Intelligent management method and system for railway transportation

Through intelligent management methods and systems, the railway transportation management analysis platform is used to analyze data, optimize transportation scheduling and safety monitoring, solve the problem of poor real-time data acquisition in railway transportation, and improve transportation efficiency and safety.

CN118735231APending Publication Date: 2024-10-01JIANGSU BAITONG COMM TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411227743.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The real-time nature of data acquisition in railway transportation is poor, which results in the transportation process taking too long and reducing the efficiency of railway transportation.

Method used

Through intelligent management methods and systems, the railway transportation management analysis platform is used to read and analyze data sets, generate transportation lattices, perform data dimensionality reduction, optimize transportation scheduling, and monitor safety risks in real time to achieve intelligent transportation management.

Benefits of technology

It improves the efficiency of railway transportation, reduces transportation costs, and enhances transportation safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735231A_ABST
    Figure CN118735231A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent management method and system for railway transportation, and relates to the field of data processing. The method comprises the following steps: reading a railway transportation data set and a railway operation state data set, and configuring the data sets in a pre-management layer; determining a transportation management decision scheme; carrying out point location identification on the transportation area to generate a transportation dot matrix; carrying out dimension reduction processing on the transportation dot matrix to obtain a dimension-reduced transportation array; generating a transportation optimization management scheduling instruction; generating transportation safety monitoring data; and carrying out intelligent transportation management on the target railway. By the adoption of the method, the technical problem that in the prior art, the railway transportation efficiency is low due to the fact that the real-time performance of related data acquisition is poor and the time spent in the transportation process is too long during railway transportation is solved, and the technical effect of improving the railway transportation efficiency is achieved by improving automation and intelligence of data driving.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing technology, in particular to the field of transportation data processing management, and specifically to an intelligent management method and system for railway transportation. Background Art

[0002] Railway transportation management is a professional management activity that uses railway facilities and equipment to transport goods and passengers, involving railway network planning, operation organization, vehicle equipment management and other aspects. In railway transportation management, special attention should be paid to transportation safety and risk management to ensure the safety and reliability of the transportation process. During railway transportation, the risk of cargo loss and loss is high due to the need for multiple transfers. In addition, railway transportation is not very flexible, the departure frequency is low, and the operation organized by train takes a long time, which increases the transportation time of goods and reduces the transportation efficiency of railways.

[0003] In summary, the prior art has the technical problems of poor real-time acquisition of relevant data during railway transportation and too long a time spent on the transportation process, resulting in low railway transportation efficiency. Summary of the invention

[0004] Based on this, it is necessary to provide an intelligent management method and system for railway transportation that can improve data-driven automation and intelligence, thereby improving railway transportation efficiency and reducing transportation costs in response to the above-mentioned technical problems.

[0005] In a first aspect, an intelligent management method for railway transportation is provided, the method comprising: using a railway transportation management and analysis platform to read a railway transportation data set and a railway operation status data set, and configuring them in a pre-management layer, the pre-management layer comprising a transportation data unit and an operation data unit; performing data analysis on the pre-management layer to determine a transportation management decision plan; based on a pre-processing layer, decomposing the transportation management decision plan to perform point identification on the transportation area of ​​a target railway and generate a transportation dot matrix; based on a data dimension reduction layer, performing dimension reduction processing on the transportation dot matrix to obtain a reduced dimension transportation array; storing the reduced dimension transportation array in the railway transportation management and analysis platform to optimize the transportation scheduling of the target railway and generate a transportation optimization management scheduling instruction; based on a safety risk warning layer, performing safety monitoring on the target railway in real time to execute the transportation optimization management scheduling instruction and generate transportation safety monitoring data; based on the railway transportation data set and the railway operation status data set, using the transportation safety monitoring data as calibration data, executing transportation safety risk decisions and transportation scheduling optimization decisions to perform intelligent transportation management on the target railway.

[0006] In a second aspect, an intelligent management system for railway transportation is provided, the system comprising: a pre-management layer configuration module, the pre-management layer configuration module is used to read a railway transportation data set and a railway operation status data set using a railway transportation management and analysis platform, and is configured in the pre-management layer, the pre-management layer comprising a transportation data unit and an operation data unit; a transportation management decision scheme determination module, the transportation management decision scheme determination module is used to perform data analysis on the pre-management layer and determine a transportation management decision scheme; a transportation dot matrix generation module, the transportation dot matrix generation module is used to decompose the transportation management decision scheme based on a pre-processing layer to perform point identification on the transportation area of ​​the target railway and generate a transportation dot matrix; a dimensionality reduction transportation array acquisition module, the dimensionality reduction transportation array acquisition module is used to perform dimensionality reduction on the transportation dot matrix based on a data dimensionality reduction layer Dimensionality reduction processing is performed to obtain a reduced-dimensional transportation array; a transportation optimization management and scheduling instruction generation module is used to store the reduced-dimensional transportation array in the railway transportation management and analysis platform to optimize the target railway transportation scheduling and generate transportation optimization management and scheduling instructions; a transportation safety monitoring data generation module is used to perform safety monitoring on the target railway in real time based on the safety risk early warning layer to execute the transportation optimization management and scheduling instructions and generate transportation safety monitoring data; an intelligent transportation management module is used to perform transportation safety risk decisions and transportation scheduling optimization decisions on the target railway based on the railway transportation data set and the railway operation status data set, using the transportation safety monitoring data as calibration data to perform intelligent transportation management on the target railway.

