A resource configuration method and system based on environment coupling
Through the resource allocation method based on environmental coupling, resource consumption data and environmental influencing factors are used to dynamically adjust resource allocation, solving the problem of unreasonable resource allocation in the existing technology and improving resource utilization efficiency.
Patent Information
- Application Number
- CN202411103750.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-13
AI Technical Summary
The existing resource allocation plan has a single factor, and it is impossible to achieve true and reasonable and effective allocation of resources, resulting in waste of resources and low utilization efficiency.
The resource configuration method based on environmental coupling is adopted, and resource consumption data is obtained for preprocessing and timing analysis, dynamic monitoring threshold is set, and resource allocation scheme is adjusted to achieve reasonable allocation of resources.
It improves the rationality and effectiveness of resource allocation, reduces resource waste, and maximizes resource utilization.
Smart Images

Figure CN118644050B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of resource configuration, and in particular to a resource configuration method and system based on environment coupling. Background Art
[0002] Reasonable resource allocation is an effective measure to maximize the use of limited resources, maximize resource utilization, reduce resource waste, and achieve planning goals. However, the current resource allocation plan refers to a relatively single factor and cannot achieve a truly reasonable and effective allocation of resources. Summary of the invention
[0003] The main purpose of the present invention is to overcome the above-mentioned defects in the prior art and propose a resource allocation method based on environmental coupling. On the basis of analyzing the resource consumption trend according to resource consumption data, combined with the influence of environmental factors, resource allocation based on environmental coupling is realized to improve the rationality and effectiveness of resource allocation.
[0004] The present invention adopts the following technical solution:
[0005] A method for resource configuration based on environment coupling includes the following steps:
[0006] Acquire resource consumption data, including but not limited to: energy consumption, raw material usage rate, and waste generation;
[0007] Preprocess the resource consumption data to obtain time series standardized data, and perform time series analysis based on the time series standardized data to obtain resource consumption trends;
[0008] Based on the resource consumption trend, set monitoring thresholds for energy and waste, monitor resource consumption, dynamically adjust monitoring thresholds, and establish the first resource allocation plan;
[0009] Extract key data from resource consumption data, obtain environmental coupling values, and obtain quantitative results of environmental impact based on the environmental coupling values;
[0010] According to the first resource allocation plan and in combination with the environmental impact quantification result, a resource adjustment allocation plan based on environmental coupling is obtained.
[0011] Specifically, the resource consumption data is preprocessed to obtain time series standardized data, specifically:
[0012] Filter the resource consumption data.
[0013] ,
[0014] The processed data stream is calculated, where represents the filtered data stream, Represents the current monitoring data. is the filtering factor, is the data of the previous time point;
[0015] Based on the processed data stream, data integrity is strengthened through the formula:
[0016] ,
[0017] Get the resource management dataset, where Represents the currently processed data point, and represents adjacent data points, and T represents the time interval;
[0018] Based on the resource management data set, the processed data stream is transformed into time series standardized data using standardization technology, through the formula:
[0019] ,
[0020] Generate time series standardized data, where represents time series standardized data, represents a data point, represents the average value, represents the standard deviation, is the stability coefficient.
[0021] Specifically, we conduct time series analysis based on the standardized data of resource consumption time series to obtain the resource consumption trend, which is as follows:
[0022] Standardize data from resource consumption time series and use the trend extraction formula:
[0023] ,
[0024] Get preliminary resource usage trends, where Represents resource usage trends, is the weight parameter, is the fused data point, n is the number of data points;
[0025] Analyze the preliminary resource usage trends and apply the analysis formula:
[0026] ,
[0027] Generate resource consumption trends, where R represents resource consumption trends. is the standardized coefficient, T is the time period, Represents preliminary resource usage trends.
[0028] Specifically, based on the resource consumption trend, the monitoring thresholds of energy and waste are set, and the resource consumption is monitored, the monitoring thresholds are adjusted dynamically, and the first resource allocation plan is established, which is specifically:
[0029] Dynamically adjust the threshold using the threshold adjustment formula:
[0030] ,
[0031] Generate an adjusted threshold value where represents the adjusted threshold, is the basic threshold, and is the adjustment factor, is the angular frequency, t represents time;
[0032] Apply the adjusted threshold to predict resource demand in the future time period, using the resource demand prediction formula:
[0033] ,
[0034] Get the resource demand forecast, where represents the predicted resource demand, a, b, c, d are the coefficients of the prediction model, represents the adjusted threshold;
[0035] Based on the resource demand forecast, the optimization formula is configured:
[0036] ,
[0037] Generate a resource configuration optimization plan, where: is the configuration coefficient of multiple resource items, is the demand forecast for the corresponding resource item, m is the normalized index, and O represents the first resource allocation plan.
