Photovoltaic smart park optimal scheduling method based on Internet of Things

By combining the Internet of Things technology and non-cooperative game model with particle swarm algorithm, the operation mode of photovoltaic power stations is optimized, which solves the problems of low power quality and poor distribution network stability in smart parks, and improves the absorption capacity of photovoltaic power generation and the security of power grid.

CN118735145APending Publication Date: 2024-10-01SIFANG-TBEA INTELLIGENT ELECTRICAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310326294.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing small photovoltaic power stations in smart parks lack effective scheduling methods, resulting in low power quality and affecting the stability of the distribution network. Frequent charging and discharging of energy storage devices increases losses and reduces power quality.

Method used

The photovoltaic smart park optimization dispatching method based on the Internet of Things is used to optimize the operation mode of the photovoltaic power station and improve power utilization and grid security through initial estimation, non-cooperative game model and particle swarm algorithm.

Benefits of technology

It improves the absorption capacity of photovoltaic power generation, improves power quality, reduces power quality degradation, optimizes equipment operation methods, and enhances the stability of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735145A_ABST
    Figure CN118735145A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of optimal scheduling, and particularly relates to a photovoltaic smart park optimal scheduling method based on the Internet of Things. Comprising the following steps: 1) carrying out initial estimation on a photovoltaic smart park; 2) when the electric energy emitted by the photovoltaic system in real time is greater than the estimation result and the residual capacity of the energy storage system is insufficient, constructing an optimal scheduling model based on a non-cooperative game model; 3) calculating the optimal scheduling model through a particle swarm algorithm to obtain a final scheduling scheme; and 4) scheduling the photovoltaic smart park according to the scheduling scheme. According to the invention, the absorption capability of photovoltaic power generation in the smart park is improved, the electric energy quality is improved, and the problem of electric energy quality reduction caused by photovoltaic electric energy grid connection is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of optimization scheduling, and specifically is a photovoltaic smart park optimization scheduling method based on the Internet of Things. Background Art

[0002] Faced with the problems of energy shortage and environmental pollution, the development of new energy is the focus of world attention. Solar energy is listed as the top priority of energy strategy due to its advantages such as wide distribution of resources, good safety and high reliability. The solar photovoltaic industry has also become one of China's emerging strategic industries. After the continuous development of the photovoltaic industry, the development of large-scale centralized photovoltaic power stations has entered a bottleneck stage, and small photovoltaic power stations such as distributed photovoltaic power stations and rooftop photovoltaic power stations will become a development trend. In recent years, more and more companies have also responded positively to establish "zero-carbon" parks by installing photovoltaic cells and other equipment on the roofs of factories and office buildings. Not only can it save energy and reduce emissions, but it can also save the cost of enterprises, killing two birds with one stone.

[0003] The existing small photovoltaic power stations in smart parks lack corresponding dispatching methods, and there is no real optimization and dispatching of the operation mode of the photovoltaic power station output, load, energy storage system, and electricity sales in the park. This will lead to low power quality and affect the stable operation of the distribution network. Therefore, the present invention provides a photovoltaic smart park optimization dispatching method based on the Internet of Things, which can improve power quality, the safety of the distribution network, and optimize the operation mode of the equipment.

[0004] The existing monitoring systems of photovoltaic power stations in smart parks are mainly used to monitor the operating status of photovoltaic cells, inverters and other equipment and to improve the work efficiency of operation and maintenance personnel. Photovoltaic power generation is greatly affected by environmental and weather factors, so the lack of relevant optimization scheduling plans may cause the electricity generated by photovoltaics to be unable to be consumed in time. Although some parks are equipped with energy storage devices that can store and emit electricity, frequent charging and discharging behaviors will not only consume part of the electricity, but also increase the loss of energy storage devices. In addition, the lack of scheduling plans will also reduce the quality of electricity. Summary of the invention

[0005] The present invention provides a photovoltaic smart park optimization scheduling method based on the Internet of Things, which can improve the power quality and the security of the distribution network, optimize the operation mode of the equipment, so as to improve the utilization rate of photovoltaic power generation in the smart park and improve the power quality of the park.

