A sealing structure and method for an old kiln shaft in a working surface
By setting up exploration lanes and strengthening supporting structures in the old kiln shaft in the working surface, and using technical means such as anchor net cables, cross joists and ring beams, the stability and sealing problems of the old kiln shaft were solved and the resource recovery rate was improved. and production efficiency, ensuring the safety of mining equipment.
Patent Information
- Application Number
- CN202411116072.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-08-14
AI Technical Summary
Existing technology cannot effectively solve the stability and sealing problems of old kiln shafts in the working surface, resulting in low resource recovery and poor safety. Moreover, existing methods cannot ensure the safe passage of mining equipment in the case of large shafts or unstable coal seams.
The exploration tunnel is used to connect the old kiln shaft and the working face along the tunnel, and the composite reinforced support of the anchor net cable, cross joist and ring beam structure is combined with the design of the roof beam and the bottom beam, and the use of concrete and foam materials for reinforcement. Form a reinforced support section and support structure to ensure the stability and sealing of the wellbore.
It effectively improves the stability and tightness of the old kiln shaft during mining on the working face, avoids the hazards of water accumulation and gas collection, improves resource recovery rate and production efficiency, and ensures the safety of mining equipment and safe production of mines.
Smart Images

Figure CN118640060B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of mine mining and shaft safety closure, and specifically relates to a shaft closure structure and method for an old kiln in a working face. Background Art
[0002] In order to improve the allocation efficiency of coal resources, nearly a thousand coal mines in my country are integrated mines. The typical feature of integrated mines is that there are a large number of old kiln shafts and goafs left over from previous mining within the mining area. There are often hazards such as water accumulation, gas collection, and collapse in the old kiln shafts and goafs, which seriously affect the safe production of mines; among them, the threat of old kiln goafs is mainly located in the coal seam, which can be explored by existing survey methods, and the difficulty of governance is relatively small. There are many studies on the governance of old kiln goafs in the existing technology, and good governance effects have been achieved in the project. However, the threat of old kiln shafts runs through multiple strata in the mine and even penetrates the ground, which is easy to introduce water (or surface water) from the upper strata into the goafs of the lower strata. In addition, the old kiln shafts have been in disrepair for a long time, and their stability is poor, which seriously threatens the production safety of the coal seam below the old kiln shafts. Among them, the old kiln shafts located in the working face of the mining area pose the greatest safety threat. Therefore, the stability and airtightness of the old kiln shafts in the working face is a very important technical problem.
[0003] In the existing papers, patents and reports at home and abroad, there are few studies on the closure of old kiln shafts in working faces, and there is no complete and effective technical solution. At present, the old kiln shafts in the working faces of mines are mostly treated by reserving safe coal pillars. This method is relatively simple and does not increase the construction process and investment, but it reduces the recovery rate of coal resources. When the working face mining advances to the boundary of the safe coal pillar, it is necessary to relocate the mining equipment and rearrange the opening of the cutting eye, which reduces the production efficiency. At the same time, the hazards of water accumulation and gas collection in the old kiln shaft are still retained in the safe coal pillar and have not been effectively eliminated. In the working faces of some mines, the old kiln shafts are treated by setting false tops and false bottoms, and filling the whole shaft. Although these methods guarantee the recovery rate of coal resources, they are only applicable to the situation where the shaft diameter is small and the shaft wall and coal seam are stable. When the shaft diameter is large and the shaft wall and coal seam are stable, the setting of false tops and false bottoms cannot ensure the safe passage of the working face mining equipment, and the new filling consumables and labor costs of the full shaft filling method are large.
[0004] The existing patent CN201710972144.7 discloses "a method for processing abandoned vertical shafts that penetrate close upper and lower coal seam mining working faces". A false top and a false bottom are formed when penetrating close upper and lower coal seam working faces. The bottom shaft is reinforced by coal gangue and concrete pouring to form a false bottom of the working face. The top shaft is reinforced by steel beams and concrete pouring to form a false top of the working face. A flexible support layer of wood piles is set between the upper and lower coal seams. This patent mainly discusses the shaft processing method between close upper and lower coal seams. It cannot provide a good guide for the processing of old kiln shafts that penetrate multiple strata in the mine within the working face. At the same time, the false top and false bottom in the technology have a large additional cost and low production efficiency. When the working face mining is advanced to the shaft position, the stability and safety of the mining equipment cannot be guaranteed. Summary of the invention
[0005] The present invention overcomes the deficiencies of the prior art, and proposes a sealing structure and method for an old kiln shaft in a working face, which solves the problems of low resource recovery rate, poor safety and poor stability when treating old kiln shafts in a working face.
[0006] In order to achieve the above object, the present invention is implemented through the following technical solutions.
