Intelligent management method and system based on user data
By receiving engineering design details and viewing instructions and user supervision data, the supervision plan is determined and the construction time nodes are adjusted, which solves the problem of unconcentrated engineering construction supervision time and improves supervision efficiency and user satisfaction.
Patent Information
- Application Number
- CN202410751002.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2024-10-01
AI Technical Summary
During the construction process, when customers supervise important design parts, the supervision time is not concentrated enough, resulting in low supervision efficiency. An intelligent management method based on user data is needed to improve supervision efficiency.
By receiving engineering design details viewing instructions, the engineering design points are displayed, the supervision plan is determined based on the supervision data input by the user, the construction time nodes are adjusted, and supervision node information is generated to facilitate on-site supervision, traceability or remote video supervision.
It realizes the adaptive adjustment of project construction time nodes according to user needs, improves supervision efficiency, saves customers' supervision time, and is more in line with user needs.
Smart Images

Figure CN118735173A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering management, and in particular to an intelligent management method and system based on user data. Background Art
[0002] Engineering management involves the effective organization, command, coordination and control of the entire process of engineering projects from planning to implementation. Engineering management includes various aspects such as engineering planning and design, construction and operation. It requires planning, organization, command, coordination and control of various resources such as manpower, material resources, financial resources and time to ensure that the project is successfully completed in accordance with the predetermined goals and quality requirements. Before the construction of the project, the customer will have design requirements. During the construction process, the customer has the need for supervision, especially for important design parts. At present, when customers want to supervise, they are completely based on the progress of the construction party. The supervision time of each project is often not concentrated enough, resulting in customers spending more time on supervision and low supervision efficiency. Therefore, it is necessary to provide an intelligent management method and system based on user data to solve the above problems. Summary of the invention
[0003] In view of the deficiencies in the prior art, the purpose of the present invention is to provide an intelligent management method and system based on user data to solve the problems existing in the above-mentioned background technology.
[0004] The present invention is implemented as follows: an intelligent management method based on user data, the method comprising the following steps:
[0005] Receive engineering design detail viewing instructions and display all engineering design points on the renderings. Each engineering design point corresponds to construction installation, material model and design elements;
[0006] Receive user supervision data input by the user, each user supervision data includes an engineering design point, and each engineering design point corresponds to one or more of construction installation, material model and design elements;
[0007] Determine the supervision plan based on user supervision data. User supervision data and supervision plan correspond one to one. The supervision plan is on-site supervision, traceability supervision or remote video supervision.
[0008] The time nodes of the engineering construction are adjusted according to the user supervision data and the supervision plan, and the supervision node information is determined. The supervision node information includes a plurality of supervision nodes, and each supervision node corresponds to one or more user supervision data.
[0009] As a further solution of the present invention: the step of receiving user supervision data input by the user specifically includes:
[0010] Receive a design point selection instruction input by a user, and generate an item display pop-up window, wherein the content in the item display pop-up window includes three items: construction and installation, material model, and design elements;
[0011] Receive an entry display instruction and display the detailed content description of the selected entry;
[0012] Receive an item confirmation selection instruction, and generate user supervision data according to the design point selection instruction and the item confirmation selection instruction.
[0013] As a further solution of the present invention: the step of determining the supervision scheme according to the user supervision data specifically includes:
[0014] Inputting user supervision data into a supervision scheme library, wherein the supervision scheme library includes all engineering design points, each engineering design point corresponds to three items: construction installation, material model, and design elements, and each item corresponds to at least one supervision scheme for on-site supervision;
[0015] Matching is performed through the input user supervision data, and a supervision scheme selection pop-up window is output. The supervision scheme selection pop-up window contains one or more supervision schemes. When the user supervision data contains multiple entries, the intersection of the supervision schemes corresponding to the multiple entries is taken and placed in the supervision scheme selection pop-up window;
[0016] A pop-up window selection instruction input by a user is received, and a supervision scheme for the user supervision data is determined according to the pop-up window selection instruction.
