Intelligent control parameter analysis and decision-making system for hard rock tunneling
Through the intelligent analysis and decision-making system of control parameters for hard rock excavation, real-time monitoring and analysis of hard rock, mechanical and environmental conditions, and dynamic adjustment of excavation parameters have solved the problems of large errors and uncertainties in traditional excavation methods, and improved excavation efficiency and safety.
Patent Information
- Application Number
- CN202410831029.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional excavation parameter control methods rely on manual experience, have large errors and uncertainties, and are difficult to meet the high standards of efficiency and safety required by modern excavation operations. Especially during the hard rock excavation process, there is a lack of real-time monitoring and dynamic control and adjustment, resulting in poor efficiency. low and high risk.
An intelligent analysis and decision-making system for control parameters for hard rock excavation is designed, including real-time monitoring and analysis modules for hard rock status, mechanical status, and environmental status. Fracture characteristic information, rotational speed, abnormal sound, and temperature are obtained through image processing and data analysis. Parameters, generate excavation control values and adjustment instructions, and dynamically adjust excavation parameters.
It improves the real-time and accuracy of excavation operations, reduces manual operation errors, enables rapid adaptation to the excavation process, improves efficiency and safety, and ensures that the tunnel boring machine always maintains its best working condition.
Smart Images

Figure CN118728407A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent analysis and decision-making of control parameters, and in particular to an intelligent analysis and decision-making system for control parameters for hard rock tunneling. Background Art
[0002] Tunnel excavation, as the core link in the coal mining process, has a direct impact on the speed of coal mine development, the progress of preparatory work and the continuous production of coal mining. In the context of the rapid development of the coal industry, how to achieve efficient and rapid tunneling of rock tunnels has become a key technical problem that the industry is currently studying and solving.
[0003] However, traditional tunneling parameter control methods mostly rely on manual experience, which not only has large errors and uncertainties, but also cannot meet the high standards of efficiency and safety required by modern tunneling operations. Especially in the process of hard rock tunneling, due to the lack of real-time monitoring and dynamic control and adjustment of the hard rock state, mechanical state and environmental state, the efficiency of tunneling operations is often limited, and the danger of tunneling operations is also relatively high. Summary of the invention
[0004] In order to overcome the shortcomings of the background technology, an embodiment of the present invention provides an intelligent analysis and decision-making system for control parameters for hard rock tunneling, which can effectively solve the problems involved in the above-mentioned background technology.
[0005] The purpose of the present invention can be achieved by the following technical solutions:
[0006] A control parameter intelligent analysis and decision-making system for hard rock tunneling, comprising:
[0007] The hard rock status monitoring and analysis module is used to monitor the hard rock status information in the tunneling process of the current monitoring period in real time to obtain the fracture tunneling assessment value and the strength tunneling assessment value, thereby analyzing and processing the hard rock status in the tunneling process of the current monitoring period to obtain the tunneling control value in the tunneling process of the current monitoring period;
[0008] The mechanical state monitoring and analysis module is used to monitor the mechanical state information during the excavation process in the current monitoring period in real time, thereby analyzing and processing the mechanical state during the excavation process in the current monitoring period to obtain the mechanical state value during the excavation process in the current monitoring period;
[0009] The environmental status monitoring and analysis module is used to monitor the environmental status information of the excavation process in the current monitoring period in real time, thereby analyzing and processing the environmental status of the excavation process in the current monitoring period to obtain the ring value of the excavation process in the current monitoring period;
[0010] The adjustment control module is used to receive the excavation control value during the excavation process of the current monitoring period, and compare and match it with the excavation control judgment table stored in the cloud database to analyze, thereby obtaining the excavation control level during the excavation process of the current monitoring period, and each excavation control value obtained during the excavation process of the current monitoring period corresponds to a excavation control level, and at the same time, it is matched with the excavation control parameter corresponding to the excavation control level to obtain the excavation control parameter during the excavation process of the current monitoring period, and is also used to receive the machine value and the ring value during the excavation process of the current monitoring period, thereby executing corresponding adjustment processing, obtaining a re-adjustment instruction and a final adjustment instruction, and re-adjusting and final adjusting the excavation control parameters of the tunnel boring machine according to the obtained re-adjustment instruction and the final adjustment instruction.