[0007] A closed structure for an old kiln shaft in a working face, comprising an exploration tunnel, wherein the exploration tunnel connects the old kiln shaft and the working face drift tunnel; the area between the top of the old kiln shaft and the top plate of the exploration tunnel is the upper section shaft; the area between the top plate of the exploration tunnel and the bottom plate of the exploration tunnel is the exploration tunnel section shaft; the area between the bottom plate of the exploration tunnel and the bottom of the old kiln shaft is the lower section shaft; a top plate beam structure is provided at the top of the exploration tunnel section shaft, and a bottom plate beam structure is provided at the upper end of the lower section shaft.
[0008] An anchor net cable structure, a cross support beam structure and a ring beam structure are arranged in the shaft of the upper section for reinforced support to form a reinforced support section; the anchor net cable structure includes anchor rods, metal nets and anchor cables; the cross support beam structure includes vertical support beams and arc support beams; a vertical support beam is vertically arranged at the bottom end of the anchor rod, and an arc support beam is horizontally arranged at the bottom end of the anchor cable; the ring beam structure is arranged in the middle of the reinforced support section, and the ring beam structure includes cross-arranged cross beams and longitudinal beams, and both ends of the cross beams and longitudinal beams are fixed to the shaft wall of the old kiln shaft through brackets and grouting anchors; foaming material is injected into the shaft above the ring beam structure; the ring beam structure, the top plate beam structure and the old kiln shaft between the ring beam structure and the top plate beam structure are cast as a whole by concrete;
[0009] The lower section of the wellbore is filled with waste materials and ash soil; the ash soil is filled between the waste materials and the bottom plate beam structure.
[0010] Furthermore, a safety net is provided at the uppermost end of the reinforced support section, and the upper surface of the expanded foam material is lower than the safety net; the length of the reinforced support section is 5m~6m, and the height of the ring beam structure from the lowermost end surface of the shaft in the upper section is not less than 2m.
[0011] Furthermore, the roof beam structure includes a roof beam and a support beam. The roof beam is arranged along the exploration direction, and the support beam is arranged perpendicular to the roof beam and below both ends of the roof beam. Single columns are provided below both ends of the support beam to support the entire roof beam structure.
[0012] Furthermore, both ends of the support beam extend into the two walls of the exploration tunnel, and the single column is arranged in the two walls of the exploration tunnel.
[0013] Furthermore, the bottom plate beam structure includes a bottom beam and a steel pad, the bottom beam is arranged along the exploration direction, and the steel pad covers the top of the bottom beam.
[0014] Furthermore, the exploration tunnel is arranged along the coal seam of the working face, with one end of the exploration tunnel connected to the old kiln shaft, and the other end vertically connected to the working face drift tunnel closest to the old kiln shaft. The width of the exploration tunnel is 200mm~800mm smaller than the inner diameter of the old kiln shaft, and the length of the niche after the exploration tunnel is connected to the old kiln shaft is ≥1000mm.
[0015] Furthermore, the anchor rods are evenly arranged perpendicular to the wellbore wall of the upper section, and the anchor rods located below the ring beam structure are provided with exposed sections; the metal mesh is provided on the lowermost end surface of the upper section wellbore and the inner side of the wellbore wall, and the anchor cables are provided with an upward inclination angle of 10°~20° and are evenly arranged in the middle position of the anchor rods.
[0016] Furthermore, the vertical support beam is vertically arranged at the bottom of the entire row of anchor rods, the arc support beam is horizontally arranged at the bottom of two adjacent anchor cables, and the arc support beam is vertically pressed on top of the vertical support beam; in the vertical direction, the arc support beams at the bottom of two adjacent layers of anchor cables are staggered.
[0017] The sealing method based on the sealing structure of the old kiln shaft in the working face comprises the following steps:
[0018] S1: First, arrange the exploration tunnel to connect the old kiln shaft and the working face drift tunnel, use waste materials to fill the lower section of the shaft until the position 1m~2m away from the exploration tunnel floor is filled with lime soil and compacted, and finally set the floor beam structure at the upper end of the lower section of the shaft to form the supporting floor of the working face at the old kiln shaft position;
[0019] S2: Secondly, the upper section of the shaft is reinforced with support: first, anchor rods, metal mesh, and vertical support beams are used for the first support, then anchor cables and arc support beams are used for the second support, and then ring beam structure, brackets, and grouting anchor rods are used for the third support in the middle of the reinforced support section; at the same time, a roof beam structure is set at the top of the shaft in the exploration tunnel section, and a single column is used to support the roof beam structure to form a supporting roof for the working face at the old kiln shaft;
[0020] S3: Finally, a formwork is set up on the lower end face of the roof beam structure in the shaft of the exploration tunnel section, and concrete is first injected through the embedded steel pipe. The ring beam structure, the roof beam structure, and the old kiln shaft between the ring beam structure and the roof beam structure are cast into one body through the concrete; then, the foaming material is injected through the embedded steel pipe, and the foaming material expands and fills the shaft in the upper area of the ring beam structure.
