Intelligent dispatching method for two-way single lane with multiple missed vehicle points based on improved genetic algorithm
By optimizing the transportation route and dispatching instructions of trackless transportation equipment by improving the genetic algorithm, the problem of discontinuity and blockage of main ramp transportation dispatching in underground metal mines has been solved, efficient and safe intelligent dispatching has been achieved, and production costs and vehicle wear have been reduced.
Patent Information
- Application Number
- CN202411078255.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-07
AI Technical Summary
The trackless transportation scheduling of the main ramp in underground metal mines has discontinuous and inaccurate scheduling, and unscientific vehicle staggering arrangements, which leads to transportation congestion, reduces production efficiency, increases tire wear and fuel consumption of transportation vehicles, and shortens the service life of vehicles.
An intelligent dispatching method based on an improved genetic algorithm for two-way single lanes with multiple wrong stops is used to obtain slope road condition data, plan the transportation route and dispatch instructions of trackless transportation equipment, optimize the execution sequence of transportation tasks, reduce the number of reversing, and improve transportation efficiency.
It realizes unmanned and less-manned intelligent dispatching, reduces production costs, improves mine production efficiency, and is suitable for narrow tunnels and other environments, with high application potential.
Smart Images

Figure CN118627846B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mine ramp vehicle dispatching, and in particular to a two-way single lane multi-missing point intelligent dispatching method based on an improved genetic algorithm. Background Art
[0002] With the popularization of 5G mobile signal transmission technology in underground mines, the underground mine trackless transportation dispatching system will usher in new changes. The trackless transportation dispatching of the main ramp in underground metal mines is closely related to the transportation efficiency of daily production equipment, personnel and construction materials in the mine, and the transportation efficiency of equipment, personnel and materials will directly affect the operation efficiency of the entire production cycle of the mine.
[0003] At present, there are transportation congestion problems in the scheduling of trackless transportation on the main ramp of underground metal mines due to discontinuous and inaccurate scheduling, unscientific arrangement of passing vehicles and low efficiency. The current scheduling method is a combination of traffic light indication and driver vision. Among them, the method of traffic light indication lacks a global scheduling perspective, resulting in the indication signal being mostly judged by the dispatcher of the dispatch center based on experience, so it is difficult to optimize the route of the system. The method of driver's active visual judgment is difficult to form effective passing avoidance behavior due to the winding underground lanes and short visible distance. As a result, the driving transport vehicles cannot pass each other when traveling in opposite directions on the main ramp, and one party needs to reverse to the nearest passing lane to complete the passing. In addition, due to the noisy underground, different vehicles can also communicate with each other using flag signals. When they need to pass each other during driving, the two vehicles will stop and wait, and the co-pilot will use a walkie-talkie or wave a flashlight to convey information, and finally determine which of the two vehicles will reverse to the passing point. However, this communication method is inefficient and prone to misunderstandings, which in turn leads to serious traffic jams in the main ramp, greatly reducing the mine's production efficiency.
[0004] In addition, frequent reversing also causes the actual mileage of the transport vehicle to be much greater than the required mileage. Both the tire wear rate and fuel consumption rate of the transport vehicle are much higher than normal travel, and even shorten the service life of the transport vehicle, greatly increasing the production cost of the mine. Therefore, the research on intelligent scheduling of the main ramp is of great significance. Summary of the invention
[0005] In view of the above-mentioned deficiencies in the prior art, the present invention proposes a two-way single-lane multi-missing point intelligent scheduling method based on an improved genetic algorithm, aiming to achieve continuous, efficient, intelligent, safe and visual production intelligent scheduling.
[0006] The present invention proposes a two-way single lane multi-missing point intelligent scheduling method based on an improved genetic algorithm, the method comprising the following steps:
[0007] Step 1: Use the traffic management equipment installed at each passing point to obtain slope road condition data;
[0008] Step 2: Number all the missed points and establish a dispatching instruction set for each trackless transport equipment;
[0009] Step 3: Divide all production tasks to be completed on the day into several transportation tasks, and assign a trackless transport device to each transportation task;
[0010] Step 4: All trackless transport equipment randomly plans the transport routes according to their assigned transport tasks. Based on the planned transport routes, the initial dispatching instructions are generated for all trackless transport equipment using the numbers of the passing points and saved in their respective dispatching instruction sets;
[0011] Step 5: Use the rolling task window principle to plan the transportation task execution order of all trackless transportation equipment, and obtain the initial planning results of all trackless transportation equipment;
[0012] Step 6: Based on the scheduling instruction set of the trackless transport equipment, the improved genetic algorithm is used to perform two optimization planning on the initial planning result of the trackless transport equipment to obtain the optimized planning result of the trackless transport equipment;
[0013] Step 7: Determine whether the optimized planning result of the trackless transport equipment meets the priority of the trackless transport equipment for waiting for passing vehicles. If so, the optimized planning result of the trackless transport equipment is used as the final planning result; otherwise, the optimized planning result of the trackless transport equipment is corrected according to the priority of the trackless transport equipment for waiting for passing vehicles, and the corrected planning result is used as the final planning result;
[0014] Step 8: All trackless transport equipment performs the transport task according to the final planning results;
[0015] The slope road condition data in step 1 includes: passing point data and trackless transport equipment data;
[0016] The passing point data include: the time when the trackless transport equipment passes the passing point, the waiting time of the trackless transport equipment at the passing point, and whether the trackless transport equipment passing the passing point transports ore;
[0017] The trackless transport equipment data includes: the type of trackless transport equipment passing through the passing point and the number of trackless transport equipment passing through the passing point;
[0018] The step 3 further comprises:
[0019] Step 3.1: Obtain all the production tasks to be completed on the day and store them in the task pool to be completed. Divide the production tasks in the task pool to be completed into several transportation subtask sequences according to the transportation capacity of the trackless transportation equipment;
[0020] Step 3.2: Take a transport subtask sequence as a transport task, and assign a trackless transport device to each transport task according to the task requirements of the production task, wherein the number of transport tasks assigned to each trackless transport device is one or more;
[0021] The task requirements of the production task include: the task location, the trackless transportation equipment required to perform the task and the task objectives;
[0022] The step 4 further comprises:
[0023] Step 4.1: Randomly select a trackless transport device, arrange all the transport tasks assigned to the trackless transport device in the time sequence of the production tasks, and obtain a production task execution order;
[0024] Step 4.2: For any transport task of the trackless transport equipment, a transport route is planned for the transport task, and an initial dispatch instruction is generated using the number of the missed point;
[0025] The method for generating the initial scheduling instruction is: create a Array As the initial scheduling instruction, it is recorded as ,in Indicates the number of missed car points; , and Respectively represent the trackless transport equipment in the first, second and The dispatching instructions at the missing point; for any missing point , according to the current transportation task, determine the trackless transport equipment at the passing point Scheduling instructions , and generate a complete initial scheduling instruction, where x\in \left [ {0,m-1} \right ] ,and , is a set of integers;
[0026] (1)
[0027] Step 4.3: Repeat step 4.2 until a transport route is planned for all transport tasks assigned to the trackless transport equipment and an initial dispatch instruction is generated, and all initial dispatch instructions of the trackless transport equipment are saved in a dispatch instruction set in the order of generation;
[0028] Step 4.4: Sort the initial scheduling instructions in the scheduling instruction set according to the execution order of the production tasks;
[0029] Step 4.5: Repeat steps 4.1-4.4 until all trackless transport equipment completes the planning of transport routes and the generation of initial dispatch instructions;
[0030] The step 5 further comprises:
[0031] Step 5.1: Using the rolling task window principle, all transport tasks are arranged in the pending task window according to the order in which the transport routes of the transport tasks are generated, and the execution order of the transport tasks in the pending task window is adjusted according to the time limit requirements contained in each transport task or the execution logic between the transport tasks;
