Railway operation risk dynamic optimization method and device based on N-K model

By combining the N-K model and the system dynamics model, it comprehensively reflects the coupling relationship and dynamic changes of railway operation risk factors, solves the problems of inaccurate and untimely risk assessment in the existing technology, and achieves higher risk assessment accuracy and safety. sex.

CN118735271AInactive Publication Date: 2024-10-01NANJING ZHONGCHE PUZHEN URBAN RAIL VEHICLE CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411125892.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing railway operation risk assessment technology has problems such as incomplete coupling relationships of risk factors, inaccurate risk assessment results, and neglect of dynamic changes in risks, resulting in incomplete and outdated assessment results.

Method used

A combination method based on the N-K model and the system dynamics model is used to obtain railway operation risk information, calculate the static risk coupling value through the N-K model, and input it into the system dynamics model to obtain the dynamic risk coupling value, and issue non-safety status alarms to achieve Dynamic risk optimization.

Benefits of technology

It improves the accuracy and timeliness of risk assessment and ensures the safety of railway operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735271A_ABST
    Figure CN118735271A_ABST
Patent Text Reader

Abstract

The invention discloses a railway operation risk dynamic optimization method and device based on an N-K model, and belongs to the technical field of railway operation, and the method comprises the steps: obtaining railway operation risk information, the railway operation risk information comprises a first-level risk and a probability thereof, and the first-level risk comprises a second-level risk and a probability thereof; in response to the fact that the probability of the first-level risk is smaller than a corresponding first-level risk threshold value, inputting the probability of the first-level risk into an N-K model to obtain a static risk coupling value; inputting the static risk coupling value and the probability of the corresponding secondary risk into a system dynamics model to obtain a dynamic risk coupling value; in response to the fact that the dynamic risk coupling value is larger than the train system risk threshold value, an alarm that railway operation is in an unsafe state is given out, railway operation risk dynamic optimization is achieved, the method has higher risk assessment accuracy, integrity and timeliness, and the railway operation safety can be more effectively guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method and a device for dynamically optimizing railway operation risk based on a NK model, and belongs to the technical field of railway operation. Background Art

[0002] The safety of railway operation has attracted more and more attention. Railway operation is a complex system involving many operational risk factors, all of which will have an impact on the safety of railway operation. Therefore, how to effectively evaluate and control these risks and ensure the safety of railway operation is an important issue facing the current railway operation management technology. The existing risk assessment technology mainly collects various risk information and then calculates it according to a certain risk assessment model to obtain the risk assessment results. Then, according to these risk assessment results, corresponding risk control measures can be taken to ensure the safety of railway operation. However, there are still some problems with the existing risk assessment technology. First, the existing risk assessment models are often relatively simple and cannot fully and accurately reflect the coupling relationship between various risk factors, which may lead to inaccurate risk assessment results. Secondly, the existing risk assessment technology often only considers a single risk factor, but does not consider the interaction between various risk factors, which may lead to incomplete risk assessment results. In addition, the existing risk assessment technology often ignores the dynamic change characteristics of risk, which may cause the risk assessment results to be outdated. Summary of the invention

[0003] The purpose of the present invention is to overcome the deficiencies in the prior art and to provide a method and device for dynamic optimization of railway operation risk based on the NK model to solve the problem of inaccurate railway operation risk assessment.

[0004] To achieve the above object, the present invention is implemented by adopting the following technical solutions: In a first aspect, the present invention provides a railway operation risk dynamic optimization method based on the NK model, comprising: Acquiring railway operation risk information, wherein the railway operation risk information includes primary risk and its probability, and the primary risk includes secondary risk and its probability; In response to the probability of the first-level risk being less than the corresponding first-level risk threshold, inputting the probability of the first-level risk into the NK model to obtain a static risk coupling value; Inputting the static risk coupling value and the corresponding secondary risk probability into a system dynamics model to obtain a dynamic risk coupling value; In response to the dynamic risk coupling value being greater than the train system risk threshold, an alarm is issued that the railway operation is in an unsafe state, thereby achieving dynamic optimization of railway operation risks.

[0005] Furthermore, the first-level risks include human risks, equipment risks, environmental risks and management risks.

