A portable gas inspection device for tunnel engineering

Through the lifting and guidance reminder functions of portable gas inspection equipment, the problem of gas leakage distribution range detection is solved, the safety and comfort of construction personnel are improved, and real-time safety guidance and lumbar support are provided in gas leakage accidents.

CN118624118BActive Publication Date: 2024-11-05CCCC SECOND HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411087707.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-05
Estimated Expiration
2044-08-09

AI Technical Summary

Technical Problem

During tunnel construction, traditional gas inspection equipment cannot effectively detect the distribution range of gas leakage, resulting in the head of construction workers being easily in high concentration areas when evacuated, which affects the evacuation efficiency and may be injured, and the equipment cannot provide real-time safe evacuation guidance.

Method used

A portable gas inspection device is designed, equipped with lift connection components and guidance reminder components. The gas leakage range is calculated through laser generators and receivers. The laser guide reminds construction workers to evacuate safely, and provides lumbar support and cooling through restraint components and cooling pipes. .

Benefits of technology

It realizes timely reminders and rapid evacuation in gas leakage accidents, reduces the risk of construction workers inhaling gas, improves evacuation efficiency and comfort, and provides temporary support in accidents, enhancing construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118624118B_ABST
    Figure CN118624118B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of engineering gas detection, and in particular, relates to a portable gas inspection device for tunnel engineering, including a waist guard, the left side wall of the waist guard is fixedly connected with an energy storage power supply and a PLC controller, a restraining assembly is provided on the right side of the waist guard, the left side wall of the waist guard is connected with a lifting plate through a lifting connection assembly, and the upper side wall of the lifting plate is symmetrically fixedly connected with two card plates, and the same gas detector is placed between the two card plates. The present invention can timely remind construction workers to evacuate through gas inspection equipment when a gas leakage accident occurs in the tunnel, and can guide the scope of gas leakage in the air during the evacuation of construction workers. Construction workers can quickly run to evacuate when the gas leakage range is small, and bend down to evacuate when the gas leakage range is large, so as to avoid the problem that construction workers inhale gas in the air, which will cause harm to the body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of engineering gas detection, and in particular relates to a portable gas detection device for tunnel engineering. Background Art

[0002] With the widespread use of natural gas and coal gas, gas needs to be transported underground by opening tunnels. During the construction of gas tunnels, the gas concentration in the tunnel needs to be detected at any time. For example, a portable gas inspection device for tunnel engineering proposed in patent publication number CN214201395U can detect the gas concentration in the air in real time, and the data of the test results can be displayed on a display screen for easy observation.

[0003] In order to facilitate construction workers to observe the gas concentration in the tunnel in real time, construction workers usually carry portable gas detection equipment with them when working in the tunnel to detect the gas concentration in the air. The portable gas detection equipment is usually worn on the surface of the construction workers, at the same height as the human body. The density of gas is usually 0.716kg / m³, while the density of air is usually 1.29kg / m³. When gas leaks, the leaked gas will float above the tunnel. When the gas detection equipment carried by the construction workers detects the leaked gas, it means that the gas concentration in the air in the tunnel is already quite high. The construction workers will evacuate too late at this time, and the high concentration of gas will cause harm to the construction workers.

[0004] However, when traditional gas inspection equipment suspended high up detects gas leakage in the air, it can only indicate the concentration of gas leakage and other conditions, but cannot detect the range of gas distribution at high altitudes in the tunnel. When construction workers evacuate in the tunnel, the heads of taller construction workers are easily exposed to areas with higher gas concentrations and they breathe in gas, which harms their bodies. When construction workers are evacuating gas by bending over and lowering their heads when there is a gas leak and the distribution range is small, the evacuation speed is slow, which affects the efficiency of the evacuation of construction workers.

[0005] Therefore, a portable gas inspection device for tunnel engineering is proposed to solve the above problems. Summary of the invention

[0006] The purpose of the present invention is to provide a portable gas inspection device for tunnel engineering in view of the above problems.

