus power and the maximum allowable power is greater than or equal to the minimum charging power, which is only used as the condition for the AC charging pile to start charging. In the subsequent charging process, the green electricity surplus power and the maximum allowable power may change at each moment, that is, the conditions for the AC charging pile to start charging may not always be met in the subsequent charging process, but this does not affect the real-time charging power of the AC charging pile in subsequent relevant situations. This part is explained in the subsequent embodiments and will not be repeated here.

[0075] It should be noted that the specific values ​​of the above-mentioned related parameters can be set accordingly according to the actual application scenario, and there is no limitation here; in order to better describe the working principle of each embodiment, examples of related parameters in actual scenarios are given below for illustration.

[0076] In a specific application scenario, the minimum operating current of the AC charging pile is 6A. When the voltage is 230V, the charging power of the single-phase charging pile is 1.38KW, and the charging power of the three-phase charging pile is 4.14KW. In other words, the single-phase charging power of the three-phase AC charging pile is 1.38KW, and the three-phase charging power is 4.14KW. Taking the single-phase charging pile as an example, the photovoltaic power and the maximum allowable power are set to 1.4KW by default. If the voltage is higher, the power value can be adjusted higher according to the actual voltage. Otherwise, when the actual voltage is greater than 230V, at the default setting power, the operating current of the charging pile will be less than 6A and charging will stop. Similarly, the three-phase charging pile can set the default power value to 4.2KW.

[0077] It is understandable that some of the limiting conditions described in the above embodiments are power, and some are current. The two are actually equivalent, that is, they can be presented in terms of power or current. However, because the AC charging pile ultimately controls the current when charging the electric vehicle, the actual limiting condition can be presented in terms of current. For example, the AC charging pile will determine the corresponding limiting current based on the set power value when in use, using limiting current = limiting power / 230V / number of phases, and then charge the electric vehicle based on the limiting current.

[0078] In one embodiment, the specific value of the green electricity surplus power can be set accordingly according to the actual application scenario. For example, for a home charging pile, the green electricity surplus power = photovoltaic power generation power - home load power consumption - energy storage charging power, photovoltaic power generation power is the power generation power of the photovoltaic storage system, home load power consumption is the sum of the electric power consumed for normal use of various loads in the home, and energy storage charging power is the electric power consumed by the photovoltaic storage system for energy storage charging. Alternatively, when the specific value of the current of each single phase of the AC charging pile is determined, that is, the current of each single phase of the three phases has been read, the minimum value of the three is selected as the corresponding green electricity surplus current, which is equivalent to obtaining the green electricity surplus power.

[0079] An embodiment of the present invention, please refer to Figure 5 When the AC charging pile is in a single-phase charging state and the maximum allowable power is greater than or equal to the minimum charging power, step S13 may include but is not limited to the following steps:

[0080] Step S131: When the green power surplus power is greater than or equal to the maximum allowable power, control the AC charging pile to charge with the green power surplus power; or, when the green power surplus power is less than the maximum allowable power, control the AC charging pile to perform mixed charging with the green power surplus power and the first target grid power, wherein the first target grid power is the difference between the maximum allowable power and the green power surplus power.

[0081] In this step, when the green electricity surplus power is greater than or equal to the maximum allowable power, it means that the green electricity surplus power is relatively saturated, and the AC charging pile can be controlled to charge with the green electricity surplus power alone; when the green electricity surplus power is less than the maximum allowable power, it means that the green electricity surplus power is at a relatively low level. At this time, the AC charging pile is controlled to perform mixed charging with the green electricity surplus power and the first target grid power, that is, the electric vehicle is still charged according to the principle of using green electricity to the greatest extent, and the insufficient power is supplemented by the grid power.

[0082] Specifically, the principle of step S131 is shown in the following table. Table 1 is a charging power diagram of an AC charging pile in a single-phase charging state under the green power constraint charging strategy. At this time, the corresponding minimum charging power is 1.38KW.

