Construction method for installation precision control of large tonnage ball joints

Through real-time monitoring and dynamic adjustment, combined with big data analysis, high-precision closed-loop control of large tonnage ball hinge installation is achieved, which solves the problems of insufficient installation accuracy and environmental factors in traditional methods, and improves the safety and efficiency of construction.

CN118607888BActive Publication Date: 2024-11-19CHINA RAILWAY 23RD BUREAU GRP NO 1 ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411080461.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-19
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

The traditional large-tonnage ball hinge installation method is difficult to ensure installation accuracy, is susceptible to environmental factors, and is difficult to monitor and adjust the three-dimensional position, angle and flatness of the ball hinge in real time, so it is impossible to achieve dynamic control of accuracy and closed-loop adjustment.

Method used

Using real-time monitoring of environmental parameters and ball hinge position, angle and flatness of the construction site, dynamically calculate installation accuracy standards, automatic adjustment is achieved through intelligent deviation correction actuators, combined with big data analysis to identify environmental factors affecting patterns and deviation correction effects, and generate emergency plans , realize high-precision closed-loop control.

Benefits of technology

It improves the accuracy and stability of ball hinge installation, adapts to complex construction environments, shortens the adjustment cycle, and improves the safety and reliability of the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118607888B_ABST
    Figure CN118607888B_ABST
Patent Text Reader

Abstract

The present application discloses a construction method for precision control of large-tonnage ball joint installation, which belongs to the field of engineering application technology. The method includes the following steps: Step 1, real-time collection of construction site environmental parameters, and real-time monitoring of the position, angle and flatness of the ball joint; Step 2, based on historical data and real-time environmental parameters, dynamically calculate and optimize the precision standard of ball joint installation to ensure that it meets engineering requirements and adapts to site conditions; Step 3, compare the real-time monitoring data with the dynamically adjusted precision standard to identify deviations in a timely manner; based on the identified deviations, automatic adjustment is performed through the intelligent deviation correction actuator to achieve closed-loop control of precision; Step 4, all data during the construction process is collected and stored; Step 5, based on the big data analysis results and current environmental conditions, a precision deviation scenario is generated, and a corresponding emergency plan is formulated for each predicted scenario.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of engineering application technology, and more specifically, to a construction method for controlling the installation precision of a large-tonnage ball joint. Background Art

[0002] In large-scale engineering construction, the installation of large-tonnage ball joints is an important part of ensuring structural stability and safety. As a key load-bearing and rotating component, ball joints are widely used in large structures such as bridges, towers, and heavy machinery. Their installation accuracy directly affects the reliability and service life of the entire project. Therefore, how to efficiently and accurately install large-tonnage ball joints has become a major technical challenge in engineering construction.

[0003] Traditional installation methods for large-tonnage ball joints usually rely on manual measurement and mechanical adjustment. This method is not only time-consuming and labor-intensive, but also easily affected by on-site environmental conditions, making it difficult to ensure installation accuracy. Especially in complex and changeable construction environments, factors such as temperature, humidity, and wind speed will have a significant impact on the installation process of the ball joint, resulting in increased installation errors. In addition, traditional methods make it difficult to monitor and adjust the three-dimensional position, angle, and flatness of the ball joint in real time, and cannot achieve dynamic control and closed-loop adjustment of accuracy.

[0004] With the development of sensor technology, data processing technology and intelligent control technology, modern engineering construction has higher and higher requirements for the precision of large-tonnage ball joint installation. The development of sensor technology makes it possible to collect and monitor environmental parameters and ball joint positions in real time; the application of big data and artificial intelligence technology provides new methods for precision optimization and deviation correction during construction; the advancement of automation and intelligent control technology makes dynamic adjustment and closed-loop control based on real-time data a reality.

[0005] To sum up, how to solve the many shortcomings of traditional methods, ensure the high-precision installation of large-tonnage ball joints, adapt to the changing construction environment, and improve the safety and reliability of the overall project has become an urgent problem to be solved. Summary of the invention

[0006] In order to overcome a series of defects existing in the prior art, the purpose of this application is to provide a large-tonnage ball joint installation precision control construction method for the above-mentioned problems, including the following steps.

[0007] Step 1: Collect construction site environmental parameters in real time and monitor the position, angle and flatness of the ball joint in real time.

[0008] Step 2: Based on historical data and real-time environmental parameters, dynamically calculate and optimize the accuracy standard of ball joint installation to ensure that it meets engineering requirements and adapts to site conditions.

[0009] Step 3: Compare the real-time monitoring data with the dynamically adjusted accuracy standard to identify deviations in a timely manner; based on the identified deviations, automatic adjustments are made through the intelligent deviation correction actuator to achieve closed-loop control of accuracy.

[0010] Step 4: Collect and store all data during the construction process, including environmental data, accuracy data, and correction operation records, and apply big data analysis technology to identify the following key information: the impact pattern of environmental factors on installation accuracy, the time series trend of accuracy deviation, the effectiveness evaluation of correction operations, and potential abnormal patterns and early warning indicators.

[0011] Step 5: Generate accuracy deviation scenarios based on big data analysis results and current environmental conditions, and formulate corresponding emergency plans for each prediction scenario.

[0012] Furthermore, step 1 includes the following steps.

[0013] Step 1.1: Arrange a variety of environmental sensors at the construction site, including temperature sensors, humidity sensors, wind speed and direction sensors, and atmospheric pressure sensors, to comprehensively monitor construction environmental parameters.

[0014] Step 1.2, install multiple high-precision laser rangefinders around the ball joint to achieve high-precision monitoring of the three-dimensional coordinates of the ball joint through multi-angle continuous tracking.

[0015] Step 1.3, install a multi-axis electronic gyroscope and accelerometer on the ball joint body to accurately measure the tilt angle and rotation angle of the ball joint in all directions; at the same time, use multiple high-resolution cameras to capture the ball joint image from different angles, and use the image processing algorithm to calculate the spatial posture of the ball joint in real time, providing redundant verification of angle monitoring.

[0016] In step 1.4, high-precision 3D laser scanning technology is used to continuously scan the surface of the ball joint, and the surface flatness is calculated through a real-time point cloud processing algorithm. At the same time, strain gauges are installed at key positions of the ball joint to monitor local deformation and provide auxiliary data for flatness evaluation.

[0017] Step 1.5, establish a centralized data acquisition and processing platform to achieve time synchronization and spatial correlation of data from all sensors and measurement devices.

[0018] Furthermore, high-precision three-dimensional tracking of the ball joint position is achieved through the following steps.

[0019] The laser distance meters are arranged on at least three different planes, and each laser distance meter is equipped with a high-precision rotating base and a temperature compensation function.

[0020] A high-precision total station is used to accurately measure the absolute coordinates of each laser rangefinder and establish a stable spatial reference system.

[0021] Utilize the fine adjustment function of the rotating base to adjust the angle of the laser rangefinder in real time to continuously lock the ball joint position.

[0022] Based on the principle of triangulation and combined with the least squares method, multi-source ranging data are fused and processed, and finally the high-precision three-dimensional coordinates of the ball joint are calculated and output to achieve accurate monitoring of the ball joint installation process.

[0023] Further, the surface flatness is calculated.

[0024] Use high-precision 3D laser scanning technology to obtain point cloud data of the ball joint surface {P i}, where P i is the coordinate of the i-th point in the point cloud, P i =(x i ,y i ,z i ).

[0025] The reference plane is fitted by the least squares method: ax+by+cz+d=0, where (a, b, c, d) are the parameters of the reference plane equation, obtained by minimizing the following objective function: min∑ i=1 N (ax i +by i +cz i +d) 2 ; (x, y, z) is used to represent each point in the spherical joint surface point cloud data.

[0026] Calculate point P i Distance d to the reference plane i , the specific calculation formula is: i =|ax i +by i +cz i +d∣ / √(a 2 +b 2 +c 2 ).

[0027] Through point P i The flatness S is evaluated by the root mean square value of the distance to the reference plane: S=√{(1 / N)·(Σ i=1 N d i 2 )}.

[0028] Furthermore, the specific steps of using strain gauges to monitor local deformation and provide auxiliary data for flatness evaluation are as follows.

[0029] According to the strain gauge measurement data ε, calculate the local deformation d ε , the formula is:ε =ε·L, where L is the initial length of the strain gauge.

[0030] The local deformation d measured by the strain gauge ε Incorporate flatness evaluation, the formula is: S combined =√{(1 / N)·(Σ i=1 N d i 2 )+W ε ·d ε 2}, where W ε is the weight factor of strain gauge data, reflecting the importance of strain gauge data in flatness assessment; S combined It is a comprehensive flatness index.

[0031] Furthermore, step 2 includes the following steps.

[0032] Establish a comprehensive ball joint installation project history database to collect and organize multi-dimensional data including installation accuracy records under different environmental conditions, environmental parameters, installation methods, equipment used, and final project performance evaluation.

[0033] A predictive model for the impact of environmental factors on installation accuracy is constructed based on multi-dimensional data to quantify the impact of temperature, humidity, vibration and wind speed on the position, angle and flatness accuracy of the ball joint.

[0034] The real-time environmental parameters collected in step 1 are input into the prediction model to calculate the potential impact of the current environmental conditions on the installation accuracy and generate quantitative evaluation results.

[0035] Comprehensively consider engineering technical requirements, environmental impact assessment results and historical performance data, and dynamically calculate accuracy standards that adapt to current environmental conditions.

[0036] Implement an iterative optimization process to continuously evaluate the rationality and feasibility of the accuracy standards derived from dynamic calculations, and make adjustments and improvements based on feedback during the actual installation process.

[0037] Furthermore, the calculation formula of the accuracy standard is: P=T·(1+k1·(∑ g=1 n w eg ·E g )+k2·(∑ j=1 m w hj ·H j )), where P is the accuracy standard obtained by dynamic calculation; T is the basic accuracy standard required by engineering technology; k1 and k2 are weight coefficients used to adjust the degree of influence of environmental impact and historical performance on the accuracy standard; weg is the environmental parameter E g The weight of hj is the historical data H j The weight of n represents the number of environmental parameters; m represents the number of historical performance data.

[0038] Furthermore, step 3 includes the following steps.

[0039] Step 3.1, compare and analyze in real time the real-time monitoring data of the ball joint position, angle and flatness collected in step 1 with the accuracy standard dynamically calculated in step 2.

[0040] Step 3.2, quickly identify various deviations during the ball joint installation process, prioritize the identified deviations, determine the key deviations that need to be corrected immediately, analyze the deviation trends, and predict the changing trends of the deviations in the short term.

[0041] Step 3.3, based on the principle of multi-objective optimization, taking into account both accuracy requirements and adjustment efficiency, automatically generates the optimal correction plan according to the deviation analysis results, including adjustment direction, adjustment amount and execution sequence, to ensure that the operation efficiency is maximized while meeting the accuracy standards.

[0042] Step 3.4, convert the formulated optimal correction plan into specific execution instructions to accurately control the action of the intelligent correction actuator.