[0038] Specifically, key data is extracted from resource consumption data to obtain environmental coupling values, specifically:
[0039] Extract key data from resource consumption data and process it using the formula:
[0040] ,
[0041] Get the environmental coupling value, where represents the environmental coupling value, b is the model deviation term, represents the key data set and V is the eigenvector matrix.
[0042] Specifically, based on the environmental coupling value, the quantitative results of environmental impact are obtained; specifically:
[0043] Based on the environmental coupling value, the influencing factors are screened through the formula:
[0044] ,
[0045] The key influencing factors evaluation results are obtained, among which, Represents the evaluation results of key influencing factors, is the factor value in the environmental coupling value, is the weighting coefficient, Indicates adjustment The influence of the coefficient;
[0046] Based on the evaluation results of the key influencing factors, the quantitative output calculation is performed through the formula:
[0047] ,
[0048] Generate quantitative output of factors, where: Quantitative output of representative factors, is the evaluation result of key influencing factors. is the weight coefficient, is the attenuation coefficient;
[0049] The quantitative output of the above factors is used to adjust the environmental impact indicators through the formula:
[0050] ,
[0051] Generate adjusted environmental impact indicators, where: represents the adjusted environmental impact index, is the adjustment factor, Quantitative output of representative factors;
[0052] Based on the adjusted environmental impact indicators, the quantitative results of environmental impact are calculated using the formula:
[0053] ,
[0054] in, represents the quantified result of environmental impact, T is the normalization constant, is a risk factor, Represents the adjusted environmental impact index.
[0055] Specifically, according to the first resource allocation scheme, combined with the environmental impact quantification results, a resource adjustment allocation scheme based on environmental coupling is obtained, which is specifically:
[0056] According to the quantitative results of the environmental impact, the environmental parameters, including temperature, humidity and light, are set, and the environmental response formula is adopted:
[0057] ,
[0058] Calculate the dynamic response of the virtual environment and generate the virtual environment state, where represents the simulated virtual environment state, k is the environmental sensitivity adjustment coefficient, and It means increasing the flexibility of the formula and its adaptability to nonlinear changes. is the offset used to adjust the baseline environmental state;
[0059] Based on the virtual environment state, the formula is:
[0060] ,
[0061] Strengthen the model's sensitivity to the pros and cons of the strategy and generate optimized strategy results, where: is the optimized strategy result, represents the weight of the strategy, is the performance of the strategy in the virtual environment, is the regulating factor;
[0062] Combined with environmental impact, the formula is adopted:
[0063] ,
[0064] The resource adjustment configuration scheme based on environment coupling is obtained, where: It is a resource adjustment configuration solution based on environment coupling. is the trade-off coefficient between cost and environmental impact, is the strategy adjustment factor, is an additional adjustment factor.
[0065] Another aspect of the present invention provides a resource configuration system based on environment coupling, comprising the following steps:
[0066] Data acquisition unit: acquires resource consumption data, including but not limited to: energy consumption, raw material utilization rate, and waste generation;
[0067] Consumption trend analysis unit: pre-process resource consumption data to obtain time series standardized data, perform time series analysis based on the time series standardized data, and obtain resource consumption trends;
[0068] The first plan establishment unit: based on the resource consumption trend, sets the monitoring thresholds of energy and waste, monitors the resource consumption, dynamically adjusts the monitoring thresholds, and establishes the first resource allocation plan;
[0069] Environmental factor calculation unit: extract key data from resource consumption data, obtain environmental coupling values, and obtain quantitative results of environmental impact based on the environmental coupling values;
[0070] Environmental coupling unit: According to the first resource configuration scheme, combined with the environmental impact quantification result, a resource adjustment configuration scheme based on environmental coupling is obtained. On the other hand, the present invention provides an electronic device, including: a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements a resource configuration method based on environmental coupling when executing the computer program.
[0071] Yet another aspect of the present invention provides a computer-readable storage medium, wherein a computer program is stored in the computer-readable storage medium, and when the computer program is executed by a processor, steps of a resource configuration method based on environment coupling are implemented.
[0072] It can be seen from the above description of the present invention that, compared with the prior art, the present invention has the following beneficial effects:
[0073] The present invention proposes a resource configuration method based on environmental coupling, which obtains resource consumption data, including but not limited to: energy consumption, raw material utilization rate, and waste generation; preprocesses the resource consumption data to obtain time series standardized data, performs time series analysis based on the time series standardized data, and obtains resource consumption trends; based on the resource consumption trends, sets monitoring thresholds for energy and waste, monitors resource consumption, dynamically adjusts the monitoring thresholds, and establishes a first resource configuration plan; extracts key data from the resource consumption data, obtains environmental coupling values, and obtains environmental impact quantification results based on the environmental coupling values; according to the first resource configuration plan, combined with the environmental impact quantification results, obtains a resource adjustment configuration plan based on environmental coupling. The present invention proposes a resource configuration method based on environmental coupling, which realizes resource configuration based on environmental coupling based on the analysis of resource consumption trends according to resource consumption data and combined with the influence of environmental factors, thereby improving the rationality and effectiveness of resource configuration. BRIEF DESCRIPTION OF THE DRAWINGS
[0074] Figure 1 A flow chart of a resource configuration method based on environment coupling provided by an embodiment of the present invention;
[0075] Figure 2 A structural diagram of a resource configuration method based on environment coupling provided by an embodiment of the present invention;
[0076] Figure 3 A schematic diagram of an embodiment of an electronic device provided by an embodiment of the present invention;
[0077] Figure 4A schematic diagram of an embodiment of a computer-readable storage medium provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0078] The present invention is further described below through specific implementation modes.
