Testing device and method for simulating cohesive force of tunnel passing through stratified rock mass

By simulating the cohesion testing device of a tunnel passing through layered rock mass, it solves the problem of difficulty in measuring the cohesion and internal friction angle of layered rock mass in the existing technology, provides accurate data for tunnel construction, and improves engineering efficiency. Safety and quality assurance.

CN118730744AActive Publication Date: 2024-10-01SHU DAO INVESTMENT GRP CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411002070.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-01
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

The existing technology lacks effective simulation methods to study the effects of different tunnel hole sizes and numbers on the cohesion and internal friction angle of the layered rock mass structural surface, making it difficult to ensure project safety and quality during submarine tunnel construction.

Method used

Provides a cohesion test device for simulating a tunnel passing through layered rock mass, including a layered rock mass installation frame, a grouting model device, a water injection device and a monitoring device. By simulating different water pressures and grouting reinforcement effects, the distance between rock slices is measured. cohesion and internal friction angle.

Benefits of technology

It achieves accurate data collection on the impact of different tunnel hole sizes and numbers on the cohesion and internal friction angle of the layered rock mass structural surface, provides accurate data support for tunnel construction, and improves project safety and quality assurance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118730744A_ABST
    Figure CN118730744A_ABST
Patent Text Reader

Abstract

The invention discloses a device and a method for testing cohesive force of a simulated tunnel passing through a layered rock mass, the device comprises the layered rock mass formed by mutually laminated rock slices, the layered rock mass is inserted into a mounting groove of a rock mass mounting frame, the rock mass mounting frame is placed in a grouting model device, and the grouting model device is matched with a water injection device, a grouting device and a grouting reinforcement effect device; the grouting model device comprises a box body formed by hermetically connecting steel plates; the water injection device comprises a height-adjustable water tank; the grouting device comprises a grouting steel pipe drilled into the stratified rock mass, grouting openings arranged in the axial direction are formed in the grouting steel pipe in the radial direction, and after grouting is completed, the stratified rock mass is taken out to detect the cohesive force between rock slices. The stratified rock mass is mounted through the rock mass mounting frame, and the cohesive force and the internal friction angle of the stratified rock mass after grouting under the real water pressure environment are simulated and obtained in the grouting model device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of underground engineering disaster prevention and control, and in particular to a device and method for simulating the cohesion test of tunnels passing through layered rock masses. Background Art

[0002] Crossing unfavorable geological formations and geological interfaces is often a critical challenge in submarine tunnel construction, directly impacting construction safety. Improper handling can trigger disasters and lead to project failure. To control the stability of layered rock masses in unfavorable geological sections, grouting reinforcement technology has been widely used worldwide, playing a vital role in ensuring project safety and quality, and significantly promoting the continuous progress and rapid development of underwater tunnel and water-stratum tunnel construction technologies. During tunnel construction, the cohesion between layered rock strata changes due to the tunnel opening. Therefore, calculating the cohesion between layered rock masses is extremely important to prevent collapse.

[0003] Layered rock masses are a widely distributed type of rock mass worldwide. Due to various geological tectonic processes during their formation, layered rock masses differ significantly from other rock masses, exhibiting directional stratification structures such as bedding and foliation. To study the stability of surrounding rock in layered rock mass tunnels, scholars employ a variety of methods, including indoor model tests, theoretical modeling, numerical simulation, field monitoring and measurement, and inversion analysis, to comprehensively and systematically investigate the failure mechanisms and stability of layered rock masses. Rock mass strength is influenced by bedding; the degree of influence varies greatly among different rock masses. Even for the same type of rock, its mechanical properties can differ due to various factors.

[0004] On the other hand, layered rock masses are widely present in tunnel engineering. Long-term geological evolution and tectonic movements have complicated their physical and mechanical properties. Many scholars both domestically and internationally have conducted in-depth research on the constitutive models and mechanical parameters of layered rock masses through experiments and numerical simulations. However, most of these studies involve physical simulation experiments and lack research on the effects of different bedding angles and the number and size of circular holes on the cohesion and internal friction angle of the rock mass's structural surfaces.