[0021] Furthermore, the ash soil fills and compacts the gaps above the waste materials and the gaps within the bottom plate beam structure.
[0022] The beneficial effects of the present invention compared with the prior art are as follows:
[0023] (1) The closed structure of the old kiln shaft in the working face provided by the present invention innovatively adopts a composite reinforced support of an anchor net cable structure + a cross support beam structure + a ring beam structure in the upper section of the shaft, and at the same time sets a roof beam structure on the top of the shaft in the exploration tunnel section, which can effectively ensure the stability of the shaft in the upper section when the working face mining advances to the position of the old kiln shaft. The exposed section of the anchor rod can increase the strength of the concrete casting, the upward inclination angle of the anchor cable can increase the support range and bearing capacity of the shaft wall, the vertical support beam and the arc support beam are arranged perpendicular to each other to increase the integrity of the anchor rod and the anchor cable, the cross beam and the longitudinal beam of the ring beam structure are arranged crosswise to increase the support force of the inner wall of the shaft, and the roof beam structure can effectively support the gravity of the shaft in the upper section.
[0024] (2) The closed structure of the old kiln shaft in the working face provided by the present invention innovatively pours concrete in the shaft between the ring beam structure, the top beam structure and the ring beam structure, and injects foaming material into the shaft above the ring beam structure, which can effectively ensure the stability and airtightness of the shaft in the upper section. During pouring, the rigid support of concrete is combined with the flexible support of metal materials such as the ring beam structure, the top beam structure, and the exposed section of the anchor rod, thereby enhancing the stability and impact resistance of the shaft in the upper section; the airtight performance of the concrete casting body isolates the hazards of water accumulation and gas accumulation above the old kiln shaft. When the old kiln shaft collapses or large objects fall, the impact force can be first transmitted to the concrete casting body after being buffered by the safety net and the foaming material to eliminate most of the energy, thereby ensuring the stability of the roof and the safety of mining when the working face mining advances to the position of the old kiln shaft.
[0025] (3) The sealing structure and method of the old kiln shaft in the working face provided by the present invention break the conventional method of reserving a safety coal pillar at the old kiln shaft during mining on the working face. It is only necessary to seal and reinforce the old kiln shaft in advance according to the technical solution of the present invention, without leaving a safety coal pillar, thereby improving the resource recovery rate and the economic benefits of the mine; at the same time, when the working face mining is advanced to the position of the old kiln shaft, it can be advanced normally without the need to relocate the mining equipment and rearrange the opening and cutting eyes, thereby improving production efficiency and ensuring the normal mining and excavation succession relationship of the mine.
[0026] (4) The present invention provides a sealing structure and method for the old kiln shaft in the working face. The length of the upper section shaft reinforcement support section is 5m~6m, and a safety net is set at the upper end of the support section. The safety net can basically ensure the safety during the lower section shaft reinforcement construction and the upper section shaft support construction, avoiding accidents of injury caused by falling objects above the shaft, and can also play a buffering and energy dissipation role for falling objects above the shaft in the later stage; the safety net is set at a height of no more than 6m to meet the underground diffusion ventilation requirements. During the support construction, it is only necessary to lay the wind duct of the local ventilator to the junction of the exploration tunnel and the old kiln shaft, which not only reduces the laying length of the wind duct, but also ensures the ventilation safety during the upper section shaft support construction.
[0027] (5) The closed structure of the old kiln shaft in the working face provided by the present invention is reinforced by filling waste materials + ash soil tamping + bottom plate beam structure in the lower section of the shaft, which ensures the stability of the bottom plate support when the working face mining advances to the position of the old kiln shaft. The waste materials can be coal gangue, mining waste, and the wall of the exploration tunnel connecting the old kiln shaft, etc., which can be made from local materials and waste can be utilized; when the waste is filled to a position 1m~2m away from the bottom plate of the exploration tunnel, ash soil is used for filling and tamping. The ash soil can fill the gaps above the waste, making the filled waste more stable and making the bottom plate beam structure at the upper end more stable. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a cross-sectional layout diagram of the closed structure of the old kiln shaft in the working face of the present invention;
[0029] Figure 2 This is a structural layout diagram of the bottom plate beam according to the present invention;
[0030] Figure 3 This is a schematic diagram of the first support section of the present invention;
[0031] Figure 4 This is a schematic diagram of the second support section of the present invention;
[0032] Figure 5 This is a schematic diagram of the third support section of the present invention;
[0033] Figure 6 It is a schematic cross-sectional view of the top beam structure of the present invention;
[0034] Figure 7 It is a schematic diagram of the planar layout of the top beam structure of the present invention;
[0035] In the figure: 1—old kiln shaft; 2—exploration tunnel; 3—safety net; 4—waste; 5—ash soil; 6—bottom beam; 7—steel pad; 8—top beam; 9—support beam; 10—single column; 11—anchor rod; 12—metal mesh; 13—anchor cable; 14—vertical support beam; 15—arc support beam; 16—cross beam; 17—longitudinal beam; 18—support; 19—grouting anchor rod; 20—embedded steel pipe; 21—concrete; 22—foaming material. DETAILED DESCRIPTION
[0036] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention is further described in detail in conjunction with the embodiments and the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. The technical solutions of the present invention are described in detail below in conjunction with the embodiments and the accompanying drawings, but the scope of protection is not limited thereto.
