An artificial intelligence-based intelligent scheduling method and optimization system for battery cell production

Through the intelligent scheduling system of artificial intelligence cell production, the problems of cell abnormality identification and environmental adaptability in photovoltaic panel production are solved, the intelligent detection and optimized replacement plan of cell cells are realized, and the power generation efficiency and product stability are improved.

CN118629918BActive Publication Date: 2024-10-22GUANGZHOU FORCECONTROL YUANHAI INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411097465.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-10-22
Estimated Expiration
2044-08-12

AI Technical Summary

Technical Problem

The existing technology makes it difficult to timely identify abnormal working conditions of cells during the production scheduling of photovoltaic panels, resulting in unstable power generation quality. It is also difficult to customize cell replacement plans for different power generation environments, affecting the maximization of power generation efficiency.

Method used

An intelligent scheduling system for cell production using artificial intelligence is used, including a battery testing module, a plate construction module, an electronic monitoring module, an abnormal positioning module and a scheduling replacement module. The performance of the cells is tested through the adjustable light source and variable angle platform, and the light efficiency ratio is calculated. Monitor the status of the power generation board in real time, locate faulty cells, and optimize the cell replacement plan based on historical data.

Benefits of technology

It has realized quality inspection and intelligent construction of cells before they leave the factory, timely identified abnormalities in power generation panels, optimized cell replacement plans, improved power generation efficiency and product performance, and ensured the stability and adaptability of the panels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118629918B_ABST
    Figure CN118629918B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of battery cell production scheduling, and specifically to an artificial intelligence battery cell production intelligent scheduling method and optimization system, comprising: a production process and a scheduling process, wherein the production process comprises: installing an RFID reader at the entrance and exit of the process, writing production equipment and process information into the RFID tag of the battery cell, and constructing a production flow traceability route through an artificial intelligence network model, and the scheduling process comprises: testing the power generation performance of the battery cell, adding an indicator battery cell, determining the location of a faulty battery cell, and selecting a replacement battery cell for shipment. The present invention can analyze the battery cell process and equipment distribution of different efficiencies and gears of the battery cell, locate the operating parameters of the equipment, and analyze the influence of different parameters on the gear and efficiency of the battery cell, which is helpful to timely discover abnormal problems in the power generation process, maximize the photovoltaic power generation efficiency, and realize data flow records. Combined with artificial intelligence technology, intelligent analysis of battery cell production can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of battery cell production scheduling, and specifically to an artificial intelligence battery cell production intelligent scheduling method and optimization system. Background Art

[0002] Artificial intelligence is a new technical science that studies and develops theories, methods, technologies and application systems for simulating, extending and expanding human intelligence. With the continuous development of artificial intelligence technology, its application in various industries has become more extensive. The development of artificial intelligence will also be involved in the field of battery cell production scheduling.

[0003] Photovoltaic panels are a key component of solar power generation systems. Commonly used photovoltaic panels are constructed from a large number of cells, so they can have different specifications and shapes. The process of producing photovoltaic cells includes raw material procurement, silicon wafer production, cell preparation, component assembly and other links.

[0004] RFID is a technology used in the field of semiconductor manufacturing. Specifically, it refers to the use of RFID (radio frequency identification) technology in PFA Cassette wafer baskets, which can achieve fast and accurate identification and data reading, reduce manual intervention, and thus improve production efficiency. RFID technology mainly relies on wireless technology, including tags and readers. The reader sends and receives electromagnetic signals from RFID tags through antennas. These tags store serial numbers or unique identifiers and use radio waves to send data to nearby readers.

[0005] Due to the production process, the specifications and service life of each battery cell vary. When a single battery cell is abnormal, the entire generating panel needs to be replaced, which easily leads to waste of materials. The existing technology can realize the life cycle monitoring of the battery cell through digital files and traceability codes, but the traceability code needs to be manually scanned to obtain the battery cell information. It is impossible to identify the abnormal working condition of the battery cell in time, which is not conducive to the stability of the power generation quality of the photovoltaic panel.

[0006] In addition, the comprehensive power generation efficiency of photovoltaic panels will be affected by factors such as the specifications of the cells, the actual light intensity, and the tilt angle of the panels. However, the power generation environment and installation location of each photovoltaic power plant are different. When replacing cells, it is difficult to customize the cell replacement plan according to the actual power generation environment, which affects the maximization of power generation efficiency. Summary of the invention

[0007] The purpose of the present invention is to provide an artificial intelligence-based intelligent scheduling method and optimization system for battery cell production to solve the problems raised in the above-mentioned background technology.

[0008] In order to solve the above technical problems, the present invention provides the following technical solutions: an artificial intelligence battery cell production intelligent scheduling optimization system, comprising: a battery testing module, a plate construction module, an electronic monitoring module, an abnormality positioning module and a scheduling replacement module;

[0009] The battery test module is used to test the power generation performance of the battery cell by using a variable light intensity illumination light source and a variable angle support platform when the battery cell leaves the factory, adjusting the intensity of the illumination light source and the angle of the support platform at a fixed rate, detecting the current emitted by the battery cell during the test, and drawing a first function of the current changing with the light intensity and a second function of the current changing with the power generation area;

[0010] The panel construction module is used to calculate the light efficiency ratio of each battery cell according to the average slope of the first function, and use the battery cell with the largest difference in light efficiency ratio as the indicator battery cell. When constructing the power generation panel, the indicator battery cell is added at a fixed position of each power generation panel, and an ammeter is installed behind the indicator battery cell. The sensitivity of each battery cell is stored in a database, and the power generation panel is constructed in the order of sensitivity.