[0079] The present invention proposes a resource configuration method based on environment coupling. On the basis of analyzing resource consumption trends according to resource consumption data, combined with the influence of environmental factors, resource configuration based on environment coupling is realized to improve the rationality and effectiveness of resource configuration.
[0080] like Figure 1 The present invention provides a resource configuration method based on environment coupling, which specifically comprises the following steps:
[0081] A method for resource configuration based on environment coupling includes the following steps:
[0082] S101: Acquire resource consumption data, which includes but is not limited to: energy consumption, raw material utilization rate, and waste generation;
[0083] S102: Preprocessing the resource consumption data to obtain time series standardized data, and performing time series analysis based on the time series standardized data to obtain a resource consumption trend;
[0084] Specifically, the resource consumption data is preprocessed to obtain time series standardized data, specifically:
[0085] Filter the resource consumption data.
[0086] ,
[0087] The processed data stream is calculated, where represents the filtered data stream, Represents the current monitoring data. is the filtering factor, is the data of the previous time point;
[0088] Based on the processed data stream, data integrity is strengthened through the formula:
[0089] ,
[0090] Get the resource management dataset, where Represents the currently processed data point, and represents adjacent data points, and T represents the time interval;
[0091] Based on the resource management data set, the processed data stream is transformed into time series standardized data using standardization technology, through the formula:
[0092] ,
[0093] Generate time series standardized data, where represents time series standardized data, represents a data point, represents the average value, represents the standard deviation, is the stability coefficient.
[0094] Assume that at time , filter data , at time t, the raw data collected , select the filter factor ;
[0095] Plugging into the formula we get:
[0096] ,
[0097] This shows that after applying the filter, the new data points It is 104.
[0098] The current processed data point formula:
[0099] ,
[0100] in, Represents the currently processed data point, and represents adjacent data points, and T represents the time interval;
[0101] Assumptions and , time interval T=2;
[0102] Plugging into the formula we get:
[0103] ,
[0104] This means that by interpolating the data, we can get an estimate of the middle point. is 105.
[0105] Standardized data formula:
[0106] ,
[0107] : Standardized data;
[0108] : processed data points;
[0109] : data average;
[0110] : standard deviation;
[0111] : Prevent decimals from dividing by zero errors;
[0112] Assumptions ,average value ,variance , stable small amount ;
[0113] Plugging into the formula we get:
[0114] ,
[0115] This shows that the normalized value Z is approximately 1.242, representing how many standard deviations the data points are above the mean.
[0116] S103: Based on the resource consumption trend, set monitoring thresholds for energy and waste, monitor resource consumption, dynamically adjust the monitoring thresholds, and establish a first resource allocation plan;
[0117] Specifically, we conduct time series analysis based on the standardized data of resource consumption time series to obtain the resource consumption trend, which is as follows:
[0118] Normalize the data from the resource consumption time series using the formula:
[0119] ,
[0120] : Normalization coefficient, ensuring that the trend value is within a reasonable range;
[0121] : All data points have equal weight;
[0122] n=4: all data points have equal weight;
[0123] : The fused data points obtained in the previous step;
[0124] calculate ;
[0125] The approximate results are: 3.16, 3.46, 3.74, 4;
[0126] Cumulative calculation:
[0127] ,
[0128] The value of is about 14.36, which represents a quantitative representation of the resource usage trend after integrating the data.
[0129] The formula for resource consumption trend analysis results is as follows:
[0130] ,
[0131] : Standardization coefficient to ensure that the results are within a reasonable range;
[0132] T=4: time period;
[0133] : Preliminary resource consumption trends.
[0134] calculate ;
[0135] The results are: 1000, 1728, 2744, 4096;
[0136] Cumulative sum: ,
[0137] Find the average: ;
[0138] Calculate R:
[0139] ,
[0140] The value of R is approximately 13.44, which represents the normalized result of the resource consumption trend analysis within a given time period.
