A method for evaluating digital twin models of hydropower and pumped storage power station equipment

By simulating and evaluating the target working conditions parameters of hydropower and pumping and storage plant equipment, the subjectivity problem of the accuracy evaluation of digital twin models is solved, the accuracy and credibility of the model are improved, and its effectiveness in practical applications is ensured. sex.

CN118643918BActive Publication Date: 2024-11-08THREE GORGES GROUP IND DEVELOPMENT (BEIJING) CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411090024.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-08
Estimated Expiration
2044-08-09

AI Technical Summary

Technical Problem

In the prior art, the accuracy evaluation of digital twin models relies on human judgment by professionals, and there is subjectivity and it is impossible to accurately determine the qualification of the model output results.

Method used

By obtaining the target working condition parameters for simulation, a target digital twin model is constructed, and the model is evaluated according to the test requirements, the difference between the model output and the preset error range is detected, and the model accuracy is determined to be qualified or unqualified.

Benefits of technology

It improves the accuracy and credibility of the digital twin model, provides a basis for model improvement and optimization, and enhances its effectiveness and accuracy in practical applications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118643918B_ABST
    Figure CN118643918B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of hydropower and pumped storage power station units, and discloses a method for evaluating a digital twin model of hydropower and pumped storage power station equipment, the method comprising: obtaining target operating condition parameters, and simulating the target operating condition parameters to obtain simulation target parameters; training a first model based on the target operating condition parameters and the simulation target parameters to obtain a target digital twin model; and evaluating the target digital twin model based on target test requirements to obtain an evaluation result. The present invention evaluates the target digital twin model according to the target test requirements to obtain an evaluation result, so that the target digital twin model can evaluate its credibility, accuracy, reliability and practicality under different target test requirements, thereby providing a basis for the improvement and optimization of the model, and further improving the effectiveness and accuracy of the digital twin model in practical applications.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hydropower and pumped storage power station units, and specifically to a digital twin model evaluation method, device, computer equipment, storage medium and program product for hydropower and pumped storage power station equipment. Background Art

[0002] With the rapid development of the energy industry and the advancement of digital transformation, the digital and intelligent transformation of power plant operation and maintenance has become an important trend in the development of the industry.

[0003] Currently, digital twin technology is often used to achieve digital and intelligent transformation in power plant operation and maintenance. However, the use of digital twins in power plant operation and maintenance is a key step in moving digital twins from theoretical research to engineering application, and therefore places higher demands on the accuracy of digital twin models.

[0004] However, at present, it is often necessary for professionals to manually evaluate the accuracy of digital twin models, that is, professionals judge whether the results output by the digital twin model are qualified based on their experience with various working conditions.

[0005] However, there is a certain degree of subjectivity in the method of having professionals manually judge whether the results output by the digital twin model are qualified, and thus it is impossible to accurately determine whether the results output by the digital twin model are qualified. Summary of the Invention

[0006] In view of this, the present invention provides a method, device, computer equipment, storage medium and program product for evaluating digital twin models of hydropower and pumped storage power station equipment to solve the problem that there is a certain degree of subjectivity in the method of manually judging whether the results output by the digital twin model are qualified by professionals, and thus it is impossible to accurately determine whether the results output by the digital twin model are qualified.

[0007] In the first aspect, the present invention provides a method for evaluating digital twin models of hydropower and pumped storage power station equipment, the method comprising: obtaining target operating parameters, and simulating the target operating parameters to obtain simulation target parameters; training a first model based on the target operating parameters and the simulation target parameters to obtain a target digital twin model; wherein, the target operating parameters are the input of the first model, and the simulation target parameters are the output of the first model; based on the target test requirements, evaluating the target digital twin model to obtain an evaluation result; wherein, the evaluation result is used to evaluate the accuracy of the target digital twin model of the hydropower and pumped storage power station unit.

[0008] The digital twin model evaluation method for hydropower and pumped-storage power station equipment provided in this embodiment obtains target operating parameters and simulates them to obtain simulated target parameters. This allows the digital twin model to be constructed based on the actual target operating parameters, thereby improving the model's accuracy. Furthermore, the target digital twin model is evaluated based on target testing requirements to obtain evaluation results. This allows the target digital twin model to be evaluated for its credibility, accuracy, reliability, and practicality under different target testing requirements, thereby providing a basis for model improvement and optimization, and further improving the effectiveness and accuracy of the digital twin model in practical applications.

[0009] In an optional embodiment, the target test requirements include at least: target digital twin model accuracy evaluation requirements; wherein, based on the target test requirements, the target digital twin model is evaluated to obtain an evaluation result, including: obtaining any first operating condition of a hydropower and pumped storage power station unit; based on the first operating condition, determining a first target operating condition parameter corresponding to the first operating condition; using a pre-set three-dimensional model to process the first target operating condition parameter to obtain a first target parameter; using the target digital twin model to process the first target operating condition parameter to obtain a second target parameter; detecting whether the first error between the first target parameter and the second target parameter is within a first preset error range; if the first error is within the first preset error range, determining that the target digital twin model accuracy is qualified; if the first error is not within the first preset error range, determining that the target digital twin model accuracy is unqualified.

[0010] The digital twin model evaluation method for hydropower and pumped storage power station equipment provided in this embodiment obtains second target parameters by processing using the target digital twin model, and compares them with the first target parameters obtained by processing the three-dimensional model, thereby verifying the accuracy of the target digital twin model.

[0011] In an optional embodiment, the target test requirements include at least: target digital twin model on-site deployment and debugging accuracy assessment requirements; wherein, based on the target test requirements, the target digital twin model is evaluated to obtain an evaluation result, including: obtaining any second operating condition of the hydropower and pumped storage power station units, and determining the third target parameter based on the second target operating condition parameter corresponding to the second operating condition; wherein, the second operating condition is used to characterize the operating condition of the field test, and the third target parameter is used to characterize the parameter of the field test; the second target operating condition parameter corresponding to the second operating condition is transmitted to the target digital twin model according to the data communication protocol; the second target operating condition parameter is processed using the target digital twin model to obtain the fourth target parameter; detect whether the second error between the third target parameter and the fourth target parameter is within the second preset error range; if the second error is within the second preset error range, the debugging accuracy of the target digital twin model is determined to be qualified; if the second error is not within the second preset error range, the debugging accuracy of the target digital twin model is determined to be unqualified.

[0012] The digital twin model evaluation method for hydropower and pumped storage power station equipment provided in this embodiment is evaluated through the field test operating conditions (i.e., the second operating condition) of the hydropower and pumped storage power station units, which can truly reflect the performance of the model in the actual application environment, making the evaluation results closer to the actual situation and improving the reliability of the evaluation. During the evaluation process, the second target operating condition parameter corresponding to the second operating condition is transmitted to the target digital twin model according to the data communication protocol, thereby improving the accuracy and reliability of the data during the transmission process and avoiding deviations in the evaluation results caused by data transmission errors. In addition, by comparing the third target parameter obtained by field testing with the fourth target parameter obtained by model processing, it is detected whether the second error between the two is within the second preset error range, which can intuitively display the difference between the model processing result and the actual test result, thereby accurately evaluating the debugging accuracy of the model.