[0011] The electronic monitoring module is used to calculate the current light intensity according to the current of the indicating battery panel and the angle of the generating panel after the generating panel is used, and after the calculation result is transmitted to the control center, the control center determines the serial number of the generating panel according to the light efficiency ratio of the indicating battery panel, calculates the expected power generation according to the battery cell composition of the generating panel in the database and the first function of the battery cell, and issues an alarm when the difference with the current power generation is higher than a threshold value;

[0012] The abnormal positioning module is used to continuously adjust the angle of the power generation panel under the same lighting conditions when the power generation panel is in an abnormal state, and read the total current change of the power generation panel, and determine the position of the faulty battery cell according to the reading result and the second function of each battery cell;

[0013] The scheduling replacement module is used to calculate the optimal light efficiency ratio of the replacement battery cell according to the historical light intensity, historical tilt angle and battery cell position of the power generation panel, and select the battery cell with the light efficiency ratio closest to the current battery cell in the inventory as the replacement solution and send it to the power plant.

[0014] Further, the battery testing module comprises: an adjustable light source unit, a variable angle platform unit and a current detection unit;

[0015] The adjustable light source unit is used to provide light source for the battery cell test and adjust the light intensity irradiated on the battery cell according to a preset change curve;

[0016] The variable angle platform unit is used to support the battery cell to be tested, and can adjust the angle of the supporting platform facing the light source through a movable joint;

[0017] The current detection unit is used to detect the magnitude of the current emitted by the battery cell after being irradiated by light, and to draw a current variation curve in a computer.

[0018] Further, the plate construction module includes: an indicator board unit and a data recording unit;

[0019] The indicator panel unit is used to determine the indicator cell according to the light efficiency ratio of the cell. When each power generation panel is constructed, the indicator cell is arranged at a fixed position therein;

[0020] The data recording unit is used to record the installation position of the battery cells in each power generation panel in the database.

[0021] Further, the electronic monitoring module includes: a light identification unit and a power generation comparison unit;

[0022] The light identification unit is used to detect the power generation status of the indicator cell and calculate the actual light intensity in combination with the irradiation area;

[0023] The power generation comparison unit is used to calculate the theoretical power generation of the power generation panel according to the light intensity, compare it with the actual power generation, and judge the loss status of the power generation panel.

[0024] Further, the abnormality positioning module includes: an angle adjustment unit, a power generation test unit and a position exchange unit;

[0025] The angle adjustment unit is used to control the power generation panel to adjust the tilt angle according to a preset speed under the same light intensity;

[0026] The power generation test unit is used to read the total current of the power generation panel during the angle adjustment process;

[0027] The position exchange unit is used to analyze the total current change rate of the power generation panel according to the second function of each battery panel in the database, and determine the position of the abnormal battery panel.

[0028] Further, the scheduling and replacement module includes: a scheme accounting unit and a film replacement logistics unit;

[0029] The scheme calculation unit is used to calculate the optimal light efficiency ratio based on historical light intensity, historical tilt angle and cell position;

[0030] The cell replacement logistics unit is used to send the cell with the light efficiency ratio closest to the optimal light efficiency ratio in the inventory as a replacement cell to the power plant.

[0031] An artificial intelligence-based intelligent scheduling method for battery cell production includes the following steps:

[0032] Step S0. When the battery cell is produced, an RFID reader is installed at the entrance and exit of the production equipment, and information is written into the RFID tag of the battery cell to establish a binding relationship between the battery cell and the production equipment and process. The binding relationship is classified and processed using an artificial intelligence model to obtain the flow route of the battery cell and store it in the RFID tag on the battery cell;

[0033] Step S1. When the battery cell leaves the factory, a light test is performed on the battery cell to obtain a first function of the battery cell output current and light intensity, and then a tilt test is performed on the battery cell to obtain a second function of the output current and tilt angle;

[0034] Step S2. Calculate the light efficiency ratio of each cell, construct the power generation panel according to the light efficiency ratio, select the indicator cell at the fixed position of each power generation panel, and calculate the third function of the total power generation of the power generation panel and the light intensity according to the light efficiency ratio of the cells constituting the power generation panel;

[0035] Step S3. After the power generation panel is installed, a current detection device is connected to the indicator cell, the light intensity is kept the same, the output current of each indicator cell is detected at a horizontal angle, and the number of the power generation panel is determined according to the current size of the indicator cell;

[0036] Step S4. When the power generation panel is working, measure the current of the power generation panel at fixed intervals, substitute it into the third function to calculate the light intensity, substitute the light intensity sequence into the first function of each battery cell to calculate the matching degree, and when the matching degree is lower than the threshold, it means that the power generation is abnormal, and go to step S5;

[0037] Step S5. Adjust the angle of the power generation panel, calculate the correlation between the change function of the actual current and the second function of each battery cell, and use the battery cell with the highest correlation as the faulty battery cell. Substitute the historical light intensity of the power generation panel into the first function of each battery cell in the inventory, and send the battery cell with the largest total current as a replacement cell to the power plant.

