Gallery structure in concrete dam and construction method thereof

By setting up circumferential and longitudinal joint water-stopping structures at the prefabricated top arch connections of the inner corridor of the concrete dam, the problem of joint seepage after prefabricated parts are assembled is solved, construction efficiency and sealing are improved, and the length of the dam is extended. service life.

CN118727672APending Publication Date: 2024-10-01SHANGHAI INVESTIGATION DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410763175.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-10-01

Smart Images

  • Figure CN118727672A_ABST
    Figure CN118727672A_ABST
Patent Text Reader

Abstract

The invention discloses a gallery structure in a concrete dam and a construction method thereof, and belongs to the technical field of water conservancy and hydropower engineering. The gallery structure in the concrete dam comprises a cast-in-place piece, at least two prefabricated top arches, at least one annular joint water stop structure and a plurality of longitudinal joint water stop structures, wherein the prefabricated top arches are sequentially connected in the first horizontal direction, and the prefabricated top arches are arranged on the cast-in-place piece; the annular joint water stop structures are arranged at the connecting positions of every two adjacent prefabricated top arches. The longitudinal joint water stop structures are arranged at the joints of the two ends, arranged in the second horizontal direction, of the cast-in-place piece and the prefabricated top arches, and the second horizontal direction is perpendicular to the first horizontal direction. By arranging the annular joint water stop structures and the longitudinal joint water stop structures, construction is simplified, the construction efficiency is improved, the overall anti-seepage effect is guaranteed while the construction quality is guaranteed, and the overall sealing performance and reliability of the gallery structure in the concrete dam are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of water conservancy and hydropower engineering, and in particular, relates to a concrete dam internal gallery structure and a construction method thereof. Background Art

[0002] In water conservancy and hydropower projects, corridors are usually required inside the concrete dam body to meet the needs of dam foundation curtain grouting, dam foundation seepage drainage, dam transportation, dam monitoring and maintenance, etc. In order to speed up the construction progress of the concrete dam, the corridor inside the dam will use prefabricated parts for on-site splicing and installation, especially in roller-compacted concrete dams. Prefabricated concrete corridors are more commonly used. However, after the prefabricated parts are assembled on site, there are often joints, which causes reservoir water to penetrate into the corridor inside the dam through the joints, making the internal environment of the corridor humid, dripping or strand-like water flow at the joints, and even serious calcium precipitation in some locations, which ultimately affects the service life of the dam structure. Summary of the invention

[0003] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a concrete dam internal corridor structure and a construction method thereof, which simplifies construction, improves construction efficiency, ensures construction quality, and ensures the overall anti-seepage effect, thereby ensuring the overall sealing and reliability of the concrete dam internal corridor structure by providing an annular joint water-stopping structure at the connection between each adjacent two prefabricated top arches, and providing a longitudinal joint water-stopping structure at the connection between each prefabricated top arch and the cast-in-place part.

[0004] In a first aspect, the present application provides a concrete dam inner gallery structure, comprising:

[0005] Cast-in-place parts;

[0006] At least two prefabricated top arches are sequentially connected along a first horizontal direction, and the prefabricated top arches are arranged on the cast-in-place part;

[0007] At least one annular joint waterproof structure, the annular joint waterproof structure is provided at the connection between two adjacent prefabricated top arches;

[0008] A plurality of longitudinal joint water-stopping structures are provided at the connection points between the cast-in-place parts and the two ends of each prefabricated top arch arranged along the second horizontal direction, and the second horizontal direction is perpendicular to the first horizontal direction.

[0009] According to the concrete dam internal corridor structure of the present application, on the one hand, by separately manufacturing the cast-in-place parts and the prefabricated crown arches and then splicing them, it helps to simplify the construction, improve the construction efficiency and ensure the construction quality; on the other hand, since an annular joint water-stopping structure is provided at the connection between each adjacent two prefabricated crown arches, and a longitudinal joint water-stopping structure is provided at the connection between each prefabricated crown arch and the cast-in-place parts, it plays a role in anti-seepage, ensures the overall sealing and reliability of the concrete dam internal corridor structure, and extends the service life of the dam body as much as possible.

[0010] According to one embodiment of the present application, the annular joint water-stopping structure includes:

[0011] A first joint groove, wherein the prefabricated top arch is provided with an inwardly recessed first joint groove near the end surface of the adjacent prefabricated top arch;

[0012] An annular joint waterproof bracket, one end of which passes through the first joint groove and is buried in the prefabricated top arch;

[0013] An annular joint rubber waterstop, the two ends of which are respectively located in the first joint grooves of two adjacent prefabricated top arches and connected to the other end of the corresponding annular joint waterstop bracket;

[0014] Annular joint filling material, the two end surfaces of which are respectively connected to the surfaces of the two prefabricated top arches that are close to each other.