[0037] The present embodiment is a sealing project for an old kiln shaft in a certain integrated coal mine working face. The old kiln shaft 1 is a subsidiary shaft of a small coal kiln before integration. The inner diameter of the shaft is 3.5m. It is supported by stone masonry. The shaft depth is estimated to be 138m, of which the depth below the bottom plate of the mined coal seam is about 8m. The old kiln shaft 1 has been scrapped for more than 20 years and the shaft mouth has been closed long ago. The average thickness of the mined coal seam in the working face is 2.5m. The working face is arranged with an air intake chute roadway and a return air chute roadway. The old kiln shaft 1 is relatively close to the air intake chute roadway (vertical distance is about 26m). The old kiln shaft sealing structure and method provided by the present invention are used for treatment.
[0038] like Figure 1 to Figure 7 As shown, this embodiment provides a sealing structure and method for an old kiln shaft in a working face, and the steps are as follows:
[0039] S1: First, arrange exploration tunnel 2 to connect the old kiln shaft 1 and the working face drift tunnel: exploration tunnel 2 is arranged along the coal seam, one end is connected to the old kiln shaft 1, and the other end is vertically connected to the working face air inlet drift tunnel. The width of exploration tunnel 2 is 200mm~800mm smaller than the inner diameter of the old kiln shaft 1, and the length of the niche after exploration tunnel 2 connects to the old kiln shaft 1 is not less than 1000mm. Divide the old kiln shaft 1 along exploration tunnel 2: the area between the top of the old kiln shaft 1 and the top plate of exploration tunnel 2 is the upper section shaft, the area between the top plate of exploration tunnel 2 and the bottom plate of exploration tunnel 2 is the exploration tunnel section shaft, and the area between the bottom plate of exploration tunnel 2 and the bottom of the old kiln shaft 1 is the lower section shaft.
[0040] Then, a safety net 3 is set in the upper section shaft, and waste materials 4 are used to fill the lower section shaft until the position 1m~2m away from the bottom plate of the exploration tunnel 2 is replaced by lime soil 5 for filling and compaction. Finally, a bottom plate beam structure is set at the upper end of the lower section shaft to form a supporting bottom plate for the working face at the position of the old kiln shaft 1. The bottom plate beam structure includes a bottom beam 6 and a steel pad 7. The bottom beam 6 is arranged along the exploration tunnel 2, and the steel pad 7 covers the top of the bottom beam 6. Figure 2 shown.
[0041] During on-site construction, the height of the safety net 3 should not exceed 6m to meet the requirement of 6m for underground diffusion ventilation. During construction, it is only necessary to lay the wind duct of the local ventilation fan to the junction of the exploration tunnel 2 and the old kiln shaft 1.
[0042] It should be noted that the ash soil 5 should fill and compact the gaps on the upper part of the waste material 4 and the gaps in the bottom beam structure; during on-site construction, the waste material 4 can be made of coal gangue, mining waste, and the wall of the exploration tunnel 2 connecting the old kiln shaft 1, etc., and the materials can be taken locally and the waste can be utilized; the ash soil 5 should be filled to the gap of the bottom beam 6 to better fix the steel pad 7. The specifications and quantity of the bottom beam 6 should be reasonably determined according to the inner diameter of the old kiln shaft 1, the width of the exploration tunnel 2, and the weight of the mining equipment passing above. The spacing of the bottom beam 6 is recommended to be about 1000mm, and the top of the bottom beam 6 is flush with the bottom plate of the exploration tunnel 2. It is recommended that two identical plates be used for the steel pad 7, the length of which should be greater than the inner diameter of the old kiln shaft 1, and the sum of the widths of the two steel pads 7 should be close to the width of the exploration tunnel 2; in order to make the steel pad 7 cover more firmly, the steel pad 7 can be fixed to the bottom beam 6 and the bottom plate of the exploration tunnel 2 by bolts.
