A complete equipment system for screw spike anchoring of concrete sleepers

Through the automated concrete sleeper spiral spike anchoring equipment system, the positioning accuracy and safety problems caused by manual operation are solved, and the efficient and precise installation and thread protection of the spiral spike on the concrete sleeper are achieved.

CN118617089BActive Publication Date: 2024-10-11ZHUZHOU MINGYIXIN RAIL TRANSIT EQUIP MFG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411095888.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-10-11
Estimated Expiration
2044-08-12

AI Technical Summary

Technical Problem

In the existing technology, the connection and fixation of spiral spikes and concrete sleepers mainly relies on manual operation, resulting in insufficient positioning accuracy and poor work safety. The amount of manual operations is large, which affects the dimensional accuracy and consistency of the anchoring of the spiral spikes on the concrete sleepers.

Method used

Provide a complete equipment system for anchoring spiral spikes in concrete sleepers, including conveyor lines, hydraulic cylinders, sleeper carrier plates, loaders and jigs, to achieve automatic installation and positioning of spiral spikes, ensure positioning accuracy, and use magnetic attraction and threaded connections to protect the threads.

Benefits of technology

It realizes the automatic installation and positioning of spiral spikes on concrete sleepers, improves positioning accuracy and efficiency, reduces manual operations, enhances work safety, and protects threads, ensuring the effective use of spiral spikes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118617089B_ABST
    Figure CN118617089B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of rail sleeper spike anchoring, and discloses a complete set of equipment system for anchoring spiral rail spikes on concrete rail sleepers, comprising a conveyor line, a hydraulic cylinder, a plurality of rail sleeper carrier plates installed on the conveyor line, a feeder for feeding spiral rail spikes into installation holes, and a jig for loading and positioning two spiral rail spikes, wherein the concrete rail sleeper is clamped on the rail sleeper carrier plate in an inverted state; the rail sleeper carrier plate has two channels, and the inner wall of each channel is embedded with two clamping plates that are symmetrically arranged and can reciprocate horizontally relative to the rail sleeper carrier plate; the clamping plate is clamped with the jig; the jig comprises two internally threaded tubes for installing spiral rail spikes, and the two internally threaded tubes can rotate around their own central axis; the jig has the advantages of automatically and continuously installing and positioning spiral rail spikes on a plurality of concrete rail sleepers and effectively ensuring the positioning accuracy of the spiral rail spikes, and at the same time, the surface of the solidified adhesive can be made smooth, so as to protect the threads on the spiral rail spikes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of rail sleeper spike anchoring, in particular to a complete equipment system for concrete rail sleeper spiral spike anchoring. Background Art

[0002] like Fig.17 The concrete sleeper shown comprises a sleeper body, a mounting hole, an injection hole and a guide rail groove; Fig.18 The spiral spike shown comprises a column, an annular boss on the column, and stud 1 and stud 2 located at both ends of the column, and the pitch of stud 2 is greater than that of stud 1. When the spiral spike is installed on the concrete sleeper in an inverted anchoring manner by means of adhesive, stud 2 is inserted into the installation hole, and the adhesive is injected into the installation hole through the injection hole and fills the installation hole, and the spiral spike is fixed on the concrete sleeper by solidification of the adhesive.

[0003] In the prior art, the connection and fixing operation between the spiral spike and the concrete sleeper is mainly completed manually. Due to the weak consistency of manual operation and the certain precision requirements for the installation of the spiral spike on the concrete sleeper, the anchoring dimensional accuracy of the spiral spike on the concrete sleeper may not meet the required precision requirements, and the manual workload is very large, and the work safety is poor. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a complete set of equipment system for anchoring spiral spikes on concrete sleepers, which has the advantages of automatically and continuously installing and positioning spiral spikes on multiple concrete sleepers and effectively ensuring the positioning accuracy of the spiral spikes. At the same time, the surface of the adhesive after solidification can be made smooth, thereby protecting the threads on the spiral spikes.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a complete set of equipment system for anchoring spiral spikes on concrete sleepers, comprising a conveyor line for continuously conveying concrete sleepers, a hydraulic cylinder for lifting the conveyor line, a plurality of sleeper carriers installed on the conveyor line, a loader for feeding spiral spikes into installation holes, and a jig for loading and positioning two spiral spikes, wherein the concrete sleeper is clamped on the sleeper carrier in an inverted state; the sleeper carrier has two channels for the jig to pass through the sleeper carrier, and the inner wall of each channel is embedded with two clamping plates that are symmetrically arranged and can reciprocate horizontally relative to the sleeper carrier; the clamping plates are clamped with the jig;

[0006] The loader comprises a moving machine, a jig bin, a spike bin, a jig out-bin mechanism and a spike out-bin mechanism; the moving machine is used to drive the loader to move horizontally back and forth in a direction perpendicular to the conveying direction of the concrete sleeper, and when the loader is located below the mounting hole, the loader is driven to flip 90 degrees; the loader is connected to the mounting jig in a magnetic way; the jig bin and the spike bin are used to temporarily store the jig and the spiral spike respectively; the jig out-bin mechanism and the spike out-bin mechanism successively push the jig and the spiral spike out of the jig bin and the spike bin respectively when the loader moves to one side of the conveying line;

[0007] The fixture comprises two internally threaded tubes for installing spiral spikes, and both of the two internally threaded tubes can rotate around their own central axes under the action of manpower or a loader.

[0008] Preferably, the mobile machine includes support one and support two, a disk motor is installed in support one, turntable one is installed at the output end of the disk motor, turntable two is rotatably installed on support two; a threaded rod and a guide column are arranged between turntable one and turntable two; motor one for driving the threaded rod to rotate is installed on support two; the loader includes a mobile seat threadedly sleeved on the threaded rod, and the mobile seat sliding sleeve is arranged on the guide column; motor two and a rotating table are respectively installed at both ends of the mobile seat, two rotating tables are provided and both are coordinated with the mobile seat for rotation, motor two is transmission-connected to the two rotating tables, and a plurality of magnetic suction columns one distributed in a ring array are embedded on the ends of the two rotating tables away from motor two.