[0006] The technical solution adopted by the present invention to achieve the above-mentioned purpose is:

[0007] A photovoltaic smart park optimization scheduling method based on the Internet of Things includes the following steps:

[0008] 1) Make an initial estimate of the photovoltaic smart park;

[0009] 2) When the real-time electricity generated by photovoltaics is greater than the estimated result and the remaining capacity of the energy storage system is insufficient, an optimization scheduling model is constructed based on a non-cooperative game model;

[0010] 3) The optimal scheduling model is calculated through the particle swarm algorithm to obtain the final scheduling plan;

[0011] 4) Dispatch the photovoltaic smart park according to the dispatch plan.

[0012] The step 1) comprises the following steps:

[0013] 1.1) Estimate the photovoltaic absorption capacity of the photovoltaic smart park and determine the installed capacity in the photovoltaic smart park as the internal load of the park;

[0014] 1.2) Treat the charging equipment in the photovoltaic smart park as transferable load for optimized scheduling.

[0015] In step 2), the optimization scheduling model is:

[0016] Taking the maximization of the revenue of the photovoltaic power station and the voltage stability of the distribution network in the photovoltaic smart park as participants, the gains and losses of the participants are calculated:

[0017] Max L 1 =P 1 (t)-C 1 (t)

[0018] P 1 (t) = P L (t)*M1(t)+P V (t)*M2(t)

[0019] C 1 (t) = η*P W *M load (t)

[0020]

[0021] Among them, L 1 is the total income of the photovoltaic power station, L 2 is the voltage deviation of the distribution point, P 1 (t) is the total income of photovoltaic power generation in time period t, C 1 (t) is the penalty function for abandoning light, U L is the actual voltage value, U 0 is the standard voltage value, P L (t) is the amount of electricity sold to the power market during period t, M1(t) is the electricity price during period t; P V (t) is the amount of electricity consumed by the load during period t, M2(t) is the electricity price at that time, PW is the amount of abandoned light, M load (t) is the electricity price in period t, and η is the penalty coefficient.

[0022] The optimization scheduling model includes the following constraints:

[0023] (1) Power balance constraints:

[0024] P g (t) = P inv (t)-P LO (t)

[0025] P inv (t) = P S (t)

[0026] P S (t) = P PV (t)+P STO (t)

[0027] Among them, P S (t) is the total power of the photovoltaic system, P inv (t) is the output power of the inverter, P LO (t) is the load power, P g (t) is the power of electricity purchased or sold, P STO (t) is the power output or absorbed by the energy storage device, P PV (t) is the output power of the photovoltaic cell;

[0028] (2) Photovoltaic output constraints:

[0029] 0≤P PV_i (t)≤P PV (t)

[0030] P PV (t)≤P C

[0031] Among them, P PV_i (t) is the photovoltaic active power output by the inverter, P PV (t) is the output power of the photovoltaic cell; P C is the installed capacity of the photovoltaic power station;

[0032] (3) Energy storage system constraints:

[0033] SOC ESS (t) = SOC ESS (t-1)+λ*g ESS (t)

[0034] SOC min ≤SOC ESS (t)≤SOCmax

[0035] g ESS_min ≤g ESS (t)≤g ESS_max

[0036] Among them, SOC ESS (t) is the storage capacity of the energy storage system during period t, SOC min , SOC max are the upper and lower limits of energy storage capacity, g ESS (t) is the charging and discharging power of the energy storage during time period t, g ESS_min , g ESS_max are the maximum charging power and discharging power of the energy storage system during period t, respectively, and λ is the charging and discharging coefficient of the energy storage system;

[0037] (4) Inverter capacity constraints:

[0038]

[0039]

[0040] Among them, Q PV1 is the inverter capacity at the current moment, is the maximum reactive power regulation of the inverter, S INV is the capacity of the inverter, P PV Provide active power for photovoltaic power stations;

[0041] (5) Constraints on electricity market purchase volume:

[0042] SOC ESS (t) = SOC ESS (t-1)+g(t)

[0043] SOC ESS (t)≤50%*SOC ESS_Max

[0044] Among them, SOC ESS (t-1) is the storage capacity of the energy storage system in the previous t-1 period, g(t) is the power market purchase amount in the t period, SOC ESS_Max is the maximum storage capacity of the energy storage system.