[0013] In an optional embodiment, the target test requirements include at least: dynamic accuracy assessment requirements for on-site deployment application evolution; wherein, based on the target test requirements, the target digital twin model is evaluated to obtain an evaluation result, including: obtaining the real-time operating conditions of the hydropower and pumped storage power station units based on the sampling frequency, and determining the fifth target parameter based on the real-time target operating condition parameters corresponding to the real-time operating conditions; using the target digital twin model to process the real-time target operating condition parameters to obtain the sixth target parameter corresponding to the sampling frequency; detecting whether the third error between the fifth target parameter and the sixth target parameter is within the third preset error range; if the third error is within the third preset error range, determining that the accuracy of the target digital twin model is qualified; if the third error is not within the third preset error range, determining that the accuracy of the target digital twin model is unqualified.

[0014] The digital twin model evaluation method for hydropower and pumped-storage power station equipment provided in this embodiment obtains the real-time operating conditions of the hydropower and pumped-storage power station units through the sampling frequency, thereby performing real-time evaluation of the accuracy of the target digital twin model, thereby ensuring the stability and reliability of the model. Moreover, by detecting whether the third error between the fifth target parameter and the sixth target parameter is within the third preset error range, it can be clearly determined whether the accuracy of the target digital twin model is qualified.

[0015] In an optional embodiment, the fifth target parameter includes at least: a first stress parameter and a first pressure parameter, and the sixth target parameter includes at least: a second stress parameter and a second pressure parameter; wherein, when the number of target digital twin models is multiple, the method further includes: constructing an evaluation index system corresponding to the target digital twin model based on the target digital twin model; determining the stress accuracy based on the first stress parameter and the second stress parameter; determining the pressure accuracy based on the first pressure parameter and the second pressure parameter; determining the comprehensive accuracy of the target digital twin model based on the product between the stress accuracy and the pressure accuracy; determining the target coefficient of each target digital twin model based on the comprehensive accuracy and the correlation between the comprehensive accuracy and the preset coefficient; integrating the target coefficient into the evaluation index system to obtain the target evaluation index system corresponding to the target digital twin model.

[0016] The digital twin model evaluation method for hydropower and pumped storage power station equipment provided in this embodiment evaluates the accuracy of the target digital twin model through multiple dimensions, such as a first stress parameter, a first pressure parameter, a second stress parameter, and a second pressure parameter, and can more comprehensively reflect the performance of the target digital twin model in different aspects. Furthermore, based on the correlation between the comprehensive accuracy and the preset coefficient, the target coefficient of each target digital twin model is determined. The introduction of the target coefficient can assign different weights to different models according to the needs of the actual application, thereby more flexibly evaluating the performance of the model.

[0017] In an optional embodiment, before obtaining the target operating condition parameters, the method also includes: determining the initial operating condition parameters corresponding to each operating condition based on all operating conditions of the unit operation process of the hydropower and pumped storage power station; wherein the initial operating condition parameters include at least: upstream water level parameters, tail water level parameters, unit speed, maximum value of guide vane opening parameters and minimum value of guide vane opening parameters; determining the target water level parameters based on the upstream water level parameters and tail water level parameters; determining the target guide vane opening parameters based on the maximum value of the guide vane opening parameters and the minimum value of the guide vane opening parameters; and arranging and combining each target water level parameter, target guide vane opening parameter and unit speed to determine the target operating condition parameters.

[0018] The digital twin model evaluation method for hydropower and pumped-storage power station equipment provided in this embodiment ensures comprehensive evaluation by analysing all operating conditions during the operation of hydropower and pumped-storage power station units. Whether it's power generation, pumping, phase adjustment, or other operating conditions, each can be reflected through corresponding initial operating condition parameters. Furthermore, with clear target operating condition parameters, the target digital twin model can be used to more conveniently simulate and analyze the operation of hydropower and pumped-storage power station units, thereby identifying potential operational issues, proposing improvement measures, and predicting the effectiveness of these improvement measures.

[0019] In the second aspect, the present invention provides a digital twin model evaluation device for hydropower and pumped storage power station equipment, which includes: an acquisition simulation module, used to obtain target operating conditions parameters, and simulate the target operating conditions parameters to obtain simulation target parameters; a training module, used to train a first model based on the target operating conditions parameters and simulation target parameters to obtain a target digital twin model; wherein, the target operating conditions parameters are the input of the first model, and the simulation target parameters are the output of the first model; an evaluation module, used to evaluate the target digital twin model based on target test requirements to obtain an evaluation result; wherein, the evaluation result is used to evaluate the accuracy of the target digital twin model of the hydropower and pumped storage power station unit.

[0020] In a third aspect, the present invention provides a computer device comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the computer instructions to execute the digital twin model evaluation method for hydropower and pumped storage power station equipment according to the first aspect or any corresponding embodiment thereof.

[0021] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, and the computer instructions are used to enable a computer to execute the digital twin model evaluation method for hydropower and pumped storage power station equipment according to the above-mentioned first aspect or any corresponding embodiment thereof.

[0022] In a fifth aspect, the present invention provides a computer program product comprising computer instructions, which are used to enable a computer to execute the digital twin model evaluation method for hydropower and pumped storage power station equipment according to the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the specific embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0024] Figure 1 1 is a flow chart of a method for evaluating a digital twin model of hydropower and pumped storage power station equipment according to an embodiment of the present invention;

[0025] Figure 2 2 is a flow chart of another method for evaluating a digital twin model of hydropower and pumped storage power station equipment according to an embodiment of the present invention;

[0026] Figure 3 1 is a structural block diagram of a digital twin model evaluation device for hydropower and pumped storage power station equipment according to an embodiment of the present invention;

[0027] Figure 4 Schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0028] To make the purpose, technical solutions, and advantages of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative efforts shall fall within the scope of protection of the present invention.

[0029] Based on relevant technologies, it can be seen that with the rapid development of the energy industry and the advancement of digital transformation, the digital and intelligent transformation of power plant operation and maintenance has become an important trend in the development of the industry.

[0030] Currently, digital twin technology is often used to achieve digital and intelligent transformation in power plant operation and maintenance. However, the use of digital twins in power plant operation and maintenance is a key step in moving digital twins from theoretical research to engineering application, and therefore places higher demands on the accuracy of digital twin models.

[0031] However, at present, it is often necessary for professionals to manually evaluate the accuracy of digital twin models, that is, professionals judge whether the results output by the digital twin model are qualified based on their experience with various working conditions.

[0032] However, there is a certain degree of subjectivity in the method of having professionals manually judge whether the results output by the digital twin model are qualified, and thus it is impossible to accurately determine whether the results output by the digital twin model are qualified.

[0033] Based on this, the present invention provides a method for evaluating digital twin models of hydropower and pumped-storage power station equipment. By acquiring target operating parameters and simulating them to obtain simulated target parameters, the digital twin model is constructed based on the actual target operating parameters, thereby improving the model's accuracy. Furthermore, the target digital twin model is evaluated according to target testing requirements to obtain evaluation results. This allows the target digital twin model to be evaluated for its credibility, accuracy, reliability, and practicality under different target testing requirements, thereby providing a basis for model improvement and optimization, and further improving the effectiveness and accuracy of the digital twin model in practical applications.

[0034] According to an embodiment of the present invention, an embodiment of a method for evaluating a digital twin model of hydropower and pumped storage power station equipment is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.

[0035] In this embodiment, a method for evaluating digital twin models of hydropower and pumped storage power station equipment is provided, which can be used for computer equipment such as computers and servers. Figure 1 is a flow chart of a method for evaluating a digital twin model of hydropower and pumped storage power station equipment according to an embodiment of the present invention, such as Figure 1 As shown, the process includes the following steps:

[0036] Step S101: acquiring target operating condition parameters, and simulating the target operating condition parameters to obtain simulation target parameters.

