A method and device for generating discrete production processes based on digital twins
By obtaining the process route and simulation model of the target product, determining the process equipment layout and logistics planning, the problem of discrete production and manufacturing information islands is solved, and the digital mapping and simulation of all factors are realized, design efficiency is improved and operation and maintenance costs are reduced.
Patent Information
- Application Number
- CN202411126617.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-08-16
AI Technical Summary
The existing technology is difficult to realize the circulation and sharing of information in the entire process of discrete manufacturing, resulting in the separation of equipment, production lines, layout, energy consumption and other links, and the difficulty of comprehensive management and control, which seriously restricts the cost reduction and efficiency improvement of high-end integrated circuit devices and other products.
By obtaining the process process route of the target product, determining the configuration list and quantity of process equipment, combining simulation models to carry out process equipment layout and logistics planning, generating discrete production processes, and realizing the integration of mechanism models between line grouping, logistics, layout, and energy-consuming modules. Interact with data to connect the integration and sharing of data throughout the manufacturing process.
It realizes the digital mapping of all factors of discrete production and manufacturing and the full process coverage of simulation simulation, improves process design efficiency, and reduces operation and maintenance costs.
Smart Images

Figure CN118656988B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of digital twins, and specifically relates to a method and device for generating a discrete production process based on digital twins. Background Art
[0002] The process of discrete production is an important part of the advanced electronic equipment industry chain, and is an important support for key equipment (such as semiconductor key equipment), cutting-edge manufacturing technology of production lines, superior production capacity and service support. Discrete production factories often have the characteristics of diverse production forms, complex process flows (thousands of processes), strict requirements for production technology and process equipment layout (high purification level, high-precision temperature and humidity control), large-scale production facilities, and complex and diverse logistics systems.
[0003] At present, simulation for discrete production is only aimed at a specific task direction. For example, patent CN117348575A provides a production optimization method, device and system based on a production simulation platform, including: determining the production optimization target, and determining the initial production information according to the production optimization target; modeling and simulating according to the initial production information and obtaining the production index simulation results; sending the production index simulation results to the optimization platform, and the optimization platform can optimize and adjust the initial production information to obtain the optimized production information when it is determined that the production index simulation results do not meet the production optimization target; repeating the modeling and simulation steps according to the optimized production information obtained by the optimization platform until the obtained production index simulation results meet the production optimization target; determining the optimized production information corresponding to the production index simulation results that meet the production optimization target as the target production information. The production optimization method based on the production simulation platform provided by this solution has the advantages of being easy to implement and highly flexible.
[0004] However, the management process of traditional production and manufacturing and single-task solutions in the above-mentioned existing technologies makes it difficult to circulate and share information in the entire discrete production and manufacturing process, resulting in information islands, and the separation of equipment, production lines, layout, energy consumption, logistics and other links. It is difficult to manage and control them comprehensively, which seriously restricts the cost reduction and efficiency improvement of products that need to be discretely produced, such as high-end integrated circuit devices.
[0005] Therefore, it is an urgent problem for technical personnel in this field to conduct research on the digitalization of the entire discrete production process, to achieve the integration and sharing of data and models of the entire discrete production process, to realize the digital mapping of all elements and the entire process of discrete production manufacturing, and to improve the efficiency of discrete production process design. Summary of the invention
[0006] In view of the defects existing in the above-mentioned prior art, the present invention provides a method and device for generating discrete production processes based on digital twins, which specifically includes the following steps: obtaining the process route of the target product, determining the process equipment corresponding to each process, and forming a process equipment configuration list; based on the preset discrete production simulation model and in combination with the production capacity planning of the target product, a process equipment quantity list is given; based on the process equipment configuration list and the process equipment quantity list, the process equipment layout is carried out, and the logistics handling flow and logistics layout are obtained, and the number of storage locations and the number of logistics vehicles are planned; combined with the process equipment layout, logistics layout and the preset energy analysis model, the energy demand of the process equipment is given, the power facility layout corresponding to the discrete production of the target product is carried out, and the discrete production process is generated. The discrete production process is generated through the solution of the present invention, and the mechanism model fusion, data interaction and real-time transmission analysis between the modules such as line assembly, logistics, layout and energy consumption are realized, and the full process coverage of digital mapping and simulation of all elements of discrete production and manufacturing is realized.
