Control method and control system of semiconductor heating device

By using parallel control and predictive calculation of multiple heating zones in the semiconductor heating device, combined with the system delay correction value, the problem of temperature control delay is solved, the efficiency and stability of the heating device are achieved, and the quality of the film deposited on the substrate is improved.

CN118726951AActive Publication Date: 2024-10-01CHUYUN TEK (SHANGHAI) CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202410722369.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2024-10-01
Estimated Expiration
2044-06-05

AI Technical Summary

Technical Problem

Existing semiconductor heating devices have response delays in temperature control, resulting in long temperature stabilization times and poor stability, which affects the quality of thin films deposited on substrates.

Method used

The parallel control method of multiple heating zones is adopted, and through predictive calculation and system delay correction value optimization, the optimal temperature regulation power and temperature control of the heating device are achieved, the equilibrium time of temperature control is shortened, and temperature instability caused by system response delay is avoided.

Benefits of technology

It significantly shortens the equilibrium time of temperature control, improves temperature stability, ensures the uniformity and stability of substrate surface temperature, and improves the quality of deposited films.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118726951A_ABST
    Figure CN118726951A_ABST
Patent Text Reader

Abstract

The invention provides a control method of a semiconductor heating device and a control system for executing the control method. For the ith heating area and j heating areas adjacent to the ith heating area, according to the control method, temperature adjustment is carried out on the heating areas through the step Sm according to the optimal temperature adjustment power of the heating areas, and predicted temperature related parameters of the heating areas corresponding to the heating areas and system delay correction values of the heating areas are obtained. Performing prediction calculation through a step S (m + n) according to the target temperature related parameters, the predicted temperature related parameters of the heating areas corresponding to the heating areas obtained in the step Sm and the system delay correction values of the heating areas; therefore, the prediction of the optimal heating power in the next step is based on the predicted temperature related parameters predicted in the previous step, and the system delay correction value of each heating area is introduced, so that the balance time of temperature control is remarkably shortened, and the problems of long temperature stabilization time and instability caused by system response delay are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of semiconductor processing technology, and in particular to a control method and a control system for a semiconductor heating device. Background Art

[0002] The vapor deposition process is a process in which a process gas is deposited on a substrate through a physical or chemical reaction at a certain temperature and pressure. The existing vapor deposition equipment heats the base supporting the substrate through a heating device, and heats the substrate through heat transfer from the base to the substrate.

[0003] In order to ensure uniform temperature at all locations on the substrate or to ensure uniform temperature of different substrates, the heating device is usually zoned and controlled, that is, the host computer drives the temperature control unit to perform heating control on each heating zone on the heating device respectively, and the temperature measuring unit obtains and feeds back the temperature conditions of the corresponding heated zone to the host computer, so that the host computer drives the temperature control unit to adjust the heating power of each heating zone in real time.

[0004] Ideally, the time lag in the response interaction between the host computer, the temperature control unit, the heating device and the temperature measuring unit should be very short or even non-existent, so that the controlled quantity can be controlled in time. However, the actual situation is that the time lag between the heating device responding to the drive control of the temperature control unit to start heating and the temperature control unit sending a drive instruction to the heating device, as well as the time lag between the temperature control unit responding to the control instruction of the host computer and the host computer sending the control instruction makes the temperature control performed by the host computer ahead of the actual temperature response of the heating device, so that the controlled quantity cannot be controlled in time. The temperature control performed by the host computer based on the controlled quantity information fed back by the temperature measuring unit obviously has a lag, which makes the heating device prone to overshoot and the system has a long stabilization time and poor stability, which will also affect the heated object, such as the quality of the thin film deposited on the substrate. Summary of the invention

[0005] The present invention provides a control method and a control system for a semiconductor heating device, so as to alleviate or avoid the situation that the temperature stabilization time is long and the stability is poor.

[0006] The present invention provides a semiconductor device including a semiconductor heating device and a heated device, wherein the semiconductor heating device includes at least three heating zones for generating heat, wherein the i-th heating zone is adjacent to the remaining j heating zones, j is a positive integer greater than or equal to 2, the i-th heating zone transfers heat to the i-th heated zone corresponding to the heated device, and the j heating zones respectively transfer heat to the j heated zones corresponding to the heated device.

[0007] To achieve the above object, taking the i-th heating zone as an example, the heating control method for the i-th heating zone includes the following steps:

[0008] S0: acquiring target temperature related parameters including the target temperature Tset, and controlling the semiconductor heating device to increase the temperature of the i-th heating zone and the j-th heating zone;

[0009] Si: performing an mth prediction calculation on the mth temperature adjustment process according to the target temperature related parameters and the obtained current temperature related parameters of the i-th heating zone and the j-th heating zone, and obtaining the m-th optimal temperature adjustment power of each of the i-th heating zone and the j-th heating zone, and the m-th predicted temperature related parameters of each of the i-th heating zone and the j-th heating zone;

[0010] Controlling the semiconductor heating device so that each of the i-th heating zone and the j-th heating zone performs the m-th temperature adjustment process at the respective m-th optimal temperature adjustment power;

[0011] Obtaining and performing correction calculations based on the issuing time of the power control instruction corresponding to the mth optimal temperature adjustment power of each of the i-th heating zone and the j-th heating zone, and the corresponding relationship between the real-time temperature and time of each of the i-th heating zone and the j-th heating zone, to obtain the system delay correction value of each of the i-th heating zone and the j-th heating zone;

[0012] S(m+n): performing the (m+n)th prediction calculation on the (m+n)th temperature adjustment process according to the target temperature related parameters, the mth predicted temperature related parameters of each of the i-th heating zone and the j-th heating zone in the step Sm, and the system delay correction value of each of the i-th heating zone and the j-th heating zone, obtaining the (m+n)th optimal temperature adjustment power of each of the i-th heating zone and the j-th heating zone, and the (m+n)th predicted temperature related parameters of each of the i-th heating zone and the j-th heating zone, and controlling the semiconductor heating device so that the i-th heating zone and the j-th heating zone respectively perform the (m+n)th temperature adjustment process with their respective (m+n)th optimal temperature adjustment powers;

[0013] Repeat the step (m+n) until the i-th heating zone and the j-th heating zone each reach the target temperature, where n is a positive integer greater than or equal to 1 and is taken sequentially.

[0014] Optionally, in step S0, the target temperature related parameters further include: set The corresponding target power P set ;

[0015] In the step Sm, the current temperature-related parameters of each of the i-th heating zone and the j-th heating zone include the current temperature T of the i-th heating zone. i0 and the corresponding current power P i0 , and the current temperature T of each of the j heating zones j0 and the corresponding current power P j0 .

[0016] Optionally, in the step Sm, the step of performing the mth prediction calculation to obtain the mth predicted temperature-related parameter of each of the i-th heating zone and the j-th heating zone comprises:

[0017] According to the current temperature T of the i-th heating zone i0 and the corresponding current power P i0 , and the current temperature T of each of the j heating zones j0 Calculate and obtain the predicted temperature T of the i-th heated area im And the corresponding predicted power P im ;

[0018] According to the current temperature T of each of the j heating zones j0 and the corresponding current power P j0 , and the current temperature T of the i-th heating zone i0 Calculate and obtain the predicted temperature T of each of the j heating zones jm And the corresponding predicted power P jm .

[0019] Optionally,

[0020] Among them, α is the correlation coefficient of the temperature adjustment rate, k ij is the thermal conductivity and σ is the Stefan-Boltzmann constant.

[0021] Optionally, the step S m In the step of performing the mth prediction calculation to obtain the mth optimal temperature adjustment power of each of the i-th heating zone and the j-th heating zone comprises:

[0022] According to the target temperature T set , the target power P set , the current temperature T of the i-th heating zone i0 and the corresponding current power P i0 Calculate and obtain the mth cost function C corresponding to the i-th heating zone im , then for the mth cost function C amMinimize to obtain the mth optimal temperature control power P of the i-th heating zone opt-im ;

[0023] According to the target temperature T set , the target power P set , the current temperature T of each of the j heating zones j0 and the corresponding current power P j0 Calculate and obtain the mth cost function C corresponding to each of the j heating zones jm , then for the mth cost function C jm Minimize to obtain the mth optimal temperature control power P of each heating zone in the j heating zones opt-jm .

[0024] Optionally, C im =(T a0 -T set ) 2 +(P a0 -P set ) 2 , P opt-im =argminC im ;

[0025] C jm =(T b0 -T set ) 2 +(P b0 -P set ) 2 , P opt-jm =argminC jm .

