A pile foundation construction survey method for cave areas
By moving the drill body down and loading it with the pressure hammering of the drill head in the drilling machine, combined with the design of the drill body and drill head, the problem of difficulty in surveying the cave area is solved, and accurate and stable surveying in a narrow space is achieved. , improving construction safety.
Patent Information
- Application Number
- CN202411232896.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-09-04
AI Technical Summary
Existing drilling machines are difficult to use in narrow spaces in cave areas, and short steel drills cannot effectively survey, affecting construction safety.
By moving multiple drill bodies down with the pressure hammering of the drill head and loading them in sequence, the bearing capacity is measured using the number of gravity hammer blows to adapt to the survey needs of narrow vertical space, and through the design of the drill body and drill head, the overall insertion and Stable connection to avoid soil clogging and survey inaccuracies.
It achieves accurate survey before pile foundation construction in the cave area, improves the stability and safety of the survey, and is suitable for survey needs in special spaces.
Smart Images

Figure CN118727696B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation construction survey, in particular to a pile foundation construction survey method in a karst cave area. Background Art
[0002] Compared with conventional open-air construction, pile foundation construction in the karst cave area has the characteristics of narrow space, great construction difficulty, and more unstable factors in construction. Therefore, before pile foundation construction in the karst cave area, it is necessary to conduct on-site foundation soil survey. Although caves are mainly formed in soluble rocks such as limestone, there is also a lot of soil in the cave, especially at the cave mouth or cave entrance. The soil area in the karst cave area must be surveyed to calculate the soil bearing capacity. At the same time, the inspection of ancient tombs, wells, undercurrents and other karst caves can be completed by a drilling machine.
[0003] The drilling machine mainly uses a hammer to hit a steel drill at a specified height with free fall, so that the steel drill is inserted into the soil after a certain number of hits by the hammer. After inserting to the corresponding depth, the number of times the steel drill is hit by the hammer is recorded, thereby judging the bearing capacity of the soil and completing the pile foundation construction survey process. However, the existing drilling machines are generally too high due to structural limitations such as the steel drill, and cannot be used in the narrow space of the karst cave area. The shorter steel drill cannot achieve the survey effect, affecting the safety of subsequent construction.
[0004] In view of this, in order to overcome the above technical problems, the present invention proposes a pile foundation construction survey method in a karst cave area, which solves the above technical problems. Summary of the invention
[0005] In order to make up for the shortcomings of the prior art, the present invention proposes a pile foundation construction survey method for a karst cave area. The present invention loads multiple drill bodies in sequence after they are moved down by the compressed hammering of the drill bit, and calculates the bearing capacity of the survey area according to the number of hammering. Compared with the existing survey by the drill probe, the present invention can survey narrow areas in the vertical space, thereby meeting the survey needs in special spaces.
[0006] The technical solution adopted by the present invention to solve the technical problem is: a pile foundation construction survey method in a karst cave area according to the present invention comprises the following steps:
[0007] S1: Determine the location, quantity and spacing to be surveyed based on the calculation; then push the drilling machine into the test area after debugging;
[0008] S2: When the drill bit in the drilling machine is controlled to be in a vertical position, a gravity hammer is used to hit the drill bit with the force of free fall, and the number of hammering of the gravity hammer is recorded. The first pull rope moves downward as the drill bit moves downward. When the upper end of the drill bit is about to enter the soil, the gravity hammer counting is stopped, and the gravity hammer is lifted, the drill body is loaded on the first pull rope, and the gravity hammer continues to hammer until the drill bit and the corresponding number of drill bodies enter to a suitable depth;
[0009] S3: The bearing capacity of the test area is determined based on the measured data. Finally, the first pull rope in the drilling machine is wound up, and the drill body moves up with the upward movement of the drill head. Finally, the drill body is removed from the first pull rope to complete the survey process before the pile foundation construction in the cave area.
[0010] Preferably, the drilling machine comprises an I-shaped base and adjustment blocks threadedly connected at four corners of the base; the upper surface of the base is symmetrically fixedly connected to the side plates; the side plates are laterally penetrated with side grooves; the two side grooves are vertically slidably connected to the square frame together; the inner side of the square frame is slidably connected to the gravity hammer; the outer wall of the gravity hammer is fixedly connected to the slider; the slider penetrates up and down and is slidably connected to the slide rod; the slide rod is fixedly connected to the square frame; the inner side of the frame is fixedly connected to the first motor; the output shaft of the first motor is fixedly connected to the lever; the lever can cyclically push the slider upward during rotation; the inner side of the frame is close to the A pressure sensor is fixedly connected to the lower position; the upper ends of the two side plates are fixedly connected to the top plate; the top plate, the square frame and the gravity hammer are movably connected to the first pull rope through the upper and lower parts; a bottom hole is arranged through the center of the base; the bottom hole is movably connected to the drill bit through the upper and lower parts; the upper end of the drill bit is fixedly connected to the lower end of the first pull rope; the upper end of the first pull rope is connected to the second motor output shaft; a center hole adapted to the outer diameter of the first pull rope is axially arranged at the center of the drill body; a loading groove is arranged through the inner wall of the center hole and the outer wall of the drill body; the movable gap of the square frame between the top plate and the base is greater than the length of the drill body.
