A steel pipe tower material lifting device
By designing a steel pipe tower tower lifting device with hydraulic push rod and motor drive, the problem of inconvenient adjustment of tower materials during lifting is solved, the precise docking of flange and stable lifting of tower materials is achieved, and construction efficiency and safety are improved. .
Patent Information
- Application Number
- CN202411192243.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-28
AI Technical Summary
The existing steel pipe tower lifting device cannot effectively adjust the tower material during lifting, resulting in misalignment and deviation of the flange installation holes, affecting construction efficiency and installation effect.
A steel pipe tower material lifting device including lifting cables, lifting racks, lifting trays, lifting clues, installation seats, fixing brackets, lifting adjustment modules and lifting stability modules was designed, and the adjustment was made by hydraulic push rods and motor drives. The wheel and transmission system realize accurate docking of the flange and stable lifting of the tower material.
It effectively avoids the misalignment deviation of the flange installation hole, improves the rapid installation efficiency and stability of the lifting, and enhances the safety and practicality of construction.
Smart Images

Figure CN118684112B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel tube tower hoisting, and in particular to a steel tube tower material hoisting device. Background Art
[0002] Steel tube tower: A lattice tower composed of steel tubes for the main components and steel tubes or steel sections for other components. It is a supporting structure for overhead transmission lines to support conductors and lightning conductors. It enables the conductors to meet the distance requirements to the ground and objects, and can withstand the loads of the conductors, lightning conductors, and itself as well as external loads. The steel tube tower is divided into several steel tube tower sections, and flanges are usually set at the ends of the tower sections to fasten the adjacent tower sections.
[0003] The steel tube tower structure has relative technical and economic advantages and is suitable for use in transmission towers that bear large loads.
[0004] 1. Load characteristics: Steel pipe tower members bear small wind pressure, have large cross-sectional bending stiffness, simple structure, and clear force transmission, which can give full play to the bearing capacity of the material.
[0005] 2. Section characteristics: The cross section of the steel pipe component is centrally symmetrical, the cross section characteristics are isotropic, and the cross section bending stiffness is large.
[0006] 3. Structural connection: In terms of structural connection, the steel pipe tower is divided into several steel pipe tower sections. Flanges are usually provided at the ends of the tower sections to fasten the adjacent tower sections.
[0007] After searching, a Chinese patent with the authorization announcement number CN220149024U discloses a steel pipe tower hoisting device, including a mounting body, the top surface of the mounting body is provided with a main hoisting part, the main hoisting part is provided with a hoisting port, and the bottom surface of the mounting body is provided with a mounting pad and at least two positioning pins for matching with the flange of the steel pipe tower section. A steel pipe tower hoisting device in the above patent has the following shortcomings: the steel pipe tower hoisting device cannot effectively adjust the tower material during hoisting, resulting in the flange mounting hole between the steel pipe tower section and the docking tower section being easily misaligned and deviated during hoisting, making docking installation inconvenient, and easily affecting construction efficiency, and the hoisting effect is not good. Summary of the invention
[0008] The invention discloses a tower material hoisting device for a steel tube tower, aiming to solve the technical problem that the hoisting device in the background technology cannot effectively adjust the tower material during hoisting, resulting in misalignment and deviation of the flange mounting holes between the tower section and the docking tower section of the steel tube tower during hoisting, making the docking installation inconvenient, easily affecting the construction efficiency, and resulting in poor hoisting effect.
[0009] The present invention proposes a steel pipe tower material lifting device, comprising a lifting cable, the bottom end of the lifting cable is fixedly connected to a lifting frame, the lifting frame is fixedly connected to four lifting wire drums, and the four lifting wire drums are all provided with lifting lines, one end of every two of the lifting lines is fixedly connected to the same mounting hanger, the bottoms of the two mounting hangers are fixedly connected to fixed brackets, the bottoms of the two fixed brackets are provided with a lifting adjustment module, and the lifting adjustment module comprises two hydraulic push rods, the two hydraulic push rods are respectively fixedly connected to one side outer wall of the two fixed brackets, a lifting stabilization module is provided on the outside of the two fixed brackets, and the lifting stabilization module is located above the lifting adjustment module.
[0010] By providing a lifting cable, a lifting frame, a lifting reel, a lifting wire, an installation hoist, a fixed bracket, a lifting adjustment module and a lifting stabilization module, the steel pipe tower material is lifted through the lifting cables, the lifting frame, the lifting reel and the lifting wire during use; the lifting adjustment module can avoid misalignment deviation of the flange mounting hole when in use, so that the device can be quickly installed in conjunction with the steel pipe tower section and the docking tower section during lifting and use, thereby increasing the lifting effect of the device and meeting the lifting operation requirements of the device; the lifting stabilization module can reduce the shaking amplitude of the steel pipe tower material during the lifting process, thereby increasing the lifting stability of the device during lifting operation, so as to meet the safety effect of the device during lifting operation.