[0043] During on-site construction, exploration tunnel 2 is arranged along the coal seam of the working face. When the coal seam is thick, it is arranged along the bottom plate of the coal seam. Its height should not exceed 3m to ensure the stability of the shaft in the upper section. Exploration tunnel 2 needs to be vertically connected to the working face drift tunnel closest to the old kiln shaft 1 to reduce the excavation work of exploration tunnel 2. The width of exploration tunnel 2 should be reasonably determined. When the width of exploration tunnel 2 is smaller than the inner diameter of the old kiln shaft 1 and the difference between the two exceeds 800mm, the bottom plate beam structure and the top plate beam structure in step S2 cannot cover the old kiln shaft 1 well, resulting in too large gaps on both sides, and the stability of the old kiln shaft 1 cannot be guaranteed during the mining of the working face. When the width of exploration tunnel 2 is smaller than the inner diameter of the old kiln shaft 1 and the difference between the two is less than 200mm, or even when the width of exploration tunnel 2 is greater than the inner diameter of the old kiln shaft 1, the shaft wall of the entire exploration tunnel section will be destroyed, and the gravity and ground pressure of the shaft in the upper section will all act on the two sides of exploration tunnel 2. The support of the old kiln shaft 1 is difficult, which is not conducive to mining safety. The length of the niche after the exploration tunnel 2 is connected to the old kiln shaft 1 should not be too long, so as to facilitate construction operations and stably arrange the top beam structure.
[0044] In this embodiment, the exploration tunnel 2 is a rectangular cross-section with a width of 2.8m (700mm smaller than the inner diameter of the old kiln shaft 1, and the center line of the exploration tunnel 2 overlaps with the center line of the old kiln shaft 1), a height of 2.5m (equal to the average thickness of the coal seam), and the length of the niche after the exploration tunnel 2 connects to the old kiln shaft 1 is 1200mm. The main material of the waste 4 is coal gangue, and the ash soil 5 uses 37 ash soil; the bottom beam 6 uses 3 No. 12 miner steels with a spacing of 800mm, one (length 4.5m) is arranged at the center line of the exploration tunnel 2, and one (single length 4.2m) is arranged on both sides; the steel pad 7 uses 2 8mm thick steel plates, with a length of 4.0m and a single width of 1.35m.
[0045] S2: Secondly, the upper section of the shaft below the safety net 3 is reinforced to form a reinforced support section with a length of 5m~6m: first, anchor rods 11+metal mesh 12+vertical support beams 14 are used for the first support, and then anchor cables 13+arc support beams 15 are used for the second support. Then, in the middle of the reinforced support section, ring beam structure+support 18+grouting anchor rods 19 are used for the third support. At the same time, a roof beam structure is set at the top of the shaft in the exploration tunnel section, and a single column 10 is used to support the roof beam structure to form a supporting roof for the working face at the position of the old kiln shaft 1.
[0046] like Figure 3 As shown, the first support includes anchor rods 11, metal mesh 12, and vertical support beams 14; the anchor rods 11 are evenly arranged perpendicular to the wellbore wall of the upper section, the metal mesh 12 is arranged on the lowermost end surface of the upper section wellbore and the inner side of the wellbore wall, and the vertical support beams 14 are vertically arranged at the bottom of the entire row of anchor rods 11. Figure 4 As shown, the second support includes anchor cables 13 and arc support beams 15; the anchor cables 13 are set with an upward inclination angle of 10°~20° and are evenly arranged in the middle position of the anchor rods 11. In the vertical direction, the number of anchor cables 13 is one row less than that of anchor rods 11. The spacing between anchor rods 11 and anchor cables 13 is the same, and is reasonably adjusted according to the inner diameter size of the old kiln shaft 1, the stability of the shaft wall, the stability of the surrounding rock, etc., to ensure the stability of the upper section of the shaft and construction safety. The arc support beams 15 are horizontally arranged at the bottom ends of two adjacent anchor cables 13, and the arc support beams 15 are vertically pressed above the vertical support beams 14; in the vertical direction, the arc support beams 15 at the bottom ends of two adjacent layers of anchor cables 13 are staggered.
[0047] During on-site construction, the vertical support beam 14 can be directly made of steel strips or processed with steel bars; the arc support beam 15 is recommended to be made of channel steel or I-beam processed into an arc shape, the arc needs to fit the inner wall of the old kiln shaft 1, and the length is 400mm longer than the arc length of the two anchor cables 13 (that is, each end is extended by 200mm).