[0009] Preferably, the fixture also includes a connecting seat, and the two internally threaded tubes are both installed through the connecting seat, the internally threaded tubes and the connecting seat are rotatably matched, and the two ends of the internally threaded tubes are respectively fixed with a top cover and a connecting block; a plurality of magnetic columns 2 distributed in a circular array are embedded on the ends of the two connecting blocks away from the internally threaded tubes; the plurality of magnetic columns 1 correspond one-to-one with the plurality of magnetic columns 2 and attract each other.

[0010] Preferably, the loader also includes two sliding tables arranged at intervals along the horizontal movement direction of the loader, and the sliding table outputs a horizontal sliding direction that is perpendicular to the horizontal movement direction of the loader; the jig bin and the spike bin are respectively installed on the two sliding tables, and the jig out-of-bin mechanism and the spike out-of-bin mechanism are also respectively connected to the two sliding tables.

[0011] Preferably, the sliding table includes a base table and a slide, the slide is slidably arranged on the base table, an inclined guide groove, a long straight guide groove and a short straight guide groove are provided on the end of the slide facing the base table, the long straight guide groove and the short straight guide groove are respectively connected at both ends of the inclined guide groove and jointly form a Y-shaped guide groove opening toward the conveyor line, and the long straight guide groove is close to the mobile machine; the loader also includes a lever fixed on the mobile seat, the lever cooperates with the Y-shaped guide groove; a gear is installed on the end of the base table away from the mobile machine for rotation through the axis, the gear and the axis are connected by a coil spring, and a rack meshing with the gear is fixed on the slide.

[0012] Preferably, the jig bin includes two vertical and mutually parallel guide plates, the two guide plates are fixed on the same base and respectively located on both sides of the slide, the inner sides of the two guide plates are provided with a jig guide groove, the jig guide groove is L-shaped and has a vertical portion and a horizontal portion, the horizontal portion of the jig guide groove passes through one end of the guide plate toward the mobile machine; the connecting seat is slidably fitted in the jig guide groove; the jig out-of-bin mechanism is a T-shaped frame and has a horizontal portion and a vertical portion, the vertical portion of the jig out-of-bin mechanism is fixedly connected to the slide, and the upper surface of the horizontal portion of the jig out-of-bin mechanism is inclined downward close to the side of the mobile machine.

[0013] Preferably, the spike bin comprises a door frame, a center plate, a spike support block and a fixing seat, the upper surface of the center plate and the top wall of the door frame are connected by a connecting column; vertical grooves are provided on both side walls of the door frame and on both side surfaces of the center plate, the spike support block is located below the center plate and abuts against the upper surface of the slide, two fixing seats are provided and fixedly connected to the door frame and the base; the spike exit mechanism comprises a push plate, the push plate is fixed on the slide, two groups of push rods are fixed on the upper part of the push plate, the two groups of push rods are both inserted into the spike support block, the push rods are provided in two per group and the spacing between the two push rods matches the spiral spikes.

[0014] Preferably, the spike ejection mechanism further includes a push-pull rod, a push rod, an ejection spring, a clamping block and a magnetic block, one end of the push-pull rod is fixedly connected to the push rod, the other end of the push-pull rod passes through the spike supporting block, one end of the push rod abuts against the spike supporting block, the other end of the push rod passes through the push plate, the ejection spring is sleeved on the push rod, the clamping block is slidably arranged in the push plate, and the push rod is provided with a clamping groove that cooperates with the clamping block; the magnetic block is embedded in the center plate, and the magnetic block cooperates with the clamping block.

[0015] Compared with the prior art, the present invention provides a complete equipment system for anchoring spiral spikes on concrete sleepers, which has the following beneficial effects:

[0016] 1. When anchoring, the automatic installation and positioning of the spiral spikes on the concrete sleepers can be realized, and the positioning accuracy can be guaranteed, and the positioning accuracy of the spiral spikes can meet the accuracy requirements; the automatic installation and positioning of the spiral spikes on multiple concrete sleepers can be realized continuously, which improves efficiency and reduces the manual installation and positioning process of the spiral spikes on the concrete sleepers, thereby avoiding the influence of manual labor on the positioning accuracy of the spiral spikes, reducing the amount of manual work, increasing work safety, and ensuring the consistency of the positioning of the spiral spikes on multiple concrete sleepers.

[0017] 2. After the adhesive fixes the spiral spike on the concrete sleeper, the surface of the adhesive layer formed by the solidification of the adhesive is smooth and flush with the surface of the annular boss on the spiral spike, so that there is no need to manually process the solidified adhesive, which facilitates the subsequent installation of accessories on the concrete through the spiral spike.

[0018] 3. It can effectively protect the threads on the spiral spikes, prevent the threads on the spiral spikes from being damaged when the spiral spikes are connected to the concrete sleepers, protect and prevent rust on the threads of the spiral spikes fixed on the concrete sleepers, and ensure the effective use of the spiral spikes. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0020] Figure 2 for Figure 1 A magnified view of the structure at center;

[0021] Figure 3 It is a structural schematic diagram of a mobile machine;

[0022] Figure 4 It is the structural schematic diagram of the charging machine;

[0023] Figure 5 This is a schematic diagram of the coordination between the jig and the spiral spike;

[0024] Figure 6 This is a schematic diagram of the coordination between the loader and the fixture;

[0025] Figure 7 It is the structural schematic diagram of the sliding table;

[0026] Figure 8 It is a schematic diagram of the cooperation between the Y-shaped slot and the lever;

[0027] Fig. 9 It is a schematic diagram of the coordination between the fixture bin, the slide table and the connecting seat;

[0028] Fig.10 This is a structural diagram of a spike bin;

[0029] Fig.11 It is a schematic diagram of the coordination between the spike bin and the spike ejection mechanism;

[0030] Fig.12 A schematic diagram of the positions of the push rod and the spiral spike when the push rod separates the upper and lower spiral spikes;

[0031] Fig.13 This is a structural diagram of the spike ejection mechanism;

[0032] Fig.14 It is a structural schematic diagram of the sleeper carrier plate;

[0033] Fig.15 The figure is a schematic diagram of the coordination of the sleeper carrier plate, the jig, the spiral spikes and the concrete sleeper;

[0034] Fig.16 This is a schematic diagram of the effect of the spiral spike being fixed on the concrete sleeper by adhesive;

[0035] Fig.17 It is a structural schematic diagram of a concrete rail in the prior art;

[0036] Fig.18 The figure is a schematic diagram of the structure of a spiral spike in the prior art.