[0045] The step 3) is specifically as follows:

[0046] Using the particle swarm algorithm, when the revenue maximization of the photovoltaic power station in the photovoltaic smart park in the optimization scheduling model and the voltage stability of the distribution network reach Nash equilibrium, the corresponding participant strategy is used as the final scheduling plan.

[0047] A photovoltaic smart park optimization scheduling system based on the Internet of Things, comprising:

[0048] Data acquisition module, used to make initial estimates of the PV smart park;

[0049] The rule engine function module is used to build an optimization scheduling model based on a non-cooperative game model when the real-time power generated by photovoltaics is greater than the estimated result and the remaining capacity of the energy storage system is insufficient;

[0050] Function calculation module, used to calculate the optimization scheduling model through particle swarm algorithm to obtain the final scheduling plan;

[0051] The scheduling module is used to schedule the photovoltaic smart park according to the scheduling plan.

[0052] A photovoltaic smart park optimization scheduling system based on the Internet of Things includes a memory and a processor; the memory is used to store a computer program; the processor is used to implement the photovoltaic smart park optimization scheduling method based on the Internet of Things when executing the computer program.

[0053] A computer-readable storage medium stores a computer program. When the computer program is executed by a processor, the photovoltaic smart park optimization scheduling method based on the Internet of Things is implemented.

[0054] The present invention has the following beneficial effects and advantages:

[0055] The present invention improves the absorption capacity of photovoltaic power generation within the smart park, improves the quality of electric energy, and reduces the problem of power quality degradation caused by photovoltaic power grid connection. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] Figure 1 Establish a flow chart schematic diagram for the system of the present invention;

[0057] Figure 2 This is a schematic diagram of the process flow of optimizing the scheduling judgment process of the present invention. DETAILED DESCRIPTION

[0058] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0059] A photovoltaic smart park optimization scheduling method based on the Internet of Things mainly includes the following steps:

[0060] 1) Estimation of photovoltaic absorption capacity of the park

[0061] 2) Plan the dispatchable load within the park

[0062] 3) Establishment of optimization scheduling model

[0063] 4) Solve the model

[0064] 5) Software backend construction

[0065] The step 1) includes the following contents:

[0066] The photovoltaic power station in the park needs to evaluate the photovoltaic absorption capacity to determine the photovoltaic installed capacity. If this analysis is not performed, when the installed capacity is too low, the power generation will be too small, resulting in economic damage; on the contrary, when the installed capacity is too high, the photovoltaic absorption capacity is insufficient and the light is abandoned, resulting in energy waste. Therefore, it is necessary to evaluate the photovoltaic absorption capacity of the park.

[0067] The step 2) includes the following contents:

[0068] Transferable load is one of the three types of demand-side loads, which means that the service time of the load can be transferred from one interval to another within a certain allowable range, and the transferred load cannot exceed the maximum allowable transfer amount. This type of load is commonly seen in daily life, mainly washing machines, water heaters, and some charging equipment whose charging time can be changed. Load shifting plays the role of peak shaving and valley filling, and can also improve the level of energy consumption. Therefore, the charging piles, air conditioners, trams and some equipment that needs to be charged inside the smart park can be planned as transferable loads, and the total amount of this part of the load can be obtained by statistics, and dispatched as transferable loads to optimize its use time and achieve peak shaving and valley filling inside the park.

[0069] The step 3) includes the following contents:

[0070] As mentioned above, most existing monitoring systems monitor the safety and operating status of equipment, but lack the optimization and scheduling of internal energy in the park, resulting in waste such as abandoned light. Therefore, the present invention uses an algorithm based on non-cooperative game to optimize scheduling in response to this situation. It can not only optimize scheduling based on photovoltaic output, load usage, and the working efficiency of the energy storage system, but also obtain the most suitable mode parameters for the operation of each device in the smart park.

[0071] The step 4) comprises the following contents:

[0072] Use intelligent algorithms to solve the non-cooperative game model, and the solution obtained is the "Nash equilibrium", which is a specific scheduling method.

[0073] The step 5) includes the following contents:

[0074] The data is communicated to the background through wired means, and the Internet of Things platform can be used to monitor photovoltaic equipment. The Internet of Things platform monitors the operating status data of the photovoltaic power generation system in real time. After continuous information collection and calculation, the cloud platform sends instructions to each device in the photovoltaic power generation system in the park to realize its control and optimized scheduling.