[0011] Furthermore, the hard rock status information during the tunneling process during the current monitoring period is monitored in real time. The specific operation steps are as follows:
[0012] By acquiring the hard rock image during the excavation process in the current monitoring period, the hard rock image during the excavation process in the current monitoring period is obtained, and the fracture feature information is extracted from the hard rock image. The fracture feature information includes the fracture angle value, fracture displacement value and fracture width value. The specific analysis is as follows: by measuring the straight-line distance between the upper and lower points of the fracture, the length of the path track of the fracture is measured along the path track of the fracture, the straight-line distance of the fracture and the path track length are calculated by trigonometric functions to obtain the fracture angle value of the corresponding fracture, which is recorded as dz, the fracture displacement value of the corresponding fracture is obtained by dividing the path track length by the straight-line distance, which is recorded as wy, and the horizontal distance between the left and right points at different positions of the fracture is calculated to obtain the fracture width value, which is recorded as kz;
[0013] Extract the values of the fracture angle value dz, fracture displacement value wy and fracture width value kz for normalization, according to the formula: Obtaining a fracture shape value DP, wherein a1, a2 and a3 represent preset weight factors of a fracture angle value, a fracture displacement value and a fracture width value respectively;
[0014] Compare and analyze the fracture shape value with the preset reference comparison interval. When the fracture shape value is greater than the maximum value of the preset reference comparison interval, the fracture is determined to be a severe fracture; when the fracture shape value is less than the minimum value of the preset reference comparison interval, the fracture is determined to be a minor fracture; when the fracture shape value is within the preset reference comparison interval, the fracture is determined to be an interruption value. The number of fractures determined to be severe fractures, minor fractures and interruptions is counted and calibrated as severe fracture value, minor fracture value and interruption value respectively. The three values are extracted, multiplied by the corresponding weight coefficients and then added to obtain the fracture excavation assessment value.
[0015] By extracting various types of hard rock images from the hard rock images and counting the number of various types of hard rock images, the number values of various types of hard rock images are obtained, and the hard rock type corresponding to the maximum value is marked as the target hard rock, and the target hard rock is matched and analyzed with the hard rock strength table stored in the cloud database, thereby obtaining the hard rock strength grade, and matching the hard rock strength corresponding to the hard rock strength grade, thereby obtaining the hard rock strength value of the target hard rock;
[0016] Compare and analyze the hard rock strength value with the preset reference comparison interval. If the hard rock strength value is greater than the maximum value of the preset reference comparison interval, mark the hard rock strength value as an overstrength value, perform difference calculation between the obtained overstrength value and the maximum value of the preset reference comparison interval to obtain an overstrength difference value, set a preset coefficient corresponding to the maximum value of the preset reference comparison interval, and multiply the overstrength difference value by the corresponding preset coefficient to obtain a strength excavation assessment value;
[0017] If the hard rock strength value is within the preset reference comparison interval, the hard rock strength value is marked as a medium strength value, a preset coefficient corresponding to the preset reference comparison interval is set, and the medium strength value is multiplied by the corresponding preset coefficient to obtain a strength excavation assessment value;
[0018] If the hard rock strength value is less than the minimum value of the preset reference comparison interval, the hard rock strength value is marked as a normal strength value, the preset coefficient corresponding to the preset reference comparison interval is set, and the normal strength value is multiplied by the corresponding preset coefficient to obtain the strength excavation assessment value.
[0019] Furthermore, the hard rock state during the tunneling process during the current monitoring period is analyzed and processed. The specific operation steps are as follows:
[0020] By extracting the fracture excavation assessment value and strength excavation assessment value from the hard rock status information during the excavation process during the current monitoring period, and calibrating them as djp and qjp respectively, according to the formula: The excavation control value YYT in the excavation process during the current monitoring period is obtained, wherein e represents a natural constant, and η1 and η2 represent preset weight factors.