[0032] Step 5.2: Generate a transport task timeline according to the adjusted transport task execution sequence, and compare the transport tasks with time limit requirements with the transport task timeline, and obtain the execution time of each transport task according to the comparison result;
[0033] Step 5.3: Reorder the transport tasks in the pending task window according to the execution time of all transport tasks, and use the obtained transport task execution order as the initial planning result of all trackless transport equipment;
[0034] The step 6 further comprises:
[0035] Step 6.1: All trackless transport equipment executes the initial scheduling instructions in the scheduling instruction set according to the initial planning results, and calculates the passage priority cost of the trackless transport equipment when executing the initial planning results, and then uses the passage priority cost to perform the first optimization planning on the initial planning results of the trackless transport equipment;
[0036] Step 6.2: Construct the objective function of the second optimization planning, including: traffic priority cost, waiting time cost and travel distance cost;
[0037] Step 6.3: When all trackless transport equipment executes the initial scheduling instructions in the scheduling instruction set according to the planning results after the first optimization planning, a random algorithm is used to generate an initial solution of the objective function of the second optimization planning and use it as the initial population, wherein the initial solution is the initial optimization result of all trackless transport equipment, and the initial optimization result of each trackless transport equipment is used as an individual;
[0038] Step 6.4: Generate a new generation of population by selecting, crossover and mutation of the initial population as a set of basic solutions of the objective function of the second optimization program;
[0039] Step 6.5: Calculate the total fitness of the basic solution obtained in step 6.4;
[0040] Step 6.6: Use the set of basic solutions obtained in step 6.4 as the new initial population and repeat steps 6.4-6.5 until the total fitness of the basic solutions in the current iteration round is Less than or equal to the total fitness of the basic solution in the previous iteration round , get several basic solutions and the total fitness of each basic solution;
[0041] Step 6.7: Select the two basic solutions with the largest total fitness and calculate the best fitness of the generation difference. If the absolute value of the best fitness of the generation difference is less than the preset fitness threshold, the basic solution with the larger total fitness of the two basic solutions is selected as the optimal solution of the objective function of the second optimization planning; otherwise, the best fitness of the generation difference is compared with zero. If the best fitness of the generation difference is less than or equal to zero, the total fitness of the two basic solutions is scaled, and the basic solution after the scale transformation is used as the new initial population and then iterated three times again, and the basic solution obtained after the third iteration is used as the optimal solution; if the best fitness of the generation difference is greater than zero, return to step 6.3;
[0042] Step 6.8: Construct the constraints of the optimal solution, including collision constraints and long-distance shunting constraints;
[0043] Step 6.9: Determine whether the optimal solution of the objective function of the second optimization planning satisfies the constraint conditions of the optimal solution. If so, the optimal solution is used as the planning result after the optimization of the trackless transportation equipment. If not, return to step 6.3;
[0044] The calculation method of the traffic priority cost described in step 6.1 is: determine the waiting priority of trackless transport equipment according to the existing dispatch priority principle, and assign a traffic priority coefficient to each trackless transport equipment. , the priority coefficient of each trackless transport equipment The product of the waiting time of the trackless transport equipment at the passing point is taken as the priority cost of the trackless transport equipment. When two trackless transport equipment intersect on a single lane, the priority costs of the two trackless transport equipment are calculated respectively, and the transportation task execution order in the initial planning result of the trackless transport equipment is adjusted in descending order of the priority costs to complete the first optimization planning;
[0045] The traffic priority cost in the objective function of the second optimization planning described in step 6.2 is expressed as:
[0046] (5)
[0047] in represents the travel priority cost of all trackless transport equipment; Indicates The waiting time of each trackless transport equipment at the missed point; Indicates the number of trackless transport equipment;
[0048] The calculation method of the waiting time cost in the objective function of the second optimization planning is as follows: according to the waiting time of each trackless transport equipment at the passing point, the waiting time cost of all trackless transport equipment at the passing point is calculated, the total interval scheduling time of each trackless transport equipment performing all transportation tasks on the day is obtained and the interval scheduling time cost of all trackless transport equipment performing all transportation tasks is calculated, and then the waiting time cost of all trackless transport equipment at the passing point and the interval scheduling time cost of all trackless transport equipment performing all transportation tasks are added to obtain the waiting time cost in the objective function of the second optimization planning;
[0049] The calculation method of the travel distance cost in the objective function of the second optimization planning is: The travel distance of a trackless transport device when performing a transport task is recorded as , will The task interval scheduling distance when a trackless transport device performs a transport task is recorded as , then the travel distance cost generated by all trackless transport equipment when performing transportation tasks is expressed as:
[0050] (9)
[0051] in It represents the travel distance cost incurred by all trackless transport equipment when performing transport tasks;
[0052] The objective function of the second optimization planning is expressed as:
[0053] (10)
[0054] in represents the total operating cost; Indicates taking the minimum value;
[0055] The calculation method of the total fitness of the basic solution described in step 6.4 is: according to the objective function of the second optimization planning, the fitness of the basic solution's traffic priority, the fitness of the shortest waiting time, and the fitness of the shortest travel distance are calculated respectively, expressed as:
[0056] (11)
[0057] in , and They are the traffic priority fitness, the shortest waiting time fitness and the shortest travel distance fitness; , and They are the weighted coefficients of the traffic priority fitness, the shortest waiting time fitness, and the shortest travel distance fitness;
[0058] The total fitness of the basic solution is calculated using the traffic priority fitness, shortest waiting time fitness and shortest travel distance fitness of the basic solution, which is expressed as:
[0059] (12)
[0060] in Represents the total fitness of the basic solution in the current iteration round;
[0061] The collision constraint described in step 6.8 is: divide all two-way single lanes into sections with the passing point as the end point of the section. When the number of trackless transport equipment in the same section in the same period is greater than or equal to 1, assume that the speed of the trackless transport equipment in the section in this period is , then the collision constraint is constructed as:
[0062] (14)
[0063] in Indicates the number of times the trackless transport equipment passes A missed car point, and , , represents the set of natural numbers that do not include 0; Trackless transport equipment The missing point of the starting point in the transportation route; Trackless transport equipment Waiting time at the missed bus stop; Trackless transport equipment The missing point of the starting point in the transportation route; Trackless transport equipment Waiting time at the missed bus stop;
[0064] The long-distance shunting constraint is: trackless transport equipment, and the dispatching instruction set of the trackless transport equipment is used as the gene set of the individual; the dispatching instruction set has Initial scheduling instructions, each initial scheduling instruction is used as a row of coding genome of an individual, and all coding genomes of the individual are re-encoded to obtain Row non-zero coding genome;
[0065] The method for re-encoding all coding genomes of the individual is: for any row of coding genome, remove all coding genes with scheduling instruction values of 0 to obtain a row of non-zero coding genomes, denoted as ,in Indicates The number of non-zero encoding genomes, and ; , and Respectively represent the first, second and third The number of the missing point, and ; , and Respectively represent the first, second and third Dispatch instructions for missed train points;
[0066] According to All non-zero coding genomes of trackless transport equipment, calculate the The task interval scheduling distance when a trackless transport device performs two consecutive transport tasks is calculated, and a long-distance shunting constraint is constructed for the calculated task interval scheduling distance, which is expressed as:
[0067] (16)
[0068] in Indicates that the trackless transport equipment is executing The last missed point when executing the first transport task The task interval scheduling distance between the first missed points when performing a transportation task; Indicates the height of the middle section; Indicates the slope angle of the ramp.