[0006] Furthermore, the secondary risks include risk of personnel illegal operation, risk of insufficient personnel ability, risk of equipment aging, risk of equipment loss, risk of natural disasters, risk of social environment, risk of personnel supervision, and risk of personnel assessment; Among them, the risks of personnel's illegal operations and insufficient personnel capabilities are the man-made risks, the risks of equipment aging and equipment loss are the equipment risks, the risks of natural disasters and social environment are the environmental risks, and the risks of personnel supervision and personnel assessment are the management risks.

[0007] Furthermore, the NK model includes a two-factor NK model and a multi-factor NK model.

[0008] Furthermore, the probability of the first-level risk is input into the NK model to obtain a static risk coupling value, including: Input the probabilities of any two first-level risks into the two-factor NK model to obtain the static risk coupling value; and, The probabilities of any X primary risks are input into the multi-factor NK model to obtain a static risk coupling value, where X is an integer greater than 2.

[0009] Furthermore, the training process of the system dynamics model includes: Randomly obtain multiple static risk coupling values, and determine the secondary risk corresponding to the maximum value among the multiple static risk coupling values; The multiple static risk coupling values ​​and the probability of secondary risk corresponding to the maximum value are taken as a data group and added into the model training set; The model training set is input into the initial model for training until the initial model meets the preset conditions, and the trained model is used as the system dynamics model.

[0010] Furthermore, the step of inputting the model training set into the initial model for training until the initial model meets a preset condition, and using the trained model as the system dynamics model, includes: The model training set is input into the initial model to obtain the dynamic risk coupling value corresponding to each data group in the model training set; In response to a difference between any dynamic risk coupling value and a simulated dynamic risk coupling value being greater than a training threshold, adjusting a model parameter of an initial model and then performing model training; In response to the difference between all the dynamic risk coupling values ​​and the simulated dynamic risk coupling values ​​being less than or equal to the training threshold, the trained model is used as the system dynamics model.

[0011] Furthermore, the process of determining the simulation dynamic risk coupling value includes: Randomly extracting multiple data groups from the model training set; For each data group, a system dynamics flow diagram is drawn according to multiple static risk coupling values ​​and secondary risks in the data group; Converting the probability of the secondary risk into a characteristic number, and determining the degree of simulation coupling according to the characteristic number; Bringing the simulation coupling degree into the system dynamics flow diagram to determine the simulation dynamic risk coupling value of the data group; The simulated dynamic risk coupling value is determined according to the simulated dynamic risk coupling value of each data group.

[0012] Further, determining the simulation dynamic risk coupling value according to the simulation dynamic risk coupling value of each data group includes: Determining the weight of each data group according to multiple static risk coupling values ​​in each data group; The weighted average of the simulated dynamic risk coupling values ​​of each data group is used as the simulated dynamic risk coupling value.

[0013] In a second aspect, the present invention provides a railway operation risk dynamic optimization device based on the NK model, comprising: An acquisition module, used to acquire railway operation risk information, wherein the railway operation risk information includes primary risk and its probability, and the primary risk includes secondary risk and its probability; A first processing module, configured to input the probability of the first-level risk into a NK model to obtain a static risk coupling value in response to the probability of the first-level risk being less than the corresponding first-level risk threshold; A second processing module is used to input the static risk coupling value and the corresponding secondary risk probability into a system dynamics model to obtain a dynamic risk coupling value; The optimization module is used to issue an alarm that the railway operation is in an unsafe state in response to the dynamic risk coupling value being greater than the train system risk threshold, thereby realizing dynamic optimization of railway operation risks.

[0014] In a third aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of any of the aforementioned methods.

[0015] In a fourth aspect, the present invention provides a computer device, comprising: Memory, for storing computer programs / instructions; A processor is used to execute the computer program / instructions to implement the steps of any of the aforementioned methods.

[0016] In a fifth aspect, the present invention provides a computer program product, comprising a computer program / instruction, which implements the steps of any one of the aforementioned methods when executed by a processor.