[0026] Optionally, in the step S(m+n), the step of performing the (m+n)th prediction calculation to obtain the (m+n)th predicted temperature-related parameter of each of the i-th heating zone and the j-th heating zone comprises:

[0027] According to the predicted temperature T of the i-th heating zone im And the corresponding predicted power P im , the predicted temperature T of each of the j heating zones jm And the system delay correction value D of the i-th heating zone si Calculate and obtain the predicted temperature T of the i-th heated area i(m+n) And the corresponding predicted power P i(m+n) ;

[0028] According to the predicted temperature T of each heating zone in the jth heating zone jm And the corresponding predicted power Pjm , the predicted temperature T of the i-th heated area im And the system delay correction value D of each heated zone in the j heating zones sj Calculate and obtain the predicted temperature T of each of the j heating zones j(m+n) And the corresponding predicted power P j(m+n) .

[0029] Optionally,

[0030] Among them, α is the correlation coefficient of the temperature adjustment rate, k ij is the thermal conductivity and σ is the Stefan-Boltzmann constant.

[0031] Optionally, in the step S(m+n), the step of performing the (m+n)th prediction calculation to obtain the (m+n)th optimal temperature adjustment power of each of the i-th heating zone and the j-th heating zone comprises:

[0032] According to the target temperature T set , the target power P set , the predicted temperature T of the i-th heated area im And the corresponding predicted power P im Calculate and obtain the (m+n)th cost function C corresponding to the i-th heating zone i(m+n) , and then for the (m+n)th cost function C i(m+n) Minimize to obtain the (m+n)th optimal heating power P of the i-th heating zone opt-i(m+n) ;

[0033] According to the target temperature T set , the target power P set , the predicted temperature T of the j heated areas jm And the corresponding predicted power P jm Calculate and obtain the (m+n)th cost function C corresponding to the j heating zones j(m+n) , and then for the (m+n)th cost function C j(m+n) Minimize to obtain the (m+n)th optimal heating power P of each of the j heating zones opt-j(m+n) .

[0034] Optionally, C i(m+n) =(T im -T set ) 2 +(P im -P set ) 2 , P opt-i(m+n) =argmin Ci(m+n) ;

[0035] C j(m+n) =(T jm -T set ) 2 +(P jm -P set ) 2 , P opt-i(m+n) =argmin C j(m+n) .

[0036] Optionally, the control instruction corresponding to the mth optimal temperature control power of the i-th heating zone is a first power control instruction, and the control instruction corresponding to the mth optimal temperature control power of one of the j heating zones is a second power control instruction. In the step Sm, the step of performing correction calculation to obtain the system delay correction value of each of the i-th heating zone and the j-th heating zone includes:

[0037] Obtain and based on the issuing time t of the first power control instruction mj ; The real-time temperature and time correspondence of the i-th heating zone is obtained, and the i-th heating zone is obtained at the time t m The corresponding temperature T si ;

[0038] Obtain and according to the sending time t of the second power control instruction mj , and the real-time temperature and time correspondence of the heated area corresponding to one of the j heating areas, and the temperature of the heated area at the time t mj The corresponding temperature T sj ;

[0039] According to T si and T sj Calculate and obtain the system delay correction value D of the i-th heating zone si , and obtain the system delay correction value D of each heating zone in the j heating zones sj .

[0040] Optionally,

[0041] Among them, k ij is the thermal conductivity and σ is the Stefan-Boltzmann constant.

[0042] Optionally, the step S0 also includes controlling the semiconductor heating device to perform an initial temperature adjustment process to adjust the temperature of the i-th heating zone and the j-th heating zone, and obtaining current temperature-related parameters of each of the i-th heating zone and the j-th heating zone.

[0043] Optionally, the control instruction corresponding to the mth optimal temperature control power of the i-th heating zone is a first power control instruction, and the control instruction corresponding to the mth optimal temperature control power of one of the j heating zones is a second power control instruction; in the step Sm, the step of performing correction calculation to obtain the system delay correction value of each of the i-th heating zone and the j heating zones includes:

[0044] Obtain and based on the issuing time t of the first power control instruction pim , the real-time temperature and time correspondence of the i-th heating zone, and the trend mutation time t′ when the temperature adjustment rate first undergoes a trend mutation since the initial temperature adjustment process in the real-time temperature and time correspondence of the i-th heating zone pmi , get the system delay correction value D of the i-th heating zone si ;

[0045] Obtain and according to the sending time t of the second power control instruction pjm , the real-time temperature-time correspondence of one of the j heating zones, and the trend mutation time t′ at which the temperature adjustment rate first undergoes a trend mutation in the real-time temperature-time correspondence of one of the j heating zones pjm , and obtain the system delay correction value D of each heating zone in the j heating zones sj .

[0046] Optionally,

[0047]

[0048] Among them, in the corresponding relationship between the real-time temperature and time of the i-th heating zone, the m-th temperature adjustment process is at t′ im The time ends, since t′ im Subtract Δt from the time dely-im The temperature value corresponding to the time node after the time length is T dim , Δt dely-im =(t′ pim -t pim );

[0049] In the real-time temperature and time correspondence of one of the j heating zones, the mth temperature adjustment process is at t′ jm The time ends, since t′ jm From time Δt dely-jm The temperature value corresponding to the time node after the time length is T sjm , Δt dely-jm =t′ pjm -t pjm.

[0050] The present application also provides a control system for a semiconductor heating device, wherein the semiconductor heating device includes at least three heating zones for generating heat, wherein the i-th heating zone is adjacent to the remaining j heating zones, and j is a positive integer greater than or equal to 2, and the control system is used to execute the control method of the semiconductor heating device to control the i-th heating zone and each of the j heating zones separately.

[0051] As described above, the control method and control system of the semiconductor heating device of the present invention have the following beneficial effects:

[0052] In the control method of the semiconductor heating device of the present invention, the mth optimal heating power of the i-th heating zone and the j-th heating zone is obtained through the step Sm to perform the m-th heating process, and the step S(m+n) performs predictive calculation based on the target temperature-related parameters, the predicted temperature-related parameters in the step Sm, and the system delay correction values ​​of the i-th heating zone and the j-th heating zone, so that the prediction of the optimal heating power in the next step is based on the predicted temperature-related parameters obtained by the previous step. Compared with the prediction of the optimal heating power based on the real-time temperature-related parameters in the previous step, the equilibrium time of temperature control is significantly shortened, and the predictive calculation of step S(m+n) introduces the system delay correction value of each heating zone obtained in step Sm, avoiding the problem of long and unstable temperature stabilization time caused by system response delay during the execution of S(m+n). BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 Shown is a schematic structural diagram of the chemical deposition equipment of the present application.

[0054] Figure 2 Shown is a flow chart of a control method for a semiconductor heating device of the present application.

[0055] Figure 3 A schematic diagram of the functional blocks of a semiconductor heating device with two partitions is shown.

[0056] Figure 4a and Figure 4b and Figure 5a and Figure 5b Shown is a schematic diagram of the partition structure of a semiconductor heating device and a heated device in a control method for a semiconductor heating device provided in Embodiment 2 of the present invention.

[0057] Figure 6 Displayed as a graph of the real-time temperature of the heated area versus time.

[0058] Figure 7a and Figure 7b and Figure 8a and Figure 8b Shown is a schematic diagram of the partition structure of a semiconductor heating device and a heated device in a control method for a semiconductor heating device provided in a fourth embodiment of the present invention.

[0059] Figure 9a and Figure 9b Shown is a schematic diagram of the partitioning of the semiconductor heating device and the heated device in the control method of the semiconductor heating device provided in the fifth embodiment. DETAILED DESCRIPTION

[0060] The following describes the embodiments of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0061] On one hand, the present invention provides a semiconductor device, which includes a heating device and a heated device, wherein the semiconductor device is a vapor deposition device, the heating device is a heating device in the vapor deposition device, and the heated device can be a base for carrying a substrate in the vapor deposition device. The functions of the heating device can include but are not limited to heating the base, heating the process chamber wall, heating the spray device, heating the air inlet pipeline, heating the air outlet pipeline, etc., so as to implement zone heating control on the heated object.

[0062] The vapor deposition equipment may be a chemical vapor deposition (CVD) equipment or a physical vapor deposition (PVD) equipment. The CVD device may be a plasma enhanced chemical vapor deposition (PECVD) equipment, a metal organic chemical vapor deposition (MOCVD) equipment, an atmospheric pressure chemical vapor deposition (APCVD) equipment, etc.; the PVD device may be a vacuum evaporation film (Vacuum Evaporation) equipment, a sputtering film (Sputtering) equipment, an ion plating (IonPlating) equipment, etc.

