Sound absorption glass curtain wall structure and preparation method

Through the design of a three-layer structure of sound-absorbing glass curtain wall, using a combination of perforated plexiglass and ordinary glass, combined with CAD software optimization processing, the problem of insufficient sound insulation of the glass curtain wall is solved, achieving more efficient noise absorption and structural stability, and reducing Construction Complexity and Cost.

CN118727971APending Publication Date: 2024-10-01SHANGHAI JIAOTONG UNIV +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410777191.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-10-01

Smart Images

  • Figure CN118727971A_ABST
    Figure CN118727971A_ABST
Patent Text Reader

Abstract

The invention provides a sound-absorbing glass curtain wall structure and a preparation method, and belongs to the technical field of sound-absorbing glass curtain wall, the sound-absorbing glass curtain wall structure comprises a connecting frame, a first glass layer, a second glass layer and a third glass layer, the first glass layer, the second glass layer and the third glass layer are fixed in the connecting frame, and the first glass layer, the second glass layer and the third glass layer are fixed in the connecting frame. A cavity structure is formed between the first glass layer and the second glass layer, and a cavity structure is formed between the second glass layer and the third glass layer; the third glass layer is perforated organic glass, and the thickness of the organic glass is 2cm; the first glass layer and the second glass layer are common glass; a plurality of through holes are formed in the third glass layer; the invention provides a sound-absorbing glass curtain wall structure and a preparation method, and can solve the problems that the construction complexity and cost are increased due to the fact that sound-absorbing materials are additionally arranged in an existing glass curtain wall, and the sound-absorbing materials can be affected by environmental factors such as indoor humidity and temperature.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of sound-absorbing glass curtain walls, and in particular relates to a sound-absorbing glass curtain wall structure and a preparation method thereof. Background Art

[0002] High-speed rail station waiting halls and terminal halls are usually designed with large curtain walls and skylights, which allow natural light to fully enter the room, giving people a bright and open feeling. However, this design may have some problems in terms of sound insulation. Curtain walls are usually made of materials such as glass, and their main function is to provide visual effects and thermal insulation. Although curtain walls can effectively isolate external noise, their ability to absorb indoor sound is relatively weak. This means that when people talk or other activities in the high-speed rail station waiting hall or terminal hall, the sound is easily reflected and refracted between the curtain walls, causing sound to gather and reverberate, thereby exacerbating the noise in the room. The setting of skylights may also have a certain impact on sound propagation. Although skylights can increase the lighting and ventilation effects of the room, they also make it easier for sound to pass through, because transparent materials such as glass have a weak barrier effect on sound waves. If the surrounding environment is noisy, the skylight may become a "channel" for sound propagation, resulting in increased indoor noise. To solve this problem, designers can take some measures to improve the sound insulation effect. For example, sound insulation materials such as sound-absorbing panels and sound-absorbing cotton can be installed inside the curtain wall to increase its sound absorption performance. In addition, through reasonable layout and design, the reflection and reverberation of sound can be reduced to avoid noise accumulation. For skylights, materials with good sound insulation performance can be selected, or technical means such as double-layer glass and air partition layers can be adopted to reduce sound transmission.

[0003] The internal space of existing glass curtain walls is relatively limited. The installation of sound-absorbing materials increases the complexity and cost of construction. In addition, the sound-absorbing materials installed inside the curtain walls will be affected by environmental factors such as indoor humidity and temperature, resulting in a shortened lifespan or reduced sound-absorbing performance. Summary of the invention

[0004] In view of this, the present invention provides a sound-absorbing glass curtain wall structure and a preparation method, which can solve the problems that the internal space of the existing glass curtain wall is relatively limited, the installation of sound-absorbing materials increases the complexity and cost of construction, and the sound-absorbing materials installed inside the curtain wall will be affected by environmental factors such as indoor humidity and temperature, resulting in a shortened lifespan or reduced sound absorption performance.

[0005] The present invention is achieved in that:

[0006] A first aspect of the present invention provides a sound-absorbing glass curtain wall structure, which includes a connecting frame, a first glass layer, a second glass layer and a third glass layer, wherein the first glass layer, the second glass layer and the third glass layer are fixed inside the connecting frame, and a cavity structure is formed between the first glass layer and the second glass layer, and between the second glass layer and the third glass layer; the third glass layer is a perforated organic glass with a thickness of 2 cm; the first glass layer and the second glass layer are ordinary glass; a plurality of through holes are provided on the third glass layer, and the plurality of through holes are evenly arranged on the third glass layer; the first glass layer, the second glass layer and the third glass layer are arranged in parallel, and the connecting frame is vertically arranged at the connection position with the first glass layer, the second glass layer and the third glass layer.