[0011] In a preferred solution, the output ends of the two hydraulic push rods are fixedly connected to connecting plates, one side outer walls of the two connecting plates are fixedly connected to fixing frames, the bottoms of the two fixing frames are fixedly connected to mounting frames, the tops of the two mounting frames are movably connected to two shaft rods, the tops of the four shaft rods are respectively movably connected to the bottoms of the two fixing frames, the bottoms of the two fixing frames are fixedly connected to two guide members, and the outer walls of the four shaft rods are fixedly connected to guide wheels, the bottoms of the two mounting frames are fixedly connected to fixing ring frames, the inner walls of the two fixing ring frames are fixedly connected to motor two, and the output shafts of the two motors two are respectively connected to the bottom ends of two of the shaft rods through couplings.
[0012] In a preferred solution, the tops of the two mounting frames are fixedly connected to two fixed shafts, the outer walls of the four fixed shafts are movably connected to adjusting wheels and transmission wheels, the bottoms of the four transmission wheels are respectively fixedly connected to the tops of the four adjusting wheels, the outer walls of the four transmission wheels are respectively provided with anti-slip rings, and the outer walls of the two transmission wheels and the outer walls of the two guide wheels on the same side are provided with the same connecting belt, and the outer walls of the two connecting belts are respectively in contact with the outer walls of the four guide members.
[0013] By setting up a hoisting adjustment module, the docking tower section can be rotated and adjusted when docking the steel pipe tower sections, so that the device can adjust the flange on the docking tower section, and then ensure that the flange mounting holes between the steel pipe tower section and the docking tower section are connected during the hoisting operation, thereby avoiding misalignment deviation of the flange mounting holes and increasing the hoisting effect of the device and the diversity of hoisting operations.
[0014] In a preferred solution, the inner walls on both sides of the two mounting frames are movably connected with the same fixed rod, the outer walls of the two fixed rods are fixedly connected with the limiting plates, the outer walls on the opposite sides of the two limiting plates are fixedly connected with the limiting frame seats, the outer walls of the two fixed rods are provided with two torsion spring members, one ends of the four torsion spring members are respectively fixedly connected with the inner walls on both sides of the two mounting frames, the other ends of the four torsion spring members are respectively fixedly connected with the outer walls on both sides of the two limiting plates, and both ends of the two fixed rods are fixedly connected with docking plates.
[0015] In a preferred scheme, the tops of the two mounting frames are fixedly connected with fixing parts, two electric telescopic rods are fixedly connected to the two fixing parts, the output ends of the four electric telescopic rods are fixedly connected to connecting rod frames, one side outer walls of the four connecting rod frames are fixedly connected with locking disks, the four locking disks are respectively clamped with four docking disks, and the two fixing parts are fixedly connected with dual-axis motors, the two output shafts of the two dual-axis motors are connected to winding disks through couplings, the four winding disks are provided with connecting cables, and one ends of the four connecting cables are respectively fixedly connected to one side outer wall of the two limit plates.
[0016] In a preferred solution, three through openings are provided on one side outer wall of the two limit frame seats, the two limit frame seats are fixedly connected to fixed vertical frames inside, the two fixed vertical frames are fixedly connected to resistance kits, the two resistance kits are movably connected to resistance plates, one side outer wall of the two resistance plates are fixedly connected to telescopic springs, one end of the two telescopic springs are respectively fixedly connected to one side inner wall of the two resistance kits, and one side outer wall of the two resistance plates are fixedly connected to connecting rods, the other side outer walls of the two resistance plates are fixedly connected to two connecting rods, four connecting rods and one end of the two connecting rods are fixedly connected to rubber balls, and the multiple rubber balls are respectively located inside the multiple through openings.
[0017] By providing a hoisting adjustment module, when performing hoisting and docking operations, the hoisting adjustment module can assist in limiting the position of the docking tower section, thereby further facilitating the hoisting and installation operations, improving the practicability of the device, and increasing the hoisting work efficiency. When performing hoisting limit operations, the limit component can provide buffering when in contact with the steel pipe tower section to avoid wear and damage to the surface of the tower section caused by collision, thereby further increasing the use effect of the device.
[0018] In a preferred solution, the lifting stabilization module includes four fixed frame rods, which are respectively fixedly connected to the outer walls of one side of two fixed brackets, and one end of the two fixed frame rods on the same fixed bracket are fixedly connected to the same arc frame, the tops of the two arc frames are provided with guide grooves, and the bottoms of the two guide grooves are movably connected to two worm gears, the outer walls of the four worm gears are fixedly connected to linkage wheels, and the four linkage wheels are respectively located inside the two guide grooves.
[0019] In a preferred solution, the bottom of the two arc-shaped frames are fixedly connected with a motor 1, the output shafts of the two motors 1 are connected to the bottom ends of two of the worm gears through a coupling, and the outer walls of the two linkage wheels in the same belt guide groove are provided with the same transmission belt, and the outer walls of the two transmission belts are respectively in contact with the inner walls of the two belt guide grooves.
