Intelligent building quality risk prediction method

Through the intelligent construction quality risk prediction method, data fusion and machine learning algorithms are used to build a risk prediction model, which solves the problems of subjectivity and insufficient timeliness in traditional construction project quality management, and realizes real-time monitoring and early warning of construction project quality. Provide scientific decision-making support and reduce quality risks and safety hazards.

CN118735319AInactive Publication Date: 2024-10-01SICHUAN LVSHU CONSTR ENG CO LTD

Patent Information

Application Number
CN202410712393.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional construction project quality management relies on manual experience and regular inspections, which suffers from subjectivity, timeliness and low efficiency. It is difficult to detect and prevent potential quality risks in a timely manner, resulting in a decline in project quality and an increase in safety hazards.

Method used

Adopting intelligent construction quality risk prediction methods, by collecting and preprocessing environmental and structural data of construction sites, using data fusion technology and machine learning algorithms to build risk prediction models, realizing real-time monitoring and early warning of construction project quality, and generating risk assessment reports .

Benefits of technology

It realizes real-time monitoring and early warning of construction project quality, provides scientific decision-making support, helps managers accurately assess project quality status, formulate reasonable management strategies, and reduce quality risks and safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735319A_ABST
    Figure CN118735319A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of building quality risk identification, and more specifically relates to an intelligent building quality risk prediction method, which can realize real-time monitoring and early warning of building engineering quality based on real-time acquisition and analysis of data by establishing a risk prediction model, and improves the construction quality. Once an abnormal condition is found, an alarm can be given out immediately to remind related personnel to carry out immediate processing, and problem expansion or safety accident occurrence is avoided. Moreover, a scientific basis and decision support can be provided for a manager through a building quality risk prediction model of a machine learning algorithm, the quality risk level is obtained through model analysis, and the manager can be helped to more accurately evaluate the project quality condition and formulate reasonable management strategies and response measures.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of building quality risk identification, and more specifically, relates to an intelligent building quality risk prediction method. Background Art

[0002] In traditional construction project management, quality control often relies on manual experience and regular inspections, which has many limitations. With the advancement of science and technology and the development of data technology, it is becoming increasingly important to use intelligent methods to predict construction quality risks.

[0003] The emergence of quality problems in construction projects may lead to a decline in project quality, increase in safety hazards, and even cause serious losses to personnel and property. However, traditional quality management methods often rely on human judgment and regular inspections, making it difficult to timely detect and prevent potential quality risks. This passive management method has the following challenges:

[0004] Subjectivity and uncertainty: The judgment of quality issues often relies on individual experience and subjective judgment, which is easily influenced by the personal preferences and ability level of the supervisor, and there are inconsistencies in the identification.

[0005] Timeliness and responsiveness: Traditional quality inspection methods are usually conducted on a periodic basis, which cannot achieve timely monitoring and response to changes in building quality, resulting in a delayed perception of potential risks.

[0006] Inefficiency and increased costs: Manual inspection and paper records are inefficient and also increase management and human resource costs. Summary of the invention

[0007] The present invention provides an intelligent building quality risk prediction method, which is intended to solve the technical problem of inconsistent identification caused by the current reliance on personal experience and subjective judgment for quality problem judgment.

[0008] An intelligent building quality risk prediction method comprises the following steps:

[0009] Step 1: Collect environmental data and structural data of the construction site and pre-process the collected data;

[0010] Step 2: Based on data fusion technology, the pre-processed data is fused with multi-source data;

[0011] Step 3: Use machine learning algorithms to extract features from the multi-source data fusion data and identify key features related to building quality;

[0012] Step 4: construct a building quality risk prediction model, and train the building quality risk prediction model based on the extracted key features to obtain a trained building quality risk prediction model;

[0013] Step 5: Analyze the quality risk level of the construction project based on the trained quality risk prediction model and generate a risk assessment report.

[0014] The present invention establishes a risk prediction model, which enables real-time monitoring and early warning of construction project quality based on real-time data collection and analysis. Once an abnormal situation is found, an alarm can be immediately issued to remind relevant personnel to take immediate action to avoid the expansion of the problem or the release of safety accidents. In addition, the present invention uses a construction quality risk prediction model based on a machine learning algorithm to provide managers with a scientific basis and decision-making support. The quality risk level is obtained through model analysis, which can help managers more accurately evaluate the project quality status and formulate reasonable management strategies and response measures.

[0015] Preferably, step 2 comprises the following steps:

[0016] Data source integration: Integrate the collected environmental data and structural data into a unified data set;

[0017] Data alignment: Time alignment of data from different data sources; interpolation or downsampling of data with different sampling frequencies;

[0018] Feature fusion: Combine the features of different data sources to form a new feature vector:

[0019] Fusion feature =[Feature1, Feature2,...,Feature n ];

[0020] Where: Fusion feature is the vector after feature fusion; Feature i Represents the characteristics of the i-th data source;

[0021] Quality control: Perform quality control on the fused data to detect whether there are outliers or erroneous data. If so, correct or eliminate them.