[0007] To achieve the above-mentioned purpose, the present invention adopts the following technical solutions: a portable gas inspection equipment for tunnel engineering, comprising a waist guard plate, a left side wall of the waist guard plate is fixedly connected to an energy storage power supply and a PLC controller, a restraining component is provided on the right side of the waist guard plate, the left side wall of the waist guard plate is connected to a lifting plate through a lifting connection component, the upper side wall of the lifting plate is symmetrically fixedly connected to two card plates, a same gas detector is placed between the two card plates, the left and right sides of the gas detector are fixedly connected to a card block that slides with the card plate, a plurality of limiting grooves are provided on the lower inner wall of the card plate, the inner wall of the limiting groove is fixedly connected to an arc seat through a spring, a plurality of grooves that match the arc seat are provided on the upper side wall of the card block, a micro motor is fixedly connected to the upper side wall of the gas detector, a guide reminder component is fixedly connected to the output end of the micro motor, a buzzer is fixedly connected to the left side wall of the waist guard plate, and the gas detector and the guide reminder component are electrically connected to the buzzer through the PLC controller.

[0008] Preferably, the restraint assembly includes two restraint belts and two air cushions, the two restraint belts are respectively fixedly connected to the front and rear sides of the waist guard plate, the air cushion is fixedly connected to the inner wall of the restraint belt, the ends of the two restraint belts away from the waist guard plate are connected by a snap structure, the left side wall of the waist guard plate is fixedly connected with a micro air pump, the interior of the waist guard plate is provided with an air supply pipe, the interior of the air supply pipe is provided with two first control valves, the air outlet end of the micro air pump is connected to the pipe wall of the air supply pipe, the front and rear ends of the air supply pipe are connected to the air cushion, the left side wall of the waist guard plate is fixedly connected with a pressure assembly, and the pressure assembly is electrically connected to the first control valve through a PLC controller.

[0009] Preferably, the pressure assembly includes a pressure cylinder and a bent pipe, the pressure cylinder is fixedly connected to the left side wall of the waist guard plate, the pressure cylinder is connected to the air supply pipe through the bent pipe, the rear inner wall of the pressure cylinder is fixedly connected to the piston plate through a spring, the rear wall of the pressure cylinder is provided with a pressure relief hole, the inner wall of the pressure cylinder is fixedly connected to a trigger switch, the trigger switch is located on the rear side of the piston plate, and the trigger switch is electrically connected to the first control valve through a PLC controller.

[0010] Preferably, the lifting connection assembly includes a cross bar and a support frame, the cross bar is fixedly connected to the left side wall of the waist guard plate, the support frame is fixedly connected to the left end of the cross bar, the front and rear side walls of the support frame are rotatably connected to the same outer ring through a connecting shaft, the left and right sides of the outer ring are rotatably connected to the same inner ring through a connecting shaft, the front and rear inner walls of the inner ring are fixedly connected to the same mounting cylinder through a connecting block, the inner wall of the mounting cylinder is rotatably connected to a threaded cylinder, the lower side wall of the mounting cylinder is fixedly connected to a servo motor, the output end of the servo motor is fixedly connected to the lower side wall of the threaded cylinder, the threaded cylinder has a threaded rod threaded in the inner thread, the upper end of the threaded rod extends out of the threaded cylinder and is fixedly connected to the lifting plate.

[0011] Preferably, the guidance reminder component includes a mounting shell and a circuit board, the mounting shell and the output end of the micro motor are fixedly connected, the right side wall of the mounting shell is fixedly connected with a laser generator and a laser receiver, the front side wall of the circuit board is fixedly connected with a high-precision timer, a microprocessor and an analog-to-digital converter, the analog-to-digital converter converts the optical signal received by the receiver into a digital signal, the high-precision timer is used to accurately measure the time interval from laser emission to reception, the microprocessor is responsible for receiving the time data measured by the timer, and using a corresponding algorithm to calculate the distance according to the propagation speed of the laser in the air, and the microprocessor is electrically connected to the PLC controller.

