Modularized secondary structure bar planting integrated construction device and using method thereof
Through the automated operation of the modular secondary structure integrated rebar planting construction device, the problem of poor operating stability of manual hand-held impact drills at higher heights has been solved, high-precision and high-safety rebar planting construction has been achieved, and construction efficiency and quality.
Patent Information
- Application Number
- CN202410661007.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2024-10-01
AI Technical Summary
During the house construction process, when manual hand-held impact drills are used to plant secondary structural reinforcements, the operator has poor stability when holding the machine at a high height and cannot guarantee the accuracy and verticality of the holes, resulting in low hole-forming efficiency and high rework rate. The risk is high and the construction quality cannot be guaranteed.
Design a modular secondary structure integrated reinforcement construction device, including a mobile unit, a lifting unit, a rotating unit, a reinforcement unit, a positioning unit and a control unit. Through the collaborative work of these units, automated drilling, cleaning, and Grouting and rebar planting operations ensure accuracy and safety.
It realizes automated construction, improves the accuracy and safety of hole formation, reduces the rework rate, improves construction efficiency, and ensures high quality of bar planting.
Smart Images

Figure CN118728121A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building secondary structure reinforcement, and in particular to a modular secondary structure reinforcement integrated construction device and a use method thereof. Background Art
[0002] During the construction of houses, the back-anchored steel bar planting technology is required for the construction of infill walls to improve the seismic performance and stability of the wall. At present, in the actual construction process, the number of holes required for the on-site secondary structure construction is large, and the hole-making accuracy requirements are high. It is necessary to avoid the upper and lower steel bars of the secondary structure to ensure verticality. On-site reinforcement drilling often uses a manual handheld impact drill. The impact drill is manually pressed, and the impact drill rotates at high speed to cut and form a hole. However, when drilling holes manually at a high height, the operator's handheld machine has poor stability and cannot guarantee accuracy and verticality, resulting in slow hole-making efficiency, high rework rate, high risk, and the problem of inability to guarantee the quality of the hole. Summary of the invention
[0003] In view of the technical problems existing in the prior art, the purpose of the present invention is to provide a modular secondary structure rebar embedding integrated construction device and its use method, so as to solve the problem that the existing rebar embedding drilling method uses a manual handheld impact drill. When the manual drilling is at a high height, the operator's handheld machine has poor stability and cannot guarantee accuracy and verticality, resulting in slow drilling efficiency, high rework rate, high risk, and the problem that the quality of the drilling cannot be guaranteed.
[0004] In order to achieve the above object, the present invention adopts the following technical solution:
[0005] A modular secondary structure rebar planting integrated construction device comprises: a moving unit; a lifting unit, which is arranged on the moving unit to move with the moving unit; a rotating unit, which is arranged on the lifting unit to rise and fall with the lifting unit; a rebar planting unit, which is arranged on the rotating unit to rotate with the rotating unit, and the rebar planting unit is used for drilling holes, cleaning holes, grouting and planting rebars in the wall; a positioning unit, which is used to locate the drilling position; and a control unit, which is used to control the operation of the lifting unit, the rotating unit, the positioning unit and the rebar planting unit.
[0006] As a preferred embodiment, the rebar embedding unit includes a rebar embedding drill bit, a grouting head, an air blow pipe and a rebar air clamp; the rebar embedding drill bit, the grouting head, the air blow pipe and the rebar air clamp are all arranged on the rotating unit, and the rebar embedding drill bit, the grouting head, the air blow pipe and the rebar air clamp are evenly distributed along the central circumference of the rotating unit; the rebar embedding drill bit is connected to a first drive motor to drive its rotation; the grouting head is connected to a drive pump, and the drive pump is used to pump unsolidified high-strength cement slurry to the grouting head; the air blow pipe is connected to an air source; the rebar air clamp is used to clamp the rebar; and the control unit controls the opening and closing of the first drive motor, the drive pump and the air source.