[0022] Preferably, in step 3, a principal component analysis method is used to identify key features, and the specific steps are as follows:

[0023] Data standardization: standardize the multi-source fused data to make its mean 0 and standard deviation 1;

[0024] Feature extraction: The principal component analysis method is used to obtain the eigenvector of each principal component, and the number of principal components is retained according to the variance explanation ratio of the principal component; the original features are converted into new spatial features using the selected principal components, and the coordinates of each sample in the new feature space are its corresponding principal component coefficients, representing the projection value of the sample on each principal component; based on this, the key features related to building quality are obtained.

[0025] Preferably, the specific steps of feature extraction are as follows:

[0026] Calculate the covariance matrix: Calculate the standardized data set X and the covariance matrix ∑. The covariance matrix represents the degree of correlation between the various features of the data:

[0027]

[0028] Where: X represents the standardized data set, the size is m×d, where m represents the number and d represents the feature dimension; Represents the mean vector of each feature; n represents the number of samples;

[0029] Solve the eigenvalues ​​and eigenvectors: Perform eigenvalue decomposition on the covariance matrix ∑ to obtain the eigenvalues ​​and corresponding eigenvectors:

[0030] ∑·V=Λ·V;

[0031] Where: V represents the eigenvector matrix, each column is an eigenvector, the size is d×d; Λ represents the diagonal matrix, the elements on the diagonal are eigenvalues, the size is d×d;

[0032] Select principal components: Select principal components that can retain more than 90% of the total variance;

[0033] Feature transformation: The original features are transformed into a new feature space using the selected principal components:

[0034] Z=X·V k ;

[0035] Where: Z represents the transformed feature matrix, the size is m×k, k is the number of principal components selected; V k Represents the matrix consisting of the first k eigenvectors selected by u, with a size of d×k.

[0036] Preferably, the building quality risk prediction model adopts a random forest model, and the specific structure is as follows:

[0037] The random forest model consists of multiple decision trees, each of which is independent and randomly generated;

[0038] Each decision tree consists of multiple nodes and leaf nodes. The nodes are used for feature division, and the leaf nodes are used for final prediction. Each node will be divided according to the value of the feature, and the feature that can maximize the purity of information after division is selected as the division criterion.

[0039] Preferably, the training steps of the random forest are as follows:

[0040] In the training process of each tree, Bootstrap Sampling method is used to extract samples from the training set with replacement to construct different training sets;

[0041] For each decision tree, the divided training set is used for training, and the best division features and division points are selected according to the information gain of the features; the tree is continuously grown until the conditions for stopping growth are met.

[0042] Preferably, the Bootstrap Sampling method is used to extract samples from the training set with replacement to construct different training sets. The specific steps are as follows:

[0043] Random sampling: For the original training set D, let it contain n samples; for each sampling, randomly select n samples from D that have playback to form a new training set D i ;

[0044] Repeated sampling: Repeat random sampling to obtain multiple different training sets D1, D2, ..., D k , a total of k;

[0045] Use each sampled training set D i To train an independent decision tree, we get a random forest containing k decision trees.

[0046] Preferably, the specific steps of selecting the best partitioning features and partitioning points according to the information gain of the features are as follows:

[0047] Calculate the information entropy of a data set:

[0048] For a given node, calculate the information entropy of the samples it contains to measure the purity of the sample set:

[0049]

[0050] Where: D represents the sample set of the current node; m represents the number of categories; px represents the proportion of the i-th sample in D;

[0051] Calculate the information gain for each feature:

[0052] For each feature A, calculate its information gain for the sample set D, and select the best partitioning feature:

[0053]

[0054] Where: V is the number of values ​​of feature A; D v represents the sample subset corresponding to the value v of feature A; |D v | represents the sample subset D v The size of; |D| represents the total size of the sample set D;

[0055] Select the feature with the largest information gain: Select the feature with the largest information gain from all features as the partition feature of the current node;

[0056] Determine the split point:

[0057] Based on the Gini index, the optimal partition point is determined according to the selected partition features;

[0058] Divide the dataset:

[0059] According to the selected partitioning features and partitioning points, the sample set D of the current node is divided into multiple sub-sets, and each sub-set corresponds to a sub-node.

[0060] The beneficial effects of the present invention include:

[0061] The present invention establishes a risk prediction model, which enables real-time monitoring and early warning of construction project quality based on real-time data collection and analysis. Once an abnormal situation is found, an alarm can be immediately issued to remind relevant personnel to take immediate action to avoid the expansion of the problem or the release of safety accidents. In addition, the present invention uses a construction quality risk prediction model based on a machine learning algorithm to provide managers with a scientific basis and decision-making support. The quality risk level is obtained through model analysis, which can help managers more accurately evaluate the project quality status and formulate reasonable management strategies and response measures. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0063] Figure 1 An overall step block diagram provided for an embodiment of the present invention. DETAILED DESCRIPTION

[0064] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0065] See also Figure 1 As shown, the best embodiment of the present invention is further described;

[0066] An intelligent building quality risk prediction method comprises the following steps:

[0067] Step 1: Collect environmental data and structural data of the construction site and pre-process the collected data;

[0068] Environmental data collection:

[0069] Sensor technology: Various sensors are deployed on construction sites, including temperature sensors, humidity sensors, pressure sensors, etc., to monitor environmental parameters in real time. These sensors can be connected to the data acquisition system via wired or wireless means to transmit environmental data to the data center.

