A kind of assembled steel structure node and installation method thereof

By designing assembled steel structure nodes including second square pipe fittings, first square pipe fittings, screw positioning mechanisms and other components, the plug-in and screw positioning mechanisms are used to achieve quick connection and firm fixation, which solves the cumbersome installation steps in the existing technology. problems and improve the security performance of the installation.

CN118601147BActive Publication Date: 2024-10-18YINGKOU DONGSHENG STEEL STRUCTURE CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411074728.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-18
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

The installation steps of existing prefabricated steel structure nodes are cumbersome, which is not conducive to rapid installation and fixation and affects safety performance.

Method used

The design includes the second square pipe fitting, the first square pipe fitting, the support plate, the screw positioning mechanism, the L-shaped plate, the adjusting plug-in mechanism, the arc-shaped round pipe fitting, the lifting mechanism and other components. Through the plug-in, screw positioning and bolt A combination of components for quick connection and secure fixation.

Benefits of technology

It realizes the quick connection and fixation of the first-party pipe fitting and the second-party pipe fitting, improves the firmness and safety performance of the connection, and simplifies the installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118601147B_ABST
    Figure CN118601147B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of assembled steel structure nodes, specifically to an assembled steel structure node and its installation method, wherein the node includes a second square pipe fitting, the upper and lower ends of the second square pipe fitting both abut against a first square pipe fitting, a support plate is fixed in the middle of the second square pipe fitting, and both ends of the support plate are provided with a screw-fitting positioning mechanism; the installation method includes the following steps: component positioning, component push-fitting, screw-fitting positioning and auxiliary fixing. The present application can quickly connect and fix the first square pipe fitting and the second square pipe fitting, can provide power through the weight of the components to realize the operation of the corresponding components in the second square pipe fitting, thereby effectively realizing the movement of the components, and realizing the connection and fixation of the first square pipe fitting, the second square pipe fitting and the first square pipe fitting by means of plug-in, screw-fitting positioning, etc., to improve the firmness of the connection, and can assist in improving the firmness of the connection through a fixing frame and a bolt assembly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of assembled steel structure nodes, and in particular to an assembled steel structure node and an installation method thereof. Background Art

[0002] The existing Chinese patent publication number is CN113279487B, which is an assembled steel structure node, comprising a node short column and a box column, the node short column is connected to a node flange, the box column is connected to a column flange, the node flange is provided with a waist-shaped hole, a bolt is provided on the node flange, the rod of the bolt is slidably arranged in the waist-shaped hole, a nut is threadedly connected to the rod of the bolt, the nut is located on the side of the node flange away from the bolt head, and a connecting groove for the bolt rod to extend into is provided on the side wall of the column flange. The application has the effect of improving the safety performance of the steel structure node during installation.

[0003] The above technical solution can effectively ensure the safety performance during installation, but its installation steps are relatively cumbersome and not conducive to rapid installation and fixation, so it needs to be improved. Summary of the invention

[0004] The purpose of the present invention is to solve the shortcomings of the prior art and to propose an assembled steel structure node and an installation method thereof.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] An assembled steel structure node comprises a second square pipe, wherein the upper and lower ends of the second square pipe both abut against a first square pipe, a support plate is fixed in the middle of the second square pipe, both ends of the support plate are provided with a screw-fitting positioning mechanism, a second push rod is provided in the screw-fitting positioning mechanism, and two second push rods extend into two first square pipes respectively;

[0007] An L-shaped plate is fixed on the four inner walls of the first square tube and the second square tube at one end, and an adjustment plug-in mechanism is provided on the L-shaped plate. Two first connecting shafts and two fixed plates are provided on the adjustment plug-in mechanism, and the four first connecting shafts at the end away from the L-shaped plate are connected to the screw-engaged positioning mechanism;

[0008] Mounting frames are fixed at both upper and lower ends of the four side walls in the second square tube, and arcuate round tubes are slidably mounted on the four mounting frames located in the same horizontal plane, the support plate is located between the two arcuate round tubes, and the four corners of the arcuate round tubes are fixed with first push rods, and the four corners of the first square tube are fixed with fixing frames, and a sleeve member is penetrated in the fixing frame, and two round tubes are penetrated on the fixing frame and the sleeve member, and the first push rod extends into the corresponding sleeve member, and the first push rod and the round tube member are connected with the corresponding adjustment plug-in mechanism;

[0009] The mounting frame is provided with a lifting mechanism, and the lifting mechanism is provided with a plug plate and two abutment rods, the plug plate is connected with the adjustment plug-in mechanism, and the abutment rods abut against corresponding arc-shaped round tubes.

[0010] Compared with the prior art, the present application can quickly connect and fix the first square pipe fitting and the second square pipe fitting, can provide power through the weight of the components to realize the operation of the corresponding components in the second square pipe fitting, thereby effectively realizing the movement of the components, and realizing the connection and fixation of the first square pipe fitting, the second square pipe fitting, and the first square pipe fitting through plug-in, screw-in positioning, etc., thereby improving the firmness of the connection, and can assist in improving the firmness of the connection through a fixing frame and a bolt assembly.

