Engineering Consulting Service Quality Evaluation System

Through the dynamic resource allocation and task priority adjustment of the engineering consulting service quality assessment system, the problem of inflexible resource allocation and task priority adjustment of existing system is solved, the project management efficiency and customer satisfaction are improved, and the project quality management capabilities are enhanced .

CN118674325BActive Publication Date: 2024-11-05SICHUAN TONGXING DACHENGXING ENG COST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411134263.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-05
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

The existing engineering consulting service quality assessment system lacks flexibility in resource allocation and task priority adjustment, resulting in inefficient resource utilization and inability to respond to problems in projects in a timely manner, affecting customer satisfaction and corporate reputation.

Method used

Historical data is collected through the project analysis module, the resource allocation module adjusts resource configuration based on the time library of key nodes, the task priority adjustment module optimizes task execution plan, the project monitoring module tracks progress in real time, and the quality control module conducts multi-stage evaluation and intervention strategy implementation, combined with Genetic algorithms and reinforcement learning algorithms, dynamically adjust resources and management strategies.

Benefits of technology

It has improved the management efficiency and service quality of engineering consulting projects, ensured that resources match project needs, optimized task priorities, timely adjusted monitoring strategies, strengthened project quality management, and improved customer satisfaction and corporate competitiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118674325B_ABST
    Figure CN118674325B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of project management, specifically to an engineering consulting service quality evaluation system, the system includes a project analysis module, a resource allocation module, a task priority adjustment module, a project monitoring module, a quality control module, and an intervention strategy implementation module. In the present invention, by dynamically adjusting resource allocation and combining real-time monitoring and data analysis, the management efficiency and service quality of engineering consulting projects are improved, including analyzing resource usage, comparing with historical data, accurately adjusting resources to adapt to project needs, adding resources for key tasks, reducing resources for non-key tasks, optimizing task priorities, ensuring that key tasks are completed first, collecting progress data in real time, monitoring project delays and advances through data analysis, and adjusting strategies in a timely manner. In terms of quality control, quality evaluation is performed on multiple stages of the project, the causes of deviations are analyzed, continuous monitoring and management are enhanced, and targeted intervention measures are implemented to improve customer satisfaction and market competitiveness.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of project management, and in particular to an engineering consulting service quality evaluation system. Background Art

[0002] The field of project management technology is committed to effectively planning, organizing, preparing, executing and completing projects to achieve predetermined goals, including in the field of engineering consulting. Project management technology not only involves the management of time and resources, but also includes multiple dimensions such as quality control and customer relationship management. The quality assessment system is a key component that helps companies monitor and improve service quality and ensure that various engineering consulting activities can meet or exceed customer expectations.

[0003] Among them, the engineering consulting service quality evaluation system refers to a set of integrated software and hardware solutions for real-time monitoring, evaluation and improvement of the service quality of engineering consulting projects. The main purpose of the system is to regularly collect key data in the service execution process, evaluate the performance of service compliance, efficiency and customer satisfaction, etc., to timely discover problems and bottlenecks in the service process, provide improvement measures, ensure the smooth progress of the project, and ultimately achieve the purpose of enhancing customer trust and corporate market competitiveness.

[0004] The existing engineering consulting service quality evaluation system in engineering consulting project management, although including time and resource management and quality control, lacks the ability to flexibly adjust resource allocation and task priorities. The existing system is difficult to quickly adjust according to the actual situation after resource allocation, resulting in sometimes insufficient utilization of resources and low efficiency. Traditional quality control methods mostly rely on post-evaluation, which is not enough to respond quickly to immediate problems in the project, resulting in an increased risk of problems expanding. In terms of customer relationship management, due to the lack of real-time project progress tracking and quality feedback mechanism, it is difficult to adjust service strategies in time to meet customer expectations, affecting customer satisfaction and corporate reputation. Summary of the invention

[0005] This application provides an engineering consulting service quality assessment system to solve the problem that the existing engineering consulting service quality assessment system in engineering consulting project management, although including time and resource management and quality control, lacks the ability to flexibly adjust resource allocation and task priorities. The existing system is difficult to adjust quickly according to actual conditions after resource allocation, resulting in sometimes insufficient utilization of resources and low efficiency. Traditional quality control methods rely more on post-evaluation, which is insufficient to respond quickly to immediate problems in the project, resulting in an increased risk of problem expansion. In terms of customer relationship management, due to the lack of real-time project progress tracking and quality feedback mechanisms, it is difficult to adjust service strategies in a timely manner to meet customer expectations, affecting customer satisfaction and corporate reputation.

[0006] In view of the above problems, this application provides an engineering consulting service quality evaluation system.

[0007] The present application provides an engineering consulting service quality assessment system, wherein the system comprises:

[0008] The project analysis module collects and organizes project historical data, extracts key time nodes through the database, summarizes the task list, and extracts the project time nodes and task lists based on the project historical data and time series to obtain the key node time library;

[0009] The resource allocation module evaluates the resource usage of key demand time nodes based on the key node time library, adjusts resource allocation according to demand fluctuations, and generates a resource utilization analysis report;

[0010] The task priority adjustment module uses the resource utilization analysis report to evaluate the matching of tasks and resources, add resources to key tasks, reduce resources for non-key tasks, update task priorities, and obtain a task execution plan;

[0011] The project monitoring module monitors the completion of key tasks according to the task execution plan, collects real-time progress data, analyzes project progress, adjusts monitoring strategies, and obtains project progress tracking results;

[0012] The quality control module conducts multi-stage quality assessments based on the project progress tracking results, analyzes quality deviations, adjusts management measures, and establishes quality optimization strategies;

[0013] The intervention strategy implementation module formulates intervention measures based on the quality optimization strategy, specifically adjusts the resources and management of key areas, implements the optimization plan, strengthens project quality management, and generates intervention measure execution instructions.