[0038] Further, step S0 includes:

[0039] Step S01. Use flower basket + RFID as the battery cell carrier, install RFID readers at the entrance and exit of each production equipment, and establish a binding relationship between the reader and the production equipment and process in the system;

[0040] Step S02. When the flower basket passes through the reader, the system records the RFID tag read, binds the production equipment and process information to the battery cell of the flower basket, and calculates the exit reader of the current flower basket battery;

[0041] Step S03. When the battery cell reaches the last process, the binding relationship is classified and processed using an artificial intelligence model, the entire battery cell flow route is recorded, and the production process of the battery cell is completely recorded in the RFID tag.

[0042] In this step, Java can be used as the main development language, combined with PgSql relational database, Hbase big data storage technology, redis as cache technology, Rabbitmq to generate queues, and Pspace as the data collection device operation parameter record to realize the entire data flow record;

[0043] For the classification task of binding relationships, artificial intelligence models such as support vector machines (SVM), decision trees, and random forests can be used. For battery production tasks with complex processes, deep learning models such as convolutional neural networks (CNN) and recurrent neural networks (RNN) can be used for further classification and analysis.

[0044] Further, step S1 includes:

[0045] Step S11. Place the factory cell on a supporting platform, install a test light source above the working surface of the cell, and connect an ammeter to the cell. The supporting platform can adjust the angle of the cell facing the light source through a movable joint, and the test light source can adjust the light intensity according to the set parameters;

[0046] Step S12. Turn on the test light source, start from a light intensity of 0, and increase the light intensity of the light source at a fixed rate until the light intensity reaches a preset maximum value, read the output current of the battery cell on the ammeter, and obtain the first function F(u) of the output current and the light intensity, where u represents the light intensity;

[0047] Step S14. Keep the light source constant, start from the angle where the battery cell is horizontal to the light source, change the inclination angle of the supporting platform at a fixed rate until the battery cell is perpendicular to the light source, read the output current of the battery cell, and obtain the second function G(v) of the output current and the inclination angle, where v represents the inclination angle of the battery cell.

[0048] Further, step S2 includes:

[0049] Step S21. Calculate the light efficiency ratio of the cell according to the following formula:

[0050]

[0051] Wherein, r represents the light efficiency ratio of the cell, G(0) represents the second function value of the cell when the tilt angle is 0, t0 represents the time length for the light intensity of the test light source to increase from 0 to the preset maximum value, U(t) represents the function of the light intensity of the test light source over time, and t represents time;

[0052] Step S22. Arrange all cells in descending order of light intensity to form a selection sequence [W1, W2, ..., Wn], where n represents the number of cells and Wn represents the cell with the nth light efficiency ratio;

[0053] Step S23. The number of cells required for each power generation panel is recorded as m, and m panels are taken out in sequence according to the order of the elements in the selection sequence and arranged in a preset order until the power generation panel is completed, and step S23 is continuously performed until the element in the selection sequence is less than m;

[0054] Step S24. Select a battery panel at the same position of each power generation panel as an indicator battery panel, use the serial number of the indicator battery panel in the selection sequence as the number of the power generation panel, and store the numbers of each battery cell constituting the power generation panel in the database;

[0055] Step S25. Add the first functions of all the cells constituting the power generation panel to obtain function H(u), where H(u) represents the relationship between the total power generation of the power generation panel and the light intensity. Function H(u) is recorded as the third function.

[0056] Further, step S3 includes:

[0057] Step S31. The power generation panels are transported to the power plant for installation. After the power generation panels are installed, a current detection device is connected to the indicator cell and the power generation panel is adjusted to a horizontal state. A photometer is used to measure the light intensity at the location of each power generation panel, and then the current of the indicator cell is measured;

[0058] Step S32: Substitute the light intensity into the first function of each indicator cell to obtain the theoretical current of each indicator cell, select the theoretical current with the smallest difference from the measured current, and bind the indicator cell number corresponding to the theoretical current as the power generation panel number to the database.

[0059] Further, step S4 includes:

[0060] Step S41. After the power generation panel is put into operation, the current of the power generation panel is collected at fixed intervals, and the current is substituted into the third function to obtain the light intensity at the corresponding moment, and a sequence [u1, u2, ..., uk] is formed in chronological order, where k represents the number of sampling times, and uk represents the light intensity calculated by the kth sampling;

[0061] Step S42. Calculate the matching degree of the power generation panel according to the following formula:

[0062]

[0063] Where p represents the matching degree of the power generation panel, uj represents the light intensity calculated by the jth sampling, and Fi represents the first function corresponding to the i-th cell constituting the power generation panel;

[0064] Step S43. When the matching degree p of the power generation panel is lower than the preset threshold value p0, it is determined that the power generation panel is abnormal, and go to step S5.