[0017] As a further solution of the present invention: the step of adjusting the time nodes of the engineering construction according to the user supervision data and the supervision scheme and determining the supervision node information specifically includes:
[0018] Input user supervision data and supervision plan into the project construction progress database, and output the supervision time corresponding to each user supervision data;
[0019] The supervision node information is determined according to the level order of the engineering design points and the discrete degree of the supervision time, and each supervision node corresponds to a supervision time node;
[0020] Adjust the time nodes of the project construction according to the supervision node information and supervision time nodes to determine the completion time of each project design point.
[0021] As a further solution of the present invention: the step of determining the supervision node information according to the level sequence of the engineering design points and the discrete degree of the supervision time specifically includes:
[0022] Retrieve the level order of each engineering design point, classify all user supervision data according to the level order, and construct the engineering design points with higher level order after the engineering design points with lower level order;
[0023] The classified user supervision data are grouped according to the supervision plan, with on-site supervision as one group and others as another group;
[0024] The user supervision data in each group is subdivided according to the discrete degree of the supervision time, and the difference in the supervision time corresponding to any two user supervision data in the subdivided category is less than the time threshold;
[0025] A supervision node is determined according to each sub-category, the corresponding supervision time node is the average value of the monitoring time in the sub-category, and the supervision node information is determined according to all the supervision nodes.
[0026] As a further solution of the present invention: the engineering construction progress library includes all engineering design points, each engineering design point corresponds to the monitoring time of construction installation, material model and design elements, and each engineering design point corresponds to a level order.
[0027] Another object of the present invention is to provide an intelligent management system based on user data, the system comprising:
[0028] The engineering design review module is used to receive engineering design detail review instructions and display all engineering design points on the rendering. Each engineering design point corresponds to construction installation, material model and design elements.
[0029] A user data collection module is used to receive user supervision data input by the user, each user supervision data includes an engineering design point, and each engineering design point corresponds to one or more of construction installation, material model and design elements;
[0030] A supervision scheme determination module is used to determine a supervision scheme based on user supervision data. User supervision data and supervision schemes correspond one to one. The supervision schemes are on-site supervision, traceability supervision or remote video supervision.
[0031] The construction supervision management module is used to adjust the time nodes of the project construction according to the user supervision data and the supervision plan, and determine the supervision node information. The supervision node information includes several supervision nodes, and each supervision node corresponds to one or more user supervision data.
[0032] As a further solution of the present invention: the supervision scheme determination module includes:
[0033] A supervision data input unit, used to input user supervision data into a supervision solution library, wherein the supervision solution library includes all engineering design points, each engineering design point corresponds to three items: construction installation, material model, and design element, and each item corresponds to at least one supervision solution for on-site supervision;
[0034] A supervision scheme matching unit, used to match the input user supervision data and output a supervision scheme selection pop-up window, which contains one or more supervision schemes. When the user supervision data contains multiple entries, the intersection of the supervision schemes corresponding to the multiple entries is taken and placed in the supervision scheme selection pop-up window;
[0035] The supervision scheme determining unit is used to receive a pop-up window selection instruction input by a user, and determine a supervision scheme for the user supervision data according to the pop-up window selection instruction.
[0036] As a further solution of the present invention: the construction monitoring management module includes:
[0037] The monitoring time determination unit is used to input the user monitoring data and the monitoring plan into the engineering construction progress library, and output the monitoring time corresponding to each user monitoring data;
[0038] A supervision node determination unit is used to determine the supervision node information according to the level order of the engineering design points and the discrete degree of the supervision time, and each supervision node corresponds to a supervision time node;
[0039] The engineering construction adjustment unit is used to adjust the time nodes of the engineering construction according to the supervision node information and the supervision time nodes, and determine the completion time of each engineering design point.
[0040] As a further solution of the present invention: the supervisory node determination unit includes:
[0041] The supervision data classification subunit is used to retrieve the level order of each engineering design point, classify all user supervision data according to the level order, and the engineering design points with a higher level order are constructed after the engineering design points with a lower level order;
[0042] The supervision data grouping subunit is used to group the classified user supervision data according to the supervision scheme, with on-site supervision as one group and others as another group;
[0043] The supervision data subdivision subunit is used to subdivide the user supervision data in each group according to the discrete degree of the supervision time, and the difference in the supervision time corresponding to any two user supervision data in the subdivision is less than the time threshold;
[0044] The supervision node information subunit is used to determine a supervision node according to each sub-category, and the corresponding supervision time node is the average value of the monitoring time in the sub-category, and the supervision node information is determined according to all the supervision nodes.