[0005] Therefore, there is an urgent need for a test device and method to simulate the cohesion of tunnels passing through layered rock masses, in order to simulate the influence of tunnel hole size and number on the cohesion and internal friction angle of the layered rock mass structure. Summary of the Invention

[0006] The purpose of this invention is to address the deficiencies and shortcomings of existing technologies by providing a simulated tunnel cohesion testing device and method for simulating grouting path planning and reinforcement of layered rock masses under different water pressures, and accurately evaluating the grouting reinforcement effect. Ultimately, this invention enables the acquisition of performance data on the influence of different tunnel hole sizes and numbers on the cohesion and internal friction angle of horizontal or inclined structural surfaces of layered rock masses.

[0007] To achieve the above objectives, this invention provides a device for simulating the cohesion testing of tunnels traversing layered rock masses. The device comprises a layered rock mass composed of stacked rock fragments, which is inserted into an installation slot of a rock mass installation frame. The rock mass installation frame is placed within a grouting model device, which is equipped with a water injection device, a grouting device, and a grouting reinforcement effect device. The grouting model device includes a box-shaped structure made of tightly connected steel plates, with a transparent grouting observation plate, grouting holes, and water outlets. The water injection device includes a height-adjustable water tank connected to the box-shaped structure via a water injection pipe, creating different groundwater pressures on the layered rock mass. The grouting device includes a grouting steel pipe drilled into the layered rock mass, with grouting ports radially arranged along the axial direction. After grouting is completed, the layered rock mass is removed to test and obtain the cohesion between the rock fragments. This invention presents a simulated tunnel-through-layered rock mass cohesion testing device. It employs a water injection system to simulate the stress environment of underground layered rock masses, realistically recreating the construction site environment. A grouting model and grouting device simulate on-site grouting conditions. Based on the grouting reinforcement effect, the device obtains near-realistic grouting results. After grouting, the layered rock mass is removed to test the cohesion between rock fragments, thereby determining the influence of tunnel borehole size and number on the cohesion and internal friction angle of the layered rock mass structural surfaces. This invention uses a rock mass installation frame to install the layered rock mass, simulating the cohesion and internal friction angle of the grouted layered rock mass under realistic water pressure conditions within the grouting model device.

[0008] The box body is constructed by connecting steel plates in a sealed manner. The top of the box body is provided with a top plate, and the top plate is provided with a water inlet. The steel plates on the sides of the box body are provided with grouting holes and water outlets arranged vertically. A transparent grouting observation plate is provided between the grouting holes and the water outlets to facilitate the observation of the grouting effect.

[0009] The water tank is connected to a chain hoist, which drives the water tank to move up and down to simulate the formation of underground water system environments with different water pressures.

[0010] The grouting steel pipe is connected to an air pump and a first grouting pump in a first grouting tank via a first grouting pipe. The first grouting pipe is connected to a second grouting pipe, which is connected to an air pump and a second grouting pump in a second grouting tank.

[0011] The first grouting tank is equipped with a first mixer, and the second grouting tank is equipped with a second mixer, for uniformly mixing the grouting slurry.

[0012] The grouting model device is connected to a monitoring device, which includes sensors such as stress gauges, strain gauges, flow meters, and pressure gauges. The stress gauges are placed inside the grouting model device, the strain gauges are attached to the inner wall of the casing, the flow meters are placed on the pipelines connecting the water injection pipe, the grouting steel pipe, and the water outlet, and the pressure gauge is placed inside the first grouting pipe. The monitoring device realizes the stress and stress changes of the layered rock mass in the grouting model device, and displays changes in pressure, water injection, and grouting flow rates. It also recreates the changes in water vapor content of the layered rock mass in the underground environment, providing accurate data support for actual on-site grouting work.

