Double-ship floating lifting system and using method thereof

By installing mechanical lifting devices, hydraulic cylinders, and diagonal support arms on two ordinary barges, the double-ship floating lift of the offshore platform was realized, which solved the problem of lifting large modules of the offshore platform, reduced the dismantling costs, and increased the cost. Operation stability.

CN118722980APending Publication Date: 2024-10-01OCEAN UNIV OF CHINA
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411115010.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing technology is difficult to meet the lifting needs of large upper blocks of offshore platforms, resulting in expensive dismantling of offshore platforms, and the high cost of traditional catamaran dismantling solutions.

Method used

Design a two-ship floating lift system. Two ordinary barges are equipped with mechanical lifting devices, and the arrangement of actuating parts is adjusted to adapt to different offshore platform modules. Hydraulic cylinders and diagonal support arms are used to lift the offshore platform. operations and reduce demolition costs.

Benefits of technology

It improves the lifting capacity of floatover operations, reduces offshore platform dismantling costs, enhances operational stability, and can adapt to different sizes and types of offshore platform modules, reducing reliance on large cranes or special ships.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118722980A_ABST
    Figure CN118722980A_ABST
Patent Text Reader

Abstract

The invention provides a double-ship floating lifting system and a using method thereof, and is characterized in that the system comprises a barge I, a barge II, and a mechanical lifting system and a mooring rope which are arranged on a deck of the barge I, and the barge I is connected with the barge II through a connecting structural member. The mechanical lifting system comprises a hydraulic station, a mounting base, a vertical hydraulic cylinder and an inclined supporting arm, the vertical hydraulic cylinder is arranged on the mounting base mounted on a barge deck, the inclined supporting arm is obliquely arranged and hinged to the mounting base, and a hydraulic rod on the vertical hydraulic cylinder is vertically arranged and hinged to the middle of the inclined supporting arm. The using method comprises preparation work needing to be completed before the ocean platform upper module is dismantled and dismantling work of the ocean platform. According to the dismounting work of the ocean platform, ocean platform lifting operation of a large-scale operation ship can be completed by additionally installing the lifting device on two common barges, the device is suitable for various ocean platform blocks by adjusting the arrangement of actuating components, and the dismounting cost of the ocean platform can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of marine engineering technology and relates to marine platform dismantling equipment technology, in particular to a double-ship floating lifting system and a use method thereof. Background Art

[0002] The offshore platform dismantling industry is growing globally. According to a survey by IHS Markit, from 2021 to 2040, the number of abandoned platforms will exceed 2,000, and the cost of dismantling and abandoning offshore facilities will increase from US$2.4 billion per year in 2015 to US$13 billion per year in 2040. As can be seen from the above, the offshore platform dismantling has a broad market and huge potential.

[0003] The removal of offshore platforms can be considered as the reverse process of installation operations. Integral floating crane operations and floating support operations are currently the most mainstream installation / removal solutions. However, as the upper modules of offshore platforms continue to develop towards integration and large-scale, the requirements for lifting capabilities in offshore construction operations continue to increase. For this purpose, technologies such as the American VersaBar double-ship lifting technology, the Norwegian Pioneering Spirit integrated operation catamaran, and the double-ship lifting technology proposed by China National Offshore Oil Corporation have been developed.

[0004] The technical solution most similar to the present invention is the Versatruss lifting system developed by Aker Corporation of the United States, which specifically includes a tension rod, a high-power winch, a support rod and two shallow-draft barges. Its lifting power is transmitted by the winch through cables, which is difficult to meet the lifting needs of large modules.

[0005] As the upper modules of offshore platforms continue to develop towards larger and more integrated forms, the requirements for offshore lifting and supporting operations are increasing. However, whether using heavy-duty crane vessels to install / dismantle the upper modules or choosing specially designed catamarans for floating installation / dismantling (such as the Pioneering Spirit work vessel of the Norwegian AllSeas company), expensive rental costs are required.