[0020] In a preferred solution, the tops of the four fixed frame rods are fixedly connected to mounting brackets, the inner walls on both sides of the four mounting brackets are movably connected to the same mounting shaft rod, the outer walls of the four mounting shaft rods are fixedly connected to a worm gear and two tightening wheels, the worm gears on the same mounting shaft rod are located between the two tightening wheels, and stabilizing cables are provided on the multiple tightening wheels.
[0021] By providing a hoisting stabilization module, the hoisting stabilization module is provided with a plurality of tightened stabilization cables when in use, and the top end of the cable is connected to the main body of the hoisting equipment during hoisting operation, so that the plurality of stabilization cables are tightened during use, thereby reducing the shaking amplitude of the steel pipe tower material during the hoisting process, thereby increasing the hoisting stability of the device during hoisting operation, and the hoisting stabilization module can further increase the safety of the device during operation while increasing the stability and reducing the shaking amplitude of the steel pipe tower material.
[0022] In a preferred solution, one side inner wall of the two mounting brackets are fixedly connected with an elastic clamp, a same tower section body is arranged between the two elastic clamps, the tower section body is located between the two fixed brackets, the tops of the two mounting brackets are fixedly connected with a plurality of limit plates, the inner walls of the plurality of limit plates are in contact with the top of the tower section body, and two mounting openings are provided on the outer walls on the opposite sides of the two mounting brackets, the inner walls of the four mounting openings are fixedly connected with mounting frames, wherein one side outer walls of the two mounting frames are fixedly connected with stepper motors, the output shafts of the two stepper motors are connected with screw rods through couplings, the two screw rods are respectively movably connected to the inner walls of the other two mounting frames, and one end of the two screw rods is fixedly connected with the limiting member.
[0023] By providing an installation hanger, an elastic splint, a tower section body, an installation port, an installation frame, a stepper motor, a screw rod and a limit piece, the tower material body can be hoisted and limited by the installation hanger and the elastic splint, so as to facilitate hoisting and use, and the device adopts elastic clamping and limiting for hoisting, which can facilitate the device to rotate and adjust the tower material body, thereby increasing the operability of the device. At the same time, when in use, the two installation hangers can be opened and closed by the stepper motor and the screw rod, and there is no need to completely separate and disassemble the equipment after use, so that the tower material body can be hoisted and limited quickly during hoisting, thereby improving the convenience of using the device.
[0024] From the above, it can be seen that the steel pipe tower material lifting device provided by the present invention has the function of improving the use effect of the lifting device. When it is used for lifting, the device can rotate and adjust the steel pipe tower material. At the same time, it can assist the steel pipe tower material to be limited and installed during the lifting process, so that the lifting device can assist in docking operations, improve the practicability of the device, and increase the lifting work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a schematic diagram of the overall structure of a steel tube tower material hoisting device proposed by the present invention;
[0026] Figure 2 A schematic diagram of the overall posture adjustment structure of a steel tube tower material hoisting device proposed by the present invention;
[0027] Figure 3 This is a schematic diagram of the combined structure of a fixed bracket and a hoisting adjustment module of a steel tube tower material hoisting device proposed by the present invention;
[0028] Figure 4 This is a structural schematic diagram of a hoisting adjustment module of a steel tube tower material hoisting device proposed by the present invention;
[0029] Figure 5 This is a schematic diagram of the combined structure of an adjusting wheel and a locking disc of a steel pipe tower material hoisting device proposed by the present invention;
[0030] Figure 6 A schematic diagram of the combined structure of a fixed rod and a limiting frame seat of a steel pipe tower material hoisting device proposed by the present invention;
[0031] Figure 7 This is a schematic diagram of the combined structure of a fixed vertical frame and a resistance plate of a steel tube tower material hoisting device proposed by the present invention;
[0032] Figure 8 This is a schematic diagram of the structure of a hoisting stabilization module of a steel tube tower material hoisting device proposed by the present invention;
[0033] Fig. 9A steel pipe tower material lifting device proposed by the present invention Figure 8 The enlarged structural diagram of part A in the middle;
[0034] Fig.10 A schematic diagram of the combined structure of a hoisting reel and an installation hanger of a steel pipe tower material hoisting device proposed by the present invention;
[0035] Fig.11 The present invention provides a schematic diagram of the combined structure of a stepper motor and an elastic clamping plate of a steel tube tower material lifting device.