[0141] Specifically, based on the resource consumption trend, the monitoring thresholds of energy and waste are set, and the resource consumption is monitored, the monitoring thresholds are adjusted dynamically, and the first resource allocation plan is established, which is specifically:
[0142] Dynamically adjust the threshold using the threshold adjustment formula:
[0143] ,
[0144] : Basic threshold, assumed to be the actual annual average resource consumption, here set to 100 units;
[0145] and :Adjustment coefficient, calculated based on historical fluctuation data, assuming , ;
[0146] : The angular frequency of the change in sex, set to , here we assume that the cycle is one year, that is ;
[0147] t: time, here it is a certain day of the year, such as the 100th day;
[0148] calculate :
[0149] ,
[0150] The result 111.83 will show the adjusted threshold , which represents the sex-adjusted threshold at day 100.
[0151] Resource demand forecast formula:
[0152] ,
[0153] a, b, c, d: coefficients are obtained based on regression analysis of historical data, assuming a=0.01, b=0.05, c=0.5, d=5;
[0154] : The adjusted threshold, assuming ;
[0155] Assumptions The result is 120, which is substituted into the formula:
[0156] ,
[0157] Calculation results will represent the forecasted resource requirements.
[0158] Resource allocation optimization solution formula:
[0159] ,
[0160] : The configuration coefficient of each resource item is allocated according to resource availability. For example, for three resources , , ;
[0161] : Resource demand forecast;
[0162] m: normalized index, with a value of 2, reflecting demand smoothing;
[0163] Assumptions The result is 250, and the configuration of each resource is calculated:
[0164] ,
[0165] The result O will represent the overall effect of the first resource allocation solution.
[0166] S104: extracting key data from resource consumption data, obtaining environmental coupling values, and obtaining environmental impact quantification results based on the environmental coupling values;
[0167] Specifically, key data is extracted from resource consumption data to obtain environmental coupling values, specifically:
[0168] Extract key data from resource consumption data and process it using the formula:
[0169] ,
[0170] Get the environmental coupling value, where represents the environmental coupling value, b is the model deviation term, Represents a key data set.
[0171] Key data set formula:
[0172] ,
[0173] : represents the extracted key data set;
[0174] : Weight coefficient, assumed to be obtained by uniform sampling or expert evaluation;
[0175] : Raw data, coming from observation or experimental measurement;
[0176] : Exponential parameter, determined by data sensitivity testing, for example, 0.5 is assumed to represent square root conversion;
[0177] : Adjustment factor, optimized by minimizing the error, assumed to be 0.1;
[0178] Suppose there are three data points, ;
[0179] The corresponding weight coefficients are ;
[0180] Index parameters ,
[0181] Modulating Factor ;
[0182] calculate Values:
[0183] ,
[0184] ,
[0185] ,
[0186] ;
[0187] this The value of represents the weighted and adjusted sum of the key figures.
[0188] Environmental impact model formula:
[0189] ,
[0190] : Environmental coupling value;
[0191] b: model bias term, assumed to be 0.05;
[0192] V: eigenvector matrix, obtained by PCA analysis of the original data set;
[0193] T: transpose of the matrix;
[0194] Assumptions As calculated above, the eigenvector V is assumed to be ,
[0195] calculate Values:
[0196] ,
[0197] this The vector represents the environmental impact pattern obtained through principal component analysis, where each component represents the degree of influence of the differentiated principal component.
[0198] S105: According to the first resource allocation scheme and in combination with the environmental impact quantification result, a resource adjustment allocation scheme based on environmental coupling is obtained.
[0199] Based on the environmental coupling value, the influencing factors are screened through the formula:
[0200] ,
[0201] : represents the key influencing factors of identification;
[0202] : Factor values in the pattern, as above Calculated;
[0203] : weighting coefficient, determined through sensitivity analysis, assumed to be 0.1;
[0204] Assumptions , weighting coefficient , ;
[0205] calculate Values:
[0206] ,
[0207] This value represents the most critical environmental impact factor identified, where the number represents its impact strength.
[0208] Based on the evaluation results of key influencing factors, quantitative output calculation is performed through the formula:
[0209] ,
[0210] Generate quantitative output of factors, where: Quantitative output of representative factors, is the evaluation result of key influencing factors. is the weight coefficient, is the attenuation coefficient;
[0211] The environmental impact indicators are adjusted using the quantitative output of the factors, through the formula:
[0212] ,
[0213] Generate adjusted environmental impact indicators, where: represents the adjusted environmental impact index, is the adjustment factor, Quantitative output of representative factors;
[0214] Based on the adjusted environmental impact indicators, the quantitative results of environmental impact are calculated through the formula:
[0215] ,
[0216] in, represents the quantified result of environmental impact, T is the normalization constant, is a risk factor, Represents the adjusted environmental impact index.
[0217] Quantitative output formula of factors:
[0218] ,
[0219] : Quantitative evaluation results of key influencing factors, obtained through professional evaluation or data analysis in the previous stage, assuming , indicating the severity of the influencing factor;
[0220] :The weight coefficient of the factor is set through expert survey or historical data analysis. , indicating the importance of the factor in the overall evaluation;
[0221] : The attenuation coefficient introduced for uncertainty, determined by statistical error or prediction uncertainty, assuming , indicating the level of uncertainty taken into account.