[0075] The implementation process of the present invention is as follows: first, conduct a survey and study on the photovoltaic absorption capacity according to the specific construction park and the region; second, plan the transferable load within the park, determine the total amount of transferable load and the capacity of the energy storage system; then establish a scheduling algorithm model; finally, establish a control system on the Internet of Things platform, and use the algorithm to optimize the scheduling of the smart park. The specific implementation method is:

[0076] Step 1: Estimation of the photovoltaic absorption capacity of the park

[0077] The photovoltaic power station in the park needs to study the photovoltaic absorption capacity and determine the photovoltaic installed capacity. If this analysis is not conducted, there will be too little power generation and too high installed capacity, resulting in insufficient photovoltaic absorption capacity and abandonment of light, causing energy waste. Here, we can analyze the power consumption of the established photovoltaic park every month of the year and the light intensity of the area in the year. By comparing the peak and trough periods of electricity consumption within the park and the months with the most and least photovoltaic power generation, we can get the corresponding installed capacity. Here, we can add a certain energy storage system to improve the utilization rate of photovoltaic power.

[0078] Step 2: Plan the load that can be transferred within the park

[0079] As explained above, the transferable loads are planned as transferable loads in the smart park, such as charging piles, electric vehicles, air conditioners, and some equipment that needs to be charged. This part of the load is used for optimized scheduling to achieve peak load shifting and valley filling: when the photovoltaic output is high and the existing load in the park cannot be absorbed in time, this transferable load consumes electricity to absorb photovoltaic energy. The specific scheduling method can be solved according to the optimization scheduling algorithm.

[0080] Step 3: Establishment of optimization scheduling algorithm model

[0081] The problems caused by the lack of a scheduling solution have been mentioned above. Therefore, the scheduling process of the present invention using the optimization solution can be divided into the following situations:

[0082] Case 1: When the electricity generated by photovoltaics cannot meet the internal load of the park, the electricity purchase amount of the power market can be calculated based on the electricity price and the remaining electricity of the energy storage system, and optimized scheduling can be carried out.

[0083] Case 2: When the photovoltaic output can meet the load of the park, there is some surplus, which can be calculated based on the electricity price and the remaining power of the energy storage system to obtain the power sales volume in the electricity market and optimize the scheduling.

[0084] Case 3: When the photovoltaic output is at its peak, there is a large amount of remaining electricity, but the remaining capacity of the energy storage system is insufficient. The amount of electricity sold in the power market can be calculated based on constraints such as the transferable load, market electricity price, remaining electricity of the energy storage system, and power quality of the distribution network, and optimized scheduling can be performed.

[0085] In the first two cases, the inverter can output reactive power, thereby adjusting the power quality. At this time, the photovoltaic power station can be dispatched with the objective function of maximizing benefits, without the need to solve it based on the non-cooperative game model; however, in the third case, due to the high photovoltaic power generation, the photovoltaic power station needs to output active power, but too much active output will cause power quality problems such as voltage crossing the limit. Therefore, the economy and power quality of the photovoltaic power station form a conflict between the two sides. Therefore, for this situation, the non-cooperative game dual-objective optimization model can be used to solve it and obtain the most suitable dispatching plan for the operation of the photovoltaic power station in the smart park.

[0086] Among them, non-cooperative game is a kind of game theory. Game theory contains three elements: participants, strategies, and gains and losses. Participants are in a competition or game, and every person with decision-making power is a participant. Strategy means that in a game, each participant has the choice of a complete and feasible action plan. Gains and losses refer to the final benefits of each participant at the end of a game. The gains and losses of participants are not only related to the participants' own strategies, but also to a set of strategies determined by the overall players, which is usually called the benefit function. Therefore, the three elements of the non-cooperative game model in the present invention are:

[0087] Participants: A two-person game consisting of the profit maximization of the smart park photovoltaic power station and the distribution network voltage stability as participants.

[0088] Participant strategy: It is composed of the active output of the photovoltaic system, the transfer load, the charging and discharging power of the energy storage system, etc.

