A method, system, equipment and storage medium for underground intelligent operation

By deploying mobile control centers and target networks underground and remotely controlling intelligent mining equipment, the problems of high construction costs of communication and positioning support systems and the risk of communication interruption in underground operations are solved, and unmanned mining and safety improvements are achieved.

CN118714175BActive Publication Date: 2024-12-06BEIJING BEIKUANG INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410960191.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-12-06
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

In underground operations, the fixed position of the ground control center leads to high construction costs of underground communication and positioning support systems, and the communication link is vulnerable to damage when the mining equipment is too far from the control center, increasing communication interruptions and security risks.

Method used

Deploy mobile control centers underground and remotely control intelligent mining equipment through the target network to reduce the requirements for the whole-domain communication network. It is only necessary to ensure the stability of the local communication network, reduce construction costs and reduce the risk of communication interruption.

Benefits of technology

Unmanned mining has been realized, reducing the construction cost of underground operating systems and the risk of communication interruption, and improving the safety and efficiency of underground operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118714175B_ABST
    Figure CN118714175B_ABST
Patent Text Reader

Abstract

The present application provides an underground intelligent operation process method, system, equipment and storage medium, the method comprising: a mobile control center deployed underground sends remote control instructions to intelligent mining equipment through a target network to control the intelligent mining equipment to perform a first mining task in a first underground mining area according to the instructions, and controls the intelligent mining equipment to transmit the task execution data of the first mining task to the mobile control center in real time, so as to determine the task execution progress of the first mining task according to the task execution data. In this way, the present application deploys a mobile control center underground, so that underground operators can remotely control mining equipment in the mobile control center to perform underground operations. While realizing unmanned mining, it is no longer necessary to make high requirements on the global communication network, effectively reducing the cost of communication, positioning and other support system construction caused by the replacement of mining areas, and reducing the risk of communication link damage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of communication technology, and more specifically, to an underground intelligent operation process method, system, equipment and storage medium. Background Art

[0002] At present, when working underground, underground workers are required to manually drive and control different mining equipment (such as charge trucks, shovel loaders, crushers, etc.) to perform corresponding mining tasks in the underground mining area; among them, underground workers can send the task execution data of the mining task to the ground control center above the mine through the underground base station, and receive a series of underground operation instructions issued by the ground control center, so that the ground control center can remotely control the underground operation process of the mining equipment.

[0003] However, since the ground control center is fixed in the well, as the mining equipment moves underground, the field support systems and equipment installed on the underground tunnel walls, such as underground communication and positioning, also need to be continuously expanded and constructed. Only after the construction is completed can remote control operations be carried out, which requires a lot of manpower, material resources and time costs. Especially for mining areas with less mining workload, there is a phenomenon of frequent changes in the installation location of equipment; and the remote operating system after deployment still has problems such as difficult underground maintenance. For example, when the ground personnel make mistakes in remote operation, the underground personnel are still required to assist in the processing. At the same time, as the mining site continues to go deeper, there is also a greater risk of damage to the communication link due to the long distance between the mining equipment and the control center and the large number of nodes, which in turn increases the risk of communication interruption and system control security risks. Summary of the invention

[0004] In view of this, the purpose of the present application is to provide an underground intelligent operation process method, system, equipment and storage medium. By deploying a mobile control center underground, underground workers can remotely control mining equipment in the mobile control center to perform underground operations. While realizing unmanned mining, there is no longer a need to place high requirements on the global communication network of the underground intelligent operation system. It is only necessary to ensure the stability of the local communication network between the underground mobile control center and the current operating underground mining area. This effectively reduces the manpower, material and time cost investment in the construction of communication, positioning and other support systems generated by the mine for mining area changes, and at the same time reduces the risk of damage to the communication link and the resulting communication interruption caused by the long distance between the mining equipment and the control center and the large number of nodes.

[0005] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings.

[0006] In a first aspect, an embodiment of the present application provides an underground intelligent operation process method, which is applied to an underground intelligent operation system, wherein the underground intelligent operation system at least includes: a mobile control center deployed underground and at least one intelligent mining device; wherein the mobile control center communicates with the intelligent mining device through a target network deployed underground; the underground intelligent operation process method includes:

[0007] The mobile control center sends a remote control instruction to the intelligent mining equipment through the target network;

[0008] In response to receiving the remote control instruction, the intelligent mining device executes the first mining task in the first underground mining area according to the first mining task specified in the remote control instruction, and during the execution of the first mining task, transmits the task execution data of the first mining task to the mobile control center in real time through the target network;

[0009] In response to receiving the task execution data, the mobile control center determines the task execution progress of the first mining task according to the task execution data.