[0045] Compared with the prior art, the present invention has the following beneficial effects:
[0046] The present invention receives user supervision data input by the user, each user supervision data contains an engineering design point, each engineering design point corresponds to one or more of construction installation, material model and design elements; then determines the supervision scheme based on the user supervision data, and the supervision scheme is on-site supervision, traceability supervision or remote video supervision; adjusts the time nodes of the engineering construction according to the user supervision data and the supervision scheme, and determines the supervision node information. In this way, the present invention can adaptively adjust the time nodes of the engineering construction according to the user's supervision needs, so that one supervision node can monitor multiple engineering design points as much as possible, saving a lot of time for users, improving supervision efficiency, and better meeting user needs. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 The present invention is a flowchart of an intelligent management method based on user data.
[0048] Figure 2 The present invention is a flow chart of receiving user supervision data input by a user in an intelligent management method based on user data.
[0049] Figure 3 A flowchart for determining a supervision scheme in an intelligent management method based on user data.
[0050] Figure 4 The present invention is a flowchart for adjusting the time nodes of engineering construction in an intelligent management method based on user data.
[0051] Figure 5 The present invention is a flowchart for determining supervision node information in an intelligent management method based on user data.
[0052] Figure 6 The figure is a structural diagram of an intelligent management system based on user data. DETAILED DESCRIPTION
[0053] In order to make the purpose, technical solution and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0054] The specific implementation of the present invention is described in detail below in conjunction with specific embodiments.
[0055] like Figure 1 As shown, an embodiment of the present invention provides an intelligent management method based on user data, the method comprising the following steps:
[0056] S100, receiving an engineering design detail viewing instruction, and displaying all engineering design points on the rendering, each of which corresponds to construction installation, material model and design elements;
[0057] S200, receiving user supervision data input by a user, each user supervision data includes an engineering design point, and each engineering design point corresponds to one or more of construction installation, material model and design elements;
[0058] S300, determining a supervision plan according to the user supervision data, wherein the user supervision data and the supervision plan correspond one to one, and the supervision plan is on-site supervision, traceability supervision or remote video supervision;
[0059] S400, adjusting the time nodes of the project construction according to the user supervision data and the supervision plan, and determining the supervision node information, wherein the supervision node information includes a plurality of supervision nodes, each of which corresponds to one or more user supervision data.
[0060] It should be noted that during the construction process, customers often have a need for supervision, especially for important design parts. Currently, when customers want to supervise, it is completely based on the progress of the construction party. The supervision time of each project is often not concentrated enough, resulting in customers spending more time on supervision and low supervision efficiency. The embodiments of the present invention aim to solve the above problems.
[0061] In the embodiment of the present invention, a three-dimensional rendering will be produced first according to the user's design requirements, and all engineering design points will be marked on the rendering. Each engineering design point corresponds to construction and installation, material model and design elements. Construction and installation refers to construction technology and installation technology, material model refers to the model of consumables used in construction, and design elements refer to the effect and style after landing. The user can view the rendering in detail by entering the engineering design detail viewing instruction, and then the user needs to determine the user supervision data according to his own supervision needs. Each user supervision data contains an engineering design point, and each engineering design point corresponds to one or more of construction and installation, material model and design elements; then the embodiment of the present invention will determine the supervision plan according to the user supervision data, and one user supervision data corresponds to a supervision plan. The supervision plan is on-site supervision, traceability supervision or remote video supervision. Traceability supervision refers to supervision through traceability codes, anti-counterfeiting codes, etc. on the materials; then the embodiment of the present invention will automatically adjust the time nodes of the engineering construction according to the user supervision data and the supervision plan, and determine the supervision node information. The supervision node information includes several supervision nodes, and each supervision node corresponds to one or more user supervision data. In this way, the embodiment of the present invention can adaptively adjust the time nodes of the project construction according to the user's supervision needs, so that one supervision node can monitor as many project design points as possible, saving a lot of time for the user, improving the supervision efficiency, and better meeting the user's needs.