[0012] Preferably, the upper side walls of the two restraints are fixedly connected with a cooling pipe, the upper side walls of the cooling pipe are connected with multiple air outlets, the cooling pipe and the air supply pipe are fixedly connected with the same short pipe, a second control valve is provided in the short pipe, and the trigger switch is electrically connected to the second control valve through a PLC controller.

[0013] Preferably, the outer walls of the support frame and the outer ring are fixedly connected with a bent plate, the side walls of the bent plate are fixedly connected with a micro electric push rod, the movable end of the micro electric push rod is fixedly connected with a square plate, and the ends of the two connecting shafts are provided with square grooves that match the clamping plate.

[0014] Preferably, both left and right sides of the installation tube are fixedly connected with positioning slide rods, and the rod wall of the threaded rod is provided with positioning slide grooves that match the positioning slide rods.

[0015] Compared with the existing technology, the advantages of a portable gas inspection device for tunnel engineering are:

[0016] By setting up the lifting connection components and guidance reminder components, when a gas leakage accident occurs in the tunnel, the gas inspection equipment can be used to promptly remind the construction workers to evacuate, and the scope of the gas leakage in the air can be guided during the evacuation of the construction workers. The construction workers can evacuate quickly by running when the gas leakage scope is small, and evacuate by bending down and lowering their heads when the gas leakage scope is large, so as to avoid the problem of construction workers inhaling gas from high altitudes, which may cause harm to the body.

[0017] By setting up the restraint components, construction workers can wear the gas inspection equipment around their waists when working in the tunnel. While using the gas inspection equipment to detect the gas concentration in the air, the waist of the construction workers can also be supported and protected by the waist guard, thereby improving the supporting force of the construction workers' waists and reducing the discomfort of the waist caused by standing for a long time.

[0018] By setting up the restraining assembly, cooling pipe, air outlet head, short pipe and second control valve, the gas inspection equipment can fit comfortably to the waist while blowing air from bottom to top to the body surface of the construction workers, thereby alleviating the discomfort of the construction workers working in high temperatures in the tunnel and improving their working comfort.

[0019] By setting up the lifting and connecting components, when a small collapse or other accident occurs in the tunnel, the gas inspection equipment can be used as a temporary jack to support the collapsed objects in time, creating favorable conditions for the escape of construction workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a front view of a portable gas inspection device for tunnel engineering provided by the present invention;

[0021] Figure 2 It is a schematic diagram of the internal structure of a mounting cylinder in a portable gas inspection device for tunnel engineering provided by the present invention;

[0022] Figure 3 It is a structural schematic diagram of a guidance and reminder component in a portable gas inspection device for tunnel engineering provided by the present invention;

[0023] Figure 4 It is a schematic diagram of the connection relationship between a card plate and a card block in a portable gas inspection device for tunnel engineering provided by the present invention;

[0024] Figure 5 It is a structural schematic diagram of a lifting connection assembly in a portable gas inspection device for tunnel engineering provided by the present invention;

[0025] Figure 6 It is a schematic diagram of a fixing method of a connecting shaft in a portable gas inspection device for tunnel engineering provided by the present invention;

[0026] Figure 7 It is a top view of a restraining assembly in a portable gas inspection device for tunnel engineering provided by the present invention;

[0027] Figure 8 It is a top view of a cooling pipe and a gas outlet head in a portable gas inspection device for tunnel engineering provided by the present invention;

[0028] Fig. 9 The present invention provides a top view of a pressure component of a portable gas inspection device for tunnel engineering.