[0083] Table 1-Charging power diagram of an AC charging pile in a single-phase charging state under the green power constraint charging strategy

[0084] Green power surplus power / KW Maximum allowable power consumption / KW Actual charging power / KW 5 1.38 5 (Green power surplus power) 1 1.38 1.38 [1 (green power surplus power) + 0.38 (grid power)] 0.38 1.38 1.38 [0.38 (green power surplus power) + 1 (grid power)] 0 1.38 1.38 (grid power)

[0085] An embodiment of the present invention, please refer to Figure 6 When the AC charging pile is in a single-phase charging state and the maximum allowable power is less than the minimum charging power, step S13 may include but is not limited to the following steps:

[0086] Step S132: when the green power surplus power is greater than or equal to the minimum charging power, control the AC charging pile to charge with the green power surplus power; or, when the green power surplus power is less than the minimum charging power, and the sum of the green power surplus power and the maximum allowable power consumption is greater than or equal to the minimum charging power, control the AC charging pile to charge with the green power surplus power and the second target grid power for mixed charging, wherein the second target grid power is the difference between the minimum charging power and the green power surplus power; or, when the green power surplus power is less than the minimum charging power, and the sum of the green power surplus power and the maximum allowable power consumption is less than the minimum charging power, control the AC charging pile to stop charging.

[0087] In this step, when the green electricity surplus power is greater than or equal to the maximum allowable power, it means that the green electricity surplus power is relatively saturated, and the AC charging pile can be controlled to charge with the green electricity surplus power alone; when the green electricity surplus power is less than the maximum allowable power, and the sum of the green electricity surplus power and the maximum allowable power is greater than or equal to the minimum charging power, it means that the green electricity surplus power and the maximum allowable power are both at a low level, but the sum of the two is a saturation value. At this time, the AC charging pile is controlled to perform mixed charging with the green electricity surplus power and the second target grid power, that is, the electric vehicle is still charged according to the principle of using green electricity to the greatest extent, and the insufficient power is supplemented by the grid power; when the green electricity surplus power is less than the minimum charging power, and the sum of the green electricity surplus power and the maximum allowable power is less than the minimum charging power, it means that not only the green electricity surplus power and the maximum allowable power are both at a low level, but the sum of the two is also a low value, so the AC charging pile can be controlled to stop charging.

[0088] Specifically, the principle of step S132 is shown in the following table. Table 2 is another charging power diagram of an AC charging pile in a single-phase charging state under the green power constraint charging strategy. At this time, the corresponding minimum charging power is 1.38KW.

[0089] Table 2 - Another charging power diagram of an AC charging pile in a single-phase charging state under the green power constraint charging strategy

[0090] Green power surplus power / KW Maximum allowable power consumption / KW Actual charging power / KW 5 0~1.38 5 (Green power surplus power) 1 1 1.38 [1 (green power surplus power) + 0.38 (grid power)] 0.5 0.5 0 (0.5+0.5<1.38KW, stop charging) 0 0~1.38 0 (stop charging)

[0091] In one embodiment of the present invention, when the AC charging pile is in a three-phase charging state, step S13 may include but is not limited to the following steps:

[0092] Step S133: When the remaining green power is greater than or equal to the maximum allowable power, and the maximum allowable power is greater than or equal to the three-phase minimum charging power, the AC charging pile is controlled to charge with the remaining green power, wherein the three-phase minimum charging power is three times the minimum charging power;

[0093] or,

[0094] Step S134: When the green power surplus power is less than the maximum allowable power consumption, and the maximum allowable power consumption is greater than or equal to the three-phase minimum charging power, the AC charging pile is controlled to perform mixed charging with the green power surplus power and the third target grid power, wherein the third target grid power is the difference between the maximum allowable power consumption and the green power surplus power.

[0095] In this step, when the green electricity surplus power is greater than or equal to the maximum allowable power consumption, and the maximum allowable power consumption is greater than or equal to the three-phase minimum charging power, it means that the green electricity surplus power is relatively saturated, and the AC charging pile can be controlled to charge with the green electricity surplus power alone; when the green electricity surplus power is less than the maximum allowable power consumption, and the maximum allowable power consumption is greater than or equal to the three-phase minimum charging power, it means that the maximum allowable power consumption can meet the three-phase minimum charging power. At this time, the AC charging pile is controlled to perform mixed charging with the green electricity surplus power and the third target grid power, that is, the electric vehicle is still charged according to the principle of maximizing the use of green electricity power, and the insufficient power is supplemented by the grid power.

