Method for determining effective water content information of material absorption steam and storage medium

By obtaining and calculating the flow distribution, moisture content and material loss information in the cigarette shred production process, we can accurately determine the effective moisture content information of the material absorbing steam, solve the problem of changes in steam moisture content affecting material quality control, and improve the accuracy of the production process. sex and efficiency.

CN118716660AActive Publication Date: 2024-10-01CHINA TOBACCO JIANGSU INDAL
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410705273.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2024-10-01
Estimated Expiration
2044-06-03

AI Technical Summary

Technical Problem

In the cigarette shred production process, changes in the moisture content of steam are greatly affected by the environment, making it difficult to accurately control the information on the effective moisture content of the steam absorbed by the material.

Method used

By obtaining the flow distribution information, moisture content information and material loss information within the preset collection time period, the cumulative value of the process is calculated, and then the effective moisture content information of the material absorbing steam is determined, which is implemented by combining hardware and software.

Benefits of technology

It achieves accurate and convenient determination of effective moisture content information for materials absorbing steam, and improves quality control capabilities in the cigarette shred production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118716660A_ABST
    Figure CN118716660A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses a method for determining effective water content information of material absorption steam and a storage medium. The method comprises the following steps: acquiring flow distribution information, water content information and material loss information corresponding to a to-be-detected process of a target product within a preset acquisition duration; the to-be-detected process is a target product production process meeting information acquisition conditions in a target cigarette factory, and the flow distribution information comprises material adding flow, water adding flow and steam adding flow; the moisture content information comprises the inlet moisture content and the outlet moisture content of the material at the to-be-detected process; determining a process accumulated value corresponding to the to-be-detected process based on the flow distribution information, a preset acquisition duration and a preset acquisition frequency; and based on the process accumulated value, the moisture content information and the material loss information, determining material absorption steam effective moisture content information corresponding to the to-be-detected process. Through the technical scheme of the embodiment of the invention, the effective water content information of the steam absorbed by the material can be accurately and conveniently determined.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present invention relate to the technical field of cigarette shred production, and in particular to a method for determining effective water content information of steam absorbed by a material and a storage medium. Background Art

[0002] In the production process of cigarette shreds, steam is mainly used to provide heat energy and atomize water to ensure the quality of the material (leaves or shreds). For example, by dynamically adjusting the amount of water and steam added, the material can meet the process production quality requirements. However, in different seasonal environments, the quality of steam (temperature and water content, etc.) will be affected to varying degrees, resulting in the inability to effectively control the quality of the materials produced using this steam.

[0003] At present, the steam moisture content detection method for gas is usually used to detect the change in steam moisture content, and the effective moisture content information of the material absorbing steam is inferred from the detected change in steam moisture content. However, the moisture content of steam will change greatly due to environmental influences, making this indirect method of inferring the effective moisture content information of the material absorbing steam inaccurate. Summary of the invention

[0004] The embodiment of the present invention provides a method for determining effective water content information of a material absorbing steam and a storage medium, so as to accurately and conveniently determine the effective water content information of a material absorbing steam.

[0005] In a first aspect, an embodiment of the present invention provides a method for determining effective water content information of a material absorbing steam, comprising:

[0006] Obtain the flow distribution information, moisture content information and material loss information corresponding to the target product in the process to be detected within the preset collection time; wherein the process to be detected is the target product production process in the target cigarette factory that meets the information acquisition conditions, and the flow distribution information includes: material addition flow, water addition flow and steam addition flow; the moisture content information includes: the inlet moisture content and outlet moisture content of the material at the process to be detected;

[0007] Based on the flow distribution information, the preset collection time and the preset collection frequency, determine the process cumulative value corresponding to the process to be detected, wherein the process cumulative value includes: the material addition cumulative value, the water addition cumulative value and the steam addition cumulative value;

[0008] Based on the process cumulative value, the moisture content information and the material loss information, the effective moisture content information of the material absorbing steam corresponding to the process to be detected is determined.

[0009] In a second aspect, an embodiment of the present invention provides a device for determining information on effective water content of a material absorbing steam, comprising:

[0010] An information acquisition module is used to acquire flow distribution information, moisture content information and material loss information corresponding to the target product in the process to be detected within a preset acquisition time; wherein the process to be detected is a production process of the target product in the target cigarette factory that meets the information acquisition conditions, and the flow distribution information includes: material addition flow, water addition flow and steam addition flow; the moisture content information includes: inlet moisture content and outlet moisture content of the material at the process to be detected;

[0011] A process cumulative value determination module, used to determine the process cumulative value corresponding to the process to be detected based on the flow distribution information, the preset collection time and the preset collection frequency, wherein the process cumulative value includes: a material addition cumulative value, a water addition cumulative value and a steam addition cumulative value;

[0012] The module for determining the effective water content information of steam absorbed by the material is used to determine the effective water content information of steam absorbed by the material corresponding to the process to be detected based on the process cumulative value, the moisture content information and the material loss information.

[0013] In a third aspect, an embodiment of the present invention provides an electronic device, the electronic device comprising:

[0014] one or more processors;

[0015] A memory for storing one or more programs;

[0016] When the one or more programs are executed by the one or more processors, the one or more processors implement the method for determining the effective water content information of steam absorption by a material as provided in any embodiment of the present invention.

[0017] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements a method for determining information on effective water content of steam absorbed by a material as provided in any embodiment of the present invention.