[0037] Target operating parameters are used to characterize the various operating parameters that hydropower and pumped storage power station units may encounter during operation. These parameters may include upstream water level parameters, tailwater level parameters, unit speed parameters, guide vane opening parameters, and the like, without specific limitations. For example, the target operating parameters for target operating condition A may include upstream water level parameter A1, tailwater level parameter A2, unit speed parameter A3, and guide vane opening parameter A4. Another example: the target operating parameters for target operating condition B may include upstream water level parameter B1, tailwater level parameter B2, unit speed parameter B3, and guide vane opening parameter B4.

[0038] Simulation target parameters can be used to represent the expected output parameters calculated by simulation software or neural network models based on target operating parameters. The simulation target parameters reflect the expected performance or behavior of the unit under specific operating conditions.

[0039] Specifically, historical data or experimental data can be queried and used as target operating parameters, and simulation can be performed using existing simulation software or platforms to obtain simulation target parameters. Alternatively, a series of target operating parameters can be manually set based on the actual operating needs of hydropower and pumped storage power stations, and the corresponding simulation target parameters can be predicted using a simulation system. This is not specifically limited here and can be implemented by those skilled in the art.

[0040] Step S102: Train the first model based on the target operating condition parameters and the simulation target parameters to obtain a target digital twin model; wherein the target operating condition parameters are the input of the first model, and the simulation target parameters are the output of the first model.

[0041] The first model can be used to represent the base model or initial model before training. The first model can be a simple physical model, a mathematical model, or a machine learning model. The target digital twin model can be used to represent the trained and optimized model, enabling more accurate simulation of the actual operation of hydropower and pumped storage power station units. Specifically, the first model is constructed using a machine learning algorithm (such as a neural network or support vector machine), and training is performed using target operating parameters and simulation target parameters as training data. The target operating parameters serve as input to the first model, while the simulation target parameters serve as output.

[0042] Preferably, during the training process, the prediction performance of the first model is continuously optimized by adjusting the parameters and structure of the first model until a target digital twin model that meets the requirements is obtained.

[0043] Step S103: Based on the target test requirements, the target digital twin model is evaluated to obtain an evaluation result; wherein the evaluation result is used to evaluate the accuracy of the target digital twin model of the hydropower and pumped storage power station units.

[0044] The target test requirements can be used to characterize the specific requirements and scenarios for evaluating the target digital twin model. Among them, the target test requirements may include: target digital twin model accuracy assessment requirements, target digital twin model on-site deployment and debugging accuracy assessment requirements, on-site deployment application evolution dynamic accuracy assessment requirements, etc., which are not specifically limited here. The evaluation results can be used to characterize the conclusions or scores drawn after testing the target digital twin model, and to measure whether the performance of the model meets the target test requirements. Specifically, the target digital twin model is verified using actual operation data or test data, and the difference between the predicted parameters output by the target digital twin model and the actual parameters is compared to evaluate the accuracy of the model.

[0045] Based on the evaluation results, the target digital twin model is preferably further adjusted and optimized to improve its performance and accuracy. If the evaluation results meet the target test requirements, the target digital twin model can be applied to the actual operation of hydropower and pumped storage power stations to predict, optimize, and control the performance of the units.

[0046] The digital twin model evaluation method for hydropower and pumped-storage power station equipment provided in this embodiment obtains target operating parameters and simulates them to obtain simulated target parameters. This allows the digital twin model to be constructed based on the actual target operating parameters, thereby improving the model's accuracy. Furthermore, the target digital twin model is evaluated based on target testing requirements to obtain evaluation results. This allows the target digital twin model to be evaluated for its credibility, accuracy, reliability, and practicality under different target testing requirements, thereby providing a basis for model improvement and optimization, and further improving the effectiveness and accuracy of the digital twin model in practical applications.

[0047] like Figure 2 As shown, in an optional embodiment, the target test requirements include at least: target digital twin model accuracy assessment requirements; wherein, in the above step S103, the target digital twin model is assessed based on the target test requirements to obtain an assessment result, including:

[0048] Step S2031, obtaining any first operating condition of a hydropower station or a pumped storage power station unit.

[0049] The first operating condition is used to characterize a specific operating state that a hydropower or pumped-storage power station unit may encounter during actual operation or testing. The first operating condition includes specific values ​​for parameters such as the upstream water level, tailwater level, unit speed, and guide vane opening. Specifically, the first operating condition can be simulated using experimental equipment or extracted from historical operating data of hydropower or pumped-storage power stations. This is not specifically limited here and can be implemented by those skilled in the art.

[0050] It should be noted that the target digital twin model accuracy assessment requirement refers to a series of accuracy testing and evaluation requirements for the target digital twin model to ensure that the target digital twin model can accurately reflect the behavior, performance and status of the physical system.

[0051] Step S2032: Based on the first operating condition, determine a first target operating condition parameter corresponding to the first operating condition.

[0052] The first target operating condition parameter can be used to represent a specific parameter value determined based on the first operating condition and input into the target digital twin model. The first target operating condition parameter can be directly extracted from the first operating condition or obtained through calculation or conversion, etc., without specific limitation herein and can be implemented by those skilled in the art.

[0053] Step S2033: Process the first target operating condition parameter using a preset three-dimensional model to obtain the first target parameter.

[0054] The three-dimensional model can be used to represent a three-dimensional physical or mathematical model that simulates the operation of a hydropower or pumped storage power station unit. The three-dimensional model is constructed based on the hydropower or pumped storage turbine or pump-turbine entity. The first target parameter can be used to represent the output parameter obtained after processing the first target operating condition parameter through the three-dimensional model, reflecting the expected performance or behavior of the unit under the first operating condition. Specifically, the three-dimensional model is started and simulation calculations are performed based on the input first target operating condition parameters. During the calculation process, the model simulates the operating status of the unit based on its internal physical laws, mathematical equations or algorithms. During the operation of the model, its operating status and output results are monitored to ensure the stability and correctness of the calculation process, and then the required first target parameters are extracted from the model operation results. These parameters may include performance indicators such as the unit's output, efficiency, flow, vibration, etc., which are not specifically limited here.

[0055] Step S2034: Use the target digital twin model to process the first target operating condition parameter to obtain the second target parameter.

[0056] The second target parameter represents the output parameter obtained by processing the first target operating condition parameter through the target digital twin model. Specifically, the first target operating condition parameter (such as upstream water level, tailwater level, unit speed, guide vane opening, etc.) is provided as input to the target digital twin model. The target digital twin model is activated and configured to perform calculations based on the input first target operating condition parameter. Based on its trained parameters and algorithms, the model simulates the operation of hydropower and pumped storage power station units and predicts their performance or behavior.

[0057] Preferably, before providing the first target operating condition parameters as input to the target digital twin model, the input data can be preprocessed, such as data cleaning, format conversion or scaling, to ensure that they match the input requirements of the model.

[0058] Step S2035 , detecting whether a first error between the first target parameter and the second target parameter is within a first preset error range.

[0059] Step S2036: If the first error is within the first preset error range, the target digital twin model is determined to be qualified in accuracy.

[0060] Step S2037: If the first error is not within the first preset error range, it is determined that the accuracy of the target digital twin model is unqualified.

[0061] The first error can be used to characterize the difference or deviation between the first target parameter and the second target parameter. The first error can be M1 or M2, etc., which is not specifically limited here.