[0006] Therefore, how to design a dual-vessel floating lifting system and its use method, which can complete the offshore platform lifting operation of large-scale operating vessels by using two ordinary barges equipped with lifting devices, and adapt to various offshore platform modules by adjusting the layout of the actuating components, and reduce the cost of dismantling the offshore platform, is a technical problem that needs to be solved urgently in this field. Summary of the invention

[0007] In view of the problems and shortcomings of the prior art, the present invention provides a double-vessel floating lifting system and a method of using the same. By using two ordinary barges equipped with lifting devices, the offshore platform lifting operation of a large operating vessel can be completed. By adjusting the arrangement of the actuating components, the system can adapt to various offshore platform modules and reduce the cost of dismantling the offshore platform.

[0008] The objective of the present invention is achieved through the following technical solutions: a double-ship floating lifting system, comprising two operating ships, characterized in that the two operating ships include a barge I and a barge II, ballast water tanks are arranged on both sides of the interior of the barge I and the barge II, at least two sets of mechanical lifting systems are arranged on the deck of the barge I and the barge II, at least two mooring cables are arranged on the barge I and the barge II, the barge I and the barge II are connected to the barge II through a connecting structure, the mechanical lifting system includes a hydraulic station for providing an oil source, a mounting base, a vertical hydraulic cylinder and a diagonal brace arm for supporting the upper module of the marine platform, the mounting base is installed on the barge deck, the vertical hydraulic cylinder is arranged on the mounting base, the diagonal brace arm is arranged obliquely, and its lower end is hinged to the mounting base, the hydraulic rod on the vertical hydraulic cylinder is arranged vertically, and the upper end of the hydraulic rod is hinged to the middle part of the diagonal brace arm.

[0009] Improvement on the above technical solution: the barge I is connected to the barge II via at least two of the connecting structures; the mechanical lifting system arranged on the deck of the barge I and the mechanical lifting system arranged on the deck of the barge II are symmetrically arranged; the two diagonal bracing arms corresponding to the positions on the barge I and the barge II are arranged in an "eight" shape.

[0010] Further improvement of the above technical solution: the connecting structure includes 4 telescopic rods with adjustable lengths, two ends of the telescopic rods are flexibly hinged to the sides adjacent to the bow of the barge I and the bow of the barge II, and two ends of the telescopic rods are flexibly hinged to the sides adjacent to the stern of the barge I and the stern of the barge II, and locking devices are arranged on the telescopic rods; one mooring cable is respectively arranged on the bow and stern of the barge I and the barge II away from the side.

[0011] Further improvement of the above technical solution: the mounting base is a frame structure, the hydraulic circuit connected to the hydraulic station starts from the hydraulic station and is integrated and installed below the mounting base, a multi-way transverse slide rail is provided above the mounting base, the bottom of the vertical hydraulic cylinder is fixed to the slider arranged on the transverse slide rail, the top of the hydraulic rod is connected to the middle part of the diagonal support arm through a first rotating pair, and the lower end of the diagonal support arm is connected to the transverse slide rail through a second rotating pair, which is used to adjust the relative position between the vertical hydraulic cylinder, the mounting base and the diagonal support arm according to the operation needs, and lock it by a snap after the relative position is determined.

[0012] Further improvement to the above technical solution: the top edge of the diagonal support arm is a hard rubber block with an arc surface. When a double-ship floating lifting operation is performed, the hard rubber block can adapt to the operation of the diagonal support arm at various angles. When the load of the upper assembly is transferred from the offshore platform jacket foundation to multiple diagonal support arms, the contact position of each diagonal support arm can produce a certain deformation, thereby increasing the contact area, improving local friction, and increasing the stability of the double-ship floating lifting operation.

[0013] Further improvement to the above technical solution: a transport ship is also provided, and the transport ship is a barge III.

[0014] The present invention provides a method for using the above-mentioned double-vessel floating lifting system, characterized in that the method comprises the following steps: Step 1: Before dismantling the upper modules of the offshore platform, the following preparations must be completed, including the following specific steps: Step 1.1: The offshore platform has completed relevant preparations before abandonment, including sealing the wellhead and completing the cutting of the connection between the upper module of the offshore platform and the jacket; Step 1.2: Determine the appropriate operation time according to the characteristics of the operating sea area and weather forecast, select the appropriate operation window, and formulate a mooring and double-vessel floating removal operation plan; Step 1.3: Use a tugboat to tow barge I and barge II in parallel to the two sides of the offshore platform for dismantling operations, and keep a certain safe distance from the operating jacket to prevent the barge or lifting system from collision damage caused by structural damage caused by dismantling during the floating operation; Step 1.4: Connect barge I and barge II by using connecting structures. At this time, the jacket to be dismantled is confined to the sheltered sea area formed by barge I, barge II and the connecting structures, which reduces the impact of environmental loads such as wind, waves and currents on the dismantling operation to a certain extent; Step 1.5: Arrange the mooring according to the mooring plan to limit the amplitude of the system motion response caused by the marine environmental load and the load transfer of the offshore platform; Step 1.6: Adjust the initial position of the vertical hydraulic cylinder and diagonal support arm according to the work object and work plan.