[0017] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention provides a method and device for dynamic optimization of railway operation risk based on the NK model, which adopts a method combining the NK model and the system dynamics model to more comprehensively and accurately reflect the coupling relationship between various risk factors, thereby improving the accuracy of risk assessment. The risk assessment model of the embodiment of the present application can more comprehensively and accurately reflect the complex relationship between various risk factors, thereby improving the accuracy of risk assessment.

[0018] 2. The present invention focuses on the interaction between various risk factors during risk assessment, thereby making the risk assessment results more complete. The risk assessment technology of the embodiment of the present application can more comprehensively and accurately reflect the interaction between various risk factors, thereby making the risk assessment results more complete.

[0019] 3. The present invention takes into account the dynamic change characteristics of risks during risk assessment, thereby making the results of risk assessment more timely. The risk assessment technology of the embodiment of the present application can better reflect the dynamic change characteristics of risks, thereby making the results of risk assessment more timely.

[0020] In general, the embodiments of the present application have higher accuracy, completeness and timeliness in risk assessment, and can more effectively ensure the safety of railway operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application; Figure 2 It is a flow chart of a method for dynamic optimization of railway operation risk based on the NK model provided in an embodiment of the present application. DETAILED DESCRIPTION

[0022] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0023] Embodiment 1: This embodiment introduces a railway operation risk dynamic optimization method based on the NK model, including: Acquiring railway operation risk information, wherein the railway operation risk information includes primary risk and its probability, and the primary risk includes secondary risk and its probability; In response to the probability of the first-level risk being less than the corresponding first-level risk threshold, inputting the probability of the first-level risk into the NK model to obtain a static risk coupling value; Inputting the static risk coupling value and the corresponding secondary risk probability into a system dynamics model to obtain a dynamic risk coupling value; In response to the dynamic risk coupling value being greater than the train system risk threshold, an alarm is issued that the railway operation is in an unsafe state, thereby achieving dynamic optimization of railway operation risks.

[0024] The above method combines the NK model with the system dynamics model, which can more comprehensively and accurately reflect the coupling relationship between various risk factors, thereby improving the accuracy of risk assessment. In the process of risk assessment, the interaction between various risk factors is considered, so that the results of risk assessment are more complete. At the same time, in the process of risk assessment, the dynamic change characteristics of risk are considered, so that the results of risk assessment are more timely.

[0025] The application process of the railway operation risk dynamic optimization method based on the NK model provided in this embodiment specifically involves the following steps: Figure 1 1 is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. The electronic device 100 is located in a railway operation system and can be used to execute a railway operation risk dynamic optimization method based on a NK model. The electronic device can be, for example, an onboard computer of a train. Figure 1 As shown, the electronic device 100 includes: one or more processors 102, and one or more memories 104 storing processor executable instructions. The processor 102 is configured to execute the railway operation risk dynamic optimization method based on the NK model provided in the following embodiment of the present application.

[0026] The processor 102 can be a gateway, a smart terminal, or a device including a central processing unit (CPU), a graphics processing unit (GPU), or other forms of processing units with data processing capabilities and / or instruction execution capabilities. It can process data of other components in the electronic device 100 and control other components in the electronic device 100 to perform desired functions.

[0027] The memory 104 may include one or more computer program products, and the computer program product may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 102 may run the program instructions to implement the dynamic optimization method of railway operation risk based on the NK model described below. Various applications and various data may also be stored in the computer-readable storage medium, such as various data used and / or generated by the application.

[0028] In one embodiment, Figure 1 The electronic device 100 shown may also include an input device 106, an output device 108, and a data acquisition device 110, which are interconnected via a bus system 112 and / or other forms of connection mechanisms (not shown). Figure 1 The components and structures of the electronic device 100 shown are merely exemplary and non-limiting. The electronic device 100 may also have other components and structures as required.

[0029] The input device 106 may be a device for a user to input instructions, and may include one or more of a keyboard, a mouse, a microphone, and a touch screen. The output device 108 may output various information (e.g., images or sounds) to the outside (e.g., a user), and may include one or more of a display, a speaker, and the like. In an embodiment of the present application, the output device 108 may issue an alarm to a railway operation manager. The data acquisition device 110 may collect railway operation risk information of a train, and store the collected data in the memory 104 for use by other components. Exemplarily, the data acquisition device 110 may be a camera.