[0036] In the figure: 1. Lifting cable; 2. Lifting frame; 3. Installing suspension seat; 4. Fixed bracket; 5. Lifting stabilization module; 501. Arc frame; 502. Transmission belt; 503. Stabilizing cable; 504. Fixed frame rod; 505. Installing shaft rod; 506. Worm gear; 507. Take-up wheel; 508. Worm gear; 509. Linkage wheel; 510. Motor 1; 511. Installing bracket; 512. Belt guide groove; 6. Lifting adjustment module; 601. Hydraulic push rod; 602. Connecting plate; 603. Installing frame; 604. Connecting cable; 605. Limiting plate; 606. Limiting frame seat; 607. Transmission wheel; 608. Fixed bracket; 609. Locking plate; 610. Connecting rod frame; 611. Electric telescopic rod; 612. Double shaft Motor; 613, fixings; 614, winding reel; 615, shaft rod; 616, guide; 617, connecting belt; 618, fixed ring frame; 619, motor 2; 620, adjusting wheel; 621, anti-skid ring; 622, fixed shaft rod; 623, guide wheel; 624, docking plate; 625, fixed rod; 626, torsion spring; 627, connecting rod; 628, rubber ball; 629, connecting rod; 630, telescopic spring; 631, resistance plate; 632, fixed vertical frame; 633, resistance kit; 7, tower section body; 8, lifting wire; 9, lifting wire drum; 10, through port; 11, limit plate; 12, stepping motor; 13, elastic splint; 14, limit piece; 15, screw rod; 16, installation frame. DETAILED DESCRIPTION
[0037] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0038] A steel tube tower material hoisting device disclosed in the present invention is mainly used in scenarios where the tower material cannot be effectively adjusted during hoisting, so that the flange mounting holes between the steel tube tower section and the docking tower section are prone to misalignment and deviation, the docking installation is inconvenient, and the hoisting effect is poor.
[0039] Reference Figure 1-Figure 11A steel pipe tower material lifting device comprises a lifting cable 1, the bottom end of the lifting cable 1 is fixedly connected to a lifting frame 2, four lifting wire drums 9 are fixedly connected to the lifting frame 2, and four lifting wire drums 9 are provided with lifting lines 8, one end of every two lifting lines 8 is fixedly connected to the same mounting hanger 3, the bottoms of the two mounting hangers 3 are fixedly connected to fixed brackets 4, the bottoms of the two fixed brackets 4 are provided with lifting adjustment modules 6, and the lifting adjustment module 6 comprises two hydraulic push rods 601, the two hydraulic push rods 601 are respectively fixedly connected to one side outer wall of the two fixed brackets 4, a lifting stabilization module 5 is provided on the outside of the two fixed brackets 4, and the lifting stabilization module 5 is located above the lifting adjustment module 6.
[0040] Specifically, when in use, the steel pipe tower material is hoisted through the hoisting cable 1, the hoisting frame 2, the hoisting wire drum 9 and the hoisting wire 8; the hoisting adjustment module 6 can avoid the misalignment deviation of the flange mounting hole when in use, so that the device can be quickly installed in conjunction with the steel pipe tower section and the docking tower section when hoisting, thereby increasing the hoisting effect of the device and meeting the hoisting operation requirements of the device; the hoisting stabilization module 5 can reduce the shaking amplitude of the steel pipe tower material during the hoisting process, thereby increasing the hoisting stability of the device during hoisting operation, so as to meet the safety effect of the device during hoisting operation.
[0041] Reference Figure 1-Figure 7In a preferred embodiment, the output ends of the two hydraulic push rods 601 are fixedly connected to the connecting plate 602, the outer walls of one side of the two connecting plate members 602 are fixedly connected to the fixing frame 608, the bottoms of the two fixing frames 608 are fixedly connected to the mounting frame 603, the tops of the two mounting frames 603 are connected to two shaft members 615 through bearings, the tops of the four shaft members 615 are respectively connected to the bottoms of the two fixing frames 608 through bearings, the bottoms of the two fixing frames 608 are fixedly connected to two guide members 616, and the outer walls of the four shaft members 615 are fixedly connected to the guide wheels 623, and the bottoms of the two mounting frames 603 are fixedly connected to the fixing ring frames 618 , the inner walls of the two fixed ring frames 618 are fixedly connected with motor 2 619, and the output shafts of the two motor 2 619 are respectively connected to the bottom ends of two shaft members 615 through couplings; the tops of the two mounting frames 603 are fixedly connected with two fixed shafts 622, and the outer walls of the four fixed shafts 622 are connected with adjustment wheels 620 and transmission wheels 607 through bearings, and the bottoms of the four transmission wheels 607 are respectively fixedly connected to the tops of the four adjustment wheels 620, and the outer walls of the four transmission wheels 607 are provided with anti-slip rings 621, and the outer walls of the two transmission wheels 607 on the same side and the outer walls of the two guide wheels 623 are provided with the same connecting belt 617, and the outer walls of the two connecting belts 617 are respectively provided with anti-slip rings 621, and the outer walls of the two transmission wheels 607 on the same side and the outer walls of the two guide wheels 623 are respectively provided with the same connecting belt 617, and the outer walls of the two connecting belts 617 are respectively provided with anti-slip rings 621, and the outer walls of the two guide wheels 623 ... anti-slip rings 621 are respectively provided with anti-slip rings 621, and the anti-slip rings 621 