[0089] Participants' gains and losses:

[0090] 1. The economic gain or loss of a photovoltaic power station is the total income of the photovoltaic power station, expressed in L 1 Indicates that P 1 The total income of the photovoltaic power station includes the remaining expenses for self-consumption in the park and the income from selling electricity to the outside. 1 The penalty for abandoning solar power, the energy loss of the energy storage system, and the loss of the energy storage equipment (the loss of solar panels is negligible):

[0091] Max L 1 =P 1 (t)-C 1 (t) (1)

[0092] Among them, P 1 (t) is the total income of photovoltaic power generation in time period t, as shown in formula (2), C 1 (t) is the penalty function for light abandonment behavior as shown in equation (3).

[0093] P 1 (t) = P L (t)*M1(t)+Pv(t)*M2(t) (2)

[0094] C 1 (t) = η*P W *M load (t) (3)

[0095] Among them, P L (t) is the amount of electricity sold to the power market during period t, M1(t) is the electricity price during this period; P L (t) is the amount of electricity consumed by the load during period t, M2(t) is the electricity price at that time; C fa (t) fine for abandoned light; W M is the amount of abandoned light; load is the electricity price in period t; η is the penalty coefficient. The greater the amount of abandoned light, the greater the penalty coefficient and the greater the fine.

[0096] 2. The gains and losses of distribution network voltage stability can be regarded as the improvement of distribution network safety performance, and its benefit function is the voltage deviation of the distribution point:

[0097]

[0098] Among them, U L is the actual voltage value, U 0 It is the standard voltage value.

[0099] The main constraints for solving the target model include the following aspects:

[0100] (1) Power balance constraints

[0101] In the process of photovoltaic output and scheduling in formula (1), the power of the entire system is balanced.

[0102] P g (t) = P inv (t)-P LO (t) (5)

[0103] P inv (t) = PS (t) (6)

[0104] P S (t) = P PV (t)+P STO (t) (7)

[0105] Among them, P S (t) is the total power of the photovoltaic system; P inv (t) is the output power of the inverter; P LO (t) is the load power; P g (t) is the power purchased or sold to the power grid; P STO (t) is the power output or absorbed by the energy storage device; P PV (t) is the output power of the photovoltaic cell.

[0106] (2) Photovoltaic output constraints

[0107] The size of photovoltaic output has a certain range and will not exceed the installed capacity.

[0108] 0≤P PV_i (t)≤P PV (t) (8)

[0109] P PV (t)≤P C (9)

[0110] Among them, P PV_i (t) is the photovoltaic active power output by the inverter; P PV (t) is the active power of photovoltaic power generation; P C It is the installed capacity of the photovoltaic power station.

[0111] (3) Energy storage system constraints

[0112] The charging and discharging power and charging and discharging amount of the energy storage system must meet the corresponding range and must not exceed its capacity.

[0113] SOC ESS (t) = SOC ESS (t-1)+λ*g ESS (t) (10)

[0114] SOC min ≤SOC ESS (t)≤SOC max (11)

[0115] g ESS_min ≤g ESS (t)≤g ESS_max (12)

[0116] Among them, SOC ESS (t) is the storage capacity of the energy storage system during time period t; SOC min , SOC max are the upper and lower limits of energy storage capacity respectively; g ESS (t) is the charging and discharging power of the energy storage during time period t; g ESS_min , g ESS_max is the maximum charging and discharging power of the energy storage system in time period t; γ is the charging and discharging coefficient of the energy storage system, which is negative during discharge and positive during charging.

[0117] (4) Inverter capacity constraints

[0118]

[0119]

[0120] in, is the maximum reactive power regulation of the inverter; S INV is the capacity of the inverter; P PV Provide active power for the photovoltaic power station.

[0121] (5) Constraints on electricity market purchase volume

[0122] In order to prevent the energy storage system from purchasing too much electricity in the electricity market, resulting in insufficient capacity to store the unabsorbed photovoltaic active power, it is necessary to restrict the amount of electricity purchased in the electricity market. The amount of active purchases depends on the remaining capacity of the energy storage system, and the remaining amount plus the purchased electricity shall not exceed 50% of its power.

[0123] SOC ESS (t) = SOC ESS (t-1)+g(t) (15)

[0124] SOC ESS (t)≤50%*SOC ESS_Max (16)

[0125] Among them, SOC ESS (t-1) is the storage capacity of the energy storage system in the previous period t-1, g(t) is the amount of electricity purchased from the power market in period t, SOC ESS_Max is the maximum storage capacity of the energy storage system.