[0030] In one embodiment, the various components in the example electronic device 100 for implementing the NK model-based dynamic optimization method for railway operation risk of the embodiment of the present application can be integrated or dispersed, such as integrating the processor 102, memory 104, input device 106 and output device 108 into one, and separately arranging the data acquisition device 110.

[0031] In one embodiment, the example electronic device 100 for implementing the railway operation risk dynamic optimization method based on the NK model of the embodiment of the present application can be implemented as an intelligent terminal such as a smart phone, a tablet computer, a desktop computer, a server, a vehicle-mounted device, etc.

[0032] Figure 2 : is a flow chart of a method for dynamic optimization of railway operation risk based on the NK model provided in an embodiment of the present application. Figure 2 As shown, the method includes the following steps S210-S240.

[0033] Step 210: Obtain railway operation risk information.

[0034] Among them, risk information includes primary risks, which include human risks, equipment risks, environmental risks, and management risks. The primary information includes secondary risks, which include risks of personnel illegal operation, risks of insufficient personnel capabilities, risks of equipment aging, risks of equipment loss, risks of natural disasters, risks of social environment, risks of personnel supervision, and risks of personnel assessment. Therefore, the risks of personnel illegal operation and insufficient personnel capabilities are the human risks, the risks of equipment aging and equipment loss are the equipment risks, the risks of natural disasters and social environment are the environmental risks, and the risks of personnel supervision and personnel assessment are the management risks.

[0035] Railway operation risk information can be stored in a database of the railway operation system. When an operation risk assessment is required, the electronic device obtains the railway operation risk information from the database. The railway operation risk information in the database is updated at regular intervals, for example, once a minute when the train is running, and once every 24 hours when the train is not running.

[0036] In addition to primary and secondary risks, risk information also includes the probability of occurrence of each primary risk (that is, the probability of primary risk) and the probability of occurrence of each secondary risk (that is, the probability of secondary risk).

[0037] Step 220: In response to the probability of the first-level risk being less than the corresponding first-level risk threshold, the probability of the first-level risk is input into the NK model to obtain a static risk coupling value.

[0038] Among them, the first-level risk threshold may include a human risk threshold, an equipment risk threshold, an environmental risk threshold, and a management risk threshold. The first-level risk threshold is a value preset based on historical experience. When at least one of the probabilities of the first-level risks is greater than or equal to the corresponding first-level risk threshold, it means that the railway operation risk is high and the train operation is in an unsafe state. At this time, it will return to step 210 to continue to obtain new risk information and continue to judge the size relationship between the probability of each first-level risk and the first-level risk threshold.

[0039] When the probabilities of all first-level risks are less than the corresponding first-level risk threshold, it means that the railway operation risk is low and the train is running in a safe state. However, this judgment method only considers a single risk and does not consider the possible coupling between various risks, which may lead to a higher overall risk. Therefore, in order to further improve the safety factor of railway operation, the probability of first-level risk will be input into the NK model, and the output value of the NK model will be used to judge the risk of railway operation. This can fully consider the coupling between various risks and improve the safety of railway operation.

[0040] The above-mentioned NK model includes a two-factor NK model and a multi-factor NK model. Correspondingly, the probability of the first-level risk is input into the NK model to obtain a static risk coupling value, including: inputting the probabilities of any two first-level risks into the two-factor NK model to obtain a static risk coupling value; and inputting the probabilities of any X first-level risks into the multi-factor NK model to obtain a static risk coupling value, wherein X is an integer greater than 2.

[0041] When the primary risk includes two risks, the probabilities of the two risks are input into the dual-factor NK model to obtain a static risk coupling value. At this time, the primary risk is, for example, a human risk and an equipment risk, or, for example, a human risk and an environmental risk, or, for example, a human risk and a management risk, or, for example, an equipment risk and an environmental risk, or, for example, an equipment risk and a management risk, or, for example, an environmental risk and a management risk.