[0015] Step 2: After completing the preparatory work before demolition, start the demolition of the offshore platform, including the following specific steps: Step 2.1: First, adjust the ballast water tanks of barge I and barge II. The ballast water tanks on the side of barge I and barge II close to the jacket of the offshore platform are unloaded, and the ballast water tanks on the side away from the jacket of the offshore platform are loaded, so that barge I and barge II have a certain initial roll angle. This is to avoid the instantaneous moment introduced by the load transfer of the upper module from causing the double-ship floating operation system to capsize, and to provide a certain initial safety margin; Step 2.2: Synchronously control the vertical hydraulic cylinder to move. As the hydraulic rods extend, the diagonal brace arms rotate and lift around the fixed point revolving pair until the arc-shaped rubber on the top of the diagonal brace arms contacts the bottom of the upper block of the offshore platform and deforms to a certain extent, that is, a certain preload is generated. At this time, lock the hydraulic rods to prevent the lifting system structure from being damaged when the offshore platform load is too large and transferred; Step 2.3: Barge I and Barge II simultaneously open their ballast water tanks to discharge the load and float up, so that the mass of the upper module of the offshore platform is transferred from the jacket foundation to the lifting system composed of multiple groups of diagonal bracing arms on Barge I and Barge II; Step 2.4: Unlock the hydraulic rods. At this point, the partial load transfer of the upper module of the offshore platform has been completed. Continue to synchronously control the actuation of the vertical hydraulic cylinders on barges I and II, and complete the continuous lifting of the upper module of the offshore platform through multiple sets of diagonal bracing arms. At the same time, the load is continuously adjusted through the ballast water tanks on both sides of barges I and barges II to maintain the stability of the posture of barges I and barges II during the overall dismantling operation. Step 2.5: When the upper module of the offshore platform continues to rise under the action of the lifting system to a certain safe distance from the lower jacket foundation of the offshore platform, the action of the vertical hydraulic cylinder and the load adjustment of the ballast water tank are stopped, the hydraulic rods are locked, and the connection relationship between the connecting structural parts and the mooring positioning system between the barge I and the barge II are released; Step 2.6: Use a tugboat to tow barge I and barge II to an open sea area. At this time, barge III for transportation is already in position and waiting. The tugboat tows barge I and barge II to both sides of barge III. At this time, barge I, barge II and barge III are in parallel, completing the preparation for a new round of load transfer; Step 2.7: Release the locking state of the vertical hydraulic cylinder, synchronously control the retraction of the hydraulic rod of the vertical hydraulic cylinder, so that each set of diagonal bracing arms can be lowered together. At this time, the ballast water tanks on both sides of barge I and barge II are loaded at the same time to speed up the lowering speed of the upper module of the offshore platform; Step 2.8: When the upper module of the offshore platform comes into contact with barge III, that is, the draft of barge III changes due to load transfer, barge I and barge II stop loading the ballast water tank, and the lifting system continues to lower until the upper module load of the offshore platform is completely borne by barge III. At this time, the second load transfer is completed; Step 2.9: The tugboat tows barge I and barge II to a certain distance from barge III, and the transportation of the upper assembly of the offshore platform is completed by barge III.