[0015] According to one embodiment of the present application, the annular joint water-stopping structure further includes:

[0016] A grouting hole, which is opened on the bottom surface of the prefabricated top arch and communicates with the first joint groove;

[0017] The second-stage backfill mortar is at least used to fill the first joint groove through the grouting hole;

[0018] A stop-slurry membrane, a portion of the bottom surface of the stop-slurry membrane is in contact with and cooperates with the top surfaces of the two adjacent prefabricated top arches, and another portion of the bottom surface of the stop-slurry membrane is in contact with and cooperates with the top surface of the circumferential joint filling material located in the two adjacent prefabricated top arches.

[0019] According to one embodiment of the present application, the longitudinal seam water-stopping structure comprises:

[0020] A second joint groove, wherein the end surface of the prefabricated top arch close to the cast-in-place part is provided with the second joint groove which is recessed inwards;

[0021] A longitudinal seam waterproof bracket, one end of which passes through the second seam groove and is buried in the prefabricated top arch;

[0022] A longitudinal seam rubber waterstop, one end of which is buried in the cast-in-place part, and the other end is connected to the other end of the longitudinal seam waterstop bracket;

[0023] A longitudinal joint filling material, wherein two end surfaces of the longitudinal joint filling material are respectively connected to the surfaces of the prefabricated crown arch and the cast-in-place part that are close to each other.

[0024] According to one embodiment of the present application, the cast-in-place part is provided with a groove, the groove is used to place the bottom of the prefabricated top arch, and the two end surfaces of the longitudinal joint filling material are respectively in contact with the bottom surface of the prefabricated top arch and the bottom surface of the groove; the longitudinal joint water-stopping structure also includes:

[0025] A slurry-stopping filler is filled in the groove.

[0026] According to an embodiment of the present application, the prefabricated top arch is provided with a first seam groove recessed inwardly near the end surface of the adjacent prefabricated top arch, and the first seam groove is connected to the second seam groove.

[0027] According to one embodiment of the present application, the cast-in-place part includes:

[0028] A concrete precast block, one end of the longitudinal joint water-stopping structure is buried in the concrete precast block, and is used to support the precast top arch;

[0029] The concrete post-cast block is respectively connected with the prefabricated top arch, the annular joint water-stopping structure and the concrete pre-cast block.

[0030] According to one embodiment of the present application, the concrete precast block is provided with a mounting groove along the first horizontal direction, and the cast-in-place part further includes:

[0031] A concrete bottom plate is located below the prefabricated top arch and is arranged on the bottom surface of the installation groove, and drainage gaps are respectively formed between the two side walls of the concrete bottom plate along the second horizontal direction and the inner side walls corresponding to the installation groove.

[0032] In a second aspect, the present application provides a construction method for a concrete dam inner gallery structure, which is used to manufacture the concrete dam inner gallery structure as described above, and the construction method for the concrete dam inner gallery structure comprises:

[0033] Step S1, preparing a prefabricated top arch, and burying one end of the longitudinal joint water-stop bracket in the prefabricated top arch;

[0034] Step S2, preparing a concrete precast block, and burying one end of the longitudinal joint rubber waterstop in the concrete precast block;

[0035] Step S3, when the concrete precast block meets the preset strength, installing the longitudinal joint filling material on the concrete precast block;

[0036] Step S4, sequentially installing the prefabricated top arches on the concrete precast blocks, so that each of the prefabricated top arches is connected to the longitudinal joint filling material, and the other end of the longitudinal joint rubber waterstop is connected to the other end of the longitudinal joint waterstop bracket;

[0037] Step S5, pouring concrete post-cast blocks on the concrete pre-cast blocks and the prefabricated top arch;

[0038] Step S6: When the concrete post-cast block meets the preset elevation, pour the second-phase backfill mortar into the connected first joint groove and the second joint of the prefabricated top arch through the grouting holes of the prefabricated top arch.

[0039] According to the construction method of the corridor structure inside the concrete dam of the present application, by adopting separated cast-in-place parts and prefabricated crown arches, it can adapt to the free deformation of the dam without causing damage, and an annular joint water-stopping structure is provided at the connection between each two adjacent prefabricated crown arches, and a longitudinal joint water-stopping structure is provided at the connection between each prefabricated crown arch and the cast-in-place part, which simplifies construction, improves construction efficiency, ensures construction quality, and at the same time ensures the overall anti-seepage effect, ensuring the overall sealing and reliability of the corridor structure inside the concrete dam.