[0029] In the figure: 1 waist plate, 2 energy storage power supply, 3 PLC controller, 4 lifting plate, 5 card plate, 6 gas detector, 7 card block, 8 limit slot, 9 arc seat, 10 micro motor, 11 buzzer, 12 restraint assembly, 121 restraint belt, 122 air cushion, 13 micro air pump, 14 air supply pipe, 15 first control valve, 16 pressure assembly, 161 pressure cylinder, 162 elbow, 17 piston plate, 18 pressure relief hole, 19 trigger switch, 20 lifting connection assembly, 201 cross bar, 202 support frame, 2 1 connecting shaft, 22 outer ring, 23 inner ring, 24 mounting tube, 25 threaded tube, 26 servo motor, 27 threaded rod, 28 guidance reminder component, 281 mounting shell, 282 circuit board, 29 laser generator, 30 laser receiver, 31 high-precision timer, 32 microprocessor, 33 analog-to-digital converter, 34 cooling tube, 35 air outlet head, 36 short tube, 37 second control valve, 38 bent plate, 39 micro electric push rod, 40 square plate, 41 square groove, 42 positioning slide rod, 43 positioning slide groove. DETAILED DESCRIPTION

[0030] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0031] like Figure 1-Figure 9As shown, a portable gas inspection device for tunnel engineering includes a waist guard plate 1, a left side wall of the waist guard plate 1 is fixedly connected to an energy storage power supply 2 and a PLC controller 3, a restraining component 12 is provided on the right side of the waist guard plate 1, the left side wall of the waist guard plate 1 is connected to a lifting plate 4 through a lifting connection component 20, the upper side wall of the lifting plate 4 is symmetrically fixedly connected to two card plates 5, a gas detector 6 is placed between the two card plates 5, and the left and right sides of the gas detector 6 are fixedly connected to card blocks that slide with the card plate 5 7. A plurality of limiting grooves 8 are provided on the lower inner wall of the card plate 5, and an arc seat 9 is fixedly connected to the inner wall of the limiting groove 8 through a spring. A plurality of grooves matching the arc seat 9 are provided on the upper wall of the card block 7. A micro motor 10 is fixedly connected to the upper wall of the gas detector 6, and a guide reminder component 28 is fixedly connected to the output end of the micro motor 10. A buzzer 11 is fixedly connected to the left side wall of the waist guard plate 1. The gas detector 6 and the guide reminder component 28 are electrically connected to the buzzer 11 through the PLC controller 3.

[0032] The restraint assembly 12 includes two restraint belts 121 and two air cushions 122. The two restraint belts 121 are fixedly connected to the front and rear sides of the waist guard plate 1 respectively. The air cushions 122 are fixedly connected to the inner walls of the restraint belts 121. The ends of the two restraint belts 121 away from the waist guard plate 1 are connected by a buckle structure. A micro air pump 13 is fixedly connected to the left side wall of the waist guard plate 1. An air supply pipe 14 is provided inside the waist guard plate 1. Two first control valves 15 are provided inside the air supply pipe 14. The air outlet end of the micro air pump 13 is connected to the pipe wall of the air supply pipe 14. The air supply The front and rear ends of the tube 14 are connected to the air cushion 122. The left side wall of the waist guard plate 1 is fixedly connected to a pressure component 16. The pressure component 16 is electrically connected to the first control valve 15 through the PLC controller 3. Through this mechanism, when construction workers are working in the tunnel, they can wear gas detection equipment around their waists. While using the gas detection equipment to detect the gas concentration in the air, the waist guard plate 1 can also support and protect the waist of the construction workers, thereby improving the support force of the waist of the construction workers and reducing the discomfort of the waist caused by standing for a long time.

[0033] The pressure assembly 16 includes a pressure cylinder 161 and a bent pipe 162. The pressure cylinder 161 is fixedly connected to the left side wall of the waist guard plate 1. The pressure cylinder 161 is connected to the air supply pipe 14 through the bent pipe 162. The rear inner wall of the pressure cylinder 161 is fixedly connected to the piston plate 17 through a spring. The rear wall of the pressure cylinder 161 is provided with a pressure relief hole 18. The inner wall of the pressure cylinder 161 is fixedly connected to a trigger switch 19. The trigger switch 19 is located on the rear side of the piston plate 17. The trigger switch 19 is electrically connected to the first control valve 15 through the PLC controller 3. Through this mechanism, the internal air pressure of the air cushion 122 can be detected, so that a suitable squeezing force is maintained between the air cushion 122 and the human body.