[0037] Among them: 100, sleeper body; 101, mounting hole; 102, injection hole; 103, track groove; 200, column; 201, boss; 202, stud 1; 203, stud 2; 300, adhesive layer; 1, conveyor line; 2, hydraulic cylinder; 3, bearing slide assembly; 4, sleeper carrier plate; 41, channel; 42, clamping plate; 43, reset spring; 5, feeder; 6, fixture ; 51, mobile machine; 52, loader; 53, sliding table; 54, fixture bin; 55, spike bin; 56, fixture out of bin mechanism; 57, spike out of bin mechanism; 511, support 1; 512, support 2; 513, turntable 1; 514, turntable 2; 515, threaded rod; 516, guide column; 517, motor 1; 521, mobile seat; 522, motor 2; 523, rotating table ; 5231, column block; 524, lever; 525, magnetic column 1; 531, base; 532, slide; 5321, positioning block; 533, oblique guide groove; 534, long straight guide groove; 5341, guide block; 535, short straight guide groove; 536, gear; 537, rack; 541, guide plate; 542, fixture guide groove; 551, door frame; 552, center plate; 5521, magnetic Block; 553, spike support block; 554, fixed seat; 5541, spring column 2; 555, groove; 571, push plate; 572, push rod; 573, push-pull rod; 574, push rod; 575, ejector spring; 576, clamping block; 61, connecting seat; 611, spring column 1; 62, internal threaded pipe; 63, top cover; 64, connecting block; 641, column slot; 65, magnetic column 2. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] See also Figures 1 to 15, a complete set of equipment system for anchoring spiral spikes on concrete sleepers, used for inverted anchoring installation of spiral spikes on concrete sleepers. The complete set of equipment system for anchoring spiral spikes on concrete sleepers includes a conveyor line 1 for continuously conveying concrete sleepers, a plurality of hydraulic cylinders 2 arranged on both sides of the conveyor line 1 and used for lifting the conveyor line 1, a plurality of sleeper carrier plates 4 for carrying concrete sleepers and installed on the conveyor line 1, a loader 5 for feeding spiral spikes into installation holes 101, and a jig 6 for loading and positioning two spiral spikes;

[0040] The sleeper carrier plate 4 is fixedly mounted on the bearing slide assembly 3 of the conveyor line 1 and is rotationally conveyed by the conveyor line 1, and the concrete sleepers are loaded and unloaded during the rotational conveying process; it should be noted that the loading and unloading of the concrete sleepers are respectively at the upstream and downstream of the conveyor line 1, and are completed by mechanical equipment such as manipulators that can carry out object handling; there are two groups of feeders 5, and the two groups of feeders 5 are respectively arranged on both sides of the conveyor line 1, and each group of feeders 5 is provided with a number of feeders that are evenly spaced along the concrete sleeper conveying direction of the conveyor line 1; in the specific implementation, in order to ensure the continuity of the spiral spike loading, each group of feeders 5 is provided with at least two.

[0041] The concrete sleeper is connected to the sleeper carrier plate 4 by a snap-on connection, so that the concrete sleeper is positioned and installed on the conveyor line 1, and at the same time, the concrete sleeper and the sleeper carrier plate 4 form a detachable connection, which is convenient for the concrete sleeper to be removed from the conveyor line 1; a plurality of jigs 6 are provided, and the jigs 6 are connected to the feeder 5 by magnetic attraction. The jig 6 has two spiral spike installation positions, and each spiral spike installation position can be rotated around its own central axis under the drive of the feeder 5 or under human power, and each spiral spike installation position is detachably connected to the spiral spike by a threaded connection; the installation of the spiral spike on the spiral spike installation position is achieved by the feeder 5 driving the two spiral spike installation positions to rotate around their respective central axes; the jig 6 can be snapped on the sleeper carrier plate 4 to position the spiral spike on the concrete sleeper; the jig 6, after being connected to the sleeper carrier plate 4, can be detached from the feeder 5, so that the jig 6, the spiral spike, the sleeper carrier plate 4 and the concrete sleeper are transported by the conveyor line 1 at the same time.

[0042] When installing the spiral spikes on the concrete sleepers, the conveyor line 1 conveys the sleeper carrier plate 4 along the conveying direction of the concrete sleepers; at the loading position of the conveyor line 1, multiple sleeper bodies 100 are successively inverted on the conveyor line 1 and clamped on the sleeper carrier plate 4 through two track grooves 103; then, the loader 5 is magnetically connected to the jig 6 and two spiral spikes are loaded through the jig 6, and then the spiral spikes are moved to the bottom of the sleeper body 100, and the spiral spikes are turned 90° and vertically facing the mounting hole 101, and then, the hydraulic cylinder 2 descends the conveyor line 1, so that the concrete sleeper moves downward, the stud 202 is inserted into the mounting hole 101, and the end of the jig 6 away from the loader 5 passes through the sleeper carrier plate 4 and abuts against the sleeper body 100, so that the jig 6 is clamped with the sleeper carrier plate 4; then, The hydraulic cylinder 2 lifts the conveyor line 1, so that the concrete sleeper, the sleeper carrier plate 4, the jig 6 and the spiral spike are moved upward, and the jig 6 is moved upward and separated from the loader 5; then, the conveyor line 1 conveys the concrete sleeper, the sleeper carrier plate 4, the jig 6 and the spiral spike to the adhesive injection position; at the adhesive injection station, a specified amount of adhesive is injected into the mounting hole 101 through the injection hole 102; after the adhesive is initially solidified, the conveyor line 1 conveys the concrete sleeper, the sleeper carrier plate 4, the jig 6 and the spiral spike to the unloading position, and then, the sleeper body 100, the jig 6 and the spiral spike are removed from the conveyor line 1 together, and are transferred to the static area together; in the static area, the sleeper body 100 is in an upright state, and the adhesive is naturally solidified and dried, so that the spiral spike is completely fixed on the concrete sleeper.