[0007] As a preferred embodiment, the mobile unit includes a base and a wheel set, the wheel set is arranged at the bottom of the base, and the lifting unit is arranged on the base.
[0008] As a preferred embodiment, the lifting unit includes a lifting track, a second drive motor, a lifting gear and a lifting platform; there are two lifting tracks, which are symmetrically fixed on the mobile unit, and both lifting tracks are provided with racks, and the racks of the two lifting tracks are vertically arranged relative to the mobile unit; there are two lifting gears, which are respectively meshed with the racks of the two lifting tracks; there are two second drive motors, which are symmetrically arranged on both sides of the lifting platform, and the output shafts of the two second drive motors are respectively fixedly connected to the two lifting gears, and the two second drive motors are electrically connected to the control unit.
[0009] As a preferred embodiment, the rotating unit includes a rotating disk, a rotating shaft, a first rotating gear, a second rotating gear and a third driving motor; the third driving motor is fixedly arranged on the lifting unit, the first rotating gear is fixedly connected to the output shaft of the third driving motor, the second rotating gear is sleeved on the rotating shaft, the rotating shaft is rotatably connected to the lifting unit, the first rotating gear and the second rotating gear are meshed, and the rotating disk is fixed on the rotating shaft; the reinforcement unit is arranged on the rotating disk, and the third driving motor is electrically connected to the control unit.
[0010] As a preferred embodiment, it further includes a fixing unit, which includes two fixing legs. The two fixing legs are symmetrically distributed on both sides of the moving unit, and the two fixing legs are both threadedly connected to the moving unit to move relative to the moving unit.
[0011] A method for using a modular secondary structure rebar-embedded integrated construction device comprises the following steps:
[0012] S1. Determine the location of the rebar through the positioning unit;
[0013] S2, the control unit controls the lifting unit to move up and down, driving the rotating unit and the rebar planting unit to move up to the rebar planting position;
[0014] S3, the control unit controls the reinforcement unit to drill holes;
[0015] S4, the control unit controls the rotating unit to drive the rebar planting unit to rotate, and the control unit controls the rebar planting unit to perform hole cleaning processing on the drilling position;
[0016] S5, the control unit controls the rotating unit to drive the rebar planting unit to rotate, and the control unit controls the rebar planting unit to perform grouting on the drilling position;
[0017] S6. The control unit controls the lifting unit to drive the rotating unit and the rebar embedding unit to descend, and uses the rebar air clamp to align the rebar with the drilling position and complete the rebar embedding.
[0018] In general, the present invention has the following advantages:
[0019] The modularized secondary structure rebar planting integrated construction device of the present invention can realize the construction of automated secondary structure rebar planting with high precision, high safety, high rebar planting quality and high construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is the front view of a modular secondary structure reinforcement integrated construction device.
[0021] Figure 2 It is a top view of a modular secondary structure reinforcement integrated construction device.
[0022] Figure 3 It is a side view of a modular secondary structure reinforcement integrated construction device.
[0023] Figure 4 It is the assembly diagram between the lifting platform, rotating unit and reinforcement unit.
[0024] Figure 5 A perspective view of a modular secondary structure rebar-embedded integrated construction device.
[0025] In the figure: 1 main machine, 11 fixed support leg, 12 base, 13 lifting track, 14 wheel set, 2 rebar embedding unit, 21 rebar embedding drill bit, 22 grouting head, 23 air blowing pipe, 3 lifting platform, 31 lifting gear, 32 second drive motor, 33 second rotating gear, 34 third drive motor, 35 rotating disk, 36 rebar air clamp, 4 electronic display screen. DETAILED DESCRIPTION
[0026] The present invention will be further described in detail below in conjunction with specific implementation methods.