[0048] like Figure 5As shown, the third support includes a ring beam structure, a bracket 18 and a grouting anchor 19. The ring beam structure includes a cross-arranged cross beam 16 and a longitudinal beam 17. Both ends of the cross beam 16 and the longitudinal beam 17 are fixed to the wall of the old kiln shaft 1 through the bracket 18 and the grouting anchor 19. The specifications and quantity of the cross beam 16 and the longitudinal beam 17 should be reasonably determined according to the inner diameter of the old kiln shaft 1 and the stability of the shaft wall. Usually, the number of cross beams 16 and longitudinal beams 17 is 2 to 4. During construction, the bracket 18 is first fixed to the wall of the old kiln shaft 1 by the grouting anchor 19, and then cement mortar is injected into the grouting anchor 19. After the cement mortar fills and stabilizes the cracks in the shaft wall, the cross beam 16 and the longitudinal beam 17 are installed by bolts.
[0049] It should be noted that the height of the ring beam structure from the lowest end surface of the upper section of the shaft is not less than 2m; the anchor rod 11 below the ring beam structure is provided with an exposed section.
[0050] like Figure 6 , 7 As shown, the roof beam structure includes a top beam 8 and a support beam 9. The top beam 8 is arranged along the direction of the exploration tunnel 2, and the support beam 9 is arranged perpendicular to the top beam 8 and below the two ends of the top beam 8. A single column 10 is provided below the two ends of the support beam 9 to support the entire roof beam structure; the two ends of the support beam 9 should extend into the two walls of the exploration tunnel 2, and the single column 10 is arranged in the two walls of the exploration tunnel 2.
[0051] During on-site construction, the specifications and quantity of top beam 8 should be reasonably determined according to the inner diameter of old kiln shaft 1 and the gravity of the upper section of the shaft. The recommended spacing of top beam 8 is 200mm~500mm, and the length of top beam 8 is at least 0.4 times larger than the inner diameter of old kiln shaft 1. The specifications and quantity of support beam 9 should be reasonably determined according to the width of exploration tunnel 2 and the gravity of the upper section of the shaft. It is recommended that support beam 9 be arranged in a double-beam welding manner, and the length of support beam 9 is at least 0.2 times larger than the width of exploration tunnel 2 (that is, the single-end extension length is at least 0.1 times larger than the width of exploration tunnel 2). The specification parameters of the single column 10 should be reasonably determined according to the width and height of the exploration tunnel 2 and the gravity of the upper section of the shaft. The layout position of the single column 10 should be grooved in advance. After the single column 10 is installed, the single column 10 should be fixed in the walls of the exploration tunnel 2 with concrete or other stable materials. When the gravity of the shaft in the upper section is large, two single columns 10 can be set at both ends of the support beam 9 to support it side by side, or one single column 10 can be added in the middle of the support beam 9 for support.
[0052] In this embodiment, the safety net 3 is set at the upper section of the shaft 6m away from the top plate of the exploration tunnel 2. The length of the upper section shaft reinforcement support section is also 6m. The safety net 3 uses a double-layer φ6mm steel mesh with a grid spacing of 100×100mm. The anchor rod 11 uses a Φ22×2400mm threaded steel anchor rod, and the anchor cable 13 uses a φ17.8mm×7000mm steel strand. The spacing between the anchor rod 11 and the anchor cable 13 is 1300mm×1000mm, of which the anchor rod 11 is arranged in 5 layers, and the anchor cable 13 is arranged in 4 layers, with 8 anchors in each layer; the anchor rod 11 is arranged perpendicular to the wall of the old kiln shaft 1, the exposed section length of the anchor rod 11 below the ring beam structure is 500mm, and the upward angle of the anchor cable 13 is 12°.
[0053] The metal mesh 12 is made of φ6mm steel mesh with a mesh spacing of 100×100mm; the vertical support beam 14 is made of φ12mm steel bar, with a width of 80mm and a length of 4.3m (the upper and lower ends are 150mm beyond the position of the anchor rod 11); the arc support beam 15 is made of No. 12 channel steel, with an arc radius of 1.75m and a single length of 1.7m. Four arc support beams 15 are arranged for each of the eight anchor cables 13 in a single layer. The upper end face of the ring beam structure is 2.8m above the top plate of the exploration tunnel 2. Both the cross beam 16 and the longitudinal beam 17 are made of No. 12 mining steel, with three arranged each; the bracket 18 is made of 16mm thick steel plate, and the grouting anchor rod 19 is a Φ25×500mm hollow anchor rod. Each bracket 18 is fixed with four grouting anchor rods 19.
[0054] Both the top beam 8 and the supporting beam 9 are made of No. 12 mining steel. The top beam 8 is arranged at a spacing of 400mm, with a single length of 5.5m, and a total of 7 beams are arranged; the supporting beam 9 is a double beam welded together, with a single length of 3.5m (0.7m larger than the width of the exploration tunnel 2), and a total of 4 beams are arranged; the specification model of the single column 10 is DW31.5-300 / 110X, and a total of 4 beams are arranged (1 beam is arranged at each supporting point).