[0043] It should be noted that the order of the operation of the hydraulic cylinder 2 lifting the conveyor line 1 and the operation of injecting the adhesive can be switched according to actual needs, that is, the injection of the adhesive can be completed first, and then the hydraulic cylinder 2 lifts the conveyor line 1.

[0044] After the spiral spike is completely fixed on the concrete sleeper, the jig 6 is removed. It should be noted that the interval between the time point of removing the jig 6 and the time point of completely fixing the spiral spike does not need to be fixed, and the jig 6 can be removed when the guide rail accessories need to be installed on the concrete sleeper through the spiral spike, so that the jig 6 can protect the stud 202 and prevent the thread of the stud 202 from rusting and distortion.

[0045] Specifically, Figure 2 As shown, the loading machine 5 includes a moving machine 51 , a charging machine 52 , a sliding platform 53 , a fixture bin 54 , a spike bin 55 , a fixture out-of-bin mechanism 56 and a spike out-of-bin mechanism 57 .

[0046] The moving machine 51 is used to drive the loader 52 to move horizontally back and forth in a direction perpendicular to the conveying direction of the concrete sleepers of the conveyor line 1, and to flip the loader 52 90° when the loader 52 is located below the mounting hole 101, so that the position state of the loader 52 alternates between a vertical state and a horizontal state;

[0047] The loader 52 is used to connect the installation jig 6 in a magnetic way, and make the two spiral spike installation positions on the jig 6 rotate around their respective central axes to achieve the simultaneous loading of two spiral spikes; after the jig 6 is equipped with the spiral spike and moved to the bottom of the installation hole 101, the moving machine 51 flips the loader 52 from a horizontal state to a vertical state, so that the spiral spike faces the installation hole 101; after the jig 6 is moved up and separated from the loader 52, the moving machine 51 flips the loader 52 to a horizontal position, and slides the loader 52 to the side away from the conveyor line 1, and the installation operation of the jig 6 and the spiral spike is performed again.

[0048] The sliding table 53 is arranged beside the mobile machine 51, and two sliding tables 53 are provided and are arranged at intervals along the horizontal moving direction of the loader 52. The jig bin 54 and the spike bin 55 are respectively installed on the two sliding tables 53, and the spike bin 55 is located between the conveyor line 1 and the jig bin 54; the jig out-bin mechanism 56 and the spike out-bin mechanism 57 cooperate with the jig bin 54 and the spike bin 55 respectively to realize the out-bin of the jig 6 and the spiral spikes.

[0049] like Figure 3 As shown, the mobile machine 51 includes a support 1 511 and a support 2 512, a disc motor is installed in the support 1 511, a turntable 1 513 is installed at the output end of the disc motor, and a turntable 2 514 is rotatably installed on the support 2 512; a threaded rod 515 and a guide column 516 are arranged between the turntable 1 513 and the turntable 2 514, and the threaded rod 515 is rotatably connected to the turntable 1 513 and the turntable 2 514 through a bearing, and the guide column 516 is fixedly connected to the turntable 1 513 and the turntable 2 514; a motor 1 517 for driving the threaded rod 515 to rotate is installed on the support 2 512; the disc motor directly drives the turntable 1 513 to rotate, and the turntable 1 513 drives the turntable 2 514 to rotate through the guide column 516, so that the motor 1 517 and the threaded rod 515 rotate at the same time.

[0050] The loader 52 includes a movable seat 521, which is threadedly mounted on the threaded rod 515 and slidably mounted on the guide column 516. When the motor 1 517 drives the threaded rod 515 to rotate, the movable seat 521 moves back and forth horizontally between the support 1 511 and the support 2 512. When the disc motor drives the motor 1 517 and the threaded rod 515 to rotate at the same time, the movable seat 521 flips, and the flipping angle of the movable seat 521 is 90°. Through the structure set in this way, the movable seat 521 can move back and forth horizontally between the two sliding platforms 53 below the sleeper body 100, and the movable seat 521 can flip 90° below the sleeper body 100.

[0051] Motor 2 522 and a rotating table 523 are respectively installed at both ends of the moving seat 521. Two rotating tables 523 are provided and both rotate in coordination with the moving seat 521. Motor 2 522 is transmission-connected to the two rotating tables 523. The ends of the two rotating tables 523 away from motor 2 522 are both embedded with a plurality of magnetic columns 1 525 distributed in a circular array. It should be noted that, in the present embodiment, the transmission connection between motor 2 522 and the two rotating tables 523 is completed through a synchronous wheel and synchronous belt transmission assembly, which includes three synchronous wheels and a synchronous belt for transmission-connecting the three synchronous wheels, and the three synchronous wheels are respectively fixed on the output end of motor 2 522 and the two rotating tables 523.

[0052] like Figure 4 As shown, the fixture 6 includes a connecting seat 61, and two internally threaded tubes 62 are installed on the connecting seat 61. The internally threaded tubes 62 are rotatably matched with the connecting seat 61, and the threads of the internally threaded tubes 62 are matched with the threads on the stud 202. The two ends of the internally threaded tube 62 are respectively fixed with a top cover 63 and a connecting block 64. The inner cavity of the top cover 63 is connected with the inner cavity of the internally threaded tube 62. A plurality of magnetic posts 65 distributed in a ring array are embedded at one end of the two connecting blocks 64 away from the internally threaded tube 62; the plurality of magnetic posts 65 are connected one by one with the plurality of magnetic posts 65. The connection between the connecting block 64 and the rotating table 523 is achieved by the mutual attraction of the magnetic column 1 525 and the magnetic column 2 65; after the connecting block 64 is connected to the rotating table 523, the two internally threaded tubes 62 can be rotated by the motor 2 522, and the two studs 202 are respectively installed in the two internally threaded tubes 62; since the magnetic connection between the magnetic column 1 525 and the magnetic column 2 65 is a non-rigid connection, in the process of the two studs 202 being installed in the two internally threaded tubes 62, the two studs 202 can be installed in place.