[0027] like Figure 1-5 As shown, this embodiment provides a modular secondary structure rebar planting integrated construction device, comprising:
[0028] like Figure 1-2 5, a mobile unit; specifically, the mobile unit includes a base 12 and a wheel set 14, the wheel set 14 is arranged at the bottom of the base 12, and the lifting unit is arranged on the base 12. There are four wheel sets 14, the base 12 is a cubic block, and the four wheel sets 14 are all universal wheels, and the four universal wheels are respectively connected to the four corners of the bottom of the base 12. In addition, the mobile unit can also be other existing mobile mechanisms, such as a track wheel structure, a trolley, etc., and the wheel set 14 can be set to be driven by a motor.
[0029] like Figure 1 , 4-5, the lifting unit is arranged on the mobile unit to move with the mobile unit; the lifting unit includes a lifting track 13, a second drive motor 32, a lifting gear 31 and a lifting platform 3; the number of the lifting track 13 is two, the two lifting tracks 13 are symmetrically fixed on the mobile unit, the two lifting tracks 13 are provided with racks, and the racks of the two lifting tracks 13 are vertically arranged relative to the mobile unit; the number of the lifting gears 31 is two, and the two lifting gears 31 are respectively meshed with the racks of the two lifting tracks 13; the number of the second drive motors 32 is two, the two second drive motors 32 are symmetrically arranged on both sides of the lifting platform 3, the output shafts of the two second drive motors 32 are respectively fixedly connected with the two lifting gears 31, and the two second drive motors 32 are electrically connected with the control unit. The lifting track 13 is a flat plate, which is vertically fixed on the base 12, and the racks are vertically arranged on the opposite side of the two lifting tracks 13. The two second drive motors 32 are respectively fixed on both sides of the lifting platform 3, and the lifting gears 31 are driven to rotate by rotating their own output shafts, thereby driving the lifting platform 3 to rise and fall on the two lifting tracks 13.
[0030] like Figure 1-5 As shown, the rotating unit is arranged on the lifting unit to rise and fall with the lifting unit; the rotating unit includes a rotating disk 35, a rotating shaft, a first rotating gear, a second rotating gear 33 and a third driving motor 34; the third driving motor 34 is fixedly arranged on the lifting unit, the first rotating gear is fixedly connected to the output shaft of the third driving motor 34, the second rotating gear 33 is sleeved on the rotating shaft, the rotating shaft is rotatably connected with the lifting unit, the first rotating gear and the second rotating gear 33 are meshed, and the rotating disk 35 is fixed on the rotating shaft; the reinforcing bar unit 2 is arranged on the rotating disk 35, and the third driving motor 34 is electrically connected with the control unit. Specifically, the lifting platform 3 is hollow, the third driving motor 34 is fixedly installed in the lifting platform 3, the rotating shaft extends vertically from the inside of the lifting platform 3 to the outside of the lifting platform 3, the bottom center of the rotating disk 35 is fixed on the top of the rotating shaft, the first rotating gear is driven to rotate by the third driving motor 34, the first rotating gear drives the second rotating gear 33 to rotate, the second rotating gear 33 drives the rotating shaft to rotate, and the rotating shaft drives the rotating disk 35 to rotate.
[0031] like Figure 1-5As shown, the rebar embedding unit 2 is arranged on the rotating unit to rotate with the rotating unit, and the rebar embedding unit 2 is used for drilling holes, cleaning holes, grouting and embedding rebars in the wall; specifically, the rebar embedding unit 2 includes a rebar embedding drill bit 21, a grouting head 22, an air blow pipe 23 and a steel bar air clamp 36; the rebar embedding drill bit 21, the grouting head 22, the air blow pipe 23 and the steel bar air clamp 36 are all arranged on the rotating unit, and the rebar embedding drill bit 21, the grouting head 22, the air blow pipe 23 and the steel bar air clamp 36 are evenly distributed along the circumference of the center of the rotating unit; the rebar embedding drill bit 21 is connected to a first drive motor to drive it to rotate; the grouting head 22 is connected to a drive pump, and the drive pump is used to pump unsolidified high-strength cement slurry to the grouting head 22; the air blow pipe 23 is connected to an air source or an air pump; the steel bar air clamp 36 is used to clamp the steel bar; the control unit controls the opening and closing of the first drive motor, the drive pump and the air source. The rebar embedding drill bit 21, the grouting head 22, the air blow pipe 23 and the rebar air clamp 36 are all existing product structures and will not be elaborated here. The rebar embedding drill bit 21, the grouting head 22, the air blow pipe 23 and the rebar air clamp 36 are distributed in a rectangular shape on the rotating disk 35. After completing the drilling of the wall, the third drive motor 34 drives the rotating disk 35 to rotate 90 degrees, the air blow pipe 23 blows air to clean the drilled hole, and then the third drive motor 34 drives the rotating disk 35 to rotate 180 degrees again, the grouting head 22 grouts the cleaned hole, the third drive motor 34 drives the rotating disk 35 to rotate 90 degrees again, and the rebar air clamp 36 inserts the clamped rebar into the hole to complete the secondary structure rebar embedding.
