A lifting equipment for construction
By introducing screw pipe clamps and automatic pipe pushers into lifting equipment for construction, multi-point clamping and automatic unloading are realized, and oil drippers are used to automatically fill oil, which solves the problem of complex structures and friction in existing equipment. It reduces the problem of lubricant drying and improves work efficiency and equipment life.
Patent Information
- Application Number
- CN202411195737.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-29
AI Technical Summary
When lifting steel pipes, existing lifting equipment has problems such as complex structure, poor fixing effect, increased pulley friction, reduced service life, and rapid drying of lubricating oil, resulting in low work efficiency.
Lifting equipment for construction including a screw pipe clamp and an automatic pipe pusher is designed. Multi-point clamping and automatic unloading are realized through a two-way screw and a servo motor. An oil dripper is used to automatically fill oil to maintain the lubricating oil. equipment.
It realizes efficient clamping and automatic blanking of multiple sets of steel pipes, reduces labor time and effort, extends the service life of the equipment, solves the problem of lubricating oil drying, and improves work efficiency.
Smart Images

Figure CN118684136B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cranes, and in particular to a lifting device for building construction. Background Art
[0002] A crane refers to a multi-action lifting machinery that can vertically lift and horizontally move heavy objects within a certain range. There are many types of cranes, such as bridge cranes, jib cranes and elevators. During the construction process, cranes are needed to cooperate with lifting equipment to lift the steel pipes, water pipes (tubular parts) required for the construction to the designated location for installation.
[0003] Existing lifting equipment has certain technical defects when in use. First, multiple groups of pipe fittings on the hanging platform need to be fixed, while the current fixing device can only fix one group of pipe fittings separately. Therefore, it is necessary to set up multiple groups of fixing devices on the hanging platform, which leads to a complex structure. In addition, since the length of some pipe fittings exceeds the standard, the fixing effect of the fixing device is poor and the pipe fittings are easy to slip. Second, after the pipe fittings are hoisted to the designated position, they need to be manually carried and unloaded. Some pipe fittings are heavy, which makes this time-consuming and labor-intensive. Third, when the pulley on the equipment moves in the track, due to the excessive weight of the hoisting device and pipe fittings at the lower end, the increased load-bearing capacity will increase the friction between the pulley and the track, and the contact surface will heat up. In addition, the oxidation effect of the air will cause the lubricating oil in the track to dry quickly. The lack of lubrication further increases the friction between the pulley and the track, resulting in the inflexible relative movement between the pulley and the track, control failure, and reduced service life. Therefore, it is necessary to add lubricating oil frequently, which is time-consuming and labor-intensive, resulting in reduced work efficiency.
[0004] In summary, considering that the existing facilities cannot meet the work use requirements, a lifting equipment for construction is proposed. Summary of the invention
[0005] The main purpose of the present invention is to provide a lifting device for construction, which can effectively solve the problems in the background technology.
[0006] To achieve the above object, the technical solution adopted by the present invention is:
[0007] A lifting device for construction includes a mobile base, the upper end surface of the mobile base is provided with a load-bearing bracket, the upper end of the load-bearing bracket is provided with a top seat, the interior of the load-bearing bracket is provided with a lifting mechanism, the interior of the lifting mechanism is installed with a lifting positioning seat, a lifting beam arm is installed on the lifting positioning seat, and the lifting beam arm extends horizontally outward.
[0008] As a preferred embodiment of the lifting equipment for construction described in the present invention, two groups of long rails are symmetrically arranged inside the lifting beam arm, a slide is installed on the long rail, a driving platform is installed on the top of the slide, two groups of pulleys are rotatably arranged inside the driving platform, the two groups of pulleys act on the long rails accordingly, and two groups of guide grooves for the movement of the slide are symmetrically opened at the bottom of the lifting beam arm, and the number of the guide grooves is 2 groups.
[0009] As a preferred embodiment of the lifting equipment for construction described in the present invention, a connecting column is welded at the middle position of the lower end of the sliding seat, a connecting piece is welded at the lower end of the connecting column, two groups of locking ring blocks are symmetrically welded at the lower end of the connecting piece, each group of locking ring blocks has a locking ring passing through it, and the number of locking rings is 2 groups, a sling table is arranged directly below the connecting piece, the end of the sling table is connected upward with a connecting plate, and two groups of hinged ears for connecting locking rings are symmetrically welded at the upper end of the connecting plate.
[0010] As a preferred solution of the lifting equipment for construction described in the present invention, wherein: a plurality of groups of steel pipe storage sleeves are equidistantly arranged on the upper end surface of the hoisting platform, the number of the steel pipe storage sleeves is 3-10 groups, and a plurality of groups of guide wheels are equidistantly and rotatably installed inside each group of the storage sleeves, the number of the guide wheels is preferably 4-16 groups, a wheel axle is penetrated through the middle part of the guide wheel, both ends of the wheel axle are fixed by a first bearing seat and the inner wall of the storage sleeve, and a part of the guide wheel extends out of the inner side surface of the storage sleeve and interacts with the steel pipe.
[0011] As a preferred solution of the lifting equipment for construction of the present invention, a plurality of groups of screw pipe clamps are equidistantly installed inside the sling platform, and the number of the screw pipe clamps is preferably 4-6 groups.