[0042] Taking the first-level risk as human risk and equipment risk as an example, human risk is represented by a, equipment risk is represented by b, and the static risk coupling value is represented by Representative, then the calculation formula of the two-factor NK model is: ; in, =1,2,3,···, ; =1,2,3,···, . For people in the first The probability of man-made risk under this state, For the device The probability of equipment risk in this state, Indicates that people In this state, the device The probability of coupling between human risk and equipment risk under this condition.

[0043] When the primary risk includes three risks, the probabilities of the three risks are input into the multi-factor NK model to obtain a static risk coupling value. At this time, the primary risk is, for example, human risk, equipment risk and environmental risk, or, for example, human risk, equipment risk and management risk, or, for example, equipment risk, environmental risk and management risk.

[0044] Taking the first-level risk as human risk, equipment risk and environmental risk as an example, human risk is represented by a, equipment risk is represented by b, environmental risk is represented by c, and the static risk coupling value is represented by Representative, then the calculation formula of the multi-factor NK model is: ; in, =1,2,3,···, ; =1,2,3,···, ; =1,2,3,···, . For people in the first The probability of man-made risk under this state, For the device The probability of equipment risk in this state, For the environment The probability of environmental risk under this state, Indicates that people In this state, the device In this state, the environment The probability of coupling of human risk, equipment risk and environmental risk under this state.

[0045] When the first-level risk includes four risks, the probabilities of these four risks are input into the multi-factor NK model to obtain the static risk coupling value.

[0046] Taking the first-level risk as human risk, equipment risk, environmental risk and management risk as an example, human risk is represented by a, equipment risk is represented by b, environmental risk is represented by c, management risk is represented by d, and the static risk coupling value is represented by Representative, then the calculation formula of the multi-factor NK model is: ; in, =1,2,3,···, ; =1,2,3,···, ; =1,2,3,···, ; =1,2,3,···, . For people in the first The probability of man-made risk under this state, For the device The probability of equipment risk in this state, For the environment The probability of environmental risk under this state, For management The probability of managing risk in this state, Indicates that people In this state, the device In this state, the environment In this state, management The probability of coupling of human risk, equipment risk, environmental risk and management risk under this state.

[0047] Step 230: Input the static risk coupling value and the corresponding secondary risk probability into the system dynamics model to obtain a dynamic risk coupling value.

[0048] Although the static risk coupling value can characterize the railway operation risk when multiple risks interact with each other to a certain extent, it cannot adapt to the real-time changing railway operation situation. Therefore, in order to reflect the railway operation risk more timely and accurately, the system dynamics model can be used to obtain the dynamic risk coupling value.

[0049] The system dynamics model can be obtained by training an initial model, which can be a neural network model. The output of the model is obtained by inputting the model training data into the initial model, and the parameters of the model are continuously adjusted according to the output of the model until the model meets the preset conditions. In this way, a system dynamics model for outputting dynamic risk coupling values ​​can be obtained.

[0050] The training process of the system dynamics model includes: randomly obtaining multiple static risk coupling values, determining the secondary risk corresponding to the maximum value among the multiple static risk coupling values; taking the multiple static risk coupling values ​​and the probability of the secondary risk corresponding to the maximum value as a data group, and adding it to the model training set; inputting the model training set into the initial model for training until the initial model meets the preset conditions, and using the trained model as the system dynamics model.

[0051] For the historical railway operation risk information, the probabilities of these historical primary risks are input into the NK model to obtain multiple historical static risk coupling values. A random algorithm is used for multiple historical static risk coupling values ​​to randomly extract multiple static risk coupling values, for example, 10 static risk coupling values ​​are randomly extracted. The maximum value among the multiple static risk coupling values ​​is determined, and the corresponding primary risk is inferred from the maximum static risk coupling value, so that the secondary risk corresponding to the maximum static risk coupling value can be obtained. At this time, the probabilities of the second risk corresponding to the multiple static risk coupling values ​​and the maximum static risk coupling value are taken as a data group and added to the model training set for training the initial model to train the initial model. Multiple data groups can be obtained by using the random algorithm multiple times. The number of data groups is set according to the requirements of model training. Generally, more than 10,000 groups of data are required to meet the training of the initial model.

