By welding the steel frame and installing arc-shaped horizontal keels at the settlement joints, the problem of uneven stress during the construction of arc-shaped stone walls is solved, the risk of rupture is reduced, the yield rate of stone is increased, and a stable arc is achieved Stone wall installation.
Patent Information
- Application Number
- CN202411078521.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-07
AI Technical Summary
During construction, stone walls at settlement joints are prone to cracking and falling off due to uneven stress. Existing technology is difficult to effectively install curved stone walls, especially for large-area arc stone wall construction.
A method of installing arc stone walls at deformation joints is adopted. By welding steel skeletons on both sides of the settlement joints and adding expansion joints at the junction, the installation skeleton includes welding embedded plates, vertical keels and arc-shaped horizontal keels to form The triangular structure is used to fix the arc stone, and it is cut and separated when the stone is dry-hanging to facilitate processing and installation.
It reduces the risk of stone cracking caused by different settlement rates, improves the yield rate of stone, solves the problem of difficulty in applying ordinary stone wall construction, and the triangular structure of the skeleton improves stability.
Smart Images

Figure CN118601255B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and particularly relates to a method for installing an arc stone wall at a deformation joint. Background Art
[0002] In construction, if there is a settlement joint on the ground between two building structures, the stone wall connecting the two buildings is prone to cracking and falling off due to uneven stress due to different settlement rates. At present, there are few deformation joints such as ground settlement joints in indoor dry-hanging stones, and there are few arcs in large-area dry-hanging stones. Most of them are cylindrical and flat stone wall construction, which is not suitable for the installation of arc stones in building structures on both sides of the settlement joints. Summary of the invention
[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a method for installing arc stone walls at deformation joints, thereby solving the technical problem that ordinary stone dry hanging methods are easily damaged in building structures at settlement joints.
[0004] In order to solve the above problems, the technical solution of the present invention is: a method for installing a circular arc stone wall at a deformation joint, the operation steps are as follows:
[0005] S1, measurement and positioning of arc-shaped giant columns;
[0006] S2. Check the wire laying accuracy;
[0007] S3, installing the frame, the installation of the frame includes the following steps S31-S34:
[0008] S31, welding a first embedded plate on one side wall of the steel structure giant column on one side of the deformation joint, welding a first vertical keel on the first embedded plate; welding a first curved transverse keel on the first vertical keel, the first curved transverse keel is used to install arc stones; welding a second vertical keel on the end of the first curved transverse keel away from the first vertical keel;
[0009] S32, welding a second embedded plate on the other side wall of the steel structure giant column, the first embedded plate and the second embedded plate are respectively located on the two adjacent side walls of the steel structure giant column, and welding a third vertical keel on the second embedded plate; and welding and fixing the third vertical keel and the second vertical keel with a first angle steel to form a triangular structure;
[0010] S33, installing the fourth vertical keel and the fifth vertical keel on the wall on the other side of the deformation joint; fixing the sixth vertical keel on the fifth vertical keel by welding with the third angle steel, and the fourth vertical keel and the sixth vertical keel are fixed by welding with the second arc-shaped transverse keel, and the second arc-shaped transverse keel is used to install the arc stone; there is a gap between the first arc-shaped transverse keel and the second arc-shaped transverse keel;
[0011] S34, fixing the first arc-shaped transverse keel and the second arc-shaped transverse keel at the horizontal joint of each stone along the stone installation height direction;
[0012] S4. Cut the arc stone from the middle of the arc edge and then dry hang the stone. Add a full-length stone on the back of the arc stone to block the gap between the arc stones on the left and right sides.
[0013] Optionally, the fourth vertical keel and the fifth vertical keel are fixed by welding through a second angle steel, and the second angle steel, the third angle steel and the second arc-shaped transverse keel form a triangular structure.
[0014] Optionally, the second angle steel is perpendicular to the third angle steel.
[0015] Optionally, the first arc-shaped transverse keel and the second arc-shaped transverse keel both have an arc-shaped profile matching the arc stone.