[0007] According to a third aspect, a computer device is provided, comprising a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps according to the first aspect when executing the computer program.

[0008] According to a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the steps described in the first aspect are implemented.

[0009] The above-mentioned intelligent management method and system for railway transportation adopts this method to solve the technical problem of low railway transportation efficiency due to poor real-time acquisition of relevant data during railway transportation in the prior art and too long time spent in the transportation process. By improving data-driven automation and intelligence, the technical effect of improving railway transportation efficiency is achieved.

[0010] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 is a flow chart of an intelligent management method for railway transportation in one embodiment; Figure 2 A schematic diagram of a flow chart of a training transportation scheduling optimization channel of an intelligent management method for railway transportation in one embodiment; Figure 3 is a structural block diagram of an intelligent management system for railway transportation in one embodiment; Figure 4 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment.

[0012] Explanation of the reference numerals: pre-management level configuration module 11, transport management decision-making scheme determination module 12, transport dot matrix generation module 13, dimension reduction transport array acquisition module 14, transport optimization management scheduling instruction generation module 15, transport safety monitoring data generation module 16, intelligent transport management module 17. DETAILED DESCRIPTION

[0013] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0014] like Figure 1 As shown, the present application provides an intelligent management method for railway transportation, the method comprising: Using the railway transportation management and analysis platform to read the railway transportation data set and the railway operation status data set, and configure them in the pre-management layer, the pre-management layer includes a transportation data unit and an operation data unit; Intelligent management of railway transportation is a complex management system. With the help of multiple sensors and information technology, the information of railway transportation is transmitted to the management system, so that the management system can make timely decisions according to preset processing plans, and intelligently handle the traffic management, comprehensive scheduling, resource allocation and other tasks of railway transportation. By providing intelligent management methods for railway transportation, the efficiency of railway transportation management is improved.

[0015] The railway transportation management and analysis platform is a comprehensive system that integrates data analysis, processing, display and decision support functions. Through the railway transportation management and analysis platform, railway transportation data sets and railway operation status data sets can be read, analyzed and used to provide strong data support for the pre-management layer of railway transportation, wherein the railway transportation data set refers to specific data on railway transportation conditions, including transportation safety data and transportation demand data; the railway operation status data set refers to specific data on railway operation conditions, including operation status data, operation characteristic data, and operation demand data; the pre-management layer is a module in the railway transportation management and analysis platform that pre-processes, analyzes and configures transportation data and operation data, and provides a basis for subsequent decision-making and scheduling, and is used to obtain railway transportation and railway operation conditions. The pre-management layer includes a transportation data unit and an operation data unit, wherein the transportation data The data unit mainly processes various data related to railway transportation, such as cargo types, transportation volume, transportation time, transportation cost, etc. Through the transportation data unit, the overall situation and trend of railway transportation can be understood, and a decision-making basis can be provided for optimizing transportation plans and improving transportation efficiency; the operation data unit mainly focuses on data on railway operation status, such as train speed, position, signal status, equipment health status, etc. The operation data unit reflects the situation of railway operation in real time, which plays an important role in timely discovering and handling problems in operation and ensuring the safety and stability of railway transportation; the railway transportation data set and the railway operation status data set are read and configured in the pre-management layer through the railway transportation management and analysis platform, so as to realize centralized management and unified analysis of the railway transportation data set and the railway operation status data set, provide data support for subsequent optimization of transportation links, and improve the management level and efficiency of railway transportation.

[0016] Collect information about the transportation area in the target railway based on multiple data sources to obtain a railway transportation data set and a railway operation status data set, wherein the railway transportation data set includes transportation safety data and transportation demand data, and the railway operation status data set includes operation status data, operation characteristic data, and operation demand data; Constructing the transportation data unit based on the transportation safety data and the transportation demand data; constructing the operation data unit based on the operation characteristic data and the operation requirement data, and configuring the operation status data to the constructed operation data unit; Data verification is performed on the transport data unit and the operation data unit respectively, and functional testing is performed according to the verification results. The transport data unit and the operation data unit that have passed the test are integrated to generate the pre-management layer.