[0065] Further, step S5 includes:

[0066] Step S51. Adjust the inclination angle of the power generation panel at a fixed rate, record the current generated by the power generation panel during the adjustment process, and obtain a function of the change of current and time, recorded as I(t);

[0067] Step S52: Calculate the correlation between the actual current variation function and the second function of the battery cell according to the following formula:

[0068]

[0069] Among them, Q represents the correlation between the battery cell and the actual current, T0 represents the adjustment time of the tilt angle of the power generation panel, Gi represents the second function corresponding to the i-th battery cell constituting the power generation panel, ur represents the light intensity at this moment, and c represents the adjustment rate of the tilt angle of the power generation panel;

[0070] Step S52. Execute step S52 for each cell constituting the power generation panel to obtain the correlation between the cell and the actual current, and mark the cell with the highest correlation as a faulty cell;

[0071] Step S53. According to the historical sampling records, the historical average light intensity at the location of the power generation panel is obtained, the historical average light intensity is substituted into the first function of each battery cell in the inventory to calculate the current value, and the battery cell with the largest current value is sent to the power plant as a replacement battery cell.

[0072] Compared with the prior art, the beneficial effects achieved by the present invention are:

[0073] 1. The present invention can test the performance of the battery cells before the battery cells leave the factory, calculate the characteristic values ​​of the battery cells according to the test results and the factory standards of the battery cells, and select the battery panel with the largest difference in characteristic values ​​as the indicator battery panel, so as to ensure that the product has good quality before leaving the factory. At the same time, the quality is used as the traceability mark of the battery panel, which is helpful for unified management of the power generation status of the battery panel, improves production efficiency and product performance, and also combines artificial intelligence technology to realize intelligent analysis and planning of the battery cell production process, and ensure intelligent scheduling of battery cell production.

[0074] 2. The present invention can incorporate an indicator battery panel at a fixed position of each power generation panel when constructing the power generation panel, and record the position of each battery panel in the power generation panel in the database. The predicted current of the power generation panel is calculated by the indicator battery panel, and the abnormal state of the power generation panel is identified, which is helpful to timely discover abnormal problems in the power generation process and improve the after-sales quality of the battery panel.

[0075] 3. The present invention can find the abnormal solar panel when the power generation panel is abnormal, and select the corresponding power generation panel specifications for replacement according to the actual efficiency of the abnormal solar panel and the installation position of the power generation panel. The battery composition of the power generation panel can be updated within a period of time, so that the power generation panel can adapt to the specific power generation environment and help maximize the photovoltaic power generation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0076] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0077] Figure 1 It is a structural schematic diagram of an artificial intelligence battery cell production intelligent scheduling optimization system of the present invention;

[0078] Figure 2 It is a schematic diagram of the steps of an artificial intelligence-based intelligent scheduling method for battery cell production of the present invention. DETAILED DESCRIPTION

[0079] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0080] See also Figure 1 , the present invention provides a technical solution: an artificial intelligence battery cell production intelligent scheduling optimization system, including: a battery testing module, a plate construction module, an electronic monitoring module, an abnormal positioning module and a scheduling replacement module;

[0081] The battery test module is used to test the power generation performance of the battery cell by using a variable light intensity illumination light source and a variable angle support platform when the battery cell leaves the factory, adjusting the intensity of the illumination light source and the angle of the support platform at a fixed rate, detecting the current emitted by the battery cell during the test, and drawing a first function of the current changing with the light intensity and a second function of the current changing with the power generation area;

[0082] The battery test module includes: an adjustable light source unit, a variable angle platform unit and a current detection unit;

[0083] The adjustable light source unit is used to provide light source for the battery cell test and adjust the light intensity irradiated on the battery cell according to a preset change curve;

[0084] The variable angle platform unit is used to support the battery cell to be tested, and can adjust the angle of the supporting platform facing the light source through a movable joint;

[0085] The current detection unit is used to detect the magnitude of the current emitted by the battery cell after being irradiated by light, and to draw a current variation curve in a computer.

[0086] The panel construction module is used to calculate the light efficiency ratio of each battery cell according to the average slope of the first function, and use the battery cell with the largest difference in light efficiency ratio as the indicator battery cell. When constructing the power generation panel, the indicator battery cell is added at a fixed position of each power generation panel, and an ammeter is installed behind the indicator battery cell. The sensitivity of each battery cell is stored in a database, and the power generation panel is constructed in the order of sensitivity.

[0087] The plate construction module includes: an indicator board unit and a data recording unit;

[0088] The indicator panel unit is used to determine the indicator cell according to the light efficiency ratio of the cell. When each power generation panel is constructed, the indicator cell is arranged at a fixed position therein;

[0089] The data recording unit is used to record the installation position of the battery cells in each power generation panel in the database.

[0090] The electronic monitoring module is used to calculate the current light intensity according to the current of the indicating battery panel and the angle of the generating panel after the generating panel is used, and after the calculation result is transmitted to the control center, the control center determines the serial number of the generating panel according to the light efficiency ratio of the indicating battery panel, calculates the expected power generation according to the battery cell composition of the generating panel in the database and the first function of the battery cell, and issues an alarm when the difference with the current power generation is higher than a threshold value;

[0091] The electronic monitoring module includes: a light identification unit and a power generation comparison unit;

[0092] The light identification unit is used to detect the power generation status of the indicator cell and calculate the actual light intensity in combination with the irradiation area;

[0093] The power generation comparison unit is used to calculate the theoretical power generation of the power generation panel according to the light intensity, compare it with the actual power generation, and judge the loss status of the power generation panel.