[0053] It should be noted that in order to improve the connection stability between the connecting block 64 and the rotating platform 523, as shown in FIG. Figure 4 , Figure 5 and Figure 6 As shown, a column block 5231 is fixed at the center of one end of the rotating table 523 away from the motor 2 522, and a column groove 641 matching with the column block 5231 is provided on the connecting block 64; when the magnetic column 1 525 and the magnetic column 2 65 are magnetically connected, the column block 5231 is located in the column groove 641, so as to support the connecting block 64 and ensure that the connecting block 64 and the rotating table 523 are coaxial.

[0054] like Figure 7 As shown, the sliding platform 53 includes a base 531 and a slide 532. The slide 532 is slidably arranged on the upper end of the base 531 and reciprocates in a direction parallel to the conveying direction of the concrete sleepers of the conveyor line 1. A Y-shaped guide groove is provided on one end of the slide 532 facing the base 531, and the opening of the Y-shaped guide groove faces the conveyor line 1.

[0055] The Y-shaped guide groove includes an oblique guide groove 533, a long straight guide groove 534 and a short straight guide groove 535. The setting directions of the long straight guide groove 534 and the short straight guide groove 535 are parallel to the horizontal reciprocating movement direction of the moving seat 521. The long straight guide groove 534 and the short straight guide groove 535 are connected and arranged at both ends of the oblique guide groove 533, and the long straight guide groove 534 is close to the moving machine 51. A guide block 5341 is rotatably installed at the connection point between the long straight guide groove 534 and the oblique guide groove 533 through a rotating shaft, and a torsion spring is connected between the guide block 5341 and the rotating shaft.

[0056] like Figure 4 and Figure 8 As shown, the loader 52 also includes a lever 524 fixed on the moving seat 521, the lever 524 cooperates with the Y-shaped guide groove, and the lever 524 pulls the slide 532 toward the moving machine 51 by cooperating with the Y-shaped guide groove during the horizontal movement toward one side of the conveyor line 1; specifically, the horizontally moving lever 524 slides through the two long straight guide grooves 534 in sequence during the process of moving away from the conveyor line 1, and can push the guide block 5341 to swing to one side during the process of sliding through the long straight guide groove 534, and the position of the slide 532 remains unchanged; the horizontally moving lever 524 first slides into the long straight guide groove 534 during the process of moving toward the conveyor line 1, and then slides into the inclined guide groove 533 with the cooperation of the guide block 5341, pulls the slide 532 toward the moving machine 51, and then slides out from the short straight guide groove 535.

[0057] It should be noted that when the lever 524 just slides to the oblique guide groove 533 and the short straight guide groove 535, the two rotating tables 523 are facing the jig bin 54 or the spike bin 55, and the rotating table 523 faces the jig bin 54 and the spike bin 55 backward; when the rotating table 523 faces the jig bin 54, the jig 6 and the loader 52 are connected and installed, and when the rotating table 523 faces the spike bin 55, the spiral spikes and the jig 6 are connected and installed.

[0058] The sliding table 53 also includes a gear 536 which is rotatably mounted on the base 531 at one end away from the mobile machine 51, and a rack 537 which is fixed on the sliding table 532 and meshed with the gear 536. The rack 537 is arranged along the sliding direction of the sliding table 532. The gear 536 and the shaft are connected by a coil spring. When the sliding table 532 slides toward the side of the mobile machine 51, the gear 536 is driven to rotate by the rack 537, causing the coil spring to elastically deform. After the lever 524 slides out of the short straight guide groove 535, the coil spring is reset, causing the sliding table 532 to slide and reset to the side away from the mobile machine 51.

[0059] It should be noted that a positioning block 5321 is provided on the slide 532 for positioning the slide 532 after the slide 532 slides back to its original position. The positioning block 5321 abuts against one end of the base 531 facing the moving machine 51 after the slide 532 slides back to its original position.

[0060] like Fig. 9 As shown, the jig bin 54 includes two vertical and mutually parallel guide plates 541, the two guide plates 541 are fixed on the same base 531 and are respectively located on both sides of the slide 532, and the inner sides of the two guide plates 541 are provided with jig guide grooves 542, the jig guide grooves 542 are L-shaped and have a vertical portion and a horizontal portion, and the horizontal portion of the jig guide grooves 542 passes through one end of the guide plate 541 toward the mobile machine 51; the connecting seat 61 is slidably fitted in the jig guide groove 542, and when the connecting seat 61 slides in the jig guide groove 542, it first slides from top to bottom along the vertical portion of the jig guide groove 542, and then slides horizontally along the horizontal portion of the jig guide groove 542 toward one side of the mobile machine 51; through such a structure, when a plurality of jigs 6 are stacked from bottom to top in the jig bin 54, the plurality of jigs 6 can be made to slide out of the jig bin 54 in sequence.

[0061] It should be noted that when the jig 6 is located at the bottom of the jig bin 54, the connecting seat 61 contacts the upper surface of the slide 532; when the jig 6 slides horizontally to one side of the mobile machine 51, the connecting seat 61 adheres to the upper surface of the slide 532, thereby ensuring the stability of the horizontal sliding of the connecting seat 61.