[0063] The specific embodiment of the present invention is described by taking a chemical vapor deposition device as an example. It should be understood that the device is only exemplary and the present invention is not limited to this device. Figure 1 As shown, the chemical vapor deposition equipment includes a process chamber 1, a base 2 for carrying a substrate 4 arranged in the process chamber 1, and a semiconductor heating device 3 is arranged below the base 2. The base 2 is a heated device exemplified in this embodiment. The semiconductor heating device 3 has two or three or more adjacent heating zones, and accordingly, the base 2 has heated zones corresponding to the heating zones of the semiconductor heating device 3. The cross-section of the process chamber 1 is generally circular or quasi-circular, or it can be a rectangular structure and other structures known to those skilled in the art, which will not be described in detail here. This embodiment takes a process chamber with a circular cross-section as an example, in which the cross-sections of the base 2 and the heating device 3 are both circular structures. The control method provided in the present application is to control each heating zone of the semiconductor heating device 3 separately to control the heat generation of each heating zone so that each heated zone of the base 2 is heated.

[0064] For a semiconductor heating device having two partitions, or a semiconductor heating device having two adjacent partitions and each partition is not adjacent to other partitions, the semiconductor heating device includes adjacent first heating zone and second heating zone, the first heating zone and the second heating zone generate heat to transfer heat to adjacent first heated zone and second heated zone of the heated device respectively, the heating control method of the semiconductor heating device of the present application includes the following steps:

[0065] S0: Get the target temperature T set The first heating area and the second heating area are heated by controlling the semiconductor heating device;

[0066] Sm: performing an mth prediction calculation on the mth temperature adjustment process according to the target temperature-related parameters and the acquired current temperature-related parameters of the first heating zone and the second heating zone, to obtain the mth optimal temperature adjustment power of the first heating zone and the second heating zone, and the mth predicted temperature-related parameters of the first heating zone and the second heating zone;

[0067] Controlling the first heating zone and the second heating zone to perform the mth temperature adjustment process at their respective mth optimal temperature adjustment powers;

[0068] Obtaining and performing correction calculations based on the issuing time of the control instruction corresponding to the mth optimal temperature adjustment power of each of the first heating zone and the second heating zone, and the corresponding relationship between the real-time temperature and time of each of the first heating zone and the second heating zone, to obtain the system delay correction values ​​of each of the first heating zone and the second heating zone;

[0069] S(m+n): performing an (m+n)th prediction calculation on the (m+n)th temperature adjustment process according to the target temperature related parameters, the mth predicted temperature related parameters of the first heating zone and the second heating zone in the step Sm, and the system delay correction values ​​of the first heating zone and the second heating zone, obtaining the (m+n)th optimal temperature adjustment power of the first heating zone and the second heating zone, and the (m+n)th predicted temperature related parameters of the first heating zone and the second heating zone, and controlling the semiconductor heating device through the (m+n)th power control instruction so that the first heating zone and the second heating zone perform the (m+n)th temperature adjustment process with their respective (m+n)th optimal temperature adjustment powers;

[0070] Repeat step (m+n) until the first heated area and the second heated area each reach the target temperature, where n is a positive integer greater than or equal to 1 and is taken sequentially.

[0071] For a heating device with three or more partitions, the i-th heating zone is adjacent to the remaining j heating zones, j is a positive integer greater than or equal to 2, the i-th heating zone transfers heat to the i-th heated zone corresponding to the heated device, and the j heating zones transfer heat to the j heated zones corresponding to the heated device one by one.

[0072] The present application provides a heating control method for the i-th heating zone, referring to Figure 2 , including the following steps:

[0073] S0: Get the target temperature T set controlling the semiconductor heating device to increase the temperature of the i-th heating zone and the j-th heating zone based on target temperature related parameters including the target temperature;

[0074] Sm: performing prediction calculation according to the target temperature related parameters and the current temperature related parameters of the i-th heating zone and each of the j-th heating zones, and controlling the i-th heating zone and each of the j-th heating zones to adjust the temperature with their respective optimal temperature adjustment powers, and obtaining the m-th predicted temperature related parameters of each heating zone, and performing correction calculation to obtain the system delay correction value of each heating zone;

[0075] S(m+n): Based on the target temperature related parameters, the mth predicted temperature related parameters of each heated zone obtained in step Sm, and the system delay correction value of each heating zone, the (m+n)th predicted calculation is performed on the (m+n)th heating process to control each heating zone to adjust the temperature with its own optimal temperature control power, and obtain the (m+n)th predicted temperature related parameters of each heated zone.

[0076] Repeat the step (m+n) until the i-th heating zone and the j-th heating zone each reach the target temperature, where n is a positive integer greater than or equal to 1 and is taken sequentially.

[0077] Wherein, step Sm comprises:

[0078] According to the target temperature-related parameters and the acquired current temperature-related parameters of each of the i-th heating zone and the j-th heating zone, an m-th prediction calculation is performed on the m-th temperature adjustment process to obtain the m-th optimal temperature adjustment power of each of the i-th heating zone and the j-th heating zone, and the m-th predicted temperature-related parameters of each of the i-th heating zone and the j-th heating zone;

[0079] Controlling the semiconductor heating device so that each of the i-th heating zone and the j-th heating zone performs the m-th temperature adjustment process at the respective m-th optimal temperature adjustment power;

[0080] Obtain and perform correction calculations based on the issuance time of the power control instruction corresponding to the mth optimal temperature control power of each of the i-th heating zone and the j-th heating zone, and the corresponding relationship between the real-time temperature and time of each of the i-th heating zone and the j-th heating zone, to obtain the system delay correction value of each of the i-th heating zone and the j-th heating zone.

[0081] Wherein, step S(m+n) comprises:

[0082] According to the target temperature related parameters, the mth predicted temperature related parameters of each of the i-th heating zone and the j-th heating zone in step Sm, and the system delay correction value of each of the i-th heating zone and the j-th heating zone, the (m+n)th predicted calculation is performed on the (m+n)th temperature control process to obtain the (m+n)th optimal temperature control power of each of the i-th heating zone and the j-th heating zone, and the (m+n)th predicted temperature related parameters of each of the i-th heating zone and the j-th heating zone, and the semiconductor heating device is controlled so that the i-th heating zone and the j-th heating zone perform the (m+n)th temperature control process with their respective (m+n)th optimal temperature control powers.

[0083] Embodiment 1

[0084] This embodiment provides a control system for a semiconductor heating device. Taking a heating control system for a heating device having two partitions as an example, the control system for the semiconductor heating device is a dual-zone heating control system, that is, the dual-zone heating control system performs temperature rise control on the two heating zones of the semiconductor heating device to make the two heating zones generate heat. Specifically, refer to Figure 3 Taking the semiconductor heating device including two partitions, partition a and partition b, as an example, the control system of the semiconductor heating device refers to Figure 3 , including partition a power control module, partition b power control module, partition a temperature measurement module, partition b temperature measurement module and prediction processing module. When the number of partitions increases, the corresponding power control module and temperature measurement module can be added.

[0085] The number of power control modules corresponds to the number of heating zones of the heating device to achieve one-to-one control, i.e. Figure 3 The partition a power control module shown corresponds to the partition a electrically connected to the heating device to control the heating of partition a, and the partition b power control module corresponds to the partition b electrically connected to the heating device to control the heating of partition b. The prediction processing module is in communication with each power control module and each temperature measurement module. The prediction processing module receives the information exchanged between each temperature measurement module and each power control module, pre-stores target temperature related parameters including the target temperature, and performs prediction calculation based on the above information to obtain prediction information and optimal heating power information, and sends power control instructions to each power control module according to the optimal heating power. Each power control module drives each heating zone of the heating device to generate heat in response to the power control instructions received, so that the corresponding heated area on the heated device is controlled to heat up, and stores the real-time power at each moment to exchange information with the prediction processing module.

[0086] The temperature measurement module is used to obtain the real-time temperature of the heated device and feed back the real-time temperature to the prediction processing module. The temperature monitoring module may include a contact temperature measurement unit to obtain the surface temperature of each heated area of ​​the heated device, or may include a non-contact temperature measurement unit to obtain the temperature near each heated area of ​​the heated device. In an optional embodiment, the number of temperature measurement units of the temperature measurement module is at least consistent with the number of heated areas of the heated device and is arranged one-to-one to obtain the real-time temperature of each heated area of ​​the heated device.

[0087] The prediction processing module is provided with a storage module for storing various parameter data obtained from the power control module and the temperature measurement module, as well as prediction information obtained by prediction calculation in each step.

[0088] In an optional embodiment, the temperature measuring unit may be a thermocouple or other component capable of collecting temperature information. The power control module may specifically be a PSU (Power Supply Unit). The above-mentioned storage module may be built into the prediction processing module or may be externally placed as an independent module. The storage module stores various types of collected information, calculated information, parameter information, and corresponding relationship information for prediction and processing calls. The prediction processing module may specifically include a host computer and a PLC, wherein the host computer performs prediction calculations, and the PLC performs logic control instruction conversion and transmission. It is understandable that the specific type and arrangement of each module may be selected according to actual needs.