[0094] The abnormal positioning module is used to continuously adjust the angle of the power generation panel under the same lighting conditions when the power generation panel is in an abnormal state, and read the total current change of the power generation panel, and determine the position of the faulty battery cell according to the reading result and the second function of each battery cell;

[0095] The abnormality positioning module includes: an angle adjustment unit, a power generation test unit and a position exchange unit;

[0096] The angle adjustment unit is used to control the power generation panel to adjust the tilt angle according to a preset speed under the same light intensity;

[0097] The power generation test unit is used to read the total current of the power generation panel during the angle adjustment process;

[0098] The position exchange unit is used to analyze the total current change rate of the power generation panel according to the second function of each battery panel in the database, and determine the position of the abnormal battery panel.

[0099] The scheduling replacement module is used to calculate the optimal light efficiency ratio of the replacement battery cell according to the historical light intensity, historical tilt angle and battery cell position of the power generation panel, and select the battery cell with the light efficiency ratio closest to the current battery cell in the inventory as the replacement solution and send it to the power plant.

[0100] The scheduling and replacement module includes: a plan calculation unit and a film replacement logistics unit;

[0101] The scheme calculation unit is used to calculate the optimal light efficiency ratio based on historical light intensity, historical tilt angle and cell position;

[0102] The cell replacement logistics unit is used to send the cell with the light efficiency ratio closest to the optimal light efficiency ratio in the inventory as a replacement cell to the power plant.

[0103] like Figure 2 As shown, an artificial intelligence-based intelligent scheduling method for battery cell production includes the following steps:

[0104] Step S0. When the battery cell is produced, an RFID reader is installed at the entrance and exit of the production equipment to write information into the RFID tag of the battery cell, establish a binding relationship between the battery cell and the production equipment and process, and obtain the flow route of the battery cell after the production is completed. The flow route is stored in the RFID tag on the battery cell;

[0105] Step S0 includes:

[0106] Step S01. Use flower basket + RFID as the battery cell carrier, install RFID readers at the entrance and exit of each production equipment, and establish a binding relationship between the reader and the production equipment and process in the system;

[0107] Step S02. When the flower basket passes through the reader, the system records the RFID tag read, binds the production equipment and process information to the battery cell of the flower basket, calculates the exit reader of the battery of the current flower basket, and thus records the flow route of the entire battery cell;

[0108] Step S03: When the battery cell reaches the last process, the production process of the battery cell is completely recorded in the RFID tag.

[0109] Step S1. When the battery cell leaves the factory, a light test is performed on the battery cell to obtain a first function of the battery cell output current and light intensity, and then a tilt test is performed on the battery cell to obtain a second function of the output current and tilt angle;

[0110] Step S1 includes:

[0111] Step S11. Place the factory cell on a supporting platform, install a test light source above the working surface of the cell, and connect an ammeter to the cell. The supporting platform can adjust the angle of the cell facing the light source through a movable joint, and the test light source can adjust the light intensity according to the set parameters;

[0112] Step S12. Turn on the test light source, start from a light intensity of 0, and increase the light intensity of the light source at a fixed rate until the light intensity reaches a preset maximum value, read the output current of the battery cell on the ammeter, and obtain the first function F(u) of the output current and the light intensity, where u represents the light intensity;

[0113] Step S14. Keep the light source constant, start from the angle where the battery cell is horizontal to the light source, change the inclination angle of the supporting platform at a fixed rate until the battery cell is perpendicular to the light source, read the output current of the battery cell, and obtain the second function G(v) of the output current and the inclination angle, where v represents the inclination angle of the battery cell.

[0114] Step S2. Calculate the light efficiency ratio of each cell, construct the power generation panel according to the light efficiency ratio, select the indicator cell at the fixed position of each power generation panel, and calculate the third function of the total power generation of the power generation panel and the light intensity according to the light efficiency ratio of the cells constituting the power generation panel;

[0115] Step S2 includes:

[0116] Step S21. Calculate the light efficiency ratio of the cell according to the following formula:

[0117]

[0118] Wherein, r represents the light efficiency ratio of the cell, G(0) represents the second function value of the cell when the tilt angle is 0, t0 represents the time length for the light intensity of the test light source to increase from 0 to the preset maximum value, U(t) represents the function of the light intensity of the test light source over time, and t represents time;

[0119] Step S22. Arrange all cells in descending order of light intensity to form a selection sequence [W1, W2, ..., Wn], where n represents the number of cells and Wn represents the cell with the nth light efficiency ratio;

[0120] Step S23. The number of cells required for each power generation panel is recorded as m, and m panels are taken out in sequence according to the order of the elements in the selection sequence and arranged in a preset order until the power generation panel is completed, and step S23 is continuously performed until the element in the selection sequence is less than m;

[0121] Step S24. Select a battery panel at the same position of each power generation panel as an indicator battery panel, use the serial number of the indicator battery panel in the selection sequence as the number of the power generation panel, and store the numbers of each battery cell constituting the power generation panel in the database;

[0122] Step S25. Add the first functions of all the cells constituting the power generation panel to obtain function H(u), where H(u) represents the relationship between the total power generation of the power generation panel and the light intensity. Function H(u) is recorded as the third function.