are respectively provided with anti-slip rings 621, and the anti-slip rings 621 are respectively provided with anti-slip ring The two inner walls of the two mounting frames 603 are connected to the same fixed rod 625 through bearings, the outer walls of the two fixed rods 625 are fixedly connected to the limiting plate 605, the outer walls of the opposite sides of the two limiting plates 605 are fixedly connected to the limiting frame seat 606, the outer walls of the two fixed rods 625 are provided with two torsion springs 626, one end of the four torsion springs 626 are fixedly connected to the inner walls of the two mounting frames 603, the other ends of the four torsion springs 626 are fixedly connected to the outer walls of the two limiting plates 605, and both ends of the two fixed rods 625 are fixedly connected to the docking plates 624; the two mounting frames The top of 603 is fixedly connected with a fixing piece 613, and two electric telescopic rods 611 are fixedly connected to the two fixing pieces 613, and the output ends of the four electric telescopic rods 611 are fixedly connected with a connecting rod frame 610, and the outer wall of one side of the four connecting rod frames 610 is fixedly connected with a locking disk 609, and the four locking disks 609 are respectively engaged with four docking disks 624, and the two fixing pieces 613 are fixedly connected with a dual-axis motor 612, and the two output shafts of the two dual-axis motors 612 are connected with a winding disk 614 through a coupling, and the four winding disks 614 are provided with a connecting cable 604, and one end of the four connecting cables 604 is respectively fixedly connected to the outer wall of one side of the two limit plates 605;The outer wall of one side of the two limit frame seats 606 is provided with three through-holes 10, the interior of the two limit frame seats 606 is fixedly connected with a fixed vertical frame 632, the two fixed vertical frames 632 are fixedly connected with a resistance set 633, the two resistance sets 633 are slidably connected with a resistance plate 631, the outer wall of one side of the two resistance plates 631 is fixedly connected with a telescopic spring 630, one end of the two telescopic springs 630 is respectively fixedly connected with the inner wall of one side of the two resistance sets 633, and the outer wall of one side of the two resistance plates 631 is fixedly connected with a connecting rod 627, the outer wall of the other side of the two resistance plates 631 is fixedly connected with two connecting rods 629, the four connecting rods 629 and one end of the two connecting rods 627 are fixedly connected with rubber balls 628, and the multiple rubber balls 628 are respectively located inside the multiple through-holes 10. ;
[0042] Specifically, during hoisting and docking, when the device is hoisted to the installed steel pipe tower section, one of the dual-axis motors 612 is started, and the dual-axis motor 612 drives the winding drum 614 to rotate, so that the winding drum 614 loosens the connecting cable 604. At this time, driven by the torsion spring 626, one of the limit plates 605 will rotate and be in a vertical state, and the electric telescopic rod 611 is started at this time, and the connecting rod frame 610 and the locking disk 609 are driven by the electric telescopic rod 611 to move until the locking disk 609 is engaged with the docking disk 624, thereby locking and fixing the limit plate 605, and then the hoisting equipment continues to operate, so that the limit plate 605 drives one of the limit frame seats 606 on The rubber ball 628 contacts with the steel pipe tower section. After contact, the rubber ball 628 cooperates with the connecting rod 627, the connecting rod 629, the resistance kit 633, and the extension rod 634 to move. The compression spring 630 and the resistance plate 631 can buffer the impact force generated during contact. At this time, the device can be initially limited by the limit plate 605 and the limit frame seat 606. Then, another dual-axis motor 612 is started, so that the other limit plate 605 and the limit frame seat 606 further limit the device. Then, the hydraulic push rod 601 is started, and the hydraulic push rod 601 drives the installation frame 603 to approach until the adjustment wheel 620 contacts the tower section body 7, and at the same time, the two limit frame seats 606 complete the limit. At this time, the second motor 619 is started, and the second motor 619 can drive the shaft rod 615 and the guide wheel 623 to rotate, and then cooperate with the connecting belt 617 to rotate the transmission wheel 607, and then drive the adjustment wheel 620 to rotate and adjust the tower section body 7 until the docking tower section corresponds to the flange mounting hole on the steel pipe tower section.
[0043] In a specific application scenario, the hoisting adjustment module 6 is suitable for the hoisting and docking of steel pipe tower sections, that is, the hoisting adjustment module 6 can rotate and adjust the docking tower section when docking the steel pipe tower sections, so that the device can adjust the flange on the docking tower section, and then ensure that the flange mounting holes between the steel pipe tower section and the docking tower section are connected during the hoisting operation, thereby avoiding misalignment deviation of the flange mounting holes, increasing the hoisting effect of the device and the diversity of hoisting operations, and when performing hoisting and docking operations, the hoisting adjustment module 6 can assist in limiting the position of the docking tower section, thereby further facilitating the hoisting and installation operations, improving the practicability of the device, and increasing the hoisting work efficiency.