[0012] As a preferred embodiment of the lifting equipment for construction described in the present invention, the screw pipe clamp includes a bidirectional screw, a second bearing seat, a forward spiral pattern, a reverse spiral pattern and a displacement seat, the bidirectional screw is horizontally arranged inside the sling platform, both ends of the bidirectional screw are fixed by the second bearing seat and the inner wall of the sling platform, the outer surface of the bidirectional screw is symmetrically distributed with forward spiral patterns and reverse spiral patterns, and several groups of symmetrically distributed forward spiral patterns and reverse spiral patterns are arranged, and displacement seats are installed at the positions of the forward spiral patterns and reverse spiral patterns.
[0013] As a preferred embodiment of the lifting equipment for construction described in the present invention, the screw pipe clamp also includes a screw nut sleeve, a guide arm, a curved clamping head and a sprocket. A screw nut sleeve acting on the forward spiral pattern or the reverse spiral pattern is installed inside the displacement seat. The upper end of the displacement seat is connected to the guide arm. The upper end surface of the hoisting platform is symmetrically provided with several groups of movable grooves on both sides of the steel pipe storage sleeve. The guide arm extends upward from the movable groove. A curved clamping head acting on the outer side of the steel pipe is welded to the upper end of the guide arm. One end of the bidirectional screw is sleeved with two groups of sprockets.
[0014] As a preferred solution of the lifting equipment for construction described in the present invention, the sprockets on the screw pipe clamp are connected and driven in sequence by chains, wherein a group of bidirectional screws are provided with an extension part, and the extension part is connected to a first servo motor through a coupling, and the first servo motor is horizontally arranged through the side of the sling platform.
[0015] As a preferred embodiment of the lifting equipment for construction described in the present invention, a driving box is riveted to the left side of the sling table through a mounting plate, a roller is horizontally rotatably installed in the driving box, both ends of the roller are fixed by a third bearing seat and the inner wall of the driving box, a large gear is sleeved on one end of the roller, a small gear is meshed on one side of the large gear, the small gear is sleeved on the output shaft of the second servo motor, a plurality of groups of cams are equidistantly sleeved on the middle part of the roller, an automatic pipe pusher is arranged on the outer side of each group of cams, and the number of the cams and the automatic pipe pushers is preferably 3-10 groups.
[0016] As a preferred embodiment of the lifting equipment for construction described in the present invention, the automatic pipe pusher includes an intermediate platform, a wheel groove, a contact wheel, a push rod, a limit plate, a No. 1 return spring and a push head. A wheel groove is opened inside the intermediate platform, and a contact wheel is rotatably arranged inside the wheel groove. A part of the contact wheel extends out of the wheel groove and contacts with the corresponding cam wheel surface. A push rod is horizontally welded on the end of the intermediate platform away from the cam. The push rod passes through the middle part of the limit plate. The limit plate is vertically riveted to the inside of the drive box. A No. 1 return spring sleeved on the outside of the push rod is connected between the limit plate and the intermediate platform. A push head acting on the end of the steel pipe is installed on the end of the push rod, and a limit opening for the push head to extend horizontally is opened inside the mounting plate.
[0017] As a preferred embodiment of the lifting equipment for construction described in the present invention, an oil dripper is arranged at the upper end of the lifting beam arm and above the long track, and the oil dripper includes an oil dripping cylinder, an oil cavity, a sealing port, a telescopic column and a slider. The oil dripping cylinder is fixed on the inner surface of the upper end of the lifting beam arm, and an oil cavity is provided inside the oil dripping cylinder, and the oil cavity is filled with lubricating oil. A sealing port is provided at the lower end of the oil dripping cylinder and in communication with the oil cavity, and the telescopic column passes through the sealing port. A slider is arranged at the lower end of the telescopic column, and the slider extends downward from the inner surface of the upper end of the lifting beam arm.
[0018] As a preferred embodiment of the lifting equipment for construction described in the present invention, the oil dripper also includes a piston, a No. 2 return spring, a first one-way valve and a second one-way valve, the telescopic column extends upward into the oil chamber and is connected to the piston, the piston and the oil chamber wall are in contact with each other, a No. 2 return spring sleeved on the outside of the piston is connected between the piston and the lower end of the oil dripper, a first one-way valve is installed on the top of the oil chamber, and two sets of second one-way valves are symmetrically installed on the wall of the oil chamber.
[0019] As a preferred solution of the lifting equipment for construction described in the present invention, wherein: the position of the first one-way valve is upwardly connected to an oil inlet pipe, the upper end of the oil inlet pipe is connected to an oil storage tank, the oil storage tank is located on the upper end surface of the lifting beam arm, the positions of the two groups of the second one-way valves are outwardly connected to capillary oil tubes, the lower ends of the capillary oil tubes are installed with double-hole joints, the two groups of double-hole joints are connected to two groups of oil nozzles, the oil nozzles extend downward from the upper end inner surface of the lifting beam arm, the two groups of oil nozzles are respectively vertically facing the positions of the long rails, and the number of the oil nozzles is 4 groups in total.
[0020] As a preferred solution of the lifting equipment for construction described in the present invention, a long slide groove for the slider to extend into is horizontally opened at the middle position of the upper end surface of the driving platform, and a circular arc convex surface is provided in the middle of the long slide groove, and the circular arc convex surface interacts with the slider.