[0052] After the model training set is constructed, the model training set is input into the initial model to obtain the dynamic risk coupling value corresponding to each data group in the model training set; in response to the difference between any dynamic risk coupling value and the simulated dynamic risk coupling value being greater than the training threshold, the model parameters of the initial model are adjusted and model training is performed; in response to the difference between all dynamic risk coupling values ​​and the simulated dynamic risk coupling values ​​being less than or equal to the training threshold, the trained model is used as the system dynamics model.

[0053] For example, in the above-mentioned model training scheme, the dynamic risk coupling values ​​corresponding to each set of data need to meet the requirements. Therefore, if the entire model training set is input into the initial model at one time, the overhead of model operation will be extremely high in the process of adjusting the model parameters. Therefore, the model training set can be divided into several batches and input into the initial model, for example, 10 batches. If there are 10,000 sets of data in the model training set, each batch will have 1,000 sets of data. After the initial model is trained with the first batch of data, an intermediate model can be obtained; then, the second batch of data is used to train the intermediate model, and so on, and the model is trained step by step. In this way, each time the model parameters are adjusted, the data required for model operation will be reduced, reducing the operation overhead.

[0054] Regarding the simulated dynamic risk coupling value, it is a simulation value that uses system dynamics to convert the static risk coupling value into a dynamic risk coupling value, which can be obtained using existing simulation software. That is, the static risk coupling value is input into the simulation software, and some necessary parameters are configured to obtain the dynamic risk coupling value. Of course, in addition to using simulation software, the simulated dynamic risk coupling value can also be obtained using the following methods, specifically: A plurality of data groups are randomly extracted from the model training set; for each data group, a system dynamics flow diagram is drawn according to a plurality of static risk coupling values ​​and secondary risks in the data group, the probability of the secondary risk is converted into a characteristic number, and a simulation coupling degree is determined according to the characteristic number, and the simulation coupling degree is brought into the system dynamics flow diagram to determine the simulation dynamic risk coupling value of the data group; the simulation dynamic risk coupling value is determined according to the simulation dynamic risk coupling value of each data group.

[0055] As mentioned above, in order to save model operation overhead, data components are used, and the grouped data is used to gradually train the model. Correspondingly, it is also necessary to obtain the simulation dynamic risk coupling value of each group according to the grouping of the model training set. For example, the model training set is divided into 10 batches. If there are 10,000 groups of data in the model training set, each batch will have 1,000 groups of data. For the first batch of data groups, 10 data groups are randomly selected, and the simulation dynamic risk coupling value corresponding to the first batch can be obtained through data simulation.

[0056] Using the above method, each data group can obtain a simulated dynamic risk coupling value. Therefore, for the simulated dynamic risk coupling values ​​of multiple data groups randomly selected from the model training set, a weighted average is used to obtain the simulated dynamic risk coupling value corresponding to the model training set. During the weighted average calculation process, the weight of each data group is determined according to the multiple static risk coupling values ​​in each data group. For a data group, the sum of the multiple static risk coupling values ​​of the data group is divided by the sum of the static risk coupling values ​​of all groups to obtain the weight of the data group.

[0057] After determining the simulated dynamic risk coupling value, if the difference between any dynamic risk coupling value and the simulated dynamic risk coupling value is greater than the training threshold, the model parameters of the initial model are adjusted and then the model training is performed. Continue to input the data of the model training set into the model after adjusting the parameters to obtain a new dynamic risk coupling value, and use the same judgment method until the difference between all dynamic risk coupling values ​​and the simulated dynamic risk coupling values ​​is less than or equal to the training threshold. At this time, the model is an acceptable model, and its model parameters have been adjusted to a reasonable state. Therefore, this model can be used as the system dynamics model. The above training threshold is a pre-set value, which can be a hyperparameter or a value set based on human experience.

[0058] Step 240: In response to the dynamic risk coupling value being greater than the train system risk threshold, an alarm is issued that the railway operation is in an unsafe state.