[0013] The water inlet and water pipe are sealed with epoxy resin AB glue, and the grouting hole and grouting steel pipe are sealed with epoxy resin AB glue to prevent water and grouting slurry from leaking out.

[0014] The grouting reinforcement effect device includes a grouting effect observation tube with zero grouting pressure. The grouting effect observation tube is embedded in a layered rock mass. The porosity of the embedded layered rock mass is limited to the entry of grouting slurry. The grouting effect is evaluated in real time based on the concentration of the grouting slurry flowing out of the grouting effect observation tube.

[0015] A method for simulating the cohesion test of a tunnel traversing layered rock mass includes the following steps: 1. Prepare layered rock fragments to form a layered rock mass. By setting the number and size of the layered rock fragments and the number of openings for grouting with grouting steel pipes, layered rock masses with different parameters can be formed. 2. Select any layered rock mass, either horizontally or inclinedly, to insert the installation frame into the mounting slot. 3. Prepare the grouting model device. The four side plates and the bottom plate of the grouting model device box are connected by high-strength bolts, and the joints are sealed with rubber gaskets to ensure the water impermeability of the box. 4. Place the rock mass installation frame from step 2 into the open box, and then seal the top plate to the box. 5. The water injection device injects water into the grouting model device through the water injection pipe, and adjusts the height of the water tank to create different groundwater pressures on the layered rock mass, simulating the groundwater pressure environment at the construction site; 6. Prepare the grouting device. Drill the grouting steel pipe into the corresponding opening in the layered rock mass. Connect the grouting steel pipe to the first grouting pipe and deliver the grouting slurry into the grouting model device through the grouting hole of the grouting steel pipe. When slurry flows out of the grouting effect observation pipe, and the flow meters installed in the grouting effect observation pipe and the grouting steel pipe show that the flow rates of the grouting effect observation pipe and the grouting steel pipe are similar, stop grouting to obtain the target grouting layered rock mass. VII. The monitoring device monitors the grouting parameters in real time and records the final grouting parameters to guide tunnel seepage grouting reinforcement under different water pressures at the construction site; 8. After extracting the target grouting rock mass from step seven, select other layered rock masses with different parameters formed in step one and repeat steps one through seven. Finally, test the cohesion and internal friction angle between the stacked rock sheets of the target grouting rock masses with different parameters to provide accurate data support for actual tunnel crossings of layered rock masses.

[0016] In step five, different groundwater pressures are created in the layered rock mass by adjusting the height of the water tank, artificially setting an artificial water head. This artificial water head guides the grout to flow in the required direction. The concentration of the grout flowing out of the observation pipe is monitored to judge the grouting reinforcement effect in real time. The artificial water head, or artificially set groundwater pressure, guides the grout to flow in the required direction by different water pressures, thereby improving the grouting effect.

[0017] In the above steps, there are two or more grouting steel pipes, evenly distributed vertically, and the grouting pressure is greater than the water pressure of the storage environment to prevent rock strata from collapsing.

[0018] Using the above-mentioned technical solution, this simulated tunnel crossing layered rock mass cohesion testing device and method involves inserting a layered rock mass composed of stacked rock fragments into the installation groove of a rock mass installation frame. A grouting model device simulates the water content and head of the layered rock mass under different water pressures at the construction site, thus recreating the construction environment of the layered rock mass. Grout is injected into the layered rock mass through a grouting device via a grouting steel pipe. The grouting effect is evaluated using a grouting reinforcement effect device, and the optimal grouting parameters are obtained by a monitoring device. Finally, the cohesion and internal friction angle between the stacked rock fragments of the target grouting rock mass with different parameters are tested, providing accurate data support for actual tunnel crossings of layered rock masses. Attached Figure Description

[0019] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the following description of the embodiments will be briefly introduced. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0020] Figure 1 is a schematic diagram of the structure of a test device for simulating the cohesion of a tunnel passing through layered rock mass according to the present invention; Figure 2 is a schematic diagram of the grouting steel pipe installation structure in this invention; Figure 3 is a schematic diagram of the grouting model device in the invention; Figure 4 is a schematic diagram of the rock mass installation frame structure in the invention; Figure 5 is a schematic diagram of the layered rock mass structure of the horizontally inserted rock mass installation frame in the invention; Figure 6 is a schematic diagram of the layered rock mass structure of the inclined rock mass installation frame in the invention. Detailed Implementation

[0021] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present invention.