[0017] Multiple data sources refer to multiple data sources involved in a single application. The target railway refers to any railway that needs to be studied, which is set by the staff. The transportation area is the area where the railway transports goods, such as train tracks. Based on the multiple data sources, information is collected on the transportation area in the target railway to obtain a railway transportation data set and a railway operation status data set. The railway transportation data set includes transportation safety data and transportation demand data, wherein the transportation safety data includes information such as the safe operation status and safety hazards of the train. The transportation demand data refers to the demand for railway transportation, such as the transportation volume, transportation direction, and transportation time of goods and passengers. The railway operation status data set includes operation status data, operation characteristic data, and operation demand data. The operation status data describes the real-time operation status of railway equipment, such as the speed, position, and signal status of the train. The operation characteristic data includes the performance characteristics and operation rules of railway equipment, such as the acceleration performance and braking performance of the train. The operation demand data refers to various resource information required for railway operation, such as power supply and water resources. The transport data set and the railway operation status data set guarantee the normal operation of the railway and the ability to respond to emergencies; the transport data unit is constructed based on the transport safety data and the transport demand data, and the transport data unit is used to process and analyze data related to transport safety and transport demand; the operation data unit is constructed according to the operation characteristic data and the operation demand data, and the operation data unit is used to monitor and analyze the operation status of the railway; the transport data unit and the operation data unit are respectively verified to ensure the accuracy and integrity of the data, and to avoid deviations in subsequent analysis and decision-making due to data errors or omissions; a functional test is performed according to the data verification results, and the functional test is to verify whether the constructed transport data unit and the operation data unit meet the preset functional requirements and whether the data can be processed and analyzed correctly; the transport data unit and the operation data unit that pass the test are integrated, and the unit integration refers to retaining the transport data unit and the operation data unit that pass the data verification and the functional test, and sorting and merging them to generate the pre-management layer. As an important part of the railway transportation management and analysis platform, the pre-management layer will be responsible for processing and analyzing the relevant data of railway transportation and operation status, and provide data support and decision-making basis for subsequent decision-making and scheduling. Through information collection and data processing based on multiple data sources, a comprehensive and accurate railway transportation management and analysis platform is built to provide strong guarantees for the safe, efficient and sustainable development of railway transportation.

[0018] Analyze the data of the pre-management layer to determine the transportation management decision plan; The pre-management layer integrates the transport data unit and the operation data unit through unit integration, including the railway transport data set and the railway operation status data set. Data analysis refers to extracting information about railway transport from the railway transport data set and the railway operation status data set, and analyzing it based on the information. In this application, by performing data analysis on the pre-management layer, it is possible to obtain transportation safety data, evaluate the safety status of railway transport, identify potential safety hazards, understand the operating status and performance characteristics of railway equipment, discover potential operating problems and optimize them. By analyzing the operation demand data, it is possible to predict the resource requirements required for railway operation and obtain a transportation management decision plan, which includes the formulation of transportation plans, optimization of resource allocation, adjustment of operation scheduling, etc. By performing data analysis on the pre-management layer, a scientific and reasonable transportation management decision plan can be determined to provide a strong guarantee for the safety, efficiency and sustainable development of railway transportation.

[0019] Based on the preprocessing layer, the transportation management decision plan is decomposed to mark the transportation area of ​​the target railway and generate a transportation dot matrix; Based on the preprocessing layer, the preprocessing layer refers to the module for processing the transportation management decision plan, decomposing the transportation management decision plan, that is, in the preprocessing layer, the transportation management decision plan is decomposed into multiple components, including transportation routes, transportation time, transportation volume, transportation methods, etc., breaking down the complex decision plan into smaller and more manageable parts to facilitate subsequent point identification and dot matrix generation; point identification refers to the location marking of multiple paths of the transportation management decision plan, so as to obtain a dot matrix containing multiple points in the target railway transportation area, recorded as a transportation dot matrix. The preprocessing layer can effectively transform complex transportation management decision plans into intuitive and easy-to-understand transportation dot matrices, providing strong support for subsequent data analysis and decision support.

[0020] The input port of the preprocessing layer is communicatively connected to the output port of the pre-management layer, and the output port of the preprocessing layer is communicatively connected to the input port of the data dimension reduction layer; Decomposing the transportation management decision plan to extract multiple transportation management paths; Determine a first transportation starting point and a first transportation ending point based on the first transportation target; Using the first transport starting point and the first transport ending point as index data, traversing the plurality of transport management paths for matching, and generating a transport management path set for the first transport target; The transport management path set is point-marked according to the transport time sequence, and the marked points are integrated to generate the transport dot matrix.

[0021] The input port of the preprocessing layer is connected to the output port of the premanagement layer, that is, the transportation management decision plan data processed by the premanagement layer will be directly passed to the preprocessing layer for further processing; the output port of the preprocessing layer is connected to the input port of the data dimensionality reduction layer, so that after the preprocessing layer completes its task, the processing result is passed to the data dimensionality reduction layer for subsequent data analysis and dimensionality reduction operations; the transportation management decision plan is decomposed through the preprocessing layer, that is, multiple transportation management paths in the transportation management decision plan are extracted, and the transportation management path refers to all manageable transportation roads in the area, including all starting points and end points; the transportation target is recorded as the first transportation target, and the starting point related to the first transportation target is determined through the processing layer The first transport start point and the first transport end point are recorded as the first transport start point and the first transport end point. Based on the first transport start point and the first transport end point as index data, the preprocessing layer will traverse the multiple transport management paths and find the path that matches these two points, thereby generating a transport management path set for the first transport target; for the generated transport management path set, the preprocessing layer will mark the points on each path according to the transportation time sequence, such as departure time, arrival time, etc. All points passed by each path will be marked and given specific identification, thereby obtaining a dot matrix containing multiple points in the target railway transportation area, that is, a transport dot matrix, the transport dot matrix shows the location of the identification points, and the transport path and time sequence are reflected through the connection relationship of the points. The preprocessing layer effectively transforms complex transportation management decision plans into intuitive and easy-to-understand transportation dot matrices, providing an important foundation for subsequent decision support and data analysis.