[0040] According to an embodiment of the present application, the step of preparing the prefabricated top arch in step S1 further includes: burying one end of the annular joint water-stopping bracket in the prefabricated top arch;

[0041] The step S4 of sequentially installing the prefabricated top arches on the concrete precast blocks includes:

[0042] Install one end of the circumferential joint rubber water stop strip on the other end of the circumferential joint water stop bracket corresponding to the prefabricated top arch installed on the concrete precast block, and install the circumferential joint caulking material on the prefabricated top arch;

[0043] The adjacent prefabricated top arch is hoisted and installed to the concrete precast block and connected to the annular joint filling material, and the other end of the annular joint rubber water stop is connected to the other end of the annular joint water stop bracket corresponding to the adjacent prefabricated top arch;

[0044] A stopper membrane is bonded at the connection between two adjacent prefabricated top arches.

[0045] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0047] Figure 1 It is a structural schematic diagram of a corridor structure in a concrete dam provided in an embodiment of the present application, in which concrete post-cast blocks and part of the prefabricated top arches are hidden;

[0048] Figure 2 yes Figure 1 A partial enlarged view of the middle A;

[0049] Figure 3 It is one of the cross-sectional views of the gallery structure in the concrete dam provided in the embodiment of the present application;

[0050] Figure 4 This is the second cross-sectional view of the gallery structure in the concrete dam provided in the embodiment of the present application;

[0051] Figure 5 is a cross-sectional view of the annular joint water-stopping structure provided in an embodiment of the present application;

[0052] Figure 6 It is a cross-sectional view of the longitudinal joint water-stopping structure provided in an embodiment of the present application.

[0053] Reference numerals:

[0054] 1. Prefabricated top arch; 2. Circumferential joint water-stopping structure; 3. Concrete precast block; 4. Longitudinal joint water-stopping structure; 5. Concrete postcast block; 6. Concrete bottom plate; 21. Circumferential joint water-stopping bracket; 22. Circumferential joint rubber water-stopping strip; 23. Circumferential joint caulking material; 24. Circumferential joint cavity; 25. Second-phase backfill mortar; 26. Stopping mortar membrane; 27. Grouting hole; 41. Longitudinal joint water-stopping bracket; 42. Longitudinal joint rubber water-stopping strip; 43. Longitudinal joint caulking material; 44. Longitudinal joint cavity; 45. Stopping mortar. DETAILED DESCRIPTION

[0055] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0056] Reference below Figure 1-Figure 6The corridor structure inside a concrete dam provided in an embodiment of the present application is described, and the corridor structure inside the concrete dam includes a cast-in-place part, at least two prefabricated top arches 1 connected in sequence along a first horizontal direction, at least one annular joint water-stopping structure 2 and a plurality of longitudinal joint water-stopping structures 4; the prefabricated top arches 1 are arranged on the cast-in-place part; the connection between two adjacent prefabricated top arches 1 is provided with an annular joint water-stopping structure 2; the connection between the cast-in-place part and both ends of each prefabricated top arch 1 arranged along a second horizontal direction is provided with a longitudinal joint water-stopping structure 4, and the second horizontal direction is perpendicular to the first horizontal direction.

[0057] It should be noted that the prefabricated top arch 1 adopts a reinforced concrete structure, and the prefabricated top arch 1 is in an upwardly protruding semicircular shape, so the two ends of the prefabricated top arch 1 along the second horizontal direction are relatively arranged on the cast-in-place part. It should be noted that the shape, size and number of the prefabricated top arch 1 and the shape and size of the cast-in-place part can be designed according to actual needs, and this embodiment does not impose specific restrictions on this.

[0058] For ease of understanding, the first horizontal direction is the axial direction of the prefabricated top arch 1 .

[0059] It can be understood that, on the one hand, by making the cast-in-place parts and the prefabricated crown arch 1 separately and then splicing them, it helps to simplify the construction, improve the construction efficiency and ensure the construction quality; on the other hand, since the connection between each adjacent prefabricated crown arch 1 is provided with an annular joint water-stopping structure 2, and the connection between each prefabricated crown arch 1 and the cast-in-place parts is provided with a longitudinal joint water-stopping structure 4, it plays a role in anti-seepage, ensures the overall sealing and reliability of the corridor structure in the concrete dam, and extends the service life of the dam body as much as possible.