[0007] In a first aspect, the present invention provides a method for generating a discrete production process based on digital twins, which specifically comprises the following steps:
[0008] Obtain the process route of the target product, determine the process equipment corresponding to each process, and form a process equipment configuration list;
[0009] Based on the preset discrete production simulation model and combined with the production capacity planning of the target product, a list of process equipment quantities is given;
[0010] Based on the process equipment configuration list and process equipment quantity list, the process equipment layout is carried out, and the logistics handling flow and logistics layout are obtained to plan the number of storage locations and the number of logistics vehicles;
[0011] Combined with the process equipment layout, logistics layout and the preset energy analysis model, the energy demand of the process equipment is given, the power facility layout corresponding to the discrete production of the target product is carried out, and the discrete production process is generated.
[0012] Furthermore, obtaining the process route of the target product specifically includes the following steps:
[0013] Based on the target product, provide a process flow sheet and process logic sheet;
[0014] Combine the process logic form, analyze the process flow form, determine each process and the corresponding process number;
[0015] Traverse each process number, and based on the search of the process database, complete the confirmation of each process to form the process route of the target product.
[0016] Furthermore, based on the search of the process database, the confirmation of each process is completed, which specifically includes the following steps:
[0017] A field code representing a process type is given to determine a search range of a process database, wherein the field code is a number and / or letter defining a process number, and the field code is located at a prefix and / or suffix of the process number;
[0018] Within the search range, query and match by process number to complete the confirmation of each process.
[0019] Furthermore, the discrete production simulation model at least includes discrete production simulation based on process flow scheduling strategy.
[0020] Furthermore, based on the preset discrete production simulation model and combined with the production capacity planning of the target product, a list of process equipment is given, including:
[0021]
[0022] Among them, M q,i is the number of type i process equipment required for the qth batch, i is the process equipment type number, n is the total number of process equipment types, q is the batch number of discrete production of the target product, CEIL() is the upward rounding function, N q is the total number of target products to be produced in the qth batch, N q,i is the maximum quantity of target products that can be processed by the i-th type of process equipment in the q-th batch, T q,i is the production time of the qth batch of type i process equipment.
[0023] Furthermore, based on the process equipment configuration list and the process equipment quantity list, the process equipment layout is carried out, and the logistics handling flow and logistics layout are obtained, and the number of storage locations and the number of logistics vehicles are planned, which specifically includes the following steps:
[0024] Obtain the process area information table to determine the location of each process area and the corresponding process area number;
[0025] Traverse each process area number, combine with the search of the process flow database, and determine each visualized process area model;
[0026] Traverse the process equipment configuration list and process equipment quantity list, and based on the arrangement logic of the process equipment, embed each process equipment into the corresponding process area model to form a process equipment layout;
[0027] Combined with the process equipment layout and the obtained machine flow table, the logistics handling flow and logistics layout are obtained, and the number of storage locations and logistics vehicles are planned.
[0028] Furthermore, combined with the search of the process flow database, each visualized process area model is determined, which specifically includes the following steps:
[0029] Searching and matching the process area number in the process flow database, and extracting the process area attribute information in the process flow database, wherein the process area attribute information is serialized data;
[0030] Convert the process area attribute information into object format to form a visual process area model;
[0031] Among them, the process area attribute information is converted into an object format, which is specifically expressed as follows:
[0032]
[0033] GM is the process area model, f() is the graphical function, DT is the process area type, A1…A n is the process area parameter item, a1...a n For A1...A n Parameter value.
[0034] Furthermore, the process equipment configuration list and the process equipment quantity list are traversed, and based on the arrangement logic of the process equipment, each process equipment is embedded into the corresponding process area model to form a process equipment layout, which specifically includes the following steps:
[0035] Extracting process equipment attribute information from a process equipment database, where the process equipment attribute information includes coordinate position information;
[0036] The process equipment attribute information is converted into an object format, and based on the coordinate position information, a visual process area model is embedded to form a process equipment layout;
[0037] Among them, based on the coordinate position information, the visualized process area model is embedded, which is specifically expressed as:
[0038]
[0039] RP is the relative position coordinate, min() is the minimum value function, x DE ,y DE is the coordinate of the center point of the process equipment, x GM ,y GM is the coordinate of the center point of the process area, The maximum allowable lateral edge value when the process equipment is embedded in the process area. The maximum allowable longitudinal edge value when the process equipment is embedded in the process area, w GM 、h GM are the width and height of the process area, wDE 、h DE are the width and height of the process equipment respectively.
[0040] Furthermore, combined with the process equipment layout, logistics layout and the preset energy analysis model, the power facility layout corresponding to the discrete production of the target product is carried out, including:
[0041] Obtain the energy consumption function of each machine and / or chamber in the process equipment, provide power facilities according to the energy consumption function, and complete the corresponding power facility layout.