[0043] Step 3.5 integrates steps 3.1 to 3.4 to build a precision control closed-loop mechanism to achieve fast-response inner-loop control and optimized outer-loop control to meet control requirements at different time scales and ensure continuous optimization of ball joint installation accuracy.

[0044] Further, various deviations during the ball joint installation process are quickly identified and the identified deviations are prioritized, including the following steps.

[0045] Define the calculation formulas for position deviation, angle deviation and flatness deviation to evaluate the difference between the current monitoring data and the target standard. The position deviation D position The calculation formula is: position =√{(X current -X target ) 2 +(Y current -Y target ) 2 +(Z current -Z target ) 2}, where (X target ,Y target ,Z target ) is the target position coordinate, (Xcurrent ,Y current ,Z current ) is the current monitored position coordinate; angle deviation D angle The calculation formula is: angle =√{(α current -α target ) 2 +(β current -β target ) 2 +(γ current -γ target ) 2}, where (α target ,β target ,γ target ) is the target angle, (α current ,β current ,γ current ) is the currently monitored angle; flatness deviation D flatness The calculation formula is: flatness =|S current -S target ∣, where S target is the target flatness, S current The currently monitored flatness.

[0046] Comprehensively consider the position, angle and flatness deviation, and introduce weight factors to calculate the comprehensive deviation index D total , the specific calculation formula is: D total =ω position ·D position +ω angle ·D angle +ω flatness ·D flatness , where ω position ,ω angle ,ω flatness Represent the weight factors of position deviation, angle deviation and flatness deviation respectively.

[0047] The priorities of position deviation, angle deviation and flatness deviation are calculated and sorted respectively. The calculation formula of position deviation priority is: position =ω position ·D position / T position , the calculation formula of angle deviation priority is: P angle =ω angle ·D angle / T angle , the calculation formula of flatness deviation priority is: P flatness =ω flatness ·D flatness / T flatness, where P position , P angle and P flatness Respectively represent the priorities of position deviation, angle deviation and flatness deviation; T position , T angle , T flatness The thresholds for position deviation, angle deviation, and flatness deviation, respectively, indicate critical deviations that need to be corrected immediately.

[0048] Furthermore, the changing trend of the position deviation in the short term is predicted by the following formula.

[0049] ΔD position (t+1)=a position (t+1)+b position -D position (t).

[0050] The changing trend of angle deviation in the short term is predicted by the following formula.

[0051] ΔD angle (t+1)=a angle (t+1)+b angle -D angle (t).

[0052] The changing trend of flatness deviation in the short term is predicted by the following formula.

[0053] ΔD flatness (t+1)=a flatness (t+1)+b flatness -D flatness (t).

[0054] Among them, D position (t) represents the position deviation at time point t; D angle (t) represents the angle deviation at time point t; D flatness (t) represents the flatness deviation at time point t; a position a represents the slope parameter of the linear regression model for the change in position deviation; angle The slope parameter of the linear regression model representing the change in angular deviation; a flatness b represents the slope parameter of the linear regression model of the flatness deviation change; b position The intercept parameter of the linear regression model representing the change in position deviation; b angle The intercept parameter of the linear regression model representing the change in angular deviation; b flatness The intercept parameter of the linear regression model representing the change in flatness deviation; t represents the current time point.

[0055] Furthermore, step 3.3 includes the following steps.

[0056] A multi-objective optimization model is established, with minimizing the accuracy deviation and shortening the adjustment time as the main objective functions, so as to take into account both the accuracy requirements and the adjustment efficiency.

[0057] Based on the deviation priority ranking results in step 3.2, combined with the accuracy standards dynamically calculated in step 2 and the real-time environmental parameters collected in step 1, formulate targeted adjustment strategies.

[0058] Consider the nature and magnitude of each deviation and determine the corrective approach.

[0059] Engineering technical requirements, equipment operating limitations and safety factors are taken into consideration as constraints to ensure the feasibility and safety of the adjustment strategy.

[0060] A heuristic algorithm is used to generate multiple feasible adjustment schemes, each of which includes a specific adjustment direction, adjustment amount, and execution sequence, while meeting the physical limitations of the equipment and operational safety requirements.

[0061] The generated adjustment schemes are comprehensively evaluated, and the optimal correction scheme is selected using a multi-criteria decision-making method taking into account the expected accuracy improvement, adjustment time, and energy consumption.

[0062] Furthermore, step 5 includes the following steps.

[0063] Step 5.1, generate multiple accuracy deviation scenarios.

[0064] Step 5.2, establish a multi-dimensional evaluation framework and prioritize each scenario.

[0065] Step 5.3, establish a comprehensive emergency plan template library, including detailed response processes, required resources, key decision points and expected effect indicators.

[0066] Step 5.4, based on the specific forecast scenario, automatically select and combine appropriate plan templates to generate targeted emergency plans.

[0067] Step 5.5: Use reinforcement learning to continuously optimize the plan generation strategy to improve the applicability and effectiveness of the plan.

[0068] In step 5.6, each generated emergency plan is subjected to a virtual simulation test to evaluate its execution effect under different conditions, and based on the evaluation results, the plan content and execution strategy are continuously optimized to improve the practical operability of the plan.

[0069] Further, step 5.1 includes the following steps.

[0070] Integrate environmental impact patterns, accuracy deviation trends, abnormal pattern recognition results, real-time environmental data and ball joint installation status data for cleaning, standardization and feature extraction.

[0071] Based on the integrated data, a predictive model is constructed that captures the relationship between environmental factors, historical trends, and abnormal patterns.

[0072] Identify key parameters and their probability distribution functions, consider correlations between parameters, and create an appropriate random sampling framework for Monte Carlo simulations.

[0073] Perform large-scale Monte Carlo simulations to generate multiple accuracy deviation scenarios through random sampling and model predictions.

[0074] The generated scenarios were statistically analyzed using a clustering algorithm to identify typical and extreme cases.

[0075] Calculate key statistics to provide a comprehensive picture of potential risk.

[0076] Further, step 5.2 includes the following steps.

[0077] Establish a multi-dimensional evaluation indicator system, including the degree of deviation, probability of occurrence and potential influencing factors.

[0078] Each evaluation indicator is quantified and all indicators are standardized to a unified scale to ensure the comparability between indicators of different dimensions.

[0079] Construct a hierarchical model, determine the relative importance of each level, calculate the weight vector and perform consistency check.

[0080] Based on the hierarchical model and the standardized indicator values, a comprehensive score is calculated for each accuracy deviation scenario, reflecting the overall importance of the scenario.

[0081] Sort the scenarios in descending order based on their comprehensive scores to determine their priorities.

[0082] Further, step 5.3 includes the following steps.

[0083] Build a systematic emergency plan classification system that covers accuracy deviation scenarios of different types and severity to ensure comprehensive coverage and facilitate rapid call-up.

[0084] Design a standardized plan template that includes scenario descriptions, response objectives, processes, resource requirements, decision points and effect indicators, taking into account both comprehensiveness and flexibility.

[0085] For each type of deviation scenario, a detailed response process is developed, including assessment, response, correction and verification steps, and clearly presented using a flowchart.

[0086] Conduct detailed resource requirement analysis, establish resource lists, and develop scheduling plans to ensure timely availability and efficient utilization of resources.

[0087] Identify and clearly mark key decision points, and provide decision support information, including decision conditions, alternatives and their pros and cons analysis.

[0088] Set quantitative expected effect indicators for each plan, covering the dimensions of accuracy improvement, response time and resource consumption, and establish an evaluation mechanism.

[0089] Further, step 5.4 includes the following steps.

[0090] Analyze and predict scenarios, automatically extract key features and convert them into structured data.

[0091] Based on the multi-dimensional similarity calculation method, the most relevant plan template is identified.

[0092] Design emergency plan template combination strategies to intelligently select and integrate multiple related templates for complex scenarios.

[0093] Based on the selected template, emergency plans are automatically generated, integrating response processes, resource requirements and decision points, and performing scenario adaptation.

[0094] Perform logical consistency checks on generated solutions to identify and correct potential inconsistencies or conflicts.

[0095] Use simulation to evaluate the feasibility of the solution, consider time, resources and risk factors, and make optimization adjustments.

[0096] Further, step 5.5 includes the following steps.

[0097] Build a virtual environment to simulate the ball joint installation process, including various accuracy deviation scenarios, environmental factors and construction conditions to ensure that it accurately reflects the actual construction complexity.

[0098] Define a comprehensive plan action space, including all possible response measures and intervention strategies, and clarify the execution conditions, steps and expected effects of each action.

[0099] A reward function that comprehensively considers accuracy improvement, cost, efficiency, and safety is designed to evaluate the effectiveness of the plan and guide the learning process.

[0100] Select and implement a suitable reinforcement learning algorithm to learn the optimal plan generation strategy through a large number of iterative training.

[0101] Regularly evaluate the learned emergency response strategies, test their generalization ability, and optimize algorithm parameters and models based on the results.

[0102] Establish a real-time learning and adaptation mechanism so that the plan strategy can continuously learn and improve from the actual construction process and adapt to dynamic changes.

[0103] Further, step 5.6 includes the following steps.

[0104] Using digital twin technology, a virtual environment for ball joint installation is constructed that reflects the complexity of the actual construction site.

[0105] Transform emergency response plans into digital processes that can be executed in a virtual environment, including automated execution and human-machine interaction interfaces.

[0106] Design and execute simulation tests covering a wide range of deviation scenarios and environmental conditions to collect critical performance data.

[0107] Establish a multi-dimensional evaluation system to analyze the performance of the plan in different scenarios and identify its strengths and weaknesses.

[0108] Conduct cause analysis on the problems found and use data mining technology to extract the key factors that affect the effectiveness of the plan.

[0109] The plan is optimized based on the analysis results, and its practical operability is improved through repeated testing and adjustment.

[0110] Compared with the prior art, the present application has the following beneficial effects.

[0111] This application collects and monitors the environmental parameters of the construction site and the three-dimensional position, angle and flatness of the ball joint in real time, uses historical data and real-time parameters to dynamically calculate and optimize the installation accuracy standard, intelligently identifies and automatically corrects installation deviations, establishes a data collection and processing platform, identifies key influencing factors through big data analysis, generates and optimizes emergency plans, and achieves high-precision closed-loop control to ensure that the ball joint installation meets engineering requirements and adapts to site conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0112] Figure 1 It is a flow chart of the large-tonnage ball joint installation precision control construction method disclosed in the embodiment of the present application. DETAILED DESCRIPTION

[0113] The present application is further described in detail below in conjunction with the accompanying drawings.

[0114] like Figure 1 As shown, the large-tonnage ball joint installation precision control construction method includes the following steps.

[0115] Step 1: Collect construction site environmental parameters in real time and monitor the position, angle and flatness of the ball joint in real time.

[0116] Step 2: Based on historical data and real-time environmental parameters, dynamically calculate and optimize the accuracy standard of ball joint installation to ensure that it meets engineering requirements and adapts to site conditions.