[0010] In a second aspect, an embodiment of the present application provides an underground intelligent operation system, the underground intelligent operation system comprising at least: a mobile control center deployed underground and at least one intelligent mining device; wherein the mobile control center communicates with the intelligent mining device via a target network deployed underground;

[0011] The mobile control center is used to send remote control instructions to the intelligent mining equipment through the target network;

[0012] The intelligent mining equipment is used to respond to receiving the remote control instruction, execute the first mining task in the first underground mining area according to the first mining task specified in the remote control instruction, and transmit the task execution data of the first mining task to the mobile control center in real time through the target network during the execution of the first mining task;

[0013] The mobile control center is used to respond to receiving the task execution data and determine the task execution progress of the first mining task according to the task execution data.

[0014] In a third aspect, an embodiment of the present application provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned downhole intelligent operation process method when executing the computer program.

[0015] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned downhole intelligent operation process method are executed.

[0016] The technical solution provided by the embodiments of the present application may have the following beneficial effects:

[0017] An underground intelligent operation process method, system, equipment and storage medium provided in an embodiment of the present application, wherein a mobile control center deployed underground sends remote control instructions to intelligent mining equipment through a target network to control the intelligent mining equipment to perform a first mining task in a first underground mining area according to the first mining task specified in the remote control instructions, and controls the intelligent mining equipment to transmit task execution data of the first mining task to the mobile control center in real time, so as to determine the task execution progress of the first mining task based on the task execution data.

[0018] In this way, the present application deploys a mobile control center underground, so that underground workers can remotely control mining equipment in the mobile control center to perform underground operations. While realizing unmanned mining, there is no longer a need to place high requirements on the global communication network of the underground intelligent operation system. It is only necessary to ensure the stability of the local communication network between the underground mobile control center and the current underground mining area. This effectively reduces the manpower, material resources and time costs of building support systems such as communications and positioning for mining area changes in the mine, and at the same time reduces the risk of damage to the communication link and the resulting communication interruption due to the long distance between the mining equipment and the control center and the large number of nodes. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 A schematic diagram of the structure of an underground intelligent operation system provided by an embodiment of the present application is shown;

[0021] Figure 2 A schematic diagram of a process flow of an underground intelligent operation process method provided by an embodiment of the present application is shown;

[0022] Figure 3 A schematic diagram of an interface for split-screen display of a task execution screen and key status indicator data provided by an embodiment of the present application is shown;

[0023] Figure 4 A schematic diagram of the structure of an electronic device 400 provided in an embodiment of the present application. DETAILED DESCRIPTION

[0024] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. It should be understood that the drawings in the present application only serve the purpose of explanation and description and are not used to limit the scope of protection of the present application. In addition, it should be understood that the schematic drawings are not drawn in real proportion. The flowchart used in this application shows the operations implemented according to some embodiments of the present application. It should be understood that the operations of the flowchart can be implemented out of sequence, and the steps without logical context can be reversed in order or implemented simultaneously. In addition, those skilled in the art can add one or more other operations to the flowchart under the guidance of the content of the present application, or remove one or more operations from the flowchart.

[0025] In addition, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.

[0026] It should be noted that the term "comprising" will be used in the embodiments of the present application to indicate the existence of the features declared thereafter, but does not exclude the addition of other features.

[0027] Here, the downhole intelligent operation process method provided in the embodiment of the present application is applied to the downhole intelligent operation system; specifically, Figure 1 FIG. 1 shows a schematic diagram of a structure of an underground intelligent operation system provided by an embodiment of the present application. Figure 1 As shown, the underground intelligent operation system comprises at least: a mobile control center 100 deployed underground and at least one intelligent mining device 102; wherein the mobile control center 100 communicates with each intelligent mining device 102 via a target network 101 deployed underground.

[0028] It should be noted that the intelligent mining equipment 102 may be an intelligent mining equipment that can operate underground, such as an intelligent rock drilling trolley, an intelligent charging vehicle, an intelligent shovel loader, an intelligent crusher, an intelligent electric locomotive, etc., which has a remote communication function; or it may be an ordinary mining equipment equipped with a remote control device. For example, after a PLC (Programmable Logic Controller) controller is installed on ordinary mining equipment that requires manual driving and control, such as a rock drilling trolley, a charging vehicle, a shovel loader, a crusher, an electric locomotive, etc., the mobile control center 100 may send a remote control instruction to the PLC controller by remote communication with the PLC controller, so as to instruct the PLC controller to control the ordinary mining equipment to execute the received remote control instruction and perform underground operations (instead of the original manual control method for ordinary mining equipment); the specific equipment type and specific equipment quantity of the above-mentioned intelligent mining equipment 102 are not limited in any way in the embodiment of the present application.