[0096] It should be noted that, although the AC charging pile is in a three-phase charging state, step S133 or step S134 does not need to pay attention to whether the charging state of the AC charging pile is switched. That is to say, regardless of whether the charging state of the AC charging pile is switched, as long as the parameter conditions of step S133 or step S134 are met, step S133 or step S134 can be executed accordingly.

[0097] In one embodiment of the present invention, when the AC charging pile is in a three-phase charging state, and the green power surplus power and the maximum allowable power are both less than the three-phase minimum charging power, step S13 may include but is not limited to the following steps:

[0098] Step S135: When the AC charging pile starts the three-phase-single-phase switching, when the first switching condition or the second switching condition is met, the AC charging pile is controlled to switch to the single-phase charging state, wherein the first switching condition is that the green power surplus power is greater than or equal to the maximum allowable power supply power and the minimum charging power at the same time, and the second switching condition is that the green power surplus power and the maximum allowable power supply power are both less than the minimum charging power, and the sum of the green power surplus power and the maximum allowable power supply power is greater than or equal to the minimum charging power;

[0099] or,

[0100] Step S136: When the AC charging pile turns off the three-phase-single-phase switching, when the sum of the green power surplus power and the maximum allowed power is greater than or equal to the three-phase minimum charging power, control the AC charging pile to perform mixed charging with the green power surplus power and the fourth target grid power, where the fourth target grid power is the difference between the three-phase minimum charging power and the green power surplus power;

[0101] or,

[0102] Step S137: When the three-phase-to-single-phase switching is turned off at the AC charging pile, when the sum of the green power surplus power and the maximum allowed power is less than the three-phase minimum charging power, the AC charging pile is controlled to stop charging.

[0103] It can be seen that when the AC charging pile turns on the three-phase-single-phase switching, when the green power surplus power is greater than or equal to the maximum allowable power and the minimum charging power at the same time, or the green power surplus power and the maximum allowable power are both less than the minimum charging power, and the sum of the green power surplus power and the maximum allowable power is greater than or equal to the minimum charging power, it means that the switching conditions of the single-phase charging state are met at this time, and the AC charging pile can be controlled to switch to the single-phase charging state;

[0104] When the three-phase-single-phase switching is turned off for the AC charging pile, when the sum of the green power surplus power and the maximum allowable power is greater than or equal to the three-phase minimum charging power, it means that although the green power surplus power and the maximum allowable power are both at a low level, the sum of the two is a saturation value, which can be used to provide the three-phase minimum charging power. At this time, the AC charging pile is controlled to perform mixed charging with the green power surplus power and the fourth target grid power, that is, the electric vehicle is still charged according to the principle of using green power to the maximum extent, and the insufficient power is supplemented by the grid power;

[0105] When the three-phase-to-single-phase switching is turned off on the AC charging pile, when the sum of the green electricity surplus power and the maximum allowable power consumption is less than the three-phase minimum charging power, it means that not only the green electricity surplus power and the maximum allowable power consumption are at a low level, but the sum of the two cannot be used to provide the three-phase minimum charging power. Therefore, the AC charging pile can be controlled to stop charging.

[0106] It should be noted that after switching to the single-phase charging state, the actual charging power continues to be judged based on the current green power surplus power, the maximum allowable power consumption and the corresponding minimum charging power. The judgment method is as shown in the above step S131 or step S132, which will not be repeated here.

[0107] It should be noted that when the AC charging pile switches to single-phase charging, it can but is not limited to using L1 phase power supply. In order to ensure that the single-phase switching does not affect the load of the single-phase line, the L1 phase of the AC charging pile can be connected to the phase line with the smallest load, and the meter wiring should be consistent with the AC charging pile; during a certain charging, after the three-phase is switched to single-phase, if the charging is not completed, even if the charging power after the switching meets the three-phase minimum charging power, it will not switch to three-phase again; but after the charging is completed, it will be restored to three-phase mode by default, that is, the three-phase-single-phase switching only affects this charging. In other words, after switching from three-phase to single-phase, it is equivalent to using this charging as a single-phase pile, and no phase loss fault will be reported after the switch.