[0060] According to the concrete dam internal corridor structure provided in the embodiment of the present application, by providing an annular joint water-stopping structure 2 at the connection between each of two adjacent prefabricated top arches 1, and providing a longitudinal joint water-stopping structure 4 at the connection between each prefabricated top arch 1 and the cast-in-place part, the construction is simplified, the construction efficiency is improved, the construction quality is ensured, and the overall anti-seepage effect is guaranteed, thereby ensuring the overall sealing and reliability of the concrete dam internal corridor structure.

[0061] In some embodiments, Figure 2 , Figure 3 and Figure 5As shown, the annular joint water-stopping structure 2 includes a first joint groove, an annular joint water-stopping bracket 21, an annular joint rubber water-stopping strip 22 and an annular joint caulking material 23. The end face of the prefabricated top arch 1 close to the adjacent prefabricated top arch 1 is provided with a first joint groove recessed inwardly; one end of the annular joint water-stopping bracket 21 passes through the first joint groove and is buried in the prefabricated top arch 1; the two ends of the annular joint rubber water-stopping strip 22 are respectively located in the first joint grooves of the two adjacent prefabricated top arches 1 and are connected to the other end of the corresponding annular joint water-stopping bracket 21; the two end faces of the annular joint caulking material 23 are respectively connected to the surfaces of the two prefabricated top arches 1 close to each other.

[0062] It can be understood that by providing inwardly recessed first seam grooves on the two end surfaces of the prefabricated top arch 1 that are relatively arranged along the first horizontal direction, the internal space of the first seam groove can be used to accommodate the connection between the corresponding annular seam water-stop bracket 21 and the annular seam rubber water-stop strip 22. At the same time, since the end surface of the annular seam filling material 23 abuts against the end surface of the prefabricated top arch 1, an annular seam cavity 24 is formed inside the first seam groove to adapt to the deformation of the connection between the two adjacent prefabricated top arches 1, thereby ensuring the sealing and reliability of the connection between the two adjacent prefabricated top arches 1.

[0063] In this embodiment, the annular joint water-stop bracket 21 can be made of steel bars on site into U-shaped and I-shaped components and then welded, and the diameter of the steel bars is 6mm or 8mm. The spacing between the annular joint water-stop brackets 21 ranges from 20cm to 40cm, as long as the annular joint rubber water-stop strip 22 does not deviate from the center line of the annular joint cavity 24, and this embodiment does not make specific restrictions on this.

[0064] In this embodiment, the height of the annular joint cavity 24 is 1 / 3 to 1 / 2 of the thickness of the prefabricated top arch 1, and the depth is 2 / 3 to 4 / 5 of the width of the annular joint rubber waterstop 22 located in the first joint groove.

[0065] In this embodiment, the annular joint filling material 23 is a closed-cell foam board with a thickness ranging from 10 mm to 20 mm.

[0066] In some embodiments, Figure 2 , Figure 3 and Figure 5 As shown, the annular joint water-stopping structure 2 also includes grouting holes 27, secondary backfill mortar 25 and a grouting membrane 26. The grouting holes 27 are opened on the bottom surface of the prefabricated top arch 1 and are connected to the first joint groove; the secondary backfill mortar 25 is at least used to fill the first joint groove through the grouting holes 27; a part of the bottom surface of the grouting membrane 26 is in contact with and cooperates with the top surfaces of two adjacent prefabricated top arches 1, and another part of the bottom surface of the grouting membrane 26 is in contact with and cooperates with the top surface of the annular joint filling material 23 located in the two adjacent prefabricated top arches 1.

[0067] It can be understood that after the two adjacent prefabricated top arches 1 are tightly spliced ​​by the annular joint water-stop bracket 21, the annular joint rubber water-stop strip 22 and the annular joint filling material 23, the grouting membrane 26 is pasted to the connection between the two adjacent prefabricated top arches 1 through an adhesive, and finally the second-phase backfill mortar 25 is injected through the grouting hole 27 to fill the entire annular joint cavity 24, and the grouting membrane 26 is used to prevent the overflow of the second-phase backfill mortar 25 during the grouting process to ensure that it solidifies at the predetermined position, and to prevent the slurry of the concrete post-cast block 5 used to form the cast-in-place part from flowing into the connection between the two adjacent prefabricated top arches 1 to affect the annular joint water-stop structure 2, so as to increase the overall sealing and reliability.

[0068] In this embodiment, the diameter of the grouting holes 27 is in the range of 10 to 15 mm, and the distance between two adjacent grouting holes 27 is in the range of 1 to 2 m.

[0069] In this embodiment, the stop film 26 can be made of plastic or rubber material, with a width ranging from 15 cm to 35 cm, a thickness ≥1.5 mm, a tensile strength ≥10 MPa, and a bonding strength with the concrete base ≥1.0 MPa.