[0014] Preferably, the key node time library includes the project start date, multi-stage deadlines, and key review time points; the resource utilization analysis report includes the human resource utilization percentages, equipment utilization rates, and material consumption rates of multiple departments; the task execution plan includes the task number, the re-assigned resource allocation amount, and the expected completion time window; the project progress tracking results include the completion percentage of key tasks, the deviation value between the expected and real-time progress, and the achievement of key milestones; the quality optimization strategy includes the pass rate of the inspection phase, a list of key quality issues, and a prediction of the effectiveness of optimization measures; the intervention measure execution instructions include the adjusted resource type, the expected adjustment time frame, and the target quality optimization standard.

[0015] Preferably, the resource allocation module includes:

[0016] The time node analysis submodule uses the key node time library to compare the historical records of resource usage with the current demand, analyzes the changes in resource usage status at the key demand time nodes, adjusts the resource demand prediction model parameters by comparing the resource usage frequency and time sensitivity, and generates resource demand comparison results;

[0017] The resource matching submodule applies a genetic algorithm based on the resource demand comparison result to evaluate the matching degree between the existing resource configuration and the project demand, adjusts the resource configuration parameters, including resource allocation priority and resource quantification standard, configures resources to match the project demand, and generates a matching adjustment record;

[0018] The data presentation submodule processes resource configuration data based on the matching adjustment records, analyzes the resource configuration data, extracts key performance indicators, organizes and formats the data, and generates a resource utilization analysis report.

[0019] Preferably, the genetic algorithm is according to the formula:

[0020] ;

[0021] in, It is a multi-factor weighted score. Assigning priorities to resources to match project needs, To quantify the matching degree between resource standards and project requirements, Time efficiency for resource allocation, For the cost efficiency of resources, , , , is the weight parameter.

[0022] Preferably, the task priority adjustment module includes:

[0023] The resource analysis submodule sorts and groups the resource usage of each project task based on the resource utilization analysis report, identifies the peak and trough of resource consumption in the differentiation stage, iteratively identifies key tasks with excess and insufficient resources, and adjusts the allocation direction of resources to generate a resource matching table;

[0024] The priority update submodule obtains data from the resource matching table, increases resource allocation for tasks with tight resources, reduces resource allocation for tasks with sufficient resources, optimizes the overall utilization efficiency of resources by adjusting the resource allocation of tasks, and generates an adjustment priority table;

[0025] The project process optimization submodule uses the adjustment priority table to sort tasks according to new priorities, postpone low-priority tasks, optimize the process and efficiency of project execution, and build a task execution plan.

[0026] Preferably, the project monitoring module includes:

[0027] The task rescheduling submodule adopts the task execution plan, analyzes the urgency and impact of the tasks, reorders the tasks based on resource availability and delivery deadlines, adjusts the scheduled time and priority of the tasks to match the changes in project requirements, optimizes the resource allocation and time window of key tasks, and generates an optimized task list;

[0028] The progress tracking submodule sets key monitoring points based on the optimized task list to track the completion of key tasks in real time, compares the current progress with the planned progress, identifies delays and advances through real-time data updates, adjusts the frequency and degree of progress monitoring, and generates real-time progress analysis results;

[0029] The monitoring strategy adjustment submodule utilizes the real-time progress analysis results and applies a reinforcement learning algorithm to evaluate the coverage and efficiency of the current monitoring strategy, adjust monitoring parameters according to real-time feedback on project progress, reconfigure resource and time management strategies, optimize responses to project changes, and generate project progress tracking results.

[0030] Preferably, the reinforcement learning algorithm is according to the formula:

[0031] ;

[0032] in, For the status The expected return under For the chosen action, To carry out actions In Status The immediate return of is the discount rate for future returns, From the state Take Action Transfer to state The probability of Status The value function of is the weight coefficient for updating the state value, is a constant feedback to the environment.

[0033] Preferably, the quality control module includes:

[0034] The stage quality assessment submodule analyzes the completion status of multiple stages of the project one by one based on the project progress tracking results. By collecting and collating key performance indicators, including the deviation between the completion time and the scheduled time and the parameters of the task completion quality, the output of each stage is compared to identify the links that meet the standards and those that do not, and generate an overview of the project execution performance;

[0035] The deviation analysis submodule extracts key deviation data from the project execution performance overview, analyzes the factors causing quality deviation, including imbalanced resource allocation and improper schedule management, determines the cause of the problem by comparing the environment and conditions where the deviation occurs item by item, and constructs a list of deviation causes;

[0036] The strategy formulation submodule uses the list of deviation causes to formulate adjustment measures and optimization strategies, including adjusting resource distribution, optimizing time management processes, and revising technical execution standards. Each measure is optimized for the identified problems to establish a quality optimization strategy.