[0021] Furthermore, the mechanical status during the excavation process during the current monitoring period is analyzed and processed. The specific operation steps are as follows:
[0022] By acquiring the speed value, abnormal sound value and temperature value in the mechanical status information of the excavation process in the current monitoring period in real time, the speed value, abnormal sound value and temperature value in the mechanical status information of the excavation process in the current monitoring period are obtained, and they are analyzed and calibrated as msz, ysz and wpz, and the values of the three are extracted for normalization. According to the formula: JZP=[(msz+1.78)×μ1+(ysz+1.56)×μ2+(wpz+1.49)×μ3]×gp, the machine state value JZP in the excavation process in the current monitoring period is obtained, wherein μ1, μ2 and μ3 respectively represent the preset weight coefficients of the speed value, abnormal sound value and temperature value, and gp represents the preset correction factor.
[0023] Furthermore, the environmental status during the tunneling process during the current monitoring period is analyzed and processed. The specific operation steps are as follows:
[0024] By acquiring the dust concentration value, humidity value and temperature value in the environmental status information of the excavation process in the current monitoring period in real time, the dust concentration value, humidity value and temperature value in the environmental status information of the excavation process in the current monitoring period are obtained, and they are calibrated as fcd, syz and hwz respectively, and the values of the three are extracted for normalization processing, according to the formula: Get the ring value HWP during the excavation process during the current monitoring period, where fcd * ,syz * and hwz * They represent the reference ambient dust concentration value, reference ambient humidity value and reference ambient temperature value respectively, and λ1, λ2 and λ3 represent the preset weight coefficients of the ambient dust concentration value, ambient humidity value and ambient temperature value respectively.
[0025] Further, the corresponding control processing is performed, and the specific operation steps are as follows:
[0026] Substitute the machine status value during the tunneling process during the current monitoring period into the corresponding preset value range, set different value ranges to correspond to a tunneling control parameter respectively, and generate a re-adjustment instruction, and re-adjust the tunneling control parameter of the tunneling machine according to the re-adjustment instruction;
[0027] The annular value in the tunneling process during the current monitoring period is substituted into the corresponding preset value range, different value ranges are set to correspond to a tunneling control parameter respectively, and a final adjustment instruction is generated, and the tunneling control parameter of the tunneling machine is finally adjusted according to the final adjustment instruction.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] The present invention monitors the hard rock status information in the tunneling process during the current monitoring period in real time, obtains the fracture tunneling assessment value and the strength tunneling assessment value, performs in-depth analysis and processing on the hard rock status, and then obtains the tunneling control value. At the same time, the mechanical status information and the environmental status information in the tunneling process during the current monitoring period are monitored and analyzed in real time, thereby obtaining the machine status value and the ring value, thereby achieving not only greatly improving the real-time performance and accuracy of the tunneling operation, but also providing strong data support for the dynamic adjustment of tunneling parameters.
[0030] By comparing and matching the tunneling control values monitored in real time with the tunneling control judgment table in the cloud database, the tunneling control level and the corresponding tunneling control parameters can be quickly and accurately obtained. This intelligent decision-making method not only reduces the errors and uncertainties of manual operations, but also can adapt to various changes in the tunneling process in real time, thereby improving the efficiency and safety of tunneling operations.