[0062] The first preset error range can be set based on evaluation requirements and is an error threshold range used to determine whether the target digital twin model's accuracy is qualified. The first preset error range can be (N1-N2), (N3-N4), etc., and is not specifically limited here. Specifically, the first error can be calculated using absolute error, relative error, or other appropriate error measurement methods. After determining the first error, the first error between the first target parameter and the second target parameter is detected to determine whether it is within the first preset error range. If the first error is within the first preset error range, the target digital twin model's accuracy is determined to be qualified; if the first error is not within the first preset error range, the target digital twin model's accuracy is determined to be unqualified.

[0063] For example: select a certain working condition (such as the rated working condition), input the first target working condition parameter corresponding to the rated working condition into the pre-set three-dimensional model, and obtain the first target parameter (such as the stress parameter of the three-dimensional model and the pressure parameter of the three-dimensional model), and then input the first target parameter into the target digital twin model to obtain the second target parameter (such as the stress parameter of the target digital twin model and the pressure parameter of the target digital twin model). If the first error between the prediction result of the target digital twin model and the simulation result of the pre-set three-dimensional model is less than 5%, the twin model accuracy is considered reliable. If the simulation result accuracy is greater than 5%, return to re-check the three-dimensional model and working condition library, and rebuild and verify the target digital twin model.

[0064] More specifically, the first error can be determined by the following formula:

[0065] P=(|P LO -P WO |) / P WO ; Where P is the error of stress parameter, P LO is the stress parameter of the target digital twin model, P WO is the stress parameter of the three-dimensional model.

[0066] ó=(|ó LO -ó WO |) / ó WO ; Among them, ó is the error of pressure parameter, ó LO is the pressure parameter of the target digital twin model, WO is the pressure parameter of the three-dimensional model.

[0067] The digital twin model evaluation method for hydropower and pumped storage power station equipment provided in this embodiment obtains second target parameters by processing using the target digital twin model, and compares them with the first target parameters obtained by processing the three-dimensional model, thereby verifying the accuracy of the target digital twin model.

[0068] In an optional embodiment, the target test requirements include at least: on-site deployment and debugging accuracy assessment requirements; wherein, in the above step S103, the target digital twin model is evaluated based on the target test requirements to obtain an assessment result, including:

[0069] Step a1, obtain any second operating condition of the hydropower and pumped storage power station units, and determine the third target parameter based on the second target operating condition parameter corresponding to the second operating condition; wherein the second operating condition is used to characterize the operating condition of the field test, and the third target parameter is used to characterize the parameter of the field test.

[0070] The second operating condition can be used to characterize the specific working state encountered by the hydropower and pumped storage power station units in actual field testing or operation. The second target operating condition parameters can be used to characterize the specific parameter values ​​determined based on the second operating condition for input into the target digital twin model. The third target parameters can be used to characterize the parameter values ​​obtained through field testing or observation for comparison with the output of the target digital twin model, and to characterize the parameters of the field test. Specifically, the second target operating condition parameters, such as water level, flow rate, speed, etc., are obtained through sensors, meters or other measuring equipment, and then the third target operating condition parameters corresponding to each operating condition can be determined from the second target operating condition parameters.

[0071] It should be noted that the on-site deployment and debugging accuracy assessment requirements refer to a series of evaluation and testing requirements that need to be carried out to ensure the accuracy and performance of the model in actual operation when the digital twin model is actually deployed to the on-site environment and debugged.

[0072] Step a2: Transmit the second target operating condition parameters corresponding to the second operating condition to the target digital twin model according to the data communication protocol.

[0073] Data communication protocols, such as TCP / IP and MQTT, represent the rules and standards that ensure the correct parsing and understanding of data during transmission. These protocols are not specifically defined here. Specifically, a stable data communication channel must be established between the target digital twin model and the field data acquisition system. Data transmission may require processing such as data format conversion, encryption and decryption, and compression and decompression to ensure data accuracy and security.

[0074] Step a3: Use the target digital twin model to process the second target operating condition parameter to obtain the fourth target parameter.

[0075] The fourth target parameter represents the output parameter of the target digital twin model after processing the second target operating condition parameter, reflecting the model's prediction of unit performance. Specifically, after field operating data (i.e., the second target operating condition parameter) of hydropower and pumped-storage power station units is collected and transmitted to the target digital twin model, the model uses its internal algorithms, physical models, and historical data to process the data to predict or simulate the unit's performance or behavior under given operating conditions.

[0076] Preferably, the target digital twin model first receives second target operating parameters collected and transmitted from the field. These parameters may include water level, flow rate, temperature, pressure, and other parameters, describing the real-time operating status of the turbine. The target digital twin model preprocesses the received data, including data cleaning (removing outliers and missing values) and data standardization (converting the data to a unified dimension or format) to ensure input data quality and consistency. Based on the preprocessed data, the target digital twin model performs a series of calculations and simulations. These calculations may involve multiple disciplines such as fluid mechanics, thermodynamics, and material mechanics to simulate the turbine's operating conditions under different operating conditions. Based on its internal physical models, algorithms, and parameters, the model predicts the turbine's performance or behavior under these conditions. After the model calculations, the target digital twin model outputs fourth target parameters. These parameters may include indicators such as turbine output, efficiency, vibration, and wear, used to evaluate the turbine's operating performance or predict its future operating status.

[0077] Step a4: Detect whether a second error between the third target parameter and the fourth target parameter is within a second preset error range.

[0078] Step a5: If the second error is within the second preset error range, it is determined that the debugging accuracy of the target digital twin model is qualified.

[0079] Step a6: If the second error is not within the second preset error range, it is determined that the debugging accuracy of the target digital twin model is unqualified.

[0080] The second error can be used to characterize the difference or degree of deviation between the third target parameter and the fourth target parameter. The second preset error range can be an error threshold range set according to the field test requirements for judging whether the debugging accuracy of the target digital twin model is qualified. Specifically, the second error is calculated by comparing the third target parameter and the fourth target parameter. The calculation method of the second error can be selected according to specific needs, such as absolute error, relative error, etc. Whether the debugging accuracy of the target digital twin model is qualified is judged according to the second preset error range. Among them, if the second error is within the second preset error range, the debugging accuracy of the target digital twin model is judged to be qualified. If the second error is not within the second preset error range, the debugging accuracy of the target digital twin model is judged to be unqualified.

[0081] For example, sensors or monitoring equipment can be used to obtain the second operating condition, such as upstream and downstream water levels and guide vane opening data, as well as real-time monitoring data of indicators on the physical entity that are identical to the simulation results of the target digital twin model.

[0082] According to the agreed data communication protocol, transmit the current working condition data to the target digital twin model, trigger the digital twin model to simulate, and obtain the simulation results of the twin model in the debugging phase (that is, the fourth target parameter mentioned above). And record the time t1 and t2 when the results are obtained. Compare the difference between the simulation results of the twin model in the debugging phase and the actual measured indicators on site. If the error is less than 10%, that is , The accuracy is considered reliable. At the same time, if t1 and t2 are less than the timeliness requirement of the twin model (such as 1s), the debugging is successful and can be put into operation. If it is not satisfied, the field working condition data is added to the boundary condition database BoundCond, and the calibration and verification of the target digital twin model are re-performed until the comparison error of the digital twin model is less than 10%; among them, is the pressure parameter of the twin model in the debugging phase, is the stress parameter of the twin model in the debugging stage, is the pressure parameter measured on site, is the stress parameter measured on site.