[0055] S3: Finally, a formwork is set up on the lower end face of the top beam 8 of the top beam structure in the shaft of the exploration tunnel section, and concrete 21 is first injected into the embedded steel pipe 20. The concrete 21 casts the ring beam structure, the top beam 8, and the old kiln shaft 1 between the ring beam structure and the top beam 8 into one. Then, a foaming material 22 is injected into the embedded steel pipe 20. After the foaming material 22 expands, it fills the shaft in the upper area of the ring beam structure.
[0056] During on-site construction, the diameter and number of the embedded steel pipe 20 should be reasonably determined according to the size of the coarse aggregate and the total injection volume of the injected concrete 21. The lower port of the embedded steel pipe 20 should be located on the non-niche side of the exploration tunnel 2, and the lower port position height should be convenient for installing the grouting equipment. The embedded steel pipe 20 should be blocked after construction. It is recommended to arrange the embedded steel pipe 20 for injecting concrete 21 and foaming material 22 separately. If they are arranged together, the embedded steel pipe 20 should be flushed in time after injecting concrete 21 to facilitate the subsequent injection of foaming material 22. The strength grade of concrete 21 shall not be lower than C30. The injection volume should be reasonably calculated and controlled during construction to ensure that the concrete 21 can cast the ring beam structure inside. The foaming material 22 should be selected from materials with expansion characteristics, and the filling height after expansion should be lower than the safety net 3.
[0057] In this embodiment, the embedded steel pipe 20 is a seamless steel pipe of φ108×4mm, and two pipes are provided for injecting concrete 21 and foaming material 22 respectively. The strength grade of the concrete 21 is C35, and the foaming material 22 is a polyurethane foaming agent.
[0058] After on-site verification at the mine, it was found that when the mining of the working face of the mine was advanced to the position of the old kiln shaft, normal mining had been achieved. The lower section of the shaft allowed the mining equipment to pass smoothly, and the upper section of the shaft did not become unstable or leak. Until the entire working face was mined, the old kiln shaft did not show any phenomenon that threatened the safe production of the mine, which proved the feasibility, stability and airtightness of the old kiln shaft sealing structure and method provided by the present invention.
[0059] Furthermore, when the shaft in the lower section is long and it is difficult to fill the waste 4 in the project, the ring beam structure provided by the present invention can be set at a suitable position in the shaft in the lower section, and a layer of steel plate can be laid on the upper end surface of the ring beam structure. Then, the old kiln shaft closing structure and method provided by the present invention can be used to achieve the same function and effect.
[0060] Furthermore, the old kiln shaft sealing structure and method provided by the present invention are not only applicable to the old kiln vertical shaft, but also to the sealing treatment of the old kiln inclined shaft in the working face, and also to the sealing treatment of other abandoned vertical shafts, inclined shafts, inclined tunnels and large boreholes in the working face.
[0061] The above content is a further detailed description of the present invention in combination with a specific preferred embodiment. It cannot be determined that the specific embodiments of the present invention are limited to this. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the present invention, which should be regarded as belonging to the present invention and the scope of patent protection determined by the submitted claims.
Claims
1. A closed structure of an old kiln shaft in a working face, comprising an exploration tunnel (2), wherein the exploration tunnel (2) connects the old kiln shaft (1) and the working face drift tunnel; the area between the top of the old kiln shaft (1) and the top plate of the exploration tunnel (2) is the upper section shaft; the area between the top plate of the exploration tunnel (2) and the bottom plate of the exploration tunnel (2) is the exploration tunnel section shaft; the area between the bottom plate of the exploration tunnel (2) and the bottom of the old kiln shaft (1) is the lower section shaft; characterized in that: A roof beam structure is provided at the top of the shaft in the exploration tunnel section, and a bottom beam structure is provided at the upper end of the shaft in the lower section; An anchor cable structure, a cross beam structure and a ring beam structure are arranged in the upper section of the wellbore for reinforced support to form a reinforced support section; the anchor cable structure comprises an anchor rod (11), a metal mesh (12) and an anchor cable (13); the cross beam structure comprises a vertical beam (14) and an arc beam (15); The anchor rods (11) are evenly arranged perpendicular to the wellbore wall of the upper section wellbore, and the anchor rods (11) located below the ring beam structure are provided with exposed sections; the metal mesh (12) is provided on the lowermost end surface of the wellbore of the upper section and the inner side of the wellbore wall, and the anchor cables (13) are provided with an upward inclination angle of 10° to 20° and are evenly arranged in the middle of the anchor rods (11); The vertical support beam (14) is vertically arranged at the bottom end of the entire row of anchor rods (11), the arc support beam (15) is horizontally arranged at the bottom end of two adjacent anchor cables (13), and the arc support beam (15) is vertically pressed on the top of the vertical support beam (14); in the vertical direction, the arc support beams (15) at the bottom ends of two adjacent layers of anchor cables (13) are staggered; The ring beam structure is arranged in the middle of the reinforced support section, and the ring beam structure includes a cross beam (16) and a longitudinal beam (17) arranged in a cross-shaped manner, and both ends of the cross beam (16) and the longitudinal beam (17) are fixed to the wall of the old kiln shaft (1) through a bracket (18) and a grouting anchor rod (19); a foaming material (22) is injected into the shaft above the ring beam structure; the ring beam structure, the top plate beam structure, and the old kiln shaft (1) between the ring beam structure and the top plate beam structure are cast as a whole through concrete (21); The lower section of the wellbore is filled with waste materials (4) and ash soil (5); the ash soil (5) is filled between the waste materials (4) and the bottom plate beam structure.