[0031] By executing corresponding control processing according to the machine status value and ring value monitored in real time, generating re-adjustment instructions and final adjustment instructions, the tunneling control parameters of the tunnel boring machine are re-adjusted and finally adjusted. This refined adjustment method ensures that the tunnel boring machine always remains in the best working state, further improving the quality and efficiency of the tunneling operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;
[0033] Figure 1 This is the overall system block diagram of the present invention. DETAILED DESCRIPTION
[0034] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] like Figure 1 As shown, a control parameter intelligent analysis and decision system for hard rock tunneling includes: a hard rock state monitoring and analysis module, a mechanical state monitoring and analysis module, an environmental state monitoring and analysis module, an adjustment control module and a display terminal;
[0036] The hard rock status monitoring and analysis module is used to monitor the hard rock status information during the tunneling process in the current monitoring period in real time, thereby analyzing and processing the hard rock status during the tunneling process in the current monitoring period. The specific operation steps are as follows:
[0037] By acquiring the hard rock image during the excavation process in the current monitoring period, the hard rock image during the excavation process in the current monitoring period is obtained, and the fracture feature information is extracted from the hard rock image. The fracture feature information includes the fracture angle value, fracture displacement value and fracture width value. The specific analysis is as follows: by measuring the straight-line distance between the upper and lower points of the fracture, the length of the path track of the fracture is measured along the path track of the fracture, the straight-line distance of the fracture and the path track length are calculated by trigonometric functions to obtain the fracture angle value of the corresponding fracture, which is recorded as dz, the fracture displacement value of the corresponding fracture is obtained by dividing the path track length by the straight-line distance, which is recorded as wy, and the horizontal distance between the left and right points at different positions of the fracture is calculated to obtain the fracture width value, which is recorded as kz;
[0038] Extract the values of the fracture angle value dz, fracture displacement value wy and fracture width value kz for normalization, according to the formula: Obtaining a fracture shape value DP, wherein a1, a2 and a3 represent preset weight factors of a fracture angle value, a fracture displacement value and a fracture width value respectively;
[0039] Compare and analyze the fracture shape value with the preset reference comparison interval. When the fracture shape value is greater than the maximum value of the preset reference comparison interval, the fracture is determined to be a severe fracture; when the fracture shape value is less than the minimum value of the preset reference comparison interval, the fracture is determined to be a minor fracture; when the fracture shape value is within the preset reference comparison interval, the fracture is determined to be an interruption value. The number of fractures determined to be severe fractures, minor fractures and interruptions is counted and calibrated as severe fracture value, minor fracture value and interruption value respectively. The three values are extracted, multiplied by the corresponding weight coefficients and then added to obtain the fracture excavation assessment value.
[0040] By extracting various types of hard rock images from the hard rock images and counting the number of various types of hard rock images, the number values of various types of hard rock images are obtained, and the hard rock type corresponding to the maximum value is marked as the target hard rock, and the target hard rock is matched and analyzed with the hard rock strength table stored in the cloud database, thereby obtaining the hard rock strength grade, and matching the hard rock strength corresponding to the hard rock strength grade, thereby obtaining the hard rock strength value of the target hard rock;
[0041] Compare and analyze the hard rock strength value with the preset reference comparison interval. If the hard rock strength value is greater than the maximum value of the preset reference comparison interval, mark the hard rock strength value as an overstrength value, perform difference calculation between the obtained overstrength value and the maximum value of the preset reference comparison interval to obtain an overstrength difference value, set a preset coefficient corresponding to the maximum value of the preset reference comparison interval, and multiply the overstrength difference value by the corresponding preset coefficient to obtain a strength excavation assessment value;
[0042] If the hard rock strength value is within the preset reference comparison interval, the hard rock strength value is marked as a medium strength value, a preset coefficient corresponding to the preset reference comparison interval is set, and the medium strength value is multiplied by the corresponding preset coefficient to obtain a strength excavation assessment value;
[0043] If the hard rock strength value is less than the minimum value of the preset reference comparison interval, the hard rock strength value is marked as a normal strength value, a preset coefficient corresponding to the preset reference comparison interval is set, and the normal strength value is multiplied by the corresponding preset coefficient to obtain a strength excavation assessment value;
[0044] By extracting the fracture excavation assessment value and strength excavation assessment value from the hard rock status information during the excavation process during the current monitoring period, and calibrating them as djp and qjp respectively, according to the formula: Obtain the excavation control value YYT during the excavation process during the current monitoring period, where e represents a natural constant, and η1 and η2 represent preset weight factors;
[0045] The obtained excavation control value during the excavation process during the current monitoring period is sent to the regulation control module;
[0046] In a specific embodiment, the present invention can achieve a preliminary understanding of the state of hard rock by acquiring hard rock images and extracting fracture feature information therein, normalize these feature information to obtain fracture shape values, and compare them with a preset reference comparison interval to determine the severity of the fracture, thereby providing a basis for subsequent tunneling control. At the same time, the hard rock images are further analyzed, the number of various types of hard rock images is counted, the target hard rock is determined, and its hard rock strength grade and strength value are queried, so as to further understand the physical properties of the hard rock. The hard rock strength value is compared with a preset reference comparison interval to obtain strength tunneling assessment values at different strength grades, which is also an important basis for tunneling control. The fracture tunneling assessment value and the strength tunneling assessment value are extracted, and calculated according to a specific formula to obtain the tunneling control value during the tunneling process during the current monitoring period. This step integrates the information of fracture characteristics and hard rock strength, and provides a comprehensive and accurate basis for the control of the tunneling process.