[0032] The positioning unit is used to locate the drilling position; specifically, the positioning unit is a laser aligner.
[0033] The control unit is used to control the operation of the lifting unit, the rotating unit, the positioning unit and the anchor unit 2. Specifically, the control unit includes an electronic display screen 4 and a host 1. The electronic display screen 4 is connected to the lifting track 13 by screws, and the host 1 is fixed on another lifting track 13. The electronic display screen 4 is electrically connected to the host 1. The construction personnel touch the control button of the electronic display screen 4 to send a signal to the host 1, and the host 1 controls all the electric drive devices of the entire device.
[0034] like Figure 1-3 As shown in Figure 5, the device also includes a fixed unit, which includes a fixed leg 11. The number of the fixed legs 11 is two, and the two fixed legs 11 are symmetrically distributed on both sides of the mobile unit. The two fixed legs 11 are both threadedly connected to the mobile unit to move relative to the mobile unit.
[0035] The present embodiment provides a method for using a modular secondary structure rebar-embedded integrated construction device, comprising the following steps:
[0036] S1. Determine the location of the rebar through the positioning unit;
[0037] S2, the operation control unit controls the lifting unit to lift and lower, driving the rotating unit and the rebar embedding unit 2 to rise to the rebar embedding position;
[0038] S3, the control unit controls the reinforcing bar embedding unit 2 to drill holes;
[0039] S4, the control unit controls the rotating unit to drive the rebar embedding unit 2 to rotate, and the control unit controls the rebar embedding unit 2 to perform hole cleaning processing on the drilling position;
[0040] S5, the control unit controls the rotating unit to drive the rebar planting unit 2 to rotate, and the control unit controls the rebar planting unit 2 to perform grouting on the drilling position;
[0041] S6, the control unit controls the lifting unit to drive the rotating unit and the rebar embedding unit 2 to descend, and uses the rebar air clamp 36 to align the rebar with the drilling position and complete the rebar embedding.
[0042] The above-mentioned embodiment provides a modular secondary structure reinforcement integrated construction device and method. When the device performs secondary structure reinforcement construction, it can provide high-precision, high-safety, and more convenient integrated construction, avoiding problems such as poor construction quality caused by low precision in the drilling construction process of the bottom of the building beam.
[0043] The above embodiments are preferred implementation modes of the present invention, but the implementation modes of the present invention are not limited to the above embodiments. Any other changes, modifications, substitutions, combinations, and simplifications that do not deviate from the spirit and principles of the present invention should be equivalent replacement methods and are included in the protection scope of the present invention.
Claims
1. A modular secondary structure rebar planting integrated construction device, characterized in that: include: Mobile unit; A lifting unit, which is arranged on the moving unit to move along with the moving unit; A rotating unit, arranged on the lifting unit to rise and fall along with the lifting unit; A reinforcement unit is arranged on the rotating unit to rotate with the rotating unit, and the reinforcement unit is used for drilling holes, cleaning holes, grouting and reinforcement planting on the wall; A positioning unit, used for locating the drilling position; The control unit is used to control the operation of the lifting unit, rotating unit, positioning unit and reinforcement unit.
