Efficient installation and construction method for factory building power station pipeline

By using technical means such as workbenches, lifting and telescopic mechanisms, and powerful suction cups during the installation of power station pipelines, automatic lifting and position adjustment are realized, which solves the problem of workers holding and climbing for long periods of time in the existing technology, and improves the efficiency of installation. Efficiency and safety.

CN118723853APending Publication Date: 2024-10-01CHINA CONSTR FOURTH ENG BUREAU MECHANICAL & ELECTRICAL INSTALLATION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310616967.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-29
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing power station pipeline installation process requires multiple workers to lift for a long time, which wastes effort and increases the risk of fatigue. Workers also need to climb high to perform installation operations, resulting in an increased risk of the pipeline falling.

Method used

An efficient installation method including a workbench, lifting and telescopic mechanism, strong suction cup, universal wheel and servo motor is designed. The transmission motor drives the threaded rod and hydraulic rod for automatic lifting and position adjustment of the pipeline. The strong suction cup is used for the pipe. Adsorption and movement, the servo motor adjusts the height of the lifting platform.

Benefits of technology

It reduces workers' long-term holding and energy consumption during the lifting process, reduces fatigue risks, improves installation efficiency and safety, avoids pipe falling, and supports installation at different heights and locations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118723853A_ABST
    Figure CN118723853A_ABST
Patent Text Reader

Abstract

The invention provides an efficient installation and construction method for a plant power station pipeline, and relates to the technical field of pipeline installing.A workbench is included, a lifting telescopic mechanism is fixedly installed on the upper surface of the workbench, and a fixing plate is installed at the end, away from the workbench, of the lifting telescopic mechanism; a plurality of uniformly distributed powerful suction cups are fixedly mounted on one side of the fixing plate, a transmission motor is started, the transmission motor is matched with a first bevel gear and a second bevel gear to drive a threaded rod to rotate, at the moment, a rectangular sliding block is matched with a connecting rod to ascend, and the powerful suction cups can be adsorbed to the surface of a pipeline while ascending; and when the pipeline is moved to the connecting position of the pipeline and connection is completed, the powerful suction cup can relieve pressure and then withdraw to continue to suck a new pipeline, multiple workers do not need to use tools to hoist the pipeline for installation, the workers do not need to keep the pipeline for a long time, and the risk that the workers are fatigued after working for a long time and consequently the pipeline falls off is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipeline installation, and in particular to a high-efficiency installation construction method for pipelines of a power station in a plant. Background Art

[0002] A power station is a station that provides power energy. Various forces that make machinery work, such as water power, wind power, electricity, animal power, etc. Power machinery can be divided into three categories according to the way it converts different energies in nature into mechanical energy: wind power machinery, hydraulic machinery and thermal engines.

[0003] However, when installing existing power station pipelines, it is generally necessary for multiple workers to use tools to lift the pipelines and then install them. This will require workers to maintain the lifting process for a long time, which is not only a waste of energy, but also causes workers to become fatigued after working for a long time, resulting in the risk of the pipeline falling. At the same time, workers are required to climb high to perform installation operations. Therefore, we have made improvements to this and proposed an efficient installation construction method for factory power station pipelines. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a method for efficiently installing and constructing factory power station pipelines, which solves the problem that, during the installation of the existing power station pipelines, multiple workers are generally required to use tools to lift the pipelines and then install them, which requires the workers to maintain the lifting for a long time, which is not only a waste of energy, but also causes the workers to become fatigued after working for a long time, resulting in the risk of the pipelines falling. At the same time, the workers are also required to climb high to perform the installation work.

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: an efficient installation construction method for factory power station pipelines, including a workbench, a lifting and telescopic mechanism is fixedly installed on the upper surface of the workbench, a fixed plate is installed at the end of the lifting and telescopic mechanism away from the workbench, and a plurality of evenly distributed strong suction cups are fixedly installed on one side of the fixed plate, two universal wheels are movably installed at both ends of the surface of the side of the workbench away from the lifting and telescopic mechanism, two rectangular protruding blocks are fixedly installed on the surface of one side of the workbench, a lifting platform is installed at one end of the rectangular protruding block, the lifting platform and the rectangular protruding block are connected by a lifting adjustment mechanism, and two clamping blocks are fixedly installed on the surface of the end of each rectangular protruding block away from the workbench.