[0042] In a second aspect, the present invention further provides a discrete production process generation device based on digital twins, which adopts the discrete production process generation method based on digital twins as described above, specifically comprising:
[0043] An acquisition unit, used to acquire a process route of a target product;
[0044] The analysis unit is used to determine the process equipment corresponding to each process and form a process equipment configuration list; based on the preset discrete production simulation model and combined with the production capacity planning of the target product, a process equipment quantity list is given;
[0045] The generation unit is used to carry out process equipment layout based on the process equipment configuration list and the process equipment quantity list, and obtain the logistics handling flow and logistics layout, and plan the number of storage locations and the number of logistics vehicles; combining the process equipment layout, logistics layout and the preset energy analysis model, the energy demand of the process equipment is given, the power facility layout corresponding to the discrete production of the target product is carried out, and the discrete production process is generated.
[0046] The present invention provides a method and device for generating a discrete production process based on digital twins, which at least have the following beneficial effects:
[0047] By generating discrete production processes through the solution of the present invention, mechanism model fusion, data interaction and real-time transmission analysis between modules such as line assembly, logistics, layout and energy consumption are realized, and full process coverage of digital mapping and simulation of all elements of discrete production and manufacturing is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] Figure 1 An architecture diagram of a discrete production process design platform based on digital twins provided by the present invention;
[0049] Figure 2 A schematic diagram of a process flow of a discrete production process generation method based on digital twins provided by the present invention;
[0050] Figure 3 A schematic diagram of a process flow for obtaining a target product provided by the present invention;
[0051] Figure 4 A schematic diagram of the process equipment layout and logistics layout provided by the present invention;
[0052] Figure 5 A schematic diagram of a process flow diagram of a layout of a forming process equipment provided by the present invention;
[0053] Figure 6 A schematic diagram of a discrete production process generation device based on digital twin provided by the present invention. DETAILED DESCRIPTION
[0054] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0055] The terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "said" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings, and "multiple" generally includes at least two.
[0056] It should also be noted that the term "includes", "comprising" or any other variation thereof is intended to cover non-exclusive inclusion, so that a commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprising a ..." do not exclude the existence of other identical elements in the commodity or device including the elements.
[0057] The existing discrete production simulation platform is only aimed at a single production task or logistics task. It lacks a multi-task platform for process flow that connects the four major modules of line assembly, logistics, layout, and energy consumption, and is unable to open up the information flow of digital twins in the discrete production business field.
[0058] At the same time, considering that the existing discrete production simulation platform has also failed to integrate a variety of data models (such as simulation models, mechanism models, black box models, etc.), it is impossible to link models between different modules, and there are problems such as the inability to achieve real-time data transmission and data storage.
[0059] In view of the above shortcomings, exploring the integrated platform of discrete production process as an enabling technology and means to practice the concept of intelligent manufacturing can effectively solve the integration problems of information data, physical models, etc., and become a feasible technology to effectively solve the problems faced by current discrete production (such as semiconductor) factories, such as the difficulty of connecting information islands and the difficulty of comprehensive management and control.
[0060] The present invention aims to solve the problems of linkage between different modules and data transmission and storage in discrete production process simulation.
[0061] The present invention designs a discrete production process design platform, which can form a full-process connection of discrete processes. Taking the target product (such as semiconductor) manufacturing factory that performs discrete production as a typical scenario, the process flow design solution research is carried out, and breakthroughs are made in the technologies of mechanism model fusion, data interaction, virtual-reality mapping and real-time transmission. An intelligent factory process flow design platform is developed to integrate and share information of the entire manufacturing process of discrete production, create the ability to build digital twins at different levels such as equipment, production lines, layouts, energy consumption, and logistics, realize digital mapping, simulation, monitoring, diagnosis, prediction and optimization of all manufacturing elements and the entire process, improve the production efficiency of intelligent factories, and reduce operation and maintenance costs.
[0062] like Figure 1 As shown, the present invention provides a discrete production process design platform 100 based on digital twins, including a wiring module 101, a layout module 102, a logistics module 103, an energy module 104 and a platform database 105, which are connected by signals between each other. The platform database 105 includes a process database, a process equipment database and a process flow database. The process database includes each process process in the discrete production process stored in the form of numbers, the process equipment database includes process equipment stored in the form of numbers, and the process flow database includes each process area attribute information in the discrete production process stored in the form of numbers, wherein the process area attribute information includes the process area location, the process area model, etc.
[0063] The overall discrete production design platform uses Vue as the front-end technology stack. The front-end of the discrete production equipment platform can create projects, set user permissions, etc.