[0007] On the basis of the above technical solution, a sound-absorbing glass curtain wall structure of the present invention can also be improved as follows:

[0008] Among them, the aperture of the through hole on the third glass layer is set to 0.5 cm, and the spacing between the centers of adjacent through holes is 2.0 cm; the perforation rate inside the third glass layer is 0.78%, the resonance frequency is 437 Hz, the calculated mid-frequency 1000 Hz sound absorption coefficient is 0.94, and the NRC is 0.65.

[0009] Furthermore, the thickness of the first glass layer is 6 cm, the thickness of the second glass layer is 8 cm; the thickness between the first glass layer and the second glass layer and between the second glass layer and the third glass layer are both 12 cm.

[0010] Furthermore, a transparent connection frame is provided between the second glass layer and the third glass layer.

[0011] A second aspect of the present invention provides a method for preparing a sound-absorbing glass curtain wall structure, which comprises the following specific steps:

[0012] S10: The construction personnel construct a three-dimensional model of the glass curtain wall according to the design drawings of the installation position of the glass curtain wall, and sequentially determine the shape and curve structure of the entire glass curtain wall, wherein the glass curtain wall is the sound-absorbing glass curtain wall structure;

[0013] S20: The construction personnel import the three-dimensional model of the glass curtain wall into the CAD software, create a curve of the glass curtain wall, and use the curve tool in the CAD software to divide the curve of the glass curtain wall to determine the structure of each part of the fired glass curtain wall;

[0014] S30: The construction personnel optimize the division method and determine the final division position of the glass curtain wall according to the characteristics of the glass material and the requirements of the firing process;

[0015] S40: preparing the first glass layer and the second glass layer according to the structure of the divided glass curtain wall and bending them according to the structure of the glass curtain wall;

[0016] S50: firing the second perforated glass layer according to the structure of the glass curtain wall divided above, and verifying its sound absorption performance;

[0017] S60: preparing the connection frame according to the structures of the fired first glass layer, the second glass layer and the third glass layer, so that the connection frame is adapted to the curve of the connection position of the adjacent first glass layer, the second glass layer and the third glass layer;

[0018] S70: sequentially and fixedly connecting the first glass layer, the second glass layer, and the third glass layer to the corresponding connection frames;

[0019] S80: Fix the glass curtain wall in its installation position in sequence, seal the joints, and then treat its surface;

[0020] The angle between the tangent lines at the connection of the adjacent glass curtain wall structures after division is between 90° and 180°, and the curvature change of the edges of the glass curtain wall structures on both sides of the division line extending inwards by 3m is less than 30°.

[0021] The technical effects of the method for preparing a sound-absorbing glass curtain wall structure provided by the present invention are as follows: constructing a three-dimensional model of the glass curtain wall:

[0022] Effect: Enables construction personnel to visualize the design of the entire glass curtain wall and determine its shape and curve structure, providing a basis for subsequent preparation.

[0023] Import CAD software and create the curves of the glass curtain wall:

[0024] Effect: Through the function of CAD software, the glass curtain wall is divided into curves, providing an accurate design and data basis for subsequent processes and preparations.

[0025] Optimize the division method and determine the split location:

[0026] Effect: Ensure the rationality and accuracy of the segmentation position, provide a suitable division basis for subsequent processes, and facilitate the preparation and performance optimization of the glass curtain wall.

[0027] Prepare the glass layers and bend them:

[0028] Effect: Prepare a glass layer that meets the design requirements, ensure that it can perfectly fit with the curtain wall structure, and improve the overall performance of the curtain wall.

[0029] Firing of the perforated second glass layer and verification of the sound absorption performance:

[0030] Effect: Improve the sound absorption performance of the glass curtain wall, so that it can effectively reduce the transmission of external noise and improve indoor comfort.

[0031] Prepare the connection frame:

[0032] Effect: Provide good connection support and enhance the stability and integrity of the glass curtain wall.

[0033] Fixed connection:

[0034] Effect: Ensure the firm connection between each part of the glass curtain wall and improve the stability and safety of the overall structure.

[0035] Fixed installation, sealing and surface treatment:

[0036] Effect: Ensure that the glass curtain wall is installed firmly and leak-free, with a smooth and tidy surface, improving the appearance quality and service life.