[0083] The digital twin model evaluation method for hydropower and pumped storage power station equipment provided in this embodiment is evaluated through the field test operating conditions (i.e., the second operating condition) of the hydropower and pumped storage power station units, which can truly reflect the performance of the model in the actual application environment, making the evaluation results closer to the actual situation and improving the reliability of the evaluation. During the evaluation process, the second target operating condition parameter corresponding to the second operating condition is transmitted to the target digital twin model according to the data communication protocol, thereby improving the accuracy and reliability of the data during the transmission process and avoiding deviations in the evaluation results caused by data transmission errors. In addition, by comparing the third target parameter obtained by field testing with the fourth target parameter obtained by model processing, it is detected whether the second error between the two is within the second preset error range, which can intuitively display the difference between the model processing result and the actual test result, thereby accurately evaluating the debugging accuracy of the model.

[0084] In an optional embodiment, the target test requirements include at least: a requirement for dynamic accuracy assessment of the evolution of field-deployed applications; wherein, in step S103, the target digital twin model is evaluated based on the target test requirements to obtain an assessment result, including:

[0085] Step b1: acquiring the real-time operating conditions of the hydropower and pumped storage power station units based on the sampling frequency, and determining the fifth target parameter based on the real-time target operating condition parameters corresponding to the real-time operating conditions.

[0086] The sampling frequency can be used to characterize the rate of data acquisition, that is, how often the real-time operating condition data of the hydropower and pumped storage power station units are obtained. The real-time operating condition is used to characterize the operating status or working conditions of the hydropower and pumped storage power station units at the current time point. The real-time target operating condition parameters are used to characterize the specific parameter values ​​determined based on the real-time operating conditions, and are used to input into the target digital twin model. The fifth target parameter is used to characterize the parameter value corresponding to the real-time operating condition obtained through field testing or observation, and is used to compare with the output of the target digital twin model. Specifically, sensors and measuring equipment are deployed on-site at the hydropower and pumped storage power stations to collect the operating data of the units in real time. According to the sampling frequency, real-time operating condition data is regularly obtained from the sensors and measuring equipment. Based on the real-time operating condition data, the corresponding real-time target operating condition parameters are determined and used as input data.

[0087] It should be noted that the dynamic accuracy assessment requirements for on-site deployment application evolution refer to a series of dynamic accuracy assessment and testing requirements that need to be carried out to ensure that the model can continue to accurately reflect the state and behavior of the physical system as the physical system evolves and changes after the target digital twin model is actually deployed in the on-site environment.

[0088] Step b2: Use the target digital twin model to process the real-time target operating condition parameters to obtain the sixth target parameter corresponding to the sampling frequency.

[0089] The collected real-time target operating parameters are transmitted to the digital twin model. This can be achieved through a high-speed communication network to ensure real-time and accurate data. The real-time target operating parameters transmitted to the digital twin model are processed. This includes data cleaning (removing outliers and noise), data conversion (converting raw data into a format recognizable by the model), and data fusion (integrating data from multiple data sources). The sixth target parameter is extracted from the model calculation results based on a specific sampling frequency.

[0090] Step b3: Detect whether a third error between the fifth target parameter and the sixth target parameter is within a third preset error range.

[0091] Step b4: If the third error is within the third preset error range, the accuracy of the target digital twin model is determined to be qualified.

[0092] Step b5: If the third error is not within the third preset error range, the accuracy of the target digital twin model is determined to be unqualified.

[0093] The third error can be used to characterize the difference or degree of deviation between the fifth and sixth target parameters. The third preset error range can be defined as an error threshold range, set based on the dynamic accuracy assessment requirements of field deployment applications, to determine whether the target digital twin model meets the required accuracy standards. Specifically, the third error is calculated by comparing the fifth target parameter (the parameter value obtained through field testing or observation) with the sixth target parameter (the parameter value predicted by the model). The calculation method for the third error can be selected based on specific needs, such as absolute error or relative error. A determination is made as to whether the third error meets the preset accuracy requirements (i.e., whether it falls within the third preset error range).

[0094] For example, the target data twin model simulation data (such as upstream and downstream water levels and guide vane opening) is recorded at the sampling frequency, and the stress and pressure results of the target data twin model are obtained. The time of the stress and pressure results of the target data twin model, as well as the real-time monitored stress and pressure results, are obtained and stored in the operating data result library TwinRes. The stress and pressure results of the target data twin model in the operating data result library are compared with the real-time monitored stress and pressure to verify the simulation accuracy of the twin model and determine whether the error is still less than 10%. If this value is exceeded, a prompt is issued for model accuracy optimization and debugging. If the time of the stress and pressure results of the target data twin model exceeds the preset timeliness requirement (such as 1s), a prompt is issued that the timeliness requirement is not met.

[0095] Preferably, if the accuracy is insufficient, the twin model is optimized again using the operating condition data in the run data result library during optimization. If the timeliness is not met, the equipment data acquisition equipment and communication equipment are inspected and debugged during downtime until the timeliness requirements are met.

[0096] The digital twin model evaluation method for hydropower and pumped-storage power station equipment provided in this embodiment obtains the real-time operating conditions of the hydropower and pumped-storage power station units through the sampling frequency, thereby performing real-time evaluation of the accuracy of the target digital twin model, thereby ensuring the stability and reliability of the model. Moreover, by detecting whether the third error between the fifth target parameter and the sixth target parameter is within the third preset error range, it can be clearly determined whether the accuracy of the target digital twin model is qualified.

[0097] In an optional embodiment, the fifth target parameter includes at least a first stress parameter and a first pressure parameter, and the sixth target parameter includes at least a second stress parameter and a second pressure parameter; wherein, when there are multiple target digital twin models, the above method further includes:

[0098] Step c1: Based on the target digital twin model, construct an evaluation index system corresponding to the target digital twin model.

[0099] The evaluation index system is used to characterize the framework structure of each target digital twin model. This evaluation index system can include primary and secondary indicators. For example, there may be three target digital twin models in the primary indicator and four target digital twin models in the secondary indicator, but this is not a specific limitation.

[0100] Step c2: determining stress accuracy based on the first stress parameter and the second stress parameter.

[0101] Stress accuracy can be used to characterize the comprehensive stress accuracy of the target digital twin model. The stress accuracy can be determined by the following formula:

[0102] W P =1-(|P LO -P WO |) / P WO Among them, W P is the pressure accuracy, P LO is the stress parameter of the target digital twin model, P WO is the stress parameter of the three-dimensional model.

[0103] Step c3: determining the pressure accuracy based on the first pressure parameter and the second pressure parameter.

[0104] Pressure accuracy can be used to characterize the comprehensive pressure accuracy of the target digital twin model. The pressure accuracy can be determined by the following formula:

[0105] W ó =1-(|ó LO -ó WO |) / ó WO Among them, W ó is the pressure accuracy, LO is the pressure parameter of the target digital twin model, WO is the pressure parameter of the three-dimensional model.

[0106] In step c4, the comprehensive accuracy of the target digital twin model is determined based on the product of stress accuracy and pressure accuracy.

[0107] W=W P ×W ó ; Where W is the comprehensive accuracy of the target digital twin model.

[0108] Step c5: Determine the target coefficients of each target digital twin model based on the comprehensive accuracy and the correlation between the comprehensive accuracy and the preset coefficients.

[0109] A target coefficient is determined for each target digital twin model based on a certain correlation between the comprehensive accuracy and the preset coefficient (such as a linear relationship, a nonlinear relationship, etc.). This coefficient can be used in subsequent model selection, optimization, or decision-making processes.