[0062] like Fig. 9 As shown, the fixture out-of-bin mechanism 56 is a T-shaped frame having a horizontal portion and a vertical portion. The vertical portion of the fixture out-of-bin mechanism 56 is fixedly connected to the slide 532 , and the upper surface of the horizontal portion of the fixture out-of-bin mechanism 56 is tilted downwardly close to one side of the mobile machine 51 . The jig out-of-bin mechanism 56 cooperates with the slide 532 to push the jig 6 out of the jig bin 54, and the process of the jig 6 being out of the bin is divided into the following steps: the slide 532 slides continuously toward the side of the mobile machine 51 to push the jig out-of-bin mechanism 56 toward the connecting seat 61, so that the horizontal part of the jig out-of-bin mechanism 56 moves between the upper and lower connecting seats 61, and pushes up the upper connecting seat 61, and abuts against the upper surface of the lower connecting seat 61, so that the upper and lower connecting seats 61 do not contact each other; after the vertical part of the jig out-of-bin mechanism 56 moves to contact the lower connecting seat 61, the jig out-of-bin mechanism 56 continues to move with the slide 532 and pushes the lower connecting seat 61 horizontally toward the mobile machine 51; when the connecting seat 61 moves horizontally to the specified position toward the side of the mobile machine 51, the slide 532 stops moving; during the horizontal movement of the connecting seat 61, the horizontal part of the jig out-of-bin mechanism 56 keeps lifting up the upper connecting seat 61.

[0063] Since the sliding of the slide 532 toward the side of the mobile machine 51 is achieved by the sliding of the lever 524 in the inclined guide groove 533, and when the lever 524 slides out of the short straight guide groove 535, the slide 532 will slide and reset to the side away from the mobile machine 51, therefore, when the lever 524 slides to the connection between the inclined guide groove 533 and the short straight guide groove 535, the connecting seat 61 moves horizontally to the side of the mobile machine 51 to the specified position; when the slide 532 slides and resets, it drives the fixture out of the warehouse mechanism 56 to move and reset; after the slide 532 is reset, the horizontal part of the fixture out of the warehouse mechanism 56 is separated from the upper connecting seat 61, and the upper connecting seat 61 naturally falls and contacts the bottom platform 531 and the slide 532. After the connecting seat 61 moves to the specified position, the magnetic column 1 525 cooperates with the magnetic column 2 65 to install the fixture 6 on the loader 52.

[0064] After the fixture 6 is removed from the warehouse, the fixture 6 is connected to the rotating table 523 through the mutual attraction between the magnetic column 1 525 and the magnetic column 2 65; after the fixture 6 is connected to the rotating table 523, the two internal threaded tubes 62 can be driven to rotate by the motor 2 522.

[0065] It should be noted that in order to prevent the lower connecting seat 61 from sliding toward the side of the mobile machine 51 when the upper connecting seat 61 is lifted by the jig ejection mechanism 56, a spring column 611 is embedded on the base 531; when the vertical portion of the jig ejection mechanism 56 pushes the lower connecting seat 61, the spring column 611 is completely pressed into the base 531 so that the connecting seat 61 can be pushed out of the jig bin 54.

[0066] like Fig.10 As shown, the spike magazine 55 includes a door frame 551 , a center plate 552 , a spike support block 553 and a fixing seat 554 . The upper surface of the center plate 552 and the top wall of the door frame 551 are connected by connecting columns to form two windows above the center plate 552 and between the door frame 551. The spiral spikes enter the spike bin 55 through the windows, so that the spiral spikes can be manually placed in the spike bin 55, and the convenience of manual operation is improved; vertical grooves 555 are provided on both side walls of the door frame 551 and both side surfaces of the center plate 552 to form two vertical spiral spike guide grooves between the door frame 551 and the center plate 552; after the spiral spikes enter the spike bin 55, the annular boss 201 is snapped into the spiral spike guide groove to realize the loading of the spiral spikes on the spike bin 55; through the two spiral spike guide grooves, two rows of spiral spikes can be installed, and the multiple spiral spikes in each row of spiral spikes are stacked up and down to ensure the continuous installation of the spiral spikes on the concrete sleepers.

[0067] The spike support block 553 is located below the center plate 552 and abuts against the upper surface of the slide 532. The spike support block 553 has two spike support grooves. Two fixing seats 554 are provided and fixed on the lower surface of the door frame 551. The two fixing seats 554 are respectively located on both sides of the slide 532 and are fixed on one end of the base 531 away from the mobile machine 51. The spiral spike slides from top to bottom along the spiral spike guide groove until it slides into the spike support groove on the spike support block 553.

[0068] like Fig.11 As shown, the spike ejection mechanism 57 includes a push plate 571, which is fixed on the slide 532. Two groups of push rods 572 are fixed on the upper part of the push plate 571. The two groups of push rods 572 are inserted into the spike support block 553 and correspond to the two spiral spike guide grooves respectively. The push rods 572 are arranged to be two in each group and the spacing between the two push rods 572 matches the spiral spikes. When the slide 532 slides toward the side of the mobile machine 51, the push plate 571 slides toward the mobile machine 51 and pushes the two groups of push rods 572 into the spike support block 553, so that each group of push rods 572 is inserted between the upper and lower spiral spikes, and pushes up the annular boss 201 of the upper spiral spike, against the outer circumference of the annular boss 201 of the lower spiral spike, so that the upper and lower spiral spikes are out of contact with each other, as shown in FIG. Fig.12 With such a structure, when the spiral spike on the lower side is pushed out of the spike chamber 55, the annular boss 201 in the upper spiral spike will not collide with the thread in the lower spiral spike, and the lower spiral spike is stabilized between the top rod 572 and the spike support block 553, thereby ensuring that the lower spiral spike can be smoothly ejected from the chamber and protecting the thread on the spiral spike.

[0069] Furthermore, if Fig.13 As shown, the spike ejection mechanism 57 further includes a push-pull rod 573, a push rod 574, an ejection spring 575 and a block 576; one end of the push-pull rod 573 is fixedly connected to the push rod 572, and the other end of the push-pull rod 573 passes through the spike support block 553. When the push rod 572 pushes the spiral spike on the upper side, the push-pull rod 573 slides on the spike support block 553; one end of the push rod 574 abuts against the spike support block 553, and the other end of the push rod 574 passes through the push plate 571. The ejection spring 575 is sleeved on the push rod 573. 74, the block 576 is slidably set in the push plate 571 and can slide freely up and down on the push plate 571, and the push rod 574 is provided with a slot matching the block 576; in the process that the push plate 571 moves toward one side of the mobile machine 51 until the push-pull rod 573 abuts against the end of the spike support block 553 away from the mobile machine 51, the ejector rod 572 pushes the spiral spike on the upper side, the ejection spring 575 is compressed, and the block 576 is inserted into the corresponding slot on the push rod 574 to keep the ejection spring 575 in a compressed state.