[0044] Reference Figure 1 , Figure 3 , Figure 8 and Fig. 9 In a preferred embodiment, the hoisting stabilization module 5 includes four fixed frame rods 504, and the four fixed frame rods 504 are respectively fixedly connected to the outer walls of one side of the two fixed brackets 4. One end of the two fixed frame rods 504 on the same fixed bracket 4 is fixedly connected to the same arc frame 501. The tops of the two arc frames 501 are provided with guide grooves 512, and the bottoms of the two guide grooves 512 are connected to two worm members 508 through bearings. The outer walls of the four worm members 508 are fixedly connected to linkage wheels 509, and the four linkage wheels 509 are respectively located inside the two guide grooves 512; the bottoms of the two arc frames 501 are fixedly connected to motors 1 510, and the outputs of the two motors 1 510 The shaft is connected to the bottom ends of two worm gears 508 through a coupling, and the outer walls of the two linkage wheels 509 inside the same belt guide groove 512 are provided with the same transmission belt 502, and the outer walls of the two transmission belts 502 are respectively in contact with the inner walls of the two belt guide grooves 512; the tops of the four fixed frame rods 504 are fixedly connected with mounting brackets 511, and the inner walls on both sides of the four mounting brackets 511 are connected to the same mounting shaft rod 505 through bearings, and the outer walls of the four mounting shaft rods 505 are fixedly connected with worm gears 506 and two tightening wheels 507, and the worm gears 506 on the same mounting shaft rod 505 are located between the two tightening wheels 507, and stabilizing cables 503 are provided on the multiple tightening wheels 507.
[0045] Specifically, during the hoisting process, as the hoisting equipment is raised, the motor 1 510 is started, and the motor 1 510 drives the worm member 508 and the linkage wheel 509 to rotate, and then cooperates with the transmission belt 502 to make the motor 1 510 drive the two worm members 508 to rotate at the same time, and because the worm member 508 is meshed with the worm wheel member 506, the worm wheel member 506 can drive the installation shaft rod 505 to rotate, and at this time, the installation shaft rod 505 can drive the tightening wheel 507 to rotate, and then tighten the stabilizing cable 503 until the hoisting operation is completed;
[0046] In a specific application scenario, the hoisting stabilization module 5 is suitable for the hoisting link of steel pipe tower materials, that is, the hoisting stabilization module 5 is provided with a plurality of tightened stabilization cables 503 when in use, and the top end of the cable is connected to the main body of the hoisting equipment during hoisting operation, so that the plurality of stabilization cables 503 are tightened with each other during use, thereby reducing the shaking amplitude of the steel pipe tower materials during the hoisting process, thereby increasing the hoisting stability of the device during hoisting operation, and the hoisting stabilization module 5 can further increase the safety of the device during operation while increasing the stability and reducing the shaking amplitude of the steel pipe tower materials.
[0047] Reference Figure 1 , Figure 2 , Fig.10 and Fig.11 In a preferred embodiment, the inner walls of one side of the two mounting brackets 3 are fixedly connected with an elastic clamping plate 13, the same tower section body 7 is arranged between the two elastic clamping plates 13, the tower section body 7 is located between the two fixed brackets 4, and the tops of the two mounting brackets 3 are fixedly connected with multiple limiting plates 11, the inner walls of the multiple limiting plates 11 are in contact with the top of the tower section body 7, and the outer walls of the opposite sides of the two mounting brackets 3 are provided with two mounting openings, and the inner walls of the four mounting openings are fixedly connected with mounting frames 16, wherein the outer walls of one side of the two mounting frames 16 are fixedly connected with stepper motors 12, and the output shafts of the two stepper motors 12 are connected with screw rods 15 through couplings, and the two screw rods 15 are respectively connected to the inner walls of the other two mounting frame members 16 by threads, and one end of the two screw rods 15 is fixedly connected to the limiting member 14.
[0048] Specifically, when in use, the mounting bracket 3 is arranged outside the tower section body 7, and the stepper motor 12 is started at this time, and the stepper motor 12 can drive the screw rod 15 to rotate, and then the screw rod 15 drives one of the mounting brackets 3 to move toward the other mounting bracket 3, so that the elastic clamping plate 13 contacts the tower section body 7 and elastically deforms to clamp and limit it, and at the same time, the limiting plate 11 limits the flange part of the tower section body 7 to complete the installation of the lifting device;
[0049] In a specific application scenario, the tower section body 7 can be hoisted and limited by installing the hanger 3 and the elastic clamp 13 to facilitate hoisting and use, and the device uses elastic clamping and limiting for hoisting, which can facilitate the device to rotate and adjust the tower section body 7, thereby increasing the operability of the device. At the same time, when in use, the two installation hangers 3 can be opened and closed by the stepper motor 12 and the screw rod 15, and there is no need to completely separate and disassemble the equipment after use, so that the tower section body 7 can be quickly hoisted and limited during hoisting, thereby improving the convenience of using the device.
