Coral sand foundation reinforcement device and method
Through the combination of pressurized blower and vibrating road roller, the problem of poor reinforcement effect of coral sand foundation is solved, the cement powder is fully mixed and deep void filling is achieved, and the density and stability of coral sand foundation is significantly improved.
Patent Information
- Application Number
- CN202411170896.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-26
AI Technical Summary
In the prior art, the reinforcement effect of coral sand foundation is poor, mainly due to the filtration of cement slurry, and the cement particles are blocked from staying on the surface of coral sand, and cannot effectively fill the gaps in the foundation.
Using pressurized blower and pipeline equipment, the proportion of pore parts and gas flow rate of the coral sand foundation is monitored through digital microscope and airflow sensors, and the pressurized blower is controlled to fully mix the cement powder and fill the gaps in the foundation, and the vibration roller is used to perform multiple milling. Press to fill further.
The cement powder is achieved to fully fill the voids in the coral sand foundation, improve the density and stability of the coral sand foundation, and solve the problem of poor reinforcement effect in the existing technology.
Smart Images

Figure CN118686150B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of coral sand foundation treatment, and in particular to a coral sand foundation reinforcement device and method. Background Art
[0002] Coral sand is a special rock and soil medium composed mainly of carbonates, formed through a long period of geological action from the remains of dead reef-building corals. Its calcium carbonate content generally exceeds 97%. Due to its unique material composition and formation mechanism, coral sand differs significantly from conventional terrestrial sand media. Coral sand has engineering properties such as being porous, irregular, easily breakable, highly compressible, and having high residual strength. Coral sand is primarily distributed along the continental shelves and coastlines of tropical or subtropical climates between 30°N and 30°S latitudes, covering 30% of the Earth's surface. The loose deposits on more than 130 islands and reefs in my country's South China Sea are primarily composed of coral fragments and coral reef sand. For areas requiring land reclamation, using local coral sand for island and reef construction can save material transportation costs and construction time.
[0003] Since the coral sand foundation is composed of coral sand particles, and the shapes and sizes of coral sand particles are different, there are usually gaps between the coral sand particles. The construction of island and reef projects with coral sand requires the coral sand foundation to be reinforced before subsequent engineering construction can be carried out on the coral sand. The coral sand foundation reinforcement method in the existing technology is usually to inject cement slurry on the surface of the coral sand to reinforce it.
[0004] In the existing coral sand foundation reinforcement method, the coral sand foundation will filter the cement slurry, causing water to seep down, while the cement particles are blocked and remain on the surface of the coral sand, resulting in poor reinforcement effect of the coral sand foundation by injecting cement slurry. Summary of the Invention
[0005] The embodiments of the present invention provide a coral sand foundation reinforcement device and method, which can solve the problem of poor reinforcement effect in the prior art. The technical solution is as follows:
[0006] In the first aspect, a coral sand foundation reinforcement device includes: a pressurized air blower, a pipeline and a monitoring device,
[0007] One end of the pipeline is connected to the pressurized air blower, and the other end of the pipeline is set in the coral sand foundation. The monitoring equipment includes a controller and a digital microscope. The digital microscope and the pressurized air blower are connected to the controller signal. The digital microscope is used to monitor the proportion of pore parts in the coral sand foundation. The controller is used to judge the density of the coral sand foundation based on the proportion of the pore part and control the pressurized air blower.
[0008] Optionally, the monitoring device includes an airflow sensor, which is connected to the controller signal. The airflow sensor is used to monitor the flow rate of gas in the coral sand foundation. The controller is used to judge the density of the coral sand foundation based on the flow rate of the gas and control the pressurized blower.
[0009] Optionally, a nozzle joint is provided at one end of the pipeline close to the coral sand foundation, the nozzle joint includes an air inlet and an air outlet, the air inlet is connected to the pipeline, and the air outlet cover is provided above the digital microscope and the airflow sensor.
[0010] Optionally, a plurality of the air nozzle joints are provided, and the air outlet diameters of the plurality of the air nozzle joints are different.
[0011] Optionally, the nozzle connector is an inflatable airbag structure.