[0070] It should be noted that, in order to ensure that the ejection spring 575 does not push the spike support block 553 toward the moving machine 51 during the compression process, a second spring column 5541 is embedded in the fixing seat 554 .

[0071] Furthermore, if Fig.13 As shown, the spike ejection mechanism 57 further includes a magnetic block 5521, which is embedded in the center plate 552 and cooperates with the clamping block 576; after the push-pull rod 573 abuts against the spike support block 553, as the slide 532 and the push plate 571 continue to slide toward the side of the mobile machine 51, the spike support block 553 slides toward the side of the mobile machine 51 and presses the spring column 2 5541 into the fixing seat 554, so as to move the spiral spike toward the mobile machine 51; when the slide 532 slides toward the side of the mobile machine 51 to a specified position (the lever 524 is located in the inclined guide groove 532), the spiral spike 553 moves toward the side of the mobile machine 51. 3 and the short straight guide groove 535), the push plate 571 stops moving, the clamping block 576 is directly opposite to the lower side of the magnetic block 5521 and moves upward to separate from the push rod 574 under the action of the magnetic block 5521, and the ejection spring 575 pushes the spike support block 553 toward the side of the mobile machine 51, so that the spike support block 553 and the spiral spike continue to move toward the side of the mobile machine 51, and the spiral spike is pushed to cooperate with the internal threaded tube 62, so that the spiral spike can move into the internal threaded tube 62 under the rotation of the internal threaded tube 62, so as to realize the installation of the spiral spike on the fixture 6.

[0072] It should be noted that, in the process that the spiral spike is pushed by the ejection spring 575 and moves toward the moving machine 51 and in the process that the internal threaded tube 62 rotates to screw the spiral spike, the annular boss 201 of the spiral spike keeps contacting the spike support block 553 and the ejection rod 572 to ensure that the spiral spike can be smoothly screwed onto the internal threaded tube 62.

[0073] After the spiral spike is connected to the internal threaded tube 62, the lever 524 slides out of the short straight guide groove 535, the slide 532 is reset, the push plate 571 is used to reset the push rod 572, and the spike support block 553 is pulled by the push-pull rod 573 to reset the spike support block 553.

[0074] As a further explanation of the above technical solution, Fig.14As shown, the sleeper carrier plate 4 is provided with two channels 41 for the jig 6 to pass through and pass through the sleeper carrier plate 4. Two symmetrically distributed clamping plates 42 are embedded on the inner wall of the channel 41. The clamping plates 42 are connected to the sleeper carrier plate 4 by a reset spring 43, and the clamping plates 42 cooperate with the connecting seat 61. The clamping plates 42 move back and forth horizontally relative to the sleeper carrier plate 4 through the elastic deformation of the reset spring 43; in the process of the hydraulic cylinder 2 pushing the conveyor line 1 downward to send the spiral spike into the mounting hole 101, the connecting seat 61 passes through the channel 41 and pushes the clamping plates 42 into the sleeper carrier plate 4. When the connecting seat 61 moves to the top of the clamping plates 42, the clamping plates 42 are reset and supported and clamped on the connecting seat 61 under the action of the reset spring 43. At this time, the entire jig 6 is against the horizontal groove wall of the track groove 103, and the stud 203 is completely located in the mounting hole 101, as shown in FIG. Fig.15 As shown, in this case, the adhesive injected through the adhesive injection hole 102 fills the mounting hole 101 and the cavity between the top cover 63 and the sleeper body 100, so that the upper surface of the adhesive layer 300 formed after the adhesive is fixed is smooth and flush with the outer surface of the annular boss 201, as shown in FIG. Fig.16 shown.

[0075] The clamping of the clamping plate 42 and the connecting seat 61 and the clamping of the track groove 103 and the sleeper carrier plate 4 can ensure the positioning accuracy between the fixture 6 and the track groove 103, thereby ensuring the positioning accuracy of the spiral spike on the concrete sleeper.

[0076] After the adhesive is injected and solidified, the concrete sleeper is lifted, so that the jig 6 moves up with the concrete sleeper and is separated from the sleeper carrier plate 4. After the adhesive solidifies, the two connecting blocks 64 are rotated simultaneously by manpower, so that the two internal threaded tubes 62 rotate simultaneously and separate from the spiral spikes.

[0077] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A complete equipment system for anchoring spiral spikes on concrete sleepers, comprising a conveyor line (1) for continuously conveying concrete sleepers and a hydraulic cylinder (2) for lifting the conveyor line (1), characterized in that: It also includes a plurality of sleeper carrier plates (4) installed on the conveyor line (1), a feeder (5) for feeding spiral spikes into the installation holes (101), and a jig (6) for loading and positioning two spiral spikes, wherein the concrete sleeper is clamped on the sleeper carrier plate (4) in an inverted state; the sleeper carrier plate (4) has two channels (41) for the jig (6) to pass through the sleeper carrier plate (4), and the inner wall of each channel (41) is embedded with two clamping plates (42) that are symmetrically arranged and can reciprocate horizontally relative to the sleeper carrier plate (4); the clamping plates (42) are clamped with the jig (6); The loading machine (5) comprises a moving machine (51), a jig bin (54), a spike bin (55), a jig out-bin mechanism (56) and a spike out-bin mechanism (57); the moving machine (51) is used to drive the loading machine (52) to move horizontally back and forth in a direction perpendicular to the conveying direction of the concrete sleeper, and when the loading machine (52) is located below the mounting hole (101), the loading machine (52) is driven to flip 90 degrees; the loading machine (52) is connected to the mounting jig (6) in a magnetic attraction manner; the jig bin (54) and the spike bin (55) are used to temporarily store the jig (6) and the spiral spikes, respectively; the jig out-bin mechanism (56) and the spike out-bin mechanism (57) are used to push the jig (6) and the spiral spikes out of the jig bin (54) and the spike bin (55) respectively, when the loading machine (52) moves toward one side of the conveying line (1); The jig (6) comprises two internally threaded tubes (62) for installing spiral spikes, and the two internally threaded tubes (62) are both capable of rotating around their own central axes under the action of manpower or the action of a loader (52).