[0037] On the basis of the above technical solution, the method for preparing a sound-absorbing glass curtain wall structure of the present invention can also be improved as follows:

[0038] Furthermore, the construction personnel optimize the division method according to the characteristics of the glass material and the requirements of the firing process, and the specific steps of determining the final division position of the glass curtain wall include:

[0039] In the first step, the construction workers analyzed the characteristics of ordinary glass and perforated plexiglass, including strength, light transmittance, and weather resistance;

[0040] In the second step, the construction workers determine the strength of ordinary glass and perforated plexiglass at different curvatures at the specified thickness, and determine the positions of multiple segmentation points according to the changes in strength and curvature;

[0041] In the third step, the construction workers divided the glass curtain wall at the dividing point positions in the 3D model in turn, simulated the effect after division, and fired it to test its bending stability;

[0042] The fourth step is to determine the final segmentation position after evaluation and verification and record it in the 3D model of the glass curtain wall to determine the final segmentation position of the glass curtain wall;

[0043] The construction personnel determine the strength of ordinary glass and perforated organic glass at different curvatures at a specified thickness, and determine the positions of multiple segmentation points according to the strength change and the curvature change. The specific steps include:

[0044] In the first step, construction workers need to conduct strength tests on ordinary glass and perforated plexiglass at specified thicknesses, including tensile tests and bending tests to obtain strength data of the material at different curvatures;

[0045] In the second step, the construction personnel converted the experimental data into a strength curve, that is, the strength variation under different curvatures, and determined through mathematical modeling that the strength of the material reached the required curvature size;

[0046] In the third step, the construction personnel set split points in the areas with obvious strength changes based on the results of the strength curve analysis to ensure sufficient support at locations with large changes in curvature;

[0047] The fourth step is to match the position of the dividing point with the connection frame when determining the position of the dividing point to ensure that the divided glass can be properly supported and fixed;

[0048] The construction personnel divide the glass curtain wall at the division point positions in the three-dimensional model in turn, simulate the effect after the division, and perform firing to detect the bending stability. The specific steps include:

[0049] In the first step, the construction workers added split surfaces to the 3D model of the glass curtain wall for division;

[0050] The second step is to simulate the bending conditions, force distribution and stability of the overall structure under different curvatures after the division is completed.

[0051] The third step is to use finite element analysis tools to evaluate the load-bearing capacity and stability of the split glass sheets under actual use conditions during the simulation process to ensure that they will not bend excessively or become unstable.

[0052] The fourth step is to prepare the split glass samples under laboratory conditions and conduct a firing test. By placing the glass samples under a heat source, the temperature changes under real use conditions are simulated to observe their bending and stability.

[0053] Step 5: During the firing test, the bending, deformation and cracking data of the glass samples are recorded, the experimental results are analyzed and compared with the simulation results to verify the accuracy of the simulation and further optimize the design scheme;

[0054] Step 6: According to the simulation and experimental results, the design of the glass curtain wall is adjusted and optimized, the position of the segmentation points is readjusted, and the support structure is added to ensure that the segmented glass pieces can maintain sufficient stability and safety under different conditions;

[0055] The seventh step is to repeatedly simulate, experiment and adjust to ensure that the divided glass curtain wall can meet the design requirements and standards under various usage conditions.

[0056] Furthermore, the specific steps of preparing the first glass layer and the second glass layer according to the structure of the divided glass curtain wall and bending the glass curtain wall according to the structure of the glass curtain wall include:

[0057] The first step is to select tempered glass of different strength and hardness according to the installation location of the sound-absorbing glass curtain wall;

[0058] The second step is to place the tempered glass into a bending furnace and heat it according to the required bending radius and angle;

[0059] The third step is to use a mold to shape the glass into the desired curved shape while it is soft;

[0060] The fourth step is to cool the glass so that it is fixed in the desired shape;

[0061] The fifth step is to perform a curvature test on the fired first glass layer and the second glass layer to ensure the accuracy of their bending.

[0062] The beneficial effects of adopting the above-mentioned improvement scheme are: selecting tempered glass of different strengths and hardnesses according to the installation location:

[0063] Function: According to the specific installation location and requirements of the perforated sound-absorbing glass curtain wall, select tempered glass with appropriate strength and hardness to ensure that the glass can withstand the corresponding load and environmental pressure.

[0064] Effect: Ensure that the glass has sufficient strength and durability to meet the requirements of the installation location, while ensuring the effectiveness of the perforated sound absorption function.

[0065] Put the tempered glass into the bending furnace for heating treatment:

[0066] Function: Heating tempered glass can soften it, making it easier to bend and form the desired curved shape.

[0067] Effect: Make the glass plastic, preparing for the subsequent shaping process.