[0006] Preferably, the lifting and telescopic mechanism comprises a transmission motor and a fixed column;

[0007] The fixing columns are fixedly mounted on two ends of a side of the workbench away from the universal wheel, and a transmission motor is fixedly mounted on the side of one end of each fixing column close to the workbench.

[0008] Preferably, the output shaft of each transmission motor is movably passed through one side of a fixing column and is fixedly mounted with a first bevel tooth, and the first bevel tooth meshes with a second bevel tooth.

[0009] Preferably, one side of the second bevel tooth is movably mounted on the inner bottom end of the fixed column via a rotating shaft, and a threaded rod is fixedly mounted on one end of the second bevel tooth away from the fixed column.

[0010] Preferably, a rectangular slider is movably mounted on the outer surface of the threaded rod, a connecting rod is fixedly mounted on one side of the rectangular slider, and a rectangular movable plate is fixedly mounted on one end of the connecting rod away from the rectangular slider.

[0011] Preferably, a hydraulic rod is fixedly installed on one side of the center of the rectangular movable plate, and the output shaft of the hydraulic rod is movably installed through the rectangular movable plate and fixedly installed on one side surface of the fixed plate. A sliding column is fixedly installed on one side of both ends of the fixed plate, and the end of the sliding column away from the fixed plate moves through the rectangular movable plate.

[0012] Preferably, the lifting and adjusting mechanism comprises a fixed base and a rectangular limit block;

[0013] The lower surfaces of both ends of the fixed base are mounted inside the clamping block by bolts, and rectangular limit blocks are fixedly mounted on both ends of one side of the fixed base.

[0014] Preferably, one side of each of the rectangular limit blocks is movably mounted with a first slide bar and a second slide bar via a movable shaft, the other ends of the two first slide bars are movably mounted on a side surface of another rectangular limit block via a movable shaft, one side of the other rectangular limit block is fixedly mounted on the lower surface of the lifting platform, and the first slide bar and the second slide bar are connected by a connecting shaft.

[0015] Preferably, the other end of the second sliding rod is movably mounted on both ends of the movable slider, the movable slider is movably mounted on the outer surface of the threaded rod, the threaded rod is movably mounted between the two movable sliders, the movable slider is fixedly mounted on the lower surface of the lifting platform, one end of the threaded rod movably passes through one of the movable sliders and is mounted on the output shaft of the servo motor, and the servo motor is fixedly mounted on the lower surface of the lifting platform through a positioning block.

[0016] Preferably, a limiting block is fixedly installed at the center of the upper surface of the fixed base, and a limiting platform is fixedly installed on one side surface of the limiting block.

[0017] The present invention provides a highly efficient installation construction method for pipelines in a power station of a plant building. It has the following beneficial effects:

[0018] First, the transmission motor is started, and the transmission motor cooperates with the first bevel gear and the second bevel gear to drive the threaded rod to rotate. At this time, the rectangular slider cooperates with the connecting rod to rise. While rising, the strong suction cup will be adsorbed on the surface of the pipe. When it moves to the connection point of the pipe and the connection is completed, the strong suction cup will release pressure and then retract to continue to adsorb the new pipe. It does not require multiple workers to use tools to lift the pipe and then install it. It does not need to keep the workers for a long time, avoiding the risk of workers becoming fatigued and causing the pipe to fall after long-term work.

[0019] The mobile workbench starts the hydraulic rod in the lifting and telescopic mechanism after aligning it with the position where it needs to be installed. At this time, the hydraulic rod will drive the fixed plate to move forward, thereby adjusting the overall position of the pipeline. At the same time, it can be extended and retracted according to different needs.

[0020] By starting the servo motor, the servo motor will drive the threaded rod to rotate during the startup process, and the threaded rod will move forward and backward in coordination with the movable slider when rotating. Since one end of the second slider is movably installed on both sides of the movable slider, a semicircular movement can be performed at this time to adjust the height of the lifting platform, which can be adjusted according to the height of different floors;

[0021] However, the problem that during the installation of existing power station pipelines, multiple workers are generally required to use tools to lift the pipelines and then install them will result in the workers having to maintain the lifting for a long time, which is not only a waste of energy, but also the workers will become fatigued after working for a long time, resulting in the risk of the pipeline falling. At the same time, the workers are also required to climb high to perform the installation work. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the overall structure of the front side of the present invention;

[0023] Figure 2 It is a structural schematic diagram of the front side of the powerful suction cup in the present invention;