[0117] Step 3: Compare the real-time monitoring data with the dynamically adjusted accuracy standard to identify deviations in a timely manner; based on the identified deviations, automatic adjustments are made through the intelligent deviation correction actuator to achieve closed-loop control of accuracy.

[0118] Step 4: Collect and store all data during the construction process, including environmental data, accuracy data, and correction operation records, and apply big data analysis technology to identify the following key information: the impact pattern of environmental factors on installation accuracy, the time series trend of accuracy deviation, the effectiveness evaluation of correction operations, and potential abnormal patterns and early warning indicators.

[0119] Step 5: Generate accuracy deviation scenarios based on big data analysis results and current environmental conditions, and formulate corresponding emergency plans for each prediction scenario.

[0120] In step 1, by collecting environmental parameters such as temperature, humidity, wind speed, etc. in real time, we can fully understand the actual situation of the construction site and promptly discover environmental factors that may affect the installation accuracy of the ball joint. At the same time, real-time monitoring of the position, angle and flatness of the ball joint can provide accurate installation data, ensuring that each step of adjustment and optimization is based on reliable real-time information, thereby effectively reducing human errors and unnecessary adjustment time.

[0121] In step 2, by combining historical data and real-time environmental parameters, the installation accuracy standard can be dynamically adjusted to better adapt to specific construction site conditions and actual environmental changes. This optimization ensures that the accuracy of the ball joint after installation meets the engineering design requirements, while also improving the efficiency and accuracy of the installation process, thereby improving the overall construction quality.

[0122] In step 3, through real-time data comparison, deviations in the installation process can be discovered in time, and immediate adjustments and corrections can be made through the intelligent deviation correction mechanism. This closed-loop control mechanism greatly reduces the need for human intervention, improves the stability and consistency of installation accuracy, and shortens the installation adjustment cycle, which is of great significance to improving engineering efficiency and safety.

[0123] In step 4, by comprehensively collecting environmental data, accuracy data, and correction operation records, a complete data accumulation and knowledge base can be established. The application of big data analysis technology can deeply explore the laws and trends behind the data, identify the specific impact patterns of environmental factors on installation accuracy, analyze the time series trend of accuracy deviation, evaluate the actual effect of correction operations, and discover potential abnormal patterns and early warning indicators. These analysis results provide a scientific basis and prediction capabilities for future installation work, effectively reducing engineering risks and costs.

[0124] In step 5, by analyzing big data, multiple possible accuracy deviation scenarios can be generated, and corresponding emergency plans can be formulated according to the different characteristics and impact levels of each scenario. These plans include targeted adjustment strategies and rapid response mechanisms that can take effect quickly when deviations occur, minimizing the impact on project progress and safety. This prediction and response capability improves resilience and overall management level, ensuring the controllability and reliability of the installation process.

[0125] To sum up, the advanced technology and systematic methods adopted in each step of the large-tonnage ball joint installation precision control construction method provided in this embodiment not only show remarkable technical effects in real-time monitoring, dynamic optimization, closed-loop control, data analysis and predictive response, but also significantly improve the project safety, quality and efficiency, and provide important support for the successful implementation of complex engineering projects.

[0126] Furthermore, step 1 includes the following steps.

[0127] Step 1.1: Arrange a variety of environmental sensors at the construction site, including temperature sensors, humidity sensors, wind speed and direction sensors, and atmospheric pressure sensors, to comprehensively monitor construction environmental parameters.

[0128] Step 1.2, install multiple high-precision laser rangefinders around the ball joint to achieve high-precision monitoring of the three-dimensional coordinates of the ball joint through multi-angle continuous tracking.

[0129] Step 1.3, install a multi-axis electronic gyroscope and accelerometer on the ball joint body to accurately measure the tilt angle and rotation angle of the ball joint in all directions; at the same time, use multiple high-resolution cameras to capture the ball joint image from different angles, and use the image processing algorithm to calculate the spatial posture of the ball joint in real time, providing redundant verification of angle monitoring.

[0130] In step 1.4, high-precision 3D laser scanning technology is used to continuously scan the surface of the ball joint, and the surface flatness is calculated through a real-time point cloud processing algorithm. At the same time, strain gauges are installed at key positions of the ball joint to monitor local deformation and provide auxiliary data for flatness evaluation.

[0131] Step 1.5, establish a centralized data acquisition and processing platform to achieve time synchronization and spatial correlation of data from all sensors and measurement devices.

[0132] In step 1.1, various environmental sensors such as temperature, humidity, wind speed and direction, and atmospheric pressure sensors are deployed to comprehensively monitor construction environmental parameters. These sensors can collect environmental data at the construction site in real time and provide basic data support for subsequent steps. Temperature and humidity sensors help evaluate the impact of environmental conditions on the performance of ball joint materials, wind speed and direction sensors provide information on wind impact and stability, and atmospheric pressure sensors help understand the impact of air pressure changes on ball joint materials and structures. These data play an important role in adjusting the ball joint installation accuracy standard to ensure that the installation process is carried out under suitable environmental conditions.

[0133] In step 1.2, multiple high-precision laser rangefinders are installed around the ball joint to achieve high-precision monitoring of the three-dimensional coordinates of the ball joint through multi-angle continuous tracking. These laser rangefinders can provide distance measurements accurate to the millimeter level and reflect the position changes of the ball joint in space in real time. Through multi-angle monitoring, the error of a single perspective can be effectively eliminated to ensure accurate grasp of the position of the ball joint. This high-precision monitoring system is the basis for achieving installation accuracy control and provides reliable real-time data support for subsequent dynamic adjustment and closed-loop control.

[0134] In step 1.3, multi-axis electronic gyroscopes and accelerometers are installed on the ball joint to accurately measure the tilt angle and rotation angle of the ball joint in all directions. At the same time, multiple high-resolution cameras are used to capture the ball joint image from different angles, and the image processing algorithm is used to calculate the spatial posture of the ball joint in real time, providing redundant verification of angle monitoring. This multi-sensor fusion method ensures comprehensive monitoring and accuracy of the posture of the ball joint in all directions. The electronic gyroscope and accelerometer provide real-time physical quantity measurement data, while the high-resolution camera and image processing algorithm increase the reliability and accuracy of posture monitoring, providing an important basis for posture adjustment during installation.

[0135] In step 1.4, high-precision 3D laser scanning technology is used to continuously scan the surface of the ball joint, and the surface flatness is calculated through a real-time point cloud processing algorithm. At the same time, strain gauges are installed at key positions of the ball joint to monitor local deformation and provide auxiliary data for flatness assessment. These technical means ensure the accurate measurement and analysis of the flatness of the ball joint surface. The large number of data points obtained through laser scanning can construct an accurate surface model, and the point cloud processing algorithm can analyze the flatness in real time and identify possible surface defects or deformations. The use of strain gauges further increases the ability to monitor local deformation and improves the accuracy of the assessment of the overall structural integrity of the ball joint.

[0136] In step 1.5, a centralized data acquisition and processing platform is established to achieve time synchronization and spatial correlation of data from all sensors and measuring devices. This platform centrally manages and processes all data obtained from steps 1.1 to 1.4 to ensure data consistency and availability. Through time synchronization and spatial correlation, data obtained from different sensors and measuring devices can be compared and analyzed in the same time reference, thereby effectively reducing data processing errors and time delays. This centralized data management platform provides efficient technical support for subsequent data analysis, model calculation, and installation accuracy control.

[0137] In summary, the various advanced sensor technologies and data processing methods used in step 1 provide a solid technical foundation for the installation precision control of large-tonnage ball joints. By comprehensively monitoring environmental parameters, accurately measuring the position and posture of the ball joint, evaluating surface flatness and structural deformation, and centrally managing and processing all data, these technical means ensure the accuracy and safety of the installation process, providing key support for the successful implementation of complex engineering projects.

[0138] Furthermore, high-precision three-dimensional tracking of the ball joint position is achieved through the following steps.

[0139] Arrange the laser rangefinders on at least three different planes, and equip each laser rangefinder with a high-precision rotating base and temperature compensation function. This configuration ensures multi-angle and multi-directional coverage, and enhances the comprehensive monitoring capability of the ball joint position. The high-precision rotating base and temperature compensation function of the laser rangefinder help maintain the stability and accuracy of the measurement under different environmental conditions. By arranging on different planes, the measurement error caused by a single perspective can be eliminated, and the full-scale monitoring of the ball joint position can be achieved.

[0140] A high-precision total station is used to accurately measure the absolute coordinates of each laser rangefinder and establish a stable spatial reference system. As a high-precision measuring device, the total station can provide millimeter-level coordinate measurement accuracy. By measuring the absolute coordinates of each laser rangefinder and establishing a stable spatial reference system, the consistency and accuracy of the subsequent ball joint position measurement data are ensured. This step provides a solid foundation for the entire 3D tracking system and ensures the reliability of the measurement results.

[0141] The fine adjustment function of the rotating base allows the angle of the laser distance meter to be adjusted in real time to continuously lock the ball joint position. The fine adjustment function of the rotating base allows small adjustments to the angle of the laser distance meter during the measurement process to ensure continuous tracking and locking of the ball joint position. This real-time adjustment mechanism allows the system to cope with small changes and vibrations that may exist on the construction site, maintaining the stability and accuracy of the measurement.

[0142] Based on the principle of triangulation, the multi-source distance measurement data is fused and processed in combination with the least squares method, and finally the high-precision three-dimensional coordinates of the ball joint are calculated and output to achieve accurate monitoring of the ball joint installation process. The distance from the ball joint to each position is measured simultaneously by multiple laser rangefinders, and the three-dimensional coordinates of the ball joint are calculated using the triangulation principle in combination with the absolute coordinates determined by the total station. The multi-source distance measurement data is optimized using the least squares method to further improve the accuracy and stability of the measurement results. The high-precision three-dimensional coordinates finally output can accurately describe the position change of the ball joint in space, providing an important basis for installation monitoring during the construction process.

[0143] As can be seen from the above, through the implementation of the above steps, high-precision three-dimensional tracking of the ball joint position can be effectively achieved. Each step uses advanced measurement technology and data processing methods to ensure accurate monitoring of the ball joint position changes in complex construction environments, providing key support for precise control of the engineering installation process.

[0144] Further, the surface flatness is calculated.

[0145] Use high-precision 3D laser scanning technology to obtain point cloud data of the ball joint surface {P i}, where P i is the coordinate of the i-th point in the point cloud, P i =(x i ,y i ,z i ). Each point P i The table covers the detailed geometric features of the spherical joint surface. Through this technology, the subtle changes in the spherical joint surface can be accurately captured, laying the foundation for the subsequent flatness calculation. The application of high-precision 3D laser scanning technology ensures the density and accuracy of point cloud data, making the surface flatness calculation highly accurate and reliable.

[0146] The reference plane is fitted by the least squares method: ax+by+cz+d=0, where (a, b, c, d) are the parameters of the reference plane equation, obtained by minimizing the following objective function: min∑ i=1 N (ax i +by i +cz i +d) 2 ; (x, y, z) is used to represent each point in the point cloud data of the ball joint surface. This step can provide an optimal reference plane for measuring the flatness of the ball joint surface. The reference plane obtained by fitting can effectively describe the overall trend of the ball joint surface, eliminate the deviation caused by the shape of the ball joint itself, and make the flatness evaluation more accurate.