[0068] Use molds to shape the glass into the desired curved shape:

[0069] Function: Use the mold to shape the heated and softened tempered glass into the required curved shape to meet the design requirements.

[0070] Effect: Ensure that the glass can reach the expected shape and size during the bending process, and ensure the appearance and function of the perforated sound-absorbing glass curtain wall.

[0071] Cool the glass to set it in the desired shape:

[0072] Function: Cooling the glass can restore its hardness and fix it in the desired shape to maintain the stability and strength of the glass.

[0073] Effect: Ensure that the glass maintains the required shape and structure after bending to meet design and installation requirements.

[0074] The curvature test is performed on the first glass layer and the second glass layer after firing:

[0075] Function: Curvature testing of fired glass can verify the accuracy of its bending and ensure that the shape and size of the glass meet the design requirements.

[0076] Effect: Ensure that each piece of glass in the perforated sound-absorbing glass curtain wall has a consistent curvature, ensuring the consistency and integrity of the curtain wall's appearance and function.

[0077] Furthermore, the specific steps of firing the perforated second glass layer according to the structure of the glass curtain wall divided above and verifying its sound absorption performance include:

[0078] The first step is to obtain transparent plexiglass sheet material and ensure its thickness and size;

[0079] The second step is to burn and bend it to meet the curvature requirements and then perforate it;

[0080] The third step is to perform perforation processing on the organic glass plate by using a laser cutting machine according to the size and arrangement of the through holes on the second glass layer;

[0081] The fourth step is to perform surface treatment on the perforated organic glass plate;

[0082] The fifth step is to use an acoustic absorption coefficient testing instrument to test the sound absorption performance of the perforated plexiglass plate, analyze the test results, and evaluate the sound absorption performance of the perforated plexiglass plate.

[0083] The beneficial effects of adopting the above-mentioned improvement scheme are: obtaining a transparent organic glass plate material:

[0084] Function: This step ensures the basic requirements of the material, that is, the material should be transparent plexiglass with a certain thickness and size.

[0085] Effect: Selecting the right material can ensure the smooth progress of subsequent processing and testing, and guarantee the quality and performance of the final product.

[0086] After firing and bending to meet the curvature requirements, perforation is performed:

[0087] Function: This step is mainly to process the plexiglass plate to achieve the required curvature to meet the structural and design requirements of the glass curtain wall.

[0088] Effect: Through firing and bending, the plexiglass sheets can meet specific curvature requirements, making it easier to fit into the design during curtain wall installation.

[0089] Use a laser cutting machine to perforate the plexiglass plate according to the size and arrangement of the through holes:

[0090] Function: Use laser cutting machine to perforate the plexiglass plate to achieve the through-hole shape, size and arrangement required by the design.

[0091] Effect: Perforation processing can provide a conduction channel for sound waves, increase the interaction between sound waves and materials, and improve the sound absorption effect.

[0092] Surface treatment of perforated plexiglass sheets:

[0093] Function: Surface treatment can remove burrs and dirt generated during the processing, ensure a smooth and clean surface, and improve the appearance.

[0094] Effect: The smooth surface can reduce the reflection of sound waves, which is beneficial to the absorption and dissipation of sound waves, and further improves the sound absorption performance.

[0095] Use the acoustic absorption coefficient tester to test the sound absorption performance of the perforated organic glass plate, analyze the test results, and evaluate the sound absorption performance of the perforated organic glass plate:

[0096] Function: Through the sound absorption performance test, the sound absorption performance of the perforated plexiglass board can be evaluated to verify whether it meets the design requirements and project needs.

[0097] Effect: The test results can provide a basis for subsequent improvements and optimizations, ensuring that the final product has good sound absorption effects in practical applications and improving the overall performance of the curtain wall system.

[0098] Furthermore, the specific steps of preparing the connection frame according to the structures of the fired first glass layer, the second glass layer, and the third glass layer so that the connection frame is adapted to the curve of the connection position of the adjacent first glass layer, the second glass layer, and the third glass layer include:

[0099] The first step is to determine the shape of the connection frame, which is the same as the shapes of the adjacent first glass layer, the second glass layer and the third glass layer and is perpendicular to them;

[0100] The second step is to process the aluminum alloy to prepare the connection frame;

[0101] The specific steps of sequentially fixing and connecting the first glass layer, the second glass layer, and the third glass layer to the corresponding connection frames include:

[0102] The first step is to clean the first glass layer, the second glass layer and the third glass layer and then fix them to the connection frame through fixing parts;

[0103] In the second step, inert gas is filled between the first glass layer and the second glass layer and between the second glass layer and the third glass layer, and the connection between the connection frame and the first glass layer, the second glass layer and the third glass layer is sealed.