[0034] The lifting connection assembly 20 includes a cross bar 201 and a support frame 202. The cross bar 201 is fixedly connected to the left side wall of the waist guard plate 1. The support frame 202 is fixedly connected to the left end of the cross bar 201. The front and rear side walls of the support frame 202 are rotatably connected to the same outer ring 22 through a connecting shaft 21. The left and right sides of the outer ring 22 are rotatably connected to the same inner ring 23 through the connecting shaft 21. The inner walls of the front and rear sides of the inner ring 23 are fixedly connected to the same mounting tube 24 through a connecting block. The inner wall of the mounting tube 24 is rotatably connected to The threaded barrel 25 and the lower side wall of the mounting barrel 24 are fixedly connected with a servo motor 26, the output end of the servo motor 26 is fixedly connected with the lower side wall of the threaded barrel 25, the threaded barrel 25 has a threaded rod 27 sleeved on the inner thread, the upper end of the threaded rod 27 extends out of the threaded barrel 25 and is fixedly connected with the lifting plate 4. Through this mechanism, when a small collapse or other accident occurs in the tunnel, the gas inspection equipment can be used temporarily as a jack to support the collapsed objects in time, creating favorable conditions for the escape of construction workers.

[0035] The guidance and reminder component 28 includes a mounting shell 281 and a circuit board 282. The mounting shell 281 is fixedly connected to the output end of the micro motor 10. The right side wall of the mounting shell 281 is fixedly connected with a laser generator 29 and a laser receiver 30. The front side wall of the circuit board 282 is fixedly connected with a high-precision timer 31, a microprocessor 32 and an analog-to-digital converter 33. The analog-to-digital converter 33 converts the optical signal received by the receiver into a digital signal. The high-precision timer 31 is used to accurately measure the time interval from laser emission to reception. The microprocessor 32 is responsible for receiving the time data measured by the timer and calculating the distance using a corresponding algorithm according to the propagation speed of the laser in the air. The microprocessor 32 is electrically connected to the PLC controller 3. Through this mechanism, when a gas leakage accident occurs in the tunnel, the gas inspection equipment can be used to promptly remind the construction personnel to evacuate, and the scope of gas leakage in the air can be guided during the evacuation of the construction personnel. The construction personnel can quickly run to evacuate when the gas leakage range is small, and bend down and evacuate when the gas leakage range is large, so as to avoid the problem that the construction personnel inhale gas in the high altitude and cause harm to the body.

[0036] The upper side walls of the two restraints 121 are fixedly connected with a cooling pipe 34, and the upper side walls of the cooling pipe 34 are connected with multiple air outlets 35. The cooling pipe 34 and the air supply pipe 14 are fixedly connected with the same short pipe 36, and a second control valve 37 is provided in the short pipe 36. The trigger switch 19 is electrically connected to the second control valve 37 through the PLC controller 3, which can make the gas inspection equipment fit comfortably between the waist and the construction workers, and can also blow air from the bottom to the top to the body surface of the construction workers, thereby alleviating the discomfort of the construction workers working under high temperature in the tunnel and improving the working comfort of the construction workers.

[0037] The outer walls of the support frame 202 and the outer ring 22 are fixedly connected with a bent plate 38, the side walls of the bent plate 38 are fixedly connected with a micro electric push rod 39, the movable end of the micro electric push rod 39 is fixedly connected with a square plate 40, and the ends of the two connecting shafts 21 are provided with square grooves 41 that match the clamping plate 5, which can fix the position of the mounting tube 24.