[0022] Based on the data dimension reduction layer, the transport lattice is subjected to dimension reduction processing to obtain a dimension-reduced transport array; The purpose of performing dimensionality reduction processing on the transport lattice based on the data dimensionality reduction layer is to reduce the complexity and dimension of the data. That is, since the point identifications in the transport lattice are too dense, lattice dimensionality reduction is performed to retain only the initial point, the end point and the turning point, and the redundant points in the transport lattice are filtered out to obtain a reduced-dimensional transport array. Through the processing of the data dimensionality reduction layer, the original transport lattice is simplified and optimized, providing a more efficient and accurate data basis for subsequent data analysis and decision-making.

[0023] The input port of the data dimension reduction layer is communicatively connected with the output port of the preprocessing layer; Acquire the lattice distribution of the transport lattice based on the data dimension reduction layer; Constructing a probability distribution function of lattice similarity, performing dimensionality reduction processing on the lattice distribution of the transport lattice, and generating a divergence of the first dimensionality reduction similarity of the transport lattice as a stage dimensionality reduction result; The dimension reduction transport array is constructed based on the dimension reduction results of the stages.

[0024] The probability distribution function of the dot matrix similarity is as follows: ; in, To characterize the measure of the closeness between the dot matrix distribution of the transport dot matrix and the dimension reduction dot matrix distribution of the transport dot matrix, let The dimension reduction process is performed with the constraint condition of tending to 0. To characterize the divergence of the similarity between the lattice distribution of the transport lattice and the dimension reduction lattice distribution of the transport lattice, is a dimension reduction lattice distribution based on the transport lattice about the lattice With dot matrix The similarity probability of For the dot matrix distribution based on the transport dot matrix With dot matrix The similarity probability of (i, j) is any coordinate point in the transport lattice, and the value range of i is 0 The input port of the data dimensionality reduction layer is communicatively connected with the output port of the preprocessing layer. After receiving the transport dot matrix output by the preprocessing layer, the data dimensionality reduction layer further performs dimensionality reduction processing to extract key information and simplify the data structure, obtain the dot matrix distribution of the transport dot matrix, the dot matrix distribution reflects the relationship and distribution pattern between each point in the transport dot matrix, and construct a dot matrix similarity probability distribution function. In the dot matrix similarity probability distribution function, To characterize the measure of the closeness between the dot matrix distribution of the transport dot matrix and the dimension reduction dot matrix distribution of the transport dot matrix, let The dimension reduction process is performed with the constraint condition of tending to 0. To characterize the divergence of the similarity between the lattice distribution of the transport lattice and the dimension reduction lattice distribution of the transport lattice, is a dimension reduction lattice distribution based on the transport lattice about the lattice With dot matrix The similarity probability of For the dot matrix distribution based on the transport dot matrix With dot matrix The similarity probability of (i, j) is any coordinate point in the transport lattice, and the value range of i is 0 The reduced-dimensional transport array is stored in the railway transport management and analysis platform to optimize the target railway transport scheduling and generate a transport optimization management and scheduling instruction; The reduced-dimensional transport array is stored in the railway transport management and analysis platform through a suitable interface. After receiving the reduced-dimensional transport array, the railway transport management and analysis platform optimizes the target railway transport scheduling, and the optimization includes the selection of transport routes, the arrangement of transport sequences, the allocation of transport resources, etc. During the optimization process, the railway transport management and analysis platform integrates multiple factors, such as transport costs, transport efficiency, and transport safety, to find the optimal transport scheduling solution and generate transport optimization management scheduling instructions. Through the adjustment and optimization of the reduced-dimensional transport array by the railway transport management and analysis platform, the reduced-dimensional transport array can play a role in actual transport management, providing powerful data support and analysis tools for the optimization of railway transport scheduling.

[0025] Convert the reduced-dimensional transport array into a transport database format; Transmitting and storing the reduced-dimensional transport array to the railway transport management and analysis platform based on the transport database format; Constructing a transport scheduling optimization channel, optimizing and analyzing the reduced-dimensional transport array in the railway transport management and analysis platform, and generating optimization analysis results; The transportation optimization management scheduling instruction is generated based on the optimization analysis result.

