Process for realizing water-preserved coal mining by using gangue slurry separation layer grouting

Through the gangue slurry separation layer grouting process, the gangue slurry is calculated and injected to form a water-proof layer, which solves the problem of existing water-retaining coal mining technology affecting production efficiency and environmental risks, and achieves the effect of effectively protecting groundwater levels and surface water sources. .

CN118728381AInactive Publication Date: 2024-10-01ORDOS ZHONGYU TAIDE COAL CO LTD +1

Patent Information

Application Number
CN202410882409.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing water-preserving coal mining process is carried out before mining, which affects production efficiency, and the cement slurry has an impact on groundwater quality, which poses environmental risks and makes it difficult to effectively protect surface water sources.

Method used

Using the gangue slurry separation layer grouting process, the grouting amount is determined by calculating the position and depth of the separation layer space, and the gangue slurry ground to the millimeter level is injected into the separation layer space to form a water-isolating layer, replenish the groundwater level, and support the cladding. rock formations to reduce water penetration.

Benefits of technology

It achieves the protection of groundwater levels during coal mining, reduces surface water seepage, improves coal mining efficiency, reduces environmental risks, and provides a new way for the green development of coal mines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728381A_ABST
    Figure CN118728381A_ABST
Patent Text Reader

Abstract

The invention discloses a process for realizing water-preserved coal mining by using gangue slurry separation layer grouting. The process comprises the following steps: calculating the separation layer space depth; determining a separation layer space; calculating the grouting amount; and pulping and pouring the gangue. The device has the advantages that by analyzing and researching coal mine geological conditions such as coal seam mining depth, mining thickness, coal seam overlying rock lithology, key layer thickness, water-resisting layer distribution characteristics, mine caving zones, water flowing fissure zones and bending sinking zones, the purpose of water-preserved coal mining of a coal mine is achieved by utilizing underground space and gangue tailings formed by coal mining. The ecological environment problems of underground water level decline and surface water infiltration caused by coal mining are solved, and a new way is provided for green sustainable development of coal mines and ecological protection and high-quality development of the Yellow River basin. The method has obvious economic efficiency, environmental protection efficiency and social efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0001] The invention relates to a process for realizing water-preserving coal mining by utilizing gangue slurry separation grouting, and belongs to the field of water-preserving coal mining. Background technology:

[0002] Groundwater is the main source of industrial and domestic water. During coal mining, underground "cavities" are formed, causing water in the coal-bearing strata and loose strata to quickly penetrate downward, forming a regional groundwater drop funnel. Under this circumstance, the groundwater level decreases year by year, and surface water dries up. In addition, some mines have dried up due to the lack of water resources, affecting the drinking water problem of residents. Therefore, water-saving coal mining is imperative. However, the current processes and methods of water-saving coal mining have the following problems:

[0003] 1. The water-saving coal mining process is mainly carried out before mining, mainly using the original space in the stratum. It takes a lot of manpower and material resources to study and verify the development degree of the original space;

[0004] 2. Water conservation measures are carried out on the working face before mining, which has a certain impact on the continuity of the working face. Water conservation coal mining is related to underground production and reduces underground production efficiency;

[0005] 3. The existing water-saving coal mining measures are implemented before coal seam mining. During or after coal seam mining, the overlying rock strata of the coal seam are broken and bent due to mining. The water-saving strata previously taken will definitely be affected, and the effect of water-saving coal mining is limited.

[0006] 4. The grouting material is mainly cement slurry, which has a certain impact on the water quality of underground aquifers. The development of primary cracks is often uncontrollable, which can easily cause surface water pollution and pose a greater environmental risk. Summary of the invention:

[0007] The purpose of the present invention is to provide a safe and efficient process for water-retaining coal mining by using gangue slurry separation grouting to solve the problems of groundwater level reduction, surface water infiltration and the like caused by coal mining.