[0012] Optionally, a rubber protective sleeve is provided on the outside of the nozzle joint.
[0013] Optionally, the length of the pipe is adjustable.
[0014] Optionally, a support frame is further included, which is arranged on the coral sand foundation. The support frame includes a first support rod, which is arranged horizontally and connected to the side of the pipeline close to the coral sand foundation.
[0015] Optionally, the support frame includes a second support rod, the second support rod is vertically arranged, the first support rod is slidably arranged on the second support rod, and the length of the first support rod is adjustable.
[0016] In a second aspect, a coral sand foundation reinforcement method is provided, based on the aforementioned coral sand foundation reinforcement device, and the steps include:
[0017] Step 1: laying cement powder on the coral sand foundation, and keeping the coral sand foundation and the cement powder dry;
[0018] Step 2: burying the digital microscope in the coral sand foundation, connecting one end of the pipe to the pressurized air blower, inserting the other end into the coral sand foundation, and turning on the pressurized air blower;
[0019] Step 3: Using the digital microscope to monitor the proportion of the pores in the coral sand foundation covered by the pipe, and transmitting a signal to the controller; when the controller determines that the density meets the requirements, the pressurized air supply is stopped and the digital microscope is removed;
[0020] Step 4: Insert the other end of the pipe into another location of the coral sand foundation that needs to be reinforced, and repeat steps 2 and 3;
[0021] Step 5: Evenly sprinkle water on the coral sand foundation and let it stand for 15 minutes. Then, use a vibratory roller to roll the coral sand foundation multiple times within 4 hours.
[0022] The beneficial effects brought about by the technical solution provided by the embodiment of the present invention include at least:
[0023] An embodiment of the present invention provides a coral sand foundation reinforcement device and method, which lays dry cement powder on a dry coral sand foundation, fully mixes the coral sand foundation and the cement powder through a pressurized air blower and a pipeline, so that the cement powder fully fills the gaps in the coral sand foundation, and monitors the density of the cement powder and the coral sand foundation after mixing through a monitoring device. When the density meets the requirements, the pressurized air blower is turned off, and water is evenly sprinkled on the cement powder and the coral sand foundation. Finally, the coral sand foundation is rolled multiple times by a vibrating roller, so that the gaps in the coral sand foundation are further filled, which can effectively solve the problem of poor reinforcement effect in the existing technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0025] Figure 1 It is a schematic diagram of the overall structure of the device provided by an embodiment of the present invention;
[0026] Figure 2 is a schematic cross-sectional view of a nozzle joint provided by an embodiment of the present invention;
[0027] Figure 3 is a schematic diagram of signal transmission provided by an embodiment of the present invention;
[0028] Figure 4 is a flow chart of a method provided by an embodiment of the present invention;
[0029] Figure 5 Schematic diagram of wind pressure entering a coral sand foundation according to an embodiment of the present invention;
[0030] Figure 6 It is a logical schematic diagram of the reinforcement method provided by an embodiment of the present invention.
[0031] In the figure: 1- pressurized air blower 1; 2- pipe; 3- monitoring equipment; 30- controller; 31- digital microscope; 32- air flow sensor; 4- nozzle connector; 41- air inlet; 42- air outlet; 43- rubber protective cover; 44- inflation port; 5- support frame; 51- first support rod; 52- second support rod. DETAILED DESCRIPTION
[0032] To make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.
[0033] Figure 1 It is a schematic diagram of the overall structure of the device provided by an embodiment of the present invention; Figure 2 is a schematic cross-sectional view of a nozzle joint provided by an embodiment of the present invention; Figure 3 is a schematic diagram of signal transmission provided by an embodiment of the present invention; Figure 4 is a flow chart of a method provided by an embodiment of the present invention; Figure 5 Schematic diagram of wind pressure entering a coral sand foundation according to an embodiment of the present invention; Figure 6 This is a logical diagram of the reinforcement method provided by the embodiment of the present invention. Figures 1 to 6 The coral sand foundation reinforcement device shown includes: a pressurized air blower 1, a pipeline 2 and a monitoring device 3. One end of the pipeline 2 is connected to the pressurized air blower 1, and the other end of the pipeline 2 is set in the coral sand foundation. The monitoring device 3 includes a controller 30 and a digital microscope 31. The digital microscope 31 and the pressurized air blower 1 are signal-connected to the controller 30. The digital microscope 31 is used to monitor the proportion of pores in the coral sand foundation. The controller 30 is used to judge the density of the coral sand foundation based on the proportion of pores and control the pressurized air blower 1.