[0029] In an optional embodiment of the present application, unlike the ground control center which is fixed in a well position, the present application can intelligently modify the trackless vehicle commonly used in underground operations, and on the basis of retaining the body of the trackless vehicle, according to the actual control requirements of the intelligent mining equipment 102 during the underground operation, a customized control cabin for remotely controlling the intelligent mining equipment 102 is installed on the vehicle body, thereby obtaining a mobile control center 100 that can move freely underground; that is, the mobile control center 100 mainly includes but is not limited to the vehicle body and the customized control cabin, and the underground workers can drive the mobile control center 100 to move underground, and remotely control the intelligent mining equipment 102 operating in the underground mining area through the remote operation platform contained in the customized control cabin.

[0030] It should be noted that, in addition to the above-mentioned remote operation platform, the customized control cabin may also include: underground mobile equipment communication system, emergency rescue equipment storage unit, electrical system and other electronic equipment and systems required for underground operations; wherein, the underground mobile equipment communication system is used to wirelessly communicate with various underground intelligent equipment including the above-mentioned intelligent mining equipment 102, and the emergency rescue equipment storage unit stores a variety of rescue equipment and rescue materials for emergency rescue in the mine (including but not limited to: long-term food and water sources, medical equipment, biochemical protective clothing, gas masks, oxygen masks, high-power lighting devices, etc.), electrical system (supports mobile control center 100 and supports external wired power supply, high-power UPS (Uninterruptible Power Supply, uninterruptible power supply) power supply and other flexible power supply methods. The specific composition structure of the above-mentioned customized control cabin is not limited in any way in the embodiment of the present application.

[0031] exist Figure 1Based on the underground intelligent operation system shown, Figure 2 A schematic diagram of a process flow of an underground intelligent operation method provided by an embodiment of the present application is shown; wherein, Figure 2 As shown, the underground intelligent operation process method includes steps S201-S203; specifically:

[0032] S201, the mobile control center sends a remote control instruction to the intelligent mining equipment through the target network.

[0033] Here, if Figure 1 As shown, after the mobile control center 100 and the intelligent mining equipment 102 access the target network 101, the mobile control center 100 and the intelligent mining equipment 102 can communicate through the target network 101. At this time, the mobile control center 100 can send remote control instructions to the intelligent mining equipment 102 through the target network 101, so as to remotely control the intelligent mining equipment 102 to perform underground mining tasks through the sent remote control instructions, without the need for manual operation of the intelligent mining equipment 102, thereby realizing unmanned mining in the underground operation area (that is, there is no need for underground operators to drive the intelligent mining equipment 102 to mine in the underground operation area).

[0034] Specifically, as an optional embodiment, the target network 101 may include: a fixed base station (i.e., a base station whose position cannot be moved) and a movable base station (i.e., a base station whose position can be changed); wherein a communication connection is established between the fixed base station and the mobile control center 100, a communication connection is established between the movable base station and the intelligent mining equipment 102, and a network connection is established between the fixed base station and the movable base station; at this time, on the side of the mobile control center 100, the mobile control center 100 can access the target network 101 through the above-mentioned fixed base station, and on the side of the intelligent mining equipment 102, the intelligent mining equipment 102 can access the target network 101 through the movable base station.

[0035] It should be noted that the fixed base station and the mobile control center 100 can communicate (i.e., establish a communication connection) through a wireless network or a wired network; the mobile base station and the intelligent mining equipment 102 can communicate through a wireless network or a wired network; the specific communication connection establishment method between the fixed base station and the mobile control center 100 and between the mobile base station and the intelligent mining equipment 102 is not limited in any way in the embodiment of the present application.

[0036] It should be noted that, in the target network 101, network interconnection (i.e., establishing a communication connection) can be achieved between the fixed base station and the movable base station through a wireless network or a wired network or a mixture of the two; the specific method for establishing a communication connection between the fixed base station and the movable base station in the target network 101 is not limited in any way in the embodiment of the present application.

[0037] S202, the intelligent mining equipment responds to receiving the remote control instruction, executes the first mining task in the first underground mining area according to the first mining task specified in the remote control instruction, and during the execution of the first mining task, transmits the task execution data of the first mining task to the mobile control center in real time through the target network.

[0038] Here, the underground operation area includes multiple underground mining areas; among them, the first underground mining area represents the underground mining area where the intelligent mining equipment 102 is currently located, and the specific task content of the first mining task is related to the equipment type to which the intelligent mining equipment 102 belongs.