[0021] As a preferred solution of the lifting equipment for construction of the present invention, a control console is installed on the outer side of the mobile base.
[0022] As a preferred solution of the lifting equipment for construction described in the present invention, the lower end surface of the movable base is provided with movable casters.
[0023] As a preferred solution of the lifting equipment for construction described in the present invention, adjustable supports are symmetrically installed on both sides of the movable base, and the number of the adjustable supports is preferably 4-8 groups.
[0024] As a preferred solution of the lifting equipment for construction described in the present invention, the lifting mechanism includes a hydraulic lifting cylinder.
[0025] As a preferred solution of the lifting equipment for construction of the present invention, the connecting plate is arranged obliquely relative to the sling platform.
[0026] As a preferred solution of the lifting equipment for construction described in the present invention, the second servo motor is horizontally arranged through the outer side surface of the driving box.
[0027] As a preferred solution of the lifting equipment for construction of the present invention, the sliding seat passes downward through the guide groove.
[0028] As a preferred solution of the lifting equipment for construction of the present invention, the push head and the push rod are threadedly connected.
[0029] As a preferred solution of the lifting equipment for construction described in the present invention, the push rod slides in the middle rod groove of the limiting plate.
[0030] As a preferred solution of the lifting equipment for construction of the present invention, the control directions of the first one-way valve and the second one-way valve are opposite.
[0031] As a preferred solution of the lifting equipment for construction of the present invention, a sealing cover is movably provided on the upper end surface of the oil storage tank.
[0032] The present invention provides a lifting device for construction by improvement, which has the following significant improvements and advantages compared with the prior art:
[0033] A screw pipe clamp is designed. The bidirectional screw rotates, causing several groups of displacement seats on the bidirectional screw to move linearly. The displacement seats on adjacent positive spiral patterns and reverse spiral patterns move towards each other and use their respective curved clamping heads to contact the outer side of the steel pipe to clamp the steel pipe together. Multiple pairs of clamping units are arranged on each group of bidirectional screws, which can clamp multiple groups of steel pipes at the same time, thereby solving the problem of complex structure caused by designing multiple groups of fixing devices separately.
[0034] The first servo motor is started to drive the bidirectional screw on one group of screw tube grippers to rotate, and the bidirectional screw on each group of screw tube grippers is synchronously rotated in the same direction through the connection transmission of multiple groups of sprockets and chains. Multiple groups of screw tube grippers are evenly arranged in different areas of each group of steel pipes to form multi-point clamping for the steel pipes, which can ensure the clamping effect of longer steel pipes, and has high synchronization, streamlined power source, and reduced cost.
[0035] An automatic pipe pusher is designed, and the second servo motor is started. The transmission causes the roller to decelerate and rotate, and several groups of cams make circular motions at the same time, acting on the automatic pipe pusher respectively. When the protruding part of the cam moves to the contact wheel position, pressure is exerted on the two, causing the intermediate table and the push rod to move rapidly in a straight line. The pusher head is used to hit the corresponding steel pipe. The steel pipe located on the steel pipe storage sleeve is subjected to the thrust and slides along several groups of contacting guide wheels and directly slides out of the steel pipe storage sleeve to complete automatic unloading. Several groups of automatic pipe pushers work synchronously to enable multiple groups of steel pipes in the spreader table to be unloaded instantly, saving time and effort and having a high degree of automation.
[0036] The sliding seat exerts a force on the sliding head during its movement, causing the sliding head to move upward, causing the piston to squeeze the lubricating oil in the oil chamber. The pressure acts on the two sets of second one-way valves, causing the second one-way valves to be pressed open, and the lubricating oil in the oil chamber is instantly released, flowing outward from the two sets of capillary oil tubes and dripping downward from the two sets of oil nozzles, causing the lubricating oil to enter the corresponding long track, thereby achieving the purpose of automatic oil filling, that is, solving the problem of easy drying of the lubricating oil in the long track, and solving the problem of frequent manual refueling that is time-consuming and labor-intensive. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 This is a schematic diagram of the overall structure of a lifting device for construction of the present invention;
[0038] Figure 2 It is a schematic diagram of the external structure of the hoisting beam arm of the present invention;
[0039] Figure 3 It is a schematic diagram of the connection structure of the spreader table of the present invention;
[0040] Figure 4 It is a schematic diagram of the external specific structure of the sling platform of the present invention;
[0041] Figure 5 It is a schematic diagram of the internal structure of the sling table of the present invention;
[0042] Figure 6 It is a schematic diagram of the specific structure of the screw pipe clamp of the present invention;
[0043] Figure 7 It is a schematic diagram of the internal structure of the drive box of the present invention;
[0044] Figure 8 It is a schematic diagram of the specific structure of the automatic pipe pusher of the present invention;
[0045] Fig. 9 It is a cross-sectional view of the hoisting beam arm of the present invention;
[0046] Fig.10 It is a structural schematic diagram of the hoisting beam arm of the present invention;
[0047] Fig.11 This is a schematic diagram of the installation position of the oil dripper of the present invention;
[0048] Fig.12 It is a schematic diagram of the external structure of the oil dripper of the present invention;
[0049] Fig.13 is a cross-sectional view of the oil dripper of the present invention;
[0050] Fig.14 It is a schematic diagram of the upper structure of the driving platform of the present invention.