[0047] The regulation control module is used to receive the excavation control value during the excavation process during the current monitoring period, and thus perform the corresponding regulation processing. The specific operation steps are as follows:
[0048] Retrieve the excavation control value during the excavation process of the current monitoring period, and compare and match it with the excavation control determination table stored in the cloud database to obtain the excavation control level during the excavation process of the current monitoring period, and each excavation control value obtained during the excavation process of the current monitoring period corresponds to an excavation control level, and match it with the excavation control parameters corresponding to the excavation control level to obtain the excavation control parameters during the excavation process of the current monitoring period, the excavation control parameters include cutting force, cutting depth, cutter head speed, excavation speed and hydraulic pressure, and display and notify on the display terminal;
[0049] In a specific embodiment, the present invention retrieves the excavation control value in the excavation process during the current monitoring period, which comprehensively reflects the state and characteristics of the hard rock in the current excavation process, and compares and matches the excavation control value with the excavation control determination table stored in the cloud database. The determination table is pre-set, which contains the excavation control levels corresponding to different excavation control values. Through comparison and matching, the excavation control level in the current excavation process can be quickly determined. After the excavation control level is determined, the excavation control parameters corresponding to the level are further searched. These parameters include cutting force, cutting depth, cutter head speed, excavation speed and hydraulic pressure, etc. They are key factors for regulating the excavation process. Once these excavation control parameters are obtained, they will be immediately sent to the control system of the excavator to adjust the excavation process in real time. At the same time, these parameters will also be displayed and notified on the display terminal so that the operator can understand the control status of the excavation process in real time.
[0050] The mechanical state monitoring and analysis module is used to monitor the mechanical state information during the excavation process in the current monitoring period in real time, thereby analyzing and processing the mechanical state during the excavation process in the current monitoring period. The specific operation steps are as follows:
[0051] The speed value, abnormal sound value and temperature value in the mechanical state information during the excavation process of the current monitoring period are obtained in real time, and the speed value, abnormal sound value and temperature value in the mechanical state information during the excavation process of the current monitoring period are obtained, and they are analyzed and calibrated as msz, ysz and wpz, and the values of the three are extracted for normalization processing. According to the formula: JZP = [(msz+1.78)×μ1+(ysz+1.56)×μ2+(wpz+1.49)×μ3]×gp, the machine state value JZP during the excavation process of the current monitoring period is obtained, wherein μ1, μ2 and μ3 represent the preset weight coefficients of the speed value, the abnormal sound value and the temperature value respectively, and gp represents the preset correction factor;
[0052] It should be noted that the speed value indicates the rotation speed of the blade of the tunnel boring machine during the excavation process, and the abnormal sound value indicates the abnormal sound of the tunnel boring machine during the excavation process. The specific solution is: obtain the decibel value during the excavation process, calibrate it as pp, and according to the formula: pa i =pp 3 / 1.78, and the acoustic frequency coefficient pa during excavation is obtained i , where the decibel value represents the vibration intensity of the tunnel boring machine during the tunneling process. The audio frequency coefficient during the tunneling process is used as the ordinate, and the tunneling operation time is used as the abscissa. Based on this, an audio frequency two-dimensional coordinate system is established. The audio frequency coefficient is plotted on the audio frequency two-dimensional coordinate system by drawing points, and the points are connected in series with line segments to obtain an audio frequency coefficient line graph. The audio frequency coefficients whose angles between the audio frequency coefficient line and the horizontal line are greater than 45 degrees are counted according to the formula: The abnormal sound value ysz is obtained, wherein i represents the excavation operation time monitoring set, and the excavation operation time monitoring set contains a number of monitoring time points, and i=1, 2, 3...n1, it should be noted that n1 is a positive integer greater than zero; the temperature value represents the blade temperature and engine temperature of the excavator during the excavation process;
[0053] The obtained machine status value during the excavation process during the current monitoring period is sent to the regulation control module;
[0054] In a specific embodiment, the present invention obtains the speed value, abnormal sound value and temperature value in the excavation process in real time. These parameters directly reflect the operating status of the tunnel boring machine. The speed value is a direct reflection of the rotation speed of the tunnel boring machine blade, which is crucial for judging the working efficiency and load status of the machine. The abnormal sound value is to evaluate its operating stability by monitoring the abnormal sound of the tunnel boring machine, which is of great significance for preventing mechanical failures. The temperature value reflects the operating temperature of the tunnel boring machine blade and engine. Excessive temperature may cause mechanical damage or performance degradation. The machine state value of the tunnel boring process during the current monitoring period is obtained by calculating and processing the speed value, abnormal sound value and temperature value during the excavation process. This machine state value is a comprehensive evaluation of the current mechanical state of the tunnel boring machine, which helps to timely regulate the operating status of the machine so as to take corresponding regulatory measures.