[0110] Step c6: Integrate the evaluation index system based on the target coefficient to obtain the target evaluation index system corresponding to the target digital twin model.

[0111] The target coefficient determined in step c5 is incorporated into the evaluation index system constructed in step c1 to form a new target evaluation index system that includes the target coefficient. This new index system can be used to more accurately evaluate the performance of the target digital twin model. For example, a target digital twin model with an accuracy rate above 80% can be used as a first-level index. A target digital twin model with an accuracy rate between 40% and 80% can be used as a second-level index, and so on. This is not specifically limited here.

[0112] The digital twin model evaluation method for hydropower and pumped storage power station equipment provided in this embodiment evaluates the accuracy of the target digital twin model through multiple dimensions, such as a first stress parameter, a first pressure parameter, a second stress parameter, and a second pressure parameter, and can more comprehensively reflect the performance of the target digital twin model in different aspects. Furthermore, based on the correlation between the comprehensive accuracy and the preset coefficient, the target coefficient of each target digital twin model is determined. The introduction of the target coefficient can assign different weights to different models according to the needs of the actual application, thereby more flexibly evaluating the performance of the model.

[0113] In an optional embodiment, the above method further includes:

[0114] Step d1, based on all operating conditions of the unit operation process of the hydropower and pumped storage power station, determine the initial operating condition parameters corresponding to each operating condition; wherein the initial operating condition parameters include at least: upstream water level parameter, tail water level parameter, unit speed, maximum value of guide vane opening parameter and minimum value of guide vane opening parameter.

[0115] Operating conditions can be used to characterize all possible operating conditions before a device or system begins operation. Initial operating condition parameters can be used to characterize the parameters corresponding to all possible operating conditions before a device or system begins operation. Initial operating condition parameters include at least: upstream water level parameters, tailwater level parameters, unit speed, maximum guide vane opening parameters, and minimum guide vane opening parameters.

[0116] It should be noted that the upstream water level parameter refers to the water level of the reservoir upstream of the hydropower station. The tailwater level parameter refers to the water level of the tailwater channel or river downstream of the hydropower station. The unit speed refers to the rotational speed of the turbine generator unit rotor. The guide vane opening parameter is the main regulating mechanism that controls the water flow and power of the turbine. The opening size affects the turbine output.

[0117] Step d2: determining the target water level parameter based on the upstream water level parameter and the tail water level parameter.

[0118] Based on the upstream and tailwater level parameters, combined with the operational requirements and safety constraints of the power plant, one or more target water level parameters can be determined. The target water level parameters may be to meet specific power generation requirements, flood control, or other purposes.

[0119] Step d3: determining a target guide vane opening parameter based on the maximum value and the minimum value of the guide vane opening parameter.

[0120] Based on the maximum and minimum guide vane opening parameters, combined with the unit's operating characteristics and requirements, one or more target guide vane opening parameters can be determined. These parameters will be used to control the water flow and output of the turbine.

[0121] Preferably, each parameter generates no less than 30 sets of training data and puts them into the database, such as:

[0122] ;in, represents the minimum guide vane opening, Represents the maximum guide vane opening, sample number .

[0123] Step d4: Arrange and combine the target water level parameters, target guide vane opening parameters, and unit speed to determine the target operating parameters.

[0124] When determining the target water level parameters, target guide vane opening parameters and unit speed corresponding to each operating condition, the target water level parameters, target guide vane opening parameters and unit speed are arranged and combined to obtain a variety of target operating condition parameters.

[0125] Preferably, the execution process of the above steps S2031 to S2037, the above steps a1 to a6, and the steps b1 to b5 may be: first execute steps S2031 to S2037, then execute steps a1 to a6, and then execute steps b1 to b5.

[0126] The digital twin model evaluation method for hydropower and pumped-storage power station equipment provided in this embodiment ensures comprehensive evaluation by analysing all operating conditions during the operation of hydropower and pumped-storage power station units. Whether it's power generation, pumping, phase adjustment, or other operating conditions, each can be reflected through corresponding initial operating condition parameters. Furthermore, with clear target operating condition parameters, the target digital twin model can be used to more conveniently simulate and analyze the operation of hydropower and pumped-storage power station units, thereby identifying potential operational issues, proposing improvement measures, and predicting the effectiveness of these improvement measures.

[0127] In this embodiment, a digital twin model evaluation device for hydropower and pumped storage power station equipment is also provided. The device is used to implement the above-mentioned embodiments and preferred implementation methods, and the details that have been described will not be repeated. As used below, the term "module" can be a combination of software and / or hardware that implements a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, implementation in hardware, or a combination of software and hardware, is also possible and conceivable.

[0128] This embodiment provides a digital twin model evaluation device for hydropower and pumped storage power station equipment, such as Figure 3 As shown, it includes: an acquisition simulation module 301, which is used to obtain target operating condition parameters and simulate the target operating condition parameters to obtain simulation target parameters; a training module 302, which is used to train the first model based on the target operating condition parameters and the simulation target parameters to obtain a target digital twin model; wherein, the target operating condition parameters are the input of the first model, and the simulation target parameters are the output of the first model; an evaluation module 303, which is used to evaluate the target digital twin model based on the target test requirements to obtain an evaluation result; wherein, the evaluation result is used to evaluate the accuracy of the target digital twin model of the hydropower and pumped storage power station units.

[0129] In an optional embodiment, the target test requirements include at least: target digital twin model accuracy evaluation requirements; wherein, the evaluation module 303 includes: a first acquisition unit, used to obtain any first operating condition of a hydropower and pumped storage power station unit; a first determination unit, used to determine the first target operating condition parameter corresponding to the first operating condition based on the first operating condition; a first processing unit, used to process the first target operating condition parameter using a preset three-dimensional model to obtain the first target parameter; a second processing unit, used to process the first target operating condition parameter using the target digital twin model to obtain the second target parameter; a first detection unit, used to detect whether the first error between the first target parameter and the second target parameter is within a first preset error range; a first judgment unit, used to determine that the accuracy of the target digital twin model is qualified if the first error is within the first preset error range; a second judgment unit, used to determine that the accuracy of the target digital twin model is unqualified if the first error is not within the first preset error range.

[0130] In an optional embodiment, the target test requirements include at least: target digital twin model on-site deployment debugging accuracy assessment requirements; wherein, the evaluation module 303 includes: a second acquisition unit, used to obtain any second operating condition of the hydropower and pumped storage power station units, and determine the third target parameter based on the second target operating condition parameter corresponding to the second operating condition; wherein, the second operating condition is used to characterize the operating condition of the field test, and the third target parameter is used to characterize the parameter of the field test; a transmission unit, used to transmit the second target operating condition parameter corresponding to the second operating condition to the target digital twin model according to the data communication protocol; a third processing unit, used to use the target digital twin model to process the second target operating condition parameter to obtain the fourth target parameter; a second detection unit, used to detect whether the second error between the third target parameter and the fourth target parameter is within the second preset error range; a third judgment unit, used to determine that the debugging accuracy of the target digital twin model is qualified if the second error is within the second preset error range; and a fourth judgment unit, used to determine that the debugging accuracy of the target digital twin model is unqualified if the second error is not within the second preset error range.