[0018] In a fifth aspect, an embodiment of the present invention provides a computer program product, including a computer program, which, when executed by a processor, implements a method for determining information on effective water content in steam absorption by a material as provided in any embodiment of the present invention.

[0019] The technical solution of the embodiment of the present invention is to obtain the flow distribution information, moisture content information and material loss information of the target product in the process to be detected within a preset collection time; wherein the process to be detected is a production process of the target product in the target cigarette factory that meets the information acquisition conditions, and the flow distribution information includes: material addition flow, water addition flow and steam addition flow; the moisture content information includes: the inlet moisture content and the outlet moisture content of the material at the process to be detected; based on the flow distribution information, the preset collection time and the preset collection frequency, the process cumulative value corresponding to the process to be detected is determined, wherein the process cumulative value includes: material addition cumulative value, water addition cumulative value and steam addition cumulative value; based on the process cumulative value, the moisture content information and the material loss information, the effective moisture content information of the material absorbing steam corresponding to the process to be detected is determined, so that the effective moisture content information of the material absorbing steam can be accurately and conveniently determined.

[0020] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 It is a flow chart of a method for determining effective water content information of steam absorption by a material provided in Example 1 of the present invention;

[0023] Figure 2 This is an example diagram of a material production process involved in Embodiment 1 of the present invention;

[0024] Figure 3 It is a flow chart of a method for determining effective water content information of steam absorption by a material provided in the second embodiment of the present invention;

[0025] Figure 4 This is a statistical example diagram of the estimated value of the inlet moisture of a loosening and regaining process involved in the second embodiment of the present invention;

[0026] Figure 5 This is a statistical example diagram of the amount of steam that can be measured in a loosening and rehumidification process according to the second embodiment of the present invention;

[0027] Figure 6 This is a statistical example diagram of the total amount of water added in a loosening and moisture regaining process involved in the second embodiment of the present invention;

[0028] Figure 7 This is a statistical example diagram of the effective water content of steam absorbed by a loose rehumidification process material involved in the second embodiment of the present invention;

[0029] Figure 8 This is a statistical example diagram of the total steam application amount in the leaf shreds rehumidification process involved in the second embodiment of the present invention;

[0030] Fig. 9 This is a statistical example diagram of the total amount of water added in the leaf shreds rehumidification process involved in the second embodiment of the present invention;

[0031] Fig.10 This is a statistical example diagram of the effective moisture content of steam absorbed by materials in a leaf shred rehumidification process involved in the second embodiment of the present invention;

[0032] Fig.11 It is a structural schematic diagram of a device for determining information on effective water content in steam absorption by a material provided in Embodiment 3 of the present invention;

[0033] Fig.12 It is a structural schematic diagram of an electronic device for implementing a method for determining information on effective water content of a material absorbing steam according to an embodiment of the present invention. DETAILED DESCRIPTION

[0034] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0035] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0036] Before introducing the technical solution of the embodiment of the present invention, the scenario used by the embodiment of the present invention is introduced. The technical solution of the embodiment of the present invention can be applied to the leaf making process section and the leaf shred making process section in the production process of cigarette shreds. There are multiple processing steps in both the leaf making process section and the leaf shred making process section. The leaf making process section includes: loosening and rehumidification process, vacuum rehumidification process, tunnel rehumidification process, leaf feeding process and leaf heating and humidification process. The leaf shred making process section includes: shredding process, leaf shred rehumidification process, leaf shred drying process and blending and flavoring process. When the steam reaches a saturated state (dry steam), that is, the water content in the steam is 0, this is the optimal state required for production control, and when the steam is in an unsaturated state, that is, the steam contains moisture, it will directly affect the stability control of the material outlet moisture and outlet temperature to a certain extent, and then affect the sensory quality of the cigarette product.

[0037] Embodiment 1

[0038] Figure 1 A flowchart of a method for determining effective water content information of steam absorbed by a material is provided for the first embodiment of the present invention. This embodiment is applicable to the case of determining effective water content information of steam absorbed by a material. The method can be performed by a device for determining effective water content information of steam absorbed by a material. The device for determining effective water content information of steam absorbed by a material can be implemented in the form of hardware and / or software. The device for determining effective water content information of steam absorbed by a material can be configured in an electronic device. Figure 1 As shown, the method includes:

[0039] S110, obtaining flow distribution information, moisture content information, and material loss information corresponding to the target product in the process to be detected within a preset collection time.

[0040] Among them, the process to be detected is the target product production process in the target cigarette factory that meets the information acquisition conditions. The target cigarette factory may refer to the production and processing plant of the materials (leaves or leaf shreds) required for cigarette production. The information acquisition condition may refer to the ability to accurately obtain the flow distribution information and moisture content information of a batch of brand materials. The flow distribution information includes: material addition flow, water addition flow and steam addition flow. For example, the flow distribution information may be but is not limited to the distribution information of mass flow or the distribution information of volume flow. In the technical scheme of the embodiment of the present invention, the distribution information of mass flow is usually used to determine the effective moisture content information of the material absorbing steam. Therefore, the collected non-mass flow can be converted into mass flow. The moisture content information includes: the inlet moisture content and the outlet moisture content of the material at the process to be detected. The preset collection time can set the preset information collection time. For example, the preset collection time can be the time required to produce a batch of materials or the integer multiple of the time required to produce a batch of materials. The target product may refer to a batch of materials produced. For example, the target product may be a leaf or leaf shreds. Material loss information may refer to the amount of material loss during the production and processing process. For example, the material loss information may be the dry mass loss information of the material in the process to be detected.