[0038] The left and right sides of the mounting tube 24 are fixedly connected with positioning slide rods 42, and the rod wall of the threaded rod 27 is provided with positioning slide grooves 43 that match the positioning slide rods 42. The mutual cooperation between the positioning slide rods 42 and the positioning slide grooves 43 prevents the threaded rod 27 from rotating, so that the threaded rod 27 can only move up and down in the vertical direction.

[0039] The operating principle of the present invention is now explained as follows: before the construction workers go to the tunnel to carry out construction, the construction workers place the waist guard plate 1 behind their waists, and then tie the two restraint belts 121 around the waists of the construction workers through the buckle structure. The outer wall of the waist guard plate 1 is connected to a control button, and the operator sends a start signal to the PLC controller 3 through the control button. After receiving the signal, the PLC controller 3 first controls the micro air pump 13 and the two first control valves 15 to work simultaneously, and the micro air pump 13 delivers external gas to the air cushion 122 through the air delivery pipe 14, so that the air cushion 122 is inflated, so that the air cushion 122 and the construction workers' waists fit closely, while ensuring that the construction workers wear the equipment well, it also avoids the equipment from getting hurt. Too tight a restraint will cause discomfort to construction workers, and when gas is transported in the air delivery pipe 14, a portion of the gas will be transported to the pressure cylinder 161 through the bend pipe 162, increasing the air pressure in the space in front of the piston plate 17 in the pressure cylinder 161. Under the action of the air pressure, the piston plate 17 will move backward until it squeezes the trigger switch 19 on the rear side. After being squeezed, the trigger switch 19 will send an electrical signal to the PLC controller 3. After receiving the electrical signal, the PLC controller 3 will control the first control valve 15 to close and the second control valve 37 to open. The gas transported by the micro air pump 13 will be transported to the cooling pipe 34 through the short pipe 36 and ejected through the multiple air outlet heads 35, thereby blowing and cooling the construction workers.

[0040] When the PLC controller 3 receives the start signal, the PLC controller 3 controls the servo motor 26 and the gas detector 6 to work at the same time. The servo motor 26 will continue to work for the set time. The servo motor 26 drives the threaded barrel 25 to rotate, and drives the threaded rod 27 to move upward through the threaded fit. The threaded rod 27 drives the gas detector 6 and the guidance reminder component 28 to move upward to a suitable position through the lifting plate 4. The gas detector 6 is used to detect the gas concentration in the air, and the gas detector 6 is connected through the support frame 202, the outer ring 22 and the inner ring 23, and the weight of the mounting barrel 24 below the support frame 202 is greater than the weight above, so that the gas detector 6 can always be kept in a vertical state for detection under the action of gravity. When the construction personnel tilt their bodies, the gas detector 6 will also remain in a vertical state:

[0041] When the gas detector 6 detects a set concentration of gas at high altitude, the gas detector 6 will send a control signal to the PLC controller 3. After receiving the control signal, the PLC controller 3 first controls the buzzer 11 to work, reminding the construction personnel that the gas concentration in the tunnel is high and they need to evacuate in time. Then the PLC controller 3 controls the servo motor 26 to work in reverse, and the servo motor 26 will drive the gas detector 6 to move downward. When the gas detector 6 detects that the gas concentration in the descending height range is low and the human body can withstand it, the gas detector 6 will control the servo motor 26 to stop working. , and control the micro motor 10 and the guidance and reminder component 28 to work simultaneously. The laser generator 29 on the surface of the guidance and reminder component 28 will emit a laser beam, and driven by the micro motor 10, it will rotate in a circle. During the rotation process, the laser beam will display the light path on the walls around the tunnel. The laser beam is used to mark a safety range on the walls around the tunnel. If the construction workers' heads are below the safety range, they will not inhale a large amount of gas (the density of gas is less than that of air. In the initial stage of gas leakage, gas will fill the tunnel from top to bottom). The construction workers can see the safety range on the wall and evacuate quickly.