[0147] Calculate point P iDistance d to the reference plane i , the specific calculation formula is: i =|ax i +by i +cz i +d∣ / √(a 2 +b 2 +c 2 ). This formula calculates the vertical distance from each point in the point cloud data to the reference plane, reflecting the local deviation of the ball joint surface. Through this distance calculation, we can understand in detail the ups and downs of the ball joint surface at different locations, so as to accurately quantify the local deformation of the ball joint surface, providing detailed data support for subsequent flatness evaluation.

[0148] Through point P i The flatness S is evaluated by the root mean square value of the distance to the reference plane: S=√{(1 / N)·(Σ i=1 N d i 2 )}. This RMS value reflects the comprehensive distance from all points to the reference plane and is an overall indicator for measuring surface flatness. The RMS value can effectively and comprehensively reflect the overall flatness of the ball joint surface and provide an intuitive numerical evaluation. Through this step, the flatness level of the ball joint surface can be clearly understood, providing an important basis for engineering quality control.

[0149] As can be seen from the above, the surface flatness of the ball joint can be comprehensively and accurately evaluated through the above steps. Each step adopts advanced technical means and mathematical methods to ensure the high accuracy and reliability of the flatness calculation, providing strong technical support for engineering quality control.

[0150] Furthermore, the specific steps of using strain gauges to monitor local deformation and provide auxiliary data for flatness evaluation are as follows.

[0151] According to the strain gauge measurement data ε, calculate the local deformation d ε , the formula is: ε =ε·L, where L is the initial length of the strain gauge.

[0152] The local deformation d measured by the strain gauge ε Incorporate flatness evaluation, the formula is: S combined =√{(1 / N)·(Σ i=1 N d i 2 )+W ε ·d ε 2}, where W εis the weight factor of strain gauge data, reflecting the importance of strain gauge data in flatness assessment; S combined It is a comprehensive flatness index.

[0153] As can be seen from the above, by calculating the local deformation of the strain gauge measurement data and incorporating it into the flatness evaluation, the comprehensiveness and accuracy of the flatness evaluation can be greatly improved. This process not only takes advantage of the laser scanning technology, but also combines the unique role of the strain gauge in local deformation monitoring to form a comprehensive evaluation system. This multi-dimensional data fusion and comprehensive evaluation method provides a strong technical guarantee for engineering quality control and ensures high precision and high quality of ball joint installation.

[0154] Furthermore, step 2 includes the following steps.

[0155] A comprehensive ball joint installation project history database is established to collect and organize multi-dimensional data including installation accuracy records under different environmental conditions, environmental parameters, installation methods, equipment used, and final project performance evaluation. The database provides a detailed historical data foundation, which can learn lessons from past projects and identify key factors that affect ball joint installation accuracy under different environmental conditions. This systematic data management not only helps improve the planning and decision-making quality of future projects, but also predicts and avoids potential problems through the analysis of historical data, ensuring the smooth progress and high-quality delivery of the project.

[0156] Based on multi-dimensional data, a predictive model for the impact of environmental factors on installation accuracy is constructed to quantify the impact of temperature, humidity, vibration and wind speed on the position, angle and flatness accuracy of the ball joint. Through machine learning and data analysis technology, complex multi-dimensional data is converted into a predictive model that is easy to understand and apply. The model can quantitatively evaluate the impact of various environmental factors on the installation accuracy of the ball joint, so that possible challenges and problems can be predicted before the project starts. This predictive ability allows the project team to formulate corresponding countermeasures in advance, optimize installation strategies and technical solutions, and improve the predictability and controllability of the project.

[0157] The real-time environmental parameters collected in step 1 are input into the prediction model to calculate the potential impact of the current environmental conditions on the installation accuracy and generate quantitative evaluation results. This step realizes the seamless connection between real-time environmental monitoring data and the prediction model, so that environmental changes at every moment can be reflected in the installation accuracy evaluation in a timely manner. Through this real-time evaluation mechanism, the operation and control parameters during the installation process can be dynamically adjusted to ensure that the best installation accuracy can be achieved under various environmental conditions. This dynamic evaluation capability not only improves the adaptability of the construction site, but also enhances the ability to respond to sudden environmental changes, ensuring the stability and consistency of the project quality.

[0158] Taking into account the engineering technical requirements, environmental impact assessment results and historical performance data, the accuracy standards that adapt to the current environmental conditions are dynamically calculated. This step forms a flexible and scientific accuracy standard calculation method, so that the installation accuracy standards are not only based on theoretical calculations, but also combined with the experience of actual environmental conditions and historical data. This dynamically calculated accuracy standard can better reflect the complexity and variability of the actual construction site, thereby ensuring the reliability and effectiveness of the installation accuracy to the greatest extent. This dynamic calculation process can make more scientific decisions during construction and improve the efficiency and quality of the overall project.

[0159] Implement an iterative optimization process to continuously evaluate the rationality and feasibility of the accuracy standards obtained through dynamic calculations, and make adjustments and improvements based on feedback from the actual installation process. This step establishes a closed-loop feedback optimization mechanism to ensure that the accuracy standards are always in the best state through continuous monitoring and evaluation. The feedback data obtained during the actual installation process is continuously used to optimize and adjust the prediction model and accuracy standards, and gradually improve the installation accuracy and quality. This iterative optimization can not only correct deviations in the installation process in a timely manner, but also continuously accumulate experience and improve the prediction model, making future installation processes more accurate and reliable. Through this continuous improvement process, the quality of the project and the efficiency of construction can be continuously improved to ensure that every ball joint installation project can meet the expected high standards.

[0160] Furthermore, the calculation formula of the accuracy standard is: P=T·(1+k1·(∑ g=1 n w eg ·E g )+k2·(∑ j=1 m w hj ·H j )), where P is the accuracy standard obtained by dynamic calculation; T is the basic accuracy standard required by engineering technology; k1 and k2 are weight coefficients used to adjust the degree of influence of environmental impact and historical performance on the accuracy standard; w eg is the environmental parameter E g The weight of hj is the historical data H j The weight of n represents the number of environmental parameters; m represents the number of historical performance data. Through this dynamic calculation method, the precision control measures can be adjusted and optimized in real time during the construction process to ensure that the installation process always meets high standards of precision requirements. This method improves the scientificity and adaptability of precision control and ensures that every ball joint installation project can achieve high-quality installation results under various complex environmental conditions. Through this comprehensive calculation method, the overall engineering quality and construction efficiency of the project are significantly improved, providing a strong technical guarantee for the installation of large-tonnage ball joints.

[0161] Furthermore, step 3 includes the following steps.

[0162] Step 3.1, compare and analyze in real time the real-time monitoring data of the ball joint position, angle and flatness collected in step 1 with the accuracy standard dynamically calculated in step 2.

[0163] Step 3.2, quickly identify various deviations during the ball joint installation process, prioritize the identified deviations, determine the key deviations that need to be corrected immediately, analyze the deviation trends, and predict the changing trends of the deviations in the short term.

[0164] Step 3.3, based on the principle of multi-objective optimization, taking into account both accuracy requirements and adjustment efficiency, automatically generates the optimal correction plan according to the deviation analysis results, including adjustment direction, adjustment amount and execution sequence, to ensure that the operation efficiency is maximized while meeting the accuracy standards.

[0165] Step 3.4, convert the formulated optimal correction plan into specific execution instructions to accurately control the action of the intelligent correction actuator.

[0166] Step 3.5 integrates steps 3.1 to 3.4 to build a precision control closed-loop mechanism to achieve fast-response inner-loop control and optimized outer-loop control to meet control requirements at different time scales and ensure continuous optimization of ball joint installation accuracy.

[0167] Step 3.1 ensures timely comparison between monitoring data and accuracy standards, thereby quickly identifying any deviations beyond the allowable range. This real-time comparison analysis not only improves the timeliness of data processing, but also detects potential problems at the first time, preventing the accumulation of problems that make subsequent corrections difficult. In this way, the monitoring quality of the construction process can be greatly improved, ensuring that each step of the installation process is carried out within a controllable range, and improving the accuracy and reliability of the overall installation.

[0168] In step 3.2, by prioritizing the deviations, resources and time can be concentrated to prioritize the deviations that have the greatest impact on the installation quality, ensuring that the key quality indicators of the installation are maintained. At the same time, by analyzing and predicting the deviation trend, preventive measures can be taken in advance to prevent the deviation from further expanding. This approach not only improves the efficiency of problem handling, but also prevents the occurrence of problems to a certain extent and reduces potential quality risks during the construction process.

[0169] In step 3.3, the multi-objective optimization algorithm can find the optimal solution among multiple adjustment schemes, so that the correction process can meet the accuracy requirements and minimize the adjustment time and resource consumption. The automatically generated correction scheme not only takes into account the size and direction of the current deviation, but also combines the actual situation of the construction site to ensure that each adjustment can achieve the best effect. This intelligent correction scheme generation method improves construction efficiency, reduces the need for manual intervention, and makes the entire construction process more automated and intelligent.

[0170] In step 3.4, by converting the abstract correction scheme into specific execution instructions, the correction actuator can be directly driven to operate, reducing errors and delays in manual operation. Precisely controlling the action of the actuator ensures that each adjustment can be performed accurately and improves the accuracy of the overall installation. The intelligent correction actuator can respond and adjust quickly according to the instructions, further improving the automation level of the construction process and reducing the impact of human factors on the installation quality.

[0171] Through step 3.5, a complete closed-loop control system is formed. Through the combination of inner and outer loop control mechanisms, precise adjustment and optimization can be performed on different time scales. The inner loop control mechanism can respond quickly to real-time deviations to ensure immediate correction; the outer loop control mechanism continuously optimizes the overall installation process to ensure long-term accuracy stability. This closed-loop control system not only improves the speed of immediate response, but also effectively controls and adjusts long-term trends, ensuring the overall accuracy and stability of the ball joint installation process. In this way, comprehensive control and continuous optimization of ball joint installation accuracy can be achieved, improving construction quality and efficiency.

[0172] Further, various deviations during the ball joint installation process are quickly identified and the identified deviations are prioritized, including the following steps.

[0173] Define the calculation formulas for position deviation, angle deviation and flatness deviation to evaluate the difference between the current monitoring data and the target standard. The position deviation D position The calculation formula is: position =√{(X current -X target ) 2 +(Y current -Y target ) 2 +(Z current -Z target ) 2}, where (X target ,Y target ,Z target ) is the target position coordinate, (X current ,Y current,Z current ) is the current monitored position coordinate; angle deviation D angle The calculation formula is: angle =√{(α current -α target ) 2 +(β current -β target ) 2 +(γ current -γ target ) 2}, where (α target ,β target ,γ target ) is the target angle, (α current ,β current ,γ current ) is the currently monitored angle; flatness deviation D flatness The calculation formula is: flatness =|S current -S target ∣, where S target is the target flatness, S current The currently monitored flatness.