[0104] Furthermore, the specific steps of fixing the glass curtain wall at its installation position in sequence, sealing the joints, and then treating its surface include:

[0105] The first step is to place one side of the second glass layer in the glass curtain wall toward the interior;

[0106] The second step is to fix the glass curtain wall in its installation position in sequence by bolts;

[0107] The third step is to seal the connection position of the glass curtain wall with a sealing strip and further strengthen it by injecting sealant;

[0108] The fourth step is to clean and polish the surface of the glass curtain wall and then apply a nano coating inside and outside to provide waterproof, dustproof, anti-pollution and self-cleaning effects and ensure the transparency of the glass curtain wall.

[0109] The beneficial effects of adopting the above-mentioned improvement scheme are: the perforated sound-absorbing organic glass layer is facing the interior:

[0110] Function: The perforated structure of the perforated acoustic plexiglass layer can effectively absorb sound waves and reduce the noise level in the room. It can maximize the sound absorption effect by facing the room.

[0111] Effect: Reduce indoor noise and improve the comfort and quietness of the indoor environment.

[0112] Fastening glass curtain walls by bolting:

[0113] Function: Using bolts to fix the glass curtain wall can ensure that it is firmly installed in the designated position to prevent it from moving or tilting under the action of wind or other external forces.

[0114] Effect: Provide structural stability, ensuring the safety and durability of the glass curtain wall.

[0115] Sealing the joints with sealing strips and sealants:

[0116] Function: Sealing strips and sealants can fill the gaps in the joints to prevent moisture, air and pollutants from entering the interior of the glass curtain wall, thereby preventing water leakage and protecting the internal structure.

[0117] Effect: Provide sealing effect, enhance the durability and waterproof performance of glass curtain wall.

[0118] Cleaning, polishing and nano-coating of glass curtain wall surfaces:

[0119] effect:

[0120] Cleaning and polishing: Remove surface dirt and blemishes to make the glass surface smooth and flawless.

[0121] Nano coating: Nano coating can provide multiple protections, such as waterproof, dustproof, anti-pollution and self-cleaning effects, and will not affect the transparency of the glass.

[0122] Effect:

[0123] Maintain the cleanliness and beauty of the glass curtain wall.

[0124] Providing an extra layer of protection, extending the life of your glass curtain wall and reducing maintenance requirements.

[0125] Improve the functionality of glass curtain walls, such as waterproof, dustproof, anti-pollution and self-cleaning capabilities.

[0126] Compared with the prior art, the sound-absorbing glass curtain wall structure and preparation method provided by the present invention have the following beneficial effects:

[0127] Connection box:

[0128] Structural role: The connecting frame is a supporting and connecting element between the glass layers, used to fix and support the glass panels while ensuring correct alignment between the parts.

[0129] Effect: The vertical setting of the connection frame helps to maintain the stability and overall balance of the curtain wall structure, ensuring that the spacing and position between each glass layer meet the design requirements, thereby improving the overall performance and appearance of the curtain wall.

[0130] First glass layer, second glass layer and third glass layer:

[0131] Structural function: These glass layers constitute the main part of the curtain wall structure and undertake functions such as heat insulation, sound insulation and wind pressure resistance.

[0132] Effect: The first, second and third glass layers are arranged in parallel and fixed by a connecting frame to form a cavity structure. This cavity structure can isolate external sound and heat conduction to a certain extent, thus achieving sound insulation and heat insulation effects. In addition, the third glass layer is perforated organic glass, and its perforation rate, aperture and spacing are precisely designed, so that it has good sound absorption performance, effectively reduces the transmission of external noise, and improves the comfort inside the building.

[0133] The aperture and spacing of the through holes on the third glass layer, as well as the perforation rate, are adjusted to optimize its sound absorption performance, improve the overall sound insulation effect and sound absorption coefficient of the curtain wall, and make the environment inside the building more comfortable.

[0134] Further increasing the thickness of the first glass layer and the second glass layer, as well as the thickness of the gaps between the first, second and third glass layers, can enhance the sound insulation and heat insulation effects of the curtain wall and improve the overall energy-saving and thermal insulation performance of the building.

[0135] Providing a transparent connection frame between the second glass layer and the third glass layer helps to maintain the spacing and position stability between the glass layers without affecting the transparency and aesthetics. BRIEF DESCRIPTION OF THE DRAWINGS

[0136] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.