[0039] Optionally, taking the example that the intelligent mining equipment 102 belongs to an intelligent rock drilling trolley (also called an intelligent drilling trolley), the mobile control center 100 can send a first remote control instruction to the intelligent rock drilling trolley through the target network 101, wherein the first remote control instruction is used to instruct the intelligent rock drilling trolley to drill at a target position within the current underground mining area (i.e., the first underground mining area) (the target position can be specified by the underground workers in the mobile control center 100); at this time, the first mining task specified in the first remote control instruction is "drilling at the target position within the first underground mining area".

[0040] Optionally, taking the case where the intelligent mining equipment 102 belongs to an intelligent charging vehicle, the mobile control center 100 can send a second remote control instruction to the intelligent charging vehicle through the target network 101, wherein the second remote control instruction is used to instruct the intelligent charging vehicle to load target explosives into target blastholes (such as blastholes drilled by the intelligent drilling rig at the above-mentioned target position) drilled in the current underground mining area (i.e., the first underground mining area) (the target blastholes and the specific explosive types of the target explosives can be specified by the underground workers in the mobile control center 100); at this time, the first mining task specified in the second remote control instruction is "loading target explosives into target blastholes in the first underground mining area."

[0041] Specifically, with the help of the image acquisition device (such as a camera module, a camera, etc.) configured on the intelligent mining equipment 102, the intelligent mining equipment 102 can, during the execution of the above-mentioned first mining task, use the working perspective of the intelligent mining equipment 102 (i.e., the first perspective) to collect the task execution screen of the first mining task (such as the intelligent rock drilling trolley can collect the drilling screen at the target position, the intelligent charging vehicle can collect the loading screen of the target explosive, etc.).

[0042] Specifically, with the help of various sensors (such as temperature sensors, pressure sensors, current sensors, voltage sensors, etc.) installed inside the intelligent mining equipment 102, the intelligent mining equipment 102 can also collect key status indicator data related to the working status of the intelligent mining equipment 102 (such as working current, working voltage, working temperature inside the equipment, etc.) during the execution of the above-mentioned first mining task.

[0043] Optionally, during the execution of the above-mentioned first mining task, the intelligent mining equipment 102 can package the collected task execution screen and the above-mentioned key status indicator data as the task execution data of the first mining task, and send the packaged task execution data to the mobile control center 100 with the help of the target network 101, so that the underground workers inside the mobile control center 100 can determine the task execution progress of the intelligent mining equipment 102 for the first mining task by checking the received task execution data, without the need for the underground workers to enter the intelligent mining equipment 102 and manually control the intelligent mining equipment 102 to perform the first mining task, which is beneficial to ensuring the underground operation safety of the underground workers.

[0044] S203: In response to receiving the task execution data, the mobile control center determines the task execution progress of the first mining task according to the task execution data.

[0045] Here, in combination with the relevant description content at the above step S202, as an optional embodiment, in step S203, the above task execution data may include: the task execution screen of the first mining task collected by the intelligent mining device 102 at the first perspective and the above key status indicator data related to the working status of the intelligent mining device 102; the repeated parts are not repeated here.

[0046] Specifically, at the mobile control center 100 side, the mobile control center 100 may process the received task execution data in the manner described in step a1 below:

[0047] Step a1: In response to receiving the task execution data, the task execution screen and the key status indicator data are displayed in different areas of the target display device through split-screen display.

[0048] Here, the above-mentioned target display device is installed in the mobile control center 100; for example, the target display device can be a display device installed on a remote operation platform in the mobile control center 100; the embodiment of the present application does not impose any limitation on the specific device type of the target display device and the specific installation location in the mobile control center 100.

[0049] Exemplary description, Figure 3 A schematic diagram of an interface for split-screen display of a task execution screen and key status indicator data provided by an embodiment of the present application is shown; Figure 3 As shown, on the side of the mobile control center 100, a graphical user interface 300 can be provided to the underground workers through the target display device; wherein, a plurality of virtual controls 301 are displayed on the graphical user interface 300, and each virtual control 301 can correspond to an intelligent mining device 102. The mobile control center 100 can respond to the underground workers' click operation on any virtual control 301, and according to the target intelligent mining device corresponding to the clicked virtual control 301, display the above-mentioned task execution screen sent by the target intelligent mining device in the first display area 310 on the graphical user interface 300 through a split-screen display method, and display the above-mentioned key status indicator data sent by the target intelligent mining device in the second display area 320 on the graphical user interface 300, so as to facilitate the underground workers to view the task execution data of the target intelligent mining device.

[0050] Combine the following Figure 1 The downhole intelligent operation system shown provides a detailed introduction to the structural details of the downhole intelligent operation system constructed in the embodiment of the present application and the implementation details of the downhole intelligent operation process method implemented.