[0222] calculate :
[0223] ,
[0224] This result It represents the quantitative evaluation result of the first key factor after considering the uncertainty.
[0225] Adjusted environmental impact indicator formula:
[0226] ,
[0227] : Quantitative results of factors;
[0228] : The adjustment coefficient of factor i is set according to the historical impact or predicted change of the factor. .
[0229] Assume there is only one factor n=1:
[0230] ,
[0231] this The values represent the environmental impact indicators after adjustment for all key factors.
[0232] Environmental impact quantification results formula:
[0233] ,
[0234] : Adjusted environmental impact indicators;
[0235] T: normalization constant, to ensure the applicability and comparability of the results, assuming T=10;
[0236] :The risk factor for each adjustment indicator, the potential risk of the factor considered, the assumption ;
[0237] calculate :
[0238] ,
[0239] this The value represents the quantitative result of the environmental impact after integrating all influencing factors, which is used to evaluate and compare the environmental impact under different scenarios.
[0240] Specifically, according to the first resource allocation scheme, combined with the environmental impact quantification results, a resource adjustment allocation scheme based on environmental coupling is obtained, which is specifically:
[0241] According to the quantified results of environmental impact, the environmental response formula is adopted:
[0242] ,
[0243] The impact of simulation conditions on differentiated operation strategies is calculated, the dynamic response of the virtual environment is generated, and the virtual environment state is generated, where represents the simulated virtual environment state, k is the environmental sensitivity adjustment coefficient, and It means increasing the flexibility of the formula and its adaptability to nonlinear changes. is the offset used to adjust the baseline environmental state;
[0244] Based on the virtual environment status, simulate and test the predefined operation strategies, evaluate the expected resource utilization efficiency and environmental impact, collect key data and analyze them, and use the formula:
[0245] ,
[0246] Strengthen the model's sensitivity to the pros and cons of the strategy and generate optimized strategy results, where: is the optimized strategy result, represents the weight of the strategy, is the performance of the strategy in the virtual environment, is the regulating factor;
[0247] Combining the optimized strategy results with the balance factor between cost and environmental impact, use the formula:
[0248] ,
[0249] The resource adjustment configuration scheme based on environment coupling is obtained, where: It is a resource adjustment configuration solution based on environment coupling. is the trade-off coefficient between cost and environmental impact, is the strategy adjustment factor, is an additional adjustment factor.
[0250] The simulated virtual environment state formula is:
[0251] ,
[0252] : Indicates the state of the simulated virtual environment;
[0253] k: Environmental sensitivity adjustment coefficient, obtained by fitting environmental monitoring data or historical data, assuming k=1.5;
[0254] : Linear adjustment parameter, reflecting the direct impact of environmental factors, assuming ;
[0255] : Nonlinear adjustment parameter, used to describe the nonlinear influence of environmental factors, assuming ;
[0256] : The offset of the baseline environmental state, based on the environmental base level setting, assuming ;
[0257] : Environmental impact quantification results, obtained from the previous steps, assuming ;
[0258] Hypothetical environmental impact quantification results ,calculate Values:
[0259] ,
[0260] this Represents a virtual environment simulated based on the quantified results of environmental impact.
[0261] The optimized strategy result formula is:
[0262] ,
[0263] : represents the optimized strategy result;
[0264] n: number of strategies, assuming n=3;
[0265] : The weight of the strategy, determined based on historical data or expert evaluation, assuming , , ;
[0266] : The performance of the strategy in the virtual environment is obtained from the results of step 1. Assume , , ;
[0267] : Adjustment factor, used to stabilize the calculation, assuming ;
[0268] Assume that the weights of the three strategies are , , ; The performance of the virtual environment is , , ;
[0269] calculate Values:
[0270] ,
[0271] this Represents the comprehensive effect of the optimized strategy.
[0272] The formula for the policy adjustment scheme for resource coupling environment is:
[0273] ,
[0274] : Strategy adjustment scheme for resource coupling environment;
[0275] : The optimized strategy results, assuming ;
[0276] : The trade-off coefficient between cost and environmental impact, assuming ;
[0277] : Strategy adjustment factor, used for balance calculation, assuming ;
[0278] : Adjustment coefficient, assuming ;
[0279] Assumptions , , , ;
[0280] calculate Values:
[0281] ,
[0282] this The strategy adjustment scheme representing the final resource coupling environment is used to determine the optimal strategy by balancing costs and environmental impacts.