[0051] In the figure: 1. movable base; 2. load-bearing bracket; 3. lifting mechanism; 4. top seat; 5. lifting beam arm; 6. lifting positioning seat; 7. screw pipe clamp; 71. bidirectional screw; 72. second bearing seat; 73. positive spiral pattern; 74. reverse spiral pattern; 75. displacement seat; 76. screw nut sleeve; 77. guide arm; 78. curved clamping head; 79. sprocket; 8. automatic pipe pusher; 81. intermediate table; 82. wheel groove; 83. contact wheel; 84. push rod; 85. limit plate; 86. No. 1 reset spring; 87. push head; 9. oil dripper; 91. oil dripper; 92. oil chamber; 93. sealing port; 94. telescopic column; 95. slider; 96. piston; 97. No. 2 reset spring; 98. first check valve; 99. second check valve; 10 , slide seat; 11, guide groove; 12, drive platform; 13, pulley; 14, connecting column; 15, connecting piece; 16, locking ring block; 17, locking ring; 20, sling table; 21, connecting plate; 22, hinged ear; 23, steel pipe storage sleeve; 24, guide wheel; 25, moving groove; 26, extension; 27, first servo motor; 28, chain; 30, drive box; 31, mounting plate; 32, roller; 33, third bearing seat; 34, large gear; 35, small gear; 36, second servo motor; 37, cam; 38, limit port; 40, oil inlet pipe; 41, oil storage tank; 42, capillary oil pipe; 43, double-hole joint; 44, oil nozzle; 45, long slide groove; 46, arc convex surface; 50, control console; 51, adjustable support; 52, long track. DETAILED DESCRIPTION
[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Embodiment 1
[0053] like Figure 1-9As shown, this embodiment provides a lifting equipment for construction, including a mobile base 1, the lower end surface of the mobile base 1 is provided with a mobile caster, the mobile caster drives the whole equipment to move, the outer side surface of the mobile base 1 is installed with a control console 50, the console 50 plays a control role, the upper end surface of the mobile base 1 is provided with a load-bearing bracket 2, which plays a load-bearing role, the upper end of the load-bearing bracket 2 is provided with a top seat 4, the interior of the load-bearing bracket 2 is provided with a lifting mechanism 3, the lifting mechanism 3 includes a hydraulic lifting cylinder and a lifting positioning seat 6, the lifting positioning seat 6 is installed with a lifting beam arm 5, the lifting beam arm 5 extends horizontally outward, and the interior of the lifting beam arm 5 is symmetrically provided with two groups of long rails 52.
[0054] Among them, a slide 10 is installed on the long track 52, and a driving platform 12 is installed on the top of the slide 10. Two sets of pulleys 13 are arranged for rotation inside the driving platform 12 (the driving platform 12 also includes a pulley motor inside), and a part of the pulley 13 extends downward from the driving platform 12. The two sets of pulleys 13 act on the long track 52 accordingly. Two sets of guide grooves 11 for the slide 10 to move are symmetrically opened at the bottom of the lifting beam arm 5. The slide 10 passes through the guide grooves 11 downward, as shown in FIG. Figure 3 , 9 , as shown in 10.
[0055] Furthermore, a connecting column 14 is welded at the middle position of the lower end of the slide 10, a connecting piece 15 is welded at the lower end of the connecting column 14, and two sets of locking ring blocks 16 are symmetrically welded at the lower end of the connecting piece 15, and each set of locking ring blocks 16 is passed through by a locking ring 17, such as Figure 3 shown.
[0056] Further, a sling table 20 is arranged directly below the connecting member 15, and a connecting plate 21 is connected upwardly to the end of the sling table 20. The connecting plate 21 is arranged obliquely relative to the sling table 20, and two sets of hinged ears 22 for connecting the locking ring 17 are symmetrically welded to the upper end of the connecting plate 21. The connecting plate 21 and the connecting member 15 are driven to move relative to each other through the two sets of locking rings 17, such as Figure 1-3 shown.
[0057] Among them, a plurality of groups of steel pipe storage sleeves 23 are equidistantly arranged on the upper end surface of the sling table 20, and the upper end of the steel pipe storage sleeve 23 presents a concave surface that fits the steel pipe. A plurality of groups of guide wheels 24 are equidistantly and rotatably installed inside each group of steel pipe storage sleeves 23. A wheel axle is provided through the middle of the guide wheel 24, and both ends of the wheel axle are fixed by the first bearing seat and the inner wall of the steel pipe storage sleeve 23. Part of the guide wheel 24 extends out of the inner side surface of the steel pipe storage sleeve 23 and interacts with the steel pipe. The guide wheel 24 plays the role of guiding and rolling acceleration. Figure 4 shown.
[0058] Among them, a plurality of groups of screw pipe clamps 7 are installed equidistantly inside the sling table 20, such as Figure 5 shown.
[0059] Specifically, the screw pipe clamp 7 includes a bidirectional screw 71, a second bearing seat 72, a positive spiral pattern 73, a reverse spiral pattern 74 and a displacement seat 75. Figure 5 and 6 shown.