[0055] The regulation control module is used to receive the machine status value during the tunneling process during the current monitoring period, and thus perform corresponding regulation processing. The specific operation steps are as follows:
[0056] Retrieve the machine status value during the tunneling process in the current monitoring period, substitute the machine status value during the tunneling process in the current monitoring period into the corresponding preset value range, set different value ranges to correspond to a tunneling control parameter respectively, and generate a re-adjustment instruction, re-adjust the tunneling control parameter of the tunneling machine according to the re-adjustment instruction, and display a notification on the display terminal;
[0057] In a specific embodiment, the present invention retrieves the machine state value during the tunneling process during the current monitoring period and substitutes it into a preset value range for comparison. These value ranges are pre-set, and each value range corresponds to a set of specific tunneling control parameters. By comparing the machine state value and the value range, it is possible to determine whether the current mechanical state of the tunneling machine is within the normal range and what degree of control is required. Once the corresponding tunneling control parameter is determined, a re-adjustment instruction will be generated and sent to the control system of the tunneling machine. The control system executes the corresponding control operation to achieve precise control of the working state of the tunneling machine, which helps to timely control the operation of the tunneling machine and perform corresponding control operations.
[0058] The environmental status monitoring and analysis module is used to monitor the environmental status information of the tunneling process in the current monitoring period in real time, thereby analyzing and processing the environmental status of the tunneling process in the current monitoring period. The specific operation steps are as follows:
[0059] By acquiring the dust concentration value, humidity value and temperature value in the environmental status information of the excavation process in the current monitoring period in real time, the dust concentration value, humidity value and temperature value in the environmental status information of the excavation process in the current monitoring period are obtained, and they are calibrated as fcd, syz and hwz respectively, and the values of the three are extracted for normalization processing, according to the formula: Get the ring value HWP during the excavation process during the current monitoring period, where fcd * ,syz * and hwz * They represent the reference ambient dust concentration value, the reference ambient humidity value and the reference ambient temperature value respectively, and λ1, λ2 and λ3 represent the preset weight coefficients of the ambient dust concentration value, the ambient humidity value and the ambient temperature value respectively;
[0060] It should be noted that the ring dust concentration value indicates the dust concentration in the environment during the excavation process, the ring humidity value indicates the humidity of the environment during the excavation process, and the ring temperature value indicates the temperature of the environment during the excavation process;
[0061] The obtained cyclic value during the excavation process during the current monitoring period is sent to the regulation control module;
[0062] In a specific embodiment, the present invention obtains environmental status information during the excavation process in real time, including the ring dust concentration value, the ring humidity value and the ring temperature value. The ring dust concentration value reflects the dust concentration of the environment during the excavation process, which is an important indicator for evaluating the environmental air quality; the ring humidity value represents the humidity of the excavation environment. Too high or too low humidity may affect the normal operation and excavation efficiency of the excavator; the ring temperature value is a quantitative representation of the ambient temperature. The appropriate temperature is crucial to ensure the smooth progress of the excavation work. The ring value in the excavation process during the current monitoring period is calculated and analyzed to obtain the ring value, which can fully reflect the excavation environment state, help to take corresponding control measures according to the changes in the environmental state, and ensure the smooth progress of the excavation work;
[0063] The regulation control module is used to receive the ring value during the excavation process during the current monitoring period, and thus perform corresponding regulation processing. The specific operation steps are as follows:
[0064] Retrieve the annular value during the tunneling process in the current monitoring period, substitute the annular value during the tunneling process in the current monitoring period into the corresponding preset value range, set different value ranges to correspond to one tunneling control parameter respectively, and generate a final adjustment instruction, perform a final adjustment on the tunneling control parameters of the tunneling machine according to the final adjustment instruction, and display a notification on the display terminal.