[0137] Figure 1 It is a structural schematic diagram of a sound-absorbing glass curtain wall structure;

[0138] Figure 2 The sound absorption calculation value is when the aperture of the through hole on the perforated organic glass is set to 0.5 cm and the spacing between the centers of adjacent through holes is 1.2 cm;

[0139] Figure 3 The sound absorption calculation value is when the aperture of the through hole on the perforated organic glass is set to 0.5 cm and the spacing between the centers of adjacent through holes is 2.0 cm;

[0140] Figure 4 The sound absorption calculation value when the aperture of the through hole on the perforated organic glass is set to 0.5 cm and the spacing between the centers of adjacent through holes is 1.8 cm;

[0141] Figure 5 An operation flow chart of a method for preparing a sound-absorbing glass curtain wall structure;

[0142] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0143] 10. Connecting frame; 20. First glass layer; 30. Second glass layer; 40. Third glass layer. DETAILED DESCRIPTION

[0144] In order to make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0145] like Figure 1 As shown, it is a structural schematic diagram of a sound-absorbing glass curtain wall structure provided by the present invention, in which the structure includes a connecting frame 10, a first glass layer 20, a second glass layer 30 and a third glass layer 40, wherein the first glass layer 20, the second glass layer 30 and the third glass layer 40 are fixed inside the connecting frame 10, and a cavity structure is formed between the first glass layer 20 and the second glass layer 30 and between the second glass layer 30 and the third glass layer 40; the third glass layer 40 is a perforated organic glass with a thickness of 2 cm; the first glass layer 20 and the second glass layer 30 are ordinary glass; a plurality of through holes are arranged on the third glass layer 40, and the plurality of through holes are evenly arranged on the third glass layer 40; the first glass layer 20, the second glass layer 30 and the third glass layer 40 are arranged in parallel, and the connecting position of the connecting frame 10 and the first glass layer 20, the second glass layer 30 and the third glass layer 40 is arranged vertically.

[0146] Among them, in the above technical solution, the aperture of the through hole on the third glass layer 40 is set to 0.5 cm, and the spacing between the centers of adjacent through holes is 2.0 cm; the perforation rate inside the third glass layer 40 is 0.78%, the resonance frequency is 437 Hz, the calculated mid-frequency 1000 Hz sound absorption coefficient is 0.94, and the NRC is 0.65.

[0147] Furthermore, in the above technical solution, the thickness of the first glass layer 20 is 6 cm, and the thickness of the second glass layer 30 is 8 cm; the thickness between the first glass layer 20 and the second glass layer 30 and between the second glass layer 30 and the third glass layer 40 is 12 cm.

[0148] Furthermore, in the above technical solution, a transparent connection frame is provided between the second glass layer 30 and the third glass layer 40 .

[0149] like Figure 5 FIG. 1 is an embodiment of a method for preparing a sound-absorbing glass curtain wall structure provided by the present invention. In this embodiment, the method comprises the following specific steps:

[0150] S10: The construction personnel build a three-dimensional model of the glass curtain wall according to the design drawings of the installation position of the glass curtain wall, and determine the shape and curve structure of the entire glass curtain wall in turn. The glass curtain wall is a sound-absorbing glass curtain wall structure;

[0151] S20: The construction workers import the 3D model of the glass curtain wall into the CAD software, create the curve of the glass curtain wall, and use the curve tool in the CAD software to divide the curve of the glass curtain wall to determine the structure of each part of the fired glass curtain wall;

[0152] S30: The construction personnel optimize the division method and determine the final division position of the glass curtain wall according to the characteristics of the glass material and the requirements of the firing process;

[0153] S40: preparing a first glass layer 20 and a second glass layer 30 according to the structure of the divided glass curtain wall and bending them according to the structure of the glass curtain wall;

[0154] S50: firing the perforated second glass layer 30 according to the structure of the glass curtain wall divided above, and verifying its sound absorption performance;

[0155] S60: preparing a connection frame 10 according to the structures of the fired first glass layer 20, the second glass layer 30 and the third glass layer 40, so that the connection frame 10 is adapted to the curve of the connection position of the adjacent first glass layer 20, the second glass layer 30 and the third glass layer 40;

[0156] S70: The first glass layer 20, the second glass layer 30 and the third glass layer 40 are fixedly connected to the corresponding connection frames 10 in sequence;

[0157] S80: Fix the glass curtain wall in its installation position in sequence, seal the joints, and then treat its surface;

[0158] The angle between the tangent lines at the connection of adjacent glass curtain wall structures after division is between 90° and 180°, and the curvature change of the edge of the glass curtain wall structure on both sides of the division line extending inward 3m is less than 30°.