[0062] like Figure 2 As shown, as a preferred embodiment of the present invention, the step of receiving user supervision data input by the user specifically includes:
[0063] S201, receiving a design point selection instruction input by a user, and generating an item display pop-up window, wherein the content in the item display pop-up window includes three items: construction and installation, material model, and design elements;
[0064] S202, receiving an item display instruction, and displaying a detailed description of the selected item;
[0065] S203, receiving an item confirmation selection instruction, and generating user supervision data according to the design point selection instruction and the item confirmation selection instruction.
[0066] In the embodiment of the present invention, when the user clicks on the engineering design point displayed on the effect diagram, it is equivalent to inputting the design point selection instruction, and an item display pop-up window will be automatically generated at this time. The content in the item display pop-up window includes three items: construction installation, material model, and design elements. When the user wants to know the specific content of an item, input the item display instruction, and the detailed content description of the selected item will be automatically displayed; when the user wants to supervise the item, double-click the item, which is equivalent to inputting the item confirmation selection instruction. Finally, user supervision data is generated according to the design point selection instruction and the item confirmation selection instruction, and the user supervision data includes engineering design point and item information.
[0067] like Figure 3 As shown, as a preferred embodiment of the present invention, the step of determining the supervision scheme according to the user supervision data specifically includes:
[0068] S301, inputting user supervision data into a supervision solution library, wherein the supervision solution library includes all engineering design points, each engineering design point corresponds to three items: construction installation, material model, and design element, and each item corresponds to at least one supervision solution for on-site supervision;
[0069] S302, matching is performed through the input user supervision data, and a supervision scheme selection pop-up window is output, where the supervision scheme selection pop-up window contains one or more supervision schemes. When the user supervision data contains multiple entries, the intersection of the supervision schemes corresponding to the multiple entries is taken and placed in the supervision scheme selection pop-up window;
[0070] S303, receiving a pop-up window selection instruction input by the user, and determining a supervision scheme for the user supervision data according to the pop-up window selection instruction.
[0071] In the embodiment of the present invention, a supervision scheme library is established in advance, and the supervision scheme library includes all engineering design points. Each engineering design point corresponds to three items: construction installation, material model, and design elements. Each item corresponds to at least one supervision scheme with on-site supervision. In other words, on-site supervision is applicable to all situations. When the user supervision data is input into the supervision scheme library for matching, a supervision scheme selection pop-up window will be automatically output. The supervision scheme selection pop-up window contains one or more supervision schemes. When a user's supervision data contains multiple entries, the intersection of the supervision schemes corresponding to the multiple entries is placed in the supervision scheme selection pop-up window. Then, the user inputs the pop-up window selection instruction according to the needs, selects the content in the pop-up window, and determines the supervision scheme of the user supervision data according to the pop-up window selection instruction.
[0072] like Figure 4As shown, as a preferred embodiment of the present invention, the step of adjusting the time nodes of the engineering construction according to the user supervision data and the supervision scheme and determining the supervision node information specifically includes:
[0073] S401, inputting user supervision data and supervision scheme into the engineering construction progress library, and outputting the supervision time corresponding to each user supervision data;
[0074] S402, determining the supervision node information according to the level order of the engineering design points and the discrete degree of the supervision time, each supervision node corresponds to a supervision time node;
[0075] S403, adjusting the time nodes of the engineering construction according to the supervision node information and the supervision time nodes, and determining the completion time of each engineering design point.
[0076] In the embodiment of the present invention, a construction progress library is established in advance, and the construction progress library includes all engineering design points, each engineering design point corresponds to a predicted completion time, and each engineering design point also corresponds to a monitoring time for construction installation, material model and design elements, where the monitoring time is determined according to the estimated construction progress of each engineering design point, and each engineering design point corresponds to a level order, and the engineering design point with a high level order must be constructed after the engineering design point with a low level order, for example, the engineering design point with a three-level order needs to be constructed after the engineering design point with a two-level order. Input the user supervision data and the supervision scheme into the construction progress library, and the monitoring time corresponding to each user supervision data will be automatically output, and then the supervision node information is determined according to the level order of the engineering design point and the discrete degree of the supervision time, each supervision node corresponds to a supervision time node, and the supervision time node is the predicted time when the user can perform supervision, and finally the time node of the engineering construction will be adjusted according to the supervision node information and the supervision time node, that is, the construction progress of each engineering design point is moved forward or backward, and after moving forward or backward, the predicted completion time is corrected, and the completion time of each engineering design point is re-determined.