[0108] The principle of steps S133 to S137 is shown in the following table: Table 3 is a schematic diagram of the charging power of the AC charging pile in the three-phase charging state when the three-phase-to-single-phase switching is turned on; Table 4 is a schematic diagram of the charging power of the AC charging pile in the three-phase charging state when the three-phase-to-single-phase switching is turned off; the corresponding minimum charging power at this time is 1.38KW, and the corresponding three-phase minimum charging power at this time is 4.14KW.

[0109] Table 3-Charging power diagram of AC charging pile in three-phase charging state when three-phase to single-phase switching is turned on

[0110] Green power surplus power / KW Maximum allowable power consumption / KW Actual charging power / KW 5 4.2 5 (Green power surplus power) 4.2 4.8 4.8 [4.2 (green power surplus power) + 0.6 (grid power)] 4 2 4 (4>2, 4>1.38, automatically switches to single-phase mode) 1 0.8 1.38 (a+b>1.38, automatically switches to single-phase mode)

[0111] Table 4 - Charging power diagram of AC charging pile in three-phase charging state with three-phase to single-phase switching turned off

[0112] Green power surplus power / KW Maximum allowable power consumption / KW Actual charging power / KW 5 4.2 5 (Green power surplus power) 4.2 4.8 4.8 [4.2 (green power surplus power) + 0.6 (grid power)] 4 2 4.14(4<4.14,2<4.14,4+2>4.14,4+0.14) 1 2 0 (a+b<4.14, stop charging)

[0113] In summary, please refer to Figure 7 , Figure 7 A schematic diagram of the execution flow of a green power constraint charging strategy provided by an embodiment of the present invention. Figure 7In the example, the charging current is used for description, the maximum allowable charging current (corresponding to the maximum allowable power consumption) is recorded as a, the green power surplus current (corresponding to the green power surplus power) is recorded as x, the startup charging surplus current (corresponding to the photovoltaic power consumption) is recorded as b, the preset household circuit breaker current is recorded as y, and the minimum charging current is 6A. Since the above embodiments have described the green power constraint charging strategy in detail based on power, the difference between this embodiment and the above embodiments is that the green power constraint charging strategy is executed in the form of current. Both belong to the same inventive concept, so the specific implementation content of this embodiment can be combined with Figure 7 The relevant implementation contents of the above embodiments are obtained and will not be described here to avoid redundancy.

[0114] Figure 8 FIG. 1 is a schematic diagram of the structure of an electronic device 1000 provided by an embodiment of the present invention. Figure 8 As shown, the electronic device 1000 includes a memory 1100 and a processor 1200. The number of the memory 1100 and the processor 1200 may be one or more. Figure 8 In the embodiment, a memory 1100 and a processor 1200 are taken as an example; the memory 1100 and the processor 1200 in the device may be connected via a bus or other means. Figure 8 The example of connecting through bus is taken in the following.

[0115] The memory 1100 is a computer-readable storage medium that can be used to store software programs, computer executable programs and modules, such as program instructions / modules corresponding to the load-constrained charging control method for an AC charging pile provided in any embodiment of the present invention. The processor 1200 implements the load-constrained charging control method for an AC charging pile by running the software programs, instructions and modules stored in the memory 1100.

[0116] The memory 1100 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system and an application required for at least one function. In addition, the memory 1100 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some instances, the memory 1100 may further include a memory remotely arranged relative to the processor 1200, and these remote memories may be connected to the device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0117] An embodiment of the present invention further provides a computer-readable storage medium storing computer-executable instructions for executing the load-constrained charging control method for an AC charging pile provided in any embodiment of the present invention.

[0118] An embodiment of the present invention also provides a computer program product, including a computer program or computer instructions, wherein the computer program or computer instructions are stored in a computer-readable storage medium, a processor of a computer device reads the computer program or computer instructions from the computer-readable storage medium, and the processor executes the computer program or computer instructions, so that the computer device executes the load-constrained charging control method for an AC charging pile provided in any embodiment of the present invention.

[0119] The electronic devices and application scenarios described in the embodiments of the present invention are intended to more clearly illustrate the technical solutions of the embodiments of the present invention, and do not constitute a limitation on the technical solutions provided by the embodiments of the present invention. Those skilled in the art will appreciate that with the evolution of electronic devices and the emergence of new application scenarios, the technical solutions provided by the embodiments of the present invention are equally applicable to similar technical problems.