[0051] In an optional embodiment of the present application, considering that underground workers can drive the mobile control center 100 to move underground, the mobile control center 100 and the intelligent mining equipment 102 can be deployed in any underground mining area in the underground area, and the intelligent mining equipment 102 can be remotely controlled by the mobile control center 100 to perform mining tasks in the currently deployed underground mining area. As an optional embodiment, in order to ensure the stability of the local communication network between the mobile control center 100 and the currently operating underground mining area (equivalent to ensuring the stability of the above-mentioned target network 101), the fixed base station in the above-mentioned target network 101 can be deployed underground in the following two ways, specifically:

[0052] Method 1: deploy the above-mentioned fixed base station on the mobile control center 100, that is, the above-mentioned fixed base station can be the first fixed base station deployed on the mobile control center 100. As the mobile control center 100 is deployed in the underground area, the mobile control center 100 can always access the target network 101 through the first fixed base station, without having to build multiple fixed base stations in all underground mining areas in advance, which effectively reduces the manpower, material and time cost investment in the construction of communication, positioning and other supporting systems caused by the change of mining areas in the mine, and is also conducive to reducing the risk of damage to the communication link and the resulting communication interruption due to the long distance between the mining equipment and the control center and the large number of nodes.

[0053] Method 2: Multiple fixed base stations are deployed in sequence at unit intervals in an underground tunnel (i.e., a passage in the underground area that can be used for vehicle travel). As the mobile control center 100 moves underground, the mobile control center 100 can select the second fixed base station that is closest to the multiple fixed base stations from the above-mentioned multiple fixed base stations, and access the target network 101 through the second fixed base station (that is, the second fixed base station represents the fixed base station that is closest to the mobile control center 100 among the multiple fixed base stations deployed in the underground tunnel).

[0054] Specifically, on the side of the intelligent mining device 102, the intelligent mining device 102 accesses the target network 101 through a movable base station; wherein, in order to facilitate the intelligent mining device 102 to follow the movement of the mobile control center 100 and to be deployed in the underground area, as an optional embodiment, the movable base station can be directly deployed on the intelligent mining device 102.

[0055] As another optional embodiment, the mobile base station can also be deployed in the underground mining area of ​​the current operation (to achieve signal coverage for the underground mining area, so that the intelligent mining equipment 102 can smoothly send the task execution data to the mobile control center 100 during the process of performing the underground mining task in the underground mining area). After the mining task in the underground mining area is completed, the underground workers in the mobile control center 100 can recycle the mobile base station to the mobile control center 100, and the mobile control center 100 will transport it to the next underground mining area, thereby realizing the mobile deployment of the mobile base station between the two adjacent underground mining areas. It is not necessary to wait for the construction of communication, positioning and other support systems in all underground mining areas before executing the underground mining task, which effectively reduces the manpower, material and time cost investment in the construction of communication, positioning and other support systems caused by the mine changing the mining area.

[0056] Specifically, in the above optional embodiment, taking the current operating underground mining area as the first underground mining area as an example, that is, the above movable base station is currently deployed in the first underground mining area, at this time, the mobile control center 100 can recover the above movable base station according to the method described in the following steps b1-b2:

[0057] Step b1, in response to the completion of the first mining task, the mobile control center 100 recovers the movable base station to the mobile control center 100, and carries the movable base station to move toward the second underground mining area.

[0058] Here, in the mobile control center 100, underground workers can determine the task execution progress of the first mining task based on the task execution data sent by the intelligent mining equipment 102, and after determining that the intelligent mining equipment 102 has completed the first mining task, the movable base station deployed in the first underground mining area is recovered to the mobile control center 100, and the mobile control center 100 is driven to carry the movable base station to move toward the next underground mining area (i.e., the second underground mining area).

[0059] Step b2: The mobile control center 100 responds by moving to the second underground mining area and redeploys the movable base station in the second underground mining area.

[0060] Here, after arriving at the next underground mining area (i.e., the second underground mining area), the underground workers can redeploy the movable base station from the mobile control center 100 to the key coverage points in the second underground mining area to achieve signal coverage for the second underground mining area, so that the intelligent mining equipment 102 can smoothly send the task execution data to the mobile control center 100 during the process of performing the underground mining task in the second underground mining area.

[0061] Specifically, after the first mining task is completed, as an optional embodiment, when the mobile control center 100 includes multiple underground workers, a driver can be assigned to the intelligent mining equipment 102 from the multiple underground workers, and the driver drives the intelligent mining equipment 102 to the next underground mining area (e.g., the second underground mining area) to perform the underground mining task.