[0069] The beneficial effects of adopting the above technical solution are:
[0070] The method of the present invention does not require major modifications to the on-site ramp, and real-time data can be obtained through protocol docking. Unmanned and low-manpower intelligent scheduling can be achieved through the intelligent scheduling algorithm in the present invention. It has the characteristics of fast implementation and high return on investment. Based on the intelligent scheduling algorithm, it can help the underground mining area traffic scheduling center to achieve unmanned operation, reduce personnel input, achieve cost reduction and efficiency improvement, and further optimize the organizational structure of production personnel. It can also be applicable to all intelligent scheduling environments with single-lane and multiple missed vehicle points, such as narrow tunnels, etc., and has a high implementation application surface.
[0071] The method of the present invention is aimed at the positioning problem. Drawing on the algorithm principle of fuzzy logic, it innovatively proposes to establish a queue array for each vehicle, and combines the data coordinate point set of the main ramp, and uses the "first-in, first-out" data storage structure characteristics of the queue array to locate the approximate section of the road where the vehicle is located. At this time, the dispatch system program does not need to read the precise spatial coordinates of the vehicle in real time, but obtains the road section where the vehicle is located through a feedback-type passing point response. The method of the present invention can greatly reduce the data that the dispatch system program needs to process and temporarily store, reduce the computing power requirements for the server, and improve the system operation speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0072] Figure 1 This is a flow chart of a two-way single lane multi-missing point intelligent scheduling method based on an improved genetic algorithm in this implementation mode;
[0073] Figure 2 This is a schematic diagram of using the improved genetic algorithm to perform two optimization planning on the initial planning results of the trackless transportation equipment in this implementation mode;
[0074] Figure 3 This is a schematic diagram of determining the real-time position of the trackless transport equipment in this embodiment. DETAILED DESCRIPTION
[0075] In order to facilitate the understanding of the present application, the specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings and embodiments. The following embodiments are used to illustrate the present invention, but are not intended to limit the scope of the present invention. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present application more thoroughly understood.
[0076] The improved genetic algorithm in this embodiment is to improve the coding method and fitness calculation in the traditional genetic algorithm, specifically: the traditional genetic algorithm uses 01 coding, while the present invention uses 012 coding to generate the dispatching instructions of the trackless transport equipment, and considers the waiting state of the trackless transport equipment at the passing point when generating the dispatching instructions, while reflecting the priority of the trackless transport equipment, it provides more comprehensive information for the dispatching planning of the trackless transport equipment at the passing point. In addition, the fitness function in the traditional genetic algorithm can only optimize and calculate one goal. In order to achieve multi-objective optimization calculation, the present invention improves the fitness function of the genetic algorithm, designs a multi-objective optimization function, uses weighted coefficients to perform weighted summation on the fitness functions of multiple goals, integrates the multiple goals into a total objective function, namely the fitness function, and then minimizes the fitness function to achieve multi-objective optimization.
[0077] The core idea of the present invention is: to obtain the slope road condition data by connecting with the traffic management equipment of the passing point, and when connecting with the traffic management equipment of the passing point to obtain data, all the passing points are numbered, and this number is used to represent the transportation route of the trackless transportation equipment. A pool of unfinished tasks is set up, and the tasks are sorted and route optimization planning is performed according to the time axis. Each trackless transportation equipment is sequentially planned according to the time sequence of the transportation tasks executed until the pool of unfinished tasks is cleared. The two-way single lane is divided into sections with the passing points as the end points of the two ends of the section, and the position of the running vehicles in the two-way single lane is determined and displayed, and the traffic priority of the vehicle is determined by the obtained vehicle data. Then the planning results are optimized twice, in which only the waiting priority of the passing vehicles between the trackless transportation equipment is considered in the first sequential planning, and the total running distance of all trackless transportation equipment, the total waiting time of the passing vehicles, and the efficiency of the transportation task completion are optimized in the second optimization planning. After the secondary optimization planning is completed, the planning results are reviewed for the priority of the passage, and the reverse priority of the passage in the planned route is corrected and combined with the time axis data to generate the final planning results. After the planning is completed, according to the route optimization results, the traffic management equipment at the passing point is connected to dispatch and direct the vehicles.
[0078] This embodiment is a two-way single lane multi-pass point intelligent scheduling method based on an improved genetic algorithm, such as Figure 1 As shown, the method comprises the following steps:
[0079] Step 1: Use the traffic management equipment installed at each passing point to obtain slope road condition data.
[0080] In this embodiment, multiple passing points are set on the two-way single lane in the underground mine area, and each passing point is equipped with traffic management equipment, which facilitates the underground mine area traffic dispatching center to obtain slope road condition data for subsequent trackless transportation equipment dispatching.
[0081] The slope road condition data includes: passing point data and trackless transport equipment data.
[0082] The passing point data include: the time when the trackless transport equipment passes the passing point, the waiting time of the trackless transport equipment at the passing point, and whether the trackless transport equipment passing the passing point transports ore.
[0083] The trackless transport equipment data includes: the type of trackless transport equipment passing the passing point and the number of trackless transport equipment passing the passing point.
[0084] In this embodiment, the types of trackless transport equipment passing through the passing point include mining trucks, mining passenger pickup trucks and mining engineering vehicles.
[0085] Step 2: Number all the missed points and establish a dispatch instruction set for each trackless transport equipment.
[0086] In this embodiment, the number of the passing point is used to indicate the vehicle running route. The scheduling instruction set of Indicates the number of missed points, Indicates the number of transport tasks assigned to the trackless transport equipment.
[0087] Step 3: Divide all production tasks to be completed on that day into several transportation tasks, and assign a trackless transport device to each transportation task.