[0026] After the data dimensionality reduction layer completes the dimensionality reduction processing, the generated dimensionality reduction transport array needs to be converted from a matrix format to a database table format to ensure data consistency and improve the processability of the dimensionality reduction transport array. After the format conversion is completed, the dimensionality reduction transport array will be transmitted to the railway transportation management and analysis platform in a transportation database format. The railway transportation management and analysis platform needs to have a corresponding data storage mechanism, such as a database system, a file system, etc., to achieve reliable storage of the dimensionality reduction transport array; in the railway transportation management and analysis platform, in order to optimize and analyze the dimensionality reduction transport array, it is necessary to construct a special transportation scheduling optimization channel to receive the dimensionality reduction transport array as input, and perform in-depth optimization analysis on it to generate optimization analysis results, including optimized transportation routes, optimized transportation timings, optimized resource allocation plans, etc. The accuracy and effectiveness of the optimization analysis results will directly affect the decision-making and implementation effects of subsequent transportation scheduling. According to the optimization analysis results, the railway transportation management and analysis platform will generate transportation optimization management scheduling instructions, optimization measures and suggestions for specific transportation tasks, aiming to improve transportation efficiency, reduce costs and enhance safety. The reduced-dimensional transportation array is converted, transmitted and stored in the railway transportation management and analysis platform through format conversion, transmission and storage, and optimization analysis is carried out by constructing a transportation scheduling optimization channel, and finally practical transportation optimization management scheduling instructions are generated to achieve the effect of improving transportation efficiency and safety.

[0027] like Figure 2As shown, historical transportation scheduling data is retrieved based on historical scheduling logs; Using a heuristic algorithm, combining the real-time transportation scheduling data with the historical transportation scheduling data for data annotation, to obtain a constructed data set, wherein the constructed data set includes a training set, a supervision set, and a validation set; The training set, the supervision set, and the verification set are used to perform supervised training and verification on the transportation scheduling optimization channel until the transportation scheduling optimization channel converges or the accuracy reaches a preset requirement and is output.

[0028] By accessing the historical dispatch log system, historical transport dispatch data is retrieved, the historical transport dispatch data records the transport dispatch situation in the past time period, including key information such as transport route, transport time, transport volume, and transport cost, and the historical transport dispatch data and real-time transport dispatch data are annotated using a heuristic algorithm, wherein real-time transport dispatch data refers to transport dispatch data synchronized with time, and a heuristic algorithm is an optimization algorithm based on experience and rules, which can combine historical data and real-time data to annotate data through certain rules and strategies. The rules in this application are specified by the staff based on expert experience and historical data, and are not limited here, and a constructed data set is obtained, the constructed data set includes a training set, a supervision set, and a verification set; the training set is used for the transport dispatch optimization channel, so that the transport dispatch optimization channel can learn and identify the rules in the training set, and the supervision set refers to the one used to supervise and adjust the transport dispatch optimization channel during the training process to ensure that learning and optimization are carried out in the expected direction; the verification set is used to verify and evaluate the transport dispatch optimization channel after the training is completed to verify the performance of the transport dispatch optimization channel. Construct a transport scheduling optimization channel, which is a neural network model that can be continuously iteratively optimized in machine learning, and is obtained through supervised training with a training set. The constructed data set includes a training set, a supervision set, and a verification set. The transport scheduling optimization channel is supervised and trained with the training set. When the output result of the model tends to converge, the accuracy of the output result of the transport scheduling optimization channel is verified with the verification set to obtain the preset requirements for convergence or accuracy. The preset requirements can be customized by technicians in this field based on actual conditions, for example: 95%. When the accuracy of the output result of the transport scheduling optimization channel is greater than or equal to the preset requirements, the transport scheduling optimization channel is obtained. By constructing a transport scheduling optimization channel based on a neural network, the efficiency and accuracy of obtaining the optimization analysis results can be improved.

[0029] Based on the safety risk early warning layer, the target railway is monitored in real time for executing the transportation optimization management and dispatching instructions, and transportation safety monitoring data is generated; The safety risk warning layer is responsible for real-time monitoring of safety risks in the transportation process to ensure the smooth progress of the transportation process. It can receive and execute transportation optimization management and dispatching instructions in real time. During the execution of the transportation optimization management and dispatching instructions, it continuously conducts all-round safety monitoring of the target railway, including real-time monitoring of railway lines, train operation status, equipment and facilities, and surrounding environment. By collecting and processing a large amount of real-time data, the safety risk warning layer can promptly discover potential safety hazards and generate transportation safety monitoring data based on the monitoring situation; the transportation safety monitoring data includes real-time monitored safety risk information, as well as risk assessment, warning, and recommended response measures; the safety risk warning layer can conduct real-time safety monitoring of the target railway's execution of transportation optimization management and dispatching instructions, and generate detailed transportation safety monitoring data, providing a strong guarantee for the safe and efficient operation of railway transportation.

[0030] Based on the railway transportation data set and the railway operation status data set, the transportation safety monitoring data is used as calibration data to execute transportation safety risk decision and transportation scheduling optimization decision to carry out intelligent transportation management of the target railway.