[0011] Preferably, a card slot is provided on one of the vertical inner walls inside the square frame; a plurality of the card slots are evenly distributed on the vertical inner wall of the square frame; a card block is connected to a sliding seal in the card slot; the card block is connected to the bottom of the card slot through a first tension spring; a driving slot is provided on the lower surface of the frame; a driving slot is connected to a driving bar through a sliding seal in the driving slot; the bottom of the driving slot and the bottom of the card slot are connected through a first air hole; the side slots are passed downward; the driving bar is squeezed by the base so that the card block extends out of the corresponding card slot; the gravity hammer is fixedly connected to a card plate on the side away from the slider; the card plate is in contact with the inner wall of the frame provided with the card slot; the card plate can be clamped by the card block extending out of the card slot.
[0012] Preferably, the upper surface of the top plate is fixedly connected to the third motor; the output shaft of the third motor is fixedly connected to the third pull rope; the other end of the third pull rope passes through the side plate and is fixedly connected to the upper surface of the frame; the outer surface of the frame is provided with a transverse groove connected to the drive groove; the sliding seal in the transverse groove is connected to the L-shaped block; the end of the L-shaped block close to the drive bar is provided with a guide surface inclined downward; the end of the L-shaped block away from the drive bar is connected to the outer wall of the frame by a second tension spring; the drive bar is vertically provided with a plurality of triangular grooves on one side facing the L-shaped block; the end of the L-shaped block close to the drive bar is unidirectionally clamped with the triangular groove.
[0013] Preferably, the drill bit is rod-shaped; the lower end of the drill bit is conical, and the upper end is provided with a first circular groove; the upper end of the drill body is provided with a second circular groove; the first circular groove and the second circular groove have the same specifications; the lower end of the drill body is provided with a second cylinder; the second cylinder at the end of the drill body can be inserted into the first circular groove at the upper end of the drill bit; adjacent drill bodies are connected with the second cylinders through the second circular groove.
[0014] Preferably, the end face of the second cylinder away from the second circular groove is inclined; the bottom of the second circular groove is inclined; the end face of the second cylinder away from the second circular groove is arranged in an opposite direction to the inclination direction of the bottom face of the second circular groove; the bottom of the first circular groove is inclined; the end face of the second cylinder is arranged in parallel and contact with the bottom face of the first circular groove; the upper surface of the base is fixedly connected to the placement box; the upper end of the placement box is open; the bottom of the placement box is provided with a mesh; the drill body is placed upside down in the placement box.
[0015] Preferably, one of the groove walls of the loading groove is provided with a first arc groove; an arc plate is slidably connected in the first arc groove; the arc plate and the bottom of the first arc groove are connected by a third tension spring; a square groove is provided in the upper groove wall of the first arc groove and is connected to the lower end of the drill body; a square bar is slidably connected in the square groove; a push block is provided between the arc plate and the bottom of the first arc groove; the push block is fixedly connected to the square bar; the cross-sectional specifications of the push block decrease as it moves away from the square bar; a notch is provided on the arc plate near the square groove; and the arc plate pulls the third tension spring during the process of the push block squeezing the notch.
[0016] Preferably, a second arc groove is provided on the other groove wall of the loading groove; the sliding seal in the second arc groove is connected to the anti-blocking plate; the anti-blocking plate is connected to the bottom of the second arc groove by a spring; the second arc groove is opposite to the first arc groove; the arc plate can be inserted into the second arc groove under the drive of the push block.
[0017] Preferably, the arc plate is connected to the first arc groove in a sliding and sealing manner; the square bar is connected to the square groove in a sliding and sealing manner; the bottom of the first arc groove is connected to the bottom of the second arc groove through a second air hole.
[0018] The beneficial effects of the present invention are as follows:
[0019] 1. The present invention loads multiple drill bodies in sequence after they are moved down by the compressed hammering of the drill bit, and calculates the bearing capacity of the survey area according to the number of hammering. Compared with the existing surveying with a drill probe, the present invention can survey narrow areas in the vertical space, thereby meeting the surveying needs in special spaces.
[0020] 2. The present invention automatically locks the gravity hammer after the frame moves down to the limit, thereby avoiding the hammering and counting of the gravity hammer during the process of loading the drill body, thereby improving the survey accuracy before the pile foundation construction survey.
[0021] 3. The present invention realizes the connection between the drill body and the drill bit, and between adjacent drill bodies through the mutual cooperation of the second cylinder, the first circular groove and the second circular groove, so that the drill body and the drill bit form a whole, ensuring the smooth progress of the survey; through the movement of the arc plate, the loading groove is blocked by the arc plate, so that on the one hand, the soil is blocked as much as possible after the drill body enters the soil to avoid the soil blocking the loading groove, and on the other hand, the first pull rope is prevented from moving out of the loading groove, so that the connection between the drill body and the first pull rope is more stable, ensuring the stability of the survey before the pile foundation construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The present invention is further described below in conjunction with the accompanying drawings and implementation modes.