[0123] Step S3. After the power generation panel is installed, a current detection device is connected to the indicator cell, the light intensity is kept the same, the output current of each indicator cell is detected at a horizontal angle, and the number of the power generation panel is determined according to the current size of the indicator cell;

[0124] Step S3 includes:

[0125] Step S31. The power generation panels are transported to the power plant for installation. After the power generation panels are installed, a current detection device is connected to the indicator cell and the power generation panel is adjusted to a horizontal state. A photometer is used to measure the light intensity at the location of each power generation panel, and then the current of the indicator cell is measured;

[0126] Step S32: Substitute the light intensity into the first function of each indicator cell to obtain the theoretical current of each indicator cell, select the theoretical current with the smallest difference from the measured current, and bind the indicator cell number corresponding to the theoretical current as the power generation panel number to the database.

[0127] Step S4. When the power generation panel is working, measure the current of the power generation panel at fixed intervals, substitute it into the third function to calculate the light intensity, substitute the light intensity sequence into the first function of each battery cell to calculate the matching degree, and when the matching degree is lower than the threshold, it means that the power generation is abnormal, and go to step S5;

[0128] Step S4 includes:

[0129] Step S41. After the power generation panel is put into operation, the current of the power generation panel is collected at fixed intervals, and the current is substituted into the third function to obtain the light intensity at the corresponding moment, and a sequence [u1, u2, ..., uk] is formed in chronological order, where k represents the number of sampling times, and uk represents the light intensity calculated by the kth sampling;

[0130] Step S42. Calculate the matching degree of the power generation panel according to the following formula:

[0131]

[0132] Where p represents the matching degree of the power generation panel, uj represents the light intensity calculated by the jth sampling, and Fi represents the first function corresponding to the i-th cell constituting the power generation panel;

[0133] Step S43. When the matching degree p of the power generation panel is lower than the preset threshold value p0, it is determined that the power generation panel is abnormal, and go to step S5.

[0134] Step S5. Adjust the angle of the power generation panel, calculate the correlation between the change function of the actual current and the second function of each battery cell, and use the battery cell with the highest correlation as the faulty battery cell. Substitute the historical light intensity of the power generation panel into the first function of each battery cell in the inventory, and send the battery cell with the largest total current as a replacement cell to the power plant.

[0135] Step S5 includes:

[0136] Step S51. Adjust the inclination angle of the power generation panel at a fixed rate, record the current generated by the power generation panel during the adjustment process, and obtain a function of the change of current and time, recorded as I(t);

[0137] Step S52: Calculate the correlation between the actual current variation function and the second function of the battery cell according to the following formula:

[0138]

[0139] Among them, Q represents the correlation between the battery cell and the actual current, T0 represents the adjustment time of the tilt angle of the power generation panel, Gi represents the second function corresponding to the i-th battery cell constituting the power generation panel, ur represents the light intensity at this moment, and c represents the adjustment rate of the tilt angle of the power generation panel;

[0140] Step S52. Execute step S52 for each cell constituting the power generation panel to obtain the correlation between the cell and the actual current, and mark the cell with the highest correlation as a faulty cell;

[0141] Step S53. According to the historical sampling records, the historical average light intensity at the location of the power generation panel is obtained, the historical average light intensity is substituted into the first function of each battery cell in the inventory to calculate the current value, and the battery cell with the largest current value is sent to the power plant as a replacement battery cell.

[0142] Embodiment: 20 solar cells are produced in a factory, each power generation panel is composed of 10 solar cells, and 2 power generation panels are constructed in the order of light efficiency ratio. The cell in the center of the power generation panel is designated as the indicator cell. The second functions of the two indicator cells are F1(u)=0.5·u and F2(u)=0.4·u respectively. After the power generation panel is installed, the light intensity at the two installation locations is measured to be 10cd and 12cd respectively, and the current of the power generation panel is 600mA and 400mA respectively. It is judged that the power generation panel 1 is installed at location 1, and the power generation panel 2 is installed at location 2;

[0143] The currents collected during the operation of the power generation panel 1 are 5A, 6A, 6.5A and 4A respectively, and the corresponding light intensities are 15cd, 18cd, 20cd and 10cd, and the matching degree is 55, which is lower than the preset threshold of 60, so it is judged that there is an abnormality in the power generation panel 1.