[0016] Compared with the prior art, the advantages and positive effects of the present invention are: 1. The present invention installs mechanical lifting devices on two ordinary barges to perform double-ship floating operations, thereby improving the lifting capacity of floating operations, avoiding the use of large cranes or special floating operation vessels, and saving operation costs; 2. The present invention can achieve good adaptation to the dismantling operation objects of marine platforms of different sizes and types by adjusting the connection structure parts, vertical hydraulic cylinders and diagonal bracing arms between barges; 3. The present invention uses the joint operation of the connecting structure, the vertical direct-acting hydraulic lifting cylinder and the diagonal support arm to form a stable triangular connection structure between the upper block and the two barges during the floating operation, thereby increasing the stability of the double-barge floating operation system; 4. The device of the present invention can be used without major changes to the upper structure of the platform; 5. During the operation, the present invention can perform lifting or lowering operations at any time by controlling the extension and retraction of the hydraulic rod of the vertical hydraulic cylinder, that is, during the operation, the operation can be stopped at any time or even performed in the reverse direction, which has a certain degree of control flexibility. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of two working barges traveling to both sides of a dismantling working platform in a double-ship floating lifting system of the present invention; Figure 2 It is a schematic diagram of two working barges connected by a connecting structure in a double-ship floating lifting system of the present invention; Figure 3 It is a front view of the lifting state of the diagonal support arms on two working barges in a double-ship floating lifting system of the present invention; Figure 4 It is a top view of the lifting state of the diagonal support arms on two working barges in a double-ship floating lifting system of the present invention; Figure 5 It is a top view of two working barges towing to both sides of a transport barge in a double-ship floating lifting system of the present invention; Figure 6 This is a top view of a double-ship floating lifting system of the present invention after two working barges transfer the load of the upper assembly to a barge for transportation; Figure 7 A schematic diagram of a transport barge carrying an upper assembly moving away from two working barges in a double-ship floating lifting system of the present invention; Figure 8The present invention is a three-dimensional diagram showing the ballast water tank inside the working barge in a double-ship floating lifting system.

[0018] In the figure: 1. Barge I; 2. Barge II; 3. Hydraulic station; 4. Diagonal support arm; 5. Vertical hydraulic cylinder; 6. Upper module of offshore platform; 7. Connecting structure; 8. Mounting base; 9. Barge III; 10. Ballast water tank. DETAILED DESCRIPTION

[0019] In order to further understand the content, features and effects of the present invention, the following implementation cases are listed and described in detail with reference to the accompanying drawings: See also Figure 1-Figure 8 The embodiment of a double-vessel floating lifting system of the present invention comprises two working vessels, the two working vessels comprise a barge I 1 and a barge II 2, ballast water tanks 10 are arranged on both sides of the interior of the barge I 1 and the barge II 2, so as to timely adjust the barge posture during the operation process, so as to balance the change of the rolling moment caused by the mass transfer of the upper module 6 of the marine platform. At least two sets of mechanical lifting systems are arranged on the decks of the barge I 1 and the barge II 2, at least two mooring cables are arranged on the barge I 1 and the barge II 2, and the barge I 1 is connected to the barge II 2 through a connecting structure 7. The above-mentioned mechanical lifting system comprises a hydraulic station 3 for providing an oil source, a mounting base 8, a vertical hydraulic cylinder 5, and a diagonal brace arm 4 for supporting the upper module 6 of the marine platform. The mounting base 8 is installed on the barge deck, the vertical hydraulic cylinder 5 is arranged on the mounting base 8, the diagonal brace arm 4 is arranged at an angle, and its lower end is hinged to the mounting base 8, the hydraulic rod on the vertical hydraulic cylinder 5 is arranged vertically, and the upper end of the hydraulic rod is hinged to the middle part of the diagonal brace arm 4.

[0020] Furthermore, the barge I 1 is connected to the barge II 2 by at least two connecting structures 7, which can reduce the large motion response that may be generated by the double-vessel floating operation system during wave action and operation, balance the lateral thrust caused by load transfer to the barge I 1 and the barge II 2, reduce the relative movement between the barge I 1 and the barge II 2, and improve the stability of the lifting operation. The mechanical lifting system set on the deck of the barge I 1 is symmetrically arranged with the mechanical lifting system set on the deck of the barge II 2, and the two diagonal bracing arms 4 corresponding to the positions on the barge I 1 and the barge II 2 are arranged in an "eight" shape.