[0037] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0038] By refining and dynamically adjusting resource allocation, combined with real-time monitoring and data analysis, the management efficiency and service quality of engineering consulting projects can be improved. By analyzing the resource usage status at multiple time nodes and comparing it with historical data, resources can be accurately adjusted to match the needs of the project, improving resource utilization, adding resources for key tasks with tight resources, and reducing resources for non-critical tasks with sufficient resources, effectively optimizing task priorities, ensuring the priority completion of key tasks, and collecting progress data in real time and analyzing project delays and advances through data comparison, which helps to adjust monitoring strategies in a timely manner and strengthen project progress control. In terms of quality control, by conducting quality assessments at multiple project stages and analyzing the causes of deviations, continuous quality monitoring and management can be strengthened, timely discovery and resolution of problems can be promoted, and targeted intervention measures can be implemented to further strengthen project quality management and improve customer satisfaction and the market competitiveness of enterprises.

[0039] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 A module diagram of an engineering consulting service quality evaluation system is proposed for the present invention;

[0041] Figure 2 The system framework diagram of the engineering consulting service quality evaluation system proposed by the present invention;

[0042] Figure 3 A specific flow chart of a project analysis module of an engineering consulting service quality assessment system is provided for the present invention;

[0043] Figure 4 A specific flow chart of a resource allocation module of an engineering consulting service quality assessment system is provided for the present invention;

[0044] Figure 5 A specific flow chart of a task priority adjustment module of an engineering consulting service quality assessment system is proposed for the present invention;

[0045] Figure 6 A specific flow chart of a project monitoring module of an engineering consulting service quality assessment system is provided for the present invention;

[0046] Figure 7 A specific flow chart of the quality control module of the engineering consulting service quality assessment system is proposed for the present invention;

[0047] Figure 8 The present invention proposes a specific flow chart of the intervention strategy implementation module of the engineering consulting service quality assessment system. DETAILED DESCRIPTION

[0048] This application provides an engineering consulting service quality assessment system to solve the problem that the existing engineering consulting service quality assessment system in engineering consulting project management, although including time and resource management and quality control, lacks the ability to flexibly adjust resource allocation and task priorities. The existing system is difficult to adjust quickly according to actual conditions after resource allocation, resulting in sometimes insufficient utilization of resources and low efficiency. Traditional quality control methods rely more on post-evaluation, which is insufficient to respond quickly to immediate problems in the project, resulting in an increased risk of problem expansion. In terms of customer relationship management, due to the lack of real-time project progress tracking and quality feedback mechanisms, it is difficult to adjust service strategies in a timely manner to meet customer expectations, affecting customer satisfaction and corporate reputation.

[0049] Application Overview: The existing engineering consulting service quality assessment system in the prior art lacks the ability to flexibly adjust resource allocation and task priorities in engineering consulting project management, although it includes time and resource management and quality control. The existing system is difficult to quickly adjust according to the actual situation after resource allocation, resulting in sometimes insufficient utilization of resources and low efficiency. Traditional quality control methods rely more on post-evaluation, which is not enough to respond quickly to immediate problems in the project, resulting in an increased risk of problem expansion. In terms of customer relationship management, due to the lack of real-time project progress tracking and quality feedback mechanism, it is difficult to adjust service strategies in time to meet customer expectations, affecting customer satisfaction and corporate reputation.

[0050] In response to the above technical problems, the overall idea of ​​the technical solution provided by this application is as follows:

[0051] like Figure 1 , Figure 2 As shown, the present application provides an engineering consulting service quality evaluation system, wherein the system includes:

[0052] The project analysis module collects and organizes project historical data, extracts key time nodes and task lists through database query, and extracts project time nodes and task lists based on project historical data and time series to obtain a key node time library;

[0053] The resource allocation module uses a key node time library to analyze resource usage at multiple time nodes, adjusts resource configuration to match project requirements by comparing historical data with current requirements, and generates resource utilization analysis reports;

[0054] The task priority adjustment module uses the resource utilization analysis report to analyze the corresponding relationship between resources and tasks, add resources for critical tasks with tight resources, reduce resources for non-critical tasks with sufficient resources, update task priorities, and obtain task execution plans;

[0055] The project monitoring module tracks the completion of key tasks according to the task execution plan, collects progress data in real time, analyzes project delays and advances through data comparison, adjusts monitoring strategies, and obtains project progress tracking results;

[0056] The quality control module conducts quality assessments on multiple project stages based on the project progress tracking results, analyzes the causes of deviations, adjusts management measures, formulates response strategies for the discovered problems, optimizes process control, and establishes quality optimization strategies;

[0057] The intervention strategy implementation module formulates targeted intervention measures based on the quality optimization strategy, reallocates resources and adjusts management for key problem areas, implements optimization plans, strengthens project quality management, and generates intervention measure execution instructions.

[0058] The key node time library includes the project start date, multi-stage deadlines, and key review time points. The resource utilization analysis report includes the human resource utilization percentage, equipment utilization rate, and material consumption rate of multiple departments. The task execution plan includes the task number, the re-assigned resource allocation, and the expected completion time window. The project progress tracking results include the completion percentage of key tasks, the deviation value between the expected and real-time progress, and the achievement of key milestones. The quality optimization strategy includes the pass rate of the inspection stage, the list of key quality issues, and the prediction of the effectiveness of optimization measures. The intervention execution instructions include the adjusted resource type, the expected adjustment time frame, and the target quality optimization standard.