[0064] The main function of the line assembly module 101 is to select process equipment for discrete production. In the line assembly module, the process route of the target product is obtained, and the process is confirmed based on the search of the process database in the platform database, and then the process equipment is screened to generate a process equipment configuration list and an investment report corresponding to the process equipment configuration list.
[0065] At the same time, by linking the process database and calculating the number of various types of process equipment in a static state according to the capacity definition, processing mode, etc., the discrete production simulation algorithm built into the line assembly module (such as a logistics scheduling algorithm based on dynamic weights, a gradient scheduling algorithm based on production line status, etc.) is used to perform modeling, parameter setting, and simulation operation, generate simulation evaluation, and update the number of various types of process equipment. A list of process equipment quantities is formed and stored in the platform database. The process equipment configuration list and the process equipment quantity list are used for the plant layout and process equipment layout of the layout module. In addition, the process equipment quantity list can also be used for the capacity, energy consumption calculation, and power facility layout of the energy-consuming module.
[0066] The layout module 102 mainly arranges the in-plant areas and process equipment for discrete production. The in-plant area arrangement includes, for example, the arrangement of WET (wet process) and CMP (chemical mechanical polishing) areas in a wafer manufacturing plant.
[0067] The layout module is linked to the line assembly module to obtain the process equipment configuration list and process equipment quantity list, customize the process equipment size model, define the mapping between process equipment and process area, and create layout tasks and modeling information.
[0068] Generate the initial scheme parameterized process area model and process equipment location information in the layout module, upload the graphic element information, calculate and generate the process area module through the process flow database in the platform database, and embed the process equipment into the corresponding process area model to form the process equipment layout, which is stored in the platform database at the same time. In addition, the information updated by the layout module can also be used in the line assembly module to assist in the adjustment of the process equipment quantity list during the process equipment selection process in the line assembly module.
[0069] The main functions of the logistics module 103 are to determine the logistics layout, evaluate the performance of the logistics layout (track optimization, optimization of the number of automated handling equipment, handling efficiency evaluation), and evaluate the cost.
[0070] The logistics module creates logistics tasks and links the layout module to obtain the process equipment layout, defines the machine flow form containing the machine flow in each process equipment, logistics vehicles (AGV, OHT, OHCV, etc.) and other information, performs logistics simulation modeling, parameter setting, simulation experiments (the number and flow of logistics vehicles, etc.), and visualizes it through the track flow heat map to give the final logistics layout, and updates the logistics simulation data to store it in the platform database.
[0071] The logistics layout provided by the present invention is based on the process equipment configuration list and process equipment quantity list generated by the line assembly module and the process equipment layout generated by the layout module to perform logistics simulation and logistics layout. The logistics layout information updated by the logistics module can also be used to update the process equipment layout plan in the layout module, and can also act on the line assembly module, energy consumption module, etc. to perform logistics linkage for discrete production.
[0072] The main function of the energy module 104 is to calculate the utilization rate of the machines in the process equipment, the production capacity and the WIP calculation of the target product production capacity, etc. By obtaining the process equipment configuration list and process equipment quantity list provided by the assembly line module, the energy consumption function of each machine and / or chamber in the process equipment is defined, and the power facilities are provided according to the energy consumption function. Based on the energy simulation results, the relevant data of the logistics module, layout module, and assembly line module can also be updated as a reference.
[0073] Figure 1 The discrete production process design platform proposed solves the problem of data discontinuity and incompatibility in multiple fields of task design. It proposes a design platform that supports interactive linkage of process group line module, layout module, logistics module, and energy consumption module, opens up the interaction of underlying structured data, and realizes the linkage effect of multiple task modules and all-round functional requirements. (1) The process task module and data interaction method proposed by the discrete production process design platform realize the intelligent retrieval method of models and data resources, quickly generate process group line plans, layout plan evaluation, logistics plans, etc., and realize multi-dimensional task management and optimization evaluation. (2) Establish the overall architecture of each level of the platform, enhance the management of the accessible data range in the process design process, and realize the internal logical expression between asynchronous ports. (3) Support the unified integrated interactive linkage of process group line module, layout module, logistics module, and energy consumption module.
[0074] The discrete generative process design platform can also help simulate various unreasonable situations that may occur in the discrete production process, evaluate and improve the equipment selection and configuration fault tolerance of the line module, thereby improving the efficiency of subsequent layout, logistics, and energy tasks; discover possible causes of failures in the process design process at an earlier stage, and reduce costs and time waste caused by failures in actual operations; help verify the design and algorithm of the discrete production process, and ensure its reliability and stability in the initial stage of plant construction.