[0016] Optionally, a gap of 15 mm is reserved between one end of the first arc-shaped transverse keel and an opposite end of the second arc-shaped transverse keel.
[0017] Optionally, the width of the full-length stone is 50 mm.
[0018] Optionally, a portion of the full-length stone is adhered to the arc stone on one side.
[0019] Optionally, before installing the stone, the stone dry hanging installation layout is carried out according to the change of the wall curvature, the intersection angle of the stone joints is calculated, and the stone expansion diagram is drawn, and the stone is pre-processed according to the stone expansion diagram.
[0020] Optionally, when dry hanging stones, at least two fixing points are required on the upper and lower sides of a stone, and the stone is fixed to the frame with dry hanging parts.
[0021] Optionally, the deformation joint is a settlement joint or an expansion joint.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] During the skeleton construction, the present invention welds steel skeletons separately on the building structures on both sides of the settlement joint, and adds wall expansion joints at the junction to reduce the risk of stone cracking connecting the building structures on both sides of the settlement joint due to different settlement rates. During dry hanging of stones, larger stones are cut and separated for installation, which is convenient for the production and processing of stones, improves the stone yield, and solves the problem that ordinary stone wall construction structures are difficult to apply to building structures at settlement joints. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a three-dimensional schematic diagram of the installation structure of the frame in the embodiment;
[0025] Figure 2It is a schematic plan view of the installation structure of the frame in the embodiment.
[0026] Figure numerals: 1, expansion joint; 2, steel structure giant column; 21, connecting horizontal keel; 3, wall; 41, first vertical keel; 42, second vertical keel; 43, third vertical keel; 431, first angle steel; 44, fourth vertical keel; 441, second angle steel; 45, fifth vertical keel; 451, third angle steel; 46, sixth vertical keel; 47, first arc-shaped horizontal keel; 48, second arc-shaped horizontal keel; 5, gap. DETAILED DESCRIPTION
[0027] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0028] Example: Figure 1 and Figure 2 As shown, this embodiment provides a method for installing a circular arc stone wall at a deformation joint, and the operation steps are as follows:
[0029] S1, measurement and positioning of arc-shaped giant columns;
[0030] S2. Check the wire laying accuracy;
[0031] S3, installing the frame, the installation of the frame includes the following steps S31-S34:
[0032] S31, welding a first embedded plate on one side wall of the steel structure giant column 2 on one side of the deformation joint 1, welding a first vertical keel 41 on the first embedded plate; welding a first arc-shaped transverse keel 47 on the first vertical keel 41, and the first arc-shaped transverse keel 47 is used to install arc stones; welding a second vertical keel 42 on the end of the first arc-shaped transverse keel 47 away from the first vertical keel 41;
[0033] S32, welding a second embedded plate on the other side wall of the steel structure giant column 2, the first embedded plate and the second embedded plate are respectively located on the two adjacent side walls of the steel structure giant column 2, and welding a third vertical keel 43 on the second embedded plate; and welding and fixing the third vertical keel 43 and the second vertical keel 42 with a first angle steel 431 to form a triangular structure;
[0034] S33, install the fourth vertical keel 44 and the fifth vertical keel 45 on the wall 3 on the other side of the deformation joint 1, and fix the sixth vertical keel 46 on the fifth vertical keel 45 by welding through the third angle steel 451, and the fourth vertical keel 44 and the sixth vertical keel 46 are fixed by welding through the second arc-shaped transverse keel 48, and the second arc-shaped transverse keel 48 is used to install arc stones; there is a gap 5 between the first arc-shaped transverse keel 47 and the second arc-shaped transverse keel 48;
[0035] S34, fixing the first arc-shaped transverse keel 47 and the second arc-shaped transverse keel 48 at the horizontal joint of each stone along the stone installation height direction;
[0036] S4. Cut the arc stone from the middle of its arc edge and then dry hang the stone. Add a full-length stone on the back of the arc stone to block the gap between the arc stones on the left and right sides.