[0070] In this embodiment, the second-phase backfill mortar 25 uses pre-shrinkage cement mortar or high molecular polymer mortar, which has the characteristic of no shrinkage and its strength is not lower than the strength of concrete used to form the prefabricated top arch 1.

[0071] In some embodiments, Figure 3 , Figure 4 and Figure 6 As shown, the longitudinal joint water-stopping structure 4 includes a second joint groove, a longitudinal joint water-stopping bracket 41, a longitudinal joint rubber water-stopping strip 42 and a longitudinal joint caulking material 43. A second joint groove recessed inward is provided on the end face of the prefabricated top arch 1 close to the cast-in-place part; one end of the longitudinal joint water-stopping bracket 41 passes through the second joint groove and is buried in the prefabricated top arch 1; one end of the longitudinal joint rubber water-stopping strip 42 is buried in the cast-in-place part, and the other end is connected to the other end of the longitudinal joint water-stopping bracket 41; the two end faces of the longitudinal joint caulking material 43 are respectively connected to the surfaces of the prefabricated top arch 1 and the cast-in-place part close to each other.

[0072] It can be understood that by providing inwardly recessed second seam grooves on the two end surfaces of the prefabricated top arch 1 that are relatively arranged along the second horizontal direction, the internal space of the second seam groove can be used to accommodate the connection between the corresponding longitudinal seam water stop bracket 41 and the longitudinal seam rubber water stop strip 42. At the same time, since the end surface of the longitudinal seam filling material 43 abuts against the end surface of the prefabricated top arch 1, a longitudinal seam cavity 44 is formed inside the second seam groove to adapt to the deformation of the connection between the adjacent prefabricated top arch 1 and the cast-in-place part, thereby ensuring the sealing and reliability of the connection between the two.

[0073] In this embodiment, the longitudinal joint water-stop bracket 41 can be made of steel bars on site into U-shaped and I-shaped components and then welded, and the diameter of the steel bars is 6mm or 8mm. The spacing between the longitudinal joint water-stop brackets 41 ranges from 20cm to 40cm, as long as the longitudinal joint rubber water-stop strip 42 does not deviate from the center line of the longitudinal joint cavity 44, and this embodiment does not make specific restrictions on this.

[0074] In this embodiment, the height of the longitudinal joint cavity 44 is 1 / 3 to 1 / 2 of the thickness of the prefabricated top arch 1, and the depth is 2 / 3 to 4 / 5 of the width of the longitudinal joint rubber water stop 42 located in the second joint groove.

[0075] In this embodiment, the longitudinal joint filling material 43 is made of a hard rubber plate with a thickness ranging from 5 mm to 10 mm.

[0076] In some embodiments, Figure 3 , Figure 4 and Figure 6 As shown, the cast-in-place part is provided with a groove, which is used to place the bottom of the prefabricated top arch 1, and the two end faces of the longitudinal joint filling material 43 are in contact and cooperation with the bottom surface of the prefabricated top arch 1 and the bottom surface of the groove respectively; the longitudinal joint water-stopping structure 4 also includes a slurry-stopping filler 45, which is filled in the groove.

[0077] It can be understood that since the prefabricated top arch 1 is in an upwardly protruding semicircular shape, at the same height, the gap between the inner wall of the groove and the outer wall of the prefabricated top arch 1 gradually increases from the bottom. Therefore, by filling the gap in the groove where the prefabricated top arch 1 is not provided with the slurry-stop filler 45, the slurry forming the concrete post-cast block 5 can be prevented from flowing through the gap into the bottom surface of the prefabricated top arch 1 and the bottom surface of the groove, thereby affecting the longitudinal joint water-stopping structure 4, thereby ensuring the sealing and reliability of the connection between the prefabricated top arch 1 and the groove.

[0078] In this embodiment, the grout-stopping filler 45 is a plastic filler, and its filling height is 10 cm.

[0079] In this embodiment, the width of the groove is 1.2 to 1.5 times the thickness of the prefabricated top arch 1 , and the height is 1.0 to 1.2 times the thickness of the prefabricated top arch 1 .

[0080] In some embodiments, Figure 3 , Figure 4 and Figure 6 As shown, the first seam groove and the second seam groove are connected.

[0081] It can be understood that since the first joint groove and the second joint groove are connected, when the second-phase backfill mortar 25 is poured through the grouting hole 27, the second-phase backfill mortar 25 can fill the entire annular joint cavity 24 and the entire longitudinal joint cavity 44, ensuring the sealing and waterproofness of the entire concrete dam corridor structure.