[0042] When the laser emitted by the laser generator 29 is diffusely reflected by surrounding objects, it will be received by the laser receiver 30. The laser signal received by the laser receiver 30 will be transmitted to the analog-to-digital converter 33. The analog-to-digital converter 33 converts the optical signal received by the receiver into a digital signal. Then the analog-to-digital converter 33 transmits the digital signal to the high-precision timer 31. The high-precision timer 31 accurately measures the time interval from the emission to the reception of the laser. The microprocessor 32 is responsible for receiving the time data measured by the timer and calculating the distance using a corresponding algorithm according to the propagation speed of the laser in the air. When the microprocessor 32 calculates that the distance is less than one meter, it means that the laser rotation path is blocked by the head or body of the construction worker, and the head of the construction worker may be in an area with a high gas concentration. At this time, the microprocessor 32 will control the buzzer 11 through the PLC controller 3 to issue a prompt sentence of "lower your head" to further warn the construction worker;

[0043] When a small collapse occurs in the tunnel and there are no suitable tools around, the operator can unfasten the waist guard plate 1, place the equipment horizontally, and press the button on the surface of the waist guard plate 1 to transmit an electrical signal to the PLC controller 3. After receiving the electrical signal, the PLC controller 3 will control the two micro-electric push rods 39 to work, and the micro-electric push rods 39 drive the square plate 40 to insert into the square groove 41, so as to fix the positions of the support frame 202, the outer ring 22, the inner ring 23 and the installation tube 24. Then the construction personnel slide to remove the gas detector 6, and then support one end of the installation tube 24 against the ground and other fixed positions, and then align the lifting plate 4 with the position that needs to be cleaned, and then control the servo motor 26 to work through the button to control the lifting plate 4 to rise or fall, which can clean up some debris or temporarily act as a jack to create favorable conditions for the escape of the construction personnel.

[0044] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A portable gas inspection device for tunnel engineering, comprising a waist guard plate (1), characterized in that: The left side wall of the waist guard plate (1) is fixedly connected to an energy storage power source (2) and a PLC controller (3); a restraining assembly (12) is provided on the right side of the waist guard plate (1); the left side wall of the waist guard plate (1) is connected to a lifting plate (4) via a lifting connection assembly (20); two card plates (5) are fixedly connected to the upper side wall of the lifting plate (4) in a symmetrical manner; a gas detector (6) is placed between the two card plates (5); a card block (7) that slidably cooperates with the card plate (5) is fixedly connected to the left and right sides of the gas detector (6); a plurality of limiting grooves (8) are provided on the inner wall of the lower side of the card plate (5); an arc seat (9) is fixedly connected to the inner wall of the limiting groove (8) via a spring; and the upper side wall of the card block (7) is provided with a A plurality of grooves matching the arc seat (9) are provided, the upper side wall of the gas detector (6) is fixedly connected to a micro motor (10), the output end of the micro motor (10) is fixedly connected to a guide reminder component (28), the left side wall of the waist protection plate (1) is fixedly connected to a buzzer (11), the gas detector (6) and the guide reminder component (28) are both electrically connected to the buzzer (11) via a PLC controller (3), and the restraint component (12) comprises two restraint belts (121) and two air cushions (122), the two restraint belts (121) are respectively fixedly connected to the front and rear sides of the waist protection plate (1), the air cushion (122) is fixedly connected to the inner wall of the restraint belt (121), and the two restraint belts (121) are fixedly connected to the inner wall of the restraint belt (121). ) is connected to the end of the waist protection plate (1) away from the waist protection plate (1) through a snap-fit ​​structure, the left side wall of the waist protection plate (1) is fixedly connected to a micro air pump (13), an air supply pipe (14) is provided inside the waist protection plate (1), and two first control valves (15) are provided inside the air supply pipe (14), the air outlet end of the micro air pump (13) is connected to the pipe wall of the air supply pipe (14), and the front and rear ends of the air supply pipe (14) are connected to the air cushion (122), the left side wall of the waist protection plate (1) is fixedly connected to a pressure assembly (16), the pressure assembly (16) is electrically connected to the first control valve (15) through a PLC controller (3), and the pressure assembly (16) includes a pressure cylinder (161) and a bent pipe (162), and the pressure cylinder (1 61) is fixedly connected to the left side wall of the waist guard plate (1), the pressure cylinder (161) is connected to the air supply pipe (14) through a bent pipe (162), the rear inner wall of the pressure cylinder (161) is fixedly connected to the piston plate (17) through a spring, the rear wall of the pressure cylinder (161) is provided with a pressure relief hole (18), the inner wall of the pressure cylinder (161) is fixedly connected to a trigger switch (19), the trigger switch (19) is located on the rear side of the piston plate (17), the trigger switch (19) is electrically connected to the first control valve (15) through a PLC controller (3), the lifting connection assembly (20) comprises a cross bar (201) and a support frame (202), the cross bar (201) is fixedly connected to the left side wall of the waist guard plate (1),The support frame (202) is fixedly connected to the left end of the cross bar (201); the front and rear side walls of the support frame (202) are both rotatably connected to the same outer ring (22) via a connecting shaft (21); the left and right sides of the outer ring (22) are both rotatably connected to the same inner ring (23) via a connecting shaft (21); the front and rear inner walls of the inner ring (23) are both fixedly connected to the same mounting tube (24) via a connecting block; the inner wall of the mounting tube (24) is rotatably connected to a threaded tube (25); the lower side wall of the mounting tube (24) is fixedly connected to a servo motor (26); the output end of the servo motor (26) is fixedly connected to the lower side wall of the threaded tube (25); the threaded tube (25) is internally threadedly sleeved with a threaded rod (27); the upper end of the threaded rod (27) extends out of the threaded tube (25) and is fixedly connected to the lifting plate (4).