[0126] In summary, when the photovoltaic power station in the smart park starts to generate electricity, it is judged based on the generated electricity and the current load. When the first two conditions are met, the optimization scheduling is carried out with the goal of economic maximization, and its constraints remain unchanged; when the power generation is too high, when the last condition is met, the optimization scheduling based on the non-cooperative game model is adopted. Therefore, the whole optimization scheduling process is as follows Figure 1 shown.

[0127] Step 4: Solve the model

[0128] Using the particle swarm algorithm to calculate the model, when the solutions of the two objective functions of equations (1) and (4) are Nash equilibrium, also known as non-cooperative game equilibrium, in a game process, no matter what the other party's strategy is, one party will choose a certain strategy, and this selected strategy is also the best, then this combination is defined as Nash equilibrium. A strategy combination is called Nash equilibrium when the equilibrium strategy of each player is to achieve the maximum value of their expected return, and at the same time, all other players also follow this strategy. Therefore, the obtained Nash equilibrium is the operation plan for optimal scheduling.

[0129] Step 5: Build the software background

[0130] The specific implementation mainly consists of the following steps:

[0131] (1) Develop cloud-based products and equipment, that is, establish relevant equipment for the photovoltaic power station within the smart park on the cloud and complete its function (physical model) definition.

[0132] (2) Use data acquisition devices to collect data from the smart park photovoltaic power station and send it to the central control room, so that the real-time operation data of the equipment end can be uploaded to the cloud, and the cloud can also provide real-time feedback and send instructions to the equipment end. This establishes communication between the smart park photovoltaic power station and the cloud.

[0133] (3) After completing step 2, the cloud platform can receive various information from the operating status of the photovoltaic power station. At this time, the rule engine function module of the Internet of Things platform (this module is an inherent function module in the Internet of Things platform, used for communication) is used to filter the data and send it to other modules to complete other operations. This paper filters the data uploaded to the cloud by the photovoltaic power station equipment and forwards it to the function calculation module (this module is an inherent function module in the Internet of Things platform, used for algorithm calculation and solution) to perform the next step.

[0134] (4) After completing step 3, that is, after the data is successfully transferred to the function calculation, the function calculation module writes the execution function code according to the specific requirements. After that, the data transferred from the IOT platform is optimized and solved, and the optimized solution is sent to the device end of the photovoltaic power station by calling the cloud API using the cloud platform to achieve the optimized scheduling of the photovoltaic power station.

[0135] After completing the above steps, the control system is basically established. Its workflow is as follows: the photovoltaic power generation system of the smart park sends the operation information to the cloud, and then the real-time operation status information of the photovoltaic power station can be seen in the cloud. Then, the IOT platform forwards the filtered data to the function calculation module for optimization and solution through the established rule engine, and finally sends the solved data to the various devices of the photovoltaic power station through the Internet of Things platform. The devices operate according to the received instructions, which realizes the optimization of the operation status of the photovoltaic power station. The workflow diagram is shown below. Figure 2 Other related functions can be added according to the internal needs of the park.

Claims

1. A photovoltaic smart park optimization scheduling method based on the Internet of Things, characterized in that: The following steps are involved: 1) Make an initial estimate of the PV smart park; 2) When the real-time electricity generated by photovoltaics is greater than the estimated result and the remaining capacity of the energy storage system is insufficient, an optimization scheduling model is constructed based on a non-cooperative game model; 3) The optimal scheduling model is calculated through the particle swarm algorithm to obtain the final scheduling plan; 4) Dispatch the photovoltaic smart park according to the dispatch plan.

2. According to the method for optimizing and scheduling photovoltaic smart parks based on the Internet of Things in claim 1, it is characterized in that: The step 1) comprises the following steps: 1.1) Estimate the photovoltaic absorption capacity of the photovoltaic smart park and determine the installed capacity in the photovoltaic smart park as the internal load of the park; 1.2) Treat the charging equipment in the photovoltaic smart park as transferable load for optimized scheduling.