[0060] In this embodiment, the bidirectional screw rod 71 is horizontally arranged inside the sling platform 20, and both ends of the bidirectional screw rod 71 are fixed by the second bearing seat 72 and the inner wall of the sling platform 20, which plays a role of connection and fixing. The outer surface of the bidirectional screw rod 71 is symmetrically distributed with positive spiral patterns 73 and reverse spiral patterns 74. There are several groups of symmetrically distributed positive spiral patterns 73 and reverse spiral patterns 74, and displacement seats 75 are installed at the positions of the positive spiral patterns 73 and reverse spiral patterns 74.
[0061] Furthermore, the screw pipe clamp 7 also includes a screw nut sleeve 76, a guide arm 77, a curved clamping head 78 and a sprocket 79. Figure 5 and 6 shown.
[0062] In this embodiment, a screw nut sleeve 76 acting on the positive spiral pattern 73 or the reverse spiral pattern 74 is installed inside the displacement seat 75, and the screw nut sleeve 76 includes a screw nut with spiral motion.
[0063] In this embodiment, the upper end of the displacement seat 75 is connected to a guide arm 77, and the upper end surface of the sling platform 20 is symmetrically provided with a plurality of movable grooves 25 on both sides of the steel pipe storage sleeve 23. The guide arm 77 extends upward from the movable groove 25, and the guide arm 77 and the movable groove 25 have the same width and move linearly along the movable groove 25. A curved clamping head 78 acting on the outer side surface of the steel pipe is welded to the upper end of the guide arm 77, and the curvature of the inner surface of the curved clamping head 78 is slightly smaller than that of the outer side surface of the steel pipe. Two sets of sprockets 79 are sleeved on one end of the bidirectional screw rod 71.
[0064] The sprockets 79 on the screw clamp 7 are connected and driven in turn by the chain 28, wherein a set of bidirectional screws 71 is provided with an extension 26, and the extension 26 is connected to a first servo motor 27 through a coupling, and the first servo motor 27 is horizontally arranged through the side of the sling table 20, such as Figure 2 and 5 shown.
[0065] The left side of the sling table 20 is riveted with a driving box 30 through a mounting plate 31. A roller 32 is mounted in the driving box 30 for horizontal rotation. Both ends of the roller 32 are fixed through a third bearing seat 33 and the inner wall of the driving box 30 to connect and fix. A large gear 34 is sleeved on one end of the roller 32. Figure 4 and 7 shown.
[0066] Furthermore, a small gear 35 is meshed on one side of the large gear 34, and the small gear 35 is sleeved on the output shaft of the second servo motor 36. The second servo motor 36 is horizontally arranged through the outer side surface of the driving box 30, and a plurality of groups of cams 37 are sleeved equidistantly in the middle of the rotating roller 32, such as Figure 7 shown.
[0067] Furthermore, an automatic pipe pusher 8 is provided on the outer side of each set of cams 37, and the automatic pipe pusher 8 is located in the drive box 30. Figure 7 shown.
[0068] Specifically, the automatic pipe pusher 8 includes an intermediate platform 81, a wheel groove 82, a contact wheel 83, a push rod 84, a limit plate 85, a No. 1 return spring 86 and a push head 87. Figure 7 and 8 shown.
[0069] In this embodiment, a wheel groove 82 is formed inside the intermediate platform 81 , and a contact wheel 83 is rotatably disposed inside the wheel groove 82 . A portion of the contact wheel 83 extends out of the wheel groove 82 and contacts the corresponding wheel surface of the cam 37 .
[0070] The push rod 84 is welded horizontally at one end of the intermediate platform 81 away from the cam 37. The push rod 84 passes through the middle of the limit plate 85. The push rod 84 slides in the middle rod groove of the limit plate 85. The rod groove serves as a limit guide. The limit plate 85 is vertically riveted to the inside of the drive box 30 to serve as a connection and fixation. A No. 1 return spring 86 sleeved on the outside of the push rod 84 is connected between the limit plate 85 and the intermediate platform 81. The No. 1 return spring 86 generates elastic force after being compressed, driving the push rod 84 to return. A push head 87 acting on the end of the steel pipe is installed at the end of the push rod 84. The push head 87 and the push rod 84 are threadedly connected for easy replacement. A limit opening 38 is provided inside the mounting plate 31 for the push head 87 to extend horizontally, which serves as a limit guide.
[0071] Furthermore, adjustable supports 51 are symmetrically installed on both sides of the mobile base 1, and the mobile base 1 can be positioned and supported by lifting and lowering. Figure 1 and 2 shown.
[0072] When the present embodiment is used, in the process of hoisting multiple groups of steel pipes, the steel pipes are first placed horizontally in the corresponding steel pipe storage sleeves 23 in sequence, and then the first servo motor 27 is started to drive the bidirectional screw rods 71 on one group of screw rod pipe clamps 7 to rotate, and through the connection transmission of multiple groups of sprocket wheels 79 and chains 28, the bidirectional screw rods 71 on each group of screw rod pipe clamps 7 are synchronously rotated in the same direction, causing the multiple groups of displacement seats 75 on each group of bidirectional screw rods 71 to move linearly (the screw rod nut sleeves 76 on the displacement seats 75 and the positive spiral pattern The displacement seats 75 on the adjacent positive spiral patterns 73 and the reverse spiral patterns 74 move towards each other (forming clamping units), and use their respective curved clamping heads 78 to contact the outer side of the steel pipe to clamp the steel pipe together. Each set of bidirectional screw rods 71 is provided with multiple pairs of clamping units, which can clamp multiple sets of steel pipes at the same time, and different areas of each set of steel pipes are evenly provided with multiple sets of screw rod clamps 7 to form multi-point clamping, thereby ensuring the clamping effect of long steel pipes.