[0022] like Figure 1-6 A device and method for simulating the cohesion of tunnels passing through layered rock masses includes a layered rock mass composed of stacked rock fragments. The layered rock mass is inserted into the installation groove 73 of the rock mass installation frame. The rock mass installation frame is placed in a grouting model device. The grouting model device is equipped with a water injection device, a grouting device, and a grouting reinforcement effect device.

[0023] The grouting model device includes a box 10 made of sealed steel plates. The box 10 is equipped with a transparent grouting observation plate 5, grouting holes 26, and water outlet holes 25. The top of the box is equipped with a top plate 30, and the top plate is equipped with a water inlet 24. The steel plates on the sides of the box are equipped with grouting holes 26 and water outlet holes 25 arranged vertically. The transparent grouting observation plate 5 is installed between the grouting holes and the water outlet holes.

[0024] The water injection device 14 includes a height-adjustable water tank 16, which is connected to the box body 10 via a water injection pipe 13 to create different groundwater pressures on the layered rock mass. The water tank 16 is connected to a chain hoist 15, which drives the water tank 16 to move up and down to achieve changes in water pressure.

[0025] The grouting device includes a grouting steel pipe 22 drilled into the layered rock mass. The grouting steel pipe 22 has radially opened grouting ports 52 arranged axially. After grouting is completed, the layered rock mass is removed to test and obtain the cohesion between rock fragments. The grouting steel pipe 22 is connected to an air pump 1 and a first grouting pump 2 inside a first grouting tank 3 via a first grouting pipe 21. The first grouting pipe 21 is connected to a second grouting pipe 20, which is connected to the air pump 1 and a second grouting pump 17 inside a second grouting tank 18 to increase the grouting flow rate. Different grouting steel pipes can also be connected to achieve multi-point grouting performance. To increase the uniformity of the grout, a first mixer 4 is installed inside the first grouting tank 3, and a second mixer 19 is installed inside the second grouting tank 18.

[0026] The preferred structural monitoring device 7 includes sensors, including a stress gauge, a strain gauge, a flow meter, and a pressure gauge. The stress gauge is placed in the grouting model device, the strain gauge is attached to the inner wall of the housing 10, the flow meter is placed on the pipeline connecting the water injection pipe, the grouting steel pipe 22, and the water outlet 25, and the pressure gauge is placed inside the first grouting pipe 21. The monitoring device 7 monitors the grouting parameters in real time through the induction lines 6 connected to the sensors. The grouting parameters include at least the grouting pressure and flow rate.

[0027] The grouting reinforcement effect device includes a grouting effect observation tube with zero grouting pressure. The grouting effect observation tube is embedded in the rock mass, and the porosity of the embedded rock mass is limited to the entry of grouting slurry. The grouting effect is evaluated in real time based on the concentration of the grouting slurry flowing out of the grouting effect observation tube.

[0028] To improve the airtightness of the housing 10, the water inlet 24 and the water inlet pipe 13 are sealed with epoxy resin AB glue, and the grouting hole 26 and the grouting steel pipe 22 are sealed with epoxy resin AB glue.