[0088] Step 3.1: Obtain all the production tasks to be completed on the day and store them in the task pool to be completed. Divide the production tasks in the task pool to be completed into several transportation subtask sequences according to the transportation capacity of the trackless transportation equipment.
[0089] Step 3.2: Take a transport subtask sequence as a transport task, and assign a trackless transport device to each transport task according to the task requirements of the production task, wherein the number of transport tasks assigned to each trackless transport device is one or more.
[0090] The task requirements of the production task include: the task location, the trackless transportation equipment required to perform the task and the task objectives.
[0091] In this embodiment, the production tasks of the day include three types of production tasks, namely: 1) ore transportation; 2) material and equipment transportation; 3) personnel transportation. All production tasks in the task pool to be completed are divided into several transportation subtask sequences according to the transportation capacity of the trackless transportation equipment, and trackless transportation equipment is assigned to each subtask sequence according to the task requirements. It should be noted that each trackless transportation equipment can be assigned to multiple subtask sequences, and it is not a one-to-one correspondence. It only needs to satisfy that each subtask sequence is assigned to a trackless transportation equipment.
[0092] Step 4: All trackless transport equipment randomly plans the transport routes according to their assigned transport tasks. Based on the planned transport routes, the initial dispatching instructions are generated for all trackless transport equipment using the numbers of the passing points and saved in their respective dispatching instruction sets.
[0093] Step 4.1: Randomly select a trackless transport device, and arrange all the transport tasks assigned to the trackless transport device in the time sequence of the production tasks to obtain a production task execution sequence.
[0094] Step 4.2: For any transport task of the trackless transport equipment, a transport route is planned for the transport task, and an initial dispatch instruction is generated using the number of the missed point.
[0095] The method for generating the initial scheduling instruction is: create a Array As the initial scheduling instruction, it is recorded as ,in Indicates the number of missed car points; , and Respectively represent the trackless transport equipment in the first, second and The dispatching instructions at the missing point; for any missing point , according to the current transportation task, determine the trackless transport equipment at the passing point Scheduling instructions , and generate a complete initial scheduling instruction, where x\in \left [ {0,m-1} \right ] ,and , is a set of integers;
[0096] (1).
[0097] Step 4.3: Repeat step 4.2 until a transportation route is planned for all transportation tasks assigned to the trackless transportation equipment and an initial scheduling instruction is generated, and all initial scheduling instructions of the trackless transportation equipment are saved in the scheduling instruction set in the order of generation.
[0098] In this embodiment, since an initial scheduling instruction is represented by an array, all initial scheduling instructions are saved in the form of a two-dimensional matrix in the scheduling instruction set, each row of the two-dimensional matrix represents an initial scheduling instruction, and each column of the two-dimensional matrix represents the state of the trackless transport equipment at each passing point when executing the current transportation task.
[0099] Step 4.4: Sort the initial scheduling instructions in the scheduling instruction set according to the execution order of the production tasks.
[0100] Step 4.5: Repeat steps 4.1-4.4 until all trackless transport equipment has completed the planning of transport routes and the generation of initial dispatch instructions.
[0101] Step 5: Use the rolling task window principle to plan the transportation task execution sequence of all trackless transportation equipment and obtain the initial planning results of all trackless transportation equipment.
[0102] Step 5.1: Using the rolling task window principle, all transport tasks are arranged in the pending task window according to the order in which the transport routes of the transport tasks are generated, and the execution order of the transport tasks in the pending task window is adjusted according to the time limit requirements contained in each transport task or the execution logic between the transport tasks.
[0103] Step 5.2: Generate a transport task timeline according to the adjusted transport task execution sequence, and compare the transport tasks containing time limit requirements with the transport task timeline, and obtain the execution time of each transport task according to the comparison result.
[0104] Step 5.3: Reorder the transport tasks in the pending task window according to the execution time of all transport tasks, and use the obtained transport task execution order as the initial planning result of all trackless transport equipment.
[0105] In this embodiment, if Figure 2 As shown, based on the rolling task window principle, after generating a transportation route and initial scheduling instructions for trackless transport equipment for each transport task, the transport tasks are arranged in the pending task window according to the generation order of the transport routes, and all transport tasks in the pending task window are sorted for the first time according to the time limit requirements contained in the transport tasks or the logical sequence between the transport tasks. The transport task timeline is generated based on the result of the first sorting, and the transport tasks with time limit requirements are compared and checked with the generated transport task timeline. Based on the comparison result, the execution time of each transport task is generated, that is, the time window of the transport task. Through this time window, the production task sorting in the pending task pool can be more in line with the actual production situation.
[0106] Step 6: Based on the scheduling instruction set of the trackless transport equipment, the improved genetic algorithm is used to perform two optimization planning on the initial planning results of the trackless transport equipment to obtain the optimized planning results of the trackless transport equipment.
[0107] Step 6.1: All trackless transport equipment executes the initial scheduling instructions in the scheduling instruction set according to the initial planning results, and calculates the travel priority cost of the trackless transport equipment when executing the initial planning results, and then uses the travel priority cost to perform the first optimization planning on the initial planning results of the trackless transport equipment.
[0108] The calculation method of the passage priority cost is as follows: determine the waiting priority of the trackless transport equipment according to the existing dispatch priority principle, and assign a passage priority coefficient to each trackless transport equipment. , the priority coefficient of each trackless transport equipment The product of the waiting time of the trackless transport equipment at the passing point is taken as the priority cost of the trackless transport equipment. When two trackless transport equipment intersect on a single lane, the priority costs of the two trackless transport equipment are calculated respectively, and the execution order of the transport tasks in the initial planning results of the trackless transport equipment is adjusted in descending order of the priority costs to complete the first optimization planning.
[0109] The priority cost of the trackless transport equipment is expressed as:
[0110] (2)
[0111] in represents the travel priority cost of the trackless transport equipment; Indicates The waiting time of a trackless transport device at the missing point.
[0112] In this implementation, according to the existing scheduling priority principle of the Sanshan Island mining area, the trackless transport equipment on the ramp is first-in-first-out, and only trackless transport equipment running in one direction is allowed between the two staggered lanes. The trackless transport equipment on the ramp goes up first and then down, and first out of the ramp and then into the ramp. Since mining trucks have the highest priority; passenger pickup trucks and engineering vehicles have the second highest priority; and transport vehicles or unclassified vehicles transporting equipment and materials have the lowest priority, different trackless transport equipment are given different priority coefficients. , specifically expressed as:
[0113] (3)
[0114] After the trackless transport equipment is assigned a priority coefficient, when two trackless transport equipment intersect, according to the principle of peer priority, the priority costs of the two trackless transport equipment, that is, the losses of the two trackless transport equipment, are compared, that is, the comparison and Since the waiting time of trackless transport equipment is generally approximately the same, the loss of two trackless transport equipment is related to the priority coefficient of the two trackless transport equipment. If and only if the number of trackless transport equipment in a certain direction is greater than a certain number, the total loss of all trackless transport equipment in that direction is:
[0115] (4)
[0116] in It represents the sum of the priority costs of all trackless transport equipment in this direction, that is, the sum of the losses of all trackless transport equipment in this direction; Indicates The priority cost of the first trackless transport equipment is Loss of trackless transport equipment.