[0021] Specifically, the above-mentioned connecting structure 7 includes 4 telescopic rods with adjustable lengths, two ends of the telescopic rods are flexibly hinged to the sides adjacent to the bow of barge I 1 and the bow of barge II 2, and two ends of the telescopic rods are flexibly hinged to the sides adjacent to the stern of barge I 1 and the stern of barge II 2, respectively. The telescopic rods are provided with locking devices. The connecting structure 7 itself can be adjusted in length along the axial direction to adapt to the operation spacing of different barges and the structural size of the jacket. When the required length of the connecting structure 7 is determined, it can be fixed by the locking device on the connecting structure 7 to avoid the influence of the length change of the connecting structure 7 on the operation process. The connecting structure 7 is connected to the bow of barge I 1 and barge II 2 through a flexible hinge, releasing part of the freedom of movement to reduce the local stress that may be generated due to environmental effects, lifting operations, and slamming, thereby improving the adaptability of the double-ship floating system to the marine environment. A mooring cable is respectively arranged on the bow and stern of the barge I 1 and the barge II 2 away from the side.

[0022] Furthermore, the above-mentioned mounting base 8 is a frame structure, and the hydraulic circuit connected to the hydraulic station 3 starts from the hydraulic station 3 and is integrated and installed below the mounting base 8. A multi-way transverse slide rail is provided above the mounting base 8, which is used to adjust the posture of the vertical hydraulic cylinder 5 and the diagonal brace arm 4 according to the working object and transportation needs. The bottom of the vertical hydraulic cylinder 5 is fixed to the slider provided on the transverse slide rail, and the top of the hydraulic rod is connected to the middle part of the diagonal brace arm 4 through a first rotating pair. The lower end of the diagonal brace arm 4 is connected to the transverse slide rail through a second rotating pair, which is used to adjust the relative position between the vertical hydraulic cylinder 5, the mounting base 8 and the diagonal brace arm 4 according to the working needs, and lock it by a buckle after the relative position is determined.

[0023] Furthermore, the top edge of the above-mentioned diagonal support arm 4 is a hard rubber block with an arc surface. When a double-ship floating lifting operation is performed, the hard rubber block can adapt to the operation of the diagonal support arm at various angles. When the load of the upper assembly is transferred from the offshore platform jacket foundation to multiple diagonal support arms 4, the contact position of each diagonal support arm 4 can produce a certain deformation, thereby increasing the contact area, improving the local friction force, and increasing the stability of the double-ship floating lifting operation.

[0024] Furthermore, a transport ship is also provided, and the transport ship is a barge III 9.

[0025] During actual operation, the barge I1 and barge II2 used for floating operation in the present invention are not required to be completely identical, but only need to be semi-shallow barges of similar tonnage. When adjusted to a suitable operating position, the mooring scheme can be further determined according to the operating environment and object parameters, including the number of mooring cable groups and their arrangement positions.

[0026] See also Figure 1-Figure 8The present invention provides an embodiment of a method for using the above-mentioned double-vessel floating lifting system, the method for using comprises the following steps: Step 1: Before dismantling the upper block 6 of the offshore platform, the following preparations must be completed, including the following specific steps: Step 1.1: The offshore platform has completed relevant preparations before abandonment, including sealing the wellhead and completing the cutting of the connection between the upper module 6 of the offshore platform and the jacket; Step 1.2: Determine the appropriate operation time according to the characteristics of the operating sea area and weather forecast, select the appropriate operation window, and formulate a mooring and double-vessel floating removal operation plan; Step 1.3: Use a tugboat to tow barge I 1 and barge II 2 in parallel to the two sides of the offshore platform for dismantling operations, and keep a certain safety distance from the operating jacket to prevent the barge or lifting system from collision damage caused by structural damage and falling during the floating operation; Step 1.4: Connect barge I1 and barge II2 by using connecting structure 7. At this time, the jacket to be removed is confined to the sheltered sea area formed by barge I1, barge II2 and connecting structure 7, which reduces the impact of environmental loads such as wind, waves and currents on the removal operation to a certain extent; Step 1.5: Arrange the mooring according to the mooring plan to limit the amplitude of the system motion response caused by the marine environmental load and the marine platform load transfer; Step 1.6: Adjust the initial positions of the vertical hydraulic cylinder 5 and the diagonal brace arm 4 according to the operation object and operation plan.