[0077] like Figure 5 As shown, as a preferred embodiment of the present invention, the step of determining the supervision node information according to the level order of the engineering design points and the discrete degree of the supervision time specifically includes:
[0078] S4021, retrieve the level sequence of each engineering design point, classify all user supervision data according to the level sequence, and construct the engineering design points with a higher level sequence after the engineering design points with a lower level sequence;
[0079] S4022, grouping the classified user supervision data according to the supervision plan, with on-site supervision as one group and others as another group;
[0080] S4023, subdividing the user supervision data in each group according to the discrete degree of the supervision time, and the difference of the supervision time corresponding to any two user supervision data in the subdivided categories is less than the time threshold;
[0081] S4024, determining a supervision node according to each sub-category, the corresponding supervision time node is the average value of the monitoring time in the sub-category, and determining the supervision node information according to all the supervision nodes.
[0082] In the embodiment of the present invention, in order to obtain complete supervision node information, the level order of each engineering design point will be retrieved first, and all user supervision data will be classified according to the level order, and the level order in each category is the same; then the classified user supervision data will be grouped according to the supervision plan, with on-site supervision as one group and the others as one group; then the user supervision data in each group needs to be subdivided according to the discrete degree of the supervision time, and the difference in the supervision time corresponding to any two user supervision data in the sub-category is less than the time threshold, for example, the time threshold is 3 days, so as to facilitate the subsequent forward or backward shifting of the construction progress of the engineering design point. Then a supervision node will be determined according to each sub-category, and the user supervision data in each sub-category is the multiple user supervision data corresponding to each supervision node. In addition, the corresponding supervision time node is the average value of the supervision time in the sub-category, and finally all supervision nodes are integrated to obtain the supervision node information.
[0083] like Figure 6 As shown, an embodiment of the present invention further provides an intelligent management system based on user data, the system comprising:
[0084] The engineering design review module 100 is used to receive an engineering design detail review instruction and display all engineering design points on the effect diagram. Each engineering design point corresponds to construction installation, material model and design elements.
[0085] The user data collection module 200 is used to receive user supervision data input by the user, each user supervision data includes an engineering design point, and each engineering design point corresponds to one or more of construction installation, material model and design elements;
[0086] A supervision scheme determination module 300 is used to determine a supervision scheme according to user supervision data. The user supervision data and the supervision scheme correspond one to one. The supervision scheme is on-site supervision, traceability supervision or remote video supervision.
[0087] The construction supervision management module 400 is used to adjust the time nodes of the project construction according to the user supervision data and the supervision plan, and determine the supervision node information. The supervision node information includes a number of supervision nodes, and each supervision node corresponds to one or more user supervision data.
[0088] As a preferred embodiment of the present invention, the supervision scheme determination module 300 includes:
[0089] A supervision data input unit, used to input user supervision data into a supervision solution library, wherein the supervision solution library includes all engineering design points, each engineering design point corresponds to three items: construction installation, material model, and design element, and each item corresponds to at least one supervision solution for on-site supervision;
[0090] A supervision scheme matching unit, used to match the input user supervision data and output a supervision scheme selection pop-up window, which contains one or more supervision schemes. When the user supervision data contains multiple entries, the intersection of the supervision schemes corresponding to the multiple entries is taken and placed in the supervision scheme selection pop-up window;
[0091] The supervision scheme determining unit is used to receive a pop-up window selection instruction input by a user, and determine a supervision scheme for the user supervision data according to the pop-up window selection instruction.