[0073] Then, the hydraulic lifting cylinder inside the lifting mechanism 3 is started to drive the lifting positioning seat 6 to rise, and the lifting beam arm 5 is used to lift the multiple groups of steel pipes in the sling platform 20. Then, the two groups of pulleys 13 move linearly on the corresponding long rails 52, pulling the multiple groups of steel pipes in the sling platform 20 to move horizontally to the specified position. At this time, the second servo motor 36 is started again, and the small gear 35 rotates, and the large gear 34 rotates with it through meshing, causing the roller 32 to decelerate. When the roller 32 decelerates, several groups of cams 37 make circular motions at the same time, acting on the automatic pipe pusher 8 respectively. When the protruding part of the cam 37 moves to the position of the contact wheel 83 of the automatic pipe pusher 8, pressure is generated between the two, causing the intermediate platform 81 and the push rod 84 to move rapidly in a straight line. The push rod 84 drives the push head 87 to extend rapidly along the limit opening 38, and uses the push head 87 to hit the corresponding steel pipe. The steel pipe located on the steel pipe storage sleeve 23 is subjected to the thrust and slides along several groups of contacting guide wheels 24, thereby directly sliding out of the steel pipe storage sleeve 23 to complete automatic unloading. Several groups of automatic pipe pushers 8 work synchronously to enable multiple groups of steel pipes in the sling platform 20 to be unloaded instantly. Embodiment 2
[0074] On the basis of the first embodiment, when the pulley 13 moves on the long rail 52, due to the excessive weight of the hanger and the steel pipe at the lower end, the increased load-bearing force will increase the friction between the pulley 13 and the long rail 52, and the contact surface will heat up. Coupled with the oxidation effect of the air, the lubricating oil in the long rail 52 will quickly dry up. The lack of lubrication will further increase the friction between the pulley 13 and the long rail 52, resulting in inflexible relative movement between the pulley 13 and the long rail 52, control failure, and reduced service life. In order to solve the above technical problems, an oil dripper 9 is provided at the upper end of the lifting beam arm 5 and above the long rail 52, such as Figure 9-14shown.
[0075] Specifically, the oil dripper 9 includes an oil dripping cylinder 91, an oil chamber 92, a sealing port 93, a telescopic column 94 and a slider 95. Fig.12 and 13 shown.
[0076] In this embodiment, the oil dripping cylinder 91 is fixed on the inner surface of the upper end of the lifting beam arm 5, and an oil chamber 92 is provided inside the oil dripping cylinder 91. The oil chamber 92 is filled with lubricating oil. A sealing opening 93 is provided at the lower end of the oil dripping cylinder 91 and in communication with the oil chamber 92. The sealing opening 93 is for the telescopic column 94 to pass through and serves as a guiding seal. A slider 95 is provided at the lower end of the telescopic column 94, and the slider 95 extends downward from the inner surface of the upper end of the lifting beam arm 5.
[0077] Furthermore, the oil dripper 9 also includes a piston 96, a second return spring 97, a first one-way valve 98 and a second one-way valve 99. Fig.12 and 13 shown.
[0078] In this embodiment, the telescopic column 94 extends upward into the oil chamber 92 and is connected to a piston 96. The piston 96 and the wall of the oil chamber 92 are in contact with each other. A No. 2 return spring 97 sleeved on the outside of the piston 96 is connected between the piston 96 and the lower end of the oil drip tube 91. After being compressed, the No. 2 return spring 97 generates elastic force to drive the telescopic column 94 to return to its original position.
[0079] In this embodiment, a first one-way valve 98 is installed on the top of the oil chamber 92. The first one-way valve 98 is opened in one direction when pressurized and automatically resets after the pressure disappears. Two sets of second one-way valves 99 are symmetrically installed on the wall of the oil chamber 92. The second one-way valve 99 is opened in one direction when pressurized. The control directions of the first one-way valve 98 and the second one-way valve 99 are opposite.
[0080] The first one-way valve 98 is upwardly connected to an oil inlet pipe 40, and the upper end of the oil inlet pipe 40 is connected to an oil storage tank 41. The oil storage tank 41 is located on the upper end surface of the lifting beam arm 5. A sealing cover is movably provided on the upper end surface of the oil storage tank 41 to seal and preserve the oil. Fig.10 and 12 shown.
[0081] The positions of the two sets of second one-way valves 99 are connected to the capillary oil tubes 42 outwardly, and the lower ends of the capillary oil tubes 42 are installed with double-hole joints 43. The two sets of double-hole joints 43 are connected to two sets of oil nozzles 44, and the oil nozzles 44 extend downward from the inner surface of the upper end of the hoisting beam arm 5. The two sets of oil nozzles 44 are respectively vertically facing the positions of the long rails 52. Fig.11 and 12 shown.