[0023] Figure 1 is a flow chart of the method of the present invention;
[0024] Figure 2 It is a three-dimensional diagram of the drilling probe machine of the present invention at one angle;
[0025] Figure 3 It is a three-dimensional diagram of the drilling probe in the present invention at another angle;
[0026] Figure 4 It is a cross-sectional view of the drilling probe in the present invention;
[0027] Figure 5 yes Figure 4 The enlarged view of point A in the middle;
[0028] Figure 6 It is a three-dimensional diagram of the square frame in the present invention;
[0029] Figure 7 It is an inverted stereogram of the drill body of the present invention;
[0030] Figure 8 is a cross-sectional view of the drill body of the present invention;
[0031] Fig. 9 It is a three-dimensional diagram of the arc plate and the push block in the present invention.
[0032] In the figure: base 1, adjustment block 11, bottom hole 12, placement box 13, side plate 2, side groove 21, top plate 22, first pull rope 23, second motor 24, third motor 25, third pull rope 26, frame 3, card plate 30, gravity hammer 31, slider 32, slide bar 33, first motor 34, lever 35, pressure sensor 36, card slot 37, drive slot 38, first air hole 39, transverse slot 391, L-shaped block 392, guide Surface 393, second tension spring 394, drill bit 4, first circular groove 41, drill body 5, center hole 51, loading groove 52, second circular groove 53, second cylinder 54, first arc groove 55, arc plate 56, notch 561, third tension spring 57, square groove 58, second arc groove 59, second air hole 591, block 6, first tension spring 61, drive bar 7, triangular groove 71, square bar 8, push block 81, anti-blocking plate 9, spring 91. DETAILED DESCRIPTION
[0033] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0034] like Figures 1 to 9 As shown, the present invention includes the following embodiments:
[0035] Embodiment 1:
[0036] A method for surveying pile foundation construction in a karst cave area comprises the following steps:
[0037] S1: Determine the location, quantity and spacing to be surveyed based on the calculation; then push the drilling machine into the test area after debugging;
[0038] S2: When the drill bit 4 in the drilling machine is controlled to be in a vertical position, the gravity hammer 31 is used to hit the drill bit 4 with the force of free fall, and the number of hammering of the gravity hammer 31 is recorded. The first pull rope 23 moves downward as the drill bit 4 moves downward. When the upper end of the drill bit 4 is about to enter the soil, the gravity hammer 31 is stopped counting, and the gravity hammer 31 is lifted. The drill body 5 is loaded on the first pull rope 23, and the drill body 5 contacts the drill bit 4. Then, the gravity hammer 31 continues to hammer until the drill bit 4 and the corresponding number of drill bodies 5 enter to a suitable depth.
[0039] S3: Determine the bearing capacity of the test area according to the measured data, and finally reel in the first pull rope 23 in the drilling machine, so that the drill body 5 moves upward along with the upward movement of the drill bit 4, and finally remove the drill body 5 from the first pull rope 23, thus completing the survey process before the pile foundation construction in the karst cave area.
[0040] In this embodiment, the drilling machine includes an I-shaped base 1 and an adjusting block 11 threadedly connected to the four corners of the base 1; the upper surface of the base 1 is symmetrically fixed to the side plate 2; the side plate 2 is laterally penetrated with a side groove 21; the two side grooves 21 are vertically slidably connected to the frame 3 together; the inner side of the frame 3 is slidably connected to the gravity hammer 31 up and down; the outer wall of the gravity hammer 31 is fixed to the slider 32; the slider 32 penetrates up and down and is slidably connected to the slide bar 33; the slide bar 33 is fixed to the frame 3; the inner side of the frame 3 is fixedly connected to the first motor 34; the output shaft of the first motor 34 is fixedly connected to the lever 35; the lever 35 can cyclically push the slider 32 upward during the rotation process; the inner side of the frame 3 is close to the The lower position is fixedly connected to the pressure sensor 36; the upper ends of the two side plates 2 are fixedly connected to the top plate 22; the top plate 22, the square frame 3 and the gravity hammer 31 are penetrated and movably connected to the first pull rope 23; the center of the base 1 is penetrated by a bottom hole 12 from top to bottom; the bottom hole 12 is movably connected to the drill bit 4; the upper end of the drill bit 4 is fixedly connected to the lower end of the first pull rope 23; the upper end of the first pull rope 23 is connected to the output shaft of the second motor 24; the center of the drill body 5 is axially provided with a center hole 51 adapted to the outer diameter of the first pull rope 23; a loading groove 52 is penetrated between the inner wall of the center hole 51 and the outer wall of the drill body 5; the movable gap of the square frame 3 between the top plate 22 and the base 1 is greater than the length of the drill body 5.