[0011] Preferably, the lifting mechanism includes a rotating shaft rotatably sleeved on the mounting frame, rocker members are fixed at both ends of the rotating shaft, two interference rods are rotatably sleeved on the two rocker members respectively, one of the interference rods is located in the mounting frame, and the plug plate member is slidably installed in the mounting frame, and the lower end of the plug plate member interferes with the interference rod located in the mounting frame.

[0012] Furthermore, during actual production and preparation, when the abutment rod located outside the mounting frame is squeezed by the arc-shaped round tube and rotated downward, the abutment rod located inside the mounting frame can push the plug plate to rise.

[0013] Preferably, lifting plates are fixed on both sides of the plug plate, and both lifting plates are slidably installed in the mounting frame. A blocking rod is fixed on one side of the mounting frame, and the blocking rod and the axis of the rotating shaft are staggered and vertically arranged, and the lifting plates are arranged through the corresponding fixed plate.

[0014] Furthermore, the position of the external resistance rod can be effectively limited by the action of the blocking rod, so that the rocker arm cannot be set vertically, which facilitates rapid rotation under the action of the arc-shaped circular tube member, so that the plug plate member located in the mounting frame can rise, and the stability of the lifting and lowering of the plug plate member can be fully guaranteed by the action of the lifting plate.

[0015] Preferably, the adjusting plug-in mechanism comprises two mounting tubes, which are respectively fixed on the upper ends of the two fixed plates, the fixed plates and the first square tube are fixedly connected, the L-shaped plate is located between the two fixed plates, an insert rod is slidably sleeved in the mounting tube, and the opposite ends of the two insert rods are rotatably sleeved with a second connecting shaft, and two oblique rods are rotatably sleeved on the second connecting shaft, and the two oblique rods located in the same horizontal plane form a group, and the two ends of the first connecting shaft are rotatably sleeved on the two oblique rods in the same group, an opening is provided on one side of the L-shaped plate, and a first connecting shaft close to the mounting frame is slidably sleeved in the opening, and one end of the first connecting shaft extends into the L-shaped plate, the upper end of the insert plate conflicts with the first connecting shaft, and the end of the insert rod away from the L-shaped plate passes through the corresponding round tube and extends into the first top rod.

[0016] Furthermore, during actual production and preparation, two holes are provided on one end of the first push rod member inserted into the sleeve member, and the two holes are respectively arranged corresponding to the two round tube members, that is, when the plug plate member rises, the first connecting shaft located in the opening can rise, which can push the two plug rod members to separate through the two inclined rod members rotatably connected to the first connecting shaft, and can be inserted into the two sleeve members on the corresponding sides. At the same time, during actual production and preparation, the four walls in the second square tube member and the four walls in the first square tube member correspond to the installation components to effectively realize synchronous operation, fully ensuring the rapid initial connection between the first square tube member, the second square tube member, and the first square tube member.

[0017] Preferably, the threaded positioning mechanism includes a circular ring member fixed on a support plate, and a plurality of positioning mechanisms are provided on the circular ring member at equal intervals. A bearing plate is fixed inside the first square tube member, and two second push rod members are respectively slidably sleeved on the two bearing plates, and screw nut assemblies are fixed on opposite sides of the two second push rod members. Screw members are rotatably sleeved on both sides of the support plate, and the screw members and corresponding screw nut assemblies are threadedly connected, and the positioning mechanism is connected to the mounting frame and the screw member.

[0018] Furthermore, when the first connecting shaft located in the opening rises, the other first connecting shaft corresponding to it can be lowered, and the four first connecting shafts located in the same horizontal plane are connected to the corresponding second top rod members, which can effectively ensure that the second top rod member moves stably in the direction of the screw member, so that the second top rod member and the screw member are screwed together, and the screw member can be rotated to effectively screw together.

[0019] Preferably, the positioning mechanism includes a plurality of shaft sleeves that are evenly spaced and arranged around a circular ring member, a round rod member is fixed in the shaft sleeve, a first push rod and a second push rod are slidably sleeved on both ends of the round rod member, the second push rod is located in the mounting frame, a return spring and a resistance spring are sleeved on the round rod member, the return spring is located in the resistance spring, the two ends of the return spring are respectively fixed on the round rod member and the second push rod, the two ends of the resistance spring are respectively fixed on the opposite sides of the first push rod and the second push rod, a plurality of sockets are evenly spaced on the side wall around the screw member, and the second push rod extends into the corresponding sockets.

[0020] Furthermore, during actual production and preparation, the second push rod will come into contact with the side wall of the screw member under the action of the return spring. At the same time, when the arc-shaped circular tube member descends, the first push rod can be squeezed. The movement of the first push rod can continue to apply pressure to the second push rod through the resistance spring, so that when the screw member rotates to the socket and corresponds to the second push rod, the second push rod can be quickly inserted into the socket, and the screw member is fully fixed, so that the screw member cannot rotate. This can further ensure the firmness of the connection between the screw member and the screw nut assembly, and ensure the firmness of the connection.