[0092] As a preferred embodiment of the present invention, the construction monitoring management module 400 includes:
[0093] The monitoring time determination unit is used to input the user monitoring data and the monitoring plan into the engineering construction progress library, and output the monitoring time corresponding to each user monitoring data;
[0094] A supervision node determination unit is used to determine the supervision node information according to the level order of the engineering design points and the discrete degree of the supervision time, and each supervision node corresponds to a supervision time node;
[0095] The engineering construction adjustment unit is used to adjust the time nodes of the engineering construction according to the supervision node information and the supervision time nodes, and determine the completion time of each engineering design point.
[0096] As a preferred embodiment of the present invention, the supervisory node determination unit includes:
[0097] The supervision data classification subunit is used to retrieve the level order of each engineering design point, classify all user supervision data according to the level order, and the engineering design points with a higher level order are constructed after the engineering design points with a lower level order;
[0098] The supervision data grouping subunit is used to group the classified user supervision data according to the supervision scheme, with on-site supervision as one group and others as another group;
[0099] The supervision data subdivision subunit is used to subdivide the user supervision data in each group according to the discrete degree of the supervision time, and the difference in the supervision time corresponding to any two user supervision data in the subdivision is less than the time threshold;
[0100] The supervision node information subunit is used to determine a supervision node according to each sub-category, and the corresponding supervision time node is the average value of the monitoring time in the sub-category, and the supervision node information is determined according to all the supervision nodes.
[0101] The above only describes in detail the preferred embodiments of the present invention, which is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
[0102] It should be understood that, although each step in the flow chart of each embodiment of the present invention is shown in sequence according to the indication of the arrow, these steps are not necessarily performed in sequence according to the order indicated by the arrow. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be performed in other orders. Moreover, at least a portion of the steps in each embodiment may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and the execution order of these sub-steps or stages is not necessarily performed in sequence, but can be performed in turn or alternately with at least a portion of other steps or sub-steps or stages of other steps.
[0103] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0104] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the disclosure in the specification and examples. This application is intended to cover any variations, uses or adaptations of the present disclosure, which follow the general principles of the present disclosure and include common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present disclosure are indicated by the claims.
Claims
1. An intelligent management method based on user data, characterized in that: The method comprises the following steps: Receive engineering design detail viewing instructions and display all engineering design points on the renderings. Each engineering design point corresponds to construction installation, material model and design elements; Receive user supervision data input by the user, each user supervision data includes an engineering design point, and each engineering design point corresponds to one or more of construction installation, material model and design elements; Determine the supervision plan based on user supervision data. User supervision data and supervision plan correspond one to one. The supervision plan is on-site supervision, traceability supervision or remote video supervision. The time nodes of the engineering construction are adjusted according to the user supervision data and the supervision plan, and the supervision node information is determined. The supervision node information includes a plurality of supervision nodes, and each supervision node corresponds to one or more user supervision data.
2. The intelligent management method based on user data according to claim 1, characterized in that: The step of receiving user supervision data input by the user specifically includes: Receive a design point selection instruction input by a user, and generate an item display pop-up window, wherein the content in the item display pop-up window includes three items: construction and installation, material model, and design elements; Receive an entry display instruction and display the detailed content description of the selected entry; Receive an item confirmation selection instruction, and generate user supervision data according to the design point selection instruction and the item confirmation selection instruction.
3. The intelligent management method based on user data according to claim 1, characterized in that: The step of determining the supervision scheme according to the user supervision data specifically includes: Inputting user supervision data into a supervision scheme library, wherein the supervision scheme library includes all engineering design points, each engineering design point corresponds to three items: construction installation, material model, and design elements, and each item corresponds to at least one supervision scheme for on-site supervision; Matching is performed through the input user supervision data, and a supervision scheme selection pop-up window is output. The supervision scheme selection pop-up window contains one or more supervision schemes. When the user supervision data contains multiple entries, the intersection of the supervision schemes corresponding to the multiple entries is taken and placed in the supervision scheme selection pop-up window; A pop-up window selection instruction input by a user is received, and a supervision scheme for the user supervision data is determined according to the pop-up window selection instruction.
4. The intelligent management method based on user data according to claim 1, characterized in that: The step of adjusting the time nodes of the engineering construction according to the user supervision data and the supervision plan and determining the supervision node information specifically includes: Input user supervision data and supervision plan into the project construction progress database, and output the supervision time corresponding to each user supervision data; The supervision node information is determined according to the level order of the engineering design points and the discrete degree of the supervision time, and each supervision node corresponds to a supervision time node; Adjust the time nodes of the project construction according to the supervision node information and supervision time nodes to determine the completion time of each project design point.