[0029] A method for simulating the cohesion test of a tunnel traversing layered rock mass includes the following steps: 1. Prepare layered rock fragments to form a layered rock mass. By setting the number and size of the layered rock fragments and the number of openings for grouting with grouting steel pipes, layered rock masses with different parameters can be formed. 2. Select any layered rock mass, either horizontally or inclinedly, to insert the installation frame into the mounting slot. 3. Prepare the grouting model device. The four side plates and the bottom plate of the grouting model device box 10 are connected by high-strength bolts, and the joints are sealed with rubber gaskets to ensure the water impermeability of the box. 4. Place the rock mass installation frame from step 2 into the open box 10, and then seal the top plate 30 to the box. 5. The water injection device 14 injects water into the grouting model device through the water injection pipe 13, and adjusts the height of the water tank 16 to form different groundwater pressures on the layered rock mass, simulating the groundwater pressure environment at the construction site. 6. Prepare the grouting device. Drill the grouting steel pipe 22 into the corresponding opening in the layered rock mass. Connect the grouting steel pipe 22 to the first grouting pipe 21. Transport the grouting slurry into the grouting model device through the grouting port 52 of the grouting steel pipe 22. When slurry flows out of the grouting effect observation pipe, and the flow meters installed in the grouting effect observation pipe and the grouting steel pipe 22 show that the flow rates of the grouting effect observation pipe and the grouting steel pipe 22 are similar, stop grouting to obtain the target grouting layered rock mass. 7. Monitoring device 7 monitors grouting parameters in real time and records the grouting parameters after the grouting reinforcement is completed to guide tunnel seepage grouting reinforcement under different water pressures at the construction site; 8. After extracting the target grouting rock mass from step seven, select other layered rock masses with different parameters formed in step one and repeat steps one through seven. Finally, test the cohesion and internal friction angle between the stacked rock sheets of the target grouting rock masses with different parameters to provide accurate data support for actual tunnel crossings of layered rock masses.

[0030] In step five, different groundwater pressures are created in the layered rock mass by adjusting the height of the water tank, and an artificial water head is set up to guide the grout to flow in the required direction.

[0031] In one specific implementation scheme, the platform of box 10 has dimensions of 1000mm*1000mm*1000mm. Box 10 is constructed from 10mm thick steel plate, meeting the requirement of a maximum grouting pressure of 10MPa. The sides and bottom are connected with high-strength bolts. To ensure the airtightness of the model box, the joints are sealed with 2mm thick rubber gaskets and sealant. Transparent grouting observation plates of different heights are installed on the sides, made of high-strength acrylic glass, measuring 225mm*100mm. The distance from the bottom of the acrylic glass to the bottom of box 10 is 225mm, 450mm, 675mm, and 900mm respectively. A 20mm radius water inlet is reserved at the top of box 10, and a 5mm radius water outlet is reserved at the bottom. After the rock mass sample is placed inside the box, the top plate 30 is fitted into the open end of the box to seal it, with the joints sealed using thick rubber gaskets and sealant.

[0032] The specific installation process for the layered rock mass composed of mutually stacked rock fragments is as follows: Step 1: Sampling. The dimensions of this rock mass installation frame 70 are 150mm*150mm*150mm. The left and right sides of the rock mass installation frame 70 are made of steel bars, and the front and rear sides of the steel bars 71 are surrounded by equidistant installation grooves 73. The upper side is surrounded by steel bars, with an empty center, and the lower side is made of steel bars. All eight corners of the rock mass installation frame 70 are fixed with washers and bolts 72 for easy disassembly of layered rock masses.

[0033] Step 2: Drill multiple circular holes of different sizes and quantities at regular intervals on each layered rock mass, with inclination angles of 0° and 45°.

[0034] Step 3: Insert the layered rock mass with pre-drilled holes into the installation slot 73 one by one, and set the first round hole 82 for the horizontally inserted layered rock mass 81, or set the second round hole 84 for the inclinedly inserted layered rock mass 83, to complete the specific installation of the layered rock mass composed of stacked rock pieces.

[0035] This invention simulates the different cohesion and internal friction angles of tunnels traversing layered rock structures by adjusting the size and number of holes, thus solving the problem of complex processing and difficult fabrication of standard rock specimens in existing tests on the cohesion and internal friction angles of layered rocks.