[0041] Specifically, there are multiple processing procedures in both the leaf making process section and the leaf shred making process section. The process to be detected needs to determine the process to be detected that meets the information acquisition conditions based on the actual situation of each target cigarette factory. The process to be detected may include at least one processing process. It can be understood that the technical solution of the embodiment of the present invention can determine the effective water content information of the material absorbing steam across processes. The information acquisition conditions are set to eliminate the processes whose quality is difficult to measure in each processing process, so as to flexibly determine the process to be detected for each target cigarette factory.

[0042] For example, Figure 2 An example diagram of a material production process is given. Figure 2 In the blade making process, in order to avoid the situation that the flow distribution information of the vacuum rehumidification process is difficult to measure and the open steam of the tunnel rehumidification process is difficult to measure, the loose rehumidification process that meets the information acquisition conditions and before entering the tunnel rehumidification process are taken as the processes to be detected, that is, Figure 2 A area in the figure. Flow distribution information is obtained based on a flow scale or mass flow meter before the loosening and rehydration process. Inlet moisture content distribution information of the material is obtained based on a near-infrared moisture meter before the loosening and rehydration process. Inlet moisture content distribution information of the material is obtained based on a near-infrared moisture meter before the tunnel-type rehydration process. The material loss information can be the dry material loss amount estimated based on the historical production data between the loosening and rehydration process and the tunnel-type rehydration process (the process to be tested).

[0043] For example, see Figure 2In the shredded leaf process, considering that there is no flow meter and inlet moisture meter in the shredded leaf drying process, and the water loss in the drying process is difficult to measure, and there is no steam operation in the blending and flavoring process, the shredded leaf moisture regain process that meets the information acquisition conditions is taken as the process to be detected, that is, Figure 2 Middle B area. Flow distribution information is obtained based on a flow scale or mass flow meter before the leaf rehydration process. Moisture content information is obtained based on a near-infrared moisture meter before and after the leaf rehydration process.

[0044] It should be noted that due to the different material states of blades and blade filaments, in the usage scenario, if there are both blade making process sections and blade filament making process sections, it is necessary to separate the blade making process sections and the blade filament making process sections so as to use targeted steam information determination methods for different process sections, thereby further improving the accuracy of determining the effective water content information of the material absorbing steam.

[0045] S120. Determine the process cumulative value corresponding to the process to be detected based on the flow distribution information, the preset collection time and the preset collection frequency.

[0046] The process cumulative value includes: the cumulative value of adding materials, the cumulative value of adding water and the cumulative value of adding steam. The process cumulative value can be used to characterize the total amount of material applied by the process to be detected within the preset collection time. The preset collection frequency can refer to the sampling frequency of collecting flow distribution information within the preset collection time.

[0047] Specifically, the flow distribution information can be understood as continuous flow information within a preset collection time. The unit of mass flow distribution information can be (kg / h), and the unit of process cumulative value can be (kg). Determine the preset collection period based on the preset collection frequency. Determine the mass flow corresponding to each preset collection moment from the flow distribution information based on the preset collection frequency, and use each mass flow as the mass flow corresponding to the preset collection period. Multiply each preset collection period and the corresponding mass flow, and add the multiplication results to obtain the process cumulative value corresponding to the process to be detected.

[0048] Based on the above technical solution, S120 may include: determining multiple first flow distribution points based on a preset acquisition frequency and flow distribution information; interpolating each first flow distribution point based on cubic spline interpolation to determine the time step; determining the process cumulative value corresponding to the process to be detected based on the first flow distribution point, the time step and the preset acquisition time.

[0049] Among them, the first flow distribution point may refer to a flow distribution point determined from continuous flow distribution information. The first flow distribution point may be understood as a collection point corresponding to a preset collection frequency. The time step may refer to the difference between two time points. The smaller the time step, the higher the accuracy of the numerical solution (process cumulative value). The time step needs to be less than the preset collection period. For example, if the preset collection frequency is 0.5 Hz, that is, a first flow distribution point is collected every 2 seconds, then the time step may be 1 second.

[0050] Specifically, the flow distribution information is sampled based on the preset acquisition frequency to determine the first flow distribution point corresponding to each preset sampling moment; the first flow distribution point is subjected to difference processing based on cubic spline interpolation, and a time step smaller than the preset acquisition cycle is obtained. Based on the first flow distribution point, the time step and the preset acquisition duration, a trapezoidal numerical integration process is performed to determine the process cumulative value corresponding to the process to be detected, thereby using the time step to improve the accuracy of determining the process cumulative value, and further improve the accuracy of determining the effective water content information of the material absorbing steam.

[0051] On the basis of the above technical solution, "determining the process cumulative value corresponding to the process to be detected based on the first flow distribution point, the time step and the preset collection time" may include: determining the second flow distribution point corresponding to each first flow distribution point based on each first flow distribution point and the time step; determining the first flow distribution value corresponding to each first flow distribution point and the second flow distribution value corresponding to each second flow distribution point from the flow distribution information; performing trapezoidal integration processing based on the time step, the preset collection time, the first flow distribution value and the second flow distribution value to determine the process cumulative value corresponding to the process to be detected.

[0052] Among them, the second flow distribution point may refer to a flow distribution point after a more detailed division of the time step. There may be at least one second flow distribution point between two consecutive first flow distribution points. The more the number of second flow distribution points, the more accurately the process cumulative value is determined. The first flow distribution value may refer to the mass flow value corresponding to the first flow distribution point in the flow distribution information, and its unit is (kg / h). The second flow distribution value may refer to the mass flow value corresponding to the second flow distribution point in the flow distribution information, and its unit is (kg / h).