[0024] Figure 3 It is a schematic structural diagram of the back side of the present invention;

[0025] Figure 4 It is a schematic diagram of the structure of the side surface of the present invention;

[0026] Figure 5 For the present invention Figure 4 Schematic diagram of the structure of the cross section at AA;

[0027] Figure 6 It is a structural schematic diagram of the front side of the lifting and lowering adjustment mechanism in the present invention;

[0028] Figure 7It is a structural schematic diagram of the back side of the lifting and lowering adjustment mechanism in the present invention;

[0029] Figure 8 It is a structural schematic diagram of the lifting and lowering adjustment mechanism of the present invention from the side;

[0030] Fig. 9 For the present invention Figure 8 Schematic diagram of the structure of the cross section at BB.

[0031] In the figure, 1, strong suction cup; 2, fixed plate; 3, workbench; 4, clamping block; 5, rectangular protruding block; 6, lifting and telescopic mechanism; 601, rectangular movable plate; 602, sliding column; 603, transmission motor; 604, hydraulic rod; 605, fixed column; 606, connecting rod; 607, rectangular sliding block; 608, threaded rod; 609, first bevel gear; 610, second bevel gear; 7, universal wheel; 8, lifting platform; 9, lifting adjustment mechanism; 901, first sliding rod; 902, second sliding rod; 903, fixed base; 904, limiting platform; 905, limiting block; 906, movable sliding block; 907, rectangular limiting block; 908, movable shaft; 909, connecting shaft; 910, threaded rod; 911, servo motor. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] Example:

[0034] like Figures 1 to 8 As shown, an embodiment of the present invention provides an efficient installation construction method for pipelines in a power station of a factory building, comprising a workbench 3, a lifting and telescopic mechanism 6 is fixedly installed on the upper surface of the workbench 3, a fixed plate 2 is installed on the end of the lifting and telescopic mechanism 6 away from the workbench 3, and a plurality of evenly distributed strong suction cups 1 are fixedly installed on one side of the fixed plate 2, two universal wheels 7 are movably installed at both ends of the surface of one side of the workbench 3 away from the lifting and telescopic mechanism 6, two rectangular protruding blocks 5 are fixedly installed on the surface of one side of the workbench 3, a lifting platform 8 is installed on one end of the rectangular protruding block 5, the lifting platform 8 and the rectangular protruding block 5 are connected by a lifting adjustment mechanism 9, and two clamping blocks 4 are fixedly installed on the surface of one end of each rectangular protruding block 5 away from the workbench 3.

[0035] It can be understood that in the present application, the lifting and telescopic mechanism 6 includes a transmission motor 603 and a fixing column 605;

[0036] The fixed column 605 is fixedly installed at both ends of one side of the workbench 3 away from the universal wheel 7, and a transmission motor 603 is fixedly installed on the side of each fixed column 605 close to the workbench 3. The output shaft of each transmission motor 603 movably passes through one side of the fixed column 605 and is fixedly installed with a first bevel tooth 609, the first bevel tooth 609 meshes with the second bevel tooth 610, and one side of the second bevel tooth 610 is movably installed on the inner bottom end of the fixed column 605 through a rotating shaft, and a threaded rod 608 is fixedly installed on the end of the second bevel tooth 610 away from the fixed column 605, and a rectangular slider 607 is movably installed on the outer surface of the threaded rod 608, and a connecting rod 606 is fixedly installed on one side of the rectangular slider 607, and a rectangular movable plate 601 is fixedly installed on the end of the connecting rod 606 away from the rectangular slider 607, and a hydraulic rod 604 is fixedly installed on the center side of the rectangular movable plate 601. 4, the output shaft movably passes through the rectangular movable plate 601 and is fixedly installed on one side surface of the fixed plate 2. A sliding column 602 is fixedly installed on one side of both ends of the fixed plate 2. The sliding column 602 moves through the rectangular movable plate 601 at one end away from the fixed plate 2. By starting the transmission motor 603, the transmission motor 603 will cooperate with the first bevel gear 609 and the second bevel gear 610 to drive the threaded rod 608 to rotate. At this time, the rectangular slider 607 will cooperate with the connecting rod 606 to rise. While rising, the strong suction cup 1 will be adsorbed on the surface of the pipeline. When it moves to the connection point of the pipeline and the connection is completed, the strong suction cup 1 will release pressure, and then retract to continue to adsorb the new pipeline. The moving workbench 3, after aligning with the position to be installed, starts the hydraulic rod 604 in the lifting and telescopic mechanism 6. At this time, the hydraulic rod 604 will drive the fixed plate 2 to move forward, thereby adjusting the overall position of the pipeline, and it can be telescopic according to different needs.