[0082] In this embodiment, the first seam groove and the second seam groove are connected, so there is a possibility that the annular seam rubber waterstop strip 22 and the longitudinal seam rubber waterstop strip 42 intersect. The intersection of the annular seam rubber waterstop strip 22 and the longitudinal seam rubber waterstop strip 42 adopts a vulcanization hot bonding process to ensure that the two are firmly connected.

[0083] In some embodiments, Figures 1 to 6 The cast-in-place parts include a concrete precast block 3 and a concrete postcast block 5. One end of the longitudinal joint water-stopping structure 4 is buried in the concrete precast block 3 to support the precast top arch 1. The concrete postcast block 5 is connected to the precast top arch 1, the annular joint water-stopping structure 2 and the concrete precast block 3 respectively.

[0084] For ease of understanding, the first horizontal direction is the length direction of the concrete precast block 3 , and the second horizontal direction is the width direction of the concrete precast block 3 .

[0085] It can be understood that the groove is opened on the top surface of the concrete pre-cast block 3, and the concrete pre-cast block 3 and the prefabricated top arch 1 are stably connected through the longitudinal joint water-stopping structure 4. Finally, the prefabricated top arch 1, which is sequentially connected by multiple trusses through the annular joint water-stopping structure 2, is used as a construction template to bear the construction load of the upper concrete post-cast block 5, thereby ensuring the structural strength and sealing of the entire concrete dam corridor structure.

[0086] In some embodiments, Figure 6 As shown, the concrete precast block 3 is provided with a mounting groove along the first horizontal direction, and the cast-in-place part also includes a concrete base plate 6, which is located below the prefabricated top arch 1 and is arranged on the bottom surface of the mounting groove, and there are drainage gaps between the two side walls of the concrete base plate 6 along the second horizontal direction and the inner side walls corresponding to the mounting groove.

[0087] It can be understood that by setting the installation groove to prevent the concrete bottom plate 6, the overall strength of the concrete precast block 3 is further strengthened, and it is also convenient for passage. At the same time, the two side walls of the concrete bottom plate 6 along the second horizontal direction are respectively provided with drainage gaps between the inner side walls corresponding to the installation groove to form two drainage grooves, further extending the service life.

[0088] In this embodiment, the thickness of the concrete bottom plate 6 is in the range of 30 cm to 50 cm, and the width of the drainage ditch is in the range of 30 cm to 50 cm.

[0089] The embodiment of the present application also provides a construction method for a concrete dam inner gallery structure, which is used to manufacture the above-mentioned concrete dam inner gallery structure.

[0090] The construction method of the concrete dam inner gallery structure comprises the following steps:

[0091] Step S1, preparing a prefabricated top arch 1, and burying one end of the longitudinal joint water-stop bracket 41 in the prefabricated top arch 1;

[0092] Step S2, preparing a concrete precast block 3, and burying one end of the longitudinal joint rubber water stop 42 in the concrete precast block 3;

[0093] Step S3, when the concrete precast block 3 meets the preset strength, the longitudinal joint filling material 43 is installed on the concrete precast block 3;

[0094] Step S4, sequentially install the prefabricated top arches 1 on the concrete precast blocks 3, so that each prefabricated top arch 1 is connected to the longitudinal joint filling material 43, and the other end of the longitudinal joint rubber water stop 42 is connected to the other end of the longitudinal joint water stop bracket 41;

[0095] Step S5, pouring concrete post-cast blocks 5 on the concrete pre-cast blocks 3 and the prefabricated top arch 1;

[0096] Step S6: When the concrete post-cast block 5 meets the preset elevation, the second-phase backfill mortar 25 is poured into the connected first joint groove and the second joint groove of the prefabricated top arch 1 through the grouting hole 27 of the prefabricated top arch 1.

[0097] According to the construction method of the corridor structure in the concrete dam provided in the embodiment of the present application, by adopting separated cast-in-place parts and prefabricated crown arches 1, it can adapt to the free deformation of the dam without causing damage, and an annular joint water-stopping structure 2 is provided at the connection between each two adjacent prefabricated crown arches 1, and a longitudinal joint water-stopping structure 4 is provided at the connection between each prefabricated crown arch 1 and the cast-in-place parts, which simplifies construction, improves construction efficiency, ensures construction quality, and at the same time ensures the overall anti-seepage effect, ensuring the overall sealing and reliability of the corridor structure in the concrete dam.