[0089] Embodiment 2

[0090] This embodiment provides a control method for a semiconductor heating device. In this embodiment, Figure 4a and Figure 4b As shown, the semiconductor heating device includes two partitions: partition a and partition b. Partition a and partition b are arranged adjacent to each other, for example Figure 4a As shown, they are arranged side by side, or as Figure 4b As shown, the partition b is arranged in a manner of surrounding the partition a. The partition a and the partition b of the semiconductor heating device correspond to Figure 5a and Figure 5b The heated area a' and the heated area b' of the heated device (ie the base) are shown.

[0091] The same substrate can cover Figure 4b The heating zone a' and the heating zone b' shown may also be different substrates placed in the heating zone a' and the heating zone b' respectively. In order to ensure the temperature uniformity of each part of the substrate surface, the host computer controls the heating of the partition a and the partition b respectively through the temperature control unit and introduces the system delay correction to overcome the problem that the controlled quantity cannot be controlled in time due to the response delay between the host computer, the temperature control unit and each partition. In addition, due to the adjacent position relationship between the heating zone a' and the heating zone b' of the base, there will be heat conduction between the adjacent heating zones, that is, the temperature of the heating zone a' is affected by the heat transfer of the heating zone b', and the temperature of the heating zone b' is affected by the heat transfer of the heating zone a'. Therefore, in this embodiment, the host computer also introduces the correction calculation of heat conduction in the process of heating control of each partition of the semiconductor heating device.

[0092] For the case where the above-mentioned semiconductor heating device and the heated device respectively include two partitions, the partition a of the semiconductor heating device serves as the first heating zone, and the corresponding partition a' of the heated device serves as the first heated zone of the heated device; the partition b of the semiconductor heating device serves as the second heating zone, and the corresponding partition b' of the heated device serves as the second heated zone of the heated device. The temperature rise control process is described in detail.

[0093] In step S0 of this embodiment: firstly, an initial heating process is performed, specifically, the initial heating process, the prediction processing module sends an initial power control instruction to the power control module of partition a, the power control module connected to partition a responds to the initial power control instruction to perform initial heating control on partition a, and partition a responds to the initial heating drive control to heat up at the initial heating rate until the heated zone a' reaches the current temperature T a0 ;

[0094] In step S0 of some embodiments, the initial temperature adjustment process can be a heating process starting from room temperature, or it can be an initial temperature adjustment process that is started after heating from room temperature to a certain temperature (for example, heating at a maximum heating rate). This can save time and effectively avoid temperature overshoot.

[0095] In this embodiment, the target temperature T set is 800°C. At the current temperature T a0 The initial temperature rise control is performed from room temperature to a target temperature 5°C lower than 800°C, that is, the current temperature T a0 It is 795℃, and a deviation of ±0.1℃ is allowed in actual control.

[0096] In some embodiments, the target temperature T set is 800°C. At the current temperature T a0 The initial temperature rise control is performed from room temperature with a target temperature of 5°C to 50°C lower than 800°C.

[0097] In some embodiments, the current temperature T a0 is the target temperature T set at least 90% of the

[0098] The above current temperature T a0 Less than the set temperature T set , optionally, the current temperature T a0 Set to a higher temperature than the set temperature T set 0.5% to 10% lower, that is, T a0 =(90%~99.5%)T set ; Further, the current temperature T a0 Set to a higher temperature than the set temperature T set 0.5% to 7% lower, that is, T a0 =(93%~99.5%)T set Therefore, specifically, according to the target temperature T set Set the current temperature T a0 .

[0099] For example, in an optional embodiment, the target temperature T set is about 200℃, at this time you can set the current temperature Ta0 3℃~5℃ lower than 200℃, that is, set the current temperature T a0 It is 195℃~197℃.

[0100] In step S0 of this embodiment, the current temperature-related parameters of the heated area a′ and the heated area b′ are obtained, including the current temperature T of the heated area a′. a0 and the corresponding current power P a0 When the current temperature of the heated area b′ is T b0 and the corresponding current power P b0 After step S0 of this embodiment is completed, the set current temperature T is reached. a0 After that, from the current temperature T a0 To target temperature T set The heating process is finely controlled step by step, specifically:

[0101] Execute step S1 (i.e. m=1): according to T set , and T set The corresponding target power P set , the current temperature T of the first heated area a′ a0 and the corresponding current power P a0 When the current temperature of partition b′ is T b0 and the corresponding current power P b0 The first prediction calculation is performed to predict the control parameters of the first heating process to guide the subsequent first heating process. The specific steps include:

[0102] S11: The prediction processing module predicts the optimal heating power P of the partition a for executing the first heating process opt-a1 , predicted temperature T a1 And the corresponding predicted power P a1 ; and predict the optimal heating power P for partition b to perform the first heating process opt-b1 ;

[0103] Specifically, the prediction processing module is based on the pre-stored target temperature T set and the target power P set , the current temperature T of the first heated area fed back by the temperature measurement module in area a a0 , the feedback from the power control module in zone a and T a0 The corresponding current power P a0 Calculate and obtain the first cost function C corresponding to the first heating zone a1 , then for the first cost function C a1 Minimize to obtain the first optimal temperature control power P of the first heating zone opt-a1 ; More specifically: C a1 =(Ta0 -T set ) 2 +(P a0 -P set ) 2 , P opt-a1 =argminC a1 ; The prediction processing module will P opt-a1 The information is converted into corresponding power control instructions and sent to the power control module of partition a;

[0104] Specifically, according to the target temperature T set , the target power P set , the current temperature T of the second heating zone b0 and the corresponding current power P b0 Calculate and obtain the first cost function C corresponding to the second heating zone b1 , then for the first cost function C b1 Minimize to obtain the first optimal temperature control power P of the second heating zone opt-b1 . More specifically: C b1 =(T b0 -T set ) 2 +(P b0 -P set ) 2 , P opt-b1 =argmin C b1 The prediction processing module will P opt-b1 Convert it into corresponding power control instructions and send them to the power control module in zone B.

[0105] Specifically, the temperature T of the heated area a′ after the first heating process is completed is predicted. a1 =T a0 +α[P a0 -σT a0 4 -k(T a0 -T b0 )]; predict the temperature T of the partition b′ after the first heating process is completed b1 =T b0 +α[P b0 -σT b0 4 -k(T b0 -T a0 )]. There is heat conduction between adjacent heated areas, so the heat transfer effect of adjacent heating areas needs to be taken into account. Among them, α is the coefficient related to the heating rate, k is the heat conductivity coefficient, which is related to the materials of the heated area a′ and the heated area b′, α and k are system setting values; σ is the Stefan-Boltzmann constant, which is 5.67x10 -8W / m 2 K.

[0106] S12: The power control module of zone a controls zone a to heat up at the first optimal heating rate P according to the corresponding power control instruction. opt-a1 During the first heating process, the power control module of zone b controls the zone b to P according to the corresponding power control instruction. opt-b1 Carry out the first heating process;

[0107] S13: Obtaining the delay time Δt of each partition a and partition b dely-a1 and Δt dely-b1 , and their respective system delay correction values ​​D sa and D sb , specifically:

[0108] In order to eliminate the obvious lag in temperature control caused by the time lag between the semiconductor heating device starting to generate heat in response to the drive control of the temperature control unit and the temperature control unit sending a drive instruction to the heating device, as well as the time lag between the temperature control unit responding to the control instruction of the host computer and the host computer sending the control instruction, in the above-mentioned first heating process, the delay time of each partition of the heating process and the heating delay item are calculated and determined.

[0109] The delay time of each partition and the heating delay term are caused by the response lag between the units of the heating device, that is, they are caused by the inherent response characteristics of the hardware. Therefore, it can be considered that they do not change with the heating process and are fixed in the entire heating process. Therefore, in the first heating process of partition a and partition b, the above-mentioned delay time and heating delay term are determined for the prediction calculation of the subsequent heating process, which can reduce or even eliminate the problem of long and unstable temperature stabilization time caused by the response lag problem caused by the inherent response characteristics of the hardware in the subsequent heating process.

[0110] The prediction processing module records P opt-a1 The information is converted into the corresponding power control instruction and sent to the time of the power control module of partition a, and the corresponding relationship between the real-time temperature and time of partition a is obtained according to the real-time temperature feedback from the temperature measurement module of partition a. The corresponding relationship is fitted according to the real-time temperature data of the initial heating process and the first heating process of partition a. Specifically: partition a responds to the heating drive to control the corresponding area heating zone a′ on the heating base and performs the first heating process of duration Δt1, and the temperature measurement unit of partition a feeds back the real-time temperatures of the heating zone a′ to the prediction processing module. Figure 6 Understand, the prediction processing module will P opt-a1 The time for the information to be converted into the corresponding power control command and sent to the power control module in zone a is t pa1, obtained by fitting the real-time temperature data of the initial heating process of partition a and the real-time temperature data of the first heating process Figure 6 From the real-time temperature and time correspondence of partition a shown in the figure, it can be seen that due to the change in heating rate, a trend mutation time t′ appears. pa1 , due to the time delay caused by the inherent response characteristics of the aforementioned hardware, t′ pa1 Lag behind t pa1 , there is a time difference Δt between the two dely-a1 =(t′ pa1 -t pa1 ). The first heating process is at t′ a1 At the end of the first heating process, considering the time lag caused by the inherent response characteristics of the hardware, it can be considered that the corresponding power control command at the end of the first heating process is at t′ a1 Before a1 Time of issuance, t′ a1 With t a1 The time difference between the moments is also Δt dely-a1 , so t a1 The temperature corresponding to the moment T sa1 The system delay correction value D of partition a is calculated based on sa =σT 4 sa1 +k(T sa1 -T sb1 ), where T sb1 The determination method of T sa1 The determination method is the same as that of , so it will not be elaborated here. k is the heat transfer coefficient, which is related to the materials of partition a and partition b.