[0027] Step 2: After completing the preparatory work before demolition, start the demolition of the offshore platform, including the following specific steps: Step 2.1: First, adjust the ballast water tanks 10 of barge I1 and barge II2, discharge the ballast water tanks 10 on the side of the offshore platform jacket of barge I1 and barge II2, and load the ballast water tanks 10 on the side away from the offshore platform jacket, so that barge I1 and barge II2 have a certain initial roll angle, which is to avoid the instantaneous moment introduced by the load transfer of the upper module from causing the double-ship floating operation system to capsize, and provide a certain initial safety margin; Step 2.2: Synchronously control the vertical hydraulic cylinder 5 to actuate. As the hydraulic rod is extended, the diagonal brace arm 4 rotates and lifts around the fixed point revolving pair until the arc-shaped rubber on the top of the diagonal brace arm 4 contacts the bottom of the upper assembly 6 of the offshore platform and produces a certain deformation, that is, a certain preload is generated. At this time, the hydraulic rods are locked to prevent the lifting system structure from being damaged when the offshore platform load is too large and transferred; Step 2.3: Open the ballast water tanks 10 of barge I 1 and barge II 2 at the same time to discharge the load and perform the floating action, so that the mass of the upper module of the offshore platform is transferred from the jacket foundation part to the lifting system composed of multiple groups of diagonal bracing arms 4 on barge I 1 and barge II 2; Step 2.4: Unlock the hydraulic rods. At this time, the partial load transfer of the upper module 6 of the offshore platform has been completed. The vertical hydraulic cylinders 5 on the barges I 1 and II 2 are continuously controlled to move synchronously, and the upper module 6 of the offshore platform is continuously lifted through multiple sets of diagonal bracing arms 4. At the same time, the load is continuously adjusted through the ballast water tanks 10 on both sides of the barges I 1 and II 2 to maintain the stable posture of the barges I 1 and II 2 during the overall dismantling operation. Step 2.5: When the upper assembly 6 of the offshore platform continues to rise under the action of the lifting system to a certain safe distance from the jacket foundation at the lower part of the offshore platform, the action of the vertical hydraulic cylinder 5 and the load adjustment of the ballast water tank 10 are stopped, the hydraulic rods are locked, and the connection relationship of the connecting structure 7 between the barge I 1 and the barge II 2 and the mooring positioning system are released; Step 2.6: The barge I 1 and the barge II 2 are towed to an open sea area by a tugboat. At this time, the transport barge III 9 is already in position and waiting. The tugboat tows the barge I 1 and the barge II 2 to both sides of the barge III 9. At this time, the barge I, the barge II and the barge III 9 are in parallel, completing the preparation for a new round of load transfer. Step 2.7: Release the locking state of the vertical hydraulic cylinder 5, and synchronously control the hydraulic rod of the vertical hydraulic cylinder 5 to retract, so that each group of diagonal bracing arms 4 can be lowered together. At this time, the ballast water tanks 10 on both sides of the barge I 1 and the barge II 2 are loaded at the same time, accelerating the lowering speed of the upper module 6 of the offshore platform; Step 2.8: When the upper assembly 6 of the offshore platform comes into contact with the barge III 9, that is, the draft of the barge III 9 changes due to the load transfer, the barge I 1 and the barge II 2 stop loading the ballast water tank 10, and the lifting system continues to lower until the load of the upper assembly 6 of the offshore platform is completely borne by the barge III 9, at which time the second load transfer is completed; Step 2.9: The tugboat tows the barge I 1 and the barge II 2 to a certain distance from the barge III 9, and the transportation of the upper assembly 6 of the offshore platform is completed by the barge III 9.

[0028] The connection method between barge I 1 and barge II 2 is not limited to the above-described scheme, and other connection methods should also be included in the protection scope of the present invention, such as: flexible connection such as mooring cable, rigid connection of rigid rod, etc.; the barge mooring scheme is only for illustration in the accompanying drawings, and different mooring methods and groups should also be included in the protection scope.

[0029] The contact portion between the top of the diagonal brace arm 4 and the upper assembly 6 of the offshore platform, in addition to the hard rubber with a certain curvature mentioned above, other structural forms or materials should also be included in the protection scope. Possible structural schemes include but are not limited to: hard metal consistent with the main material of the diagonal brace arm 4, or a cutting plane with a certain angle, and a universal hinge device that can provide a certain relative movement, etc.

[0030] Although the offshore platform dismantling method proposed in the present invention has been described above in conjunction with an embodiment, the present invention is not limited to the specific implementation methods mentioned above. Without departing from the spirit of the present invention and the scope of protection of the claims, changes including but not limited to the structure and form of the components involved in the present invention should be deemed to be within the scope of protection of the present invention.