2. A complete equipment system for screw spike anchoring of concrete sleepers according to claim 1, characterized in that: The mobile machine (51) comprises a support 1 (511) and a support 2 (512); a disk motor is installed in the support 1 (511); a turntable 1 (513) is installed at the output end of the disk motor; a turntable 2 (514) is rotatably installed on the support 2 (512); a threaded rod (515) and a guide column (516) are arranged between the turntable 1 (513) and the turntable 2 (514); a motor 1 (517) for driving the threaded rod (515) to rotate is installed on the support 2 (512); the loading machine (52) comprises a threaded sleeve A movable seat (521) is arranged on the threaded rod (515), and the movable seat (521) is slidably sleeved on the guide column (516); two motors (522) and rotating tables (523) are respectively installed at two ends of the movable seat (521); two rotating tables (523) are provided and both are rotatably matched with the movable seat (521); the two motors (522) are transmission-connected to the two rotating tables (523); and a plurality of magnetic suction columns (525) distributed in a ring array are embedded at one end of the two rotating tables (523) away from the two motors (522).

3. A complete equipment system for anchoring spiral spikes on concrete sleepers according to claim 2, characterized in that: The fixture (6) further comprises a connecting seat (61), two internally threaded tubes (62) are both installed through the connecting seat (61), the internally threaded tubes (62) and the connecting seat (61) are rotatably matched, and a top cover (63) and a connecting block (64) are respectively fixed at two ends of the internally threaded tube (62); a plurality of magnetic posts (65) distributed in a ring array are embedded at one end of the two connecting blocks (64) away from the internally threaded tube (62); and the plurality of magnetic posts (525) correspond to the plurality of magnetic posts (65) one by one and attract each other.

4. A complete equipment system for anchoring spiral spikes on concrete sleepers according to claim 3, characterized in that: The loading machine (5) further comprises two sliding tables (53) arranged at intervals along the horizontal moving direction of the loading machine (52); the sliding tables (53) have an output sliding direction which is perpendicular to the horizontal moving direction of the loading machine (52); the fixture bin (54) and the spike bin (55) are respectively mounted on the two sliding tables (53); and the fixture bin exit mechanism (56) and the spike bin exit mechanism (57) are also respectively connected to the two sliding tables (53).

5. A complete equipment system for anchoring spiral spikes on concrete sleepers according to claim 4, characterized in that: The sliding platform (53) comprises a base (531) and a slide (532), wherein the slide (532) is slidably arranged on the base (531), and an inclined guide groove (533), a long straight guide groove (534) and a short straight guide groove (535) are provided on one end of the slide (532) facing the base (531), wherein the long straight guide groove (534) and the short straight guide groove (535) are respectively connected to the two ends of the inclined guide groove (533) and jointly form an opening facing the conveying line (1). The Y-shaped guide groove and the long straight guide groove (534) are close to the moving machine (51); the loading machine (52) further comprises a lever (524) fixed on the moving seat (521), the lever (524) cooperates with the Y-shaped guide groove; a gear (536) is rotatably mounted on the end of the base (531) away from the moving machine (51), the gear (536) and the shaft are connected by a coil spring, and a rack (537) meshing with the gear (536) is fixed on the slide (532).

6. A complete equipment system for screw spike anchoring of concrete sleepers according to claim 5, characterized in that: The jig bin (54) comprises two vertical and mutually parallel guide plates (541), the two guide plates (541) are fixed on the same base (531) and are respectively located on both sides of the slide (532), the inner side surfaces of the two guide plates (541) are both provided with a jig guide groove (542), the jig guide groove (542) is L-shaped and has a vertical portion and a horizontal portion, the horizontal portion of the jig guide groove (542) penetrates one end of the guide plate (541) toward the moving machine (51); the connecting seat (61) is slidably fitted in the jig guide groove (542); the jig exit mechanism (56) is a T-shaped frame and has a horizontal portion and a vertical portion, the vertical portion of the jig exit mechanism (56) is fixedly connected to the slide (532), and the upper surface of the horizontal portion of the jig exit mechanism (56) is arranged to be inclined downwardly close to the side of the moving machine (51).

7. A complete equipment system for anchoring spiral spikes on concrete sleepers according to claim 6, characterized in that: The spike bin (55) comprises a door frame (551), a center plate (552), a spike support block (553) and a fixing seat (554). The upper surface of the center plate (552) and the top wall of the door frame (551) are connected by a connecting column. Vertical grooves (555) are provided on both side walls of the door frame (551) and on both side surfaces of the center plate (552). The spike support block (553) is located below the center plate (552) and abuts against the upper surface of the slide table (532). The fixed seat (554) is provided with two fixed seats (554) and is fixedly connected to the door frame (551) and the bottom platform (531); the spike ejection mechanism (57) comprises a push plate (571), the push plate (571) is fixed on the slide platform (532), two groups of push rods (572) are fixed on the upper part of the push plate (571), the two groups of push rods (572) are both inserted into the spike support block (553), and the push rods (572) are arranged in a group of two and the spacing between the two push rods (572) matches the spiral spike.

8. A complete equipment system for anchoring spiral spikes on concrete sleepers according to claim 7, characterized in that: The spike ejection mechanism (57) further comprises a push-pull rod (573), a push rod (574), an ejection spring (575), a clamping block (576) and a magnetic block (5521); one end of the push-pull rod (573) is fixedly connected to the push rod (572); the other end of the push-pull rod (573) passes through the spike support block (553); one end of the push rod (574) abuts against the spike support block (553); the other end of the push rod (574) passes through the push plate (571); the ejection spring (575) is sleeved on the push rod (574); the clamping block (576) is slidably arranged in the push plate (571); the push rod (574) is provided with a clamping groove that matches the clamping block (576); and the magnetic block (5521) is embedded in the center plate (552); the magnetic block (5521) matches the clamping block (576).