[0034] For example, in an embodiment of the present invention, the controller can be a data processing device such as a computer or a host computer, which is used to receive the data collected by the digital microscope 31 and analyze and judge the current density. First, it is necessary to keep the coral sand foundation and cement powder dry to prevent the cement powder from flocculating in the shallow layer or producing an adhesion effect with the coral sand when it encounters water. The cement powder is laid on the coral sand foundation, and the digital microscope 31 is buried in the coral sand foundation that needs to be reinforced. One end of the pipe 2 is connected to the pressurized air blower 1, and the other end is inserted into the coral sand foundation that needs to be reinforced. The pressurized air blower 1 is turned on so that the coral sand particles in the coral sand foundation covered by the pipe 2 are fully mixed with the cement powder, and the density of the mixed coral sand foundation is monitored in real time by the digital microscope 31. The digital microscope 31 records the coral sand foundation, dynamically records the changes in the microstructure of the sand during the mixing process, and analyzes the evolution of the microstructure of the sand over time. The image captured by the digital microscope 31 is transmitted to the controller 30. The color of each pixel in the image is determined by the three color components of red, green, and blue (RGB), with each component ranging from 0 to 255. The pores, cement particles, and coral sand particles in the image can be distinguished based on their different colors. The characteristic color value X (RGB) of a pixel of the pore is selected as a reference. For any pixel in the image, the distance between its color value P (RGB) and the characteristic color in the RGB color space is calculated:
[0035] d=|PX|(1);
[0036] If d is less than a given threshold T, the pixel is identified as a pore; otherwise, it is identified as a particle. Binarization then produces a black-and-white binary image, where black represents pores and white represents particles. In practice, the threshold T is determined by selecting characteristic colors multiple times.
[0037] Count the number of all black pixels in the image, and then divide this number by the total number of pixels in the image to get the proportion of pores.
[0038] The calculation formula for the pore fraction is:
[0039] The proportion of the pore part is defined as C. The index C represents the degree of filling of the pores by cement. The value ranges from 0 to 1. The smaller the value, the denser the filling.
[0040] When the controller 30 analyzes the image data transmitted by the digital microscope 31 and monitors that the proportion of the pore part is less than 0.1, when it is determined that the density meets the requirements, the controller 30 transmits a signal to the pressurized air blower 1 to shut it down, removes the pipe 2 and the digital microscope 31 inserted into the coral sand foundation, and moves to the next coral sand foundation that needs to be reinforced, so that the pipe 2 covers the coral sand foundation that needs to be reinforced, and repeats the above steps to make the coral sand foundations that need to be reinforced and the cement powder fully mixed, and then evenly sprinkle water on the mixed coral sand foundation and let it stand for 15 minutes, and use a vibratory roller to compact the mixed coral sand foundation within 4 hours. Under the action of the vibratory roller, the positions of the coral sand particles move and fill each other, and the speed of the vibratory roller is relatively slow, which can provide a relatively long-lasting vibration force to the coral sand foundation, facilitate the transmission of the vibration force to the deep, and have little effect on the breakage of the coral sand particles. The vibration energy and frequency should minimize the breakage of coral sand particles, allowing more cement powder to vibrate downward, and ensuring that the deep coral sand has sufficient vibration amplitude and frequency. The coral sand foundation is repeatedly rolled by a vibrating roller to further fill the gaps between the coral sand particles, thereby making the coral sand foundation formed after the cement solidifies more stable. The monitoring device 3 is provided to automatically shut down the pressurized air blower 1 when it detects that the density of the coral sand meets the requirements, thereby improving the automation level of this equipment.