[0283] like Figure 2 The embodiment of the present invention further provides a system for resource configuration based on environment coupling, including:
[0284] Data acquisition unit 201: acquires resource consumption data, including but not limited to: energy consumption, raw material utilization rate, and waste generation;
[0285] Consumption trend analysis unit 202: pre-processes resource consumption data to obtain time series standardized data, performs time series analysis based on the time series standardized data, and obtains resource consumption trends;
[0286] The first plan establishing unit 203: based on the resource consumption trend, sets the monitoring thresholds of energy and waste, monitors the resource consumption, dynamically adjusts the monitoring thresholds, and establishes the first resource allocation plan;
[0287] Environmental factor calculation unit 204: extracts key data from resource consumption data, obtains environmental coupling values, and obtains environmental impact quantification results based on the environmental coupling values;
[0288] Environmental coupling unit 205: According to the first resource configuration scheme, combined with the environmental impact quantification result, obtains a resource adjustment configuration scheme based on environmental coupling.
[0289] like Figure 3 As shown, an embodiment of the present invention provides an electronic device 300, including a memory 310, a processor 320, and a computer program 311 stored in the memory 310 and executable on the processor 320. When the processor 320 executes the computer program 311, a resource configuration method based on environment coupling provided in an embodiment of the present invention is implemented.
[0290] In the specific implementation process, when the processor 320 executes the computer program 311, it can achieve Figure 1 Any implementation manner in the corresponding embodiments.
[0291] Since the electronic device introduced in this embodiment is a device used to implement a data processing device in the embodiment of the present invention, based on the method introduced in the embodiment of the present invention, technical personnel in this field can understand the specific implementation method of the electronic device of this embodiment and its various variations. Therefore, how the electronic device implements the method in the embodiment of the present invention is not introduced in detail here. As long as the equipment used by technical personnel in this field to implement the method in the embodiment of the present invention falls within the scope of protection of the present invention.
[0292] See also Figure 4 , Figure 4 A schematic diagram of an embodiment of a computer-readable storage medium provided in an embodiment of the present invention.
[0293] like Figure 4 As shown, this embodiment provides a computer-readable storage medium 400, on which a computer program 411 is stored. When the computer program 411 is executed by a processor, a resource configuration method based on environment coupling provided by an embodiment of the present invention is implemented;
[0294] In the specific implementation process, when the computer program 411 is executed by the processor, it can achieve Figure 1 Any implementation manner in the corresponding embodiments.
[0295] It should be noted that in the above embodiments, the description of each embodiment has its own emphasis, and for parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0296] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0297] The present invention proposes a resource configuration method based on environmental coupling, which utilizes multiple sensors to collect historical signals of electromechanical products, and performs data fusion processing on the historical signals collected by multiple sensors at the same time to obtain fused signals; the fused signals are decomposed by an EEMD algorithm to generate a plurality of intrinsic mode functions; the generated plurality of intrinsic mode functions are calculated, and their respective energy values are normalized to obtain energy feature distribution vectors; the energy feature distribution vectors are screened by using correlation coefficients to obtain the energy values of the screened intrinsic mode function components, and the final fault features are constructed; the fault features are divided into a training set and a test set; a semi-supervised bidirectional generative adversarial network of a dual attention mechanism is established, the training set is input to train the semi-supervised bidirectional generative adversarial network of the dual attention mechanism, and the test set is used to test the trained semi-supervised bidirectional generative adversarial network of the dual attention mechanism to obtain the trained semi-supervised bidirectional generative adversarial network of the dual attention mechanism; the fault features obtained by the collected electromechanical product signals are input into the trained semi-supervised bidirectional generative adversarial network of the dual attention mechanism to perform fault diagnosis, and the diagnosis results are sent to realize fault control. The present invention proposes a resource configuration method based on environmental coupling, adopts multiple sensors to collect signals and fuse them, uses the EEMD algorithm to complete fault feature extraction, constructs fault features, and proposes a more accurate fault diagnosis model, thereby improving the accuracy of fault diagnosis of electromechanical products in many aspects.
[0298] The above is only a specific implementation of the present invention, but the design concept of the present invention is not limited thereto. Any non-substantial changes to the present invention using this concept shall be deemed as an infringement of the protection scope of the present invention.