[0059] According to the system dynamics model, the static risk coupling value obtained by the NK model can be converted into a dynamic risk coupling value, and then the dynamic risk coupling value is compared with the train system risk threshold. If it is greater than the train risk threshold, it indicates that the train operation is in an unsafe state, and the electronic device will send an alarm that the railway operation is in an unsafe state to other modules of the railway operation system (for example, the system user interaction interface), so as to remind the user (for example, the train safety officer) that the railway operation is in a dangerous state, so that the user can check the dangerous points in time. Of course, if the dynamic risk coupling value is less than or equal to the train system risk threshold, it indicates that the train operation is in an acceptable safe state. At this time, return to step S210, continue to obtain new risk information, and enter a new round of risk assessment monitoring.

[0060] The above method of the embodiment of the present application adopts a combination of the NK model and the system dynamics model, which can more comprehensively and accurately reflect the coupling relationship between various risk factors, thereby improving the accuracy of risk assessment. In the risk assessment process, the interaction between various risk factors is focused on, so that the results of risk assessment are more complete. At the same time, in the risk assessment process, the dynamic change characteristics of risks are taken into account, so that the results of risk assessment are more timely.

[0061] Embodiment 2: This embodiment provides a railway operation risk dynamic optimization device based on the NK model, comprising: An acquisition module, used to acquire railway operation risk information, wherein the railway operation risk information includes primary risk and its probability, and the primary risk includes secondary risk and its probability; A first processing module, configured to input the probability of the first-level risk into a NK model to obtain a static risk coupling value in response to the probability of the first-level risk being less than the corresponding first-level risk threshold; A second processing module is used to input the static risk coupling value and the corresponding secondary risk probability into a system dynamics model to obtain a dynamic risk coupling value; The optimization module is used to issue an alarm that the railway operation is in an unsafe state in response to the dynamic risk coupling value being greater than the train system risk threshold, thereby realizing dynamic optimization of railway operation risks.

[0062] The specific functional implementation of each of the above modules can be found in the relevant contents of the method in Example 1 and will not be elaborated here.

[0063] Embodiment 3, this embodiment provides a computer-readable storage medium, on which a computer program is stored, and when the program is executed by a processor, the steps of any one of the methods described in Embodiment 1 are implemented.

[0064] Embodiment 4: This embodiment provides a computer device, including: Memory, for storing computer programs / instructions; A processor is used to execute the computer program / instructions to implement the steps of any method described in Example 1.

[0065] Embodiment 5: This embodiment provides a computer program product, including a computer program / instruction, which implements the steps of any method described in Embodiment 1 when executed by a processor.

[0066] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

[0067] It should be understood by those skilled in the art that the embodiments of the present disclosure may be provided as methods, systems or computer program products. Therefore, the present disclosure may take the form of a complete hardware embodiment, a complete software embodiment or an embodiment combining software and hardware aspects. Moreover, the present disclosure may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0068] The present disclosure is described with reference to flowcharts and / or block diagrams of methods, devices (systems) and computer program products according to embodiments of the present disclosure. It should be understood that each process and / or block in the flowchart and / or block diagram and the combination of processes and / or blocks in the flowchart and / or block diagram can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0069] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0070] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0071] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present disclosure rather than to limit its protection scope. Although the present disclosure has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that after reading the present disclosure, those skilled in the art can still make various changes, modifications or equivalent substitutions to the specific implementation methods of the invention, but these changes, modifications or equivalent substitutions are all within the protection scope of the disclosed claims to be approved.

Claims

1. A dynamic optimization method for railway operation risk based on NK model, characterized in that: include: Acquiring railway operation risk information, wherein the railway operation risk information includes primary risk and its probability, and the primary risk includes secondary risk and its probability; In response to the probability of the first-level risk being less than the corresponding first-level risk threshold, inputting the probability of the first-level risk into the NK model to obtain a static risk coupling value; Inputting the static risk coupling value and the corresponding secondary risk probability into a system dynamics model to obtain a dynamic risk coupling value; In response to the dynamic risk coupling value being greater than the train system risk threshold, an alarm is issued that the railway operation is in an unsafe state, thereby achieving dynamic optimization of railway operation risks.

2. The railway operation risk dynamic optimization method based on the NK model according to claim 1 is characterized in that: The first-level risks include human risks, equipment risks, environmental risks and management risks.