[0008] The present invention is implemented by the following technical scheme: a process for realizing water-retaining coal mining by using gangue slurry separation grouting, which comprises the following steps:

[0009] Step 1, calculating the spatial position and depth of the separation layer;

[0010] Based on the exploration data and mining data of the mining area, the position and depth of the separation space formed during the mining process of the mining area are calculated;

[0011] Step 2: determine the position and depth of the separation space;

[0012] According to the position and depth of the separation layer space obtained in step 1, a borehole is drilled on the surface to confirm the position and depth of the separation layer space;

[0013] Step 3: Calculate the grouting volume;

[0014] The separation space capacity is calculated based on the mining data of the mining area.

[0015] Separation space capacity V 离 =S 采 ×h 采 ×K; where S 采 is the area of ​​mined working surface; h 采 is the mining height; K is the injection-production ratio constant, which is 0.4-0.45, which is the empirical data;

[0016] The amount of grouting is equal to the capacity of the separation space, and the two have the same volume;

[0017] Step 4: making slurry and pouring gangue;

[0018] The exploration hole for determining the delamination space in step 2 is transformed into a grouting hole; the gangue produced during mining is slurried, and the gangue slurry obtained by slurrying is injected into the delamination space from the grouting hole according to the grouting amount calculated in step 3.

[0019] Preferably, in the gangue slurrying in step 4, the gangue is ground into particles below the millimeter level.

[0020] The advantages of the present invention are as follows: by analyzing and studying the coal mining depth, mining thickness, lithology of overlying strata, thickness of key layers, distribution characteristics of impermeable layers, mine collapse zones, water-conducting fracture zones, curved subsidence zones and other coal mining geological conditions, the underground space and gangue tailings formed by coal mining are utilized to achieve the purpose of water-saving coal mining in coal mines. The ecological and environmental problems of groundwater level decline and surface water infiltration caused by coal mining are solved, providing a new way for the green and sustainable development of coal mines, ecological protection of the Yellow River Basin and high-quality development. It has obvious economic efficiency, environmental efficiency and social efficiency. Description of the drawings:

[0021] Figure 1 It is a schematic diagram of gangue slurry delamination grouting of the present invention. Specific implementation method:

[0022] Example:

[0023] The process of realizing water-retaining coal mining by using gangue slurry separation grouting comprises the following steps:

[0024] Step 1, calculate the depth of the detached space;

[0025] According to the exploration data and mining data of the mining area, the spatial position and depth of the separation layer are calculated; the specific method is that according to the key layer theory, the development position of the separation layer is located below each key layer, and the maximum development height of the separation layer stops below the main key layer. The amount of separation under the key layer is related to the mining height of the coal seam, the collapse and expansion characteristics of the falling rock mass, the height of the key layer from the coal seam roof, and the bearing and deformation characteristics of the key layer. Combined with the geological conditions of the mining area (mainly the thickness distribution and mechanical properties of each rock layer overlying the coal seam), the key layer is calculated and judged, and the key layer identification method is used to identify the stratigraphic position of the key layer, so that the spatial position and depth of the separation layer can be obtained. The geological conditions of the mining area are mainly the thickness distribution and mechanical properties of each rock layer overlying the coal seam.

[0026] Step 2: Determine the separation space;

[0027] According to the position and depth of the delamination space obtained in step 1, a borehole is drilled on the surface to confirm the delamination space;

[0028] Step 3: Calculate the grouting volume;

[0029] The separation space capacity is calculated based on the mining data of the mining area.