[0117] Step 6.2: Construct the objective function of the second optimization planning, including: traffic priority cost, waiting time cost and travel distance cost.
[0118] The traffic priority cost in the objective function of the second optimization planning is expressed as:
[0119] (5)
[0120] in represents the travel priority cost of all trackless transport equipment; Indicates the number of trackless transport equipment.
[0121] In this embodiment, the second optimization planning is actually achieved by minimizing the operating cost, so the objective function of the second optimization planning is defined as an operating cost function, including the traffic priority cost, waiting time cost and travel distance cost. The calculation method of the traffic priority cost is the same as the calculation method of the traffic priority cost in the first optimization planning.
[0122] The calculation method of the waiting time cost in the objective function of the second optimization planning is as follows: according to the waiting time of each trackless transport equipment at the passing point, the waiting time cost of all trackless transport equipment at the passing point is calculated, the total interval scheduling time of all transport tasks performed by each trackless transport equipment on the day is obtained and the interval scheduling time cost of all trackless transport equipment performing all transport tasks is calculated, and then the waiting time cost of all trackless transport equipment at the passing point and the interval scheduling time cost of all trackless transport equipment performing all transport tasks are added to obtain the waiting time cost in the objective function of the second optimization planning.
[0123] The waiting time cost of all trackless transport equipment at the passing point is expressed as:
[0124] (6)
[0125] in Represents the waiting time cost of all trackless transport equipment at the missing point.
[0126] In this embodiment, the waiting time of the trackless transport equipment at the passing point and the transportation task interval scheduling time are both included in the total waiting time, which belongs to the waiting time cost of the scheduling process. The waiting time of the trackless transport equipment at the passing point comes from the slope road condition data obtained in step 1, and the total interval scheduling time of the trackless transport equipment performing all transportation tasks on the day can be directly obtained from the underground mine area traffic scheduling center.
[0127] In this embodiment, in order to obtain the waiting time of the trackless transport equipment at the passing point t The calculation code is:
[0128] import time
[0129] sum_t = t #Total time spent
[0130] while ( Crossing == true): #Crossing is a function for meeting vehicles with route conflicts
[0131] time_start = time.time() #Start timing
[0132] #Code or function to be executed
[0133] time_end = time.time() #End timing
[0134] tn=(time_end - time_start)+sum_t #Time spent running the current loop
[0135] t = t + tn
[0136] print('time cost', sum_t, 's') #The unit of time is seconds.
[0137] The time cost of scheduling all transport tasks performed by all trackless transport equipment is expressed as:
[0138] (7)
[0139] in It represents the time cost of scheduling all transport tasks performed by all trackless transport equipment; Indicates The total interval scheduling time for a trackless transport device to perform all transport tasks on the day.
[0140] The waiting time cost is expressed as:
[0141] (8)
[0142] in Represents the waiting time cost incurred by all trackless transport equipment when performing transport tasks.
[0143] In this embodiment, the average speed of the trackless transport equipment during the transport process is equal to the total waiting time generated by all trackless transport equipment when performing the transport task divided by the total travel distance.
[0144] The calculation method of the travel distance cost in the objective function of the second optimization planning is: The travel distance of a trackless transport device when performing a transport task is recorded as , will The task interval scheduling distance when a trackless transport device performs a transport task is recorded as , then the travel distance cost generated by all trackless transport equipment when performing transportation tasks is expressed as:
[0145] (9)
[0146] in Represents the travel distance cost incurred by all trackless transport equipment when performing transport tasks.
[0147] The objective function of the second optimization planning is expressed as:
[0148] (10)
[0149] in represents the total operating cost; Indicates taking the minimum value.
[0150] In this embodiment, since the interval scheduling time for the trackless transport equipment to perform all transport tasks is easily affected, the interval scheduling time is not considered in the objective function of the second optimization planning for optimization, and only the scheduling interval distance is used to measure the degree of optimization. Since the average speed of the trackless transport equipment will not change significantly due to the fluctuation of the interval scheduling time, the interval scheduling time is calculated only to obtain the approximate average speed of the trackless transport equipment.
[0151] Step 6.3: When all trackless transport equipment execute the initial scheduling instructions in the scheduling instruction set according to the planning results after the first optimization planning, a random algorithm is used to generate an initial solution of the objective function of the second optimization planning and use it as the initial population, wherein the initial solution is the initial optimization result of all trackless transport equipment, and the initial optimization result of each trackless transport equipment is taken as an individual, and an initial scheduling instruction of each trackless transport equipment is taken as a line of coding genome of the individual.
[0152] In this embodiment, the initial solution of the objective function of the second optimization planning is given by the ramdom random algorithm provided by the python function library.
[0153] Step 6.4: Generate a new generation of population by selecting, crossover and mutation on the initial population as a set of basic solutions for the objective function of the second optimization program.
[0154] Step 6.5: Calculate the total fitness of the basic solution obtained in step 6.4.
[0155] In this embodiment, the optimal solution of the objective function of the second optimization planning is the minimum cost of mine production scheduling, and the objective function of the second optimization planning is used to calculate the total fitness of the basic solution. However, in the actual production process, according to the production scheduling rules of the mine, the priority principle needs to be met first, so when calculating the total fitness, the calculation formula of the objective function of the second optimization planning needs to be adjusted. By weighting the passage priority cost, waiting time cost, and travel distance cost respectively, it is ensured that the chromosome that meets the minimum priority fitness can be ranked at the top of the screening in the calculation of the total fitness.
[0156] The calculation method of the total fitness of the basic solution is: according to the objective function of the second optimization planning, the fitness of the traffic priority, the fitness of the shortest waiting time and the fitness of the shortest travel distance of the basic solution are calculated respectively, which is expressed as:
[0157] (11)
[0158] in , and They are the traffic priority fitness, the shortest waiting time fitness and the shortest travel distance fitness; , and They are the weighted coefficients of the traffic priority fitness, the shortest waiting time fitness and the shortest travel distance fitness respectively.
[0159] The total fitness of the basic solution is calculated using the traffic priority fitness, shortest waiting time fitness and shortest travel distance fitness of the basic solution, which is expressed as:
[0160] (12)
[0161] in Represents the total fitness of the basic solution in the current iteration round.
[0162] In this embodiment, according to the actual operation of the mine, , , The values are 100, 10, and 1 respectively. If it is put into actual production, the constants will be adjusted according to the operating conditions. The current objective function of the second optimization plan is The fitness of the basic solution in each iteration round is that the smaller the value of the objective function is, the greater the fitness is, and the closer it is to the optimal solution.
[0163] Step 6.6: Use the set of basic solutions obtained in step 6.4 as the new initial population and repeat steps 6.4-6.5 until the total fitness of the basic solutions in the current iteration round is Less than or equal to the total fitness of the basic solution in the previous iteration round , and obtain several basic solutions and the total fitness of each basic solution.