[0159] Furthermore, in the above technical solution, the construction personnel optimize the division method according to the characteristics of the glass material and the requirements of the firing process, and the specific steps of determining the final division position of the glass curtain wall include:

[0160] In the first step, the construction workers analyzed the characteristics of ordinary glass and perforated plexiglass, including strength, light transmittance, and weather resistance;

[0161] In the second step, the construction workers determine the strength of ordinary glass and perforated plexiglass at different curvatures at the specified thickness, and determine the positions of multiple segmentation points according to the changes in strength and curvature;

[0162] In the third step, the construction workers divided the glass curtain wall at the dividing point positions in the 3D model in turn, simulated the effect after division, and fired it to test its bending stability;

[0163] The fourth step is to determine the final segmentation position after evaluation and verification and record it in the 3D model of the glass curtain wall to determine the final segmentation position of the glass curtain wall;

[0164] The construction personnel determine the strength of ordinary glass and perforated organic glass at different curvatures at a specified thickness, and the specific steps for determining the positions of multiple segmentation points according to the strength change and curvature change include:

[0165] In the first step, construction workers need to conduct strength tests on ordinary glass and perforated plexiglass at specified thicknesses, including tensile tests and bending tests to obtain strength data of the material at different curvatures;

[0166] In the second step, the construction personnel converted the experimental data into a strength curve, that is, the strength variation under different curvatures, and determined through mathematical modeling that the strength of the material reached the required curvature size;

[0167] In the third step, the construction personnel set split points in the areas with obvious strength changes based on the results of the strength curve analysis to ensure sufficient support at locations with large changes in curvature;

[0168] Step 4, when determining the position of the split point, match it with the connecting frame 10 to ensure that the split glass can be properly supported and fixed;

[0169] The construction workers divide the glass curtain wall at the dividing point positions in the 3D model in turn, simulate the effect after division, and perform firing to test its bending stability. The specific steps include:

[0170] In the first step, the construction workers added split surfaces to the 3D model of the glass curtain wall for division;

[0171] The second step is to simulate the bending conditions, force distribution and stability of the overall structure under different curvatures after the division is completed.

[0172] The third step is to use finite element analysis tools to evaluate the load-bearing capacity and stability of the split glass sheets under actual use conditions during the simulation process to ensure that they will not bend excessively or become unstable.

[0173] The fourth step is to prepare the split glass samples under laboratory conditions and conduct a firing test. By placing the glass samples under a heat source, the temperature changes under real use conditions are simulated to observe their bending and stability.

[0174] Step 5: During the firing test, the bending, deformation and cracking data of the glass samples are recorded, the experimental results are analyzed and compared with the simulation results to verify the accuracy of the simulation and further optimize the design scheme;

[0175] Step 6: According to the simulation and experimental results, the design of the glass curtain wall is adjusted and optimized, the position of the segmentation points is readjusted, and the support structure is added to ensure that the segmented glass pieces can maintain sufficient stability and safety under different conditions;

[0176] The seventh step is to repeatedly simulate, experiment and adjust to ensure that the divided glass curtain wall can meet the design requirements and standards under various usage conditions.

[0177] Furthermore, in the above technical solution, according to the structure of the divided glass curtain wall, the specific steps of preparing the first glass layer 20 and the second glass layer 30 and bending the glass curtain wall according to the structure of the glass curtain wall include:

[0178] The first step is to select tempered glass of different strength and hardness according to the installation location of the sound-absorbing glass curtain wall;

[0179] The second step is to place the tempered glass into a bending furnace and heat it according to the required bending radius and angle;

[0180] The third step is to use a mold to shape the glass into the desired curved shape while it is soft;

[0181] The fourth step is to cool the glass so that it is fixed in the desired shape;

[0182] In the fifth step, a curvature test is performed on the fired first glass layer 20 and the second glass layer 30 to ensure the accuracy of their bending.

[0183] Furthermore, in the above technical solution, the specific steps of firing the perforated second glass layer 30 according to the structure of the glass curtain wall divided above and verifying its sound absorption performance include:

[0184] The first step is to obtain transparent plexiglass sheet material and ensure its thickness and size;

[0185] The second step is to burn and bend it to meet the curvature requirements and then perforate it;

[0186] The third step is to perform perforation processing on the organic glass plate using a laser cutting machine according to the size and arrangement of the through holes on the second glass layer 30;

[0187] The fourth step is to perform surface treatment on the perforated organic glass plate;

[0188] The fifth step is to use an acoustic absorption coefficient testing instrument to test the sound absorption performance of the perforated plexiglass plate, analyze the test results, and evaluate the sound absorption performance of the perforated plexiglass plate.