[0131] In an optional embodiment, the target test requirements include at least: dynamic accuracy assessment requirements for on-site deployment application evolution; wherein, the assessment module 303 includes: a third acquisition unit, used to obtain the real-time operating conditions of hydropower and pumped storage power station units based on the sampling frequency, and determine the fifth target parameter based on the real-time target operating condition parameters corresponding to the real-time operating conditions; a fourth processing unit, used to process the real-time target operating condition parameters using the target digital twin model to obtain the sixth target parameter corresponding to the sampling frequency; a third detection unit, used to detect whether the third error between the fifth target parameter and the sixth target parameter is within a third preset error range; a fifth judgment unit, used to determine that the accuracy of the target digital twin model is qualified if the third error is within the third preset error range; and a sixth judgment unit, used to determine that the accuracy of the target digital twin model is unqualified if the third error is not within the third preset error range.

[0132] In an optional embodiment, the fifth target parameter includes at least: a first stress parameter and a first pressure parameter, and the sixth target parameter includes at least: a second stress parameter and a second pressure parameter; wherein the above-mentioned device also includes: a construction module, which is used to construct an evaluation index system corresponding to the target digital twin model based on the target digital twin model; a first determination module, which is used to determine the stress accuracy based on the first stress parameter and the second stress parameter; a second determination module, which is used to determine the pressure accuracy based on the first pressure parameter and the second pressure parameter; a third determination module, which is used to determine the comprehensive accuracy of the target digital twin model based on the product between the stress accuracy and the pressure accuracy; a fourth determination module, which is used to determine the target coefficient of each target digital twin model based on the comprehensive accuracy and the correlation between the comprehensive accuracy and the preset coefficient; an integration module, which is used to integrate the evaluation index system based on the target coefficient to obtain the target evaluation index system corresponding to the target digital twin model.

[0133] In an optional embodiment, the above-mentioned device also includes: a fifth determination module, which is used to determine the initial operating condition parameters corresponding to each operating condition based on all operating conditions of the unit operation process of the hydropower and pumped storage power station; wherein the initial operating condition parameters include at least: upstream water level parameters, tail water level parameters, unit speed, maximum value of guide vane opening parameters and minimum value of guide vane opening parameters; a sixth determination module, which is used to determine the target water level parameters based on the upstream water level parameters and tail water level parameters; a seventh determination module, which is used to determine the target guide vane opening parameters based on the maximum value of the guide vane opening parameters and the minimum value of the guide vane opening parameters; an eighth determination module, which is used to arrange and combine each target water level parameter, target guide vane opening parameter and unit speed to determine the target operating condition parameters.

[0134] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.

[0135] The digital twin model evaluation device for hydropower and pumped storage power station equipment in this embodiment is presented in the form of a functional unit, where the functional unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.

[0136] The embodiment of the present invention also provides a computer device having the above Figure 3 The digital twin model evaluation device for hydropower and pumped storage power station equipment is shown.

[0137] See also Figure 4 , Figure 4 is a structural diagram of a computer device provided by an optional embodiment of the present invention, such as Figure 4 As shown, the computer device includes: one or more processors 10, memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components utilize different buses to communicate with each other and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in the memory or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Equally, multiple computer devices can be connected, and each device provides part of the necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 4 A processor 10 is taken as an example.

[0138] The processor 10 may be a central processing unit, a network processor, or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be an application-specific integrated circuit, a programmable logic device, or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic, or any combination thereof.

[0139] The memory 20 stores instructions that can be executed by at least one processor 10, so as to enable at least one processor 10 to execute the method shown in the above embodiment.

[0140] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and application programs required for at least one function; the data storage area may store data created based on the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely located relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0141] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid-state drive; the memory 20 may also include a combination of the above types of memory.

[0142] The computer device further includes a communication interface 30 for the computer device to communicate with other devices or a communication network.

[0143] The embodiment of the present invention also provides a computer-readable storage medium. The above-mentioned method according to the embodiment of the present invention can be implemented in hardware, firmware, or implemented as a computer code that can be recorded in a storage medium, or implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and downloaded through a network and will be stored in a local storage medium, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state drive, etc.; further, the storage medium can also include a combination of the above-mentioned types of memory. It can be understood that a computer, a processor, a microprocessor controller or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor or hardware, the method shown in the above embodiment is implemented.

[0144] A portion of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the form in which the computer program instruction exists in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc. Accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium that can be accessed by the computer.

[0145] Although the embodiments of the present invention have been described with reference to the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention. Such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for evaluating a digital twin model of hydropower and pumped storage power station equipment, characterized in that: The method comprises: Acquiring target operating condition parameters, and simulating the target operating condition parameters to obtain simulation target parameters; The first model is trained based on the target operating condition parameter and the simulation target parameter to obtain a target digital twin model; wherein the target operating condition parameter is an input of the first model, and the simulation target parameter is an output of the first model; Based on the target test requirements, the target digital twin model is evaluated to obtain an evaluation result; wherein the evaluation result is used to evaluate the accuracy of the target digital twin model of the hydropower and pumped storage power station units; The target test requirements at least include: target digital twin model accuracy assessment requirements; wherein, based on the target test requirements, the target digital twin model is assessed to obtain an assessment result, including: Obtain any first operating condition of a hydropower or pumped storage power station unit; Based on the first operating condition, determining a first target operating condition parameter corresponding to the first operating condition; Processing the first target operating condition parameter using a preset three-dimensional model to obtain a first target parameter; Processing the first target operating condition parameter using the target digital twin model to obtain a second target parameter; Detecting whether a first error between the first target parameter and the second target parameter is within a first preset error range; If the first error is within a first preset error range, it is determined that the accuracy of the target digital twin model is qualified; If the first error is not within a first preset error range, it is determined that the accuracy of the target digital twin model is unqualified; Determine the first error using the following formula: P=(|P LO -P WO |) / P WO ; Where P is the error of stress parameters, P LO is the stress parameter of the target digital twin model, P WO is the stress parameter of the three-dimensional model; ó=(|ó LO - WO |) / ó WO ; where ó is the error of the pressure parameter, ó LO is the pressure parameter of the target digital twin model, WO is the pressure parameter of the three-dimensional model; The target test requirements at least include: target digital twin model on-site deployment and debugging accuracy assessment requirements; wherein, based on the target test requirements, the target digital twin model is assessed to obtain an assessment result, including: Obtain any second operating condition of a hydropower and pumped storage power station unit, and determine a third target parameter based on a second target operating condition parameter corresponding to the second operating condition; wherein the second operating condition is used to characterize the operating condition of a field test, and the third target parameter is used to characterize the parameter of the field test; Transmitting a second target operating condition parameter corresponding to the second operating condition to the target digital twin model according to a data communication protocol; Processing the second target operating condition parameter using the target digital twin model to obtain a fourth target parameter; Detecting whether a second error between the third target parameter and the fourth target parameter is within a second preset error range; If the second error is within a second preset error range, it is determined that the debugging accuracy of the target digital twin model is qualified; If the second error is not within the second preset error range, it is determined that the debugging accuracy of the target digital twin model is unqualified; The target test requirements at least include: dynamic accuracy assessment requirements for on-site deployment application evolution; wherein, based on the target test requirements, the target digital twin model is evaluated to obtain an assessment result, including: Acquire the real-time operating conditions of the hydropower and pumped storage power station units based on the sampling frequency, and determine the fifth target parameter based on the real-time target operating condition parameters corresponding to the real-time operating conditions; Processing the real-time target operating condition parameter using the target digital twin model to obtain a sixth target parameter corresponding to the sampling frequency; Detecting whether a third error between the fifth target parameter and the sixth target parameter is within a third preset error range; If the third error is within a third preset error range, it is determined that the accuracy of the target digital twin model is qualified; If the third error is not within the third preset error range, it is determined that the accuracy of the target digital twin model is unqualified; Stress accuracy is determined by the following formula: W P =1-(|P LO -P WO |) / P WO ; Among them, W P is the pressure accuracy, P LO is the stress parameter of the target digital twin model, P WO is the stress parameter of the three-dimensional model; Pressure accuracy is determined by the following formula: W ó =1-(|ó LO - WO |) / ó WO ; Among them, W ó is the pressure accuracy, LO is the pressure parameter of the target digital twin model, WO is the pressure parameter of the three-dimensional model.