[0036] The specific grouting steps in the grouting device are as follows: ① First, two parallel grouting steel pipes and a grouting effect observation pipe with zero grouting pressure are drilled into the layered rock mass. The two parallel grouting steel pipes are grouting steel pipe 22 and first grouting steel pipe 23. The first grouting steel pipe 23 has first grouting holes 44 with equal spacing, and the grouting steel pipe 22 has grouting ports 52 with equal spacing. The grouting steel pipe 22 and the first grouting steel pipe 23 are matched with the first round hole 82 or the second round hole 84.

[0037] ② Each grouting steel pipe is symmetrically distributed vertically, and the spacing between adjacent holes is adjusted as needed; ③ The grouting pressure of the grouting steel pipe is greater than the water pressure of the environment; the grouting effect observation pipe has zero grouting pressure, and the grouting effect observation pipe is embedded in the layered rock mass. The porosity of the embedded layered rock mass is limited to the entry of grouting slurry. The grouting effect is evaluated in real time based on the concentration of grouting slurry flowing out of the grouting effect observation pipe.

[0038] Although embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make changes, modifications, substitutions, and variations to the above embodiments within the scope of the present invention without departing from the principles and spirit of the invention. The scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A cohesion test device for simulating tunneling through layered rock mass, characterized in that: The invention comprises a layered rock mass composed of mutually stacked rock slices, the layered rock mass is inserted into a mounting groove (73) of a rock mass mounting frame (70), the rock mass mounting frame is placed in a grouting model device, and the grouting model device is equipped with a water injection device, a grouting device, and a grouting reinforcement effect device; the grouting model device comprises a box body (10) formed by a closed connection of steel plates, the box body (10) is provided with a transparent grouting observation plate (5), a grouting hole (26), and a water outlet hole (25); the water injection device (14) comprises a water tank (16) with adjustable height, the water tank (16) is connected to the box body (10) via a water injection pipe (13) to form different underground water pressures on the layered rock mass; the grouting device comprises a grouting steel pipe (22) drilled into the layered rock mass, the grouting steel pipe (22) is radially provided with grouting ports (52) arranged along the axial direction, and after the grouting is completed, the layered rock mass is taken out for detection to obtain the cohesion between the rock slices.

2. The cohesion test device for simulating tunneling through layered rock mass according to claim 1, characterized in that: The box body (10) is provided with a top plate (30) on the top plate, which is provided with a water injection port (24); a steel plate on the side of the box body is provided with grouting holes (26) and water outlet holes (25) arranged up and down; and a transparent grouting observation plate (5) is provided between the grouting holes and the water outlet holes.

3. The cohesion test device for simulating tunneling through layered rock mass according to claim 1, characterized in that: The water tank (16) is connected to the chain hoist (15), and the chain hoist (15) drives the water tank (16) to move up and down.

4. The cohesion test device for simulating tunnel passing through layered rock mass according to claim 1, characterized in that: The grouting steel pipe (22) is connected to the air pump (1) and the first grouting pump (2) in the first grouting bucket (3) via a first grouting pipe (21); the first grouting pipe (21) is connected to a second grouting pipe (20); the second grouting pipe (20) is connected to the air pump (1) and the second grouting pump (17) in the second grouting bucket (18).

5. The cohesion testing device for simulating tunneling through layered rock mass according to claim 4, characterized in that: A first mixer (4) is provided in the first grouting bucket (3), and a second mixer (19) is provided in the second grouting bucket (18).

6. The cohesion test device for simulating tunneling through layered rock mass according to claim 1, characterized in that: The grouting model device is connected to a monitoring device (7), the monitoring device (7) comprising a sensor, the sensor comprising a stress gauge, a strain gauge, a flow meter and a pressure monitoring gauge; the stress gauge is placed in the grouting model device, the strain gauge is adhered to the inner wall of the box (10), the flow meter is placed in the pipeline connecting the water injection pipe, the grouting steel pipe (22) and the water outlet (25), and the pressure monitoring gauge is placed in the first grouting pipe (21).