2. The closed structure of the old kiln shaft in the working face according to claim 1 is characterized in that: A safety net (3) is provided at the uppermost end of the reinforced support section, and the upper surface of the foamed material (22) after expansion is lower than the safety net (3); the length of the reinforced support section is 5m to 6m, and the height of the ring beam structure from the lowermost end surface of the shaft in the upper section is not less than 2m.
3. The closed structure of the old kiln shaft in the working face according to claim 1 is characterized in that: The roof beam structure comprises a roof beam (8) and a support beam (9), wherein the roof beam (8) is arranged along the direction of the exploration tunnel (2), and the support beam (9) is arranged perpendicular to the roof beam (8) and below both ends of the roof beam (8). Single columns (10) are provided below both ends of the support beam (9) to support the entire roof beam structure.
4. The closed structure of the old kiln shaft in the working face according to claim 3 is characterized in that: Both ends of the support beam (9) extend into the two side walls of the exploration tunnel (2), and the single column (10) is arranged in the two side walls of the exploration tunnel (2).
5. The closed structure of the old kiln shaft in the working face according to claim 1 is characterized in that: The bottom plate beam structure comprises a bottom beam (6) and a steel pad (7), wherein the bottom beam (6) is arranged along the direction of the exploration tunnel (2), and the steel pad (7) covers the top of the bottom beam (6).
6. The closed structure of the old kiln shaft in the working face according to claim 1 is characterized in that: The exploration tunnel (2) is arranged along the coal seam of the working face, one end of the exploration tunnel (2) is connected to the old kiln shaft (1), and the other end is vertically connected to the working face drift tunnel closest to the old kiln shaft (1). The width of the exploration tunnel (2) is 200 mm to 800 mm smaller than the inner diameter of the old kiln shaft (1), and the length of the niche after the exploration tunnel (2) is connected to the old kiln shaft (1) is ≥1000 mm.
7. A method for sealing an old kiln shaft sealing structure in a working face according to any one of claims 1 to 6, characterized in that: The following steps are involved: S1: First, arrange the exploration tunnel (2) to connect the old kiln shaft (1) and the working face drift tunnel, use waste materials (4) to fill the lower section of the shaft until the position 1m~2m away from the bottom plate of the exploration tunnel (2) is changed to lime soil (5) for filling and compaction, and finally set the bottom plate beam structure at the upper end of the lower section of the shaft to form the supporting bottom plate of the working face at the position of the old kiln shaft (1); S2: Secondly, the upper section of the shaft is reinforced with support: firstly, anchor rods (11), metal mesh (12), and vertical support beams (14) are used for the first support, then anchor cables (13) and arc support beams (15) are used for the second support, and then a ring beam structure, a bracket (18), and a grouting anchor rod (19) are used in the middle of the reinforced support section for the third support; at the same time, a roof beam structure is set at the top of the shaft in the exploration tunnel section, and a single column (10) is used to support the roof beam structure, so as to form a supporting roof of the working face at the position of the old kiln shaft (1); S3: Finally, a template is set up on the lower end surface of the roof beam structure in the shaft of the exploration tunnel section, and concrete (21) is first injected through the pre-buried steel pipe (20). The ring beam structure, the roof beam structure, and the old kiln shaft (1) between the ring beam structure and the roof beam structure are cast into one piece through the concrete (21); then, a foaming material (22) is injected through the pre-buried steel pipe (20). After the foaming material (22) expands, it fills the shaft in the upper area of the ring beam structure.
8. The method for sealing the old kiln shaft sealing structure in the working face according to claim 7, characterized in that: The ash soil (5) fills and compacts the gaps above the waste material (4) and the gaps in the bottom beam structure.