[0037] Through the above method, the installation of the arc stone wall at the deformation joint 1 is realized, which reduces the risk of the arc stone breaking and falling due to the different settlement rates and uneven force of the building at the deformation joint 1, and solves the problem that the ordinary stone wall construction structure is difficult to apply to the building structure at the settlement joint. The processed whole stone is cut and then installed, which is convenient for the processing and manufacturing of the stone and improves the stone yield; the triangular structure formed by the skeleton has better stability.
[0038] In the installation method of the circular arc stone wall at the deformation joint of this embodiment, the fourth vertical keel 44 and the fifth vertical keel 45 are welded and fixed by the second angle steel 441, and the second angle steel 441, the third angle steel 451 and the second arc-shaped horizontal keel 48 form a triangular structure. The triangular structure formed by the frame has better stability.
[0039] In the installation method of the arc stone wall at the deformation joint of this embodiment, the first arc-shaped transverse keel 47 and the second arc-shaped transverse keel 48 both have arc-shaped profiles matching and opposite to the arc stone, which facilitates the installation of the arc stone and makes the installation of the arc stone more stable.
[0040] In the installation method of the arc stone wall at the deformation joint of the present embodiment, in step S1, the operation steps of measuring and positioning the arc giant column are as follows: according to the plane position of the arc giant column, a polar coordinate system is established, and the position of the center of the giant column is found by using the AutoCAD calculation function. With the center of the circle as the origin of the coordinates, the stone is simulated and laid out on the computer according to the stone size, the arc is evenly divided, and the angle between any two lines of the arc and the distance between the control points on the measured arc trajectory are quickly marked, and then the total station is used to complete the on-site line point positioning, so as to minimize the difficulty of arc laying and improve the accuracy of laying work.
[0041] In the installation method of the arc stone wall at the deformation joint of the present embodiment, in step S2, the line laying accuracy check specifically includes the following steps S21-S22;
[0042] S21, hang vertically, set square to find the rules:
[0043] Use a theodolite to draw vertical lines at the four corners where the wall turns and at the edges of door and window openings. If the wall is high, use a special large plumb line from the top floor and use a wire to hang it vertically. Then find the control point based on the intersection of the doors, windows and floor horizontal reference lines.
[0044] S22. Marking lines: According to the design block drawing, mark the bottom stone position lines and wall stone block lines on the ground and wall respectively.
[0045] In a method for installing an arc stone wall at a deformation joint of the present embodiment, specifically, a 150mm*150mm*5mm galvanized embedded plate is welded on the steel structure giant column 2 every 800mm as the first embedded plate, and a connecting horizontal keel is used between the first vertical keel 41 and the first embedded plate to adjust the verticality and then weld and fix them, and a 50mm*50mm*5mm galvanized angle steel is welded on the first vertical keel 41 as the first arc-shaped horizontal keel 47.
[0046] In the installation method of the arc stone wall at the deformation joint of the present embodiment, the fourth vertical keel 44 and the fifth vertical keel 45 are spaced 500 mm apart.
[0047] In the installation method of the arc stone wall at the deformation joint of the present embodiment, the connecting transverse keel, the first angle steel 431, the second angle steel 441 and the third angle steel 451 are all angle steels with a size of 50mm*50mm*5mm.
[0048] In the installation method of the arc stone wall at the deformation joint of this embodiment, the second angle steel 441 and the third angle steel 451 are perpendicular to each other, so the installation is convenient.
[0049] In the installation method of the circular arc stone wall at the deformation joint of the present embodiment, a gap 5 of 15 mm is reserved between one end of the first arc-shaped transverse keel 47 and the opposite end of the second arc-shaped transverse keel 48 to cope with the damage of the stone wall caused by the inconsistent settlement size of the building at the settlement joint.
[0050] In the installation method of the arc stone wall at the deformation joint of this embodiment, the width of the full-length stone is 50 mm.