[0144] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0145] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An artificial intelligence-based intelligent scheduling method for battery cell production, characterized in that: The method comprises the following steps: Step S0. When the battery cell is produced, an RFID reader is installed at the entrance and exit of the production equipment, and information is written into the RFID tag of the battery cell to establish a binding relationship between the battery cell and the production equipment and process. The binding relationship is classified and processed using an artificial intelligence model to obtain the flow route of the battery cell and store it in the RFID tag on the battery cell; Step S1. After the battery cell leaves the factory, a light test is performed on the battery cell to obtain a first function of the battery cell output current and light intensity, and then a tilt test is performed on the battery cell to obtain a second function of the output current and tilt angle; Step S2. Calculate the light efficiency ratio of each cell, construct the power generation panel according to the light efficiency ratio, select the indicator cell at the fixed position of each power generation panel, and calculate the third function of the total power generation of the power generation panel and the light intensity according to the light efficiency ratio of the cells constituting the power generation panel; Step S3. After the power generation panel is installed, a current detection device is connected to the indicator cell, the light intensity is kept the same, the output current of each indicator cell is detected at a horizontal angle, and the number of the power generation panel is determined according to the current size of the indicator cell; Step S4. When the power generation panel is working, measure the current of the power generation panel at fixed intervals, substitute it into the third function to calculate the light intensity, substitute the light intensity sequence into the first function of each battery cell to calculate the matching degree, and when the matching degree is lower than the threshold, it means that the power generation is abnormal, and go to step S5; Step S5. Adjust the angle of the power generation panel, calculate the correlation between the change function of the actual current and the second function of each battery cell, and use the battery cell with the highest correlation as the faulty battery cell. Substitute the historical light intensity of the power generation panel into the first function of each battery cell in the inventory, and send the battery cell with the largest total current as a replacement cell to the power plant.

2. The method for intelligent scheduling of battery cell production based on artificial intelligence according to claim 1, characterized in that: Step S1 includes: Step S11. Place the factory battery cell on the supporting platform, install a test light source above the working surface of the battery cell, and connect an ammeter to the battery cell. The supporting platform can adjust the angle of the battery cell facing the light source through a movable joint, and the test light source adjusts the light intensity according to the set parameters; Step S12. Turn on the test light source, start from a light intensity of 0, and increase the light intensity of the light source at a fixed rate until the light intensity reaches a preset maximum value, read the output current of the battery cell on the ammeter, and obtain the first function F(u) of the output current and the light intensity, where u represents the light intensity; Step S13. Keep the light source constant, start from the angle where the battery cell is horizontal to the light source, change the inclination angle of the supporting platform at a fixed rate until the battery cell is perpendicular to the light source, read the output current of the battery cell, and obtain the second function G(v) of the output current and the inclination angle, where v represents the inclination angle of the battery cell.

3. The method for intelligent scheduling of battery cell production based on artificial intelligence according to claim 2, characterized in that: Step S2 includes: Step S21. Calculate the light efficiency ratio of the cell according to the following formula: Wherein, r represents the light efficiency ratio of the cell, G(0) represents the second function value of the cell when the tilt angle is 0, t0 represents the time length for the light intensity of the test light source to increase from 0 to the preset maximum value, U(t) represents the function of the light intensity of the test light source over time, and t represents time; Step S22. Arrange all cells in descending order of light intensity to form a selection sequence [W1, W2, ..., Wn], where n represents the number of cells and Wn represents the cell with the nth light efficiency ratio; Step S23. The number of cells required for each power generation panel is recorded as m, and m panels are taken out in sequence according to the order of the elements in the selection sequence and arranged in a preset order until the power generation panel is completed, and step S23 is continuously performed until the element in the selection sequence is less than m; Step S24. Select a battery panel at the same position of each power generation panel as an indicator battery panel, use the serial number of the indicator battery panel in the selection sequence as the number of the power generation panel, and store the numbers of each battery cell constituting the power generation panel in the database; Step S25. Add the first functions of all the cells constituting the power generation panel to obtain function H(u), where H(u) represents the relationship between the total power generation of the power generation panel and the light intensity. Function H(u) is recorded as the third function.

4. The method for intelligent scheduling of battery cell production based on artificial intelligence according to claim 3, characterized in that: Step S3 includes: Step S31. The power generation panels are transported to the power plant for installation. After the power generation panels are installed, a current detection device is connected to the indicator cell and the power generation panel is adjusted to a horizontal state. A photometer is used to measure the light intensity at the location of each power generation panel, and then the current of the indicator cell is measured; Step S32. Substitute the light intensity into the first function of each indicator cell to obtain the theoretical current of each indicator cell, select the theoretical current with the smallest difference from the measured current, and bind the indicator cell number corresponding to the theoretical current as the power generation panel number to the database; Step S4 includes: Step S41. After the power generation panel is put into operation, the current of the power generation panel is collected at fixed intervals, and the current is substituted into the third function to obtain the light intensity at the corresponding moment, and a sequence [u1, u2, ..., uk] is formed in chronological order, where k represents the number of sampling times, and uk represents the light intensity calculated by the kth sampling; Step S42. Calculate the matching degree of the power generation panel according to the following formula: Where p represents the matching degree of the power generation panel, uj represents the light intensity calculated by the jth sampling, and Fi represents the first function corresponding to the i-th cell constituting the power generation panel; Step S43. When the matching degree p of the power generation panel is lower than the preset threshold value p0, it is determined that the power generation panel is abnormal, and go to step S5.