[0053] Specifically, the following formula (1) can be used to determine the process cumulative value, thereby improving the accuracy of determining the process cumulative value and further improving the accuracy of determining the effective water content information of the material absorbing steam.

[0054]

[0055] Among them, G(t) can be expressed as the cumulative value of the process corresponding to the process to be detected. g(t) can be expressed as the flow distribution information corresponding to the first flow distribution point in the process to be detected, that is, the first flow distribution value. T can be expressed as the preset collection time. m can be expressed as the time step. g(t+m) can be expressed as the flow distribution information corresponding to the second flow distribution point in the process to be detected, that is, the second flow distribution value. t can be expressed as the preset collection time.

[0056] For example, the above operation can be used to determine the process cumulative value of a batch of materials (target products) in a certain time period in the process to be detected. For example, the process cumulative value of all batches of materials from August 2021 to August 2022 can be determined.

[0057] S130. Based on the process cumulative value, moisture content information and material loss information, determine the effective moisture content information of the material absorbing steam corresponding to the process to be detected.

[0058] The effective water content information of steam absorbed by the material may refer to the effective steam information absorbed by the material. For example, the effective water content information of steam absorbed by the material may include but is not limited to the effective water content of steam absorbed by the material and the effective water content rate of steam absorbed by the material.

[0059] Specifically, the total mass of the material produced by the process to be detected is determined based on the process cumulative value and the material loss information, and the dry material mass and the effective water content of the material absorbed by steam are determined based on the total material mass and moisture content.

[0060] The technical solution of the embodiment of the present invention is to obtain the flow distribution information, moisture content information and material loss information of the target product in the process to be detected within a preset collection time; wherein the process to be detected is a production process of the target product in the target cigarette factory that meets the information acquisition conditions, and the flow distribution information includes: material addition flow, water addition flow and steam addition flow; the moisture content information includes: the inlet moisture content and the outlet moisture content of the material at the process to be detected; based on the flow distribution information, the preset collection time and the preset collection frequency, the process cumulative value corresponding to the process to be detected is determined, wherein the process cumulative value includes: the material addition cumulative value, the water addition cumulative value and the steam addition cumulative value; based on the process cumulative value, the moisture content information and the material loss information, the effective moisture content information of the material absorbing steam corresponding to the process to be detected is determined, so that the effective moisture content information of the material absorbing steam can be accurately and conveniently determined.

[0061] Embodiment 2

[0062] Figure 3This is a flow chart of a method for determining effective water content information of material absorbing steam provided in the second embodiment of the present invention. Based on the above embodiments, this embodiment describes in detail the process of determining effective water content information of material absorbing steam. The explanations of the terms that are the same or corresponding to the above embodiments are not repeated here. Figure 3 As shown, the method includes:

[0063] S310, obtaining flow distribution information, moisture content information and material loss information of the target product in the process to be tested within a preset collection time.

[0064] Among them, the process to be tested is the target product production process in the target cigarette factory that meets the information acquisition conditions, and the flow distribution information includes: material addition flow, water addition flow and steam addition flow; the moisture content information includes: the inlet moisture content and outlet moisture content of the material at the process to be tested.

[0065] S320: Determine the process cumulative value corresponding to the process to be detected based on the flow distribution information, the preset collection time and the preset collection frequency.

[0066] Among them, the process cumulative value includes: the cumulative value of adding materials, the cumulative value of adding water and the cumulative value of adding steam.

[0067] S330. Based on the status information corresponding to the material loss information, determine the method for determining the steam information corresponding to the process to be detected.

[0068] The state information may refer to whether the information is acquired. For example, the state information may include a null value state and a non-null value state.

[0069] Specifically, since material loss information cannot be obtained for some processes to be inspected, but material loss information can be obtained for other processes to be inspected, targeted steam information determination methods can be used for these two types of processes to be inspected, thereby improving the versatility of the method for determining the effective water content information of material absorption of steam, and also using targeted methods to more accurately determine the effective water content information of material absorption of steam corresponding to the process to be inspected.

[0070] Based on the above technical solution, S330 may include: if the status information corresponding to the material loss information is null value information, then determining the first steam information determination method corresponding to the process to be detected; if the status information corresponding to the material loss information is non-null value information, then determining the second steam information determination method corresponding to the process to be detected.

[0071] Among them, the first steam information determination method can be an expression group constructed by using the expression of the mass conservation principle of the dry matter mass of the material, the expression of the mass conservation principle of each production link of the material (the amount of material applied, the amount of water applied, the amount of steam applied), the expression of the inlet moisture content distribution of the material, and the expression of the outlet moisture content distribution of the material. The second steam information determination method can be an expression group constructed by using the expression of the mass conservation principle of each production link of the material (the amount of material applied, the amount of water applied, the amount of steam applied), the expression of the inlet moisture content distribution of the material, the expression of the outlet moisture content distribution of the material, and the expression of the effective moisture content of the material absorbed by steam. The advantage of this setting is that the effective moisture content (rate) of the material absorbing steam can be directly determined, rather than inferring the effective moisture content (rate) of the material absorbing steam through gas. In addition, the influencing factors of different external and internal moisture discharge openings involved in the process to be tested are considered and included in the calculation of the effective moisture content (rate) of steam absorbed by the material. From the perspective of the material applying steam, the effective moisture content (rate) of steam absorbed by the material includes its own moisture and the steam condensed into water absorbed by the material due to the temperature difference after contact with the material. Therefore, the effective moisture content (rate) of steam absorbed by the material can also be used to intuitively characterize the impact of changes in steam quality on the material processing process during the production process.