[0164] Step 6.7: Select the two basic solutions with the largest total fitness and calculate the best fitness of the generation difference. If the absolute value of the best fitness of the generation difference is less than the preset fitness threshold, the basic solution with the larger total fitness of the two basic solutions is selected as the optimal solution of the objective function of the second optimization planning; otherwise, the best fitness of the generation difference is compared with zero. If the best fitness of the generation difference is less than or equal to zero, the total fitness of the two basic solutions is scaled, and the scaled basic solution is used as the new initial population and then iterated three times again, and the basic solution obtained after the third iteration is used as the optimal solution; if the best fitness of the generation difference is greater than zero, return to step 6.3.
[0165] In order to avoid falling into the local optimal solution, when the optimal fitness of the difference is less than or equal to zero, the fitness needs to be scaled. In this implementation, a power scale transformation is adopted, that is:
[0166] (13)
[0167] in Represents the total fitness after scale transformation; Represents the total fitness before scale transformation; The power to which the scaling is applied.
[0168] When conducting the second optimization planning, the two indicators of the shortest total travel distance and the shortest total waiting time for all trackless transport equipment are added as fitness functions for optimization based on the traffic priority between trackless transport equipment. That is, the three fitness calculations of traffic priority cost, running distance cost and waiting time cost are performed simultaneously. Finally, the sum of the three fitnesses, that is, the two groups of results with the best total fitness, are selected for review to obtain the optimized planning results of the trackless transport equipment.
[0169] Step 6.8: Construct the constraints of the optimal solution, including collision constraints and long-distance shunting constraints.
[0170] The collision constraint is: divide all two-way single lanes into sections with the passing point as the end point of the section. When the number of trackless transport equipment in the same section in the same period is greater than or equal to 1, it is assumed that the speed of the trackless transport equipment in the section in this period is , then the collision constraint is constructed as:
[0171] (14)
[0172] in Indicates the number of times the trackless transport equipment passes A missed car point, and , , represents the set of natural numbers that do not include 0; Trackless transport equipment The missing point of the starting point in the transportation route; Trackless transport equipment Waiting time at the missed bus stop; Trackless transport equipment The missing point of the starting point in the transportation route; Trackless transport equipment Waiting time at the missed bus stop.
[0173] In this embodiment, it is assumed that the trackless transport equipment The missing point of the starting point in the transportation route is , the missing point of the terminal is The total stop time is ; Trackless transport equipment The missing point of the starting point in the transportation route is , the missing point of the terminal is The total stop time is .
[0174] In the actual operation of the intelligent dispatching system, since the driving speeds of various trackless transport equipment are inconsistent, it is necessary to monitor the real-time driving speed and position of the trackless transport equipment. , assuming trackless transport equipment The stop time in a certain section of a road during a certain period is , and the travel distance of other trackless transport equipment in the same section during the same period is , then the trackless transport equipment The driving speed in this section during this period is corrected to:
[0175] (15)
[0176] in Trackless transport equipment the revised driving speed within the road section during the period; Indicates the travel distance of all trackless transport equipment in this section during this period; Indicates the stop time of all trackless transport equipment in this section during this period.
[0177] like Figure 3 As shown, the real-time position of the trackless transport equipment is represented by an independent queue array with a data space of 2. When the trackless transport equipment passes a passing point, the trackless transport equipment will be recorded by the video surveillance at the passing point and a passing signal will be fed back. The passing signal includes the passing point number and the passing time. The passing point number is input into the independent queue array. According to the queue principle, when the number of data in the array is greater than the data space, an overflow phenomenon will occur, and according to the first-in-first-out principle, the data that first enters the array is deleted, and the subsequent data is moved forward one position in sequence. Specifically, it is expressed as: all two-way single lanes are divided into sections with the passing point as the end point of the section. Assuming that when the trackless transport equipment moves from section 1-2 to section 2-3, the original array of the trackless transport equipment is (1, 2). When entering section 2-3, the number sequence 3 will enter from the back of the array, and the number sequence 1 will be squeezed out of the array. At this time, the independent queue array of the trackless transport equipment becomes (2, 3).
[0178] In this embodiment, after completing a transport task, each trackless transport device needs to go to the nearest starting point of the next transport task to avoid long-distance cross-section interval scheduling.
[0179] The long-distance shunting constraint is: trackless transport equipment, and the dispatching instruction set of the trackless transport equipment is used as the gene set of the individual; the dispatching instruction set has Initial scheduling instructions, each initial scheduling instruction is used as a row of coding genome of an individual, and all coding genomes of the individual are re-encoded to obtain Rows with non-zero encoding genomes.
[0180] The method for re-encoding all coding genomes of the individual is: for any row of coding genome, remove all coding genes with scheduling instruction values of 0 to obtain a row of non-zero coding genomes, denoted as ,in Indicates The number of non-zero encoding genomes, and ; , and Respectively represent the first, second and third The number of the missing point, and ; , and Respectively represent the first, second and third The dispatch instructions for the missing train point.
[0181] According to All non-zero coding genomes of trackless transport equipment, calculate the The task interval scheduling distance when a trackless transport device performs two consecutive transport tasks is calculated, and a long-distance shunting constraint is constructed for the calculated task interval scheduling distance, which is expressed as:
[0182] (16)
[0183] in Indicates that the trackless transport equipment is executing The last missed point when executing the first transport task The task interval scheduling distance between the first missed points when performing a transportation task; Indicates the height of the middle section; Indicates the slope angle of the ramp.
[0184] In this embodiment, for any row of coding genomes, all coding genes with a value of 0 are removed, that is, only the number information of all the missed train points that the trackless transport equipment passes when executing the current transport task and the dispatch instruction value at each missed train point are retained to obtain a re-encoded non-zero coding genome. The task interval dispatch distance of the trackless transport equipment can be calculated by extracting the last missed train point number in each row of the non-zero coding genome of the trackless transport equipment and the first missed train point number in the next row of the non-zero coding genome, and the actual dispatch distance is calculated by querying the coordinate position of the missed train point. The task interval scheduling distance when a trackless transport device performs a transport task The calculation method is:
[0185] (17)
[0186] Step 6.9: Determine whether the optimal solution of the objective function of the second optimization planning satisfies the constraint conditions of the optimal solution. If so, use the optimal solution as the planning result after the optimization of the trackless transportation equipment. If not, return to step 6.3.
[0187] Step 7: Determine whether the optimized planning result of the trackless transport equipment meets the priority of the trackless transport equipment for waiting for passing vehicles. If so, the optimized planning result of the trackless transport equipment is used as the final planning result; otherwise, the optimized planning result of the trackless transport equipment is corrected according to the priority of the trackless transport equipment for waiting for passing vehicles, and the corrected planning result is used as the final planning result.