[0174] Comprehensively consider the position, angle and flatness deviation, and introduce weight factors to calculate the comprehensive deviation index D total , the specific calculation formula is: D total =ω position ·D position +ω angle ·D angle +ω flatness ·D flatness , where ω position ,ω angle ,ω flatness Represent the weight factors of position deviation, angle deviation and flatness deviation respectively.

[0175] The priorities of position deviation, angle deviation and flatness deviation are calculated and sorted respectively. The calculation formula of position deviation priority is: position =ω position ·D position / T position , the calculation formula of angle deviation priority is: P angle =ω angle ·D angle / T angle , the calculation formula of flatness deviation priority is: P flatness =ω flatness ·D flatness / T flatness , where P position , Pangle and P flatness Respectively represent the priorities of position deviation, angle deviation and flatness deviation; T position , T angle , T flatness The thresholds for position deviation, angle deviation, and flatness deviation, respectively, indicate critical deviations that need to be corrected immediately.

[0176] Furthermore, the changing trend of the position deviation in the short term is predicted by the following formula.

[0177] ΔD position (t+1)=a position (t+1)+b position -D position (t).

[0178] The changing trend of angle deviation in the short term is predicted by the following formula.

[0179] ΔD angle (t+1)=a angle (t+1)+b angle -D angle (t).

[0180] The changing trend of flatness deviation in the short term is predicted by the following formula.

[0181] ΔD flatness (t+1)=a flatness (t+1)+b flatness -D flatness (t).

[0182] Among them, D position (t) represents the position deviation at time point t; D angle (t) represents the angle deviation at time point t; D flatness (t) represents the flatness deviation at time point t; a position a represents the slope parameter of the linear regression model for the change in position deviation; angle The slope parameter of the linear regression model representing the change in angular deviation; a flatness b represents the slope parameter of the linear regression model of the flatness deviation change; b position The intercept parameter of the linear regression model representing the change in position deviation; b angle The intercept parameter of the linear regression model representing the change in angular deviation; b flatness The intercept parameter of the linear regression model representing the change in flatness deviation; t represents the current time point.

[0183] Through the integration of the above steps, a perfect closed-loop precision control mechanism is formed. This mechanism can not only monitor and evaluate installation deviations in real time, but also quickly respond to and correct deviations to ensure the accuracy and quality of the ball joint installation process, making the entire construction process more intelligent, efficient and precise, greatly improving the quality and reliability of the project.

[0184] Furthermore, step 3.3 includes the following steps.

[0185] A multi-objective optimization model was established, with minimization of accuracy deviation and minimization of adjustment time as the main objective functions, in order to take into account both accuracy requirements and adjustment efficiency. This step incorporates accuracy deviation (including position deviation, angle deviation, and flatness deviation) and adjustment time into the optimization objectives. By solving this model, it is possible to minimize the time required for adjustment while ensuring installation accuracy. This approach not only improves construction efficiency, but also reduces downtime and labor costs, thereby improving the overall economic and time benefits of the project.

[0186] Based on the deviation priority sorting results in step 3.2, combined with the accuracy standards dynamically calculated in step 2 and the real-time environmental parameters collected in step 1, a targeted adjustment strategy is formulated. This step provides detailed deviation priority sorting results, indicating which deviations need to be processed first; step 2 provides dynamic accuracy standards to ensure that the adjustment strategy can adapt to the current environmental conditions; the real-time environmental data in step 1 further refines the formulation of the adjustment strategy. This comprehensive data processing method can maximize the accuracy and effectiveness of the adjustment strategy and ensure the best results in actual construction.

[0187] Consider the characteristics and impact of each deviation and determine the correction method. Different types of deviations require different correction methods. For example, position deviation may require adjustment of the support structure, angle deviation may require rotation adjustment, and flatness deviation may require surface treatment. By analyzing the characteristics of each deviation and its impact on the overall installation accuracy, the most appropriate correction method can be determined. This approach ensures targeted adjustments, avoids a one-size-fits-all approach, and improves the accuracy and efficiency of corrections.

[0188] Engineering requirements, equipment operating limitations, and safety factors are taken into account as constraints to ensure the feasibility and safety of the adjustment strategy. The implementation of any adjustment strategy must be carried out within the framework of engineering requirements, and the physical limitations of equipment operation and safe operating procedures must be considered. For example, some equipment may have a maximum rotation range limit when adjusting the angle, and the safe operating procedures of the construction site may stipulate the safe distance of personnel, etc. By incorporating these constraints into the optimization model, it can be ensured that the generated adjustment strategy is not only optimal, but also feasible and safe. This step ensures the practical operability of the adjustment process and avoids potential safety risks and equipment damage.

[0189] Heuristic algorithms are used to generate multiple feasible adjustment plans, each of which includes specific adjustment directions, adjustment amounts, and execution sequences, while meeting the physical limitations of the equipment and operational safety requirements. Heuristic algorithms are an effective search and optimization tool that can quickly generate multiple feasible adjustment plans under complex constraints. Each plan specifies the specific operational steps for the adjustment in detail to ensure smooth implementation in actual construction. This method of generating multiple plans provides multiple options, avoids the risks that may exist in a single plan, and improves the flexibility and adaptability of the adjustment strategy.

[0190] The generated adjustment schemes are comprehensively evaluated, and the expected degree of improvement in accuracy, adjustment time, and energy consumption are considered, and the optimal correction scheme is selected using a multi-criteria decision-making method. The comprehensive evaluation process compares different schemes, considers the performance of each scheme in terms of accuracy improvement, adjustment time, and energy consumption, and uses a multi-criteria decision-making method (such as hierarchical analysis method, weighted comprehensive scoring method, etc.) to select the optimal scheme. This method not only focuses on the results of the adjustment, but also comprehensively considers the resource consumption and time cost during the adjustment process to ensure that the final correction scheme is the best in all aspects, thereby achieving the best balance between accuracy and efficiency.

[0191] Furthermore, step 5 includes the following steps.

[0192] Step 5.1, generate multiple accuracy deviation scenarios.

[0193] Step 5.2, establish a multi-dimensional evaluation framework and prioritize each scenario.

[0194] Step 5.3, establish a comprehensive emergency plan template library, including detailed response processes, required resources, key decision points and expected effect indicators.

[0195] Step 5.4, based on the specific forecast scenario, automatically select and combine appropriate plan templates to generate targeted emergency plans.

[0196] Step 5.5: Use reinforcement learning to continuously optimize the plan generation strategy to improve the applicability and effectiveness of the plan.

[0197] In step 5.6, each generated emergency plan is subjected to a virtual simulation test to evaluate its execution effect under different conditions, and based on the evaluation results, the plan content and execution strategy are continuously optimized to improve the practical operability of the plan.

[0198] In step 5.1, through comprehensive analysis of historical data, real-time monitoring data and environmental parameters, multiple possible accuracy deviation scenarios are predicted. The purpose of generating multiple scenarios is to cover all possible deviation situations so that they can be quickly identified and responded to in actual operations. The generation of these scenarios relies on in-depth data mining and modeling to ensure that each scenario has high accuracy and representativeness, thereby providing detailed basic data support for subsequent emergency plans.

[0199] In step 5.2, the generated scenarios are prioritized by multi-dimensional evaluation criteria (such as the severity of the deviation, the likelihood of occurrence, and the overall impact on the project). The main function of prioritization is to help decision makers quickly identify the scenarios that need to be focused on and prioritized. In this way, when resources are limited, attention can be focused on the most critical issues, thereby improving the efficiency and effectiveness of emergency response.

[0200] Step 5.3 provides standardized and executable solutions for various possible accuracy deviation scenarios. These templates contain detailed operation steps and lists of required resources to ensure that effective countermeasures can be implemented quickly when deviations occur. At the same time, key decision points and expected effect indicators are clarified to help the construction team effectively monitor and evaluate during the emergency process, thereby continuously improving emergency measures.

[0201] In step 5.4, the intelligent decision support system can automatically select the most appropriate emergency plan template according to the real-time situation, and combine them to generate targeted emergency plans. This method not only improves the efficiency of emergency plan generation, but also ensures the pertinence and effectiveness of emergency plans, allowing the construction team to take the most effective measures to deal with deviations in the shortest time.

[0202] Step 5.5 can conduct self-learning and optimization based on the previous execution results of the emergency plan, gradually improving the applicability and effectiveness of the plan. This dynamic optimization process can ensure that the emergency plan is always in the best state, adapt to the ever-changing construction environment and conditions, and improve the emergency response capabilities during the construction process.

[0203] In step 5.6, virtual simulation testing can be used to fully evaluate the actual effect of the emergency plan in a risk-free environment. It can identify potential problems in the emergency plan in advance and adjust and optimize it before actual implementation. Simulation testing provides a safe and efficient verification platform. Through repeated testing and optimization, it ensures that the final emergency plan is efficient and operable in actual operation, thereby improving the reliability and stability of the entire ball joint installation process.

[0204] Further, step 5.1 includes the following steps.

[0205] Integrate environmental impact patterns, accuracy deviation trends, abnormal pattern recognition results, real-time environmental data, and ball joint installation status data for cleaning, standardization, and feature extraction. Ensure the quality and consistency of input data by fully integrating and processing various data sources. The data cleaning process can remove noise and invalid data and improve data accuracy; the standardization process can unify the format of data from different sources to make them comparable; feature extraction provides useful information for subsequent modeling and prediction by identifying and extracting key variables. The combined effect of these steps is to lay a solid data foundation for the prediction of accuracy deviation scenarios.

[0206] Based on the integrated data, a prediction model is constructed to capture the relationship between environmental factors, historical trends and abnormal patterns. Through machine learning and statistical methods, an accurate mathematical model is established to describe the influence of various environmental factors, historical trends and abnormal patterns on the installation accuracy of ball joints. The prediction model can effectively capture complex multivariate relationships and interactions, and provide the ability to predict future deviations. In this way, the construction team can foresee possible deviation scenarios and formulate countermeasures in advance, thereby improving the accuracy and stability of the overall construction.

[0207] Determine the key parameters and their probability distribution functions, consider the correlation between parameters, and create an appropriate random sampling framework for Monte Carlo simulation. This step can identify the key parameters that have the greatest impact on installation accuracy and describe their uncertainty through probability distribution functions. Considering the correlation between parameters can more realistically simulate the complexity of the actual situation, ensure the accuracy and reliability of the random sampling framework, so that it can better reflect the actual construction environment and conditions, and provide reliable input for subsequent simulations.

[0208] Perform large-scale Monte Carlo simulations to generate multiple precision deviation scenarios through random sampling and model prediction. Using a large number of random samples of the Monte Carlo simulation method to generate different precision deviation scenarios provides comprehensive coverage of future deviation situations. Monte Carlo simulation has strong computing power and flexibility, can handle high-dimensional and complex systems, generate a large number of possible deviation scenarios, and provide rich data support and prediction basis for the formulation of emergency plans.