5. The method for intelligent scheduling of battery cell production based on artificial intelligence according to claim 4, characterized in that: Step S5 includes: Step S51. Adjust the inclination angle of the power generation panel at a fixed rate, record the current generated by the power generation panel during the adjustment process, and obtain a function of the change of current and time, recorded as I(t); Step S52: Calculate the correlation between the actual current variation function and the second function of the battery cell according to the following formula: Among them, Q represents the correlation between the battery cell and the actual current, T0 represents the adjustment time of the tilt angle of the power generation panel, Gi represents the second function corresponding to the i-th battery cell constituting the power generation panel, ur represents the light intensity at this moment, and c represents the adjustment rate of the tilt angle of the power generation panel; Step S53. Execute step S52 for each cell constituting the power generation panel to obtain the correlation between the cell and the actual current, and mark the cell with the highest correlation as a faulty cell; Step S54. According to the historical sampling records, the historical average light intensity at the location of the power generation panel is obtained, and the historical average light intensity is substituted into the first function of each battery cell in the inventory to calculate the current value, and the battery cell with the largest current value is sent to the power plant as a replacement battery cell.

6. An artificial intelligence battery cell production intelligent scheduling system, characterized in that: The system includes the following modules: a battery testing module, a plate construction module, an electronic monitoring module, an abnormality positioning module and a scheduling replacement module; The battery test module is used to test the power generation performance of the battery cell by using a variable light intensity illumination light source and a variable angle support platform when the battery cell leaves the factory, adjusting the intensity of the illumination light source and the angle of the support platform at a fixed rate, detecting the current emitted by the battery cell during the test, and drawing a first function of the current changing with the light intensity and a second function of the current changing with the power generation area; The panel construction module is used to calculate the light efficiency ratio of each battery cell according to the average slope of the first function, and use the battery cell with the largest difference in light efficiency ratio as the indicator battery cell. When constructing the power generation panel, the indicator battery cell is added at a fixed position of each power generation panel, and an ammeter is installed behind the indicator battery cell. The sensitivity of each battery cell is stored in a database, and the power generation panel is constructed in the order of sensitivity. The electronic monitoring module is used to calculate the current light intensity according to the current of the indicator battery panel and the angle of the power generation panel after the power generation panel is used, and after the calculation result is transmitted to the control center, the control center determines the serial number of the power generation panel according to the light efficiency ratio of the indicator battery panel, generates the first function of the battery cell in the power generation panel according to the parameters of the battery cell in the database, calculates the expected power generation, and issues an alarm when the difference between the expected power generation and the current power generation is higher than a threshold value; The abnormal positioning module is used to continuously adjust the angle of the power generation panel under the same lighting conditions when the power generation panel is in an abnormal state, and read the total current change of the power generation panel, and determine the position of the faulty battery cell according to the reading result and the second function of each battery cell; The scheduling replacement module is used to calculate the optimal light efficiency ratio of the replacement battery cell according to the historical light intensity, historical tilt angle and battery cell position of the power generation panel, and select the battery cell with the light efficiency ratio closest to the current battery cell in the inventory as the replacement solution and send it to the power plant.

7. The artificial intelligence battery production intelligent scheduling system according to claim 6 is characterized by: The battery test module includes: an adjustable light source unit, a variable angle platform unit and a current detection unit; The adjustable light source unit is used to provide light source for the battery cell test and adjust the light intensity irradiated on the battery cell according to a preset change curve; The variable angle platform unit is used to support the battery cell to be tested, and can adjust the angle of the supporting platform facing the light source through a movable joint; The current detection unit is used to detect the magnitude of the current emitted by the battery cell after being irradiated by light, and to draw a current variation curve in a computer.

8. The artificial intelligence battery production intelligent scheduling system according to claim 7 is characterized by: The plate construction module includes: an indicator board unit and a data recording unit; The indicator panel unit is used to determine the indicator cell according to the light efficiency ratio of the cell. When each power generation panel is constructed, the indicator cell is arranged at a fixed position therein; The data recording unit is used to record the installation position of the battery cells in each power generation panel in the database; The electronic monitoring module includes: a light identification unit and a power generation comparison unit; The light identification unit is used to detect the power generation status of the indicator cell and calculate the actual light intensity in combination with the irradiation area; The power generation comparison unit is used to calculate the theoretical power generation of the power generation panel according to the light intensity, compare it with the actual power generation, and judge the loss status of the power generation panel.

9. The artificial intelligence battery production intelligent scheduling system according to claim 8 is characterized by: The abnormality positioning module includes: an angle adjustment unit, a power generation test unit and a position exchange unit; The angle adjustment unit is used to control the power generation panel to adjust the tilt angle according to a preset speed under the same light intensity; The power generation test unit is used to read the total current of the power generation panel during the angle adjustment process; The position exchange unit is used to analyze the total current change rate of the power generation panel according to the second function of each battery panel in the database, and determine the position of the abnormal battery panel.

10. The artificial intelligence battery production intelligent scheduling system according to claim 9 is characterized in that: The scheduling and replacement module includes: a plan calculation unit and a film replacement logistics unit; The scheme calculation unit is used to calculate the optimal light efficiency ratio based on historical light intensity, historical tilt angle and cell position; The cell replacement logistics unit is used to send the cell with the light efficiency ratio closest to the optimal light efficiency ratio in the inventory as a replacement cell to the power plant.