[0111] The prediction processing module records the P opt-b1 The information is converted into the corresponding power control instruction and sent to the time of the power control module of zone b, and the corresponding relationship between the real-time temperature and time of zone b is obtained according to the real-time temperature feedback from the temperature measurement module of zone b. The corresponding relationship is fitted according to the real-time temperature data of the initial heating process and the first heating process of zone b. Specifically: zone b responds to the heating drive to control the corresponding area heated zone b′ on the heating base and performs the first heating process of duration △t1, and the temperature measurement unit of zone b feeds back the real-time temperatures of the heated zone b′ to the prediction processing module. Specifically, D sb =σT 4 sb1 +k(T sb1 -T sa1 ); for specific implementation methods, please refer to the above sa Description of the computational process.

[0112] Step S2 (i.e. m=1, n=1) specifically includes:

[0113] S21: According to T set , P set , the predicted temperature and corresponding predicted power of each heated area in step S11 are calculated to obtain the second cost function C of partition a a2 =(T c1 -T set ) 2 +(P a1 -P set ) 2 , the second best heating power P of partition a opt-a2 =argmin C a2 Similarly, the second cost function C of partition b is b2 =(T b1 -T set ) 2 +(P b1 -P set ) 2 , the second best heating power P of partition b opt-b2 =argminC b2 ;

[0114] According to the predicted temperature T of the heated area a′ a1 And the corresponding predicted power P a1 , the predicted temperature T of the heated area b′ b1 , the system delay correction value D of the first heating zone sa , calculate the second predicted temperature of the heated area a′: T a2 =T a1 +α[P a1 -σT a1 4 -k(T a1 -T b1 )-D sa ];

[0115] According to the predicted temperature T of the heated area b′ b1 And the corresponding predicted power P b1 , the predicted temperature T of the first heated area a′ a1 , the system delay correction value D of the second heating zone sb , calculate the second predicted temperature of the heated area b′: T b2 =T b1 +α[P b1 -σT b1 4 -k(T b1 -T a1 )-D sb ];

[0116] S22: The power control module of zone a controls zone a to heat up the room with the second optimal heating power P according to the corresponding power control instruction. opt-a2 The second heating process is carried out, and the power control module of zone b controls the zone b to heat the second optimal heating power P according to the corresponding power control instruction. opt-b2 The second heating process is carried out with a duration of △t2.

[0117] Step S3 (m=1, n=2) specifically includes:

[0118] S31: According to T set , P set , the predicted temperature and corresponding predicted power of each heated area in step S21 are calculated to obtain the third cost function C of partition a a3 =(T a2 -T set ) 2 +(P a2 -P set ) 2 , the third best heating power P of partition a opt-a3 =argmin C a3 Similarly, the third cost function C of partition b is b3 =(T b2 -T set ) 2 +(P b2 -P set ) 2 , the third best heating power P of partition b opt-b3 =argminC b3 ;

[0119] According to the predicted temperature T of the heated area a′ a2 And the corresponding predicted power P a2 , the predicted temperature T of the heated area b′ b2 , the system delay correction D for the first heating zone sa The third predicted temperature of partition a is calculated as: T a3 =T a2 +α[P a2 -σT a2 4 -k(T a2 -T b2 )-D sa ];

[0120] According to the predicted temperature T of the heated area b′ b2 And the corresponding predicted power P b2 , the predicted temperature T of the heated area a′ a2 , the system delay correction D for the second heating zone sb The third predicted temperature of partition b is calculated as: Tb3 =T b2 +α[P b2 -σT b2 4 -k(T b2 -T a2 )-D sb ];

[0121] S32: The power control module of zone a controls zone a to heat up the temperature with the third optimal heating power P according to the corresponding power control instruction. opt-a3 The third heating process with a duration of △t3 is carried out, and the power control module of zone b controls zone b to P according to the corresponding power control instruction. opt-b3 The third heating process with a duration of △t3 is carried out.

[0122] In step S4 (m=1, n=3):

[0123] S41: According to T set , P set , calculate the predicted temperature and corresponding predicted power of each heated area in step S31, and obtain C a4 =(T a3 -T set ) 2 +(P a3 -P set ) 2 , the 4th best heating power P of partition a opt-a4 =argminC a4 , similarly, C b4 =(T b3 -T set ) 2 +(P b3 -P set ) 2 , the 4th best heating power P of partition b opt-b4 =argmin C b4 ;

[0124] S42: The power control module of zone a controls zone a to heat up the temperature with the fourth optimal heating power P according to the corresponding power control instruction. opt-a4 The fourth heating process with a duration of △t4 is performed until the target temperature is reached. The power control module of zone b controls zone b to P according to the corresponding power control instruction. opt-b4 The fourth heating process with a duration of Δt4 is carried out until the target temperature is reached.

[0125] In summary, in this embodiment, m=1, and n takes values ​​of 1, 2, and 3 in sequence. It can be understood that in D sa and D sb After confirmation, use D sa and D sbThe temperature control was performed at least once.

[0126] In some embodiments, the duration of each heating process may be equal, or may be not completely equal or not equal at all according to the actual control situation and control requirements. The specific duration needs to be adaptively adjusted according to the actual control requirements, which mainly depends on the difference between the current temperature of each partition reached in step S0 and the target temperature, as well as the requirements for temperature stability and duration.

[0127] In this embodiment, the temperature rise of two partitions of the semiconductor heating device is controlled separately, and the optimal heating rate is used for heating in each heating process, thereby ensuring that the temperature of each partition gradually rises from the current temperature to the set temperature through multiple heating processes, and the error between the heating temperature and the target temperature of each heating process is controlled to a minimum, or even the error between the two is eliminated, thereby ensuring the consistency of the heating temperature and the set temperature, and preventing defects in the vapor deposition process caused by insufficient or excessive heating.

[0128] Embodiment 3

[0129] This embodiment also provides a control method for a semiconductor heating device, and specifically provides another method for determining a system delay correction value in the control method, specifically:

[0130] In the step Sm, the step of performing correction calculation to obtain the system delay correction value of each of the first heating area and the second heating area includes:

[0131] Obtain the issuing time t of the mth power control instruction m ;

[0132] According to the corresponding relationship between the real-time temperature and time of the first heated area, the temperature of the first heated area at the time t m The corresponding temperature T sa ;

[0133] According to the corresponding relationship between the real-time temperature and time of the second heated area, the temperature of the second heated area at the time t m The corresponding temperature T sb ;

[0134] According to the first heating zone at the emission time t m The corresponding temperature T sa and the second heated area at the emission time t j The corresponding temperature T sb Calculate and obtain the system delay correction value D of the first heating zone sa , and obtain the system delay correction value D of the second heating zone sb .

[0135] More specifically:

[0136] D sa =σT 4 sa +k(T sa -T sb );

[0137] D sb =σT 4 sb +k(T sb -T sa );

[0138] Where k is the thermal conductivity and σ is the Stefan-Boltzmann constant.

[0139] Embodiment 4

[0140] This embodiment provides a control method for a semiconductor heating device. In this embodiment, Figure 7a As shown, the semiconductor heating device includes three partitions: partition a, partition b and partition c. Partition a is located in the central area of ​​the semiconductor heating device 3, partition b surrounds partition a and is located in the secondary peripheral area of ​​the semiconductor heating device 3, and partition c surrounds partition b and is located in the outermost area of ​​the semiconductor heating device 3. Accordingly, the partitions a, b and c of the semiconductor heating device 3 correspond to the following respectively: Figure 7b The subarea a′, subarea b′ and subarea c′ on the base 2 shown are heating zone a′, heating zone b′ and heating zone c′.