[0209] The generated scenarios are statistically analyzed, and clustering algorithms are used to identify typical and extreme situations. Through the application of clustering algorithms, a large number of simulated scenarios can be effectively classified and summarized, and representative typical situations and potential extreme deviation situations can be identified. The technical effect is that by classifying and summarizing the scenarios, the characteristics and probability of occurrence of different deviation situations can be better understood, so that more specific and effective response measures can be formulated for different situations in the emergency plan.

[0210] Calculate key statistical indicators to fully describe potential risks. By calculating and analyzing key statistical indicators, such as mean, variance, confidence interval, etc., the potential risks under different precision deviation scenarios can be comprehensively evaluated and described. In this way, the risk level of different scenarios can be quantified, providing strong data support for decision-making. At the same time, these statistical indicators also provide an important reference for the subsequent optimization of emergency plans, helping construction teams make more scientific and efficient decisions when facing actual deviations.

[0211] Further, step 5.2 includes the following steps.

[0212] Establish a multi-dimensional evaluation indicator system, including deviation degree, probability of occurrence and potential influencing factors. This step creates a comprehensive evaluation framework, allowing different accuracy deviation scenarios to be evaluated from multiple perspectives. The deviation degree can reflect the severity of the accuracy deviation; the probability of occurrence can provide an assessment of the possibility of the deviation; the potential influencing factors consider the potential impact of these deviations on the entire construction process and the final project quality. Through this multi-dimensional evaluation, the impact and importance of each scenario can be more accurately assessed, providing a basis for subsequent priority sorting.

[0213] Each evaluation indicator is quantified and standardized to a unified scale to ensure the comparability of indicators of different dimensions. Through quantification and standardization, indicators of different types and dimensions can be directly compared in the same evaluation system. Quantification can turn subjective evaluation into objective data, and standardization eliminates the differences between different indicator dimensions, thereby ensuring the fairness and consistency of the evaluation results. In this way, deviations caused by different indicator scales can be avoided, ensuring that the influence of each indicator in the comprehensive score is correctly reflected.

[0214] Construct a hierarchical model, determine the relative importance of each level, calculate the weight vector and perform consistency check. This step decomposes the complex multi-indicator evaluation problem into simple problems at multiple levels. The relative importance of each level is determined by expert scoring or other methods, and the calculated weight vector reflects the relative weight of each indicator in the overall evaluation. Performing consistency check can ensure the rationality and consistency of weight distribution and avoid deviations and unreasonable weight distribution caused by human factors. In this way, the structural and scientific nature of the evaluation system can be guaranteed.

[0215] Based on the hierarchical model and the standardized indicator values, the comprehensive score of each accuracy deviation scenario is calculated to reflect the overall importance of the scenario. The comprehensive score of each accuracy deviation scenario is calculated by combining the standardized indicator values ​​with the corresponding weight vector. The comprehensive score can fully reflect the overall importance of each scenario, combining the degree of deviation, probability of occurrence, and the comprehensive impact of potential influencing factors. Through this calculation method, a quantitative score can be provided for each scenario, making the comparison and ranking between different scenarios simple and intuitive, thereby providing a reliable basis for priority sorting.

[0216] Sort the scenarios in descending order according to the comprehensive scores and determine the priorities. By sorting the comprehensive scores in descending order, the priorities of different precision deviation scenarios are clarified. The priority sorting results can help the construction team quickly identify the scenarios that need to be focused on and prioritized, thereby optimizing resource allocation and emergency response strategies. This method can ensure that the most important and urgent scenarios can be handled promptly and effectively when deviations occur, reduce possible risks and losses during the construction process, and improve the overall safety and quality control level of construction.

[0217] Further, step 5.3 includes the following steps.

[0218] Build a systematic plan classification system that covers different types and severity of precision deviation scenarios to ensure comprehensive coverage and facilitate quick access. This step establishes a comprehensive and structured plan library, so that when precision deviations of different types and severity occur, the corresponding emergency plans can be quickly found. The classification system can more effectively organize and manage plan resources, ensuring that appropriate plans can be quickly called and implemented when needed. This systematic classification method improves the efficiency of plan management and the accuracy of response, and reduces delays and confusion when dealing with deviations.

[0219] Design a standardized plan template that includes scenario descriptions, response objectives, processes, resource requirements, decision points, and effect indicators, taking into account both comprehensiveness and flexibility. This step provides a unified template to ensure that each emergency plan includes key elements, thereby improving the completeness and operability of the plan. Standardized templates can ensure the consistency of all plans, so that different teams and personnel can follow the same standards and processes when implementing the plan. At the same time, the template design also takes into account flexibility, allowing adjustments and customization according to specific circumstances, thereby enhancing the applicability and actual effectiveness of the plan.

[0220] Develop detailed response processes for various deviation scenarios, including assessment, response, correction and verification steps, and clearly present them using flowcharts. This step breaks down the complex emergency response process into clear steps and presents them intuitively in the form of flowcharts. This approach helps ensure that all participants can clearly understand and follow the predetermined operating procedures, thereby reducing misoperations and delays. Detailed response processes can also improve the efficiency and effectiveness of emergency response, ensuring that effective measures can be taken quickly to correct problems and verify results when deviations occur.

[0221] Conduct a detailed resource demand analysis, establish a resource list, and develop a scheduling plan to ensure timely availability and efficient use of resources. This step ensures that the various resources required during the emergency response process (such as personnel, equipment, materials, etc.) can be in place in a timely manner to support the smooth implementation of the plan. Through a detailed resource demand analysis, the required resources can be identified and prepared in advance to avoid delays and problems caused by insufficient resources during the emergency response process. Developing a scheduling plan helps optimize the use of resources and improve resource utilization and response efficiency.

[0222] Identify and clearly mark key decision points, and provide decision support information, including decision conditions, alternatives, and their pros and cons. This step enables quick and effective decisions to be made during the emergency response process by identifying and analyzing key decision points in advance. Providing detailed decision support information (such as decision conditions, alternatives, and their pros and cons) can help decision makers quickly weigh various options and make the best decision in an emergency. Clearly marking key decision points can also reduce decision delays and errors caused by unclear decisions or insufficient information, and improve the quality and effectiveness of emergency response.

[0223] Set quantitative expected effect indicators for each plan, covering the dimensions of accuracy improvement, response time, and resource consumption, and establish an evaluation mechanism. This step sets specific, quantitative effect indicators so that the execution effect of each emergency plan can be objectively evaluated. Indicators covering dimensions such as accuracy improvement, response time, and resource consumption can fully reflect the execution effect of the plan and evaluate its actual performance from multiple angles. Establishing an evaluation mechanism can ensure the continuous improvement of emergency plans. Through the evaluation and feedback of the execution effect of the plan, the content and execution strategy of the plan can be continuously optimized to improve the practical operability and effectiveness of the plan.

[0224] Further, step 5.4 includes the following steps.

[0225] Analyze the forecast scenario, automatically extract key features and convert them into structured data. This step makes the subsequent emergency plan generation more efficient and accurate by breaking down complex forecast scenarios into key features that can be quantified and processed. The structured data format helps the computer system to quickly analyze and match, reducing the time and error rate of manual processing. Automated feature extraction not only improves data processing speed, but also ensures the standardization and consistency of feature extraction, thus laying a solid foundation for the next step of similarity calculation and plan template selection.

[0226] Based on the multi-dimensional similarity calculation method, the most relevant plan template is identified. The use of the multi-dimensional similarity calculation method can fully take into account the complex relationship and mutual influence of various scenario features, so as to more accurately match the most relevant plan template. This ensures that the selected plan template is more targeted and can more effectively respond to specific forecast scenarios. The multi-dimensional characteristics of the similarity calculation method improve the accuracy of the match, allowing the system to quickly screen out the best solution from a large number of plan templates, thereby improving the efficiency and effectiveness of emergency response.

[0227] Design a contingency plan template combination strategy to intelligently select and integrate multiple related templates for complex scenarios. By intelligently combining multiple contingency plan templates, complex precision deviation scenarios can be handled. For complex scenarios, a single contingency plan template may not be sufficient to fully cover all possible situations. Through intelligent combination, the advantages of multiple templates can be integrated to provide a comprehensive and flexible emergency plan. This strategy not only enhances the comprehensiveness and adaptability of the emergency plan, but also improves the ability to deal with complex scenarios, ensuring accurate and efficient handling in various situations.

[0228] Based on the selected template, the emergency plan is automatically generated, integrating the response process, resource requirements and decision points, and performing scenario adaptation. Automatic generation of emergency plans can greatly reduce manual intervention and improve the speed and accuracy of generation. By integrating the response process, resource requirements and decision points, a complete and operational emergency plan can be provided. Scenario adaptation further ensures that the generated plan can be effectively implemented in the specific scenario, taking into account the uniqueness and complexity of the specific scenario. Automation and integration make emergency plans more efficient and practical.

[0229] Perform logical consistency checks on generated plans to identify and correct potential contradictions or conflicts. Logical consistency checks ensure that generated emergency plans will not have logical contradictions or operational conflicts during implementation. Automatic identification and correction of potential problems can greatly improve the reliability and feasibility of emergency plans and reduce risks and errors in actual operations. Logical consistency checks make emergency plans more rigorous and reliable, ensuring that they can be implemented smoothly in emergency situations.

[0230] Use simulation to evaluate the feasibility of the plan, consider time, resources and risk factors, and make optimization adjustments. Through simulation testing, the feasibility and effectiveness of the emergency plan in actual implementation can be evaluated in advance. Simulation testing can discover potential problems and optimization space, and make adjustments and optimizations considering multiple factors such as time, resources and risks. In this way, the emergency plan finally generated is not only feasible in theory, but also efficient and reliable in actual operation. Simulation evaluation makes the emergency plan more complete and optimized, providing a solid guarantee for actual implementation.

[0231] Further, step 5.5 includes the following steps.

[0232] Construct a virtual environment that simulates the ball joint installation process, including various precision deviation scenarios, environmental factors, and construction conditions, to ensure that it accurately reflects the actual construction complexity. The establishment of a virtual environment is crucial because it provides a safe and controllable environment to test and optimize plans. By simulating different precision deviation scenarios, environmental factors, and construction conditions, it is possible to identify possible problems and challenges in advance and evaluate the effectiveness of various emergency plans. The accuracy of the virtual environment directly affects the effectiveness of plan optimization and the feasibility of actual application, ensuring that various complex situations can be responded to quickly and accurately during the real construction process.

[0233] Define a comprehensive plan action space, including all possible response measures and intervention strategies, and clarify the execution conditions, steps, and expected effects of each action. By building a comprehensive plan action space, all possible response measures can be covered to ensure the comprehensiveness and flexibility of the plan. The clear definition of the execution conditions, steps, and expected effects of each action facilitates rapid decision-making and execution in emergency situations. This step ensures the standardization and systematization of the plan, making it consistent and predictable when executed, thereby improving the efficiency and effectiveness of emergency response.