[0120] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.

[0121] In hardware implementation, the division between the functional modules / units mentioned in the above description does not necessarily correspond to the division of physical components; for example, a physical component may have multiple functions, or a function or step may be performed by several physical components in cooperation. Some or all physical components may be implemented as software executed by a processor, such as a central processing unit, a digital signal processor, or a microprocessor, or implemented as hardware, or implemented as an integrated circuit, such as an application-specific integrated circuit. Such software may be distributed on a computer-readable medium, which may include a computer storage medium (or non-transitory medium) and a communication medium (or transient medium). As is well known to those of ordinary skill in the art, the term computer storage medium includes volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information (such as computer-readable instructions, data structures, program modules, or other data). Computer storage media include, but are not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile disk (DVD) or other optical disk storage, magnetic cassettes, magnetic tapes, disk storage or other magnetic storage devices, or any other medium that can be used to store desired information and can be accessed by a computer. Furthermore, it is well known to those skilled in the art that communication media typically embodies computer readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and may include any information delivery media.

[0122] The terms "component", "module", "system", etc. used in this specification are used to represent computer-related entities, hardware, firmware, a combination of hardware and software, software, or software in execution. For example, a component can be, but is not limited to, a process running on a processor, a processor, an object, an executable file, an execution thread, a program, or a computer. By way of illustration, both applications running on a computing device and a computing device can be components. One or more components may reside in a process or an execution thread, and a component may be located on a computer or distributed between two or more computers. In addition, these components may be executed from various computer-readable media having various data structures stored thereon. Components may, for example, communicate through a local or remote process based on a signal having one or more data packets (e.g., data from two components interacting with another component between a local system, a distributed system, or a network, such as the Internet interacting with other systems through signals).

Claims

1. A load-constrained charging control method for an AC charging pile, characterized in that: The steps include: Step S1, judging whether the AC charging pile is connected to the photovoltaic storage system, if connected, controlling the AC charging pile to enter the green power priority mode, and in the green power priority mode, obtaining the green power surplus power and the maximum allowable power consumption, and generating a green power constraint charging strategy for the AC charging pile according to the green power surplus power and the maximum allowable power consumption, otherwise executing step S2; The green power surplus power represents the power of the photovoltaic storage system that can be used by the AC charging pile, and the maximum allowable power represents the maximum power that the AC charging pile is allowed to draw from the power grid; Step S2: when the AC charging pile establishes a communication connection with an electric meter in the power grid, obtaining the grid connection point current reported by the electric meter through the AC charging pile; Step S3, generating a dynamic constraint charging strategy for the AC charging pile according to a dynamic evaluation parameter, wherein the dynamic evaluation parameter is a difference between a preset household circuit breaker current and a grid connection point current; The step in step S1, generating a green power constraint charging strategy for the AC charging pile according to the green power surplus power and the maximum allowable power consumption, includes the following steps: Step S11, obtaining the photovoltaic power and the minimum charging power of the AC charging pile, wherein the photovoltaic power represents the power that the AC charging pile is allowed to obtain from the photovoltaic storage system; Step S12: When the green power surplus power is greater than the photovoltaic power, and the sum of the green power surplus power and the maximum allowable power is greater than or equal to the minimum charging power, control the AC charging pile to start charging; Step S13: During the charging process of the AC charging pile, the real-time charging status of the AC charging pile is obtained, and according to the real-time charging status of the AC charging pile, the green power surplus power, the maximum allowable power consumption and the minimum charging power are combined to generate a green power constraint charging strategy for the AC charging pile.

2. The load-constrained charging control method for an AC charging pile according to claim 1, characterized in that: When the AC charging pile is in a single-phase charging state and the maximum allowable power is greater than or equal to the minimum charging power, step S13 includes the following steps: When the green power surplus power is greater than or equal to the maximum allowable power, controlling the AC charging pile to charge with the green power surplus power; or, When the green power surplus power is less than the maximum allowable power consumption, the AC charging pile is controlled to perform mixed charging with the green power surplus power and the first target grid power, wherein the first target grid power is the difference between the maximum allowable power consumption and the green power surplus power.