[0059] Specifically, if Figure 2 , Figure 3 As shown, the project analysis module includes:

[0060] The time data classification submodule collects and organizes project historical data from the project database, filters the data according to the start and end dates of task execution, and sorts the data into three stages: early, middle, and late. The frequency and type of tasks in each stage are counted, and the execution process of generating a time index table is as follows;

[0061] The time data classification submodule first connects to the project database and executes SQL query statements to extract project task data within the target date range. The date range is determined by the start date and end date fields of the task. The collected data is sorted in time series using a time sorting algorithm, thereby dividing the task data into three stages: early, middle, and late. The early stage is defined as the first third of the period after the start of the task, the middle third is the middle third, and the late third is the last third. The task data of each stage is classified by calculating the ratio of the start and end time of each task to the total project time, counting the task frequency and task type of each stage, and storing the statistical results in a structured time index table, which can significantly provide insights into the phased characteristics of the project.

[0062] The formula is set as follows: Indicates The start time of a task, Indicates The duration of a task, Indicates the total project time and calculates the tasks The formula for the stage is: in, Indicates the stage to which the task belongs (1 for the early stage, 2 for the middle stage, and 3 for the late stage).

[0063] The task list sorting submodule uses the time index table as input to query the corresponding task information, including the duration, required resources and completion status of each task, sort the tasks according to resource consumption and urgency, optimize the order and classification of task display, and obtain the execution process of the dynamic priority queue as follows;

[0064] The task list sorting submodule uses the time index table as input, performs detailed queries on each task in the table, extracts the duration, required resources, and completion status of each task, and sorts the tasks according to resource consumption and urgency. The specific method is to first calculate the resource consumption index and urgency index of each task, and then use these two indexes to generate a comprehensive sorting index. The resource consumption index and urgency index are calculated using the following formula, where Indicates The resource consumption of each task, Indicates the degree of urgency, and The weights of these two factors are: Optimize the order and classification of task display, and finally generate an optimized task list, which is sorted in descending order by comprehensive sorting index.

[0065] The key node extraction submodule analyzes the data in the dynamic priority queue, identifies the key start and deadline time of each task, evaluates the influence of time points on the project process, analyzes and determines the time nodes in project management, and builds the key node time library. The execution process is as follows;

[0066] The key node extraction submodule determines the key start and deadline of each task by analyzing the data in the dynamic priority queue. First, the time difference method is used to determine the task interval, and the tasks with short intervals and high task importance are identified as key tasks. For each key task, the weight of its impact on the project process is calculated, which is determined by the duration and resource consumption of the task. The weight calculation formula is: in Indicates The influence weight of each task, and Defined. Build a key node time library based on the weight value, including the start and end time of all key tasks.

[0067] Specifically, if Figure 2 , Figure 4 As shown, the resource allocation module includes:

[0068] The time node analysis submodule uses the key node time library to compare the historical records of resource usage with the current demand, analyze the changes in resource usage at the key demand time nodes, and adjust the resource demand prediction model parameters by comparing the resource usage frequency and time sensitivity. The execution process of generating resource demand comparison results is as follows;

[0069] The time node analysis submodule uses the key node time library to screen the historical data in the key node time library, selects the time points and resource usage records related to the current demand, extracts the relevant data of resource usage frequency and time nodes, and calculates the difference between the current resource demand and the historical average demand. The specific operation is to calculate the usage frequency of each resource type at different time nodes and the difference between the frequency and the current demand, and use the difference results to adjust the parameters of the resource demand prediction model. The specific adjustment process includes optimizing the sensitivity parameters in the prediction model to ensure that the model reflects the recent resource usage trends. The comparison results are displayed in a tabular form. The table lists the current demand, historical average demand and difference value of each resource type. By comparing the resource usage frequency and time sensitivity, the resource demand prediction model parameters are adjusted to generate resource demand comparison results.

[0070] The resource matching submodule applies genetic algorithms based on the resource demand comparison results to evaluate the matching degree between the existing resource configuration and the project demand, adjust the resource configuration parameters, including resource allocation priority and resource quantification standards, configure resources to match the project demand, and generate the matching adjustment record. The execution process is as follows;

[0071] Based on the resource demand comparison results, the resource matching submodule first determines the resource configuration parameters that need to be adjusted, including resource allocation priority and resource quantification standards. For the adjustment of resource allocation priority, based on the frequency difference shown in the resource demand comparison results, the resources with high demand frequency are set to high priority to ensure that urgent needs are met. The adjustment of resource quantification standards is based on the time sensitivity of resources. Highly sensitive resources are given higher weights when quantified. By adjusting parameters, resource configuration is optimized to better match project requirements. After adjustment, the adjustment records are used to evaluate the matching degree between the existing resource configuration and project requirements. The evaluation process includes analyzing the pairing effectiveness of each resource type and generating matching adjustment records.

[0072] The genetic algorithm follows the formula:

[0073] ;

[0074] in, It is a multi-factor weighted score. Assigning priorities to resources to match project needs, To quantify the matching degree between resource standards and project requirements, Time efficiency for resource allocation, For the cost efficiency of resources, , , , It is a weight parameter that determines the contribution of each factor to the final score.