Claims
1. A resource configuration method based on environment coupling, characterized in that: The following steps are involved: Acquire resource consumption data, including but not limited to: energy consumption, raw material usage rate, and waste generation; Preprocess the resource consumption data to obtain time series standardized data, and perform time series analysis based on the time series standardized data to obtain resource consumption trends; Based on the resource consumption trend, set monitoring thresholds for energy and waste, monitor resource consumption, dynamically adjust monitoring thresholds, and establish the first resource allocation plan; Extract key data from resource consumption data, obtain environmental coupling values, and obtain quantitative results of environmental impact based on the environmental coupling values; According to the first resource allocation plan, combined with the environmental impact quantification result, a resource adjustment allocation plan based on environmental coupling is obtained; The resource consumption data is preprocessed to obtain time series standardized data, specifically: Filter the resource consumption data. , The processed data stream is calculated, where represents the filtered data stream, Represents the current monitoring data. is the filtering factor, is the data of the previous time point; Based on the processed data stream, data integrity is strengthened through the formula: , Get the resource management dataset, where Represents the currently processed data point, and represents adjacent data points, and T represents the time interval; Based on the resource management data set, the processed data stream is transformed into time series standardized data using standardization technology, through the formula: , Generate time series standardized data, where represents time series standardized data, represents a data point, represents the average value, represents the standard deviation, is the stability coefficient; Based on the time series analysis of the standardized data of resource consumption time series, the resource consumption trend is obtained, which is as follows: Standardize data from resource consumption time series and use the trend extraction formula: , Get preliminary resource usage trends, where Represents resource usage trends, is the weight parameter, is the fused data point, n is the number of data points; Analyze the preliminary resource usage trends and apply the analysis formula: , Generate resource consumption trends, where R represents resource consumption trends. is the standardized coefficient, T is the time period, Represents preliminary resource use trends; Based on the resource consumption trend, set the monitoring thresholds for energy and waste, monitor resource consumption, dynamically adjust the monitoring thresholds, and establish the first resource allocation plan, specifically: Adjust the formula by threshold: , Generate an adjusted threshold value where represents the adjusted threshold, is the basic threshold, and is the adjustment factor, is the angular frequency, t represents time; Apply the adjusted threshold to predict resource demand in the future time period, using the resource demand prediction formula: , Get the resource demand forecast, where represents the predicted resource demand, a, b, c, d are the coefficients of the prediction model, represents the adjusted threshold; Based on the resource demand forecast, the optimization formula is configured: , Generate a resource configuration optimization plan, where: is the configuration coefficient of multiple resource items, is the demand forecast for the corresponding resource item, m is the normalized index, and O represents the first resource allocation scheme; Extract key data from resource consumption data to obtain environmental coupling values, specifically: Extract key data from resource consumption data and process it using the formula: , Get the environmental coupling value, where represents the environmental coupling value, b is the model deviation term, represents the key data set, V is the feature vector matrix; Based on the environmental coupling value, the quantitative results of environmental impact are obtained; specifically: Based on the environmental coupling value, the influencing factors are screened through the formula: , The key influencing factors evaluation results are obtained, among which, Represents the evaluation results of key influencing factors, is the factor value in the environmental coupling value, is the weighting coefficient, Indicates adjustment The influence of the coefficient; Based on the evaluation results of the key influencing factors, the quantitative output calculation is performed through the formula: , Generate quantitative output of factors, where: Quantitative output of representative factors, is the evaluation result of key influencing factors. is the weight coefficient, is the attenuation coefficient; The quantitative output of the above factors is used to adjust the environmental impact indicators through the formula: , Generate adjusted environmental impact indicators, where: represents the adjusted environmental impact index, is the adjustment factor, Quantitative output of representative factors; Based on the adjusted environmental impact indicators, the quantitative results of environmental impact are calculated using the formula: , in, represents the quantified result of environmental impact, T is the normalization constant, is a risk factor. It represents the adjusted environmental impact index; According to the first resource allocation scheme, combined with the environmental impact quantification results, the resource adjustment allocation scheme based on environmental coupling is obtained, which is as follows: According to the quantitative results of the environmental impact, the environmental parameters, including temperature, humidity and light, are set, and the environmental response formula is adopted: , Calculate the dynamic response of the virtual environment and generate the virtual environment state, where represents the simulated virtual environment state, k is the environmental sensitivity adjustment coefficient, and It means increasing the flexibility of the formula and its adaptability to nonlinear changes. is the offset used to adjust the baseline environmental state; Based on the virtual environment state, the formula is: , Strengthen the model's sensitivity to the pros and cons of the strategy and generate optimized strategy results, where: is the optimized strategy result, represents the weight of the strategy, is the performance of the strategy in the virtual environment, is the regulating factor; Combined with environmental impact, the formula is adopted: , The resource adjustment configuration scheme based on environment coupling is obtained, where: It is a resource adjustment configuration solution based on environment coupling. is the trade-off coefficient between cost and environmental impact, is the strategy adjustment factor, is an additional adjustment factor.