[0021] Preferably, the ends of the first push rod and the second push rod extending out of the shaft sleeve are both hemispherical, the lower end of the mounting frame is arc-shaped, and the end of the screw member corresponding to the screw nut assembly is hemispherical.

[0022] Furthermore, the hemispherical arrangement can facilitate mutual insertion of components and quickly complete the connection.

[0023] Preferably, the two rocker members on the same rotating shaft are arranged at a right angle.

[0024] Furthermore, the lifting and lowering of the plug plate can be fully adjusted.

[0025] Preferably, a fixing frame is fixed to the opposite ends of the first square tube and the second square tube, and a plurality of bolt assemblies are installed on the two fixing frames on the same side.

[0026] Furthermore, the firmness of the connection can be better improved through the action of the first square pipe, the second square pipe, the fixing frame and the bolt assembly between the first square pipe.

[0027] The present invention also proposes an installation method for a prefabricated steel structure node, which is applicable to the above-mentioned prefabricated steel structure node and comprises the following steps:

[0028] S1. Component positioning: After fixing the first square tube at the lower end, place the second square tube and the first square tube at the upper end in sequence, so that the second square tube is located between the two first square tubes, and adjust the angle between the first square tube and the second square tube to effectively ensure that the two fixing frames on the same side are overlapped;

[0029] S2, push and plug the components: press down the first square tube at the uppermost end, so that the first square tube, the second square tube and the first square tube contact each other, so that the sleeve and the corresponding first push rod can be plugged, and at the same time, the first push rod is pushed to move into the second square tube, and the movement of the first push rod can drive the arc-shaped round tube to move into the second square tube, so that the arc-shaped round tube squeezes the conflicting rod that contacts it, so that the conflicting rod located in the mounting frame can push the plug plate to move in the direction of the L-shaped plate, and the plug plate can push the first connecting shaft on the L-shaped plate to move, so that the two plug rods are separated and inserted into the round tube and the first push rod through the oblique rod;

[0030] S3, screw-on positioning: the first connecting shaft located on the L-shaped plate moves, and the cooperation of the oblique rod and the corresponding parts can make the other first connecting shaft move toward the direction of the second square tube. The first connecting shaft can drive the second push rod to move toward the direction of the second square tube, so that the lead screw nut assembly and the lead screw can be screwed together. The rotation of the lead screw can make the socket on it correspond to the second push rod, and when the arc-shaped circular tube moves into the second square tube, the first push rod can be squeezed to apply pressure to the second push rod so that it can be inserted into the corresponding socket of the second push rod to complete the connection and fixation;

[0031] S4. Auxiliary fixation: Auxiliary fixation is performed by installing bolt assemblies on two conflicting fixing frames.

[0032] Compared with the prior art, this application fully explains how to connect the first party pipe fitting, the second party pipe fitting, and the first party pipe fittings, and how the corresponding components installed in the second party pipe fitting and the first party pipe fitting operate in conjunction, so that the staff can know how to use and fix them.

[0033] The beneficial effects of the present invention are:

[0034] 1. In actual production and preparation, when the abutment stick located outside the mounting frame is squeezed and rotated downward by the arc-shaped round tube, the abutment stick located inside the mounting frame can push the plug plate to rise;

[0035] 2. The blocking rod can effectively limit the position of the external resistance rod, so that the swing rod cannot be set vertically, which is convenient for rapid rotation under the action of the arc-shaped round tube, so that the plug-in plate in the mounting frame can be raised, and the lifting plate can fully ensure the stability of the lifting of the plug-in plate;

[0036] 3. In actual production and preparation, two holes are provided on one end of the first push rod member inserted into the sleeve member, and the two holes are respectively arranged corresponding to the two round tube members, that is, when the plug plate member rises, the first connecting shaft located in the opening can be raised, so that the two plug rod members can be pushed to separate through the two oblique rod members rotatably connected to the first connecting shaft, and can be inserted into the two sleeve members on the corresponding sides. At the same time, in actual production and preparation, the four walls in the second square tube member and the four walls in the first square tube member correspond to the installation components to effectively realize synchronous operation and fully ensure the rapid preliminary connection between the first square tube member, the second square tube member and the first square tube member;

[0037] 4. When the first connecting shaft located in the opening rises, another first connecting shaft corresponding to it can be lowered, and the four first connecting shafts located in the same horizontal plane are connected with the corresponding second push rods, which can effectively ensure that the second push rods move stably in the direction of the screw member, so that the second push rods and the screw member are screwed together, and the screw member can be rotated to effectively screw together;

[0038] 5. The fixing frame and bolt assembly can be used to assist fixation, effectively improve the resistance connection at the connection position, and better assist fixation. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 This is a structural diagram of an assembled steel structure node proposed by the present invention;

[0040] Figure 2 A structural diagram of an arc-shaped round tube member and a first top rod member of an assembled steel structure node proposed by the present invention;