[0075] In addition, the discrete production process design platform can use the Web to display the platform interface, automatically calculate equipment configuration solutions, adapt equipment layout, logistics transportation routes, energy consumption display, etc., forming the advantages of energy consumption, logistics and production data linkage.
[0076] like Figure 2As shown, the present invention provides a discrete production process generation method based on digital twins, which specifically includes the following steps:
[0077] Obtain the process route of the target product, determine the process equipment corresponding to each process, and form a process equipment configuration list;
[0078] Based on the preset discrete production simulation model and combined with the production capacity planning of the target product, a list of process equipment quantities is given;
[0079] Based on the process equipment configuration list and process equipment quantity list, the process equipment layout is carried out, and the logistics handling flow and logistics layout are obtained to plan the number of storage locations and the number of logistics vehicles;
[0080] Combined with the process equipment layout, logistics layout and the preset energy analysis model, the energy demand of the process equipment is given, the power facility layout corresponding to the discrete production of the target product is carried out, and the discrete production process is generated.
[0081] The present invention provides a method for generating a discrete production process based on digital twins. In response to the input operation of process data and process flow, the discrete production simulation model and parameterized information in the mechanism model are determined through the data flow of the four modules of process line group, logistics, layout and energy consumption. After data analysis and processing, report analysis, process equipment selection, task management, multi-scheme comparison and other data information are completed to generate a discrete production process. The solution of this application solves the problem of data connectivity between line group, logistics, layout and energy consumption in the discrete production process design, and realizes the full process coverage of digital twins in the discrete production field.
[0082] like Figure 3 As shown, obtaining the process route of the target product specifically includes the following steps:
[0083] Based on the target product, provide a process flow sheet and process logic sheet;
[0084] Combine the process logic form, analyze the process flow form, determine each process and the corresponding process number;
[0085] Traverse each process number, and based on the search of the process database, complete the confirmation of each process to form the process route of the target product.
[0086] Based on the search of the process database, the confirmation of each process is completed, which includes the following steps:
[0087] A field code representing a process type is given to determine a search range of a process database, wherein the field code is a number and / or letter defining a process number, and the field code is located at a prefix and / or suffix of the process number;
[0088] Within the search range, query and match by process number to complete the confirmation of each process.
[0089] Combined with the process logic form, the process flow form is analyzed, mainly to conduct from-to analysis of the process flow, that is, the flow logic of the target product (such as wafers) between machines.
[0090] In a certain embodiment, a search is performed in the process database to complete the confirmation of each process, which is represented by: finding the field code representing the process type, for example, PN, of course, it can also be a combination of other numbers or letters, and the field code can be set in the prefix or suffix position. The search term or search formula is limited to the field code, which can quickly query the matching process and complete the confirmation of each process.
[0091] In the discrete production process design platform, the discrete production simulation model used can realize the simulation of production process, logistics simulation, process equipment operation simulation, etc.
[0092] Discrete production simulation models can include push / pull combined simulation models based on process flow and production scheduling strategies, logistics simulation models based on from-to relationships and logistics scheduling principles, and energy simulation models based on process beats and energy consumption curves. The carrier of the development model can be implemented by various types of software, such as PlantSimulation, AutoMod, FlexSim, Ansys fluent abaqus, etc.
[0093] Based on the preset discrete production simulation model and combined with the production capacity planning of the target product, a list of process equipment is given, including:
[0094]
[0095] Among them, M q,i is the number of type i process equipment required for the qth batch, i is the process equipment type number, n is the total number of process equipment types, q is the batch number of discrete production of the target product, CEIL() is the upward rounding function, N q is the total number of target products to be produced in the qth batch, N q,i is the maximum quantity of target products that can be processed by the i-th type of process equipment in the q-th batch, T q,i is the production time of the qth batch of type i process equipment.
[0096] According to the process equipment configuration list, the production capacity of the target product and other information, and based on the relationships defined in the discrete production simulation model, the data of a specific type of process equipment can be given, and a list of process equipment quantities containing each type of process equipment can be formed.
[0097] In a certain embodiment, taking wafer production as an example, the required number of preparation machines is calculated based on the rated capacity of each type of process equipment and the amount of wafers used. The types of process equipment that need to be calculated include, for example, dry etching equipment, cleaning equipment, coating equipment, etc.
[0098] According to the actual processing capacity of each type of process equipment, the amount of wafers used, and the rated production capacity of each type of process equipment, the quota number of process equipment is calculated. Finally, the process equipment models configured by different process procedures are summarized, and the final quantity result is determined according to the specific situation. In actual production, an integer should be taken. Since the types of process equipment required for different process procedures are different, the number of process equipment types required in the process needs to be calculated separately, and finally added up.