[0062] Specifically, since the mobile control center 100 can remotely control the intelligent mining equipment 102, as another optional embodiment, the mobile control center 100 can also remotely control the intelligent mining equipment 102 to automatically go to the next underground mining area (e.g., the second underground mining area) to perform underground mining tasks according to the following steps c1-c2:

[0063] Step c1: In response to the completion of the first mining task, the mobile control center 100 moves toward the second underground mining area and sends a target movement control instruction to the intelligent mining device 102 .

[0064] Here, the target movement control instruction is used to instruct the intelligent mining device 102 to move according to the target path; wherein the path starting point of the target path is determined according to the current position of the intelligent mining device 102 in the first underground mining area, and the path end point of the target path is determined according to the position of the second underground mining area.

[0065] Specifically, after the completion of the first mining task, the mobile control center 100 can use the current position of the intelligent mining equipment 102 in the first underground mining area as the starting point of the path, select any operating point in the second underground mining area as the end point of the path for path planning, and determine the above-mentioned target path, thereby remotely controlling the intelligent mining equipment 102 to move along the target path. There is no need for underground workers to drive the intelligent mining equipment 102, and the intelligent mining equipment 102 can still be controlled to automatically go to the next underground mining area (the second underground mining area).

[0066] Step c2: In response to receiving the target movement control instruction, the intelligent mining device 102 moves toward the second underground mining area according to the target path indicated in the target movement control instruction.

[0067] Specifically, after receiving the above target movement control instruction, the intelligent mining device 102 can move according to the target path indicated in the target movement control instruction and automatically go to the next underground mining area (the second underground mining area).

[0068] Based on the above-mentioned underground intelligent operation process method provided by the embodiment of the present application, on the one hand, by deploying a mobile control center underground, underground workers can remotely control mining equipment in the mobile control center to perform underground operations. While realizing unmanned mining, it is no longer necessary to put forward high requirements on the global communication network of the underground intelligent operation system. It is only necessary to ensure the stability of the local communication network between the underground mobile control center and the underground mining area of ​​the current operation; on the other hand, underground workers can remotely control the operation of intelligent mining equipment in the mobile control center. When the mining task is completed in an underground mining area, the mobile control center, movable base stations and other equipment can be quickly moved and deployed to the next underground mining area, and the network deployment in the underground mining area can be quickly completed to realize the rapid remote operation of the equipment. It is no longer necessary to wait for the mine to complete the construction of communication, positioning and other support systems in all underground mining areas before executing underground mining tasks. The manpower, material resources and time cost investment in the construction of communication, positioning and other support systems generated by the mine for the replacement of mining areas are effectively reduced, and the communication link damage and the resulting communication interruption risk caused by the long distance between the mining equipment and the control center and the large number of nodes are reduced.

[0069] Based on the above-mentioned underground intelligent operation process method provided by the embodiment of the present application, the mobile control center deployed underground sends a remote control instruction to the intelligent mining equipment through the target network to control the intelligent mining equipment to perform the first mining task in the first underground mining area according to the first mining task specified in the remote control instruction, and control the intelligent mining equipment to transmit the task execution data of the first mining task to the mobile control center in real time, so as to determine the task execution progress of the first mining task according to the task execution data. In this way, the present application deploys the mobile control center underground, so that the underground workers can remotely control the mining equipment in the mobile control center to perform underground operations. While realizing unmanned mining, it is no longer necessary to put forward high requirements on the global communication network of the underground intelligent operation system. It is only necessary to ensure the stability of the local communication network between the underground mobile control center and the underground mining area of ​​the current operation, which effectively reduces the manpower, material resources and time cost investment in the construction of the communication, positioning and other support systems generated by the mine for the replacement of the mining area, and at the same time reduces the communication link damage caused by the long distance between the mining equipment and the control center and the large number of nodes, and the risk of communication interruption caused by the resulting communication interruption.

[0070] Based on the same inventive concept, the present application also provides a downhole intelligent operation system corresponding to the above-mentioned downhole intelligent operation process method. Since the principle of solving the problem by the downhole intelligent operation system in the embodiment of the present application is similar to the above-mentioned downhole intelligent operation process method in the embodiment of the present application, the implementation of the downhole intelligent operation system can refer to the implementation of the above-mentioned downhole intelligent operation process method, and the repeated parts will not be repeated.