2. A modular secondary structure rebar planting integrated construction device according to claim 1, characterized in that: The rebar embedding unit includes a rebar embedding drill bit, a grouting head, an air blowing pipe and a rebar air clamp; The rebar embedding drill bit, grouting head, air blowing pipe and rebar air clamp are all arranged on the rotating unit, and the rebar embedding drill bit, grouting head, air blowing pipe and rebar air clamp are evenly distributed along the circumference of the center of the rotating unit; The reinforcing bar embedding drill bit is connected to a first driving motor to drive the drill bit to rotate; The grouting head is connected to a driving pump, and the driving pump is used to pump unsolidified cement slurry to the grouting head; The air blowing pipe is connected to an air source; Rebar air clamps are used to clamp rebars; The control unit controls the opening and closing of the first driving motor, the driving pump and the air source.
3. A modular secondary structure rebar planting integrated construction device according to claim 1, characterized in that: The mobile unit comprises a base and a wheel set, the wheel set is arranged at the bottom of the base, and the lifting unit is arranged on the base.
4. A modular secondary structure rebar planting integrated construction device according to claim 1, characterized in that: The lifting unit includes a lifting track, a second driving motor, a lifting gear and a lifting platform; There are two lifting rails, which are symmetrically fixed on the moving unit. Both lifting rails are provided with racks, and the racks of the two lifting rails are vertically arranged relative to the moving unit. There are two lifting gears, which are respectively meshed with the racks of the two lifting tracks; There are two second drive motors, which are symmetrically arranged on both sides of the lifting platform. The output shafts of the two second drive motors are fixedly connected to the two lifting gears respectively, and the two second drive motors are electrically connected to the control unit.
5. A modular secondary structure reinforcing bar planting integrated construction device according to claim 1, characterized in that: The rotating unit includes a rotating disk, a rotating shaft, a first rotating gear, a second rotating gear and a third driving motor; the third driving motor is fixedly arranged on the lifting unit, the first rotating gear is fixedly connected to the output shaft of the third driving motor, the second rotating gear is sleeved on the rotating shaft, the rotating shaft is rotatably connected to the lifting unit, the first rotating gear and the second rotating gear are meshed, and the rotating disk is fixed on the rotating shaft; The reinforcing bar embedding unit is arranged on the rotating disk, and the third driving motor is electrically connected to the control unit.
6. A modular secondary structure reinforcing bar planting integrated construction device according to claim 1, characterized in that: It also includes a fixing unit, which includes two fixing legs. The two fixing legs are symmetrically distributed on both sides of the moving unit. The two fixing legs are both threadedly connected to the moving unit to move relative to the moving unit.
7. A method for using a modular secondary structure reinforcing bar planting integrated construction device according to any one of claims 1 to 6, characterized in that: The following steps are involved: S1. Determine the location of the rebar through the positioning unit; S2, the control unit controls the lifting unit to move up and down, driving the rotating unit and the rebar embedding unit to move up to the rebar embedding position; S3, the control unit controls the reinforcement unit to drill holes; S4, the control unit controls the rotating unit to drive the rebar planting unit to rotate, and the control unit controls the rebar planting unit to perform hole cleaning processing on the drilling position; S5, the control unit controls the rotating unit to drive the rebar planting unit to rotate, and the control unit controls the rebar planting unit to perform grouting on the drilling position; S6. The control unit controls the lifting unit to drive the rotating unit and the rebar embedding unit to descend, and uses the rebar air clamp to align the rebar with the drilling position and complete the rebar embedding.
Citation Information
Patent Citations
Bridge guardrail drilling and steel bar embedding structure and construction method thereof
CN110331662A
Self-hole-cleaning steel bar planting guide drilling device
CN214264835U
An integrated rebar anchoring device
CN218857354U
Safe material elevator
CN219409084U