[0041] The embodiment of the present invention provides a coral sand foundation reinforcement device, which lays dry cement powder on a dry coral sand foundation, and fully mixes the coral sand foundation and cement powder through a pressurized air blower and a pipe, so that the cement powder fully fills the gaps in the coral sand foundation, and monitors the density of the cement powder and coral sand foundation after mixing through a monitoring device. When the density meets the requirements, the pressurized air blower is turned off, and water is evenly sprinkled on the cement powder and coral sand foundation. Finally, the coral sand foundation is rolled multiple times by a vibrating roller, so that the gaps in the coral sand foundation are further filled, which can effectively solve the problem of poor reinforcement effect in the existing technology. Compared with the traditional technical means of directly laying cement slurry on the surface of the coral sand foundation, which can only reinforce the surface layer of the coral sand foundation, the embodiment of the present invention provides a device that can fully mix cement powder and coral sand particles and then add water to solidify, and can also fill the gaps in the deep coral sand foundation, thereby making the reinforced coral sand foundation more stable.
[0042] Optionally, the monitoring device 3 includes an airflow sensor 32, which is connected to the controller 30 signal. The airflow sensor 32 is used to monitor the flow rate of gas in the coral sand foundation. The controller 30 is used to judge the density of the coral sand foundation based on the flow rate of gas and control the pressurized air blower 1.
[0043] For example, in an embodiment of the present invention, Figure 5 As shown, the downward arrow represents the downward force of the air blower. A digital microscope 31 and airflow sensor 32 are embedded in the coral sand foundation that requires reinforcement. Airflow sensor 32 is installed to further monitor whether the coral sand foundation meets the required density. Airflow sensor 32 is a device capable of detecting airflow speed and direction. It uses a heating element and multiple temperature sensors to measure airflow speed. By measuring the temperature change, the airflow speed can be calculated to monitor the density of the coral sand. After detecting changes in wind speed, airflow sensor 32 converts the signal into an electrical signal. The sensor output is collected and transmitted to controller 30 for processing and analysis. When the coral sand foundation meets the required density, the wind speed detected by controller 30 decreases. Once the required density is met, a signal is transmitted to pressurized air blower 1 to shut it down. The operating principle of airflow sensor 32 is primarily based on the thermal effect: the heating element emits a constant amount of heat. As air flows through it, it removes some of this heat, causing the temperature measured by the temperature sensor to change. By measuring the temperature change, the airflow velocity can be calculated. The relationship between temperature change and airflow velocity can be expressed by the following formula:
[0044]
[0045] Where v is the air velocity, Q is the heating power of the heating element, ρ is the gas density, c p is the specific heat capacity of the gas and A is the surface area of the heating element.
[0046] Q=h·A·(T wire -T ambient )(3);
[0047] Where Q is the heating power of the heating element, h is the convective heat transfer coefficient, A is the surface area of the hot wire, T wire is the temperature of the hot wire, T ambient is the ambient temperature.
[0048] When airflow sensor 32 detects a wind speed of less than 20 ml / min, it transmits a signal to controller 30. Controller 30 determines that the density of the coral sand foundation meets the required level and transmits a signal to pressurized blower 1 to shut it down. The addition of airflow sensor 32 allows for more precise determination of the density of the coral sand foundation, allowing for more thorough mixing of cement powder and coral sand particles, thus making the reinforced coral sand foundation more stable.
[0049] Optionally, a nozzle joint 4 is provided at one end of the pipe 2 close to the coral sand foundation. The nozzle joint 4 includes an air inlet 41 and an air outlet 42. The air inlet 41 is connected to the pipe 2, and the air outlet 42 is covered above the digital microscope 31 and the airflow sensor 32.
[0050] For example, in an embodiment of the present invention, a nozzle joint 4 is provided at one end of the pipe 2 close to the coral sand foundation, and the nozzle joint 4 can be inserted into the coral sand foundation for mixing. Compared with directly inserting the pipe 2 into the coral sand foundation for mixing, which may cause the air outlet of the pipe 2 to be deformed and difficult to repair, the nozzle joint 4 can be replaced after multiple uses to prevent the pipe 2 from being deformed due to direct contact with the coral sand foundation, thereby further improving the operational convenience of the coral sand foundation reinforcement equipment.