[0072] S340. Based on the steam information determination method, the process cumulative value, the moisture content information and the material loss information, determine the effective moisture content information of the steam absorbed by the material corresponding to the process to be detected.

[0073] Specifically, the pre-set steam information determination method for different processes to be tested and various parameters (process cumulative value, moisture content information and material loss information) can be used to accurately determine the effective moisture content information of the material absorbing steam corresponding to the process to be tested.

[0074] On the basis of the above technical scheme, S340 may include: if the first steam information determination method corresponding to the process to be detected is used, the process cumulative value and moisture content information are substituted into the mass conservation formula of the process to be detected, the inlet material moisture content calculation formula of the process to be detected, and the outlet material moisture content calculation formula of the process to be detected to determine the effective moisture content information of the material absorbing steam corresponding to the process to be detected; if the second steam information determination method is used, the process cumulative value, moisture content information and material loss information are substituted into the mass conservation formula of the process to be detected, the inlet material moisture content calculation formula of the process to be detected, the outlet material moisture content calculation formula of the process to be detected, and the effective moisture content calculation formula of the material absorbing steam to determine the effective moisture content information of the material absorbing steam corresponding to the process to be detected.

[0075] Among them, the mass conservation formula includes the dry matter mass conservation formula and the applied matter mass conservation formula.

[0076] The dry matter mass conservation formula (2) is as follows.

[0077]

[0078] Wherein, L can be expressed as the cumulative value of added materials. i can be expressed as different production batches. k can be expressed as the first processing step in the process to be tested. x can be expressed as the inlet moisture content of the process to be tested at steady state. n can be expressed as the number of process intervals between the last processing step and the first processing step in the process to be tested. ε can be expressed as the dry material loss between the last processing step and the first processing step in the process to be tested, i.e., the material loss information.

[0079] The applied material mass conservation formula (3) is as follows.

[0080]

[0081] The explanations of the terms that are the same as or corresponding to the parameters in the above formula are not repeated here. S can be expressed as the cumulative value of water addition. ZS can be expressed as the effective water content of the material absorbed by the steam in the process to be tested. y can be expressed as the outlet moisture content of the process to be tested in a steady state.

[0082] It should be noted that the embodiments of the present invention combine the two basic principles of conservation of material dry matter and conservation of applied material mass, wherein the parameters involved not only cover the applied material mass, applied water mass, and applied steam mass, but also include other measurable applied material masses involved in the production process, such as the mass of the liquid applied in the blade feeding process.

[0083] The calculation formula (4) for the effective moisture content of the material after steam absorption is as follows.

[0084]

[0085] The explanations of the terms that are the same as or corresponding to the parameters in the above formula are not repeated here. W can be expressed as material. Z can be expressed as the cumulative value of steam addition. It can be expressed as the effective moisture content of steam absorbed by the material in the process to be tested.

[0086] The calculation formula (5) for the moisture content of the inlet material of the process to be tested and the calculation formula (6) for the moisture content of the outlet material of the process to be tested are as follows.

[0087]

[0088] The explanations of the terms that are the same as or corresponding to the parameters in the above formula are not repeated here. 0 It can be expressed as the starting time when a batch of materials reaches steady state. 1It can be expressed as the cut-off time for a batch of materials to reach a steady state. f is the preset collection frequency.

[0089] For example, in the blade making process, k is 1, indicating the calculation of the loosening and rehydration process, and n is 2, indicating the number of intervals between the loosening and rehydration process and the tunnel rehydration process. There are 505 batches in the data from August 2021 to August 2022, that is, the value range of i is an integer from 1 to 505. Taking i as 1 as an example, the cumulative mass of the first batch of blades (cumulative value of added materials) is The actual amount of water added is 4800.00kg (cumulative value of water added). The moisture content at the blade outlet is 203.84 kg. 18.00%, total steam volume can be measured (cumulative value of steam addition) 219.70kg, the inlet moisture of the tunnel rehumidification process The cumulative amount of materials is 17.64%. The dry matter loss ε is 5015.90 kg, and the dry matter loss ε is 86 kg. The estimated moisture value at the entrance of the loosening and rehydration process is calculated by using the above formulas (2), (3), (5) and (6): 12.14%, effective water content of material absorbing steam It is 139.18kg.

[0090] For example, in the above example, in the leaf shreds making process, k is 7, indicating the leaf shreds rehydration process. There are 505 batches in the data from August 2021 to August 2022, that is, the value range of i is an integer from 1 to 505. Taking i as 1 as an example, the cumulative mass of the first batch of leaf shreds (cumulative value of added materials) is The actual amount of water added is 4927.20kg (cumulative value of water added). The moisture content of the leaf inlet is 166.02kg. The moisture content of the leaf export is 16.61%. The total steam application amount (cumulative value of steam addition) is 22.24%. The effective water content of the material absorbed by steam is 251.51 kg. The effective moisture content of the material absorbing steam is 190.72kg. It is 75.83%.

[0091] It should be noted that, in the embodiment of the present invention, the moisture content of the incoming tobacco leaves (raw materials required for cigarette production) in the first process of the entire production line can be determined, and the problem of moisture meter detection drift and judgment impact caused by differences in incoming materials in different seasons can be solved from the calculation dimension, and the workload of manual repeated moisture measurement can be reduced.