[0050] Working principle: when in use, the mounting bracket 3 is set outside the tower section body 7, and the stepper motor 12 is started at this time. The stepper motor 12 can drive the screw rod 15 to rotate, and then the screw rod 15 drives one of the mounting brackets 3 to move toward the other mounting bracket 3, so that the elastic clamping plate 13 contacts the tower section body 7 and elastically deforms to clamp and limit it. At the same time, the limiting plate 11 limits the flange part of the tower section body 7 to complete the installation of the lifting device; during lifting and docking, when the device is lifted to the tower section of the installed steel pipe tower, one of the dual-axis motors 612 is started, and the dual-axis motor 612 drives the winding disk 614 to rotate, so that the winding disk 614 is The connecting cable 604 is relaxed. At this time, driven by the torsion spring 626, one of the limit plates 605 will rotate and be in a vertical state. At this time, the electric telescopic rod 611 is started, and the connecting rod frame 610 and the locking plate 609 are driven to move by the electric telescopic rod 611 until the locking plate 609 is engaged with the docking plate 624, so as to lock and fix the limit plate 605. After that, the lifting equipment continues to operate, so that the limit plate 605 drives the rubber ball 628 on one of the limit frame seats 606 to contact with the steel pipe tower section. After contact, the rubber ball 628 cooperates with the connecting rod 627, the connecting rod 629, the resistance kit 633, the telescopic spring 630 and the resistance plate 631 to The impact force generated during contact can be buffered. At this time, the device can be initially limited by the limiting plate 605 and the limiting frame seat 606. Then, another dual-axis motor 612 is started, so that the other limiting plate 605 and the limiting frame seat 606 further limit the device. Then, the hydraulic push rod 601 is started, and the hydraulic push rod 601 drives the installation frame 603 to approach until the adjustment wheel 620 contacts the tower section body 7, and at the same time, the two limiting frame seats 606 complete the limiting. At this time, the motor 2 619 is started, and the motor 2 619 can drive the shaft rod 615 and the guide wheel 623 to rotate, and then cooperate with the connecting belt 617 to rotate the transmission wheel 607, thereby driving The dynamic adjustment wheel 620 is used to rotate and adjust the tower section body 7 until the docking tower section corresponds to the flange mounting hole on the steel pipe tower section; during the hoisting process, as the hoisting equipment moves up, the motor 510 is started, and the motor 510 drives the worm member 508 and the interlocking wheel 509 to rotate, and then cooperates with the transmission belt 502 to make the motor 510 drive the two worm members 508 to rotate at the same time, and because the worm member 508 is meshed with the worm wheel member 506, the worm wheel member 506 can drive the installation shaft 505 to rotate, and at this time, the installation shaft 505 can drive the tightening wheel 507 to rotate, and then tighten the stabilizing cable 503 until the hoisting operation is completed.
[0051] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A steel pipe tower material hoisting device, comprising a hoisting cable (1), characterized in that: The bottom end of the lifting cable (1) is fixedly connected to a lifting frame (2), and four lifting cable drums (9) are fixedly connected to the lifting frame (2), and each of the four lifting cable drums (9) is provided with a lifting line (8), and one end of each of the two lifting lines (8) is fixedly connected to the same mounting bracket (3), and the bottoms of the two mounting brackets (3) are fixedly connected to fixed brackets (4), and the bottoms of the two fixed brackets (4) are provided with a lifting adjustment module (6), and the lifting adjustment module (6) includes two hydraulic push rods (601), and the two hydraulic push rods (601) are respectively fixedly connected to one side outer wall of the two fixed brackets (4), and a lifting stabilization module (5) is provided outside the two fixed brackets (4), and the lifting stabilization module (5) is located Above the hoisting adjustment module (6), the output ends of the two hydraulic push rods (601) are fixedly connected to a connecting plate (602), one side outer wall of the two connecting plate members (602) is fixedly connected to a fixing frame (608), the bottom of the two fixing frames (608) is fixedly connected to a mounting frame (603), the top of the two mounting frames (603) is movably connected to two shaft rods (615), the tops of the four shaft rods (615) are respectively movably connected to the bottom of the two fixing frames (608), the bottom of the two fixing frames (608) is fixedly connected to two guide members (616), and the outer walls of the four shaft rods (615) are fixedly connected to guide wheels (623), the bottoms of the two mounting frames (603) are fixedly connected A fixed ring frame (618) is provided, the inner walls of the two fixed ring frames (618) are fixedly connected with motor 2 (619), the output shafts of the two motors 2 (619) are respectively connected to the bottom ends of two shaft members (615) through couplings, the tops of the two mounting frames (603) are fixedly connected with two fixed shafts (622), the outer walls of the four fixed shafts (622) are movably connected with adjustment wheels (620) and transmission wheels (607), the bottoms of the four transmission wheels (607) are respectively fixedly connected with the tops of the four adjustment wheels (620), the outer walls of the four transmission wheels (607) are respectively provided with anti-slip rings (621), and the outer walls of the two transmission wheels (607) on the same side and the outer walls of the two guide wheels (623) are provided with the same a connecting belt (617), the outer walls of the two connecting belts (617) are respectively in contact with the outer walls of the four guide members (616), the inner walls on both sides of the two installation frames (603) are movably connected to the same fixed rod (625), the outer walls of the two fixed rods (625) are both fixedly