[0075] The execution process is as follows;

[0076] and The calculation of remains unchanged, and the matching degree of resource allocation and the adaptability of quantitative criteria continue to be evaluated. Newly added as a time efficiency evaluation for resource allocation, by assessing the degree of compliance between the time required to complete the allocation and the project time requirements, Consider the cost efficiency of resources and evaluate the fit between the required costs and the project budget. , , , The specific value of needs to be determined through data analysis or experiments. The weight can be set by historical data regression analysis or expert evaluation method to ensure that each weight reflects the actual influence and adapts to the characteristics of the project. The most appropriate weight value is determined through iterative optimization to ensure the versatility and accuracy of the algorithm in various resource allocation scenarios. A comprehensive score will be calculated and generated to guide the optimal allocation of resources.

[0077] The execution flow of the data presentation submodule based on matching adjustment records, processing resource configuration data, parsing resource configuration data, extracting key performance indicators, collating and formatting data, and generating resource utilization analysis reports is as follows;

[0078] The data presentation submodule is based on matching and adjusting records. First, the data in the records is preprocessed, including screening key data and cleaning irrelevant information. After the preprocessing is completed, the resource configuration data is parsed and key performance indicators are extracted, such as resource utilization, deployment speed, etc., which will show the utilization efficiency and matching success rate of various resources in detail, as well as the impact of time sensitivity on the resource configuration effect. The report is presented in the form of charts and data tables, so that the management can intuitively understand the efficiency and effect of resource allocation, process resource configuration data, parse resource configuration data, extract key performance indicators, organize and format data, and generate resource utilization analysis reports.

[0079] Specifically, if Figure 2 , Figure 5 As shown, the task priority adjustment module includes:

[0080] The resource analysis submodule sorts and groups the resource usage of each project task based on the resource utilization analysis report, identifies the peak and trough of resource consumption in the differentiation stage, iteratively identifies the key tasks with excess and insufficient resources, and adjusts the allocation direction of resources. The execution process of generating the resource matching table is as follows;

[0081] The resource analysis submodule first receives data from the resource utilization analysis report, which includes detailed records of resource usage for each project task. The module processes the data centrally, sorts the resource usage of each task, and uses the selection sorting algorithm to determine the order of resource usage of each task from high to low by comparing item by item. After the sorting is completed, the module groups the tasks into resource consumption peak group and resource consumption trough group according to the set resource usage threshold. The module uses an iterative method to identify key tasks with excess and insufficient resources in the differentiation stage. For the identified key tasks, the module calculates the resource demand deviation. The deviation calculation formula is Di=(Ru−Ra), where Di is the resource deviation of the i-th task, Ru is the resource usage upper limit, and Ra is the actual resource usage. Through calculation, the module adjusts the resource allocation direction, optimizes resource configuration, reduces waste, and generates a resource matching table.

[0082] The priority update submodule obtains data from the resource matching table, increases resource allocation for tasks with tight resources, and reduces resource allocation for tasks with sufficient resources. By adjusting the resource allocation of tasks, the overall utilization efficiency of resources is optimized. The execution process of generating the adjustment priority table is as follows;

[0083] The priority update submodule obtains data from the resource matching table and analyzes the resource status of each task. The submodule first identifies tasks with tight resources and increases resource allocation to the tasks. The decision to increase resources is based on the optimization calculation of resource allocation, and the calculation formula is: ,in is the original resource ratio, is the incremental resource demand, is the adjustment coefficient, which is used to control the sensitivity of resource allocation. For tasks with sufficient resources, the module reduces resources, and the amount of reduced resources is also calculated by a similar formula. The module continuously adjusts the resource allocation of tasks to optimize the overall utilization efficiency of resources. The module generates an adjustment priority table, which records the new priority of each task after resource optimization, thus providing a basis for subsequent operations. By adjusting the resource allocation of tasks, the overall utilization efficiency of resources is optimized and an adjustment priority table is generated.

[0084] The project process optimization submodule uses the adjustment priority table to sort the tasks according to the new priority, postpone the low-priority tasks, optimize the process and efficiency of project execution, and build the execution process of the task execution plan as follows;

[0085] The project process optimization submodule uses the adjusted priority table to start sorting the tasks with new priorities. The sorting uses the insertion sort algorithm to insert each task into the appropriate position according to the priority of the task, ensuring that the high-priority tasks are ranked first. After sorting, the module makes a strategic decision on postponing low-priority tasks based on the evaluation of the project deadline and resource availability. If the postponement will not affect the overall progress of the project, it will be postponed; otherwise, the resource allocation will be re-evaluated. After optimization, the plan describes in detail the execution time, required resources and priority information of each task, effectively optimizing the process and efficiency of project execution. The project process optimization submodule uses the adjusted priority table to sort the tasks according to the new priority, postpone the low-priority tasks, optimize the process and efficiency of project execution, and build a task execution plan.