[0041] Figure 3 This is a structural diagram of a first top rod, a fixing frame and a sleeve member of an assembled steel structure node proposed by the present invention;

[0042] Figure 4 This is a structural diagram of an L-shaped plate, a plug-in plate and a mounting frame of an assembled steel structure node proposed by the present invention;

[0043] Figure 5 A cross-sectional view of a prefabricated steel structure node proposed by the present invention;

[0044] Figure 6 A structural diagram of a lead screw member and a lead screw nut assembly of an assembled steel structure node proposed by the present invention;

[0045] Figure 7 A cross-sectional view of an axis kit of a prefabricated steel structure node proposed by the present invention;

[0046] In the figure: 1 first square pipe, 2 second square pipe, 3 fixing frame, 4 first push rod, 5 arc-shaped round pipe, 6 round pipe, 7 mounting frame, 8 swing rod, 9 sleeve pipe, 10 fixing frame, 11 plug rod, 12 mounting pipe, 13 fixing plate, 14 lifting plate, 15 plug plate, 16 blocking rod, 17 resisting rod, 18 rotating shaft, 19 opening, 20 L-shaped plate, 21 first connecting shaft, 22 oblique rod, 23 second connecting shaft, 24 second push rod, 25 bearing plate, 26 lead screw, 27 supporting plate, 28 circular ring, 29 lead screw nut assembly, 30 first push rod, 31 resistance spring, 32 return spring, 33 circular rod, 34 second push rod, 35 shaft kit, 36 bolt assembly. DETAILED DESCRIPTION

[0047] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0048] Reference Figure 1-7 A prefabricated steel structure node includes a second square pipe fitting 2, the upper and lower ends of the second square pipe fitting 2 are in contact with a first square pipe fitting 1, a support plate 27 is fixed in the middle of the second square pipe fitting 2, both ends of the support plate 27 are provided with a screw positioning mechanism, a second push rod 24 is provided in the screw positioning mechanism, and the two second push rods 24 extend into the two first square pipe fittings 1 respectively. The screw positioning mechanism can better ensure the firmness of the connection between the first square pipe fitting 1, the second square pipe fitting 2, and the first square pipe fitting 1, and can quickly complete the connection of the first square pipe fitting 1, the second square pipe fitting 2, and the first square pipe fitting 1.

[0049] Reference Figure 1-7 An L-shaped plate 20 is fixed on the four inner walls of the first square tube 1 and the second square tube 2 at one end. An adjusting plug-in mechanism is provided on the L-shaped plate 20. Two first connecting shafts 21 and two fixed plates 13 are provided on the adjusting plug-in mechanism. The four first connecting shafts 21 at the end away from the L-shaped plate 20 are connected to the screw positioning mechanism. The four oblique rods 22 can form a quadrilateral structure through the two first connecting shafts 21 and the two fixed plates 13. When the two fixed plates 13 are separated, the two first connecting shafts 21 move relative to each other. When the two first connecting shafts 21 are relatively separated, the two fixed plates 13 move relative to each other, which helps to control the movement of the inserted rod 11 and the second top rod 24.

[0050] Reference Figure 1-7, mounting frames 7 are fixed at the upper and lower ends of the four side walls in the second square tube 2, and an arc-shaped round tube 5 is slidably installed on the four mounting frames 7 located in the same horizontal plane, and the support plate 27 is located between the two arc-shaped round tubes 5. The four corners of the arc-shaped round tube 5 are fixed with a first push rod 4, and the four corners in the first square tube 1 are fixed with a fixing frame 10. A sleeve member 9 is penetrated in the fixing frame 10, and two round tube members 6 are penetrated on the fixing frame 10 and the sleeve member 9. The first push rod 4 extends into the corresponding sleeve member 9, and the first push rod 4 and the round tube member 6 are connected with the corresponding adjustment plug-in mechanism. In actual production and preparation, two holes are opened at one end of the first push rod 4 inserted into the sleeve member 9, and the two holes correspond to the round tube member 6 on the fixing frame 10, so that the plug-in member 11 can be inserted into the first push rod 4 during plugging to complete the connection, and the firmness of the connection between the fixing frame 10, the sleeve member 9 and the first square tube 1 is ensured by welding and the like.

[0051] Reference Figure 2-4 , a lifting mechanism is provided on the mounting frame 7, and a plug plate 15 and two conflicting rods 17 are provided on the lifting mechanism. The plug plate 15 is connected to the adjusting plug-in mechanism, and the conflicting rod 17 conflicts with the corresponding arc-shaped round tube 5; the lifting mechanism includes a rotating shaft 18 rotatably sleeved on the mounting frame 7, and a rocker member 8 is fixed at both ends of the rotating shaft 18. The two rocker members 8 on the same rotating shaft 18 are arranged at a right angle, and the two conflicting rods 17 are respectively rotatably sleeved on the two rocker members 8, one of the conflicting rods 17 is located in the mounting frame 7, and the plug plate 15 is slidably installed in the mounting frame 7, and the lower end of the plug plate 15 conflicts with the conflicting rod 17 located in the mounting frame 7. In actual production and preparation, when the conflicting rod 17 located outside the mounting frame 7 is squeezed and rotated downward by the arc-shaped round tube 5, the conflicting rod 17 located in the mounting frame 7 can push the plug plate 15 to rise.