2. A portable gas inspection device for tunnel engineering according to claim 1, characterized in that: The guidance reminder component (28) comprises a mounting shell (281) and a circuit board (282); the mounting shell (281) is fixedly connected to the output end of the micro motor (10); the right side wall of the mounting shell (281) is fixedly connected to a laser generator (29) and a laser receiver (30); the front side wall of the circuit board (282) is fixedly connected to a high-precision timer (31), a microprocessor (32) and an analog-to-digital converter (33); the analog-to-digital converter (33) converts an optical signal received by the receiver into a digital signal; the high-precision timer (31) is used to accurately measure the time interval from laser emission to laser reception; the microprocessor (32) is responsible for receiving the time data measured by the timer and calculating the distance using a corresponding algorithm according to the propagation speed of the laser in the air; the microprocessor (32) is electrically connected to the PLC controller (3).

3. A portable gas inspection device for tunnel engineering according to claim 1, characterized in that: The upper side walls of the two restraining belts (121) are fixedly connected with a cooling tube (34), the upper side walls of the cooling tube (34) are connected with a plurality of air outlets (35), the cooling tube (34) and the air supply tube (14) are fixedly connected with a same short tube (36), a second control valve (37) is provided in the short tube (36), and the trigger switch (19) is electrically connected with the second control valve (37) via the PLC controller (3).

4. A portable gas inspection device for tunnel engineering according to claim 1, characterized in that: The outer walls of the support frame (202) and the outer ring (22) are both fixedly connected with a bent plate (38), the side wall of the bent plate (38) is fixedly connected with a micro electric push rod (39), the movable end of the micro electric push rod (39) is fixedly connected with a square plate (40), and the ends of the two connecting shafts (21) are both provided with square grooves (41) that match the clamping plate (5).

5. A portable gas inspection device for tunnel engineering according to claim 1, characterized in that: The left and right sides of the installation cylinder (24) are both fixedly connected with positioning slide rods (42), and the rod wall of the threaded rod (27) is provided with positioning slide grooves (43) that match the positioning slide rods (42).