[0086] Specifically, if Figure 2 , Figure 6 As shown, the project monitoring module includes:

[0087] The task rescheduling submodule adopts the task execution plan, analyzes the urgency and impact of tasks, reorders tasks based on resource availability and delivery deadlines, adjusts the scheduled time and priority of tasks to match the changes in project requirements, optimizes resource allocation and time windows for key tasks, and generates the optimized task list. The execution process is as follows;

[0088] The task rescheduling submodule uses the task execution plan. First, the urgency and impact data of each task are extracted from the task execution plan. The priority of each task is evaluated based on the data. The tasks are sorted according to the availability of resources and the delivery deadline of each task. This involves querying the resource allocation table to ensure that resource availability matches the task requirements. For urgent tasks with a wide range of impact, their scheduled time is adjusted first to ensure that key resources can be equipped in time. For key tasks, resource allocation and time windows are optimized, including adjustments to task execution paths and resource reconfiguration to cope with changes in demand. All adjustments are summarized, and the new scheduled time and priority of each task are displayed in detail. The resource allocation and time windows of key tasks are optimized to generate an optimized task list.

[0089] The progress tracking submodule is based on the optimized task list, sets key monitoring points to track the completion of key tasks in real time, compares the current progress with the planned progress, identifies delays and advances through real-time data updates, adjusts the frequency and degree of progress monitoring, and generates real-time progress analysis results. The execution process is as follows;

[0090] Based on the optimized task list, the progress tracking submodule starts to track the completion of key tasks in real time by setting key monitoring points. First, define the key monitoring points, which are located at the key stages of task execution, such as the start, intermediate inspection and completion stages. The real-time data of task completion is collected through the monitoring points, and the collected data is compared with the planned progress. If a delay or advance in task progress is detected, the monitoring system is updated immediately, and the frequency and degree of monitoring are adjusted to more closely monitor the affected tasks. The monitoring system automatically records all data changes. The result shows in detail the comparison between the current status of each task and the expected status. Delays and advances are identified through real-time data updates, and the frequency and degree of progress monitoring are adjusted to generate real-time progress analysis results.

[0091] The monitoring strategy adjustment submodule uses the real-time progress analysis results and applies the reinforcement learning algorithm to evaluate the coverage and efficiency of the current monitoring strategy, adjust the monitoring parameters according to the real-time feedback of the project progress, reconfigure the resource and time management strategies, optimize the response to project changes, and generate the project progress tracking results. The execution process is as follows;

[0092] The monitoring strategy adjustment submodule uses the real-time progress analysis results to first analyze the efficiency and coverage of various monitoring strategies reflected in the results. By comparing the monitoring data of different tasks and stages, the effectiveness of the existing monitoring strategy is evaluated, and the deficiencies in the monitoring strategy are identified. According to the real-time feedback of the project progress, the monitoring parameters are adjusted, including the monitoring frequency, key points of monitoring, and technical means of monitoring, to improve the adaptability and response speed of the strategy, reconfigure the resource and time management strategy, and ensure that the monitoring system can flexibly respond to the changes and needs of the project, not only reflecting the effect of the monitoring strategy adjustment, but also providing a quick response to project changes, optimizing the response to project changes, and generating project progress tracking results.

[0093] The reinforcement learning algorithm follows the formula:

[0094] ;

[0095] in, For the status The expected return under For the chosen action, To carry out actions In Status The immediate return of is the discount rate for future returns, From the state Take Action Transfer to state The probability of Status The value function of is the weight coefficient for updating the state value, is a constant feedback of the environment, which is used to adjust the adaptability of the model to the environment.

[0096] The execution process is as follows;

[0097] By executing actions From the status Start by calculating the immediate return in this state , for each state , calculate its transition probability , calculate the weighted value function of the state, here we introduce a new parameter and ,in Used to balance values ​​learned directly from historical data and environmental constants The influence between them ensures that the model can learn from historical data and adapt to environmental changes. The value of reflects the average environmental feedback in a non-specific state. All values ​​will be combined according to the Bellman equation to calculate each row The optimal value of , select the action with the maximum reward to update the current state The value function , where the weight coefficient The specific value of can be determined through cross-validation or model tuning to optimize the long-term effect of the overall strategy.

[0098] Specifically, if Figure 2 , Figure 7 As shown, the quality control module includes:

[0099] The stage quality assessment submodule analyzes the completion status of multiple stages of the project one by one based on the project progress tracking results. By collecting and organizing key performance indicators, including the deviation between the completion time and the scheduled time and the parameters of the task completion quality, the output of each stage is compared to identify the links that meet the standards and those that do not meet the standards. The execution process of generating a project execution performance overview is as follows;

[0100] The stage quality assessment submodule is based on the project progress tracking results. First, the completion data of each stage is extracted from the tracking results, including the comparison data of the completion time of each stage with the scheduled time, and the specific parameters of the task completion quality. For the deviation between the completion time and the scheduled time, the actual completion time of each stage is compared with the scheduled time in the plan to calculate the time deviation; for the task completion quality, the performance of each stage is evaluated by analyzing the specific quality indicators of the task output, and the data is sorted and analyzed. By comparing the performance indicators of each stage, the links that meet the standards and those that do not meet the standards are identified, and the analysis results are summarized. This overview shows the quality assessment results of each stage and the quality status of the overall project in detail, and generates an overview of the project execution performance.