[0099] like Figure 4 As shown, based on the process equipment configuration list and the process equipment quantity list, the process equipment layout is carried out, and the logistics handling flow and logistics layout are obtained, and the number of storage locations and the number of logistics vehicles are planned, which specifically includes the following steps:
[0100] Obtain the process zoning information table to determine the location of each process area and the corresponding process area number;
[0101] Traverse each process area number, combine with the search of the process flow database, and determine each visualized process area model;
[0102] Traverse the process equipment configuration list and process equipment quantity list, and based on the arrangement logic of the process equipment, embed each process equipment into the corresponding process area model to form a process equipment layout;
[0103] Combined with the process equipment layout and the obtained machine flow table, the logistics handling flow and logistics layout are obtained, and the number of storage locations and logistics vehicles are planned.
[0104] When the layout module is used to lay out the process equipment, it is necessary to input the process zoning information and the process equipment configuration list and process equipment quantity list provided by the line assembly module. The process zoning information table contains the names of each process area, the location of the process area, the process area number, the area of the process area, the arrangement preference, etc. According to the process zoning information table, the arrangement of each process area can be determined, and then the process flow database can be searched by the process area number, and the corresponding process area model name can be found and determined from the process flow database to form a visual process area model.
[0105] Then determine the process equipment from the process equipment configuration list and the process equipment quantity list, and embed it into the process area model according to the arrangement logic and arrangement rules of the process equipment to form the process equipment layout.
[0106] After obtaining the process equipment layout, input the logistics module, combine the machine flow table, and then give the logistics layout. Based on the process equipment layout and process flow, the logistics handling flow and logistics layout are obtained, the number of storage locations and the number of logistics vehicles are planned, and the logistics system capacity limit and optimal configuration are given.
[0107] Taking the logistics layout of wafer production as an example, the machine flow form defines the from-to relationship of the machines during wafer processing, such as from machine A to machine B, the number of wafers transported, etc. In addition, it can also be combined with logistics carrier information (logistics carrier information defines the number of overhead cranes, processing efficiency, etc.), process equipment layout, and logic table (logic table defines the handling standards of automatic material handling systems across systems, floors, or factories). By serializing the field names and field values in each form, nested list data is formed. The output of the logistics module is the average handling time (booking a car + picking up goods + delivering goods), the average handling distance (picking up goods + delivering goods), logistics carrier utilization, logistics carrier congestion rate, track flow (heat map), number of handling tasks, visual model display, etc.
[0108] Combined with the search of the process flow database, each visualized process area model is determined, which specifically includes the following steps:
[0109] Searching and matching the process area number in the process flow database, and extracting the process area attribute information in the process flow database, wherein the process area attribute information is serialized data;
[0110] Convert the process area attribute information into object format to form a visual process area model;
[0111] Among them, the process area attribute information is converted into an object format, which is specifically expressed as follows:
[0112]
[0113] GM is the process area model, f() is the graphical function, DT is the process area type, A1…A n is the process area parameter item, a1…a n For A1...A n Parameter value.
[0114] By converting the process area attribute information of the serialized data into an object format, a visual process area model can be formed. For a certain process area type, the object format conversion is realized through a graphical function combined with the process area parameter items and parameter values.
[0115] The graphical function is preset in the layout module, indicating the mapping relationship between serialized data and graphics. Here, no further restrictions are imposed on the type of graphical function and the format of process area type. Different graphical functions and different process area type formats can be selected according to different scenarios. For example, the process area type can be represented by letter codes, and the process area parameter items can be represented by digital codes. The process area type and process area parameter items can be identified through graphical functions to give a process area model.
[0116] like Figure 5 As shown, the process equipment configuration list and the process equipment quantity list are traversed, and based on the arrangement logic of the process equipment, each process equipment is embedded in the corresponding process area model to form a process equipment layout, which specifically includes the following steps:
[0117] Extracting process equipment attribute information from a process equipment database, where the process equipment attribute information includes coordinate position information;
[0118] The process equipment attribute information is converted into an object format, and based on the coordinate position information, a visual process area model is embedded to form a process equipment layout;
[0119] Among them, based on the coordinate position information, the visualized process area model is embedded, which is specifically expressed as:
[0120]
[0121] RP is the relative position coordinate, min() is the minimum value function, x DE ,y DE is the coordinate of the center point of the process equipment, x GM ,y GM is the coordinate of the center point of the process area, The maximum allowable lateral edge value when the process equipment is embedded in the process area. The maximum allowable longitudinal edge value when the process equipment is embedded in the process area, w GM 、h GM are the width and height of the process area, w DE 、h DE are the width and height of the process equipment respectively.