[0051] Optionally, a plurality of air nozzle joints 4 are provided, and the air outlets 42 of the plurality of air nozzle joints 4 have different diameters.
[0052] For example, in an embodiment of the present invention, by providing multiple air nozzle joints 4 with different calibers of air outlets 42, air nozzle joints 4 with different calibers can be selected when the pressurized blower 1 mixes coral sand foundations of different terrains, thereby improving the versatility of the coral sand foundation reinforcement equipment, and in the early stage of the mixing work, a larger caliber air nozzle joint 4 can be selected to mix a large area of coral sand foundation, and then a smaller caliber air nozzle joint 4 can be used for filling work, thereby improving the efficiency of the coral sand foundation reinforcement equipment.
[0053] Optionally, the nozzle connector 4 is an inflatable airbag structure.
[0054] For example, in an embodiment of the present invention, the coral sand foundation is composed of coral sand particles. After the nozzle joint 4 is inserted into the coral sand foundation, a gap is generated between the bottom of the nozzle joint 4 and the contact surface of the coral sand particles. By setting the nozzle joint 4 as an inflatable airbag structure, such as Figure 2 As shown, the nozzle joint 4 is provided with an inflation port 44, and gas is injected into the inflation port 44 to form the nozzle joint 4. When the nozzle joint 4 is an inflatable airbag structure, Figure 2 The cross-section line in the figure represents the inflatable portion. When the bottom of the nozzle joint 4 contacts the coral sand particles, the inflatable airbag structure fills the gap between the nozzle joint 4 and the coral sand particles, thereby making the nozzle joint 4 more firmly pressed into the coral sand foundation. The wind force generated by the pressurized blower 1 can vertically downwardly mix the cement powder with the deep coral sand foundation, thereby improving the reinforcement effect of the coral sand foundation reinforcement device. On the other hand, when the nozzle joint 4 is an inflatable airbag structure, it is also convenient to store it when the nozzle joint 4 is not in use.
[0055] Optionally, a rubber protective sleeve 43 is provided on the outside of the nozzle joint 4 .
[0056] For example, in an embodiment of the present invention, since the nozzle joint 4 needs to be frequently inserted into the coral sand foundation to mix cement powder and coral sand particles, the nozzle joint 4 can be protected by providing a rubber protective sleeve 43 on the outside of the nozzle joint 4, thereby extending the service life of the nozzle joint 4 and reducing the use cost of the coral sand foundation reinforcement equipment.
[0057] Optionally, the length of the pipe 2 is adjustable.
[0058] For example, in an embodiment of the present invention, the pipe 2 can be a hose or a plurality of hard pipes connected in sections and telescopically, so that the length of the pipe 2 is adjustable. After the pressurized air blower 1 finishes mixing one coral sand foundation and cement powder, it needs to be moved to the next coral sand foundation for mixing. The pipe 2 is set to be in a length-adjustable form, so that during the use of the pressurized air blower 1, there is no need to move it. It is only necessary to adjust the length of the pipe 2 so that the pressurized air blower 1 can mix multiple coral sand foundations, thereby improving the operational convenience of the coral sand foundation reinforcement equipment.
[0059] Optionally, a support frame 5 is further included. The support frame 5 is arranged on the coral sand foundation. The support frame includes a first support rod 51. The first support rod 51 is horizontally arranged and connected to the side of the pipeline 2 close to the coral sand foundation.
[0060] For example, in an embodiment of the present invention, by providing a support frame 5, the pipe 2 can be fixed near one end of the coral sand foundation. When the pipe 2 is a hose, the support frame 5 is more required. By providing a first support rod 51, the end of the pipe 2 near the coral sand foundation can be stably inserted vertically into the coral sand foundation, so that the wind force generated by the pressurized blower 1 can blow the cement powder as much as possible vertically into the deeper coral sand foundation. After the addition of water, the gaps in the deep coral sand foundation can also be filled with cement powder, thereby further improving the reinforcement effect of the coral sand foundation reinforcement device.
[0061] Optionally, the support frame 5 includes a second support rod 52 , which is vertically arranged. The first support rod 51 is slidably arranged on the second support rod 52 , and the length of the first support rod 51 is adjustable.