[0052] Reference Figure 2-4 , lifting plates 14 are fixed on both sides of the plug plate member 15, and the two lifting plates 14 are slidably installed in the mounting frame 7. A blocking rod member 16 is fixed on one side of the mounting frame 7. The blocking rod member 16 and the axis of the rotating shaft 18 are staggered and vertically arranged. The lifting plates 14 are arranged through the corresponding fixed plate member 13. The position of the external interference rod 17 can be effectively limited by the action of the blocking rod member 16, so that the rocker member 8 cannot be set vertically, which is convenient for rapid rotation under the action of the arc-shaped circular tube member 5, so that the plug plate member 15 located in the mounting frame 7 can be raised, and the stability of the lifting and lowering of the plug plate member 15 can be fully guaranteed by the action of the lifting plate 14.

[0053] Reference Figure 1-5The adjusting plug-in mechanism includes two mounting pipes 12, and the two mounting pipes 12 are respectively fixed on the upper ends of the two fixed plates 13. The fixed plates 13 and the first square pipe 1 are fixedly connected. The L-shaped plate 20 is located between the two fixed plates 13. The mounting pipe 12 is slidably sleeved with an insert rod 11, and the opposite ends of the two insert rods 11 are rotatably sleeved with a second connecting shaft 23. Two oblique rods 22 are rotatably sleeved on the second connecting shaft 23. The two oblique rods 22 located in the same horizontal plane are a group. The two ends of the first connecting shaft 21 are rotatably sleeved on the two oblique rods 22 in the same group. An opening 19 is provided on one side of the L-shaped plate 20. The first connecting shaft 21 close to the mounting frame 7 is slidably sleeved in the opening 19, and one end of the first connecting shaft 21 extends into the L-shaped plate 20. The upper end of the insert plate 15 is connected to the first connecting shaft The shafts 21 conflict with each other, and the end of the plug rod 11 away from the L-shaped plate 20 passes through the corresponding round tube 6 and extends to the first push rod 4. During actual production and preparation, two holes are opened on the end of the first push rod 4 inserted into the sleeve 9, and the two holes are respectively arranged corresponding to the two round tubes 6, that is, when the plug plate 15 rises, the first connecting shaft 21 located in the opening 19 can be raised, which can push the two plug rods 11 to separate through the two inclined rods 22 rotatably connected to the first connecting shaft 21, and can be inserted into the two sleeves 9 on both sides corresponding to them. At the same time, during actual production and preparation, the four walls in the second square tube 2 and the four walls in the first square tube 1 correspond to the installation components to effectively realize synchronous operation, fully ensuring the rapid initial connection between the first square tube 1, the second square tube 2, and the first square tube 1.

[0054] Reference Figure 5-7 The screw-engaged positioning mechanism includes a circular ring member 28 fixed on the support plate 27, and the circular ring member 28 is provided with a plurality of positioning mechanisms at equal intervals. A bearing plate 25 is fixed in the first square tube member 1, and two second push rod members 24 are respectively slidably sleeved on the two bearing plates 25, and a screw nut assembly 29 is fixed on the opposite side of the two second push rod members 24. A screw member 26 is rotatably sleeved on both sides of the support plate 27, and the screw member 26 and the corresponding screw nut assembly 29 are screwed together. The positioning mechanism is connected to the mounting frame 7 and the screw member 26. In actual production, when the plug plate member 15 pushes the first connecting shaft 21 located in the opening 19 to move in a direction away from the mounting frame 7, the other first connecting shaft 21 can be moved in a direction close to the mounting frame 7, so that the second push rod member 24 drives the screw nut assembly 29 to descend, so that the screw nut assembly 29 is quickly screwed with the screw member 26, so that the screw member 26 rotates, which facilitates the connection of the positioning mechanism with the screw member 26.

[0055] Reference Figure 6 , 7The positioning mechanism includes a plurality of shaft sleeves 35 which are evenly spaced and penetrate through a circle of the circular ring member 28. A round rod member 33 is fixed in the shaft sleeve 35. The first push rod 30 and the second push rod 34 are respectively slidably sleeved at both ends of the round rod member 33. The second push rod 34 is located in the mounting frame 7. A return spring 32 and a resistance spring 31 are sleeved on the round rod member 33. The return spring 32 is located in the resistance spring 31. The two ends of the return spring 32 are respectively fixed on the round rod member 33 and the second push rod 34. The two ends of the resistance spring 31 are respectively fixed on the opposite sides of the first push rod 30 and the second push rod 34. A plurality of insertion holes are evenly spaced on a side wall of a circle of the lead screw member 26. The second push rod 34 extends into the corresponding insertion holes. During actual production and preparation, through the cooperation of the reset spring 32 and the second push rod 34, the second push rod 34 can be made to collide with the outer side of the screw member 26. When the arc-shaped circular tube member 5 descends, it will squeeze the first push rod 30, so that the first push rod 30 will apply pressure to the second push rod 34 through the resistance spring 31, and as the screw member 26 rotates, the second push rod 34 can correspond to the socket on the screw member 26, so that the second push rod 34 can be inserted into the socket, which can effectively complete the position of the screw member 26 and prevent it from rotating. In this way, the position of the second push rod member 24 and the screw nut assembly 29 can be effectively limited, so as to further ensure the stability among the first square tube member 1, the second square tube member 2, and the first square tube member 1.