[0082] Furthermore, a long slide groove 45 is horizontally provided at the middle position of the upper end surface of the driving platform 12 for the slider 95 to extend into, which plays a limiting role. The slider 95 extends into the bottom position of the long slide groove 45. A circular arc convex surface 46 is provided in the middle of the long slide groove 45. The circular arc convex surface 46 protrudes upward in an arc shape. The circular arc convex surface 46 and the slider 95 interact with each other to generate sliding, such as Fig.11 and 14 shown.
[0083] When the present embodiment is in use, when the pulley 13 on the slide 10 moves on the long track 52, it will pass through the area of the automatic pipe pusher 8, and the slider 95 extended by the telescopic column 94 will first enter the long slide groove 45 of the slide 10. When the telescopic column 94 performs relative movement in the long slide groove 45, it will pass through the arc convex surface 46, which is in the shape of an arc convex. During the movement, a force is generated on the slider 95, causing the slider 95 to move upward and drive the telescopic column 94 to contract into the oil chamber 92, causing the piston 96 to squeeze the lubricating oil in the oil chamber 92. The pressure acts on the two sets of second one-way valves 99, so that the second one-way valves 99 are pressed open, and the lubricating oil in the oil chamber 92 is instantly released, flows outward from the two sets of capillary oil tubes 42, is diverted through the double-hole joint 43, and drips oil downward from the oil nozzle 44, so that the lubricating oil enters the corresponding long track 52, thereby achieving the purpose of automatic oil filling.
[0084] When the slider 95 passes over the arc convex surface 46, the compressed No. 2 return spring 97 generates elastic force to drive the telescopic column 94 to extend downward and return to its original position. At this time, the oil chamber 92 is short of oil and is in a negative pressure state, which acts on the first one-way valve 98. The gravity of the lubricating oil in the oil inlet pipe 40 and the positive air pressure above cause the first one-way valve 98 to open, replenishing the lubricating oil to the oil chamber 92.
[0085] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0086] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A lifting device for construction, comprising a mobile base (1), characterized in that: The upper end surface of the mobile base (1) is provided with a load-bearing bracket (2), the upper end of the load-bearing bracket (2) is provided with a top seat (4), the interior of the load-bearing bracket (2) is provided with a lifting mechanism (3), the interior of the lifting mechanism (3) is provided with a lifting positioning seat (6), the lifting positioning seat (6) is provided with a lifting beam arm (5), and the lifting beam arm (5) extends outward horizontally; Two groups of long rails (52) are symmetrically arranged inside the hoisting beam arm (5), a slide seat (10) is installed on the long rails (52), a driving platform (12) is installed on the top of the slide seat (10), two groups of pulleys (13) are rotatably arranged inside the driving platform (12), and the two groups of pulleys (13) act on the long rails (52) respectively. Two groups of guide grooves (11) for the slide seat (10) to move are symmetrically opened at the bottom of the hoisting beam arm (5), and the middle position of the lower end of the slide seat (10) is A connecting column (14) is welded at the position, a connecting piece (15) is welded at the lower end of the connecting column (14), two groups of locking ring blocks (16) are symmetrically welded at the lower end of the connecting piece (15), a locking ring (17) passes through each group of locking ring blocks (16), a sling table (20) is arranged directly below the connecting piece (15), a connecting plate (21) is connected upward at the end of the sling table (20), and two groups of hinged ears (22) for connecting the locking ring (17) are symmetrically welded at the upper end of the connecting plate (21); The upper end surface of the sling platform (20) is equidistantly provided with a plurality of groups of steel pipe receiving sleeves (23), each group of the steel pipe receiving sleeves (23) is equidistantly rotatably installed with a plurality of groups of guide wheels (24), the middle of the guide wheel (24) is penetrated by a wheel axle, both ends of the wheel axle are fixed by a first bearing seat and the inner wall of the steel pipe receiving sleeve (23), a part of the guide wheel (24) extends out of the inner side surface of the steel pipe receiving sleeve (23) and interacts with the steel pipe, and a plurality of groups of screw pipe clamps (7) are equidistantly installed inside the sling platform (20).
2. A lifting equipment for construction according to claim 1, characterized in that: The screw pipe clamp (7) comprises a bidirectional screw (71), a second bearing seat (72), a forward spiral pattern (73), a reverse spiral pattern (74) and a displacement seat (75). The bidirectional screw (71) is horizontally arranged inside the sling platform (20). Both ends of the bidirectional screw (71) are fixed by the second bearing seat (72) and the inner wall of the sling platform (20). The outer surface of the bidirectional screw (71) is symmetrically distributed with forward spiral patterns (73) and reverse spiral patterns (74). A plurality of groups of symmetrically distributed forward spiral patterns (73) and reverse spiral patterns (74) are arranged. Displacement seats (75) are installed at the positions of the forward spiral patterns (73) and the reverse spiral patterns (74).
3. A lifting equipment for construction according to claim 2, characterized in that: The screw tube clamp (7) further comprises a screw nut sleeve (76), a guide arm (77), a curved clamping head (78) and a sprocket (79). A screw nut sleeve (76) acting on the forward spiral pattern (73) or the reverse spiral pattern (74) is installed inside the displacement seat (75). The upper end of the displacement seat (75) is connected to the guide arm (77). The upper end surface of the sling table (20) is symmetrically provided with a plurality of moving grooves (25) on both sides of the steel pipe receiving sleeve (23). The guide arm (77) extends upward from the moving groove (25). The upper end of the guide arm (77) is welded with a curved clamping head (78) acting on the outer side surface of the steel pipe. One end of the bidirectional screw (71) is sleeved with two sets of sprockets (79).