[0189] Further, in the above technical solution, according to the structures of the fired first glass layer 20, the second glass layer 30 and the third glass layer 40, the connection frame 10 is prepared, and the specific steps of making the connection frame 10 and the curve of the connection position of the adjacent first glass layer 20, the second glass layer 30 and the third glass layer 40 adapt to each other include:

[0190] The first step is to determine the shape of the connection frame 10, which is the same as the shape of the adjacent first glass layer 20, the second glass layer 30 and the third glass layer 40, and is perpendicular thereto;

[0191] The second step is to process the aluminum alloy to prepare the connection frame 10;

[0192] The specific steps of sequentially fixing and connecting the first glass layer 20, the second glass layer 30 and the third glass layer 40 to the corresponding connection frame 10 include:

[0193] In the first step, the first glass layer 20, the second glass layer 30 and the third glass layer 40 are cleaned and fixedly connected to the connection frame 10 through fixing parts;

[0194] In the second step, inert gas is filled between the first glass layer 20 and the second glass layer 30 and between the second glass layer 30 and the third glass layer 40 , and the connection between the connection frame 10 and the first glass layer 20 , the second glass layer 30 and the third glass layer 40 is sealed.

[0195] Furthermore, in the above technical solution, the glass curtain wall is fixed in its installation position in sequence, and after the joints are sealed, the specific steps of processing the surface thereof include:

[0196] The first step is to place one side of the second glass layer 30 in the glass curtain wall toward the interior;

[0197] The second step is to fix the glass curtain wall in its installation position in sequence by bolts;

[0198] The third step is to seal the connection position of the glass curtain wall with a sealing strip and further strengthen it by injecting sealant;

[0199] The fourth step is to clean and polish the surface of the glass curtain wall and then apply nano-coating inside and outside to provide waterproof, dustproof, anti-pollution and self-cleaning effects and ensure the transparency of the glass curtain wall.

[0200] Embodiment 1:

[0201] like Figure 2 As shown, the aperture of the through hole on the third glass layer 40 is set to 0.5 cm, the spacing between the centers of adjacent through holes is 1.2 cm, and the sound absorption coefficient at a medium frequency of 1000 Hz is obtained by calculating the software Zorba 3.0 to be 0.90, and the NRC is 0.60.

[0202] Embodiment 2:

[0203] like Figure 4 As shown, the aperture of the through hole on the third glass layer 40 is set to 0.5 cm, the spacing between the centers of adjacent through holes is 1.8 cm, and the sound absorption coefficient at a medium frequency of 1000 Hz is obtained by calculating the software Zorba 3.0 to be 0.90, and the NRC to be 0.65.

[0204] Embodiment three:

[0205] like Figure 3 As shown, the aperture of the through hole on the third glass layer 40 is set to 0.5 cm, the spacing between the centers of adjacent through holes is 2.0 cm, and the sound absorption coefficient at a medium frequency of 1000 Hz is obtained by calculating the software Zorba 3.0 to be 0.94 and the NRC to be 0.65.

[0206] Specifically, the principle of the present invention is as follows: the construction personnel build a three-dimensional model of the glass curtain wall according to the design drawings of the installation position of the glass curtain wall, and determine the shape and curve structure of the entire glass curtain wall in turn, and the glass curtain wall is a sound-absorbing glass curtain wall structure; the construction personnel import the three-dimensional model of the glass curtain wall into the CAD software, create the curve of the glass curtain wall, use the curve tool in the CAD software to divide the curve of the glass curtain wall, and determine the structure of each part of the fired glass curtain wall; the construction personnel optimize the division method according to the characteristics of the glass material and the requirements of the firing process, and determine the final segmentation position of the glass curtain wall; according to the structure of the divided glass curtain wall, prepare the first glass layer 20 and the second glass layer 30 and bend them according to the structure of the glass curtain wall; according to the structure of the glass curtain wall divided above, the perforated second glass layer 30 is fired, and its sound absorption performance is verified; according to the structure of the fired first glass layer 20, the second glass layer 30 and the third glass layer 40, a connecting frame 10 is prepared, so that the connecting frame 10 is adapted to the curve of the connecting position of the adjacent first glass layer 20, the second glass layer 30 and the third glass layer 40; the first glass layer 20, the second glass layer 30 and the third glass layer 40 are fixedly connected to the corresponding connecting frame 10 in sequence; the glass curtain wall is fixed in its installation position in sequence, and after the connection is sealed, its surface is treated.