[0092] The technical solution of the embodiment of the present invention determines the steam information determination method corresponding to the process to be detected based on the status information corresponding to the material loss information; wherein, there are differences in the use of material loss information in some processes to be detected, such as some processes to be detected do not need to use material loss information, that is, the status information is null value information, and other processes to be detected need to use material loss information, that is, the status information is non-null value information, so the state information corresponding to the material loss information can be used to accurately determine the steam information determination method corresponding to the process to be detected, and based on the steam information determination method, the process cumulative value, the moisture content information and the material loss information, the effective water content information of the material absorbing steam corresponding to the process to be detected is determined, thereby achieving accurate determination of the effective water content information of the material absorbing steam for different processes to be detected, and further improving the accuracy of determining the effective water content information of the material absorbing steam.

[0093] Based on the above technical solution, the method also includes: after determining the effective water content information of the steam absorbed by the material corresponding to the process to be detected, comparing the effective water content information of the steam absorbed by the material with the preset steam information to determine the comparison result; based on the comparison result and the preset mapping relationship, determining the target steam adjustment strategy corresponding to the process to be detected.

[0094] Among them, the preset steam information may refer to the pre-set steam information that meets the generated quality. The comparison result may refer to the information difference between the effective water content information of the material absorbing steam and the preset steam information. The preset mapping relationship may be a mapping relationship between the comparison result and the adjustment strategy. The target steam adjustment strategy may be, but is not limited to, increasing or decreasing the water content of the added steam, and increasing or decreasing the temperature of the added steam. The preset mapping relationship may be manually set and updated, or it may be adjusted and updated through a closed-loop proportional integral differential (PID).

[0095] For example, following the above example, in the blade making process, the amount of steam that can be measured in the first batch of loosening and moisture recovery process is The total amount of water added is 219.70kg 203.84kg, effective water content of material absorbing steam The total weight is 139.18 kg. By analyzing the data for the whole year, the distribution results are as follows Figures 4 to 7 As shown. According to the annual production workshop sampling, the moisture content of the loose and moistened blade entrance is between 10.5% and 12.5%. Figure 4 This shows that the technical solution of the embodiment of the present invention is accurate. Figures 5 to 7From November 2021 to February 2022, due to the decrease in seasonal temperature, the measurable steam volume and the effective moisture content of steam absorbed by the material remained in a relatively high range, indicating that when the blades reached the same outlet moisture and temperature values, the steam usage increased, and the moisture content of the material acted on by the steam also increased, that is, the effective moisture content of steam absorbed by the material increased, and the total amount of water added decreased synchronously. This is further reflected in the need to strengthen the dryness value of steam in winter to ensure the production quality of the target product.

[0096] For example, using the above example, in the leaf shreds making process, the total steam application amount of the first batch of leaf shreds rewetting process (LOTOS) is The total amount of water added is 251.51Kg 166.02Kg, effective moisture content of material absorbing steam The distribution of the data for the whole year is as follows: Figure 8-10 As shown. From November 2021 to February 2022, due to the decrease in seasonal temperature, the total steam application and the effective moisture content of steam absorbed by the material remained in a relatively high range, indicating that the blade reached the same outlet moisture and temperature values ​​in the rehumidification process. As the steam usage increased, the moisture content of the steam-acted material also increased, that is, the effective moisture content of steam absorbed by the material increased, and the total water addition amount decreased synchronously. This further reflects that the dryness value of steam must be strengthened in winter to ensure the production quality of the target product.

[0097] The device for determining effective water content information of steam absorbed by a material provided in an embodiment of the present invention can execute the method for determining effective water content information of steam absorbed by a material provided in any embodiment of the present invention, and has the corresponding beneficial effects of executing the method for determining effective water content information of steam absorbed by a material.

[0098] The following is an embodiment of a device for determining information on effective water content of steam absorbed by a material provided in an embodiment of the present invention. The device and the methods for determining information on effective water content of steam absorbed by a material in the above-mentioned embodiments belong to the same inventive concept. For details not fully described in the embodiment of the device for determining information on effective water content of steam absorbed by a material, reference can be made to the embodiments of the methods for determining information on effective water content of steam absorbed by a material in the above-mentioned embodiments.

[0099] Embodiment 3

[0100] Fig.11 This is a schematic diagram of the structure of a device for determining effective water content information of material absorbing steam provided in Embodiment 3 of the present invention. Fig.11 As shown, the device includes: an information acquisition module 1101, a process cumulative value determination module 1102 and a material absorption steam effective water content information determination module 1103.

[0101] Among them, the information acquisition module 1101 is used to obtain the flow distribution information, moisture content information and material loss information of the target product in the process to be detected within the preset collection time; wherein the process to be detected is the target product production process in the target cigarette factory that meets the information acquisition conditions, and the flow distribution information includes: material addition flow, water addition flow and steam addition flow; the moisture content information includes: the inlet moisture content and the outlet moisture content of the material at the process to be detected; the process cumulative value determination module 1102 is used to determine the process cumulative value corresponding to the process to be detected based on the flow distribution information, the preset collection time and the preset collection frequency, wherein the process cumulative value includes: the material addition cumulative value, the water addition cumulative value and the steam addition cumulative value; the material absorption steam effective water content information determination module 1103 is used to determine the material absorption steam effective water content information corresponding to the process to be detected based on the process cumulative value, moisture content information and material loss information.