[0141] like Figure 5a As shown, the heating zone adjacent to partition a is partition b, the heating zones adjacent to partition b are partition a and partition c, and the heating zone adjacent to partition c is partition b. It can be seen that partition a and partition c in this embodiment each have only one adjacent heating zone, which is the same as the setting of partition a in Example 2. Therefore, the temperature rise control process of partition a and partition c is the same as the temperature rise process of partition a described in Example 2. The temperature rise process of partition a and partition c can be completed with reference to the description of Example 2. The heating zones adjacent to partition b are partition a and partition c. That is, in the heating device of this embodiment, partition b is the i-th partition, and the j-th adjacent partition is the two partitions of partition a and partition c. Therefore, the temperature rise process of partition b must be affected by the joint influence of partition a and partition c. In this regard, when controlling the temperature rise of partition b, the predicted temperature of the temperature rise process needs to consider the joint influence of partition a and partition c.

[0142] Specifically, the heating process of the partition b includes: first, according to the heating control method described in the second embodiment, completing step S0, in the initial heating process, obtaining the target temperature Tset The corresponding target power P set , and obtain the current temperature T of the heated area b′ b0 and the corresponding current power P b0 , and the current temperature T of the adjacent heated area a′ a0 and the corresponding current power P a0 , the current temperature T of the heated area c′ c0 and the corresponding current power P c0 . The temperature rise in each zone is carried out synchronously.

[0143] Similarly, after step S0 is completed, the set current temperature T is reached. b0 After that, from the current temperature T b0 To target temperature T set The heating process is finely controlled step by step, and the fine control of each zone is also carried out simultaneously. Specifically:

[0144] Execute step S1 (i.e. m=1): according to T set , and T set The corresponding target power P set , the current temperature T of the heated area b′ b0 and the corresponding current power P b0 , and the current temperature T of the adjacent heated area a′ a0 and the corresponding current power P a0 , the current temperature T of the heated area c′ c0 and the corresponding current power P c0 , performing a first prediction calculation to predict the temperature-related parameters and control parameters of the first heating process to guide the subsequent first heating process, the specific steps include:

[0145] S11: Predicting the optimal heating power P for partition b to execute the first heating process opt-ai , predicted temperature T b1 And the corresponding predicted power P b1 ; and predict the optimal heating power P for partition b to perform the first heating process opt-b1 ;

[0146] Specifically, the prediction processing module calculates the target temperature T according to the pre-stored set and the target power P set , the current temperature T of the heated area b′ fed back by the temperature measurement module of partition b b0 , the feedback of the power control module of partition b and T b0 The corresponding current power P b0 Calculate and get the first cost function C corresponding to partition b b1 , then for the first cost function C b1Minimize to get the first optimal temperature control power P of partition b opt-b1 ; More specifically: C b1 =(T b0 -T set ) 2 +(P b0 -P set ) 2 , P opt-b1 =argmin C b1 ; The prediction processing module will P opt-b1 The information is converted into corresponding power control instructions and sent to the power control module of partition b;

[0147] Specifically, the temperature T of the heated area b′ after the first heating process is predicted to be b1 =T b0 +αQ bm ; Since different heating materials may be used in different partitions of the heated device, the above material-related heat conduction term Q bm Specifically, when the materials of the heated zones are different, Q bm =σT b0 4 +k ba (T b0 -T a0 )+k bc (T b0 -T c0 ), k ba is the thermal conductivity coefficient associated with the materials of partition a' and partition b', k bc is the thermal conductivity coefficient related to the materials of partition c' and partition b', and the specific determination method is conventional in the art. Therefore, when the materials of the heated partitions are the same, that is, k ba =k bc = k, Q b1 =σT b0 4 +k((T b0 -T a0 )+(T b0 -T c0 )). Wherein, α is a coefficient related to the heating rate, k is a thermal conductivity coefficient related to the composition material of the heated partition, and the specific determination method is conventional in the art, and σ is the Stefan-Boltzmann constant, which is 5.67x10 -8 W / m 2 K.

[0148] For the control of partition a in step S11, please refer to step S11 of embodiment 2. For the control of partition c in step S11, please refer to step S11 of embodiment 2. The difference is that the current temperature T of the heated area corresponding to partition c is also obtained. c0 and the corresponding current power P c0 , C c1 =(T c0 -T set ) 2 +(P c0 -P set ) 2 , P opt-c1 =argmin C c1 .

[0149] S12: The power control module of partition b controls partition b to heat up at the first optimal heating rate P according to the corresponding power control instruction. opt-b1 At the same time, the partition a power control module and the partition c power control module also control the partition a and partition c to P according to the corresponding power control instructions respectively. opt-a1 and P opt-c1 The first heating process is carried out simultaneously.

[0150] S13: Obtaining the delay time Δt of each of partition b, partition a, and partition c dely-b1 , Δt dely-a1 and Δt dely-c1 , and their respective system delay correction values ​​D sb , D sa and D sc The calculation principle of the delay correction value of each partition can be found in the corresponding description of the second embodiment. The delay correction values ​​of each partition obtained are: D sb =σT 4 sb1 +k((T sb1 -T sa1 )+(T sb1 -T sc1 ));D sa =σT 4 sa1 +k(T sa1 -T sb1 )、D sc =σT 4 sc1 +k(T sc1 -T sb1 ), the above situation is that the components of the heated partitions are the same; when the components of the heated partitions are different, the delay correction values ​​of each partition are: D sb =σT 4 sb1 +k ba (Tsb1 -T sa1 )+k bc (T sb1 -T sc1 );D sa =σT 4 sa1 +k ab (T sa1 -T sb1 )、D sc =σT 4 sc1 +k cb (T sc1 -T sb1 ).

[0151] Step S2 (i.e. m=1, n=1) specifically includes:

[0152] S21: Calculate the second cost function C of partition b b2 =(T b1 -T set ) 2 +(P b1 -P set ) 2 , minimize the second cost function and obtain the second optimal heating power P of partition b opt-b2 =argmin C b2 ;

[0153] According to the target temperature T set , the target power P set , the predicted temperature T of the heated area a′ and heated area c′ a1 , T c1 And the corresponding predicted power P a1 and P c1 Calculate and obtain the second cost function C corresponding to the heated area a′ and the heated area c′ c2 :

[0154] C a2 =(T a2 -T set ) 2 +(P a2 -P set ) 2 ;

[0155] C c2 =(T c2 -T set ) 2 +(P c2 -P set ) 2 .

[0156] The second cost function is minimized respectively to obtain the second optimal heating power corresponding to the heated area a′ and the heated area c′:

[0157] P opt-a2 =argmin C a2 ;P opt-c2 =argmin C c2 .

[0158] According to the predicted temperature T of the heated area b′ b1 And the corresponding predicted power P b1 , and the system delay correction value D of partition b sb , the predicted temperatures T of the heating zones a′ and c′ adjacent to the heating zone b′ a1 , T c1 , calculate the second predicted temperature T of the heated area b′ b2 :T b2 =T b1 +α[P b1 -Q2]; where Q2 is the heat conduction term related to the material of the heating device. When the materials of the heated zones are different: Q2 = σT b1 4 +k ba (T b1 -T a1 )+k bc (T b1 -T c1 )+D sb ; When the materials of each heated zone are the same: Q2 = σT b1 4 +k((T b1 -T a1 )+(T b1 -T c1 ))+D sb .

[0159] Similarly, the calculation process of the second predicted temperature of the heated area a′ can refer to step S21 of the second embodiment. When the composition materials of the heated area a′ and the heated area b′ are different, k is k ab The calculation process of the second predicted temperature of the heated zone c 'is the same as step S21 of the second embodiment, except that, T c2 =T c1 +α[P c1 -σT c1 4 -k cb (T c1 -T b1 )-D sc ];

[0160] S22: The power control module of partition b controls partition b to heat up with the second optimal heating power P according to the corresponding power control instruction. opt-b2 The second heating process is performed, and the power control modules of partition a and partition c control partition a and partition c according to the corresponding power control instructions to control the second optimal heating power P opt-a2 , P opt-c2 The second heating process of duration Δt2 is performed. That is, the second heating processes of the three subareas a, b, and c are performed synchronously.

[0161] Step S3 (m=1, n=2) specifically includes:

[0162] S31: Calculate the third cost function C of partition b b3 =(T b2 -T set ) 2 +(P b2 -P set ) 2 , minimize the third cost function and obtain the third optimal heating power P of partition b opt-b3 =argmin C b3 ;

[0163] According to the target temperature T set , the target power P set , the predicted temperature T of the heated area a′ and heated area c′ a2 , T c2 And the corresponding predicted power P a2 and P c2 Calculate and obtain the third cost function C corresponding to the heated area a′ and the heated area c′ a3 :

[0164] C a3 =(T a2 -T set ) 2 +(P a2 -P set ) 2 ;

[0165] C c3 =(T c2 -T set ) 2 +(P c2 -P set ) 2 .

[0166] The third cost function is minimized respectively to obtain the third optimal heating power corresponding to the heated area a′ and the heated area c′:

[0167] P opt-a3 =argmin Ca3 ;P opt-c3 =argmin C c3 .