[0071] like Figure 1 As shown, the underground intelligent operation system at least includes: a mobile control center 100 deployed underground and at least one intelligent mining device 102; wherein the mobile control center 100 and the intelligent mining device 102 communicate with each other through a target network 101 deployed underground;

[0072] The mobile control center 100 is used to send remote control instructions to the intelligent mining equipment 102 through the target network 101;

[0073] The intelligent mining device 102 is used to respond to receiving the remote control instruction, execute the first mining task in the first underground mining area according to the first mining task specified in the remote control instruction, and transmit the task execution data of the first mining task to the mobile control center 100 in real time through the target network 101 during the execution of the first mining task;

[0074] The mobile control center 100 is used to determine the task execution progress of the first mining task according to the task execution data in response to receiving the task execution data.

[0075] In an optional implementation, the target network 101 includes: a fixed base station and a movable base station; wherein a communication connection is established between the fixed base station and the mobile control center, a communication connection is established between the movable base station and the intelligent mining equipment 102, and a network connection is established between the fixed base station and the movable base station.

[0076] In an optional embodiment, the fixed base station includes: a first fixed base station deployed on the mobile control center 100 or a second fixed base station deployed in an underground tunnel; wherein the second fixed base station represents a fixed base station that is closest to the mobile control center 100 among multiple fixed base stations deployed in the underground tunnel.

[0077] In an optional implementation, the movable base station is currently deployed in the first underground mining area; the mobile control center 100 is further used to respond to the completion of the first mining task, recycle the movable base station to the mobile control center 100, and carry the movable base station to move toward the second underground mining area;

[0078] The mobile control center 100 is further configured to redeploy the movable base station in the second underground mining area in response to moving to the second underground mining area.

[0079] In an optional implementation, the task execution data includes: a task execution screen of the first mining task collected by the intelligent mining device 102 at the first perspective and key status indicator data related to the working status of the intelligent mining device 102; the mobile control center 100 is used to process the received task execution data by the following method:

[0080] In response to receiving the task execution data, the task execution screen and the key status indicator data are displayed in different areas of a target display device through a split-screen display method; wherein the target display device is installed in the mobile control center 100.

[0081] In an optional embodiment, the mobile control center 100 is further used to respond to the completion of the first mining task, move toward the second underground mining area, and send a target movement control instruction to the intelligent mining device 102; wherein the target movement control instruction is used to instruct the intelligent mining device 102 to move according to the target path; the path starting point of the target path is determined according to the current position of the intelligent mining device 102 in the first underground mining area, and the path end point of the target path is determined according to the position of the second underground mining area;

[0082] The intelligent mining device 102 is configured to move toward the second underground mining area according to the target path indicated in the target movement control instruction in response to receiving the target movement control instruction.

[0083] In an optional implementation, the mobile control center 100 is provided with an emergency rescue equipment storage unit, wherein the emergency rescue equipment storage unit stores a variety of rescue equipment and rescue materials for implementing emergency rescue underground.

[0084] Based on the same inventive concept, the present application also provides electronic equipment corresponding to the above-mentioned downhole intelligent operation process method. Since the principle of solving the problem by the electronic equipment in the embodiment of the present application is similar to the above-mentioned downhole intelligent operation process method in the embodiment of the present application, the implementation of the electronic equipment can refer to the implementation of the above-mentioned downhole intelligent operation process method, and the repeated parts will not be repeated.

[0085] Figure 4 A structural diagram of an electronic device 400 provided in an embodiment of the present application includes: a processor 401, a memory 402 and a bus 403, the memory 402 stores machine-readable instructions executable by the processor 401, when the electronic device runs a downhole intelligent operation process method such as in the embodiment, the processor 401 communicates with the memory 402 through the bus 403, and the processor 401 executes the machine-readable instructions, wherein the processor 401 implements the above-mentioned downhole intelligent operation process method when executing the machine-readable instructions.

[0086] Specifically, the above-mentioned memory 402 and processor 401 can be general-purpose memory and processor, which are not specifically limited here. When the processor 401 runs the computer program stored in the memory 402, it can execute the above-mentioned downhole intelligent operation process method.

[0087] Corresponding to the downhole intelligent operation process method in the present application, an embodiment of the present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned downhole intelligent operation process method are executed.

[0088] Specifically, the storage medium can be a general storage medium, such as a mobile disk, a hard disk, etc. When the computer program on the storage medium is run, the above-mentioned downhole intelligent operation process method can be executed.

[0089] In the embodiments provided in the present application, it should be understood that the disclosed systems and methods can be implemented in other ways. The system embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, indirect coupling or communication connection of systems or units, which can be electrical, mechanical or other forms.

[0090] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0091] In addition, each functional unit in the embodiments provided in the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0092] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk, and other media that can store program codes.

[0093] It should be noted that similar numbers and letters represent similar items in the following figures. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description and are not to be understood as indicating or implying relative importance.