3. The load-constrained charging control method for an AC charging pile according to claim 1, characterized in that: When the AC charging pile is in a single-phase charging state and the maximum allowable power is less than the minimum charging power, step S13 includes the following steps: When the green power surplus power is greater than or equal to the minimum charging power, controlling the AC charging pile to charge with the green power surplus power; or, When the green power surplus power is less than the minimum charging power, and the sum of the green power surplus power and the maximum allowed power consumption is greater than or equal to the minimum charging power, the AC charging pile is controlled to perform mixed charging with the green power surplus power and the second target grid power, wherein the second target grid power is the difference between the minimum charging power and the green power surplus power; or, When the green power surplus power is less than the minimum charging power, and the sum of the green power surplus power and the maximum allowed power consumption is less than the minimum charging power, the AC charging pile is controlled to stop charging.

4. The load-constrained charging control method for an AC charging pile according to claim 1, characterized in that: When the AC charging pile is in a three-phase charging state, step S13 includes the following steps: When the green power surplus power is greater than or equal to the maximum allowable power, and the maximum allowable power is greater than or equal to the three-phase minimum charging power, the AC charging pile is controlled to charge with the green power surplus power, wherein the three-phase minimum charging power is 3 times the minimum charging power; or, When the green electricity surplus power is less than the maximum allowable power consumption, and the maximum allowable power consumption is greater than or equal to the three-phase minimum charging power, the AC charging pile is controlled to perform mixed charging with the green electricity surplus power and the third target grid power, wherein the third target grid power is the difference between the maximum allowable power consumption and the green electricity surplus power.

5. The load-constrained charging control method for an AC charging pile according to claim 1, characterized in that: When the AC charging pile is in a three-phase charging state, and the green power surplus power and the maximum allowable power are both less than the three-phase minimum charging power, step S13 includes the following steps: In the case where the AC charging pile starts the three-phase-single-phase switching, when the first switching condition or the second switching condition is met, the AC charging pile is controlled to switch to the single-phase charging state, wherein the first switching condition is that the green power surplus power is greater than or equal to the maximum allowable power supply power and the minimum charging power at the same time, and the second switching condition is that the green power surplus power and the maximum allowable power supply power are both less than the minimum charging power, and the sum of the green power surplus power and the maximum allowable power supply power is greater than or equal to the minimum charging power; or, In the case where the three-phase-single-phase switching is turned off on the AC charging pile, when the sum of the green power surplus power and the maximum allowed power is greater than or equal to the three-phase minimum charging power, the AC charging pile is controlled to perform mixed charging with the green power surplus power and the fourth target grid power, wherein the fourth target grid power is the difference between the three-phase minimum charging power and the green power surplus power; or, In the case where the three-phase-to-single-phase switching is turned off on the AC charging pile, when the sum of the green power surplus power and the maximum allowed power is less than the three-phase minimum charging power, the AC charging pile is controlled to stop charging.

6. The load-constrained charging control method for an AC charging pile according to claim 1, characterized in that: The step S3 comprises the following steps: When the dynamic evaluation parameter is greater than the minimum charging current of the AC charging pile, controlling the AC charging pile to charge with the dynamic evaluation parameter; or, When the dynamic evaluation parameter is less than or equal to the minimum charging current of the AC charging pile, the AC charging pile is controlled to stop charging.

7. The load-constrained charging control method for an AC charging pile according to claim 1, characterized in that: The following steps are also included: Step S4: When the AC charging pile has not established a communication connection with an electric meter in a power grid, control the AC charging pile to charge with a minimum charging current.

8. An electronic device, characterized in that: include: at least one processor; at least one memory for storing at least one program; When at least one of the programs is executed by at least one of the processors, the load-constrained charging control method for the AC charging pile as described in any one of claims 1 to 7 is implemented.

9. A computer-readable storage medium, characterized in that: A program executable by a processor is stored therein, and when the program executable by the processor is executed by the processor, it is used to implement the load-constrained charging control method for the AC charging pile as described in any one of claims 1 to 7.

Citation Information

Cited By

  • Charging control system for charging pile and charging control method

    EP4768313A1