[0037] It can be understood that in the present application, the lifting and adjusting mechanism 9 includes a fixed base 903 and a rectangular limit block 907;

[0038] The lower surfaces of both ends of the fixed base 903 are mounted inside the clamping block 4 by bolts, and rectangular limit blocks 907 are fixedly mounted on both ends of one side of the fixed base 903. A first slide bar 901 and a second slide bar 902 are movably mounted on one side of each of the rectangular limit blocks 907 through a movable shaft 908. The other ends of the two first slide bars 901 are movably mounted on the surface of one side of another rectangular limit block 907 through a movable shaft 908, and one side of the other rectangular limit block 907 is fixedly mounted on the lower surface of the lifting platform 8. The first slide bar 901 and the second slide bar 902 are connected by a connecting shaft 909, and the other end of the second slide bar 902 is movably mounted on both ends of a movable slider 906. The movable slider 906 is movably mounted on the outer surface of a threaded rod 910, and the threaded rod 910 is movably mounted between the two movable sliders 906. The movable slider 906 is fixedly installed on the lower surface of the lifting platform 8, one end of the threaded rod 910 is movably installed through one of the movable sliders 906 and is installed on the output shaft of the servo motor 911, and the servo motor 911 is fixedly installed on the lower surface of the lifting platform 8 through a positioning block, and a limiting block 905 is fixedly installed at the center of the upper surface of the fixed base 903, and a limiting platform 904 is fixedly installed on one side surface of the limiting block 905. By starting the servo motor 911, the servo motor 911 will drive the threaded rod 910 to rotate during the startup process, and the threaded rod 910 will cooperate with the movable slider 906 to move back and forth when rotating. Since one end of the second slide bar 902 is movably installed on both sides of the movable slider 906, a semicircular movement can be performed at this time, thereby adjusting the height of the lifting platform 8, and adjustments can be made according to the heights of different floors.

[0039] Working principle:

[0040] First, the transmission motor 603 is started, and the transmission motor 603 cooperates with the first bevel gear 609 and the second bevel gear 610 to drive the threaded rod 608 to rotate. At this time, the rectangular slider 607 cooperates with the connecting rod 606 to rise. While rising, the strong suction cup 1 will be adsorbed on the surface of the pipe. When it moves to the connection point of the pipe and the connection is completed, the strong suction cup 1 will release pressure and then retract to continue to adsorb new pipes.

[0041] The mobile workbench 3 starts the hydraulic rod 604 in the lifting and telescopic mechanism 6 after aligning it with the position to be installed. At this time, the hydraulic rod 604 will drive the fixed plate 2 to move forward, thereby adjusting the overall position of the pipeline, and can be extended and retracted according to different needs;

[0042] By starting the servo motor 911, the servo motor 911 will drive the threaded rod 910 to rotate during the starting process, and the threaded rod 910 will cooperate with the movable slider 906 to move forward and backward during the rotation. Since one end of the second slide bar 902 is movably installed on both sides of the movable slider 906, it can move in a semicircle at this time, thereby adjusting the height of the lifting platform 8, and can be adjusted according to the height of different floors;

[0043] However, the problem that during the installation of existing power station pipelines, multiple workers are generally required to use tools to lift the pipelines and then install them will result in the workers having to maintain the lifting for a long time, which is not only a waste of energy, but also the workers will become fatigued after working for a long time, resulting in the risk of the pipeline falling. At the same time, the workers are also required to climb high to perform the installation work.

[0044] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not limitations on the implementation methods of the present invention. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made on the basis of the above description. It is impossible to list all the implementation methods here. All obvious changes or modifications derived from the technical solution of the present invention are still within the protection scope of the present invention.