[0031] In the railway transportation management and analysis platform, detailed information about railway lines, train operations, equipment status, and historical transportation records can be obtained based on the railway transportation data set and the railway operation status data set; the transportation safety monitoring data can reflect the actual safety status of the current railway transportation, including any abnormal conditions or potential risks that may occur, and optimize the transportation scheduling by combining with the railway transportation data set and the railway operation status data set; when executing the transportation safety risk decision, according to the comprehensive data analysis results, the potential safety risks such as equipment failure, weather influence, human factors, etc. are automatically identified and warned, and transportation scheduling is optimized. In terms of transportation scheduling optimization decision, the transportation scheduling plan is dynamically optimized according to the real-time transportation safety monitoring data, railway transportation data set, and railway operation status data set. This includes adjusting the train operation schedule, optimizing the transportation route, and reasonably allocating transportation resources, etc., to improve transportation efficiency, reduce transportation costs, and reduce safety risks. By using the above multiple data sets, intelligent transportation management of the target railway is realized, the efficiency and accuracy of transportation management are improved, and a strong guarantee is provided for the safe and efficient operation of railway transportation.

[0032] In summary, the present application has the following beneficial effects: The railway transportation data set and railway operation status data set are read through the railway transportation management and analysis platform, achieving data-driven management decision-making, automation and intelligent scheduling; Improve the efficiency of railway transportation based on data-driven intelligent scheduling; By optimizing railway transportation decisions, the technical effect of reducing safety risks is achieved.

[0033] like Figure 3 As shown, the embodiment of the present application includes an intelligent management system for railway transportation, and the system includes: A pre-management layer configuration module 11, which is used to read a railway transportation data set and a railway operation status data set using a railway transportation management and analysis platform, and is configured in a pre-management layer, wherein the pre-management layer includes a transportation data unit and an operation data unit; A transport management decision scheme determining module 12, wherein the transport management decision scheme determining module 12 is used to perform data analysis on the pre-management layer to determine a transport management decision scheme; A transport dot matrix generation module 13, which is used to decompose the transport management decision plan based on the preprocessing layer, mark the transport area of ​​the target railway, and generate a transport dot matrix; A reduced-dimensional transport array acquisition module 14, wherein the reduced-dimensional transport array acquisition module 14 is used to perform a dimensionality reduction process on the transport lattice based on a data dimensionality reduction layer to obtain a reduced-dimensional transport array; A transport optimization management scheduling instruction generation module 15, wherein the transport optimization management scheduling instruction generation module 15 is used to store the reduced-dimensional transport array in the railway transport management analysis platform to optimize the target railway transport scheduling and generate a transport optimization management scheduling instruction; A transportation safety monitoring data generating module 16, which is used to perform safety monitoring on the target railway executing the transportation optimization management and dispatching instructions in real time based on the safety risk early warning layer, and generate transportation safety monitoring data; The intelligent transportation management module 17 is used to perform intelligent transportation management on the target railway based on the railway transportation data set and the railway operation status data set, using the transportation safety monitoring data as calibration data, executing transportation safety risk decisions and transportation scheduling optimization decisions.

[0034] Furthermore, the embodiment of the present application also includes: A railway operation status data set module, which is used to collect information on the transportation area within the target railway based on multiple data sources, and obtain a railway transportation data set and a railway operation status data set, wherein the railway transportation data set includes transportation safety data and transportation demand data, and the railway operation status data set includes operation status data, operation characteristic data, and operation demand data; A transport data unit construction module, the transport data unit construction module is used to construct the transport data unit based on the transport safety data and the transport demand data; An operation data unit construction module, the operation data unit construction module is used to construct the operation data unit based on the operation characteristic data and the operation requirement data, and configure the operation status data to the constructed operation data unit; The unit integration module is used to perform data verification on the transport data unit and the operation data unit respectively, perform functional testing according to the verification results, integrate the transport data unit and the operation data unit that have passed the test, and generate the pre-management layer.

[0035] Furthermore, the embodiment of the present application also includes: A port communication connection module, wherein the port communication connection module is used for communication connection between the input port of the preprocessing layer and the output port of the pre-management layer, and the output port of the preprocessing layer is used for communication connection with the input port of the data dimension reduction layer; A transport management path extraction module, the transport management path extraction module is used to decompose the transport management decision plan to extract multiple transport management paths; A transport start and end point determination module, the transport start and end point determination module is used to determine a first transport start point and a first transport end point based on a first transport target; A transport management path set generation module, the transport management path set generation module is used to use the first transport starting point and the first transport ending point as index data, traverse the multiple transport management paths for matching, and generate a transport management path set for the first transport target; The transport dot matrix integration module is used to mark the points of the transport management path set according to the transport sequence, and integrate the marked points to generate the transport dot matrix.