[0188] In this embodiment, the planning result obtained after the secondary optimization planning is reviewed for the priority of waiting for missed vehicles, that is, the traffic priority cost of the planning result is recalculated, and the calculated traffic priority cost is used to correct the reverse traffic priority traffic phenomenon in the planning result and combined with the transportation task timeline to generate the final planning result, thereby reducing the manpower operating cost of the dispatching center, improving the traffic capacity of the road, and helping the dispatching center to realize unmanned on-site duty. It can realize intelligent dispatching and arrange production according to road traffic conditions, which can improve the operational management efficiency of mine production, and the implementation cost is low, and it can be implemented quickly and conveniently.
[0189] Step 8: All trackless transport equipment performs transport tasks according to the final planning results.
[0190] The process of executing the transportation task according to the final planning result is as follows: when the trackless transport equipment starts to execute the transportation task, it is checked whether there is a trackless transport equipment traveling in the opposite direction on the adjacent section where the current trackless transport equipment is located; if not, a direct pass signal is displayed at the current passing point; if so, according to the final planning result, a waiting passing signal is displayed at the signal light in the direction of the trackless transport equipment with a lower passing waiting priority, and a direct pass signal is displayed at the signal light in the direction of the trackless transport equipment with a higher passing waiting priority.
[0191] In this embodiment, the independent queue arrays of all trackless transport equipment are accessed and the total number of vehicles is obtained. The forward direction of the trackless transport equipment is obtained by determining the size relationship between two data in the independent queue array. If the first data is greater than the second data, it is upward along the ramp, otherwise it is downward along the ramp. The adjacent sections of the forward direction of each trackless transport equipment are traversed to search whether there is a trackless transport equipment.
[0192] In this embodiment, when the production tasks in the task pool to be completed change in real time, it is necessary to re-plan in real time, and the transportation route can also be re-planned according to the operating status of the trackless transportation equipment in the road. When the method in this embodiment is applied to the scheduling system of an underground mining area, if it is necessary to temporarily modify the production task, the modification parameters can be manually input, the system data can be updated, and the optimization calculation can be re-performed. Compared with the modification of the scheduling operation directly, this method can increase the accuracy of the system storage data, reduce the error rate during system operation, and increase the correctness and stability of the system operation.
[0193] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some or all of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope defined by the claims of the present invention.
Claims
1. An intelligent dispatching method for two-way single lane with multiple missed vehicle points based on improved genetic algorithm. It is characterized in that The method comprises the following steps: Step 1: Use the traffic management equipment installed at each passing point to obtain slope road condition data; The slope road condition data includes: passing point data and trackless transport equipment data; Step 2: Number all the missed points and establish a dispatching instruction set for each trackless transport equipment; Step 3: Divide all production tasks to be completed on the day into several transportation tasks, and assign a trackless transport device to each transportation task; Step 4: All trackless transport equipment randomly plans the transport routes according to their assigned transport tasks. Based on the planned transport routes, the initial dispatching instructions are generated for all trackless transport equipment using the numbers of the passing points and saved in their respective dispatching instruction sets; Step 4.1: Randomly select a trackless transport device, arrange all the transport tasks assigned to the trackless transport device in the time sequence of the production tasks, and obtain a production task execution order; Step 4.2: For any transport task of the trackless transport equipment, a transport route is planned for the transport task, and an initial dispatch instruction is generated using the number of the missed point; The method for generating the initial scheduling instruction is as follows: create an array D with a length of m as the initial scheduling instruction, denoted as D=[d 0 ,d 1 ,…,d m-1 ], where m represents the number of missed car points; d, d 1 and d m-1 represent the dispatching instructions of the trackless transport equipment at the first, second and mth passing points respectively; for any passing point x, the dispatching instruction d of the trackless transport equipment at the passing point x is determined according to the current transport task. x , and generate a complete initial scheduling instruction, where x∈[0,m-1], and x∈Z, Z is an integer set; Step 4.3: Repeat step 4.2 until a transport route is planned for all transport tasks assigned to the trackless transport equipment and an initial dispatch instruction is generated, and all initial dispatch instructions of the trackless transport equipment are saved in a dispatch instruction set in the order of generation; Step 4.4: Sort the initial scheduling instructions in the scheduling instruction set according to the execution order of the production tasks; Step 4.5: Repeat steps 4.1-4.4 until all trackless transport equipment completes the planning of transport routes and the generation of initial dispatch instructions; Step 5: Use the rolling task window principle to plan the transportation task execution order of all trackless transportation equipment, and obtain the initial planning results of all trackless transportation equipment; Step 5.1: Using the rolling task window principle, all transport tasks are arranged in the pending task window according to the order in which the transport routes of the transport tasks are generated, and the execution order of the transport tasks in the pending task window is adjusted according to the time limit requirements contained in each transport task or the execution logic between the transport tasks; Step 5.2: Generate a transport task timeline according to the adjusted transport task execution sequence, and compare the transport tasks with time limit requirements with the transport task timeline, and obtain the execution time of each transport task according to the comparison result; Step 5.3: Reorder the transport tasks in the pending task window according to the execution time of all transport tasks, and use the obtained transport task execution order as the initial planning result of all trackless transport equipment; Step 6: Based on the scheduling instruction set of the trackless transport equipment, the improved genetic algorithm is used to perform two optimization planning on the initial planning result of the trackless transport equipment to obtain the optimized planning result of the trackless transport equipment; Step 6.1: All trackless transport equipment executes the initial scheduling instructions in the scheduling instruction set according to the initial planning results, and calculates the passage priority cost of the trackless transport equipment when executing the initial planning results, and then uses the passage priority cost to perform the first optimization planning on the initial planning results of the trackless transport equipment; The calculation method of the passage priority cost is as follows: determine the waiting priority of the trackless transport equipment according to the existing scheduling priority principle, and assign a passage priority coefficient δ to each trackless transport equipment, and use the product of the passage priority coefficient δ of each trackless transport equipment and the waiting time of the trackless transport equipment at the passing point as the passage priority cost of the trackless transport equipment. When two trackless transport equipment intersect on a single lane, calculate the passage priority costs of the two trackless transport equipment respectively, and adjust the transportation task execution order in the initial planning result of the trackless transport equipment according to the order of passage priority cost from large to small, and complete the first optimization planning; Step 6.2: Construct the objective function of the second optimization planning, including: traffic priority cost, waiting time cost and travel distance cost; The traffic priority cost in the objective function of the second optimization planning is expressed as: Where C represents the priority cost of all trackless transport equipment; t a represents the waiting time of the a-th trackless transport equipment at the passing point; N represents the number of trackless transport equipment; The calculation method of the waiting time cost in the objective function of the second optimization planning is as follows: according to the waiting time of each trackless transport equipment at the passing point, the waiting time cost of all trackless transport equipment at the passing point is calculated, the total interval scheduling time of each trackless transport equipment performing all transportation tasks on the day is obtained and the interval scheduling time cost of all trackless