4. A lifting equipment for construction according to claim 3, characterized in that: The sprockets (79) on the adjacent screw pipe clamps (7) are connected and driven in sequence by means of chains (28), wherein a group of bidirectional screws (71) is provided with an extension portion (26), and the extension portion (26) is connected to a first servo motor (27) via a coupling, and the first servo motor (27) is horizontally arranged through the side of the sling platform (20).
5. A lifting equipment for construction according to claim 1, characterized in that: A drive box (30) is riveted to the left side of the sling platform (20) via a mounting plate (31), a roller (32) is mounted in the drive box (30) for horizontal rotation, both ends of the roller (32) are fixed via a third bearing seat (33) and the inner wall of the drive box (30), a large gear (34) is sleeved on one end of the roller (32), a small gear (35) is meshed on one side of the large gear (34), and the small gear (35) is sleeved on the output shaft of the second servo motor (36), a plurality of groups of cams (37) are sleeved equidistantly in the middle of the roller (32), and an automatic pipe pusher (8) is arranged on the outer side of each group of cams (37).
6. A lifting equipment for construction according to claim 5, characterized in that: The automatic pipe pusher (8) comprises an intermediate platform (81), a wheel groove (82), a contact wheel (83), a push rod (84), a limit plate (85), a No. 1 return spring (86) and a push head (87). The intermediate platform (81) is provided with a wheel groove (82) inside, and a contact wheel (83) is rotatably arranged inside the wheel groove (82). A part of the contact wheel (83) extends out of the wheel groove (82) and contacts with a wheel surface of a corresponding cam (37). The intermediate platform (81) is away from the cam (37). A push rod (84) is horizontally welded at one end, the push rod (84) passes through the middle of a limit plate (85), the limit plate (85) is vertically riveted inside the drive box (30), a No. 1 return spring (86) sleeved on the outside of the push rod (84) is connected between the limit plate (85) and the intermediate platform (81), a push head (87) acting on the end of the steel pipe is installed at the end of the push rod (84), and a limit opening (38) is opened inside the mounting plate (31) for the push head (87) to extend horizontally.
7. A lifting equipment for construction according to claim 1, characterized in that: An oil dripper (9) is provided at the upper end of the hoisting beam arm (5) and above the long rail (52). The oil dripper (9) comprises an oil dripping tube (91), an oil cavity (92), a sealing port (93), a telescopic column (94) and a slider (95). The oil dripping tube (91) is fixed to the inner surface of the upper end of the hoisting beam arm (5). An oil cavity (92) is provided inside the oil dripping tube (91). The oil cavity (92) is filled with lubricating oil. A sealing port (93) is provided at the lower end of the oil dripping tube (91) and in communication with the oil cavity (92). The sealing port (93) allows the telescopic column (94) to pass through. A slider (95) is provided at the lower end of the telescopic column (94). The slider (95) extends downward from the inner surface of the upper end of the hoisting beam arm (5).
8. A lifting equipment for construction according to claim 7, characterized in that: The oil dripper (9) further comprises a piston (96), a second return spring (97), a first one-way valve (98) and a second one-way valve (99); the telescopic column (94) extends upward into the oil chamber (92) and is connected to the piston (96); the piston (96) and the wall of the oil chamber (92) are in close contact with each other; a second return spring (97) sleeved on the outside of the piston (96) is connected between the piston (96) and the lower end of the oil dripper (91); the first one-way valve (98) is installed at the top of the oil chamber (92); and two sets of second one-way valves (99) are symmetrically installed on the wall of the oil chamber (92).
9. A lifting equipment for construction according to claim 8, characterized in that: The position of the first one-way valve (98) is upwardly connected to an oil inlet pipe (40), the upper end of the oil inlet pipe (40) is connected to an oil storage tank (41), and the oil storage tank (41) is located on the upper end surface of the lifting beam arm (5). The positions of the two groups of the second one-way valves (99) are both externally connected to capillary oil pipes (42), and the lower ends of the capillary oil pipes (42) are installed with double-hole joints (43). The two groups of double-hole joints (43) are both connected to two groups of oil nozzles (44), and the oil nozzles (44) extend downward from the inner surface of the upper end of the lifting beam arm (5). The two groups of oil nozzles (44) are respectively vertically oriented toward the positions of the long rails (52).
10. A lifting equipment for construction according to claim 9, characterized in that: A long slide groove (45) is horizontally provided at the middle position of the upper end surface of the driving platform (12) for the slider (95) to extend into, and a circular arc convex surface (46) is provided in the middle of the long slide groove (45), and the circular arc convex surface (46) and the slider (95) interact with each other.
Citation Information
Patent Citations
Intelligent crane for pipeline carrying
CN118255250A
Lifting device and method for bridge crane with emergency braking
CN118270653A
Lifting device for carrying building materials
CN217947461U
Movable building engineering material hoisting equipment
CN219279322U
Hoisting equipment for building heating and ventilation pipeline
CN219860275U