[0030] Separation space capacity V 离 =S 采 ×h 采 ×K; where S 采 is the area of ​​mined working surface; h 采 is the mining height; K is the injection-production ratio constant, which is 0.4-0.45, which is the empirical data;

[0031] The amount of grouting is equal to the capacity of the separation space, and the two have the same volume;

[0032] Step 4: making slurry and pouring gangue;

[0033] The gangue generated during the mining process is crushed and ground into particles below the millimeter level by a wet ball mill, and the water used in the wet ball mill is the groundwater generated during the mining process; the gangue particles generated by the wet ball mill are mixed with the groundwater generated during the mining process to obtain gangue slurry; Figure 1 As shown, the exploration hole for determining the separation space in step 2 is transformed into a grouting hole;

[0034] According to the grouting amount calculated in step three, the gangue slurry is injected into the delamination space from the grouting hole; after the gangue slurry enters the delamination space, solid-liquid separation occurs when it is left to stand, and solid aggregates are precipitated. The slurry particles are millimeter-level smaller than mudstone rock particles, which can play a water-proof effect and artificially increase the thickness of the water-proof layer. The separated water replenishes the groundwater; the gangue slurry will form properties similar to mudstone after a certain period of compaction under the action of overburden stress, which will enhance the thickness of the water-proof layer to a certain extent and can effectively block the upper groundwater from infiltrating into the mining working face of the mining area; the treated mine water used in the slurrying process returns to the underground again, effectively replenishing the underground aquifer; at the same time, the gangue slurry fills the underground delamination space to support the key overburden layer, prevent or reduce its bending and sinking, and effectively protect the upper aquifer.

[0035] Key overburden strata: Due to the different formation times and mineral compositions of rocks, coal-bearing strata form multiple layers of rock with different thicknesses and strengths. Due to the differences in the stratified characteristics of coal-bearing strata, the role of each rock layer in rock mass activity is different. Some hard and thick rock layers play a controlling role in rock mass activity, that is, they play the role of the main bearing body and skeleton; some relatively weak rock layers play a load role in rock mass activity. Therefore, the rock layer that plays a major controlling role in rock mass activity is called the key overburden strata. That is: when there are multiple rock layers in the overburden strata of the mining area, the rock layer that plays a controlling role in all or part of the rock mass activity is called the key overburden stratum.

Claims

1. A process for realizing water-retaining coal mining by using gangue slurry separation grouting, characterized in that: It includes the following steps: Step 1, calculating the spatial position and depth of the separation layer; Based on the exploration data and mining data of the mining area, the position and depth of the separation space formed during the mining process of the mining area are calculated; Step 2: determine the position and depth of the separation space; According to the position and depth of the separation layer space obtained in step 1, a borehole is drilled on the surface to confirm the position and depth of the separation layer space; Step 3: Calculate the grouting volume; The separation space capacity is calculated based on the mining data of the mining area. Separation space capacity V 离 =S 采 ×h 采 ×K; where S 采 is the area of ​​mined working surface; h 采 is the mining height; K is the injection-production ratio constant, which is 0.4-0.45, which is the empirical data; The amount of grouting is equal to the capacity of the separation space, and the two have the same volume; Step 4: making slurry and pouring gangue; The exploration hole for determining the delamination space in step 2 is transformed into a grouting hole; the gangue produced during mining is slurried, and the gangue slurry obtained by slurrying is injected into the delamination space from the grouting hole according to the grouting amount calculated in step 3.

2. The process for realizing water-retaining coal mining by using gangue slurry separation grouting according to claim 1 is characterized in that: In step 4, the gangue is ground into particles below the millimeter level during gangue slurry preparation.

Citation Information

Patent Citations

  • Method for reducing subsidence of stope overburden bed separation by grouting

    CN103216236A

  • Method for weakening overlying strata dynamic disasters through coal mining subsequent space gangue grouting and filling

    CN115199326A

  • Detection device and detection method for positioning separation space

    CN118091081A

  • Coal mine ground drilling gangue fluidization filling water-preserved mining engineering design method

    CN118148703A

Cited By

  • Fully mechanized coal mining face three-in-one drilling fluidization filling green mining method

    CN119266901A

  • Key parameter design method for targeted grouting filling pier stud water-preserved coal mining

    CN121803291A