Claims

1. A highly efficient installation construction method for pipelines in a power station of a plant, comprising a workbench (3), characterized in that: A lifting and telescopic mechanism (6) is fixedly installed on the upper surface of the workbench (3); a fixed plate (2) is installed at one end of the lifting and telescopic mechanism (6) away from the workbench (3); a plurality of evenly distributed strong suction cups (1) are fixedly installed on one side of the fixed plate (2); two universal wheels (7) are movably installed at both ends of the surface of the side of the workbench (3) away from the lifting and telescopic mechanism (6); two rectangular protruding blocks (5) are fixedly installed on one side of the workbench (3); a lifting platform (8) is installed at one end of the rectangular protruding block (5); the lifting platform (8) and the rectangular protruding block (5) are connected via a lifting adjustment mechanism (9); and two clamping blocks (4) are fixedly installed on the surface of one end of each rectangular protruding block (5) away from the workbench (3).

2. The auxiliary support mechanism for gluing and installing a glass curtain wall according to claim 1, characterized in that: The lifting and telescopic mechanism (6) comprises a transmission motor (603) and a fixing column (605); The fixed columns (605) are fixedly mounted on both ends of a side of the workbench (3) away from the universal wheel (7), and a transmission motor (603) is fixedly mounted on the side surface of one end of each fixed column (605) close to the workbench (3).

3. The auxiliary support mechanism for gluing and installing a glass curtain wall according to claim 2, characterized in that: The output shaft of each transmission motor (603) is movably passed through one side of a fixed column (605) and is fixedly mounted with a first bevel tooth (609), and the first bevel tooth (609) is meshed with a second bevel tooth (610).

4. The auxiliary support mechanism for gluing and installing a glass curtain wall according to claim 3 is characterized in that: One side of the second bevel tooth (610) is movably mounted on the inner bottom end of the fixed column (605) via a rotating shaft, and a threaded rod (608) is fixedly mounted on one end of the second bevel tooth (610) away from the fixed column (605).

5. The auxiliary support mechanism for gluing and installing a glass curtain wall according to claim 4 is characterized in that: A rectangular slider (607) is movably mounted on the outer surface of the threaded rod (608), a connecting rod (606) is fixedly mounted on one side of the rectangular slider (607), and a rectangular movable plate (601) is fixedly mounted on one end of the connecting rod (606) away from the rectangular slider (607).

6. The auxiliary support mechanism for gluing and installing a glass curtain wall according to claim 5, characterized in that: A hydraulic rod (604) is fixedly installed on one side of the center of the rectangular movable plate (601); an output shaft of the hydraulic rod (604) movably passes through the rectangular movable plate (601) and is fixedly installed on a side surface of the fixed plate (2); a sliding column (602) is fixedly installed on one side of both ends of the fixed plate (2); and one end of the sliding column (602) away from the fixed plate (2) movably passes through the rectangular movable plate (601).

7. The auxiliary support mechanism for gluing and installing a glass curtain wall according to claim 1, characterized in that: The lifting and adjusting mechanism (9) comprises a fixed base (903) and a rectangular limiting block (907); The lower surfaces of both ends of the fixed base (903) are mounted inside the clamping block (4) by means of bolts, and rectangular limit blocks (907) are fixedly mounted on both ends of one side of the fixed base (903).

8. The efficient installation construction method for pipelines in a power station of a power plant according to claim 7 is characterized by: One side of each rectangular limit block (907) is movably mounted with a first slide bar (901) and a second slide bar (902) via a movable shaft (908); the other ends of the two first slide bars (901) are movably mounted on a side surface of another rectangular limit block (907) via a movable shaft (908); one side of another rectangular limit block (907) is fixedly mounted on the lower surface of the lifting platform (8); and the first slide bar (901) and the second slide bar (902) are connected via a connecting shaft (909).

9. The method for efficient installation and construction of pipelines in a power station of a power plant according to claim 8, characterized in that: The other end of the second sliding rod (902) is movably mounted on the two ends of the movable slider (906), the movable slider (906) is movably mounted on the outer surface of the threaded rod (910), the threaded rod (910) is movably mounted between the two movable sliders (906), the movable slider (906) is fixedly mounted on the lower surface of the lifting platform (8), one end of the threaded rod (910) is movably passed through one of the movable sliders (906) and is mounted on the output shaft of the servo motor (911), and the servo motor (911) is fixedly mounted on the lower surface of the lifting platform (8) through a positioning block.

10. The efficient installation construction method for pipelines in a power station of a power plant according to claim 7, characterized in that: A limiting block (905) is fixedly mounted at the center of the upper surface of the fixed base (903), and a limiting platform (904) is fixedly mounted on a side surface of the limiting block (905).