[0065] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. An intelligent analysis and decision-making system for control parameters for hard rock tunneling, characterized in that: include: The hard rock status monitoring and analysis module is used to monitor the hard rock status information in the tunneling process of the current monitoring period in real time to obtain the fracture tunneling assessment value and the strength tunneling assessment value, thereby analyzing and processing the hard rock status in the tunneling process of the current monitoring period to obtain the tunneling control value in the tunneling process of the current monitoring period; The mechanical state monitoring and analysis module is used to monitor the mechanical state information during the excavation process in the current monitoring period in real time, thereby analyzing and processing the mechanical state during the excavation process in the current monitoring period to obtain the mechanical state value during the excavation process in the current monitoring period; The environmental status monitoring and analysis module is used to monitor the environmental status information of the excavation process in the current monitoring period in real time, thereby analyzing and processing the environmental status of the excavation process in the current monitoring period to obtain the ring value of the excavation process in the current monitoring period; The adjustment control module is used to receive the excavation control value during the excavation process of the current monitoring period, and compare and match it with the excavation control judgment table stored in the cloud database to analyze, thereby obtaining the excavation control level during the excavation process of the current monitoring period, and each excavation control value obtained during the excavation process of the current monitoring period corresponds to a excavation control level, and at the same time, it is matched with the excavation control parameter corresponding to the excavation control level to obtain the excavation control parameter during the excavation process of the current monitoring period, and is also used to receive the machine value and the ring value during the excavation process of the current monitoring period, thereby executing corresponding adjustment processing, obtaining a re-adjustment instruction and a final adjustment instruction, and re-adjusting and final adjusting the excavation control parameters of the tunnel boring machine according to the obtained re-adjustment instruction and the final adjustment instruction.
2. The intelligent analysis and decision-making system for control parameters for hard rock tunneling according to claim 1, characterized in that: Real-time monitoring of the hard rock status information during the tunneling process during the current monitoring period. The specific operation steps are as follows: By acquiring the hard rock image during the excavation process of the current monitoring period, the hard rock image during the excavation process of the current monitoring period is obtained, and the fracture feature information is extracted from the hard rock image, the fracture feature information includes the fracture angular value, the fracture displacement value and the fracture width value, the fracture angular value, the fracture displacement value and the fracture width value are extracted and normalized and calculated to obtain the fracture shape value, the fracture shape value is compared and analyzed with the preset reference comparison interval, when the fracture shape value is greater than the maximum value of the preset reference comparison interval, the fracture is determined to be a severe fracture; when the fracture shape value is less than the minimum value of the preset reference comparison interval, the fracture is determined to be a minor fracture; when the fracture shape value is within the preset reference comparison interval, the fracture is determined to be an interruption value, the number of fractures determined to be severe fractures, minor fractures and interruptions is counted and calibrated as severe fracture value, minor fracture value and interruption value respectively, the values of the three are extracted, multiplied by the corresponding weight coefficients and then added to obtain the fracture excavation assessment value; By extracting various types of hard rock images from the hard rock images and counting the number of various types of hard rock images, the number values of various types of hard rock images are obtained, and the hard rock type corresponding to the maximum value is marked as the target hard rock, and the target hard rock is matched and analyzed with the hard rock strength table stored in the cloud database, thereby obtaining the hard rock strength grade, and matching the hard rock strength corresponding to the hard rock strength grade, thereby obtaining the hard rock strength value of the target hard rock; Compare and analyze the hard rock strength value with the preset reference comparison interval. If the hard rock strength value is greater than the maximum value of the preset reference comparison interval, mark the hard rock