transport equipment performing all transportation tasks is calculated, and then the waiting time cost of all trackless transport equipment at the passing point and the interval scheduling time cost of all trackless transport equipment performing all transportation tasks are added to obtain the waiting time cost in the objective function of the second optimization planning; The calculation method of the travel distance cost in the objective function of the second optimization planning is: the travel distance of the a-th trackless transport equipment when performing the transport task is recorded as S a , the task interval scheduling distance when the a-th trackless transport equipment performs the transport task is recorded as S' a , then the travel distance cost generated by all trackless transport equipment when performing transportation tasks is expressed as: Where S represents the travel distance cost incurred by all trackless transport equipment when performing transport tasks; The objective function of the second optimization planning is expressed as: Where Z represents the total operating cost; min represents the minimum value; Step 6.3: When all trackless transport equipment executes the initial scheduling instructions in the scheduling instruction set according to the planning results after the first optimization planning, a random algorithm is used to generate an initial solution of the objective function of the second optimization planning and use it as the initial population, wherein the initial solution is the initial optimization result of all trackless transport equipment, and the initial optimization result of each trackless transport equipment is used as an individual; Step 6.4: Generate a new generation of population by selecting, crossover and mutation of the initial population as a set of basic solutions of the objective function of the second optimization program; Step 6.5: Calculate the total fitness of the basic solution obtained in step 6.4; The calculation method of the total fitness of the basic solution is: according to the objective function of the second optimization planning, the fitness of the traffic priority, the fitness of the shortest waiting time and the fitness of the shortest travel distance of the basic solution are calculated respectively, which is expressed as: where γ 1 , γ 2 and γ 3 They are the fitness of traffic priority, the fitness of shortest waiting time and the fitness of shortest travel distance respectively; b 1 、b 2 and b 3 They are the weighted coefficients of the traffic priority fitness, the shortest waiting time fitness, and the shortest travel distance fitness; The total fitness of the basic solution is calculated using the traffic priority fitness, shortest waiting time fitness and shortest travel distance fitness of the basic solution, which is expressed as: c n =c 1 +g 2 +g 3 where γ n Represents the total fitness of the basic solution in the current iteration round; Step 6.6: Take the set of basic solutions obtained in step 6.4 as the new initial population and repeat steps 6.4-6.5 until the total fitness of the basic solutions in the current iteration round is γ n Less than or equal to the total fitness γ of the basic solution in the previous iteration round n-1 , get several basic solutions and the total fitness of each basic solution; Step 6.7: Select the two basic solutions with the largest total fitness and calculate the best fitness of the generation difference. If the absolute value of the best fitness of the generation difference is less than the preset fitness threshold, the basic solution with the larger total fitness of the two basic solutions is selected as the optimal solution of the objective function of the second optimization planning; otherwise, the best fitness of the generation difference is compared with zero. If the best fitness of the generation difference is less than or equal to zero, the total fitness of the two basic solutions is scaled, and the basic solution after the scale transformation is used as the new initial population and then iterated three times again, and the basic solution obtained after the third iteration is used as the optimal solution; if the best fitness of the generation difference is greater than zero, return to step 6.3; Step 6.8: Construct the constraints of the optimal solution, including collision constraints and long-distance shunting constraints; The collision constraint is: divide all bidirectional single lanes into sections with the passing point as the end point of the section. When the number of trackless transport equipment in the same section in the same period is greater than or equal to 1, assuming that the travel speed of the trackless transport equipment in the section in this period is v, the collision constraint is constructed as follows: Among them A ε represents the εth passing point passed by the trackless transport equipment, and ε∈N * , N * represents the set of natural numbers that do not include 0; Indicates trackless transport equipment 1 The missing point of the starting point in the transportation route; Indicates trackless transport equipment 1 Waiting time at the missed bus stop; Indicates trackless transport equipment 2 The missing point of the starting point in the transportation route; Indicates trackless transport equipment 2 Waiting time at the missed bus stop; The long-distance shunting constraint is: for the a-th trackless transport equipment, the dispatching instruction set of the trackless transport equipment is used as the gene set of the individual; there are k initial dispatching instructions in the dispatching instruction set, each initial dispatching instruction is used as a row of coding genome of the individual, and all coding genomes of the individual are re-encoded to obtain k rows of non-zero coding genomes; The method for re-encoding all coding genomes of the individual is: for any row of coding genome, remove all coding genes with scheduling instruction values of 0 to obtain a row of non-zero coding genomes, denoted as Where D i represents the non-zero coding genome in the i-th row, and 0≤i≤k-1; l 1 , l 2 and l j They represent the numbers of the first, second and jth passing points passed by the trackless transport equipment, and 0≤j≤m-1; and They respectively represent the dispatching instructions for the first, second and jth missed points passed by the trackless transport equipment; According to all non-zero code genomes of the a-th trackless transport equipment, the task interval scheduling distance when the a-th trackless transport equipment performs two consecutive transport tasks is calculated, and a long-distance shunting constraint is constructed for the calculated task interval scheduling distance, which is expressed as: in represents the task interval scheduling distance between the last missed point passed by the trackless transport equipment when performing the i-th transport task and the first missed point passed by the trackless transport equipment when performing the i+1-th transport task; h represents the height of the middle section is h; θ represents the slope angle of the ramp; Step 6.9: Determine whether the optimal solution of the objective function of the second optimization planning satisfies the constraint conditions of the optimal solution. If so, the optimal solution is used as the planning result after the optimization of the trackless transportation equipment. If not, return to step 6.3; Step 7: Determine whether the optimized planning result of the trackless transport equipment meets the priority of the trackless transport equipment for waiting for passing vehicles. If so, the optimized planning result of the trackless transport equipment is used as the final planning result; otherwise, the optimized planning result of the trackless transport equipment is corrected according to the priority of the trackless transport equipment for waiting for passing vehicles, and the corrected planning result is used as the final planning result; Step 8: All trackless transport equipment performs transport tasks according to the final planning results.
2. According to the intelligent dispatching method for two-way single lane with multiple missed vehicle points based on improved genetic algorithm in claim 1, It is characterized in that The data of the passing point in step 1 include: the time when the trackless transport equipment passes the passing point, the waiting time of the trackless transport equipment at the passing point, and whether the trackless transport equipment passing the passing point transports ore; The trackless transport equipment data includes: the type of trackless transport equipment passing the passing point and the number of trackless transport equipment passing the passing point.
3. According to claim 2, the two-way single lane multi-pass point intelligent scheduling method based on improved genetic algorithm, It is characterized in that The step 3 further comprises: Step 3.1: Obtain all the production tasks to be completed on the day and store them in the task pool to be completed. Divide the production tasks in the task pool to be completed into several transportation subtask sequences according to the transportation capacity of the trackless transportation equipment; Step 3.2: Take a transport subtask sequence as a transport task, and assign a trackless transport device to each transport task according to the task requirements of the production task, wherein the number of transport tasks assigned to each trackless transport device is one or more; The task requirements of the production task include: the task location, the trackless transportation equipment required to perform the task and the task objectives.
Citation Information
Patent Citations
Intelligent warehousing route planning system and method based on multiple AGVs
CN110264120A
Portable borehole crack identification system based on image intelligent identification
CN118030035A