[0062] For example, in an embodiment of the present invention, by slidably arranging the first support rod 51 on the second support rod 52, the length of the first support rod 51 is adjustable, so that when the pipe 2 is telescoped and changes in length, the first support rod 51 can still provide support force to the end of the pipe 2 close to the coral sand foundation without moving to the position of the support frame 5, thereby further improving the operational convenience of the coral sand foundation reinforcement equipment.
[0063] A coral sand foundation reinforcement method, based on the aforementioned coral sand foundation reinforcement device, comprises the following steps:
[0064] S1: Lay cement powder on the coral sand foundation and keep the coral sand foundation and cement powder dry;
[0065] S2: bury the digital microscope 31 in the coral sand foundation, connect one end of the pipe 2 to the pressurized air blower 1, insert the other end into the coral sand foundation, and turn on the pressurized air blower 1;
[0066] S3: The proportion of pores in the coral sand foundation covered by the pipe 2 is monitored by the digital microscope 31 and a signal is transmitted to the controller 30. When the controller 30 determines that the density meets the requirement, the pressurized air blower 1 is controlled to be shut down and the digital microscope 31 is removed.
[0067] S4: Insert the other end of pipe 2 into another coral sand foundation that needs to be reinforced, and repeat S2 and S3;
[0068] S5: After evenly sprinkling water on the coral sand foundation and letting it stand for 15 minutes, use a vibratory roller to compact the coral sand foundation multiple times within 4 hours.
[0069] For example, in an embodiment of the present invention, dry cement powder is laid on a dry coral sand foundation, a digital microscope 31 and an air flow sensor 32 are buried in the coral sand foundation that needs to be reinforced, one end of the pipe 2 is connected to the pressurized air blower 1, and the other end is connected to the air nozzle connector 4 and inserted into the coral sand foundation that needs to be reinforced. The pressurized air blower 1 is turned on to allow the coral sand particles in the coral sand foundation covered by the pipe 2 to be fully mixed with the cement powder. The density of the mixed coral sand foundation is monitored in real time by the digital microscope 31 and the air flow sensor 32, and a signal is transmitted to the controller 30. The digital microscope 31 records the coral sand foundation, dynamically recording the changes in the microscopic structure of the sand during the mixing process and transmitting the data to the controller 30. The evolution of the microscopic structure of the sand over time is analyzed. When the controller 30 detects that the proportion of the pore portion is less than 0.1, that is, the density meets the requirement, the controller 30 records a first control signal. When the controller 30 detects through the airflow sensor 32 that the wind speed in the coral sand foundation is less than 20 ml / min, that is, the density of the coral sand foundation meets the requirements, the controller 30 records the second control signal. When the controller 30 simultaneously records the first control signal and the second control signal, it transmits a shutdown signal to the pressurized blower 1 and proceeds to the next step. Take out the nozzle joint 4, digital microscope 31 and air flow sensor 32 inserted into the coral sand foundation, and move to the next coral sand foundation that needs to be reinforced, so that the nozzle joint 4 covers the coral sand foundation that needs to be reinforced, and repeat the above steps, so that the coral sand foundations that need to be reinforced are fully mixed with cement powder, evenly sprinkle water on the mixed coral sand foundation and let it stand for 15 minutes, and use a vibratory roller to roll the mixed coral sand foundation within 4 hours. Under the action of the vibratory roller, the positions between the coral sand particles move and fill each other, and the vibratory roller speed is relatively slow, which can give the coral sand foundation a relatively long-lasting vibration force, making it easier for the vibration force to be transmitted to the deep part, and having less effect on the crushing of the coral sand particles. The vibration energy and frequency should minimize the crushing of the coral sand particles, achieve more cement powder vibration and slide, and ensure that the deep coral sand has sufficient vibration amplitude and frequency. The coral sand foundation is rolled multiple times by the vibratory roller, so that the gaps between the coral sand particles are further filled, so that the coral sand foundation formed after the cement solidifies is more stable.