[0041] During operation, the position to be surveyed, the number of surveys and the spacing are determined according to the measurement; then after debugging the drilling probe, the corresponding survey point of the test area is pushed in, and then the four adjustment blocks 11 are twisted to adjust the base 1 to a horizontal state. Since the base 1 is provided with bottom holes 12 running through the top and bottom, and the drill bit 4 is movably connected in the bottom hole 12, the drill bit 4 is in a vertical state after the base 1 is adjusted, and then the second motor 24 is controlled to reverse, so that the second motor 24 releases the first pull rope 23, so that the first pull rope 23 is relaxed, and the holes running through the top and bottom of the frame 3 are adapted to the outer diameter of the first pull rope 23, so after the frame 3 slides downward along the side groove 21, the frame 3 abuts against the upper end of the drill bit 4, and the lower end of the drill bit 4 moves along the bottom hole 12 under the action of gravity of the frame 3 until the drill bit 4 is drilled. The lower end of the drill head 4 is against the soil surface. At this time, the upper end of the drill head 4 is higher than the base 1. As the first motor 34 starts to work, the output shaft of the first motor 34 drives the lever 35 to rotate. During the rotation of the lever 35, the slider 32 is pushed from bottom to top. The slider 32 slides and moves upward along the slide bar 33 when being pushed. During the upward movement of the slider 32, it moves from bottom to top inside the frame 3 until the slider 32 is away from the lower position inside the frame 3. As the lever 35 is separated from the slider 32, the slider 32 moves downward under the gravity of the gravity hammer 31. The slider 32 slides along the slide bar 33. The slider 32 moves downward as the gravity hammer 31 moves downward. During the downward movement of the gravity hammer 31, it hits the lower position inside the frame 3, causing the pressure sensor 36 to sense When the gravity hammer 31 is struck, the gravity hammer 31 will transfer the force of striking the frame 3 to the upper end of the drill bit 4. The drill bit 4 will move along the bottom hole 12 and be inserted into the ground. As the slider 32 on one side of the gravity hammer 31 is pushed down again, the gravity hammer 31 will move up and fall again. The pressure sensor 36 will record the pressure again. The pressure sensor 36 is used to record the number of times the gravity hammer 31 falls, that is, the number of hammer strikes. Each downward movement of the gravity hammer 31 can transfer the impact force to the drill bit 4 through the frame 3, so that the drill bit 4 gradually moves down. Before the upper end of the drill bit 4 is about to enter the bottom hole 12, the rotation of the first motor 34 is stopped, the gravity hammer 31 stops hammering, and then the frame 3 is controlled to move up. During the upward movement of the frame 3, it will slide along the side groove 21. After the frame 3 moves up, it will contact the first pull rope 23 is active, and the frame 3 moves closer to the top plate 22 and away from the drill bit 4 during the upward movement, until the frame 3 reaches the upper limit position, and the distance between the frame 3 and the drill bit 4 is greater than the length of the drill body 5. Then the drill body 5 is taken and moved between the frame 3 and the drill bit 4, and the loading slot 52 of the drill body 5 is aligned with the first pull rope 23, and the drill body 5 is sleeved on the first pull rope 23, so that the first pull rope 23 is located in the center hole 51 in the drill body 5, and the loading of one of the drill bodies 5 is completed. Then the frame 3 is released, so that the frame 3 moves downward under its own gravity, and the upper end of the drill body 5 is pressed against the lower surface of the frame 3, and the lower end of the drill body 5 is pressed against the upper end of the drill bit 4. As the first motor 34 is started again, the gravity hammer 31 starts to hammer.The gravity hammer 31 will transfer the force generated by the hammering to the drill body 5 through the square frame 3, and the drill body 5 will transfer the force to the drill bit 4, so that the drill body 5 is inserted into the ground along with the drill bit 4. When the upper end of the drill body 5 is about to enter the inner side of the bottom hole 12, the square frame 3 is controlled to move up again, and the next drill body 5 is loaded until the corresponding number of drill bodies 5 and the drill bit 4 are inserted into the ground. In this way, the staff will calculate the bearing capacity of the ground in the survey area according to the number of hammering. Finally, when the square frame 3 is controlled to move up to the limit position, the second motor 24 is controlled to rotate forward, and the second motor 24 will reel up the first pull rope 23. After the square frame 3 moves up, enough space is reserved for the unloading of the drill body 5. During the upward movement of the drill body 5, the drill body 5 will move along the bottom hole 12, and the drill body 5 will be pulled out from the ground soil in sequence, and then the drill body 5 will be removed from the first pull rope 23 in sequence, completing the survey of one point in the survey area, and then controlling the drill probe to move to the next position;
[0042] The present invention loads multiple drill bodies 5 in sequence after they are moved down as the drill bit 4 is hammered under pressure, and calculates the bearing capacity of the survey area according to the number of hammer blows. Compared with the existing surveying with a drill probe, the present invention can survey narrow areas in the vertical space, thereby meeting the survey needs in special spaces.
[0043] Embodiment 2:
[0044] A card slot 37 is provided on one of the vertical inner walls inside the square frame 3; a plurality of the card slots 37 are evenly distributed on the vertical inner wall of the square frame 3; a card block 6 is slidably and sealedly connected in the card slot 37; the card block 6 is connected to the bottom of the card slot 37 through a first tension spring 61; a driving slot 38 is provided on the lower surface of the frame 3; a driving bar 7 is slidably and sealedly connected in the driving slot 38; the bottom of the driving slot 38 is connected to the bottom of the card slot 37 through a first air hole 39; the side groove 21 passes through downward; after the driving bar 7 is squeezed by the base 1, the card block 6 extends out from the corresponding card slot 37; the gravity hammer 31 is fixedly connected to the card plate 30 on the side away from the slider 32; the card plate 30 contacts the inner wall of the square frame 3 provided with the card slot 37; the card plate 30 can be clamped by the card block 6 extending out of the card slot 37.