[0102] The technical solution of the embodiment of the present invention is to obtain the flow distribution information, moisture content information and material loss information of the target product in the process to be detected within a preset collection time; wherein the process to be detected is a production process of the target product in the target cigarette factory that meets the information acquisition conditions, and the flow distribution information includes: material addition flow, water addition flow and steam addition flow; the moisture content information includes: the inlet moisture content and the outlet moisture content of the material at the process to be detected; based on the flow distribution information, the preset collection time and the preset collection frequency, the process cumulative value corresponding to the process to be detected is determined, wherein the process cumulative value includes: the material addition cumulative value, the water addition cumulative value and the steam addition cumulative value; based on the process cumulative value, the moisture content information and the material loss information, the effective moisture content information of the material absorbing steam corresponding to the process to be detected is determined, so that the effective moisture content information of the material absorbing steam can be accurately and conveniently determined.

[0103] Based on the above technical solution, the process cumulative value determination module 1102 may include:

[0104] A first flow distribution point determination submodule, used to determine a plurality of first flow distribution points based on a preset collection frequency and flow distribution information;

[0105] A time step determination submodule, used for performing interpolation processing on each first flow distribution point based on cubic spline interpolation to determine the time step;

[0106] The process cumulative value determination submodule is used to determine the process cumulative value corresponding to the process to be detected based on the first flow distribution point, the time step and the preset collection time.

[0107] On the basis of the above technical solution, the process cumulative value determination submodule is specifically used to: determine the second flow distribution point corresponding to each first flow distribution point based on each first flow distribution point and the time step; determine the first flow distribution value corresponding to each first flow distribution point and the second flow distribution value corresponding to each second flow distribution point from the flow distribution information; perform trapezoidal integration processing based on the time step, the preset collection time, the first flow distribution value and the second flow distribution value to determine the process cumulative value corresponding to the process to be detected.

[0108] Based on the above technical solution, the material absorption steam effective water content information determination module 1103 may include:

[0109] A steam information determination method determination submodule is used to determine the steam information determination method corresponding to the process to be detected based on the state information corresponding to the material loss information;

[0110] The submodule for determining the effective water content information of steam absorbed by the material is used to determine the effective water content information of steam absorbed by the material corresponding to the process to be detected based on the steam information determination method, the process cumulative value, the moisture content information and the material loss information.

[0111] On the basis of the above technical solution, the steam information determination method determination submodule is specifically used for: if the status information corresponding to the material loss information is null value information, then determining the first steam information determination method corresponding to the process to be detected; if the status information corresponding to the material loss information is non-null value information, then determining the second steam information determination method corresponding to the process to be detected.

[0112] On the basis of the above technical scheme, the target steam information determination submodule is specifically used for: if the first steam information determination method corresponds to the process to be detected, the process cumulative value and moisture content information are substituted into the mass conservation formula of the process to be detected, the inlet material moisture content calculation formula of the process to be detected, and the outlet material moisture content calculation formula of the process to be detected, to determine the effective moisture content information of the material absorbing steam corresponding to the process to be detected; if the second steam information determination method corresponds to the process to be detected, the process cumulative value, moisture content information and material loss information are substituted into the mass conservation formula of the process to be detected, the inlet material moisture content calculation formula of the process to be detected, the outlet material moisture content calculation formula of the process to be detected, and the effective moisture content calculation formula of the material absorbing steam, to determine the effective moisture content information of the material absorbing steam corresponding to the process to be detected.

[0113] On the basis of the above technical solution, the device also includes:

[0114] A comparison result determination module is used to determine the comparison result based on the effective water content information of the steam absorbed by the material corresponding to the process to be detected, after determining the effective water content information of the steam absorbed by the material and the preset steam information;

[0115] The target steam adjustment strategy determination module is used to determine the target steam adjustment strategy corresponding to the process to be detected based on the comparison result and the preset mapping relationship.

[0116] The device for determining effective water content information of material absorbing steam provided in the embodiment of the present invention can execute the method for determining effective water content information of material absorbing steam provided in any embodiment of the present invention, and has corresponding functional modules and beneficial effects for executing the method for determining effective water content information of material absorbing steam.

[0117] It is worth noting that in the above-mentioned embodiment of determining the effective water content information of the material absorbing steam, the various units and modules included are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.

[0118] Embodiment 4

[0119] Fig.12 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0120] like Fig.12 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.

[0121] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0122] The processor 11 may be a variety of general and / or dedicated processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a method for determining effective water content information of steam absorption by a material.

[0123] In some embodiments, the method for determining the effective water content information of steam absorbed by a material may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the method for determining the effective water content information of steam absorbed by a material described above may be executed. Alternatively, in other embodiments, the processor 11 may be configured to execute the method for determining the effective water content information of steam absorbed by a material in any other appropriate manner (e.g., by means of firmware).

[0124] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0125] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0126] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0127] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0128] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.

[0129] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.

[0130] The embodiment of the present application also discloses a computer program product, which includes a computer program. When the computer program is executed by a processor, the method for determining effective water content information of steam absorbed by a material provided in any embodiment of the present application is implemented. The program product and the method for determining effective water content information of steam absorbed by a material disclosed in each embodiment of the present application belong to the same inventive concept, and therefore will not be described in detail here.

[0131] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.