[0234] A reward function that comprehensively considers accuracy improvement, cost, efficiency, and safety is designed to evaluate the effectiveness of the plan and guide the learning process. The reward function is a key component in reinforcement learning. It ensures that the learning process focuses on the balance of various important factors by comprehensively considering accuracy improvement, cost, efficiency, and safety. This reward function guides the algorithm to focus not only on accuracy improvement when looking for the optimal plan, but also on cost control, operational efficiency, and safety. This step optimizes the reward function to ensure that the generated plan is efficient, economical, and safe in practical applications, thereby improving the quality and reliability of the overall construction process.

[0235] Select and implement a suitable reinforcement learning algorithm, and learn the optimal plan generation strategy through a large number of iterative training. Selecting a suitable reinforcement learning algorithm is the basis for effective learning. Through a large number of iterative training, the algorithm can gradually optimize the plan generation strategy. The reinforcement learning algorithm continuously improves the quality and adaptability of the plan through continuous trial and error and adjustment. The technical effect of this step is that through continuous iteration and optimization, it can autonomously learn and generate the optimal emergency plan strategy, ensuring that it can efficiently respond to various complex situations in the actual construction process and improve construction accuracy and safety.

[0236] Regularly evaluate the learned emergency response strategies, test their generalization ability, and optimize the algorithm parameters and models based on the results. Regular evaluation and testing are important steps to ensure the effectiveness of learning. By testing the generalization ability of the emergency response strategies, we can ensure that they can be effectively applied in different scenarios and environments. Optimizing the algorithm parameters and models based on the evaluation results can further improve the adaptability and effectiveness of the emergency response strategies. The technical effect of this step is to ensure that the emergency response strategies always remain efficient and adaptable through continuous evaluation and optimization, and to improve the emergency response capabilities and precision control effects in the actual construction process.

[0237] Establish a real-time learning and adaptation mechanism so that the emergency plan strategy can continuously learn and improve from the actual construction process and adapt to dynamic changes. The establishment of a real-time learning and adaptation mechanism enables the continuous acquisition of new data and experience in the actual construction process, and the continuous optimization of the emergency plan strategy based on these data and experience. The technical effect of this step is that through real-time learning and adaptation, the emergency plan strategy can continue to evolve and improve, ensuring that it always adapts to the dynamically changing construction environment and conditions, and improving the emergency response speed and precision control effect during the construction process. The establishment of this mechanism makes the emergency plan strategy not only immediately effective, but also long-term adaptability and sustainability.

[0238] Further, step 5.6 includes the following steps.

[0239] Using digital twin technology, a virtual environment for ball joint installation that reflects the complexity of the actual construction site is constructed. Through digital twin technology, a virtual model that is highly consistent with the actual construction environment is created, so that all simulation tests and plan optimization processes can be carried out in a virtual environment. Digital twin technology not only simulates various parameters of the physical space, but also reflects environmental changes and feedback from equipment operations in real time, so that multiple tests and optimizations can be carried out without affecting the actual construction progress, thereby improving the practicality and reliability of the plan. In addition, the virtual environment can also be used to train construction personnel so that they can be familiar with various emergency plans before actual operation, thereby improving the speed and accuracy of on-site emergency response.

[0240] Transform the emergency plan into a digital process that can be executed in a virtual environment, including automatic execution and human-computer interaction interface. This step can digitize the various steps of the plan so that it can be automatically executed in a virtual environment. By creating a human-computer interaction interface, operators can simulate the execution process of the emergency plan in a virtual environment and intuitively understand the operational requirements and effects of each step. This not only improves the execution efficiency of the plan, but also ensures the feasibility and effectiveness of the plan in actual operation. The combination of digital processes and human-computer interaction interfaces makes the execution process of the plan more flexible and can quickly adapt to different site conditions and operational requirements.

[0241] Design and execute simulation tests covering various deviation situations and environmental conditions to collect key execution data. Through extensive simulation tests, comprehensively evaluate the performance of emergency plans under various deviation situations and environmental conditions. Simulation tests not only help identify the strengths and weaknesses of the plan, but also quantify the effectiveness and performance indicators of the plan by collecting key execution data. Through these test data, the reliability and applicability of the plan can be more accurately evaluated, providing strong support for subsequent optimization. The extensive coverage and data collection of simulation tests will help to comprehensively improve the execution effect of the plan and ensure that various emergencies can be efficiently responded to in actual construction.

[0242] Establish a multi-dimensional evaluation system to analyze the performance of the plan in different scenarios and identify strengths and weaknesses. Through a multi-dimensional evaluation system, the performance of the emergency plan in different scenarios is systematically analyzed. The evaluation system takes into account multiple dimensions such as accuracy improvement, response time, resource consumption, and safety to comprehensively measure the effectiveness of the plan. Through the analysis of each dimension, the strengths and weaknesses of the plan can be identified and the key points that need to be improved can be found. Multi-dimensional evaluation not only improves the comprehensiveness and accuracy of the plan, but also provides a detailed reference basis for subsequent optimization, ensuring that the plan can perform well in different situations.

[0243] We conduct cause analysis on the problems found and use data mining technology to extract the key factors that affect the effectiveness of the plan. Through in-depth cause analysis and data mining technology, we can find out the key factors that affect the effectiveness of the emergency plan. Data mining technology can extract hidden patterns and rules from a large amount of simulation test data and identify which factors have a significant impact on the effectiveness of the plan. The identification of these key factors will help to improve the plan in a targeted manner and enhance its overall effectiveness. Through systematic cause analysis, we can ensure that the optimization process is targeted, improve the practical operability and effectiveness of the plan, and provide solid data support for subsequent optimization and adjustment.

[0244] The plan is optimized based on the analysis results, and the practical operability of the plan is improved through repeated testing and adjustment. Through repeated testing and adjustment, the emergency plan is continuously optimized to make it more efficient and reliable in actual operation. The optimization process not only improves the identified problems, but also continuously adjusts each link of the plan according to the new test results to ensure that it can be effectively implemented in different environments and conditions. The cycle of repeated testing and adjustment allows the plan to evolve and improve continuously, gradually reaching the optimal state. Ultimately, this continuous optimization process enables the emergency plan to respond quickly in actual construction, improve construction accuracy and safety, and significantly improve the overall level of construction management.

Claims

1. A large-tonnage ball joint installation precision control construction method, characterized in that: The following steps are involved: Step 1: Collect the construction site environmental parameters in real time and monitor the position, angle and flatness of the ball joint in real time; Step 2: Based on historical data and real-time environmental parameters, dynamically calculate and optimize the accuracy standard of ball joint installation to ensure that it meets engineering requirements and adapts to site conditions; Step 3: compare the real-time monitoring data with the dynamically adjusted accuracy standard to identify deviations in a timely manner; based on the identified deviations, the intelligent deviation correction actuator performs automatic adjustments to achieve closed-loop control of accuracy; Step 4: Collect and store all data during the construction process, including environmental data, accuracy data, and correction operation records, and apply big data analysis technology to identify the following key information: the impact pattern of environmental factors on installation accuracy, the time series trend of accuracy deviation, the effect evaluation of correction operations, and potential abnormal patterns and early warning indicators; Step 5: Generate accuracy deviation scenarios based on big data analysis results and current environmental conditions, and formulate corresponding emergency plans for each prediction scenario; Step 1 includes the following steps: Step 1.1, deploy a variety of environmental sensors at the construction site, including temperature sensors, humidity sensors, wind speed and direction sensors, and atmospheric pressure sensors, to comprehensively monitor construction environment parameters; Step 1.2, multiple high-precision laser rangefinders are installed around the spherical joint to achieve high-precision monitoring of the three-dimensional coordinates of the spherical joint through multi-angle continuous tracking; Step 1.3, install a multi-axis electronic gyroscope and accelerometer on the ball joint body to accurately measure the tilt angle and rotation angle of the ball joint in all directions; at the same time, use multiple high-resolution cameras to capture the ball joint image from different angles, and use image processing algorithms to calculate the spatial posture of the ball joint in real time, providing redundant verification of angle monitoring; Step 1.4: Use high-precision 3D laser scanning technology to continuously scan the surface of the ball joint, and calculate the surface flatness through real-time point cloud processing algorithm; at the same time, install strain gauges at key positions of the ball joint to monitor local deformation and provide auxiliary data for flatness evaluation; Step 1.5, establish a centralized data acquisition and processing platform to achieve time synchronization and spatial correlation of data from all sensors and measurement devices; Step 2 includes the following steps: Establish a comprehensive ball joint installation project history database to collect and organize multi-dimensional data including installation accuracy records under different environmental conditions, environmental parameters, installation methods, equipment used, and final project performance evaluation; A prediction model for the impact of environmental factors on installation accuracy is built based on multi-dimensional data to quantify the impact of temperature, humidity, vibration and wind speed on the position, angle and flatness accuracy of the ball joint; Input the real-time environmental parameters collected in step 1 into the prediction model to calculate the potential impact of the current environmental conditions on the installation accuracy and generate quantitative evaluation results; Comprehensively consider engineering technical requirements, environmental impact assessment results and historical performance data, and dynamically calculate the accuracy standard that adapts to current environmental conditions; Implement an iterative optimization process to continuously evaluate the rationality and feasibility of the accuracy standards derived from dynamic calculations, and make adjustments and improvements based on feedback from the actual installation process; Step 3 includes the following steps: Step 3.1, performing real-time comparison and analysis on the real-time monitoring data of the ball joint position, angle and flatness collected in step 1 and the accuracy standard dynamically calculated in step 2; Step 3.2, quickly identify various deviations during the ball joint installation process, prioritize the identified deviations, determine the key deviations that need to be corrected immediately, analyze the deviation trends, and predict the deviation change trends in the short term; Step 3.3, based on the principle of multi-objective optimization, taking into account both accuracy requirements and adjustment efficiency, automatically generates the optimal correction plan according to the deviation analysis results, including adjustment direction, adjustment amount and execution sequence, to ensure that the operation efficiency is maximized while meeting the accuracy standards; Step 3.4, converting the formulated optimal correction scheme into specific execution instructions to accurately control the action of the intelligent correction actuator; Step 3.5 integrates steps 3.1 to 3.4 to build a precision control closed-loop mechanism to achieve fast-response inner-loop control and optimized outer-loop control to meet control requirements at different time scales and ensure continuous optimization of ball joint installation accuracy.

2. The large-tonnage ball joint installation precision control construction method according to claim 1 is characterized in that: The following steps are used to achieve high-precision 3D tracking of the ball joint position: Arrange the laser rangefinders on at least three different planes, and equip each laser rangefinder with a high-precision rotating base and temperature compensation function; Use high-precision total stations to accurately measure the absolute coordinates of each laser rangefinder and establish a stable spatial reference system; Using the fine-tuning function of the rotating base, the angle of the laser rangefinder is adjusted in real time to continuously lock the ball joint position; Based on the principle of triangulation and combined with the least squares method, multi-source ranging data are fused and processed, and finally the high-precision three-dimensional coordinates of the ball joint are calculated and output to achieve accurate monitoring of the ball joint installation process.