[0045] In this embodiment, the upper surface of the top plate 22 is fixedly connected to the third motor 25; the output shaft of the third motor 25 is fixedly connected to the third pull rope 26; the other end of the third pull rope 26 passes through the side plate 2 and is fixedly connected to the upper surface of the frame 3; the outer surface of the frame 3 is provided with a transverse groove 391 connected to the drive groove 38; the L-shaped block 392 is connected to the sliding seal in the transverse groove 391; the end of the L-shaped block 392 close to the drive bar 7 is provided with a guide surface 393 inclined downward; the end of the L-shaped block 392 away from the drive bar 7 is connected to the outer wall of the frame 3 by a second tension spring 394; the drive bar 7 is vertically provided with a plurality of triangular grooves 71 on the side facing the L-shaped block 392; the end of the L-shaped block 392 close to the drive bar 7 is unidirectionally clamped with the triangular groove 71.
[0046] During operation, as the gravity hammer 31 continuously hits the lower inner side of the frame 3, the frame 3 will slide from top to bottom along the side groove 21. During the downward movement of the frame 3, the third motor 25 will control the third pull rope 26 to relax, thereby preventing the third pull rope 26 from affecting the downward movement of the frame 3. During the downward movement of the frame 3, it will move close to the base 1. During the downward movement of the frame 3, the driving bar 7 will be driven to move downward synchronously until the driving bar 7 contacts the upper surface of the base 1. Then, the driving bar 7 enters the driving groove 38 as the frame 3 continues to move downward. During the movement of the driving bar 7 close to the bottom of the driving groove 38, a plurality of triangular grooves 71 and the transverse groove 391 will be staggered in sequence. The L-shaped block 392 is close to one end of the driving bar 7. The triangular groove 71 moves out of the corresponding triangular groove 71 under the cooperation of the guide surface 393, the L-shaped block 392 moves along the transverse groove 391, and the driving bar 7 continues to move toward the inside of the driving groove 38 until the frame 3 contacts the upper surface of the base 1, the driving bar 7 stops entering the driving groove 38, and the end of the L-shaped block 392 close to the driving bar 7 is inserted into the corresponding triangular groove 71 to lock the driving bar 7. Since the end of the L-shaped block 392 away from the driving bar 7 is connected to the outer wall of the frame 3 through the second tension spring 394, the locking of the driving bar 7 by the L-shaped block 392 is more stable. When the driving bar 7 moves toward the bottom of the driving groove 38, the medium in the driving groove 38 is squeezed by the driving bar 7. The first air hole 39 enters the card slot 37, thereby pushing the card block 6 out of the corresponding card slot 37. Since the card block 6 is connected to the bottom of the card slot 37 by the first tension spring 61, the card block 6 needs to overcome the tension of the first tension spring 61 during the process of extending from the card slot 37, so that multiple card blocks 6 can be extended from the corresponding card slots 37 more evenly. After the card block 6 is extended, the card plate 30 can be stuck, so that the card plate 30 cannot move with the movement of the gravity hammer 31, and the gravity hammer 31 is locked. The gravity hammer 31 also stops hammering. Then the staff will control the third motor 25 to reel in the third pull rope 26, so that the frame 3 moves up, and then the drill body 5 is loaded. After loading is completed, the L-shaped block 392 is pulled, and the L-shaped block 392 overcomes the second tension spring 394 under the pulling and moves in the transverse groove 391. The L-shaped block 392 moves away from the driving bar 7, so that the end of the L-shaped block 392 moves out from the corresponding triangular groove 71. In this way, the driving bar 7 is unlocked, and the first tension spring 61 will pull the respective card blocks 6 back into the card slot 37. The medium in the card slot 37 enters the driving slot 38 along the first air hole 39, so that the driving bar 7 extends out from the notch of the driving slot 38. Due to the restriction of the medium in the driving slot, the driving bar 7 will not detach from the driving slot 38. After the card block 6 is retracted to the card slot 37, the card plate 30 and the gravity hammer 31 are unlocked, and the hammering of the gravity hammer 31 begins.
[0047] This embodiment automatically locks the gravity hammer 31 after the frame 3 moves down to the limit, thereby avoiding the hammering and counting of the gravity hammer 31 during the process of loading the drill body 5, thereby improving the survey accuracy before the pile foundation construction survey.
[0048] Embodiment 3:
[0049] The drill bit 4 is rod-shaped; the lower end of the drill bit 4 is conical, and the upper end is provided with a first circular groove 41; the upper end of the drill body 5 is provided with a second circular groove 53; the first circular groove 41 and the second circular groove 53 have the same specifications; the lower end of the drill body 5 is provided with a second cylinder 54; the second cylinder 54 at the end of the drill body 5 can be inserted into the first circular groove 41 at the upper end of the drill bit 4; adjacent drill bodies 5 are connected with the second cylinders 54 through the second circular grooves 53.
[0050] In this embodiment, the end face of the second cylinder 54 away from the second circular groove 53 is inclined; the bottom of the second circular groove 53 is inclined; the end face of the second cylinder 54 away from the second circular groove 53 is arranged in an opposite direction to the inclination direction of the bottom face of the second circular groove 53; the bottom of the first circular groove 41 is inclined; the end face of the second cylinder 54 is arranged in parallel and contact with the bottom face of the first circular groove 41; the upper surface of the base 1 is fixedly connected to the placement box 13; the upper end of the placement box 13 is open; the bottom of the placement box 13 is provided with a mesh; the drill body 5 is placed upside down in the placement box 13.