3. The photovoltaic smart park optimization scheduling method based on the Internet of Things according to claim 1 is characterized in that: In step 2), the optimization scheduling model is: Taking the maximization of the revenue of the photovoltaic power station and the voltage stability of the distribution network in the photovoltaic smart park as participants, the gains and losses of the participants are calculated: Max L1=P1(t)-C1(t) P1(t)=P L (t)*M1(t)+P V (t)*M2(t) C1(t)=η*P W *M load (t) Among them, L1 is the total income of the photovoltaic power station, L2 is the voltage deviation of the distribution point, P1(t) is the total income of photovoltaic power generation in the time period t, C1(t) is the penalty function for abandonment of light, and U L is the actual voltage value, U0 is the standard voltage value, P L (t) is the amount of electricity sold to the power market during period t, M1(t) is the electricity price during period t; P V (t) is the amount of electricity consumed by the load during period t, M2(t) is the electricity price at that time, P W is the amount of abandoned light, M load (t) is the electricity price in period t, and η is the penalty coefficient.

4. The photovoltaic smart park optimization scheduling method based on the Internet of Things according to claim 3 is characterized in that: The optimization scheduling model includes the following constraints: (1) Power balance constraints: P g (t)=P inv (t)-P LO (t) P inv (t)=P S (t) P S (t)=P PV (t)+P STO (t) Among them, P S (t) is the total power of the photovoltaic system, P inv (t) is the output power of the inverter, P LO (t) is the load power, P g (t) is the power of electricity purchased or sold, P STO (t) is the power output or absorbed by the energy storage device, P PV (t) is the output power of the photovoltaic cell; (2) Photovoltaic output constraints: 0≤P PV_i (t)≤P PV (t) P PV (t)≤P C Among them, P PV_i (t) is the photovoltaic active power output by the inverter, P PV (t) is the output power of the photovoltaic cell; P C is the installed capacity of the photovoltaic power station; (3) Energy storage system constraints: SOCIETY ESS (t)=SOC ESS (t-1)+λ*g ESS (t) SOC min ≤SOC ESS (t)≤SOC max g ESS_min ≤g ESS (t)≤g ESS_max Among them, SOC ESS (t) is the storage capacity of the energy storage system during period t, SOC min , SOC max are the upper and lower limits of energy storage capacity, g ESS (t) is the charging and discharging power of the energy storage during time period t, g ESS_min , g ESS_max are the maximum charging power and discharging power of the energy storage system during period t, respectively, and λ is the charging and discharging coefficient of the energy storage system; (4) Inverter capacity constraints: Among them, Q PV1 is the inverter capacity at the current moment, is the maximum reactive power regulation of the inverter, S INV is the capacity of the inverter, P PV Provide active power for photovoltaic power stations; (5) Constraints on electricity market purchase volume: SOC ESS (t)=SOC ESS (t-1)+g(t) SOC ESS (t)≤50%*SOC ESS_Max Among them, SOC ESS (t-1) is the storage capacity of the energy storage system in the previous t-1 period, g(t) is the power market purchase amount in the t period, SOC ESS_Max is the maximum storage capacity of the energy storage system.

5. The photovoltaic smart park optimization scheduling method based on the Internet of Things according to claim 1 is characterized in that: The step 3) is specifically as follows: Using the particle swarm algorithm, when the revenue maximization of the photovoltaic power station in the photovoltaic smart park in the optimization scheduling model and the voltage stability of the distribution network reach Nash equilibrium, the corresponding participant strategy is used as the final scheduling plan.

6. A photovoltaic smart park optimization scheduling system based on the Internet of Things, characterized in that: include: Data acquisition module, used to make initial estimates of the PV smart park; The rule engine function module is used to build an optimization scheduling model based on a non-cooperative game model when the real-time power generated by photovoltaics is greater than the estimated result and the remaining capacity of the energy storage system is insufficient; Function calculation module, used to calculate the optimization scheduling model through particle swarm algorithm to obtain the final scheduling plan; The scheduling module is used to schedule the photovoltaic smart park according to the scheduling plan.

7. A photovoltaic smart park optimization scheduling system based on the Internet of Things, characterized in that: It comprises a memory and a processor; the memory is used to store a computer program; the processor is used to implement a photovoltaic smart park optimization scheduling method based on the Internet of Things as described in any one of claims 1-6 when executing the computer program.

8. A computer-readable storage medium, characterized in that: The storage medium stores a computer program, and when the computer program is executed by the processor, the photovoltaic smart park optimization scheduling method based on the Internet of Things as described in any one of claims 1 to 6 is implemented.