[0122] To embed process equipment into the process area model, it is necessary to analyze the coordinate position of the process equipment relative to the process area model. Based on the coordinate position information, embedding the process equipment requires considering the relative position of the center point of the process equipment and the center point of the process area, as well as dealing with the boundary problem between the process equipment and the process area. On the premise that the process equipment is inside the process area and does not exceed the boundary of the process area (while meeting the requirements in the width and height directions), the relative position of the center point of the process equipment and the center point of the process area is used to determine the solution for embedding the process equipment into the process area model.
[0123] Combined with the process equipment layout, logistics layout and the preset energy analysis model, the power facility layout corresponding to the discrete production of the target product is carried out, including:
[0124] Obtain the energy consumption function of each machine and / or chamber in the process equipment, provide power facilities according to the energy consumption function, and complete the corresponding power facility layout.
[0125] For discrete production plants, it is possible to obtain data on energy consumption of pure water, consumables, etc. in different scenarios, organize the above historical data into a time series curve of energy consumption, and derive the energy consumption function of each machine and / or chamber. The energy analysis model can be preset according to the energy consumption function of each machine and / or chamber. After obtaining the process equipment layout and logistics layout through the above layout module and logistics module, the corresponding power facility layout is completed in combination with the energy analysis model.
[0126] like Figure 6 As shown, the present invention also provides a discrete production process generation device based on digital twins, which adopts the discrete production process generation method based on digital twins as mentioned above, specifically comprising:
[0127] An acquisition unit, used to acquire a process route of a target product;
[0128] The analysis unit is used to determine the process equipment corresponding to each process and form a process equipment configuration list; based on the preset discrete production simulation model and combined with the production capacity planning of the target product, a process equipment quantity list is given;
[0129] The generation unit is used to carry out process equipment layout based on the process equipment configuration list and the process equipment quantity list, and obtain the logistics handling flow and logistics layout, and plan the number of storage locations and the number of logistics vehicles; combining the process equipment layout, logistics layout and the preset energy analysis model, the energy demand of the process equipment is given, the power facility layout corresponding to the discrete production of the target product is carried out, and the discrete production process is generated.
[0130] The present invention provides a method and device for generating a discrete production process based on digital twins, which at least have the following beneficial effects:
[0131] By generating discrete production processes through the solution of the present invention, mechanism model fusion, data interaction and real-time transmission analysis between modules such as line assembly, logistics, layout and energy consumption are realized, and full process coverage of digital mapping and simulation of all elements of discrete production and manufacturing is achieved.
[0132] Although preferred embodiments of the present invention have been described, additional changes and modifications may be made to these embodiments by those skilled in the art once the basic inventive concepts are known. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention. Obviously, those skilled in the art may make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A discrete production process generation method based on digital twin, characterized in that: The specific steps include: Obtain the process route of the target product, determine the process equipment corresponding to each process, and form a process equipment configuration list; Based on the preset discrete production simulation model and combined with the production capacity planning of the target product, a list of process equipment quantities is given; Based on the process equipment configuration list and process equipment quantity list, the process equipment layout is carried out, and the logistics handling flow and logistics layout are obtained to plan the number of storage locations and the number of logistics vehicles; Combined with the process equipment layout, logistics layout and the preset energy analysis model, the energy demand of the process equipment is given, the power facility layout corresponding to the discrete production of the target product is carried out, and the discrete production process is generated; Among them, based on the process equipment configuration list and the process equipment quantity list, the process equipment layout is carried out, and the logistics transportation flow and logistics layout are obtained, and the number of storage locations and the number of logistics vehicles are planned, which specifically includes the following steps: Obtain the process zoning information table to determine the location of each process area and the corresponding process area number; Traverse each process area number, combine with the search of the process flow database, and determine each visualized process area model; Traverse the process equipment configuration list and process equipment quantity list, and based on the arrangement logic of the process equipment, embed each process equipment into the corresponding process area model to form a process equipment layout; Combined with the process equipment layout and the obtained machine flow table, the logistics handling flow and logistics layout are obtained, and the number of storage locations and logistics vehicles are planned.
2. The method for generating discrete production processes based on digital twins according to claim 1, characterized in that: Obtain the process route of the target product, which specifically includes the following steps: Based on the target product, provide a process flow sheet and process logic sheet; Combine the process logic form, analyze the process flow form, determine each process and the corresponding process number; Traverse each process number, and based on the search of the process database, complete the confirmation of each process to form the process route of the target product.