[0051] In the installation method of the arc stone wall at the deformation joint of the present embodiment, a part of the full-length stone is pasted on the arc stone on one side. The structure is simple and the installation is convenient. Optionally, before installing the stone, the full-length stone is pasted on one of the arc stones, and then the arc stone is installed on the frame.
[0052] In a method for installing a circular arc stone wall at a deformation joint of the present embodiment, before the stone is installed, the stone dry hanging installation layout is performed according to the curvature change of the wall 3, the intersection angle of the stone joints is calculated, and a stone expansion diagram is drawn, and the stone is pre-processed according to the stone expansion diagram.
[0053] In the installation method of the arc stone wall at the deformation joint of the present embodiment, when dry hanging the stone, there are at least two fixing points on the upper and lower sides of a stone, and the distance between the fixing points and the edge of the stone is about 15 centimeters. The stone is fixed to the frame with dry hanging parts. The dry hanging parts need to be above the horizontal keel, and the screws are equipped with gaskets and spring washers. It is strictly forbidden to weld the stone dry hanging parts directly to the steel frame.
[0054] In the installation method of the circular arc stone wall at the deformation joint of the present embodiment, the first arc-shaped horizontal keel 47 and the second arc-shaped horizontal keel 48 are both made of L50mm×50mm×5mm hot-dip galvanized angle steel; the first arc-shaped horizontal keel 47 and the second arc-shaped horizontal keel 48 should be punched in advance according to the stone size and the position of the hanger before welding, and the hole diameter should generally be 1mm-2mm larger than the bolt for fixing the hanger, and it is best to punch it into an ellipse in the left and right direction to facilitate the left and right adjustment of the hanger. The connection between the horizontal keel and the vertical keel is welded, and the weld anti-rust treatment is the same as the vertical keel.
[0055] In the installation method of the arc stone wall at the deformation joint of the present embodiment, after checking the horizontal height of the frame and the welding to see if it meets the design requirements, the welding slag is knocked off, and then the anti-corrosion material is applied. After drying, anti-rust paint is applied 1-2 times. The application needs to be even and no exposed part should be allowed.
[0056] In the installation method of the circular arc stone wall at the deformation joint of the present embodiment, the deformation joint 1 is a settlement joint or an expansion joint. The installation method of the present embodiment can be used on the building structure at the deformation joint 1 such as the settlement joint, the expansion joint, etc.
[0057] In the installation method of the arc stone wall at the deformation joint of the present embodiment, specifically, the same kind of stone produced in batches is carefully selected, paying attention to color difference, and the stones with missing edges and corners and cracks are removed, and then numbered in order of parts, and the edges of the stones are marked with eyelines, and generally a hole is set every 30 cm. The stone is dry hung in two orders, from top to bottom or from bottom to top, and the flow operation is carried out to ensure that the construction period requirements are met and cross-operation between the upper and lower layers is avoided to ensure safe construction. After determining the height of the first stone, a stainless steel hanger is inserted into the bottom groove of the stone, and the upper mouth of the stone is fixed with a stainless steel pin to avoid displacement. After the position and verticality of the stone are inspected, the special epoxy resin glue is applied to the pin and the groove to ensure that the stone will not deviate or loosen after installation, and a ruler is used to check for deformation. After the epoxy resin glue solidifies, the stones are installed in sequence according to the stone numbers in the same way. After the first floor is installed, use a straightedge to check verticality, a level to check levelness, a square to check the angles, and a vernier caliper to check the board joints. If the stone installation does not meet the requirements, it should be corrected. Install the second and all layers of stone in the same way, and repeat the process of hanging and pasting. Finally, clean the wall. After the curved stone is broken into two pieces due to the settlement joint, add a 50mm wide and long stone on the back.