Claims

1. A double-vessel floating lifting system, comprising two operating vessels, characterized in that: The two operating vessels include barge I and barge II. Ballast water tanks are arranged on both sides of the interior of barge I and barge II. At least two sets of mechanical lifting systems are arranged on the decks of barge I and barge II. At least two mooring cables are arranged on barge I and barge II. Barge I is connected to barge II through a connecting structure. The mechanical lifting system includes a hydraulic station for providing an oil source, a mounting base, a vertical hydraulic cylinder and a diagonal brace arm for supporting the upper module of the offshore platform. The mounting base is installed on the barge deck. The vertical hydraulic cylinder is arranged on the mounting base. The diagonal brace arm is arranged at an angle, and its lower end is hinged to the mounting base. The hydraulic rod on the vertical hydraulic cylinder is arranged vertically, and the upper end of the hydraulic rod is hinged to the middle part of the diagonal brace arm.

2. The double-vessel floating lifting system according to claim 1 is characterized in that: The barge I is connected to the barge II via at least two of the connecting structures; the mechanical lifting system on the deck of the barge I is symmetrically arranged with the mechanical lifting system on the deck of the barge II; and the two diagonal bracing arms corresponding to the positions on the barge I and the barge II are arranged in an "eight" shape.

3. The double-vessel floating lifting system according to claim 1 or 2, characterized in that: The connecting structure includes four telescopic rods with adjustable lengths, two ends of the telescopic rods are flexibly hinged to the sides adjacent to the bow of the barge I and the bow of the barge II, and two ends of the telescopic rods are flexibly hinged to the sides adjacent to the stern of the barge I and the stern of the barge II, respectively. A locking device is arranged on the telescopic rods; one mooring rope is respectively arranged on the bow and stern of the barge I and the barge II away from the side.

4. The double-vessel floating lifting system according to claim 1 or 2, characterized in that: The mounting base is a frame structure. The hydraulic circuit connected to the hydraulic station starts from the hydraulic station and is integrated and installed below the mounting base. A multi-way transverse slide rail is provided above the mounting base. The bottom of the vertical hydraulic cylinder is fixed to a slider arranged on the transverse slide rail. The top of the hydraulic rod is connected to the middle part of the diagonal brace arm through a first rotating pair. The lower end of the diagonal brace arm is connected to the transverse slide rail through a second rotating pair, which is used to adjust the relative positions among the vertical hydraulic cylinder, the mounting base and the diagonal brace arm according to the operation requirements, and lock them by means of a snap after the relative position is determined.

5. The double-vessel floating lifting system according to claim 3 is characterized in that: The mounting base is a frame structure, and the hydraulic circuit connected to the hydraulic station starts from the hydraulic station and is integrated and installed below the mounting base. A multi-way transverse slide rail is provided above the mounting base, which is used to adjust the posture of the vertical hydraulic cylinder and the diagonal brace arm according to the working object and transportation needs. The bottom of the vertical hydraulic cylinder is fixed to the slider arranged on the transverse slide rail, the top of the hydraulic rod is connected to the middle part of the diagonal brace arm through a first rotating pair, and the lower end of the diagonal brace arm is connected to the transverse slide rail through a second rotating pair, which is used to adjust the relative positions of the vertical hydraulic cylinder, the mounting base and the diagonal brace arm according to the working needs, and lock them by means of snaps after the relative positions are determined.

6. The double-vessel floating lifting system according to claim 1 or 2, characterized in that: The top edge of the diagonal bracing arm is a hard rubber block with an arc surface.

7. The double-vessel floating lifting system according to claim 5 is characterized in that: The top edge of the diagonal bracing arm is a hard rubber block with an arc surface.

8. The double-vessel floating lifting system according to claim 1 or 2, characterized in that: A transport vessel is also provided, which is a barge III.

9. The double-vessel floating lifting system according to claim 7, characterized in that: A transport vessel is also provided, which is a barge III.