strength value as an overstrength value, perform difference calculation between the obtained overstrength value and the maximum value of the preset reference comparison interval to obtain an overstrength difference value, set a preset coefficient corresponding to the maximum value of the preset reference comparison interval, and multiply the overstrength difference value by the corresponding preset coefficient to obtain a strength excavation assessment value; If the hard rock strength value is within the preset reference comparison interval, the hard rock strength value is marked as a medium strength value, a preset coefficient corresponding to the preset reference comparison interval is set, and the medium strength value is multiplied by the corresponding preset coefficient to obtain a strength excavation assessment value; If the hard rock strength value is less than the minimum value of the preset reference comparison interval, the hard rock strength value is marked as a normal strength value, the preset coefficient corresponding to the preset reference comparison interval is set, and the normal strength value is multiplied by the corresponding preset coefficient to obtain the strength excavation assessment value.
3. The intelligent analysis and decision system for control parameters for hard rock tunneling according to claim 2, characterized in that: Analyze and process the hard rock status during the excavation process during the current monitoring period. The specific operation steps are as follows: By extracting the fracture excavation assessment value and strength excavation assessment value from the hard rock status information during the excavation process during the current monitoring period, and calibrating them as djp and qjp respectively, according to the formula: The excavation control value YYT in the excavation process during the current monitoring period is obtained, wherein e represents a natural constant, and η1 and η2 represent preset weight factors.
4. The intelligent analysis and decision system for control parameters for hard rock tunneling according to claim 1, characterized in that: Analyze and process the mechanical status during the excavation process during the current monitoring period. The specific operation steps are as follows: By acquiring the speed value, abnormal sound value and temperature value in the mechanical status information of the excavation process during the current monitoring period in real time, the speed value, abnormal sound value and temperature value in the mechanical status information of the excavation process during the current monitoring period are obtained, and the values of the three are extracted for normalized calculation and processing to obtain the machine status value during the excavation process during the current monitoring period.
5. The intelligent analysis and decision system for control parameters for hard rock tunneling according to claim 1, characterized in that: Analyze and process the environmental status during the excavation process during the current monitoring period. The specific operation steps are as follows: By acquiring the ring dust concentration value, ring humidity value and ring temperature value in the environmental status information of the excavation process in the current monitoring period in real time, the ring dust concentration value, ring humidity value and ring temperature value in the environmental status information of the excavation process in the current monitoring period are obtained, and the values of the three are extracted for normalized calculation and processing to obtain the ring value in the excavation process in the current monitoring period.
6. The intelligent analysis and decision system for control parameters for hard rock tunneling according to claim 1, characterized in that: Execute the corresponding control processing. The specific steps are as follows: Substitute the machine status value during the tunneling process during the current monitoring period into the corresponding preset value range, set different value ranges to correspond to a tunneling control parameter respectively, and generate a re-adjustment instruction, and re-adjust the tunneling control parameter of the tunneling machine according to the re-adjustment instruction; The annular value in the tunneling process during the current monitoring period is substituted into the corresponding preset value range, different value ranges are set to correspond to a tunneling control parameter respectively, and a final adjustment instruction is generated, and the tunneling control parameter of the tunneling machine is finally adjusted according to the final adjustment instruction.
Citation Information
Patent Citations
Intelligent tunneling method and system of hard rock tunneling machine based on slag sheet image
CN114645718A
Tunnel boring machine control method based on BIM depth planning
CN115045679A
Mining heading machine intelligent control system based on Internet of Things
CN115788476A
Rock drift intelligent rapid tunneling system
CN117345232A
Intelligent tunneling construction method based on tunnel boring machine
CN118065924A
Cited By
Intelligent control system and control method of pit digging device
CN119356100A