[0168] According to the predicted temperature T of the heated area b′ b1 And the corresponding predicted power P b2 , and the system delay correction value D of partition b sb , the predicted temperatures T of the heating zones a′ and c′ adjacent to the heating zone b′ a2 , T c2 , calculate the third predicted temperature T of the heated area b′ b3 :T b3 =T a2 +α[P b2 -Q3]; when the materials of the heated zones are different: Q3 = σT b2 4 +k ba (T b2 -T a2 )+k bc (T b2 -T c2 )+D sb ; When the materials of each heated zone are the same: Q3 = σT b2 4 +k((T b2 -T a2 )+(T b2 -T c2 ))+D sb .

[0169] Similarly, the calculation process of the third predicted temperature of the heated zone a′ can refer to step S31 of the second embodiment. When the composition materials of the heated zone a′ and the heated zone b′ are different, k is k ab The calculation process of the third predicted temperature of the heated zone c 'is the same as step S31 of the second embodiment, except that, T c3 =T c2 +α[P c2 -σT c2 4 -k cb (T c2 -T b2 )-D sc ];

[0170] S32: The power control module of partition b controls partition b to heat up with the third optimal heating power P according to the corresponding power control instruction. opt-b3 The third heating process with a duration of Δt3 is performed, and the power control modules of partition a and partition c control partition a and partition c to heat the partition a and partition c at the third optimal heating power P according to the corresponding power control instructions. opt-a3 , Popt-c3 The third heating process with a duration of Δt3 is carried out synchronously with partition b.

[0171] In step S4 (m=1, n=3):

[0172] S41: Calculate the fourth cost function C of partition b b4 =(T b3 -T set ) 2 +(P b3 -P set ) 2 , minimize the fourth cost function and obtain the fourth optimal heating power P of partition b opt-b4 =argmin C b4 ;

[0173] According to the target temperature T set , the target power P set , the predicted temperature T of the heated area a′ and heated area c′ a3 , T c3 And the corresponding predicted power P a3 and P c3 Calculate and obtain the fourth cost function C corresponding to the heated area a′ and the heated area c′ a4 :

[0174] C a4 =(T a3 -T set ) 2 +(P a3 -P set ) 2 ;

[0175] C c4 =(T c3 -T set ) 2 +(P c3 -P set ) 2 .

[0176] The fourth cost function is minimized respectively to obtain the fourth optimal heating power corresponding to the heated area a′ and the heated area c′:

[0177] P opt-a4 =argmin C a4 ;P opt-c4 =argmin C a4 .

[0178] S42: The power control module of partition b controls partition b to heat up with the fourth optimal heating power P according to the corresponding power control instruction. opt-b4The fourth heating process with a duration of △t4 is performed, and the power control modules of partition a and partition c control partition a and partition c synchronously with the fourth optimal heating power P according to the corresponding power control instruction. opt-a4 , P opt-c4 The fourth heating process with a duration of △t4 is carried out.

[0179] In summary, in this embodiment, m=1, and n takes values ​​of 1, 2, and 3 in sequence. It can be understood that in D sa and D sb , D sc After confirmation, use D sa and D sb , D sc The temperature control was performed at least once.

[0180] As described above, when a heating zone has, for example, two adjacent heating zones, each heating process takes into account the thermal influence between the corresponding heated zone and each adjacent heated zone, so that the heating process can be controlled more quickly and accurately and the temperature is more stable.

[0181] In an optional embodiment of this embodiment, if Figure 8a As shown, the semiconductor heating device also includes three partitions: partition a, partition b and partition c. Figure 7a The difference between the three partitions shown is that the partition a, the partition b and the partition c are formed into fan-shaped areas, which are arranged in pairs adjacent to each other. Figure 8a In the heating device shown, partition a has two adjacent heating zones, partition b and partition c; partition b has two adjacent heating zones, partition a and partition c; and partition c has two adjacent heating zones, partition a and partition b. Figure 8b The base shown also has corresponding partitions a', b' and c'. Therefore, in this optional embodiment, after the initial heating process and the first heating process are completed for each partition, when predicting the second predicted temperature of the second heating process according to the parameters of the first heating process, it is necessary to simultaneously consider the influence of the two adjacent heating zones of each partition. Therefore, the heating control process of each partition can refer to the above Figure 7a Description of the heating control process for partition b is shown.

[0182] Specifically, the predicted temperature reached by each heated zone after different heating processes is:

[0183] When the materials of each heated zone are the same, the k of each zone ij The same value is used. When the materials of the heated zones are different, the k ij Take values ​​respectively, k ijThe determination of is common knowledge in the art. Wherein, i is b, j is a, c; n is a positive integer such as 1, 2, 3, etc.

[0184] Embodiment 5

[0185] This embodiment provides a control method for a semiconductor heating device. In this embodiment, Figure 9a As shown, the heating device of the semiconductor heating device of this embodiment includes four partitions: partition a, partition b, partition c and partition d. Partition a is located in the central area of ​​the heating device, and partitions b, partition c and partition d are distributed around partition a, so each partition has three adjacent partitions: partition a is adjacent to partitions b, c and d, partition b is adjacent to partitions a, c and d, partition c is adjacent to partitions a, b and d, and partition d is adjacent to partitions a, b and c, that is, each partition has three heating zones. Accordingly, the partitions a, b, c and d of the semiconductor device heating device 3 correspond to the following respectively. Figure 9b The subareas a', b', c' and d' on the base are shown. Similarly, each heating zone of the base 2 also has three adjacent heating zones.

[0186] The difference from the above-mentioned fourth embodiment is that the number of adjacent partitions of each partition in this embodiment is increased. Therefore, in the heating control process, it is necessary to simultaneously consider the influence of more adjacent partitions on the heating partition. The independent control process of each partition is the same as that described in the fourth embodiment, and will not be repeated here. The difference is that the predicted temperature obtained by each heated partition after each heating process is different, which can be obtained according to the following formula combined with the process described in the fourth embodiment:

[0187] When the materials of each heated zone are the same, the k of each zone ij The same value is used. When the materials of the heated zones are different, the k ij Take values ​​respectively, k ij The determination of is common knowledge in the art. Wherein, i is a, b, c, d; when i is a, j is b, c, d; when i is b, j is a, c, d; when i is c, j is a, b, d; when i is d, j is a, b, c; n is a positive integer such as 1, 2, 3, etc.

[0188] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A control method for a semiconductor heating device, characterized in that: A semiconductor device is provided, comprising a semiconductor heating device and a heated device, wherein the semiconductor heating device comprises at least three heating zones for generating heat, wherein the i-th heating zone is adjacent to the remaining j heating zones, j being a positive integer greater than or equal to 2, the i-th heating zone transfers heat to the i-th heated zone corresponding to the heated device, and the j heating zones transfer heat to the j heated zones corresponding to the heated device in a one-to-one correspondence; The heating control method includes a heating control method performed on the i-th heating zone, comprising the following steps: S0: Get the target temperature T set controlling the semiconductor heating device to increase the temperature of the i-th heating zone and the j-th heating zone based on target temperature related parameters including the target temperature; Sm: performing an mth prediction calculation on the mth temperature adjustment process according to the target temperature related parameters and the acquired current temperature related parameters of the i-th heating zone and each of the j-th heating zones, and obtaining the mth optimal temperature adjustment power of each of the i-th heating zone and each of the j-th heating zones, and the mth predicted temperature related parameters of each of the i-th heating zone and each of the j-th heating zones; Controlling the semiconductor heating device so that each of the i-th heating zone and the j-th heating zone performs the m-th temperature adjustment process at the respective m-th optimal temperature adjustment power; Obtaining and performing correction calculations based on the issuing time of the power control instruction corresponding to the mth optimal temperature adjustment power of each of the i-th heating zone and the j-th heating zone, and the corresponding relationship between the real-time temperature and time of each of the i-th heating zone and the j-th heating zone, to obtain the system delay correction value of each of the i-th heating zone and the j-th heating zone; S(m+n): performing the (m+n)th prediction calculation on the (m+n)th temperature adjustment process according to the target temperature related parameters, the mth predicted temperature related parameters of each of the i-th heating zone and the j-th heating zone in the step Sm, and the system delay correction value of each of the i-th heating zone and the j-th heating zone, obtaining the (m+n)th optimal temperature adjustment power of each of the i-th heating zone and the j-th heating zone, and the (m+n)th predicted temperature related parameters of each of the i-th heating zone and the j-th heating zone, and controlling the semiconductor heating device so that the i-th heating zone and the j-th heating zone respectively perform the (m+n)th temperature adjustment process with their respective (m+n)th optimal temperature adjustment powers; Repeat the step (m+n) until the i-th heating zone and the j-th heating zone each reach the target temperature, where n is a positive integer greater than or equal to 1 and is taken sequentially.