[0098] In some embodiments, the step S1 of preparing the prefabricated top arch 1 further includes: burying one end of the annular joint waterproof bracket 21 in the prefabricated top arch 1;

[0099] The step S4 of sequentially installing the prefabricated top arch 1 on the concrete precast block 3 includes:

[0100] Install one end of the circumferential joint rubber water stop strip 22 on the other end of the circumferential joint water stop bracket 21 corresponding to the prefabricated top arch 1 installed on the concrete precast block 3, and install the circumferential joint caulking material 23 on the prefabricated top arch 1;

[0101] The adjacent prefabricated top arch 1 is hoisted and installed to the concrete precast block 3 and connected to the annular joint filling material 23, and the other end of the annular joint rubber water stop 22 is connected to the other end of the annular joint water stop bracket 21 corresponding to the adjacent prefabricated top arch 1;

[0102] The stop film 26 is bonded to the connection between two adjacent prefabricated top arches 1 .

[0103] It can be understood that the above steps ensure the correct installation of the annular joint waterproof structure 2, which can effectively prevent moisture from penetrating from the connection between the two prefabricated top arches 1, thereby improving the sealing and durability.

[0104] The construction method of the entire concrete dam internal gallery structure is as follows:

[0105] Step S1, preparing a prefabricated top arch 1 on site according to the design requirements, reserving a first joint groove and a second joint groove on the prefabricated top arch 1, and pre-embedding an annular joint waterproof bracket 21 and a longitudinal joint waterproof bracket 41 respectively;

[0106] Step S2, construct and pour according to the design requirements to form a concrete precast block 3, and reserve a groove for supporting the prefabricated top arch 1 on the top of the concrete precast block 3, and embed a longitudinal joint rubber water stop 42 in the groove;

[0107] Step S3, when the concrete precast block 3 reaches the 28-day age strength, the longitudinal joint filling material 43 is installed in the groove;

[0108] Step S4, sequentially hoisting the prefabricated top arches 1 into the grooves of the concrete precast blocks 3, and installing the circumferential joint rubber water stop 22 and the circumferential joint caulking material 23 at the first joint groove of the prefabricated top arches 1 that have been hoisted, then completing the hoisting of the adjacent prefabricated top arches 1, assembling the two prefabricated top arches 1 together, and bonding the stop film 26 on the outside of the joint until all the prefabricated top arches 1 are assembled together;

[0109] Step S5, construct and pour according to the design requirements to form a concrete post-cast block 5;

[0110] Step S6: After the concrete post-cast block 5 is poured to a certain elevation, the corridor structure in the concrete dam has completed most of its deformation, and before the reservoir is filled with water, the second-phase backfill mortar 25 is poured through the grouting holes 27 to fill the annular joint cavity 24 and the longitudinal joint cavity 44, so that the entire corridor structure in the concrete dam forms a complete anti-seepage system.

[0111] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated before and after are in an "or" relationship. Among them, the terms "first position" and "second position" are two different positions.

[0112] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0113] Unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0114] In the description of this application, "first feature" or "second feature" may include one or more of the features.

[0115] In the description of the present application, “plurality” means two or more.

[0116] In the description of the present application, a first feature being “on” or “under” a second feature may include that the first and second features are directly in contact with each other, or may include that the first and second features are not in direct contact with each other but are in contact with each other via another feature therebetween.

[0117] In the description of the present application, a first feature being “above”, “above”, and “above” a second feature includes the first feature being directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature includes the first feature being directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0118] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0119] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.

Claims

1. A corridor structure in a concrete dam, characterized in that: include: Cast-in-place parts; At least two prefabricated top arches are sequentially connected along a first horizontal direction, and the prefabricated top arches are arranged on the cast-in-place part; At least one annular joint waterproof structure, the annular joint waterproof structure is provided at the connection between two adjacent prefabricated top arches; A plurality of longitudinal joint water-stopping structures are provided at the connection points between the cast-in-place parts and the two ends of each prefabricated top arch arranged along the second horizontal direction, and the second horizontal direction is perpendicular to the first horizontal direction.

2. The concrete dam inner gallery structure according to claim 1, characterized in that: The annular joint water-stopping structure comprises: A first joint groove, wherein the prefabricated top arch is provided with an inwardly recessed first joint groove near the end surface of the adjacent prefabricated top arch; An annular joint waterproof bracket, one end of which passes through the first joint groove and is buried in the prefabricated top arch; An annular joint rubber waterstop, the two ends of which are respectively located in the first joint grooves of two adjacent prefabricated top arches and connected to the other end of the corresponding annular joint waterstop bracket; Annular joint filling material, the two end surfaces of which are respectively connected to the surfaces of the two prefabricated top arches that are close to each other.