[0132] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for determining effective water content information of a material absorbing steam, characterized in that: include: Obtain the flow distribution information, moisture content information and material loss information corresponding to the target product in the process to be detected within the preset collection time; wherein the process to be detected is the target product production process in the target cigarette factory that meets the information acquisition conditions, and the flow distribution information includes: material addition flow, water addition flow and steam addition flow; the moisture content information includes: the inlet moisture content and outlet moisture content of the material at the process to be detected; Based on the flow distribution information, the preset collection time and the preset collection frequency, determine the process cumulative value corresponding to the process to be detected, wherein the process cumulative value includes: the material addition cumulative value, the water addition cumulative value and the steam addition cumulative value; Based on the process cumulative value, the moisture content information and the material loss information, the effective moisture content information of the material absorbing steam corresponding to the process to be detected is determined.

2. The method according to claim 1, characterized in that: The determining, based on the flow distribution information, the preset collection time and the preset collection frequency, the process cumulative value corresponding to the process to be detected includes: Determining a plurality of first flow distribution points based on a preset collection frequency and the flow distribution information; Performing interpolation processing on each of the first flow distribution points based on cubic spline interpolation to determine a time step; Based on the first flow distribution point, the time step and the preset collection time, a process cumulative value corresponding to the process to be detected is determined.

3. The method according to claim 2, characterized in that The determining, based on the first flow distribution point, the time step and the preset collection time, the process cumulative value corresponding to the process to be detected includes: Based on each of the first flow distribution points and the time step, determining a second flow distribution point corresponding to each of the first flow distribution points; Determine, from the traffic distribution information, a first traffic distribution value corresponding to each of the first traffic distribution points and a second traffic distribution value corresponding to each of the second traffic distribution points; A trapezoidal integration process is performed based on the time step, the preset collection time, the first flow distribution value, and the second flow distribution value to determine the process cumulative value corresponding to the process to be detected.

4. The method according to claim 1, characterized in that: The determining, based on the process cumulative value, the moisture content information and the material loss information, the effective moisture content information of the material absorbing steam corresponding to the process to be detected includes: Based on the state information corresponding to the material loss information, determining a method for determining the steam information corresponding to the process to be detected; Based on the steam information determination method, the process cumulative value, the moisture content information and the material loss information, the effective moisture content information of the steam absorbed by the material corresponding to the process to be detected is determined.

5. The method according to claim 4, characterized in that The method of determining the steam information corresponding to the process to be detected based on the state information corresponding to the material loss information includes: If the state information corresponding to the material loss information is null value information, determining the first steam information determination method corresponding to the process to be detected; If the state information corresponding to the material loss information is non-null value information, a method for determining the second steam information corresponding to the process to be detected is determined.

6. The method according to claim 4, characterized in that The determining of the effective moisture content information of steam absorbed by the material corresponding to the process to be detected based on the steam information determination method, the process cumulative value, the moisture content information and the material loss information includes: If the first steam information corresponding to the process to be detected is determined in a certain manner, the process cumulative value and the moisture content information are substituted into the mass conservation formula of the process to be detected, the moisture content calculation formula of the inlet material of the process to be detected, and the moisture content calculation formula of the outlet material of the process to be detected to determine the effective moisture content information of the steam absorbed by the material corresponding to the process to be detected; If the second steam information corresponding to the process to be detected is determined in a method, the process cumulative value, the moisture content information and the material loss information are substituted into the mass conservation formula of the process to be detected, the inlet material moisture content calculation formula of the process to be detected, the outlet material moisture content calculation formula of the process to be detected and the effective moisture content calculation formula of the steam absorbed by the material to determine the effective moisture content information of the steam absorbed by the material corresponding to the process to be detected.

7. The method according to claim 1, characterized in that After determining the effective water content information of the material absorbing steam corresponding to the process to be detected, the method further includes: Compare the effective water content information of the steam absorbed by the material with the preset steam information to determine the comparison result; Based on the comparison result and the preset mapping relationship, a target steam adjustment strategy corresponding to the process to be detected is determined.

8. A device for determining effective water content information of a material absorbing steam, characterized in that: include: An information acquisition module is used to acquire flow distribution information, moisture content information and material loss information corresponding to the target product in the process to be detected within a preset acquisition time; wherein the process to be detected is a production process of the target product in the target cigarette factory that meets the information acquisition conditions, and the flow distribution information includes: material addition flow, water addition flow and steam addition flow; the moisture content information includes: inlet moisture content and outlet moisture content of the material at the process to be detected; A process cumulative value determination module, used to determine the process cumulative value corresponding to the process to be detected based on the flow distribution information, the preset collection time and the preset collection frequency, wherein the process cumulative value includes: a material addition cumulative value, a water addition cumulative value and a steam addition cumulative value; The module for determining the effective water content information of steam absorbed by the material is used to determine the effective water content information of steam absorbed by the material corresponding to the process to be detected based on the process cumulative value, the moisture content information and the material loss information.

9. An electronic device, characterized in that: The electronic device comprises: one or more processors; A memory for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the method for determining the effective water content information of steam absorption by a material as described in any one of claims 1-7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for determining the effective water content information of a material absorbing steam as described in any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Case reasoning technology-based damping machine intelligent optimized control method

    CN102486630A

  • Tobacco leaf processing method, system and equipment and storage medium

    CN113951533A

  • Method and system for detecting processing strength of tobacco material roller moisture regaining procedure

    CN115702690A

  • Accurate control method for moisture and temperature of outlet of moisture regaining machine

    CN117678796A

  • Intelligent Cut Tobacco Drying Control System and Method Based on Volatile Moisture Content

    US20230309602A1