10. A method for using the double-vessel floating lifting system according to any one of claims 1 to 9, characterized in that: The method of use includes the following steps: Step 1: Before dismantling the upper modules of the offshore platform, the following preparations must be completed, including the following specific steps: Step 1.1: The offshore platform has completed relevant preparations before abandonment, including sealing the wellhead and completing the cutting of the connection between the upper module of the offshore platform and the jacket; Step 1.2: Determine the appropriate operation time according to the characteristics of the operating sea area and weather forecast, select the appropriate operation window, and formulate a mooring and double-vessel floating removal operation plan; Step 1.3: Use a tugboat to tow barge I and barge II in parallel to the two sides of the offshore platform for dismantling operations, and keep a certain safe distance from the operating jacket to prevent the barge or lifting system from collision damage caused by structural damage caused by dismantling during the floating operation; Step 1.4: Connect barge I and barge II by using connecting structures. At this time, the jacket to be dismantled is confined to the sheltered sea area formed by barge I, barge II and the connecting structures, which reduces the impact of environmental loads such as wind, waves and currents on the dismantling operation to a certain extent; Step 1.5: Arrange the mooring according to the mooring plan to limit the amplitude of the system motion response caused by the marine environmental load and the marine platform load transfer; Step 1.6: Adjust the initial position of the vertical hydraulic cylinder and the diagonal brace arm according to the operation object and operation plan; Step 2: After completing the preparatory work before demolition, start the demolition of the offshore platform, including the following specific steps: Step 2.1: First, adjust the ballast water tanks of barge I and barge II. The ballast water tanks on the side of barge I and barge II close to the jacket of the offshore platform are unloaded, and the ballast water tanks on the side away from the jacket of the offshore platform are loaded, so that barge I and barge II have a certain initial roll angle. This is to avoid the instantaneous moment introduced by the load transfer of the upper module from causing the double-ship floating operation system to capsize, and to provide a certain initial safety margin; Step 2.2: Synchronously control the vertical hydraulic cylinder to move. As the hydraulic rods extend, the diagonal brace arms rotate and lift around the fixed point revolving pair until the arc-shaped rubber on the top of the diagonal brace arms contacts the bottom of the upper block of the offshore platform and deforms to a certain extent, that is, a certain preload is generated. At this time, lock the hydraulic rods to prevent the lifting system structure from being damaged when the offshore platform load is too large and transferred; Step 2.3: Barge I and Barge II simultaneously open their ballast water tanks to discharge the load and float up, so that the mass of the upper module of the offshore platform is transferred from the jacket foundation to the lifting system composed of multiple groups of diagonal bracing arms on Barge I and Barge II; Step 2.4: Unlock the hydraulic rods. At this point, the partial load transfer of the upper module of the offshore platform has been completed. Continue to synchronously control the actuation of the vertical hydraulic cylinders on barges I and II, and complete the continuous lifting of the upper module of the offshore platform through multiple sets of diagonal bracing arms. At the same time, the load is continuously adjusted through the ballast water tanks on both sides of barges I and barges II to maintain the stability of the posture of barges I and barges II during the overall dismantling operation. Step 2.5: When the upper module of the offshore platform continues to rise under the action of the lifting system to a certain safe distance from the lower jacket foundation of the offshore platform, the action of the vertical hydraulic cylinder and the load adjustment of the ballast water tank are stopped, the hydraulic rods are locked, and the connection relationship between the connecting structural parts and the mooring positioning system between the barge I and the barge II are released; Step 2.6: Use a tugboat to tow barge I and barge II to an open sea area. At this time, barge III for transportation is already in position and waiting. The tugboat tows barge I and barge II to both sides of barge III. At this time, barge I, barge II and barge III are in parallel, completing the preparation for a new round of load transfer; Step 2.7: Release the locking state of the vertical hydraulic cylinder, synchronously control the retraction of the hydraulic rod of the vertical hydraulic cylinder, so that each set of diagonal bracing arms can be lowered together. At this time, the ballast water tanks on both sides of barge I and barge II are loaded at the same time to speed up the lowering speed of the upper module of the offshore platform; Step 2.8: When the upper module of the offshore platform comes into contact with barge III, that is, the draft of barge III changes due to load transfer, barge I and barge II stop loading the ballast water tank, and the lifting system continues to lower until the upper module load of the offshore platform is completely borne by barge III. At this time, the second load transfer is completed; Step 2.9: The tugboat tows barge I and barge II to a certain distance from barge III, and the transportation of the upper assembly of the offshore platform is completed by barge III.

Citation Information

Cited By

  • Pile foundation construction auxiliary platform

    CN122402723A