[0070] Unless otherwise defined, the technical or scientific terms used herein shall have the ordinary meaning understood by persons of ordinary skill in the art to which the invention belongs. The terms "first", "second" and similar words used in the patent specification and claims of the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, terms such as "a" or "an" do not indicate a quantitative limitation, but rather indicate the presence of at least one. Terms such as "include" or "comprising" mean that the elements or objects appearing before "include" or "comprising" include the elements or objects listed after "include" or "comprising" and their equivalents, and do not exclude other elements or objects. Terms such as "connected" or "connected" are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. Terms such as "upper", "lower", "left", and "right" are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0071] The above descriptions are merely optional embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A coral sand foundation reinforcement method, based on a coral sand foundation reinforcement device, characterized in that: The coral sand foundation reinforcement device comprises: a pressurized air blower (1), a pipeline (2) and a monitoring device (3). One end of the pipeline (2) is connected to the pressurized air blower (1), and the other end of the pipeline (2) is arranged in the coral sand foundation. The monitoring device (3) comprises a controller (30) and a digital microscope (31). The digital microscope (31) and the pressurized air blower (1) are connected to the controller (30) by signals. The digital microscope (31) is used to monitor the proportion of pores in the coral sand foundation. The controller (30) is used to judge the compactness of the coral sand foundation based on the proportion of pores and to control the pressurized air blower (1). The method comprises the following steps: Step 1: laying cement powder on the coral sand foundation, and keeping the coral sand foundation and the cement powder dry; Step 2: bury the digital microscope (31) in the coral sand foundation, connect one end of the pipe (2) to the pressurized air blower (1), insert the other end into the coral sand foundation, and turn on the pressurized air blower (1); Step 3: The proportion of the pores in the coral sand foundation covered by the pipe (2) is monitored by the digital microscope (31), and a signal is transmitted to the controller (30). When the controller (30) determines that the density meets the requirement, the pressurized air blower (1) is controlled to be shut down and the digital microscope (31) is taken out. Step 4: insert the other end of the pipe (2) into another location of the coral sand foundation that needs to be reinforced, and repeat steps 2 and 3; Step 5: After evenly sprinkling water on the coral sand foundation and letting it stand for 15 minutes, a vibratory roller is used to roll the coral sand foundation multiple times within 4 hours.
2. The coral sand foundation reinforcement method according to claim 1, characterized in that: The monitoring device (3) comprises an airflow sensor (32), wherein the airflow sensor (32) is connected to the controller (30) by signal, and the airflow sensor (32) is used to monitor the flow rate of gas in the coral sand foundation, and the controller (30) is used to determine the compactness of the coral sand foundation based on the flow rate of the gas, and to control the pressurized air blower (1).
3. The coral sand foundation reinforcement method according to claim 2, characterized in that: An air nozzle joint (4) is provided at one end of the pipeline (2) close to the coral sand foundation, the air nozzle joint (4) comprising an air inlet (41) and an air outlet (42), the air inlet (41) being connected to the pipeline (2), and the air outlet (42) being covered above the digital microscope (31) and the air flow sensor (32).
4. The coral sand foundation reinforcement method according to claim 3, characterized in that: A plurality of the air nozzle joints (4) are provided, and the air outlets (42) of the plurality of air nozzle joints (4) have different calibers.
5. The coral sand foundation reinforcement method according to claim 3, characterized in that: The nozzle joint (4) is an inflatable airbag structure.
6. The coral sand foundation reinforcement method according to claim 3, characterized in that: A rubber protective sleeve (43) is provided on the outside of the nozzle joint (4).
7. The coral sand foundation reinforcement method according to claim 1, characterized in that: The length of the pipeline (2) is adjustable.
8. The coral sand foundation reinforcement method according to claim 7, characterized in that: It also comprises a support frame (5), the support frame (5) being arranged on the coral sand foundation, the support frame comprising a first support rod (51), the first support rod (51) being arranged horizontally and connected to a side of the pipeline (2) close to the coral sand foundation.
9. The coral sand foundation reinforcement method according to claim 8, characterized in that: The support frame (5) comprises a second support rod (52), the second support rod (52) is arranged vertically, the first support rod (51) is slidably arranged on the second support rod (52), and the length of the first support rod (51) is adjustable.