[0058] The equipment used in this embodiment is as follows:
[0059]
Claims
1. A method for installing arc stone wall at deformation joints. It is characterized in that The steps are as follows: S1, measurement and positioning of arc-shaped giant columns; S2. Check the wire laying accuracy; S3, installing the frame, the installation of the frame includes the following steps S31-S34: S31, welding a first embedded plate on one side wall of the steel structure giant column (2) on one side of the deformation joint (1), and welding a first vertical keel (41) on the first embedded plate; welding a first arc-shaped transverse keel (47) on the first vertical keel (41), and the first arc-shaped transverse keel (47) is used to install arc stones; welding a second vertical keel (42) on the end of the first arc-shaped transverse keel (47) away from the first vertical keel (41); S32, welding a second embedded plate on the other side wall of the steel structure giant column (2), the first embedded plate and the second embedded plate are respectively located on the adjacent two side walls of the steel structure giant column (2), and welding a third vertical keel (43) on the second embedded plate; and welding and fixing the third vertical keel (43) and the second vertical keel (42) with a first angle steel (431) to form a triangular structure; S33, installing a fourth vertical keel (44) and a fifth vertical keel (45) on the wall (3) on the other side of the deformation joint (1); fixing a sixth vertical keel (46) by welding on the fifth vertical keel (45) by means of a third angle steel (451); the fourth vertical keel (44) and the sixth vertical keel (46) are fixed by welding by means of a second arc-shaped transverse keel (48); the second arc-shaped transverse keel (48) is used for installing arc stones; there is a gap (5) between the first arc-shaped transverse keel (47) and the second arc-shaped transverse keel (48); S34, fixing a first arc-shaped transverse keel (47) and a second arc-shaped transverse keel (48) at the horizontal joint of each stone along the stone installation height direction; S4. Cut the arc stone from the middle of its arc edge and then dry hang the stone. Add a full-length stone on the back of the arc stone to block the gap between the arc stones on the left and right sides.
2. A method for installing a circular arc stone wall at a deformation joint according to claim 1, It is characterized in that The fourth vertical keel (44) and the fifth vertical keel (45) are welded and fixed by a second angle steel (441), and the second angle steel (441), the third angle steel (451) and the second arc-shaped transverse keel (48) form a triangular structure.
3. The installation method of the arc stone wall at the deformation joint according to claim 2, It is characterized in that The second angle steel (441) is perpendicular to the third angle steel (451).
4. The installation method of the arc stone wall at the deformation joint according to claim 1, It is characterized in that The first arc-shaped transverse keel (47) and the second arc-shaped transverse keel (48) both have arc-shaped profiles matching the arc stone.
5. The installation method of the arc stone wall at the deformation joint according to claim 1, It is characterized in that A 15 mm gap (5) is reserved between one end of the first arc-shaped transverse keel (47) and the opposite end of the second arc-shaped transverse keel (48).
6. The installation method of the arc stone wall at the deformation joint according to claim 1, It is characterized in that The width of the full-length stone is 50mm.
7. The installation method of the arc stone wall at the deformation joint according to claim 1, It is characterized in that A portion of the full-length stone is glued to the arc stone on one side.
8. The method for installing a circular arc stone wall at a deformation joint according to claim 1, It is characterized in that Before the stone is installed, the stone dry hanging installation layout is carried out according to the curvature change of the wall (3), the intersection angle of the stone joints is calculated, and a stone expansion diagram is drawn, and the stone is pre-processed according to the stone expansion diagram.
9. The method for installing a circular arc stone wall at a deformation joint according to claim 1, It is characterized in that When dry hanging stone, there must be at least two fixing points on the upper and lower sides of a stone, and the stone must be fixed to the frame with dry hanging parts.
10. The method for installing a circular arc stone wall at a deformation joint according to claim 1, It is characterized in that The deformation joint (1) is a settlement joint or an expansion joint.
Citation Information
Patent Citations
Dry hanging stone material structure on settlement joint
CN111335572A
Stone dry hanging structure at wall deformation joint and construction method of stone dry hanging structure
CN115262905A