[0036] Furthermore, the embodiment of the present application also includes: A port connection module, the port connection module is used to communicate and connect the input port of the data dimensionality reduction layer with the output port of the preprocessing layer; A dot matrix distribution acquisition module, the dot matrix distribution acquisition module is used to obtain the dot matrix distribution of the transport dot matrix based on the data dimension reduction layer; A stage dimension reduction result obtaining module, wherein the stage dimension reduction result obtaining module is used to construct a lattice similarity probability distribution function, perform dimensionality reduction processing on the lattice distribution of the transport lattice, and generate a divergence of a first dimensionality reduction similarity of the transport lattice as a stage dimension reduction result; A dimension reduction transport array construction module is used to construct the dimension reduction transport array based on the dimension reduction result of the stage.

[0037] Furthermore, the embodiment of the present application also includes: The dot matrix similarity probability distribution function module is used for the dot matrix similarity probability distribution function as follows: ; in, To characterize the measure of the closeness between the dot matrix distribution of the transport dot matrix and the dimension reduction dot matrix distribution of the transport dot matrix, let The dimension reduction process is performed with the constraint condition of tending to 0. To characterize the divergence of the similarity between the lattice distribution of the transport lattice and the dimension reduction lattice distribution of the transport lattice, is a dimension reduction lattice distribution based on the transport lattice about the lattice With dot matrix The similarity probability of For the dot matrix distribution based on the transport dot matrix With dot matrix The similarity probability of (i, j) is any coordinate point in the transport lattice, and the value range of i is 0 Furthermore, the embodiment of the present application also includes: A transport database format generation module, the transport database format generation module is used to convert the reduced-dimensional transport array into a format to generate a transport database format; A railway transportation management and analysis platform transmission module, the railway transportation management and analysis platform transmission module is used to transmit and store the reduced-dimensional transportation array to the railway transportation management and analysis platform based on the transportation database format; An optimization analysis result generation module, which is used to construct a transport scheduling optimization channel, optimize and analyze the reduced-dimensional transport array in the railway transport management and analysis platform, and generate optimization analysis results; A transport optimization management scheduling instruction generation module is used to generate the transport optimization management scheduling instruction based on the optimization analysis result.

[0038] Furthermore, the embodiment of the present application also includes: A historical transportation scheduling data retrieval module, wherein the historical transportation scheduling data retrieval module is used to retrieve historical transportation scheduling data based on historical scheduling logs; A data set construction module, wherein the data set construction module is used to use a heuristic algorithm to combine the real-time transportation scheduling data with the historical transportation scheduling data for data annotation to obtain a constructed data set, wherein the constructed data set includes a training set, a supervision set, and a verification set; The transport scheduling optimization channel training module is used to use the training set, the supervision set, and the verification set to perform supervised training and verification on the transport scheduling optimization channel until the transport scheduling optimization channel converges or the accuracy reaches the preset requirements for output.

[0039] For the specific embodiment of the intelligent management system for railway transportation, please refer to the embodiment of the intelligent management method for railway transportation mentioned above, which will not be repeated here. The above modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0040] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 4 As shown. The computer device includes a processor, a memory and a network interface connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store news data and data such as time decay factors. The network interface of the computer device is used to communicate with an external terminal through a network connection. The computer program is executed by the processor to implement an intelligent management method for railway transportation.

[0041] Those skilled in the art will understand that Figure 4 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0042] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps of an intelligent management method for railway transportation when executing the computer program.

[0043] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the intelligent management method for railway transportation are implemented.

[0044] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0045] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. An intelligent management method for railway transportation, characterized in that: The method comprises: Using the railway transportation management and analysis platform to read the railway transportation data set and the railway operation status data set, and configure them in the pre-management layer, the pre-management layer includes a transportation data unit and an operation data unit; Analyze the data of the pre-management layer to determine the transportation management decision plan; Based on the preprocessing layer, the transportation management decision plan is decomposed to mark the transportation area of ​​the target railway and generate a transportation dot matrix; Based on the data dimension reduction layer, the transport lattice is subjected to dimension reduction processing to obtain a dimension-reduced transport array; The reduced-dimensional transport array is stored in the railway transport management and analysis platform to optimize the target railway transport scheduling and generate a transport optimization management and scheduling instruction; Based on the safety risk early warning layer, the target railway is monitored in real time for executing the transportation optimization management and dispatching instructions, and transportation safety monitoring data is generated; Based on the railway transportation data set and the railway operation status data set, the transportation safety monitoring data is used as calibration data to execute transportation safety risk decision and transportation scheduling optimization decision to carry out intelligent transportation management of the target railway.

2. The method according to claim 1, characterized in that The railway transportation management and analysis platform is used to read the railway transportation data set and the railway operation status data set, and is configured in the pre-management layer, wherein the pre-management layer includes a transportation data unit and an operation data unit. The method includes: Collect information about the transportation area in the target railway based on multiple data sources to obtain a railway transportation data set and a railway operation status data set, wherein the railway transportation data set includes transportation safety data and transportation demand data, and the railway operation status data set includes operation status data, operation characteristic data, and operation demand data; Constructing the transportation data unit based on the transportation safety data and the transportation demand data; constructing the operation data unit based on the operation characteristic data and the operation requirement data, and configuring the operation status data to the constructed operation data unit; Data verification is performed on the transport data unit and the operation data unit respectively, and functional testing is performed according to the verification results. The transport data unit and the operation data unit that have passed the test are integrated to generate the pre-management layer.