5. The intelligent management method based on user data according to claim 4 is characterized in that: The step of determining the supervision node information according to the level order of the engineering design points and the discrete degree of the supervision time specifically includes: Retrieve the level order of each engineering design point, classify all user supervision data according to the level order, and construct the engineering design points with higher level order after the engineering design points with lower level order; The classified user supervision data are grouped according to the supervision plan, with on-site supervision as one group and others as another group; The user supervision data in each group is subdivided according to the discrete degree of the supervision time, and the difference in the supervision time corresponding to any two user supervision data in the subdivided category is less than the time threshold; A supervision node is determined according to each sub-category, the corresponding supervision time node is the average value of the monitoring time in the sub-category, and the supervision node information is determined according to all the supervision nodes.
6. The intelligent management method based on user data according to claim 4, characterized in that: The engineering construction progress library includes all engineering design points, each of which corresponds to the monitoring time of construction installation, material model and design elements, and each of which corresponds to a level order.
7. An intelligent management system based on user data, characterized in that: The system comprises: The engineering design review module is used to receive engineering design detail review instructions and display all engineering design points on the rendering. Each engineering design point corresponds to construction installation, material model and design elements. A user data collection module is used to receive user supervision data input by the user, each user supervision data includes an engineering design point, and each engineering design point corresponds to one or more of construction installation, material model and design elements; A supervision scheme determination module is used to determine a supervision scheme based on user supervision data. User supervision data and supervision schemes correspond one to one. The supervision schemes are on-site supervision, traceability supervision or remote video supervision. The construction supervision management module is used to adjust the time nodes of the project construction according to the user supervision data and the supervision plan, and determine the supervision node information. The supervision node information includes several supervision nodes, and each supervision node corresponds to one or more user supervision data.
8. The intelligent management system based on user data according to claim 7, characterized in that: The regulatory scheme determination module includes: A supervision data input unit, used to input user supervision data into a supervision solution library, wherein the supervision solution library includes all engineering design points, each engineering design point corresponds to three items: construction installation, material model, and design element, and each item corresponds to at least one supervision solution for on-site supervision; A supervision scheme matching unit, used to match the input user supervision data and output a supervision scheme selection pop-up window, which contains one or more supervision schemes. When the user supervision data contains multiple entries, the intersection of the supervision schemes corresponding to the multiple entries is taken and placed in the supervision scheme selection pop-up window; The supervision scheme determining unit is used to receive a pop-up window selection instruction input by a user, and determine a supervision scheme for the user supervision data according to the pop-up window selection instruction.
9. The intelligent management system based on user data according to claim 7, characterized in that: The construction supervision management module includes: The monitoring time determination unit is used to input the user monitoring data and the monitoring plan into the engineering construction progress library, and output the monitoring time corresponding to each user monitoring data; A supervision node determination unit is used to determine the supervision node information according to the level order of the engineering design points and the discrete degree of the supervision time, and each supervision node corresponds to a supervision time node; The engineering construction adjustment unit is used to adjust the time nodes of the engineering construction according to the supervision node information and the supervision time nodes, and determine the completion time of each engineering design point.
10. The intelligent management system based on user data according to claim 9, characterized in that: The supervisory node determination unit includes: The supervision data classification subunit is used to retrieve the level order of each engineering design point, classify all user supervision data according to the level order, and the engineering design points with a higher level order are constructed after the engineering design points with a lower level order; The supervision data grouping subunit is used to group the classified user supervision data according to the supervision scheme, with on-site supervision as one group and others as another group; The supervision data subdivision subunit is used to subdivide the user supervision data in each group according to the discrete degree of the supervision time, and the difference in the supervision time corresponding to any two user supervision data in the subdivision is less than the time threshold; The supervision node information subunit is used to determine a supervision node according to each sub-category, and the corresponding supervision time node is the average value of the monitoring time in the sub-category, and the supervision node information is determined according to all the supervision nodes.