[0051] In this embodiment, a first arc groove 55 is provided on one of the groove walls of the loading groove 52; an arc plate 56 is slidably connected in the first arc groove 55; the arc plate 56 is connected to the bottom of the first arc groove 55 by a third tension spring 57; a square groove 58 is provided on the upper groove wall of the first arc groove 55 and is connected to the lower end of the drill body 5; a square bar 8 is slidably connected in the square groove 58; a push block 81 is provided between the arc plate 56 and the bottom of the first arc groove 55; the push block 81 is fixedly connected to the square bar 8; the cross-sectional specifications of the push block 81 decrease as it moves away from the square bar 8; a notch 561 is provided on the arc plate 56 near the square groove 58; the arc plate 56 pulls the third tension spring 57 during the process of the push block 81 squeezing the notch 561.
[0052] In this embodiment, a second arc groove 59 is provided on the other groove wall of the loading groove 52; the second arc groove 59 is slidingly sealed and connected to the anti-blocking plate 9; the anti-blocking plate 9 and the bottom of the second arc groove 59 are connected by a spring 91; the second arc groove 59 is opposite to the first arc groove 55; the arc plate 56 can be inserted into the second arc groove 59 under the drive of the push block 81.
[0053] In this embodiment, the arc plate 56 is slidably sealed to the first arc groove 55 ; the square bar 8 is slidably sealed to the square groove 58 ; the bottom of the first arc groove 55 is connected to the bottom of the second arc groove 59 via the second air hole 591 .
[0054] During operation, the drill body 5 is inverted and placed in the placement box 13 for storage and placement. The drill body 5 vibrates with the movement of the placement box 13. The vibration generated during the movement of the drill probe and the operation process will be transmitted to the drill body 5 in the placement box 13, causing the drill body 5 to vibrate. Impurities attached to the drill body 5 fall off with the vibration. The inverted drill body 5 protects the second cylinder 54.
[0055] After the drill bit 4 is inserted into the ground under pressure, the staff will lift the box 3 to expose a suitable space, take out one of the drill bodies 5 from the placement box 13, and put the inverted drill body 5 upright so that the second cylinder 54 on the drill body 5 is located directly below the second circular groove 53. Then, the loading groove 52 on the outer wall of the drill body 5 is aligned with the first pull rope 23, and the drill body 5 is put on the first pull rope 23. The first pull rope 23 is located on the inner side of the center hole 51 of the drill body 5. Then, the drill body 5 is controlled to move downward, and the drill body 5 will drive the second cylinder 54 at the lower end to be inserted into the first circular groove 41. Since the end face of the second cylinder 54 on the drill body 5 is parallel to the bottom face of the first circular groove 41, the drill body 5 is placed on the first pull rope 23. Therefore, the second cylinder 54 on the drill body 5 can be completely inserted into the first circular groove 41. The specifications of the second cylinder 54 are the same as those of the first circular groove 41, so that the connection between the drill body 5 and the drill bit 4 is realized. In the process of the second cylinder 54 entering the first circular groove 41 under the control of the drill body 5, the square bar 8 is squeezed and slides along the square groove 58. The square bar 8 will drive the push block 81 to move in the first arc groove 55. The push block 81 will squeeze the notch 561 on the arc plate 56, so that the arc plate 56 slides along the first arc groove 55 after being squeezed by the push block 81. After sliding along the first arc groove 55, the arc plate 56 pulls the third tension spring 57, and the tension of the third tension spring 57 is less than The gravity of the drill body 5 causes the square bar 8 to retract smoothly into the square groove 58. As the arc plate 56 extends out from the first arc groove 55, the arc plate 56 enters into the loading groove 52 and blocks the loading groove 52, so that the loading groove 52 is blocked and locked by the arc plate 56. After the loading groove 52 is blocked, on the one hand, the drill body 5 can block the soil as much as possible after entering the soil to prevent the soil from blocking the loading groove 52. On the other hand, it can prevent the first pull rope 23 from moving out of the loading groove 52, so that the connection between the drill body 5 and the first pull rope 23 is more stable. The arc plate 56 will pass over the loading groove 52 and enter into the first arc groove 55 as the push block 81 is squeezed. 56 will squeeze the anti-blocking plate 9 at the notch of the first arc groove 55. The anti-blocking plate 9 will overcome the spring 91 under pressure and move toward the bottom of the first arc groove 55. After the arc plate 56 enters the first arc groove 55, the strength of the arc plate 56 is guaranteed, and the stability of the arc plate 56 in shielding the loading groove 52 is improved. In the process of the arc plate 56 squeezing the anti-blocking plate 9, the anti-blocking plate 9 will drive the medium in the first arc groove 55 along the second air hole 591 into the first arc groove 55. The square bar 8 cannot be removed after the drill body 5 is pressed, so that the medium in the first arc groove 55 will squeeze the arc plate 56, so that the arc plate 56 is easier to enter the second arc groove 59.