3. The method for generating discrete production processes based on digital twins according to claim 2, characterized in that: Based on the search of the process database, the confirmation of each process is completed, which includes the following steps: A field code representing a process type is given to determine a search range of a process database, wherein the field code is a number and / or letter defining a process number, and the field code is located at a prefix and / or suffix of the process number; Within the search range, query and match by process number to complete the confirmation of each process.
4. The method for generating discrete production processes based on digital twins according to claim 1, characterized in that: The discrete production simulation model at least includes discrete production simulation based on process flow scheduling strategy.
5. The method for generating discrete production processes based on digital twins according to claim 4, characterized in that: Based on the preset discrete production simulation model and combined with the production capacity planning of the target product, a list of process equipment is given, including: ; Among them, M q,i is the number of type i process equipment required for the qth batch, i is the process equipment type number, n is the total number of process equipment types, q is the batch number of discrete production of the target product, CEIL() is the upward rounding function, N q is the total number of target products to be produced in the qth batch, N q,i is the maximum quantity of target products that can be processed by the i-th type of process equipment in the q-th batch, T q,i is the production time of the qth batch of type i process equipment.
6. The method for generating discrete production processes based on digital twins according to claim 1, characterized in that: Combined with the search of the process flow database, each visualized process area model is determined, which specifically includes the following steps: Searching and matching the process area number in the process flow database, and extracting the process area attribute information in the process flow database, wherein the process area attribute information is serialized data; Convert the process area attribute information into object format to form a visual process area model; Among them, the process area attribute information is converted into an object format, which is specifically expressed as follows: ; GM is the process area model, f() is the graphical function, DT is the process area type, A1…A n is the process area parameter item, a1...a n For A1...A n Parameter value.
7. The method for generating discrete production processes based on digital twins according to claim 1, characterized in that: Traverse the process equipment configuration list and process equipment quantity list, and embed each process equipment into the corresponding process area model based on the arrangement logic of the process equipment to form a process equipment layout, which specifically includes the following steps: Extracting process equipment attribute information from a process equipment database, where the process equipment attribute information includes coordinate position information; The process equipment attribute information is converted into an object format, and based on the coordinate position information, a visual process area model is embedded to form a process equipment layout; Among them, based on the coordinate position information, the visualized process area model is embedded, which is specifically expressed as: ; RP is the relative position coordinate, min() is the minimum value function, x DE ,y DE is the coordinate of the center point of the process equipment, x GM ,y GM is the coordinate of the center point of the process area, The maximum allowable lateral edge value when the process equipment is embedded in the process area. The maximum allowable longitudinal edge value when the process equipment is embedded in the process area, w GM 、h GM are the width and height of the process area, w DE 、h DE are the width and height of the process equipment respectively.
8. The method for generating discrete production processes based on digital twins according to claim 1, characterized in that: Combined with the process equipment layout, logistics layout and the preset energy analysis model, the power facility layout corresponding to the discrete production of the target product is carried out, including: Obtain the energy consumption function of each machine and / or chamber in the process equipment, provide power facilities according to the energy consumption function, and complete the corresponding power facility layout.
9. A discrete production process generation device based on digital twin, characterized in that: Specifically include: An acquisition unit, used to acquire a process route of a target product; The analysis unit is used to determine the process equipment corresponding to each process and form a process equipment configuration list; Based on the preset discrete production simulation model and combined with the production capacity planning of the target product, a list of process equipment quantities is given; The generation unit is used to carry out the layout of process equipment based on the process equipment configuration list and the process equipment quantity list, and obtain the logistics handling flow and logistics layout, and plan the number of storage locations and the number of logistics vehicles; combined with the process equipment layout, logistics layout and the preset energy analysis model, the energy demand of the process equipment is given, the power facility layout corresponding to the discrete production of the target product is carried out, and the discrete production process is generated; Among them, based on the process equipment configuration list and the process equipment quantity list, the process equipment layout is carried out, and the logistics handling flow and logistics layout are obtained, and the number of storage locations and the number of logistics vehicles are planned, which specifically includes: obtaining the process zoning information table to determine the location of each process area and the corresponding process area number; traversing each process area number, and combining the search of the process flow database to determine each visualized process area model; traversing the process equipment configuration list and the process equipment quantity list, and based on the arrangement logic of the process equipment, embedding each process equipment into the corresponding process area model to form a process equipment layout; combining the process equipment layout and the obtained machine flow form to obtain the logistics handling flow and logistics layout, and planning the number of storage locations and the number of logistics vehicles.
Citation Information
Patent Citations
Production simulation platform-based production optimization method, device and system
CN117348575A
Discrete manufacturing process-oriented digital twin modeling system and method
CN114692371A
Semiconductor process production line equipment configuration method and device
CN115994457A