3. The railway operation risk dynamic optimization method based on the NK model according to claim 2 is characterized in that: The secondary risks include risks of personnel operating in violation of regulations, risks of insufficient personnel capabilities, risks of equipment aging, risks of equipment loss, risks of natural disasters, risks of social environment, risks of personnel supervision, and risks of personnel assessment; Among them, the risks of personnel's illegal operations and insufficient personnel capabilities are the man-made risks, the risks of equipment aging and equipment loss are the equipment risks, the risks of natural disasters and social environment are the environmental risks, and the risks of personnel supervision and personnel assessment are the management risks.

4. The railway operation risk dynamic optimization method based on the NK model according to claim 1 is characterized in that: The NK model includes a two-factor NK model and a multi-factor NK model.

5. The railway operation risk dynamic optimization method based on the NK model according to claim 4 is characterized in that: The probability of the first-level risk is input into the NK model to obtain a static risk coupling value, including: Input the probabilities of any two first-level risks into the two-factor NK model to obtain the static risk coupling value; and, The probabilities of any X primary risks are input into the multi-factor NK model to obtain a static risk coupling value, where X is an integer greater than 2.

6. The railway operation risk dynamic optimization method based on the NK model according to claim 1 is characterized in that: The training process of the system dynamics model includes: Randomly obtain multiple static risk coupling values, and determine the secondary risk corresponding to the maximum value among the multiple static risk coupling values; The multiple static risk coupling values ​​and the probability of secondary risk corresponding to the maximum value are taken as a data group and added into the model training set; The model training set is input into the initial model for training until the initial model meets the preset conditions, and the trained model is used as the system dynamics model.

7. The railway operation risk dynamic optimization method based on the NK model according to claim 6 is characterized in that: The step of inputting the model training set into the initial model for training until the initial model meets a preset condition, and using the trained model as the system dynamics model, comprises: The model training set is input into the initial model to obtain the dynamic risk coupling value corresponding to each data group in the model training set; In response to a difference between any dynamic risk coupling value and a simulated dynamic risk coupling value being greater than a training threshold, adjusting a model parameter of an initial model and then performing model training; In response to the difference between all the dynamic risk coupling values ​​and the simulated dynamic risk coupling values ​​being less than or equal to the training threshold, the trained model is used as the system dynamics model.

8. The railway operation risk dynamic optimization method based on the NK model according to claim 7 is characterized in that: The process of determining the simulation dynamic risk coupling value includes: Randomly extracting multiple data groups from the model training set; For each data group, a system dynamics flow diagram is drawn according to multiple static risk coupling values ​​and secondary risks in the data group; Converting the probability of the secondary risk into a characteristic number, and determining the degree of simulation coupling according to the characteristic number; Bringing the simulation coupling degree into the system dynamics flow diagram to determine the simulation dynamic risk coupling value of the data group; The simulated dynamic risk coupling value is determined according to the simulated dynamic risk coupling value of each data group.

9. The railway operation risk dynamic optimization method based on the NK model according to claim 8 is characterized in that: The step of determining the simulation dynamic risk coupling value according to the simulation dynamic risk coupling value of each data group includes: Determining the weight of each data group according to multiple static risk coupling values ​​in each data group; The weighted average of the simulated dynamic risk coupling values ​​of each data group is used as the simulated dynamic risk coupling value.

10. A railway operation risk dynamic optimization device based on the NK model, characterized in that: include: An acquisition module, used to acquire railway operation risk information, wherein the railway operation risk information includes primary risk and its probability, and the primary risk includes secondary risk and its probability; A first processing module, configured to input the probability of the first-level risk into a NK model to obtain a static risk coupling value in response to the probability of the first-level risk being less than the corresponding first-level risk threshold; A second processing module is used to input the static risk coupling value and the corresponding secondary risk probability into a system dynamics model to obtain a dynamic risk coupling value; The optimization module is used to issue an alarm that the railway operation is in an unsafe state in response to the dynamic risk coupling value being greater than the train system risk threshold, thereby realizing dynamic optimization of railway operation risks.

Citation Information

Patent Citations

  • Railway station train track safety collaborative early warning method based on dynamic Bayesian

    CN114889678A

  • System performance analysis method integrating coupling degree model and N-K model

    CN116776629A