[0101] The deviation analysis submodule extracts key deviation data from the project execution performance overview and analyzes the factors that cause quality deviations, including imbalanced resource allocation and improper progress management. By comparing the environment and conditions where the deviations occurred item by item, the causes of the problems are determined and the execution process of constructing a list of deviation causes is as follows;

[0102] The deviation analysis submodule extracts key deviation data from the project execution performance overview and begins to analyze the various factors that cause quality deviations. The extracted deviation data is classified according to the categories of unbalanced resource allocation, improper schedule management, and inaccurate technical execution. For each type of deviation data, the specific environment and conditions in which the deviation occurs are analyzed. For example, unbalanced resource allocation is caused by budget constraints or supply problems, improper schedule management is caused by unreasonable planning or insufficient monitoring, and inaccurate technical execution is caused by inappropriate technical level or tool selection. Through analysis, the root cause of each deviation is determined, and a list of deviation causes is constructed. The list records the cause and impact of each deviation in detail, providing a basis for subsequent optimization measures.

[0103] The strategy formulation submodule uses the list of deviation causes to formulate adjustment measures and optimization strategies, including adjusting resource distribution, optimizing time management processes, and revising technical execution standards. Each measure optimizes the identified problems, and the execution process of establishing a quality optimization strategy is as follows;

[0104] The strategy formulation submodule uses the list of deviation causes to first assess the scope and severity of each identified problem. Based on the assessment results, specific adjustment measures and optimization strategies are formulated. Adjustments to resource distribution involve reconfiguring resource priorities or increasing the supply of key resources; optimizing time management processes include re-establishing project schedules to ensure the rationality of time arrangements; and revising technical execution standards requires updating operating manuals and training materials to ensure that the technical team can execute according to the new standards. Each measure is optimized for the identified problems to ensure that the implementation of the strategy can effectively solve the existing problems and establish a quality optimization strategy.

[0105] Specifically, if Figure 2 , Figure 8 As shown, the intervention strategy implementation modules include:

[0106] The data analysis submodule identifies key problem areas based on the quality optimization strategy, including collecting the completion rate and quality feedback of the tasks in the project, using variable association analysis to determine the key factors affecting the project results, and identifying the problem areas by calculating the deviation and frequency. The execution process of generating the problem area analysis results is as follows;

[0107] The data analysis submodule first receives the completion rate and quality feedback data of the tasks in the project based on the quality optimization strategy. This module uses data mining technology, including association analysis, to identify the key factors that affect project results. This analysis uses specific statistical indicators, such as the Pearson correlation coefficient, to calculate the correlation between variables. The formula is: ,in and are the observed values ​​of two variables, and and is the average value. In this way, the module not only identifies the variables that are closely related to the project results, but also calculates the deviations and frequencies between the variables, identifies and marks the problem areas. The problem areas are automatically marked by the algorithm, providing accurate problem location for subsequent modules and generating problem area analysis results.

[0108] The resource reallocation submodule uses the problem area analysis results to develop a resource reallocation plan, including evaluating the resource requirements of key problem areas, allocating human and material resources, adjusting the resource allocation model, and optimizing the response efficiency and project quality of key areas. The execution process of generating a resource reallocation plan is as follows;

[0109] The resource reallocation submodule obtains the problem area analysis results from the data analysis submodule and formulates a resource reallocation plan based on the results. This module evaluates the specific resource requirements of each identified problem area, including human and material resources. During the evaluation process, the required resource quantity is determined using a quantitative analysis method. The calculation formula can be expressed as Rneeded=f(A,B), where A represents the task complexity index, B represents the task urgency index, and the function f is set based on historical data and expert experience. After determining the resource requirements, the module adjusts the resource allocation model to ensure that key problem areas receive priority and sufficient resources, thereby optimizing the response efficiency and project quality of key areas and generating a resource reallocation plan.

[0110] The execution instruction generation submodule formulates execution instructions and operation steps according to the resource reallocation plan, transforms resource allocation decisions into actionable task instructions, determines the executors, time and steps of the task, and generates the execution process of intervention measures execution instructions as follows;

[0111] The execution instruction generation submodule formulates execution instructions and operation steps according to the resource reallocation plan. This module transforms resource allocation decisions into specific and operational task instructions to ensure the specificity and operability of the execution. First, the module defines the format of the task instruction and clarifies the content of the instruction: the executor, time and steps of the task. The executors are selected by matching the skills and task requirements in the human resources library. The time arrangement takes into account the overall timeline of the project and the actual situation of resource allocation. The steps are planned in detail according to the specific needs and preconditions of the task. Each task instruction is simulated and tested to ensure its effectiveness and feasibility in actual operation. The module also adjusts the instructions through a feedback mechanism to adapt to the dynamic changes in the project and generate intervention execution instructions.

[0112] Although the present application has been described in conjunction with specific features and embodiments thereof, it is obvious that various modifications and combinations may be made thereto without departing from the spirit and scope of the present application. Accordingly, this specification and the drawings are merely exemplary illustrations of the present application as defined by the appended claims, and are deemed to have covered any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is intended to include these modifications and variations.