2. The control method of the semiconductor heating device according to claim 1, characterized in that: In the step S0, the target temperature related parameters also include: set The corresponding target power P set ; In the step Sm, the current temperature-related parameters of each of the i-th heating zone and the j-th heating zone include the current temperature T of the i-th heating zone. i0 and the corresponding current power P i0 , and the current temperature T of each of the j heating zones j0 and the corresponding current power P j0 .

3. The control method of the semiconductor heating device according to claim 2, characterized in that: In the step Sm, the step of performing the mth prediction calculation to obtain the mth predicted temperature-related parameter of each of the i-th heating zone and the j-th heating zone comprises: According to the current temperature T of the i-th heating zone i0 and the corresponding current power P ii0 , and the current temperature T of each of the j heating zones j0 Calculate and obtain the predicted temperature T of the i-th heated area im And the corresponding predicted power P im ; According to the current temperature T of each of the j heating zones j0 and the corresponding current power P j0 , and the current temperature T of the i-th heating zone i0 Calculate and obtain the predicted temperature T of each of the j heating zones jm And the corresponding predicted power P jm .

4. The control method of the semiconductor heating device according to claim 3, characterized in that: Among them, α is the correlation coefficient of the temperature adjustment rate, k ij is the thermal conductivity and σ is the Stefan-Boltzmann constant.

5. The control method of the semiconductor heating device according to claim 2, characterized in that: The step S m In the step of performing the mth prediction calculation to obtain the mth optimal temperature adjustment power of each of the i-th heating zone and the j-th heating zone comprises: According to the target temperature T set , the target power P set , the current temperature T of the i-th heating zone i0 and the corresponding current power P i0 Calculate and obtain the mth cost function C corresponding to the i-th heating zone im , then for the mth cost function C am Minimize to obtain the mth optimal temperature control power P of the i-th heating zone opt-im ; According to the target temperature T set , the target power P set , the current temperature T of each of the j heating zones j0 and the corresponding current power P j0 Calculate and obtain the mth cost function C corresponding to each of the j heating zones jm , then for the mth cost function C jm Minimize to obtain the mth optimal temperature control power P of each heating zone in the j heating zones opt-jm .

6. The control method of the semiconductor heating device according to claim 5, characterized in that: C im =(T i0 -T set ) 2 +(P i0 -P set ) 2 ,P opt-im =argmin C im ; C jm =(T j0 -T set ) 2 +(P j0 -P set ) 2 ,P opt-jm =argmin C jm 。 7. The control method of the semiconductor heating device according to claim 3, characterized in that: In the step S(m+n), the step of performing the (m+n)th prediction calculation to obtain the (m+n)th predicted temperature-related parameter of each of the i-th heating zone and the j-th heating zone comprises: According to the predicted temperature T of the i-th heating zone im And the corresponding predicted power P im , the predicted temperature T of each of the j heating zones jm And the system delay correction value D of the i-th heating zone si Calculate and obtain the predicted temperature T of the i-th heated area i(m+n) And the corresponding predicted power P i(m+n) ; According to the predicted temperature T of each heating zone in the jth heating zone jm And the corresponding predicted power P jm , the predicted temperature T of the i-th heated area mi And the system delay correction value D of each heated zone in the j heating zones sj Calculate and obtain the predicted temperature T of each of the j heating zones j(m+n) And the corresponding predicted power P j(m+n) .

8. The control method of the semiconductor heating device according to claim 7, characterized in that: Among them, α is the correlation coefficient of the temperature adjustment rate, k ij is the thermal conductivity and σ is the Stefan-Boltzmann constant.

9. The control method of the semiconductor heating device according to claim 3, characterized in that: In the step S(m+n), the step of performing the (m+n)th prediction calculation to obtain the (m+n)th optimal temperature adjustment power of each of the i-th heating zone and the j-th heating zone comprises: According to the target temperature T set , the target power P set , the predicted temperature T of the i-th heated area im And the corresponding predicted power P im Calculate and obtain the (m+n)th cost function C corresponding to the i-th heating zone i(m+n) , and then for the (m+n)th cost function C i(m+n) Minimize to obtain the (m+n)th optimal heating power P of the i-th heating zone opt-i(m+n) ; According to the target temperature T set , the target power P set , the predicted temperature T of the j heated areas jm And the corresponding predicted power P jm Calculate and obtain the (m+n)th cost function C corresponding to the j heating zones j(m+n) , and then for the (m+n)th cost function C j(m+n) Minimize to obtain the (m+n)th optimal heating power P of each of the j heating zones opt-j(m+n) .

10. The control method of the semiconductor heating device according to claim 9, characterized in that: C i(m+n) =(T im -T set ) 2 +(P im -P set ) 2 ,P opt-j(m+n) =argmin C i(m+n) ; C j(m+n) =(T jm -T set ) 2 +(P jm -P set ) 2 ,P opt-j(m+n) =argmin C j(m+n) 。 11. The control method of the semiconductor heating device according to claim 1, characterized in that: With the i-th addition The control instruction corresponding to the mth optimal temperature control power of the hot zone is the first power control instruction, and the control instruction corresponding to the mth optimal temperature control power of one of the j heating zones is the second power control instruction. In the step Sm, the step of performing correction calculation to obtain the system delay correction value of each of the i-th heating zone and the j-th heating zone includes: Obtain and based on the issuing time t of the first power control instruction mi The real-time temperature and time correspondence of the i-th heating zone is obtained by calculating the temperature of the i-th heating zone at the time t mi The corresponding temperature T si ; Obtain and according to the sending time t of the second power control instruction mj , and the real-time temperature and time correspondence of the heated area corresponding to one of the j heating areas, and the temperature of the heated area at the time t mj The corresponding temperature T sj ; According to T si and T sj Calculate and obtain the system delay correction value D of the i-th heating zone si , and obtain the system delay correction value D of each heating zone in the j heating zones sj .

12. The control method of the semiconductor heating device according to claim 11, characterized in that: Among them, k ij is the thermal conductivity and σ is the Stefan-Boltzmann constant.

13. The control method of the semiconductor heating device according to claim 1, characterized in that: The step S0 also includes controlling the semiconductor heating device to perform an initial temperature adjustment process to adjust the temperature of the i-th heating zone and the j-th heating zone, and obtaining current temperature-related parameters of each of the i-th heating zone and the j-th heating zone.

14. The control method of the semiconductor heating device according to claim 13, characterized in that: The control instruction corresponding to the mth optimal temperature control power of the i-th heating zone is a first power control instruction, and the control instruction corresponding to the mth optimal temperature control power of one heating zone among the j heating zones is a second power control instruction; In the step Sm, the step of performing correction calculation to obtain the system delay correction value of each of the i-th heating zone and the j-th heating zone comprises: Obtain and based on the issuing time t of the first power control instruction pim , the real-time temperature and time correspondence of the i-th heating zone, and the trend mutation time t′ when the temperature adjustment rate first undergoes a trend mutation since the initial temperature adjustment process in the real-time temperature and time correspondence of the i-th heating zone pmi , get the system delay correction value D of the i-th heating zone si ; Obtain and according to the sending time t of the second power control instruction pjm , the real-time temperature-time correspondence of one of the j heated zones, and the trend mutation time t′ at which the temperature adjustment rate first undergoes a trend mutation since the initial temperature adjustment process in the real-time temperature-time correspondence of one of the j heated zones. pjm , and obtain the system delay correction value D of each heating zone in the j heating zones sj .

15. The control method of the semiconductor heating device according to claim 14, characterized in that ,, Among them, in the corresponding relationship between the real-time temperature and time of the i-th heating zone, the m-th temperature adjustment process is at t′ im The time ends, since t′ im Subtract Δt from the time dely-im The temperature value corresponding to the time node after the time length is T sim , Δt dely-im =(t′ pim -t pim ); In the real-time temperature and time correspondence of one of the j heating zones, the mth temperature adjustment process is at t′ jm The time ends, since t′ jm From time Δt dely-jm The temperature value corresponding to the time node after the time length is T sjm , Δt dely-jm =t′ pjm -t pjm 。 16. A control system for a semiconductor heating device, characterized in that: The semiconductor heating device includes at least three heating zones for generating heat, wherein the i-th heating zone is adjacent to the remaining j heating zones, and j is a positive integer greater than or equal to 2. The control system is used to execute the control method of the semiconductor heating device as described in any one of claims 1 to 15, so as to control the i-th heating zone and each of the j heating zones respectively.

Citation Information

Patent Citations

  • Temperature control system and temperature control method for adjusting substrate surface temperature

    CN103628046A

  • Magneto-fluid thermotherapy temperature control method based on temperature feedback and thermotherapy instrument thereof

    CN106377842A

  • Base heating method and device

    CN110565074A

  • Temperature control device for partition of pore plate of PCR (Polymerase Chain Reaction) instrument

    CN116496887A

  • Temperature control method and device, intelligent equipment and computer readable storage medium

    CN117687451A