[0056] After the first drill body 5 is loaded, as the first drill body 5 is inserted into the soil under pressure, the second drill body 5 is loaded, and the second cylinder 54 on the second drill body 5 will be inserted into the second circular groove 53 on the first drill body 5. Since the end face of the second cylinder 54 and the bottom face of the second circular groove 53 are inclined in opposite directions, after the adjacent drill bodies 5 are plugged in, the loading grooves 52 on the adjacent drill bodies 5 open in opposite directions, thereby further preventing the drill body 5 from detaching from the first pull rope 23 and further improving the stability of the drill body 5 loaded on the first pull rope 23; after the counting of the gravity hammer 31 is completed, the control frame 3 moves up to the extreme position to reserve disassembly space, and the first pull rope 23 is wound up, so that the drill body 5 and the drill head 4 move up. After one of the drill bodies 5 is completely exposed from the bottom hole 12, the drill body 5 is moved up, so that the second cylinder 54 at the lower end of the drill body 5 in the upper position is pulled out from the second circular groove 53 below. The spring 91 will push the anti-blocking plate 9 to return to its original position, while the third tension spring 57 will pull the arc plate 56. The anti-blocking plate 9 will move away from the bottom of the second arc groove 59 under the elastic force of the spring 91, so that the second arc groove 59 forms a negative pressure. The arc plate 56 is pulled out of the second arc groove 59 and the loading groove 52 by the third tension spring 57, so that the loading groove 52 is opened, and the arc plate 56 is finally retracted into the first arc groove 55. During the process of the arc plate 56 being pulled back by the third tension spring 57, the medium in the first arc groove 55 is squeezed and enters the second arc groove 59 along the second air hole 591. During the process of the arc plate 56 returning to its original position, the push block 81 will be squeezed through the notch 561, and the push block 81 will be close to the square groove 58. The push block 81 will drive the square bar 8 to move out of the square groove 58. Finally, the staff can remove the drill body 5 from the first pull rope 23, and the separation process of the drill body 5 and the drill bit 4 is completed in the same way.
[0057] In this embodiment, the second cylinder 54, the first circular groove 41 and the second circular groove 53 cooperate with each other to achieve the connection between the drill body 5 and the drill bit 4, and the connection between adjacent drill bodies 5, so that the drill body 5 and the drill bit 4 form a whole, ensuring the smooth progress of the survey;
[0058] The present invention shields the loading slot 52 by the curved plate 56 through the movement of the curved plate 56, so that on the one hand, the soil is shielded as much as possible after the drill body 5 enters the soil to prevent the soil from blocking the loading slot 52, and on the other hand, the first pull rope 23 is prevented from moving out of the loading slot 52, so that the connection between the drill body 5 and the first pull rope 23 is more stable, thereby ensuring the stability of the survey before the pile foundation construction.
[0059] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate directions or positional relationships based on the attached Figure 2The orientation or positional relationship shown is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, it cannot be understood as limiting the scope of protection of the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0060] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A method for surveying pile foundation construction in a karst cave area, characterized in that: The following steps are involved: S1: Determine the location, quantity and spacing to be surveyed based on the calculation; then push the drilling machine into the test area after debugging; S2: When the drill bit (4) in the drilling machine is controlled to be in a vertical position, a gravity hammer (31) is used to hit the drill bit (4) with the force of free fall, and the number of hammering of the gravity hammer (31) is recorded. The first pull rope (23) moves downward along with the downward movement of the drill bit (4). When the upper end of the drill bit (4) is about to enter the soil, the gravity hammer (31) is stopped from counting, and the gravity hammer (31) is lifted, the drill body (5) is loaded on the first pull rope (23), and the gravity hammer (31) is continued to hammer until the drill bit (4) and the corresponding number of drill bodies (5) enter to a suitable depth; S3: judging the bearing capacity of the test area according to the measured data, finally winding up the first pull rope (23) in the drilling probe, the drill body (5) moves upward along with the upward movement of the drill head (4), and finally removing the drill body (5) from the first pull rope (23), thus completing the survey process before the pile foundation construction in the karst cave area; The drilling machine comprises an I-shaped base (1) and an adjusting block (11) threadedly connected to four corners of the base (1); the upper surface of the base (1) is symmetrically fixed to a side plate (2); the side plate (2) is laterally penetrated with a side groove (21); the two side grooves (21) are vertically slidably connected to a square frame (3); the inner side of the square frame (3) is slidably connected to a gravity hammer (31); the outer wall of the gravity hammer (31) is fixed to a slider (32); the slider (32) penetrates up and down and is slidably connected to a slide bar (33); the slide bar (33) is fixed to the square frame (3); the inner side of the square frame (3) is fixed to a first motor (34); the output shaft of the first motor (34) is fixed to a lever (35); the lever (35) can cyclically shift the slider (32) upward during rotation; the lower position of the inner side of the square frame (3) is fixed to the slider (32) The top end of the two side plates (2) is fixedly connected to the top plate (22); the top plate (22), the square frame (3) and the gravity hammer (31) are movably connected to the first pull rope (23) through the top and bottom; the center of the base (1) is provided with a bottom hole (12) through the top and bottom; the bottom hole (12) is movably connected to the drill bit (4) through the top and bottom; the top end of the drill bit (4) is fixedly connected to the bottom end of the first pull rope (23); the top end of the first pull rope (23) is