3. The method according to claim 1, characterized in that Based on the preprocessing layer, the transportation management decision plan is decomposed to mark the transportation area of ​​the target railway and generate a transportation dot matrix, and the method includes: The input port of the preprocessing layer is communicatively connected to the output port of the pre-management layer, and the output port of the preprocessing layer is communicatively connected to the input port of the data dimension reduction layer; Decomposing the transportation management decision plan to extract multiple transportation management paths; Determine a first transportation starting point and a first transportation ending point based on the first transportation target; Using the first transport starting point and the first transport ending point as index data, traversing the plurality of transport management paths for matching, and generating a transport management path set for the first transport target; The transport management path set is point-marked according to the transport time sequence, and the marked points are integrated to generate the transport dot matrix.

4. The method according to claim 1, characterized in that Based on the data dimension reduction layer, the transport point matrix is ​​subjected to dimension reduction processing to obtain a dimension-reduced transport array, and the method includes: The input port of the data dimension reduction layer is communicatively connected with the output port of the preprocessing layer; Acquire the lattice distribution of the transport lattice based on the data dimension reduction layer; Constructing a probability distribution function of lattice similarity, performing dimensionality reduction processing on the lattice distribution of the transport lattice, and generating a divergence of the first dimensionality reduction similarity of the transport lattice as a stage dimensionality reduction result; The dimension reduction transport array is constructed based on the dimension reduction results of the stages.

5. The method according to claim 4, characterized in that The probability distribution function of lattice similarity is as follows: ; in, To characterize the measure of the closeness between the dot matrix distribution of the transport dot matrix and the dimension reduction dot matrix distribution of the transport dot matrix, let The dimension reduction process is performed with the constraint condition of tending to 0. To characterize the divergence of the similarity between the lattice distribution of the transport lattice and the dimension reduction lattice distribution of the transport lattice, is a dimension reduction lattice distribution based on the transport lattice about the lattice With dot matrix The similarity probability of For the dot matrix distribution based on the transport dot matrix With dot matrix The similarity probability of (i, j) is any coordinate point in the transport lattice, the value range of i is 0<j<n, and n is the total number of coordinate points in the transport lattice.

6. The method according to claim 1, characterized in that The reduced-dimensional transport array is stored in the railway transport management and analysis platform to optimize the target railway transport scheduling and generate a transport optimization management and scheduling instruction, the method comprising: Convert the reduced-dimensional transport array into a transport database format; Transmitting and storing the reduced-dimensional transport array to the railway transport management and analysis platform based on the transport database format; Constructing a transport scheduling optimization channel, optimizing and analyzing the reduced-dimensional transport array in the railway transport management and analysis platform, and generating optimization analysis results; The transportation optimization management scheduling instruction is generated based on the optimization analysis result.

7. The method according to claim 1, characterized in that Construct a transportation scheduling optimization channel, including: Retrieve historical transportation scheduling data based on historical scheduling logs; Using a heuristic algorithm, combining the real-time transportation scheduling data with the historical transportation scheduling data for data annotation, to obtain a constructed data set, wherein the constructed data set includes a training set, a supervision set, and a verification set; The training set, the supervision set, and the verification set are used to perform supervised training and verification on the transportation scheduling optimization channel until the transportation scheduling optimization channel converges or the accuracy reaches a preset requirement and is output.

8. An intelligent management system for railway transportation, characterized in that: The system comprises: A pre-management layer configuration module, which is used to read a railway transportation data set and a railway operation status data set using a railway transportation management and analysis platform, and is configured in a pre-management layer, wherein the pre-management layer includes a transportation data unit and an operation data unit; A transport management decision scheme determination module, the transport management decision scheme determination module is used to perform data analysis on the pre-management layer to determine a transport management decision scheme; A transport dot matrix generation module, which is used to decompose the transport management decision plan based on the preprocessing layer, mark the transport area of ​​the target railway, and generate a transport dot matrix; A reduced-dimensional transport array acquisition module, wherein the reduced-dimensional transport array acquisition module is used to perform a dimensionality reduction process on the transport lattice based on a data dimensionality reduction layer to obtain a reduced-dimensional transport array; A transport optimization management scheduling instruction generation module, the transport optimization management scheduling instruction generation module is used to store the reduced-dimensional transport array in the railway transport management analysis platform to optimize the target railway transport scheduling and generate a transport optimization management scheduling instruction; A transportation safety monitoring data generation module, which is used to perform safety monitoring on the target railway executing the transportation optimization management and scheduling instructions in real time based on the safety risk early warning layer, and generate transportation safety monitoring data; An intelligent transportation management module is used to perform intelligent transportation management on the target railway based on the railway transportation data set and the railway operation status data set, using the transportation safety monitoring data as calibration data, executing transportation safety risk decisions and transportation scheduling optimization decisions.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.