2. A resource configuration system based on environment coupling, characterized in that: The following steps are involved: Data acquisition unit: acquires resource consumption data, including but not limited to: energy consumption, raw material utilization rate, and waste generation; Consumption trend analysis unit: pre-process resource consumption data to obtain time series standardized data, perform time series analysis based on the time series standardized data, and obtain resource consumption trends; The first plan establishment unit: based on the resource consumption trend, sets the monitoring thresholds of energy and waste, monitors the resource consumption, dynamically adjusts the monitoring thresholds, and establishes the first resource allocation plan; Environmental factor calculation unit: extract key data from resource consumption data, obtain environmental coupling values, and obtain quantitative results of environmental impact based on the environmental coupling values; Environmental coupling unit: according to the first resource allocation scheme and in combination with the environmental impact quantification result, a resource adjustment allocation scheme based on environmental coupling is obtained; The resource consumption data is preprocessed to obtain time series standardized data, specifically: Filter the resource consumption data. , The processed data stream is calculated, where represents the filtered data stream, Represents the current monitoring data. is the filtering factor, is the data of the previous time point; Based on the processed data stream, data integrity is strengthened through the formula: , Get the resource management dataset, where Represents the currently processed data point, and represents adjacent data points, and T represents the time interval; Based on the resource management data set, the processed data stream is transformed into time series standardized data using standardization technology, through the formula: , Generate time series standardized data, where represents time series standardized data, represents a data point, represents the average value, represents the standard deviation, is the stability coefficient; Based on the time series analysis of the standardized data of resource consumption time series, the resource consumption trend is obtained, which is as follows: Standardize data from resource consumption time series and use the trend extraction formula: , Get preliminary resource usage trends, where Represents resource usage trends, is the weight parameter, is the fused data point, n is the number of data points; Analyze the preliminary resource usage trends and apply the analysis formula: , Generate resource consumption trends, where R represents resource consumption trends. is the standardized coefficient, T is the time period, Represents preliminary resource use trends; Based on the resource consumption trend, set the monitoring thresholds for energy and waste, monitor resource consumption, dynamically adjust the monitoring thresholds, and establish the first resource allocation plan, specifically: Adjust the formula by threshold: , Generate an adjusted threshold value where represents the adjusted threshold, is the basic threshold, and is the adjustment factor, is the angular frequency, t represents time; Apply the adjusted threshold to predict resource demand in the future time period, using the resource demand prediction formula: , Get the resource demand forecast, where represents the predicted resource demand, a, b, c, d are the coefficients of the prediction model, represents the adjusted threshold; Based on the resource demand forecast, the optimization formula is configured: , Generate a resource configuration optimization plan, where: is the configuration coefficient of multiple resource items, is the demand forecast for the corresponding resource item, m is the normalized index, and O represents the first resource allocation scheme; Extract key data from resource consumption data to obtain environmental coupling values, specifically: Extract key data from resource consumption data and process it using the formula: , Get the environmental coupling value, where represents the environmental coupling value, b is the model deviation term, represents the key data set, V is the feature vector matrix; Based on the environmental coupling value, the quantitative results of environmental impact are obtained; specifically: Based on the environmental coupling value, the influencing factors are screened through the formula: , The key influencing factors evaluation results are obtained, among which, Represents the evaluation results of key influencing factors, is the factor value in the environmental coupling value, is the weighting coefficient, Indicates adjustment The influence of the coefficient; Based on the evaluation results of the key influencing factors, the quantitative output calculation is performed through the formula: , Generate quantitative output of factors, where: Quantitative output of representative factors, is the evaluation result of key influencing factors. is the weight coefficient, is the attenuation coefficient; The quantitative output of the above factors is used to adjust the environmental impact indicators through the formula: , Generate adjusted environmental impact indicators, where: represents the adjusted environmental impact index, is the adjustment factor, Quantitative output of representative factors; Based on the adjusted environmental impact indicators, the quantitative results of environmental impact are calculated using the formula: , in, represents the quantified result of environmental impact, T is the normalization constant, is a risk factor. It represents the adjusted environmental impact index; According to the first resource allocation scheme, combined with the environmental impact quantification results, the resource adjustment allocation scheme based on environmental coupling is obtained, which is as follows: According to the quantitative results of the environmental impact, the environmental parameters, including temperature, humidity and light, are set, and the environmental response formula is adopted: , Calculate the dynamic response of the virtual environment and generate the virtual environment state, where represents the simulated virtual environment state, k is the environmental sensitivity adjustment coefficient, and It means increasing the flexibility of the formula and its adaptability to nonlinear changes. is the offset used to adjust the baseline environmental state; Based on the virtual environment state, the formula is: , Strengthen the model's sensitivity to the pros and cons of the strategy and generate optimized strategy results, where: is the optimized strategy result, represents the weight of the strategy, is the performance of the strategy in the virtual environment, is the regulating factor; Combined with environmental impact, the formula is adopted: , The resource adjustment configuration scheme based on environment coupling is obtained, where: It is a resource adjustment configuration solution based on environment coupling. is the trade-off coefficient between cost and environmental impact, is the strategy adjustment factor, is an additional adjustment factor.
3. An electronic device, characterized in that: include: A memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the method steps of any one of claims 1-2 when executing the computer program.
4. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method steps of any one of claims 1-2 are implemented.
Citation Information
Patent Citations
Short-term runoff intelligent forecasting hybrid model method suitable for changing environment
CN111695290A
Water environment quality and economic risk evaluation method based on random dominance theory
CN112700098A
Smart city big data analysis and identification system and method
CN117273414A
Intelligent perception finished product repair decision support system
CN117829554A
Atmospheric environment control system based on Internet of Things
CN117851900A