3. The large-tonnage ball joint installation precision control construction method according to claim 1 is characterized in that: Surface flatness calculation steps: Use high-precision 3D laser scanning technology to obtain point cloud data of the ball joint surface {P i }, where P i is the coordinate of the i-th point in the point cloud, P i =(x i ,y i ,z i ); The reference plane is fitted by the least squares method: ax+by+cz+d=0, where (a, b, c, d) are the parameters of the reference plane equation, obtained by minimizing the following objective function: min∑ i=1 N (ax i +by i +cz i +d) 2 ; (x, y, z) is used to represent each point in the point cloud data of the spherical joint surface; Calculate point P i Distance d to the reference plane i , the specific calculation formula is: i =|ax i +by i +cz i +d∣ / √(a 2 +b 2 +c 2 ); Through point P i The flatness S is evaluated by the root mean square value of the distance to the reference plane: S=√{(1 / N)·(Σ i=1 N d i 2 )}.

4. The large-tonnage ball joint installation precision control construction method according to claim 1 is characterized in that: The specific steps of using strain gauges to monitor local deformation and provide auxiliary data for flatness assessment are as follows: According to the strain gauge measurement data ε, calculate the local deformation d ε , the formula is: ε =ε·L, where L is the initial length of the strain gauge; The local deformation d measured by the strain gauge ε Incorporate flatness evaluation, the formula is: S combined =√{(1 / N)·(Σ i= 1 N d i 2 )+W ε ·d ε 2 }, where W ε is the weight factor of strain gauge data, reflecting the importance of strain gauge data in flatness assessment; S combined It is a comprehensive flatness index.

5. The large-tonnage ball joint installation precision control construction method according to claim 1 is characterized in that: The calculation formula of the precision standard is: P=T·(1+k1·(∑ g=1 n w eg ·E g )+k2·(∑ j=1 m w hj ·H j )), where P is the accuracy standard obtained by dynamic calculation; T is the basic accuracy standard required by engineering technology; k1 and k2 are weight coefficients used to adjust the degree of influence of environmental impact and historical performance on the accuracy standard; w eg is the environmental parameter E g The weight of hj is the historical data H j The weight of n represents the number of environmental parameters; m represents the number of historical performance data.

6. The large-tonnage ball joint installation precision control construction method according to claim 1 is characterized in that: Quickly identify various deviations during ball joint installation and prioritize the identified deviations, including the following steps: Define the calculation formulas for position deviation, angle deviation and flatness deviation to evaluate the difference between the current monitoring data and the target standard. The position deviation D position The calculation formula is: position =√{(X current -X target ) 2 +(Y current -Y target ) 2 +(Z current -Z target ) 2 }, where (X target ,Y target ,Z target ) is the target position coordinate, (X current ,Y current ,Z current ) is the current monitored position coordinate; angle deviation D angle The calculation formula is: angle =√{(α current -α target ) 2 +(β current -β target ) 2 +(γ current -γ target ) 2 }, where (α target ,β target ,γ target ) is the target angle, (α current ,β current ,γ current ) is the currently monitored angle; flatness deviation D flatness The calculation formula is: flatness =|S current -S target ∣, where S target is the target flatness, S current is the currently monitored flatness; Comprehensively consider the position, angle and flatness deviation, introduce weight factors, and calculate the comprehensive deviation index D total , the specific calculation formula is: D total =ω position ·D position +ω angle ·D angle +ω flatness ·D flatness , where ω position ,ω angle ,ω flatness Represent the weight factors of position deviation, angle deviation and flatness deviation respectively; The priorities of position deviation, angle deviation and flatness deviation are calculated and sorted respectively. The calculation formula of position deviation priority is: position =ω position ·D position / T position , the calculation formula of angle deviation priority is: P angle =ω angle ·D angle / T angle , the calculation formula of flatness deviation priority is: P flatness =ω flatness ·D flatness / T flatness , where P position , P angle and P flatness Respectively represent the priorities of position deviation, angle deviation and flatness deviation; T position , T angle , T flatness The thresholds for position deviation, angle deviation, and flatness deviation, respectively, indicate critical deviations that need to be corrected immediately.

7. The large-tonnage ball joint installation precision control construction method according to claim 1 is characterized in that: The changing trend of position deviation in the short term is predicted by the following formula: ΔD position (t+1)=a position ·(t+1)+b position -D position (t); The changing trend of angle deviation in the short term is predicted by the following formula: ΔD angle (t+1)=a angle ·(t+1)+b angle -D angle (t); The change trend of flatness deviation in the short term is predicted by the following formula: ΔD flatness (t+1)=a flatness ·(t+1)+b flatness -D flatness (t); Among them, D position (t) represents the position deviation at time point t; D angle (t) represents the angle deviation at time point t; D flatness (t) represents the flatness deviation at time point t; a position a represents the slope parameter of the linear regression model for the change in position deviation; angle The slope parameter of the linear regression model representing the change in angular deviation; a flatness b represents the slope parameter of the linear regression model of the flatness deviation change; b position The intercept parameter of the linear regression model representing the change in position deviation; b angle The intercept parameter of the linear regression model representing the change in angular deviation; b flatness The intercept parameter of the linear regression model representing the change in flatness deviation; t represents the current time point.

8. The large-tonnage ball joint installation precision control construction method according to claim 1 is characterized in that: Step 3.3 includes the following steps: A multi-objective optimization model is established, with minimization of accuracy deviation and minimization of adjustment time as the main objective functions, so as to take into account both accuracy requirements and adjustment efficiency; Based on the deviation priority ranking results in step 3.2, combined with the accuracy standards dynamically calculated in step 2 and the real-time environmental parameters collected in step 1, formulate targeted adjustment strategies; Consider the nature and magnitude of each deviation and determine the corrective approach; Take engineering technical requirements, equipment operating limitations and safety factors into consideration as constraints to ensure the feasibility and safety of adjustment strategies; Use heuristic algorithms to generate multiple feasible adjustment plans, each of which includes specific adjustment directions, adjustment amounts, and execution sequences, while meeting equipment physical limitations and operational safety requirements; The generated adjustment schemes are comprehensively evaluated, and the optimal correction scheme is selected using a multi-criteria decision-making method taking into account the expected accuracy improvement, adjustment time, and energy consumption.

9. The large-tonnage ball joint installation precision control construction method according to claim 1 is characterized in that: Step 5 includes the following steps: Step 5.1, generate multiple accuracy deviation scenarios; Step 5.2, establish a multi-dimensional evaluation framework to prioritize each scenario; Step 5.3, establish a comprehensive emergency plan template library, including detailed response processes, required resources, key decision points and expected effect indicators; Step 5.4, based on the specific forecast scenario, automatically select and combine appropriate plan templates to generate targeted emergency plans; Step 5.5: Use reinforcement learning to continuously optimize the emergency plan generation strategy to improve the applicability and effectiveness of the emergency plan; In step 5.6, each generated emergency plan is subjected to a virtual simulation test to evaluate its execution effect under different conditions, and based on the evaluation results, the plan content and execution strategy are continuously optimized to improve the practical operability of the plan.

10. The large-tonnage ball joint installation precision control construction method according to claim 9 is characterized in that: Step 5.1 includes the following steps: Integrate environmental impact patterns, accuracy deviation trends, abnormal pattern recognition results, real-time environmental data, and ball joint installation status data for cleaning, standardization, and feature extraction; Based on the integrated data, a predictive model is constructed that captures the relationship between environmental factors, historical trends, and abnormal patterns; Identify key parameters and their probability distribution functions, consider correlations between parameters, and create an appropriate random sampling framework for Monte Carlo simulations; Perform large-scale Monte Carlo simulations to generate multiple accuracy deviation scenarios through random sampling and model predictions; Perform statistical analysis on the generated scenarios, using clustering algorithms to identify typical and extreme cases; Calculate key statistical indicators to fully describe potential risks; Step 5.2 includes the following steps: Establish a multi-dimensional evaluation indicator system, including the degree of deviation, probability of occurrence and potential influencing factors; Quantify each evaluation indicator and standardize all indicators to a unified scale to ensure comparability between indicators of different dimensions; Construct a hierarchical model, determine the relative importance of each level, calculate the weight vector and perform consistency check; Based on the hierarchical model and the standardized indicator values, a comprehensive score is calculated for each accuracy deviation scenario, reflecting the overall importance of the scenario; Sort the scenarios in descending order based on the comprehensive scores to determine the priority; Step 5.3 includes the following steps: Build a systematic emergency plan classification system to cover different types and severity of accuracy deviation scenarios to ensure comprehensive coverage and facilitate rapid call-up; Design a standardized emergency plan template that includes scenario descriptions, response objectives, processes, resource requirements, decision points, and effect indicators, taking into account both comprehensiveness and flexibility; Develop detailed response processes for various deviation scenarios, including assessment, response, correction and verification steps, and clearly present them using flowcharts; Conduct detailed resource demand analysis, establish resource lists, and develop scheduling plans to ensure timely availability and efficient use of resources; Identify and clearly mark key decision points and provide decision support information, including decision conditions, alternatives and their pros and cons analysis; Set quantitative expected effect indicators for each plan, covering the dimensions of accuracy improvement, response time and resource consumption, and establish an evaluation mechanism; Step 5.4 includes the following steps: Analyze and predict scenarios, automatically extract key features and convert them into structured data; Identify the most relevant plan templates based on multi-dimensional similarity calculation methods; Design a combination strategy for emergency plan templates to intelligently select and integrate multiple relevant templates for complex scenarios; Automatically generate emergency plans based on selected templates, integrate response processes, resource requirements, and decision points, and perform scenario adaptation; Perform logical consistency checks on generated solutions to identify and correct potential inconsistencies or conflicts; Use simulation to evaluate the feasibility of the solution, consider time, resources and risk factors, and make optimization adjustments; Step 5.5 includes the following steps: Build a virtual environment to simulate the ball joint installation process, including various accuracy deviation scenarios, environmental factors and construction conditions, to ensure that it accurately reflects the actual construction complexity; Define a comprehensive action space of contingency plans, including all possible response measures and intervention strategies, and clearly define the execution conditions, steps and expected effects of each action; Design a reward function that comprehensively considers accuracy improvement, cost, efficiency, and safety to evaluate the effectiveness of the plan and guide the learning process; Select and implement a suitable reinforcement learning algorithm to learn the optimal plan generation strategy through a large number of iterative training; Regularly evaluate the learned emergency response strategies, test their generalization ability, and optimize algorithm parameters and models based on the results; Establish a real-time learning and adaptation mechanism so that the plan strategy can continuously learn and improve from the actual construction process and adapt to dynamic changes; Step 5.6 includes the following steps: Using digital twin technology, a virtual environment for ball joint installation is constructed that reflects the complexity of the actual construction site; Transform emergency response plans into digital processes that can be executed in a virtual environment, including automated execution and human-machine interaction interfaces; Design and execute simulation tests covering various deviation scenarios and environmental conditions to collect key performance data; Establish a multi-dimensional evaluation system to analyze the performance of the plan in different scenarios and identify its strengths and weaknesses; Analyze the causes of the problems found and use data mining technology to extract the key factors that affect the effectiveness of the plan; The plan is optimized based on the analysis results, and its practical operability is improved through repeated testing and adjustment.