7. The cohesion testing device for simulating tunneling through layered rock mass according to claim 1, characterized in that: The water injection port (24) and the water injection pipe (13) are sealed by epoxy resin AB glue, and the grouting hole (26) and the grouting steel pipe (22) are sealed by epoxy resin AB glue.

8. The cohesion testing device for simulating tunneling through layered rock mass according to claim 1, characterized in that: The grouting reinforcement effect device comprises a grouting effect observation tube with zero grouting pressure, wherein the grouting effect observation tube is embedded with layered rock mass, and the porosity of the embedded layered rock mass is limited to the entry of grouting slurry. The concentration of the grouting slurry flowing out of the grouting effect observation tube is used to judge the grouting effect in real time.

9. The method for testing the cohesion of a simulated tunnel passing through a layered rock mass according to claim 1, characterized in that: The following steps are involved:

1. Prepare mutually stacked rock pieces to form a layered rock mass, and form a layered rock mass with different parameters by setting the number and size of the stacked rock pieces and the number of holes for grouting with a grouting steel pipe; 2. Select any layered rock mass and insert it horizontally or obliquely into the installation groove of the rock mass installation frame; 3. Prepare a grouting model device. The four side plates and the bottom plate of the grouting model device box (10) are connected by high-strength bolts, and the joints are sealed with rubber gaskets to ensure the watertightness of the box; 4. Place the rock mass installation frame of step 2 into the open box (10), and then seal the top plate (30) to the box; 5. The water injection device (14) injects water into the grouting model device through the water injection pipe (13), adjusts the height of the water tank (16), forms different groundwater pressures on the layered rock mass, and simulates the groundwater pressure environment at the construction site; Sixth, prepare a grouting device, drill a grouting steel pipe (22) into an opening at which the layered rock mass is matched, connect the grouting steel pipe (22) to the first grouting pipe (21), and deliver the grouting slurry to the grouting model device through the grouting port (52) of the grouting steel pipe (22); when slurry flows out of the grouting effect observation pipe and the flow meters installed in the grouting effect observation pipe and the grouting steel pipe (22) show that the flow rates of the grouting effect observation pipe and the grouting steel pipe (22) are similar, stop grouting to obtain the target grouting layered rock mass; 7. Monitoring device (7) monitors grouting parameters in real time and records the grouting parameters of the final grouting reinforcement to guide tunnel seepage grouting reinforcement under different water pressures at the construction site; 8. After taking out the target grouting rock mass that has completed step seven, select the layered rock masses with other different parameters formed in step one in turn to perform steps one to seven. Finally, the cohesion and internal friction angle between the stacked rock slices of the target grouting rock mass with different parameters are tested to provide accurate data support for the actual tunnel passing through the layered rock mass.

10. A method for testing the cohesion of a simulated tunnel passing through a layered rock mass according to claim 9, characterized in that: In the step 5, different underground water pressures are formed on the layered rock mass by adjusting the height of the water tank, and an artificial water head is artificially set, and the grouting slurry is guided to flow in a directional manner as required by the artificial water head.

Citation Information

Patent Citations

  • Hole position space prediction method for tunnel gushing mud desilting horizontal high-pressure grouting

    CN109855987A

  • Model test device for influence of anti-slide pile on slope stability of stratified rock mass during rainfall

    CN112064689A

  • Model test device and test method for water-rich fractured rock stratum flowing water grouting reinforcement

    CN114152510A

  • Rock grouting anchor rod pull-out test mesoscopic parameter calibration method based on FLAC-PFC coupling

    CN116415373A

  • Three-soft thick coal seam mining overlying strata multi-layer separation layer grouting settlement reduction method

    CN117167080A