2. The method for evaluating the digital twin model of hydropower and pumped storage power station equipment according to claim 1, characterized in that: The fifth target parameter includes at least a first stress parameter and a first pressure parameter, and the sixth target parameter includes at least a second stress parameter and a second pressure parameter; wherein, when there are multiple target digital twin models, the method further includes: Based on the target digital twin model, construct an evaluation index system corresponding to the target digital twin model; determining a stress accuracy based on the first stress parameter and the second stress parameter; determining a pressure accuracy based on the first pressure parameter and the second pressure parameter; Determining a comprehensive accuracy of a target digital twin model based on a product of the stress accuracy and the pressure accuracy; Determine the target coefficient of each target digital twin model based on the comprehensive accuracy and the correlation between the comprehensive accuracy and the preset coefficient; Based on the target coefficient being integrated into the evaluation index system, a target evaluation index system corresponding to the target digital twin model is obtained.

3. The method for evaluating the digital twin model of hydropower and pumped storage power station equipment according to any one of claims 1 to 2, characterized in that: Before obtaining the target operating condition parameters, the method further includes: According to all the operating conditions of the unit operation process of the hydropower and pumped storage power station, the initial operating condition parameters corresponding to each of the operating conditions are determined; wherein the initial operating condition parameters at least include: an upstream water level parameter, a tail water level parameter, a unit speed, a maximum value of a guide vane opening parameter, and a minimum value of a guide vane opening parameter; Determining a target water level parameter based on the upstream water level parameter and the tail water level parameter; Determining a target guide vane opening parameter based on a maximum value of the guide vane opening parameter and a minimum value of the guide vane opening parameter; The target water level parameters, the target guide vane opening parameters and the unit speed are arranged and combined to determine the target operating condition parameters.

4. A digital twin model evaluation device for hydropower and pumped storage power station equipment, characterized in that: The device comprises: The simulation module is used to obtain target operating parameters and simulate the target operating parameters to obtain simulation target parameters; A training module, used to train the first model based on the target operating condition parameter and the simulation target parameter to obtain a target digital twin model; wherein the target operating condition parameter is an input of the first model, and the simulation target parameter is an output of the first model; An evaluation module, used to evaluate the target digital twin model based on the target test requirements to obtain an evaluation result; wherein the evaluation result is used to evaluate the accuracy of the target digital twin model of the hydropower and pumped storage power station units; The target test requirements at least include: target digital twin model accuracy assessment requirements; wherein the assessment module includes: a first acquisition unit, used to obtain any first operating condition of a hydropower and pumped storage power station unit; a first determination unit, used to determine the first target operating condition parameter corresponding to the first operating condition based on the first operating condition; a first processing unit, used to process the first target operating condition parameter using a preset three-dimensional model to obtain the first target parameter; a second processing unit, used to process the first target operating condition parameter using the target digital twin model to obtain the second target parameter; a first detection unit, used to detect whether the first error between the first target parameter and the second target parameter is within a first preset error range; a first determination unit, used to determine that the accuracy of the target digital twin model is qualified if the first error is within the first preset error range; a second determination unit, used to determine that the accuracy of the target digital twin model is unqualified if the first error is not within the first preset error range; wherein the first error is determined by the following formula: P=(|P LO -P WO |) / P WO ; Where P is the error of stress parameters, P LO is the stress parameter of the target digital twin model, P WO is the stress parameter of the three-dimensional model; ó=(|ó LO - WO |) / ó WO ; where ó is the error of the pressure parameter, ó LO is the pressure parameter of the target digital twin model, WO is the pressure parameter of the three-dimensional model; The target test requirements at least include: the target digital twin model on-site deployment debugging accuracy assessment requirements; wherein, the assessment module includes: a second acquisition unit, used to obtain any second operating condition of the hydropower and pumped storage power station units, and determine the third target parameter based on the second target operating condition parameter corresponding to the second operating condition; wherein, the second operating condition is used to characterize the operating condition of the field test, and the third target parameter is used to characterize the parameter of the field test; a transmission unit, used to transmit the second target operating condition parameter corresponding to the second operating condition to the target digital twin model according to the data communication protocol; a third processing unit, used to process the second target operating condition parameter using the target digital twin model to obtain a fourth target parameter; a second detection unit, used to detect whether the second error between the third target parameter and the fourth target parameter is within a second preset error range; a third determination unit, used to determine that the debugging accuracy of the target digital twin model is qualified if the second error is within the second preset error range; a fourth determination unit, used to determine that the debugging accuracy of the target digital twin model is unqualified if the second error is not within the second preset error range; The target test requirements at least include: the requirements for dynamic accuracy evaluation of the evolution of the on-site deployment application; wherein the evaluation module includes: a third acquisition unit, which is used to obtain the real-time operating conditions of the hydropower and pumped storage power station units based on the sampling frequency, and determine the fifth target parameter based on the real-time target operating condition parameters corresponding to the real-time operating conditions; a fourth processing unit, which is used to process the real-time target operating condition parameters using the target digital twin model to obtain the sixth target parameter corresponding to the sampling frequency; a third detection unit, which is used to detect whether the third error between the fifth target parameter and the sixth target parameter is within the third preset error range; a fifth determination unit, which is used to determine that the accuracy of the target digital twin model is qualified if the third error is within the third preset error range; a sixth determination unit, which is used to determine that the accuracy of the target digital twin model is unqualified if the third error is not within the third preset error range; wherein the stress accuracy is determined by the following formula: W P =1-(|P LO -P WO |) / P WO ; Among them, W P is the pressure accuracy, P LO is the stress parameter of the target digital twin model, P WO is the stress parameter of the three-dimensional model; Pressure accuracy is determined by the following formula: W ó =1-(|ó LO - WO |) / ó WO ; Among them, W ó is the pressure accuracy, LO is the pressure parameter of the target digital twin model, WO is the pressure parameter of the three-dimensional model.

5. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the digital twin model evaluation method for hydropower and pumped storage power station equipment according to any one of claims 1 to 3 by executing the computer instructions.

6. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the digital twin model evaluation method for hydropower and pumped storage power station equipment according to any one of claims 1 to 3.

7. A computer program product, characterized in that It includes computer instructions, which are used to enable a computer to execute the digital twin model evaluation method for hydropower and pumped storage power station equipment according to any one of claims 1 to 3.

Citation Information

Patent Citations

  • Equipment abnormity monitoring method, electronic equipment and storage medium

    CN116380166A

  • Intelligent monitoring, inversion and prediction system for transition process of pumped storage unit

    CN117573731A

  • Method and system for evaluating credibility of tunnel fire digital twin model

    CN117934998A

  • Method and device for optimizing digital twin model of optical network

    CN118313250A

  • Intelligent vibration digital twin systems and methods for industrial environments

    WO2021108680A1