connected to the output shaft of the second motor (24); the center of the drill body (5) is provided with a center hole (51) along the axial direction that is adapted to the outer diameter of the first pull rope (23); a loading groove (52) is provided between the inner wall of the center hole (51) and the outer wall of the drill body (5); the movable gap of the square frame (3) between the top plate (22) and the base (1) is greater than the length of the drill body (5); A card slot (37) is provided on one of the vertical inner walls inside the square frame (3); a plurality of the card slots (37) are evenly distributed on the vertical inner wall of the square frame (3); a card block (6) is slidably and sealably connected to the card slot (37); the card block (6) is connected to the bottom of the card slot (37) via a first tension spring (61); a driving slot (38) is provided on the lower surface of the square frame (3); a driving bar (7) is slidably and sealably connected to the driving slot (38); the bottom of the driving slot (38) is connected to the The bottoms of the card slots (37) are connected via a first air hole (39); the side grooves (21) are connected downward; the driving bar (7) is squeezed by the base (1) so that the card block (6) extends out from the corresponding card slot (37); the side of the gravity hammer (31) away from the slider (32) is fixedly connected to the card plate (30); the card plate (30) is in contact with the inner wall of the frame (3) provided with the card slot (37); the card plate (30) can be clamped by the card block (6) extending out of the card slot (37); The upper surface of the top plate (22) is fixedly connected to the third motor (25); the output shaft of the third motor (25) is fixedly connected to the third pull rope (26); the other end of the third pull rope (26) passes through the side plate (2) and is fixedly connected to the upper surface of the square frame (3); the outer surface of the square frame (3) is provided with a transverse groove (391) connected to the driving groove (38); the inner sliding seal of the transverse groove (391) is connected to the L-shaped block (392); the end of the L-shaped block (392) close to the driving bar (7) is provided with a guide surface (393) inclined downward; the end of the L-shaped block (392) away from the driving bar (7) is connected to the outer wall of the square frame (3) through a second tension spring (394); a plurality of triangular grooves (71) are vertically provided on the side of the driving bar (7) facing the L-shaped block (392); the end of the L-shaped block (392) close to the driving bar (7) is unidirectionally clamped with the triangular groove (71).
2. A pile foundation construction survey method for a karst cave area according to claim 1, characterized in that: The drill bit (4) is rod-shaped; the lower end of the drill bit (4) is conical, and the upper end is provided with a first circular groove (41); the upper end of the drill body (5) is provided with a second circular groove (53); the first circular groove (41) and the second circular groove (53) have the same specifications; the lower end of the drill body (5) is provided with a second cylinder (54); the second cylinder (54) at the end of the drill body (5) can be inserted into the first circular groove (41) at the upper end of the drill bit (4); adjacent drill bodies (5) are plugged into the second cylinders (54) via the second circular grooves (53).
3. A pile foundation construction survey method for a karst cave area according to claim 2, characterized in that: The end face of the second cylinder (54) away from the second circular groove (53) is arranged at an inclination; the bottom of the second circular groove (53) is arranged at an inclination; the end face of the second cylinder (54) away from the second circular groove (53) is arranged in an inclination direction opposite to the bottom face of the second circular groove (53); the bottom of the first circular groove (41) is arranged at an inclination; the end face of the second cylinder (54) is arranged in parallel and in contact with the bottom face of the first circular groove (41); the upper surface of the base (1) is fixedly connected to the placement box (13); the upper end of the placement box (13) is open; the bottom of the placement box (13) is provided with mesh holes; the drill body (5) is placed upside down in the placement box (13).
4. The method for pile foundation construction survey in a karst cave area according to claim 2, characterized in that: A first arc groove (55) is provided on one of the groove walls of the loading groove (52); an arc plate (56) is slidably connected inside the first arc groove (55); the arc plate (56) is connected to the groove bottom of the first arc groove (55) via a third tension spring (57); a square groove (58) is provided on the upper groove wall of the first arc groove (55) and is connected to the lower end of the drill body (5); a square bar (8) is slidably connected inside the square groove (58); a push block (81) is provided between the arc plate (56) and the groove bottom of the first arc groove (55); the push block (81) is fixedly connected to the square bar (8); a notch (561) is provided on the arc plate (56) near the square groove (58); the arc plate (56) pulls the third tension spring (57) when the push block (81) squeezes the notch (561).
5. A method for surveying pile foundation construction in a karst cave area according to claim 4, characterized in that: The other groove wall of the loading groove (52) is provided with a second arc groove (59); the second arc groove (59) is slidingly sealed and connected to an anti-blocking plate (9); the anti-blocking plate (9) and the groove bottom of the second arc groove (59) are connected by a spring (91); the second arc groove (59) is opposite to the first arc groove (55); the arc plate (56) can be inserted into the second arc groove (59) under the drive of a push block (81).
6. A method for surveying pile foundation construction in a karst cave area according to claim 5, characterized in that: The arc plate (56) is connected to the first arc groove (55) in a sliding and sealing manner; the square bar (8) is connected to the square groove (58) in a sliding and sealing manner; the bottom of the first arc groove (55) and the bottom of the second arc groove (59) are connected via a second air hole (591).
Citation Information
Patent Citations
Fully-automatic drill rod detection method and drill rod detection equipment for soil layer
CN106759222A
Equipment for karst geology pile foundation drilling and grouting method for construction thereof
CN112696150A