3. The corridor structure in the concrete dam according to claim 2, characterized in that: The annular joint water-stopping structure also includes: A grouting hole, which is opened on the bottom surface of the prefabricated top arch and communicates with the first joint groove; The second-stage backfill mortar is at least used to fill the first joint groove through the grouting hole; A stop-slurry membrane, a portion of the bottom surface of the stop-slurry membrane is in contact with and cooperates with the top surfaces of the two adjacent prefabricated top arches, and another portion of the bottom surface of the stop-slurry membrane is in contact with and cooperates with the top surface of the circumferential joint filling material located in the two adjacent prefabricated top arches.

4. The concrete dam inner gallery structure according to any one of claims 1 to 3, characterized in that: The longitudinal joint water-stopping structure comprises: A second joint groove, wherein the end surface of the prefabricated top arch close to the cast-in-place part is provided with the second joint groove which is recessed inwards; A longitudinal seam waterproof bracket, one end of which passes through the second seam groove and is buried in the prefabricated top arch; A longitudinal seam rubber waterstop, one end of which is buried in the cast-in-place part, and the other end is connected to the other end of the longitudinal seam waterstop bracket; A longitudinal joint filling material, wherein two end surfaces of the longitudinal joint filling material are respectively connected to the surfaces of the prefabricated crown arch and the cast-in-place part that are close to each other.

5. The corridor structure in the concrete dam according to claim 4, characterized in that: The cast-in-place part is provided with a groove, and the groove is used to place the bottom of the prefabricated top arch, and the two end surfaces of the longitudinal joint filling material are respectively in contact with the bottom surface of the prefabricated top arch and the bottom surface of the groove; the longitudinal joint water-stopping structure also includes: A slurry-stopping filler is filled in the groove.

6. The corridor structure in the concrete dam according to claim 4, characterized in that: The prefabricated top arch is provided with a first seam groove recessed inwardly near the end surface of the adjacent prefabricated top arch, and the first seam groove is communicated with the second seam groove.

7. The concrete dam inner gallery structure according to any one of claims 1 to 3, characterized in that: The cast-in-place parts include: A concrete precast block, one end of the longitudinal joint water-stopping structure is buried in the concrete precast block, and is used to support the precast top arch; The concrete post-cast block is respectively connected with the prefabricated top arch, the annular joint water-stopping structure and the concrete pre-cast block.

8. The concrete dam inner gallery structure according to claim 7, characterized in that: The concrete precast block is provided with a mounting groove along the first horizontal direction, and the cast-in-place part further comprises: A concrete bottom plate is located below the prefabricated top arch and is arranged on the bottom surface of the installation groove, and drainage gaps are respectively formed between the two side walls of the concrete bottom plate along the second horizontal direction and the inner side walls corresponding to the installation groove.

9. A construction method for a concrete dam inner gallery structure, used to manufacture the concrete dam inner gallery structure as claimed in any one of claims 1 to 8, characterized in that: include: Step S1, preparing a prefabricated top arch, and burying one end of the longitudinal joint water-stop bracket in the prefabricated top arch; Step S2, preparing a concrete precast block, and burying one end of the longitudinal joint rubber waterstop in the concrete precast block; Step S3, when the concrete precast block meets the preset strength, installing the longitudinal joint filling material on the concrete precast block; Step S4, sequentially installing the prefabricated top arches on the concrete precast blocks, so that each of the prefabricated top arches is connected to the longitudinal joint filling material, and the other end of the longitudinal joint rubber waterstop is connected to the other end of the longitudinal joint waterstop bracket; Step S5, pouring concrete post-cast blocks on the concrete pre-cast blocks and the prefabricated top arch; Step S6: When the concrete post-cast block meets the preset elevation, pour the second-phase backfill mortar into the connected first joint groove and the second joint of the prefabricated top arch through the grouting holes of the prefabricated top arch.

10. The construction method of the gallery structure in a concrete dam according to claim 9, characterized in that: The step of preparing the prefabricated top arch in step S1 further includes: burying one end of the annular joint water-stop bracket in the prefabricated top arch; The step S4 of sequentially installing the prefabricated top arches on the concrete precast blocks includes: Install one end of the circumferential joint rubber water stop strip on the other end of the circumferential joint water stop bracket corresponding to the prefabricated top arch installed on the concrete precast block, and install the circumferential joint caulking material on the prefabricated top arch; The adjacent prefabricated top arch is hoisted and installed to the concrete precast block and connected to the annular joint filling material at the same time, and the other end of the annular joint rubber water stop is connected to the other end of the annular joint water stop bracket corresponding to the adjacent prefabricated top arch; A stopper membrane is bonded at the connection between two adjacent prefabricated top arches.