[0056] Reference Figure 6 , 7 The first push rod 30 and the second push rod 34 extend out of the shaft sleeve 35 at one end and are both hemispherically arranged. The lower end of the mounting frame 7 is arc-shaped. The end of the screw member 26 corresponding to the screw nut assembly 29 is hemispherically arranged. The arc-shaped arrangement facilitates the relative insertion of the components. At the same time, the opposite ends of the screw member 26 and the screw nut assembly 29 are arc-shaped, which facilitates the rapid lowering of the screw nut assembly 29 so that it can be screwed into the corresponding screw member 26, so that the screw member 26 can rotate. At the same time, during actual production and preparation, the screw member 26 and the screw nut assembly 29 components are arranged so that the screw member 26 can be rotated and screwed under the extrusion of the screw nut assembly 29.

[0057] Reference Figure 1A fixing frame 3 is fixed to the opposite ends of the first square pipe fitting 1 and the second square pipe fitting 2, and a plurality of bolt assemblies 36 are installed on the two fixing frames 3 on the same side. During actual production and preparation, the fixing frame 3 and the corresponding first square pipe fitting 1 and the second square pipe fitting 2 are welded and connected, and it is ensured that the fixing frame 3 is flush with the end connected to the first square pipe fitting 1 and the second square pipe fitting 2, so as to effectively ensure the connection and fixation of the corresponding fixing frame 3. At the same time, a triangular reinforcement plate can be installed between the fixing frame 3 and the corresponding first square pipe fitting 1 or the second square pipe fitting 2 to fully improve the firmness of the connection. The firmness of the connection can be better guaranteed by the bolt assembly 36, and the first square pipe fitting 1, the second square pipe fitting 2, and the corresponding components in the first square pipe fitting 1 can be better guaranteed. In addition, the corresponding threaded holes can be set on the second square pipe fitting 2 or the corresponding connecting parts can be installed to realize the installation of horizontal steel structure parts.

[0058] The present invention also proposes an installation method for a prefabricated steel structure node, which is applicable to the above-mentioned prefabricated steel structure node and comprises the following steps:

[0059] S1. Positioning components: After fixing the first square tube 1 at the lower end, place the second square tube 2 and the first square tube 1 at the upper end in sequence, so that the second square tube 2 is located between the two first square tubes 1, and adjust the angle between the first square tube 1 and the second square tube 2 to effectively ensure that the two fixing frames 3 on the same side are overlapped;

[0060] S2, push and plug components: press down the first square tube 1 at the uppermost end, so that the first square tube 1 and the second square tube 2 are in conflict with each other, and the sleeve member 9 and the corresponding first push rod member 4 can be plugged, and at the same time, the first push rod member 4 is pushed to move into the second square tube 2, and the movement of the first push rod member 4 can drive the arc-shaped circular tube 5 to move into the second square tube 2, so that the arc-shaped circular tube 5 squeezes the conflicting rod 17 that conflicts with it, so that the conflicting rod 17 located in the mounting frame 7 can push the plug-in plate 15 to move in the direction of the L-shaped plate 20, and the plug-in plate 15 can push the first connecting shaft 21 on the L-shaped plate 20 to move, so that the two plug-in rod members 11 are separated and inserted into the circular tube 6 and the first push rod member 4 through the inclined rod member 22;

[0061] S3, screwing and positioning: the first connecting shaft 21 located on the L-shaped plate 20 moves, and the cooperation of the oblique rod 22 and the corresponding parts can make the other first connecting shaft 21 move toward the second square tube 2, and the first connecting shaft 21 can drive the second push rod 24 to move toward the second square tube 2, so that the screw nut assembly 29 and the screw member 26 can be screwed together, and the rotation of the screw member 26 can make the socket on it correspond to the second push rod 34, and when the arc-shaped circular tube 5 moves into the second square tube 2, it can press the first push rod 30 toward the second push rod 34 so that it can be inserted into the corresponding socket of the second push rod 34, and the connection and fixation are completed;

[0062] S4, auxiliary fixing: auxiliary fixing is performed by installing bolt assemblies 36 on the two conflicting fixing frames 3.