[0094] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the present application, which are used to illustrate the technical solutions of the present application, rather than to limit them. The protection scope of the present application is not limited thereto. Although the present application is described in detail with reference to the above-mentioned embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-mentioned embodiments within the technical scope disclosed in the present application, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present application. They should all be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.

Claims

1. A method for underground intelligent operation, characterized in that: Applied to an underground intelligent operation system, the underground intelligent operation system at least comprises: a mobile control center deployed underground and at least one intelligent mining device; wherein the mobile control center communicates with the intelligent mining device through a target network deployed underground; the target network comprises: a fixed base station and a movable base station; wherein a communication connection is established between the fixed base station and the mobile control center, a communication connection is established between the movable base station and the intelligent mining device, and a network connection is established between the fixed base station and the movable base station; the underground intelligent operation process method comprises: The mobile control center sends a remote control instruction to the intelligent mining equipment through the target network; In response to receiving the remote control instruction, the intelligent mining device executes the first mining task in the first underground mining area according to the first mining task specified in the remote control instruction, and during the execution of the first mining task, transmits the task execution data of the first mining task to the mobile control center in real time through the target network; In response to receiving the task execution data, the mobile control center determines the task execution progress of the first mining task according to the task execution data; The movable base station is currently deployed in the first underground mining area; the underground intelligent operation process method further includes: In response to the completion of the first mining task, the mobile control center recovers the movable base station to the mobile control center, and carries the movable base station to move toward the second underground mining area; In response to the movement to the second downhole mining area, the mobile control center redeploys the movable base station in the second downhole mining area.

2. The underground intelligent operation process method according to claim 1 is characterized in that: The fixed base station includes: a first fixed base station deployed on the mobile control center or a second fixed base station deployed in an underground tunnel; wherein the second fixed base station represents a fixed base station that is closest to the mobile control center among multiple fixed base stations deployed in the underground tunnel.

3. The underground intelligent operation process method according to claim 1 is characterized in that: The task execution data includes: the task execution picture of the first mining task collected by the intelligent mining device at the first viewing angle and key status indicator data related to the working status of the intelligent mining device; the mobile control center processes the received task execution data by the following method: In response to receiving the task execution data, the mobile control center displays the task execution screen and the key status indicator data in different areas of a target display device through a split-screen display; wherein the target display device is installed in the mobile control center.

4. The underground intelligent operation process method according to claim 1 is characterized in that: The underground intelligent operation process method also includes: The mobile control center moves toward the second underground mining area in response to the completion of the first mining task, and sends a target movement control instruction to the intelligent mining device; wherein the target movement control instruction is used to instruct the intelligent mining device to move along a target path; the path starting point of the target path is determined according to the current position of the intelligent mining device in the first underground mining area, and the path end point of the target path is determined according to the position of the second underground mining area; In response to receiving the target movement control instruction, the intelligent mining equipment moves toward the second underground mining area according to the target path indicated in the target movement control instruction.

5. The underground intelligent operation process method according to claim 1 is characterized in that: The mobile control center is provided with an emergency rescue equipment storage unit, wherein the emergency rescue equipment storage unit stores a variety of rescue equipment and rescue materials for implementing emergency rescue underground.

6. An underground intelligent operation system, characterized in that: The underground intelligent operation system at least comprises: a mobile control center deployed underground and at least one intelligent mining device; wherein the mobile control center communicates with the intelligent mining device via a target network deployed underground; the target network comprises: a fixed base station and a movable base station; wherein a communication connection is established between the fixed base station and the mobile control center, a communication connection is established between the movable base station and the intelligent mining device, and a network connection is established between the fixed base station and the movable base station; The mobile control center is used to send remote control instructions to the intelligent mining equipment through the target network; The intelligent mining equipment is used to respond to receiving the remote control instruction, execute the first mining task in the first underground mining area according to the first mining task specified in the remote control instruction, and transmit the task execution data of the first mining task to the mobile control center in real time through the target network during the execution of the first mining task; The mobile control center is used to determine the task execution progress of the first mining task according to the task execution data in response to receiving the task execution data; The movable base station is currently deployed in the first underground mining area; the mobile control center is also used for: In response to the completion of the first mining task, the movable base station is recovered to the mobile control center, and the movable base station is carried to move toward the second underground mining area; In response to moving to the second downhole mining area, the movable base station is redeployed within the second downhole mining area.

7. An electronic device, characterized in that: include: A processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor. When the electronic device is running, the processor and the memory communicate via the bus. When the machine-readable instructions are executed by the processor, the steps of the downhole intelligent operation process method as described in any one of claims 1 to 5 are performed.

8. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the underground intelligent operation process method as described in any one of claims 1 to 5 are executed.