connected to the limiting plate (605), the outer walls on the opposite sides of the two limiting plates (605) are both fixedly connected to the limiting frame seat (606), the outer walls of the two fixed rods (625) are both provided with two torsion spring members (626), one end of the four torsion spring members (626) are respectively fixedly connected to the inner walls on both sides of the two installation frames (603), and the other ends of the four torsion spring members (626) are respectively fixedly connected to the outer walls on both sides of the two limiting plates (605),Both ends of the two fixed rods (625) are fixedly connected to docking plates (624), the tops of the two mounting frames (603) are fixedly connected to fixing members (613), the two fixing members (613) are fixedly connected to two electric telescopic rods (611), the output ends of the four electric telescopic rods (611) are fixedly connected to connecting rod frames (610), one side outer walls of the four connecting rod frames (610) are fixedly connected to locking plates (609), the four locking plates (609) are respectively engaged with the four docking plates (624), and the two fixing members (613) are fixedly connected to a dual-axis motor (612), the two output shafts of the two dual-axis motors (612) are connected to a winding reel (614) via a coupling, the four winding reels (614) are provided with connecting cables (604), one end of the four connecting cables (604) is respectively fixedly connected to one side outer wall of the two limiting plates (605), and the two limiting frame seats The outer wall of one side of the (606) is provided with three through openings (10), the interiors of the two limit frame seats (606) are fixedly connected with fixed vertical frames (632), the two fixed vertical frames (632) are fixedly connected with resistance sets (633), the two resistance sets (633) are movably connected with resistance plates (631), the outer walls of one side of the two resistance plates (631) are fixedly connected with telescopic springs (630), one end of the two telescopic springs (630) is respectively fixedly connected to the inner walls of one side of the two resistance sets (633), and the outer walls of one side of the two resistance plates (631) are fixedly connected with connecting rods (627), the outer walls of the other sides of the two resistance plates (631) are fixedly connected with two connecting rods (629), the four connecting rods (629) and one end of the two connecting rods (627) are fixedly connected with rubber balls (628), and the plurality of rubber balls (628) are respectively located inside the plurality of through openings (10).
2. A steel pipe tower material hoisting device according to claim 1, characterized in that: The hoisting stabilization module (5) comprises four fixed frame rods (504), the four fixed frame rods (504) are respectively fixedly connected to the outer walls of one side of two fixed brackets (4), one end of the two fixed frame rods (504) on the same fixed bracket (4) are fixedly connected to the same arc frame (501), the tops of the two arc frames (501) are provided with guide grooves (512), and the bottoms of the two guide grooves (512) are movably connected to two worm gears (508), the outer walls of the four worm gears (508) are fixedly connected to linkage wheels (509), and the four linkage wheels (509) are respectively located inside the two guide grooves (512).
3. A steel pipe tower material hoisting device according to claim 2, characterized in that: The bottoms of the two arc-shaped frames (501) are fixedly connected to motors 1 (510), the output shafts of the two motors 1 (510) are connected to the bottom ends of two worm members (508) via couplings, and the outer walls of the two linkage wheels (509) located in the same belt guide groove (512) are provided with the same transmission belt (502), and the outer walls of the two transmission belts (502) are in contact with the inner walls of the two belt guide grooves (512) respectively.
4. A steel pipe tower material hoisting device according to claim 3, characterized in that: The tops of the four fixed frame rods (504) are fixedly connected to mounting brackets (511), the inner walls on both sides of the four mounting brackets (511) are movably connected to the same mounting shaft rod (505), the outer walls of the four mounting shaft rods (505) are fixedly connected to a worm gear (506) and two tightening wheels (507), the worm gear (506) on the same mounting shaft rod (505) is located between the two tightening wheels (507), and a stabilizing cable (503) is provided on the multiple tightening wheels (507).
5. The steel pipe tower material hoisting device according to claim 1, characterized in that: The inner walls of one side of the two mounting brackets (3) are fixedly connected with an elastic clamping plate (13), a tower section body (7) is arranged between the two elastic clamping plates (13), and the tower section body (7) is located between the two fixed brackets (4). The tops of the two mounting brackets (3) are fixedly connected with a plurality of limit plates (11), the inner walls of the plurality of limit plates (11) are in contact with the top of the tower section body (7), and the outer walls of the two mounting brackets (3) on the opposite side are provided with two mounting openings, the inner walls of the four mounting openings are fixedly connected with mounting frames (16), wherein the outer walls of one side of the two mounting frames (16) are fixedly connected with stepping motors (12), the output shafts of the two stepping motors (12) are connected with screw rods (15) through couplings, the two screw rods (15) are movably connected to the inner walls of the other two mounting frames (16), and one end of the two screw rods (15) is fixedly connected with the limit member (14).
Citation Information
Patent Citations
Steel tube tower hoisting device
CN220149024U
Lifting appliance and method for using lifting appliance to omni-directionally overturning abnormal-shaped twisted tower segment
CN105905779A
Self-adjusting roller carrier
CN105945506A
Construction method for adjusting mounting angle of arch tower section
CN115288037A
Hoisting device for mounting flange fixed splicing type steel tube tower
CN220116046U