[0063] In the present invention, after the first square tube 1 at the lower end is fixed, the second square tube 2 and the first square tube 1 at the upper end are placed in sequence, forming a state in which the second square tube 2 is located between the two first square tubes 1, and at the same time, the angle relationship between the first square tube 1 and the second square tube 2 is adjusted to effectively ensure that the two fixing frames 3 on the same side are overlapped; the first square tube 1 at the uppermost end is pressed down to make the first square tube 1, the second square tube 2 and the first square tube 1 conflict with each other, so that the sleeve member 9 and the corresponding first push rod member 4 can be made Insertion, at the same time, push the first push rod 4 to move into the second square tube 2, the movement of the first push rod 4 can drive the arc-shaped round tube 5 to move into the second square tube 2, so that the arc-shaped round tube 5 squeezes the conflicting rod 17 that conflicts with it, so that the conflicting rod 17 located in the mounting frame 7 can push the plug-in plate 15 to move in the direction of the L-shaped plate 20, and the plug-in plate 15 can push the first connecting shaft 21 on the L-shaped plate 20 to move, so that the two plug-in rods 11 are separated and inserted into the round tube 6 and the first push rod 4 through the oblique rod 22;

[0064] The first connecting shaft 21 located on the L-shaped plate 20 moves, and the cooperation of the inclined rod 22 and the corresponding parts can make the other first connecting shaft 21 move toward the second square tube 2. The first connecting shaft 21 can drive the second push rod 24 to move toward the second square tube 2, so that the screw nut assembly 29 and the screw member 26 can be screwed together. The rotation of the screw member 26 can make the socket on it correspond to the second push rod 34, and when the arc-shaped circular tube 5 moves into the second square tube 2, it can pressurize the first push rod 30 toward the second push rod 34 so that it can be inserted into the corresponding socket of the second push rod 34 to complete the connection and fixation; auxiliary fixation is performed by installing a bolt assembly 36 on the two conflicting fixing frames 3.

[0065] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An assembled steel structure node, comprising a second square pipe (2), characterized in that: The upper and lower ends of the second square tube (2) are in contact with the first square tube (1); a support plate (27) is fixed in the middle of the second square tube (2); screw-engaged positioning mechanisms are provided at both ends of the support plate (27); a second push rod (24) is provided in the screw-engaged positioning mechanism; the two second push rods (24) extend into the two first square tubes (1) respectively; An L-shaped plate (20) is fixed to each of the four inner walls of the first square tube (1) and the second square tube (2) at one end thereof; the L-shaped plate (20) is provided with an adjustment plug-in mechanism; the adjustment plug-in mechanism is provided with two first connecting shafts (21) and two fixing plates (13); the four first connecting shafts (21) at the end away from the L-shaped plate (20) are connected to the screw-engaged positioning mechanism; Mounting frames (7) are fixed at both upper and lower ends of the four side walls of the second square tube (2); arc-shaped round tubes (5) are slidably mounted on the four mounting frames (7) located in the same horizontal plane; the support plate (27) is located between two arc-shaped round tubes (5); four corners of the arc-shaped round tubes (5) are fixed with first push rods (4); four corners of the first square tube (1) are fixed with fixing frames (10); a sleeve (9) is passed through the fixing frame (10); two round tubes (6) are passed through the fixing frame (10) and the sleeve (9); the first push rod (4) extends into the corresponding sleeve (9); the first push rod (4) and the round tube (6) are connected to corresponding adjustment plug-in mechanisms; The mounting frame (7) is provided with a lifting mechanism, and the lifting mechanism is provided with a plug plate (15) and two abutment rods (17), the plug plate (15) is connected to the adjustment plug-in mechanism, and the abutment rods (17) abut against the corresponding arc-shaped circular tube (5); The lifting mechanism comprises a rotating shaft (18) rotatably sleeved on the mounting frame (7), a rocker member (8) being fixed at both ends of the rotating shaft (18), two abutment rods (17) being rotatably sleeved on the two rocker members (8), one of the abutment rods (17) being located in the mounting frame (7), the plug plate member (15) being slidably mounted in the mounting frame (7), and the lower end of the plug plate member (15) abutting against the abutment rod (17) located in the mounting frame (7); A lifting plate (14) is fixed on both sides of the plug plate (15), and the two lifting plates (14) are slidably mounted in the mounting frame (7). A blocking rod (16) is fixed on one side of the mounting frame (7), and the axes of the blocking rod (16) and the rotating shaft (18) are staggered and vertically arranged, and the lifting plates (14) are arranged through the corresponding fixed plate (13); The adjustable plug-in mechanism comprises two mounting pipes (12), the two mounting pipes (12) being fixed to the upper ends of two fixed plates (13) respectively, the fixed plates (13) being fixedly connected to the first square pipe (1), the L-shaped plate (20) being located between the two fixed plates (13), a plug-in rod (11) being slidably sleeved in the mounting pipe (12), the opposite ends of the two plug-in rods (11) being rotatably sleeved with a second connecting shaft (23), two oblique rods (22) being rotatably sleeved on the second connecting shaft (23), the two oblique rods (22) being located in the same horizontal plane 22) is a group, the two ends of the first connecting shaft (21) are rotatably sleeved on the two oblique rods (22) in the same group, one side of the L-shaped plate (20) is provided with an opening (19), the first connecting shaft (21) close to the mounting frame (7) is slidably sleeved in the opening (19), and one end of the first connecting shaft (21) extends into the L-shaped plate (20), the upper end of the plug plate (15) is in conflict with the first connecting shaft (21), and the end of the plug rod (11) away from the L-shaped plate (20) passes through the corresponding round tube (6) and extends into the first top rod (4); The screw-engaged positioning mechanism comprises a circular ring member (28) fixed on a support plate (27), the circular ring member (28) being provided with a plurality of positioning mechanisms at equal intervals, a bearing plate (25) being fixed inside the first square tube member (1), two second push rod members (24) being respectively slidably sleeved on the two bearing plates (25), a lead screw nut assembly (29) being fixed on opposite sides of the two second push rod members (24), a lead screw member (26) being rotatably sleeved on both sides of the support plate (27), the lead screw member (26) and the corresponding lead screw nut assembly (29) being screw-engaged, and the positioning mechanism being connected to the mounting frame (7) and the lead screw member (26).