Claims

1. The engineering consulting service quality evaluation system is characterized by: The system comprises: The project analysis module collects and organizes project historical data, extracts key time nodes through the database, summarizes the task list, and extracts the project time nodes and task lists based on the project historical data and time series to obtain the key node time library; The resource allocation module evaluates the resource usage of key demand time nodes based on the key node time library, adjusts resource allocation according to demand fluctuations, and generates a resource utilization analysis report; The task priority adjustment module uses the resource utilization analysis report to evaluate the matching of tasks and resources, add resources to key tasks, reduce resources for non-key tasks, update task priorities, and obtain a task execution plan; The project monitoring module monitors the completion of key tasks according to the task execution plan, collects real-time progress data, analyzes project progress, adjusts monitoring strategies, and obtains project progress tracking results; The quality control module conducts multi-stage quality assessments based on the project progress tracking results, analyzes quality deviations, adjusts management measures, and establishes quality optimization strategies; The intervention strategy implementation module formulates intervention measures based on the quality optimization strategy, adjusts the resources and management of key areas in a targeted manner, implements the optimization plan, strengthens project quality management, and generates intervention measure execution instructions; The resource allocation module comprises: The time node analysis submodule uses the key node time library to compare the historical records of resource usage with the current demand, analyzes the changes in resource usage status at the key demand time nodes, adjusts the resource demand prediction model parameters by comparing the resource usage frequency and time sensitivity, and generates resource demand comparison results; The resource matching submodule applies a genetic algorithm based on the resource demand comparison result to evaluate the matching degree between the existing resource configuration and the project demand, adjusts the resource configuration parameters, including resource allocation priority and resource quantification standard, configures resources to match the project demand, and generates a matching adjustment record; The data presentation submodule processes resource configuration data based on the matching adjustment record, parses the resource configuration data, extracts key performance indicators, organizes and formats the data, and generates a resource utilization analysis report; The genetic algorithm follows the formula: ; in, It is a multi-factor weighted score. Assigning priorities to resources to match project needs, To quantify the matching degree between resource standards and project requirements, Time efficiency for resource allocation, For the cost efficiency of resources, , , , is the weight parameter; The project monitoring module includes: The task rescheduling submodule adopts the task execution plan, analyzes the urgency and impact of the tasks, reorders the tasks based on resource availability and delivery deadlines, adjusts the scheduled time and priority of the tasks to match the changes in project requirements, optimizes the resource allocation and time window of key tasks, and generates an optimized task list; The progress tracking submodule sets key monitoring points based on the optimized task list to track the completion of key tasks in real time, compares the current progress with the planned progress, identifies delays and advances through real-time data updates, adjusts the frequency and degree of progress monitoring, and generates real-time progress analysis results; The monitoring strategy adjustment submodule utilizes the real-time progress analysis results and applies a reinforcement learning algorithm to evaluate the coverage and efficiency of the current monitoring strategy, adjust monitoring parameters according to real-time feedback of project progress, reconfigure resource and time management strategies, optimize responses to project changes, and generate project progress tracking results; The reinforcement learning algorithm follows the formula: ; in, For the status The expected return under For the chosen action, To carry out actions In Status The immediate return of is the discount rate for future returns, From the state Take Action Transfer to state The probability of Status The value function of is the weight coefficient for updating the state value, is a constant feedback to the environment.

2. The engineering consulting service quality evaluation system according to claim 1 is characterized in that: The key node time library includes the project start date, multi-stage deadlines, and key review time points. The resource utilization analysis report includes the human resource utilization percentage, equipment utilization rate, and material consumption rate of multiple departments. The task execution plan includes the task number, the re-assigned resource allocation amount, and the expected completion time window. The project progress tracking results include the completion percentage of key tasks, the deviation value between the expected and real-time progress, and the achievement of key milestones. The quality optimization strategy includes the pass rate of the inspection stage, the list of key quality issues, and the effect prediction of optimization measures. The intervention measure execution instructions include the adjusted resource type, the expected adjustment time frame, and the target quality optimization standard.

3. The engineering consulting service quality evaluation system according to claim 1 is characterized in that: The task priority adjustment module includes: The resource analysis submodule sorts and groups the resource usage of each project task based on the resource utilization analysis report, identifies the peak and trough of resource consumption in the differentiation stage, iteratively identifies key tasks with excess and insufficient resources, and adjusts the allocation direction of resources to generate a resource matching table; The priority update submodule obtains data from the resource matching table, increases resource allocation for tasks with tight resources, reduces resource allocation for tasks with sufficient resources, optimizes the overall utilization efficiency of resources by adjusting the resource allocation of tasks, and generates an adjustment priority table; The project process optimization submodule uses the adjustment priority table to sort tasks according to new priorities, postpone low-priority tasks, optimize the process and efficiency of project execution, and build a task execution plan.

4. The engineering consulting service quality evaluation system according to claim 1 is characterized in that: The quality control module comprises: The stage quality assessment submodule analyzes the completion status of multiple stages of the project one by one based on the project progress tracking results. By collecting and collating key performance indicators, including the deviation between the completion time and the scheduled time and the parameters of the task completion quality, the output of each stage is compared to identify the links that meet the standards and those that do not, and generate an overview of the project execution performance; The deviation analysis submodule extracts key deviation data from the project execution performance overview, analyzes the factors causing quality deviations, including imbalanced resource allocation and improper schedule management, determines the causes of the problems by comparing the environment and conditions where the deviations occurred item by item, and constructs a list of deviation causes; The strategy formulation submodule uses the list of deviation causes to formulate adjustment measures and optimization strategies, including adjusting resource distribution, optimizing time management processes, and revising technical execution standards. Each measure is optimized for the identified problems to establish a quality optimization strategy.