2. The assembled steel structure node according to claim 1, characterized in that: The positioning mechanism comprises a plurality of shaft sleeves (35) which are arranged at equal intervals on a circle of a circular ring member (28); a round rod member (33) is fixed in the shaft sleeve (35); a first push rod (30) and a second push rod (34) are slidably sleeved at two ends of the round rod member (33); the second push rod (34) is located in a mounting frame (7); a return spring (32) and a resistance spring (31) are sleeved on the round rod member (33); the return spring (32) is located in the resistance spring (31); the two ends of the return spring (32) are respectively fixed on the round rod member (33) and the second push rod (34); the two ends of the resistance spring (31) are respectively fixed on opposite sides of the first push rod (30) and the second push rod (34); a plurality of insertion holes are opened at equal intervals on a side wall of a circle of the lead screw member (26); the second push rod (34) extends into the corresponding insertion holes.

3. The assembled steel structure node according to claim 2, characterized in that: One end of the first push rod (30) and the second push rod (34) extending out of the shaft sleeve (35) are both hemispherical, the lower end of the mounting frame (7) is arc-shaped, and the end of the lead screw member (26) corresponding to the lead screw nut assembly (29) is hemispherical.

4. The assembled steel structure node according to claim 3, characterized in that: The two rocker members (8) on the same rotating shaft (18) are arranged at a right angle.

5. The assembled steel structure node according to claim 1, characterized in that: A fixing frame (3) is fixed to opposite ends of the first square tube (1) and the second square tube (2), and a plurality of bolt assemblies (36) are installed on the two fixing frames (3) located on the same side.

6. A method for installing a prefabricated steel structure node, applicable to a prefabricated steel structure node according to claim 5, characterized in that: The following steps are involved: S1, component positioning: after fixing the first square tube (1) at the lower end, the second square tube (2) and the first square tube (1) at the upper end are placed in sequence, so that the second square tube (2) is located between the two first square tubes (1), and at the same time, the angle relationship between the first square tube (1) and the second square tube (2) is adjusted to effectively ensure that the two fixing frames (3) on the same side are overlapped; S2, component push and plug: press down the first square tube (1) located at the uppermost end, so that the first square tube (1), the second square tube (2) and the first square tube (1) are mutually in conflict with each other, and then the sleeve member (9) and the corresponding first push rod member (4) can be plugged, and at the same time, the first push rod member (4) is pushed to move into the second square tube member (2). The movement of the first push rod member (4) can drive the arc-shaped circular tube member (5) to move into the second square tube member (2), so that the arc-shaped circular tube member (5) squeezes the conflicting rod (17) in conflict with it, so that the conflicting rod (17) located in the mounting frame (7) can push the plug-in plate member (15) to move in the direction of the L-shaped plate (20), and the plug-in plate member (15) can push the first connecting shaft (21) on the L-shaped plate (20) to move, so that the two plug-in rod members (11) are separated and inserted into the circular tube member (6) and the first push rod member (4) through the inclined rod member (22); S3, screw-engagement positioning: the first connecting shaft (21) located on the L-shaped plate (20) moves, and the other first connecting shaft (21) can move toward the second square tube (2) through the cooperation of the inclined rod (22) and the corresponding parts. The first connecting shaft (21) can drive the second push rod (24) to move toward the second square tube (2), so that the screw nut assembly (29) and the screw member (26) can be screwed together. The rotation of the screw member (26) can make the socket on it correspond to the second push rod (34), and when the arc-shaped circular tube (5) moves into the second square tube (2), the first push rod (30) can be pressed toward the second push rod (34) so ​​that it can be inserted into the corresponding socket of the second push rod (34), thereby completing the connection and fixation; S4, auxiliary fixing: Auxiliary fixing is performed by installing bolt assemblies (36) on the two conflicting fixing frames (3).

Citation Information

Patent Citations

  • A prefabricated steel structure node

    CN113279487B

  • Fabricated wall system and construction method thereof

    CN117605185A

  • External measurement and control device for improving precision of machining component of numerical control lathe

    CN117773656A