[0070] Camera monitoring: Set up cameras to monitor the construction site in real time, and use image processing technology to extract environmental information, such as weather conditions, areas with dense human activity, etc. Image recognition technology can be used to automatically identify and record the status of the construction site.

[0071] Structural data collection:

[0072] Sensor monitoring: Structural monitoring sensors, such as stress sensors and displacement sensors, are arranged at key locations of the building structure to monitor the deformation and stress of the structure, as well as possible abnormal conditions, in real time.

[0073] Laser scanning: Use laser scanning technology to scan the building structure to obtain its geometric shape and size information. This non-contact collection method can quickly obtain a large amount of data without causing damage to the structure itself.

[0074] Data preprocessing:

[0075] Data cleaning: Clean and denoise the collected raw data, remove outliers and invalid data, and ensure the accuracy and reliability of the data.

[0076] Data format conversion: Convert the data collected by different sensors into the same format for subsequent processing and analysis.

[0077] Data calibration: Calibrate sensor data to map raw data to actual physical quantities to ensure data interpretability and comparability.

[0078] Step 2: Based on data fusion technology, the pre-processed data is fused with multi-source data;

[0079] The step 2 comprises the following steps:

[0080] Data source integration: Integrate the collected environmental data (such as temperature, humidity, air pressure, etc.) and structural data (such as vibration, stress, displacement, etc.) into a unified data set; ensure that the data format and unit of different data sources are unified to facilitate subsequent data processing and analysis.

[0081] Data alignment: Time alignment of data from different data sources; interpolation or downsampling of data with different sampling frequencies;

[0082] Feature fusion: Combine the features of different data sources to form a new feature vector:

[0083] Fusion feature =[Feature1, Feature2,...,Feature n ];

[0084] Where: Fusion feature is the vector after feature fusion; Feature i Represents the characteristics of the i-th data source;

[0085] Quality control: Perform quality control on the fused data to detect whether there are outliers or erroneous data. If so, correct or eliminate them.

[0086] Step 3: Use machine learning algorithms to extract features from the multi-source data fusion data and identify key features related to building quality;

[0087] In step 3, the principal component analysis method is used to identify key features. The specific steps are as follows:

[0088] Data standardization: standardize the multi-source fused data to make its mean 0 and standard deviation 1;

[0089] Feature extraction: The principal component analysis method is used to obtain the feature vector of each principal component, and the number of principal components is retained according to the variance explanation ratio of the principal component; the original features are converted into new spatial features using the selected principal components, and the coordinates of each sample in the new feature space are the corresponding principal component coefficients, which represent the projection values ​​of the sample on each principal component; based on this, the key features related to building quality are obtained;

[0090] The specific steps of feature extraction are as follows:

[0091] Calculate the covariance matrix: Calculate the standardized data set X and the covariance matrix ∑. The covariance matrix represents the degree of correlation between the various features of the data:

[0092]

[0093] Where: X represents the standardized data set, the size is m×d, where m represents the number and d represents the feature dimension; Represents the mean vector of each feature; n represents the number of samples;

[0094] Solve the eigenvalues ​​and eigenvectors: Perform eigenvalue decomposition on the covariance matrix ∑ to obtain the eigenvalues ​​and corresponding eigenvectors:

[0095] ∑·V=Λ·V;

[0096] Where: V represents the eigenvector matrix, each column is an eigenvector, the size is d×d; Λ represents the diagonal matrix, the elements on the diagonal are eigenvalues, the size is d×d;

[0097] Select principal components: Select principal components that can retain more than 90% of the total variance;

[0098] Feature transformation: The original features are transformed into a new feature space using the selected principal components:

[0099] Z=X·V k ;

[0100] Where: Z represents the transformed feature matrix, the size is m×k, k is the number of principal components selected; V k Represents the matrix consisting of the first k eigenvectors selected by u, with a size of d×k.

[0101] Step 4: construct a building quality risk prediction model, and train the building quality risk prediction model based on the extracted key features to obtain a trained building quality risk prediction model;

[0102] The building quality risk prediction model adopts a random forest model, and the specific structure is as follows:

[0103] The random forest model consists of multiple decision trees, each of which is independent and randomly generated;

[0104] Each decision tree consists of multiple nodes and leaf nodes. The nodes are used for feature division, and the leaf nodes are used for final prediction. Each node will be divided according to the value of the feature, and the feature that can maximize the purity of information after division is selected as the division criterion.

[0105] Preferably, the training steps of the random forest are as follows:

[0106] In the training process of each tree, the BootstrapSampling method is used to extract samples from the training set with replacement to construct different training sets;

[0107] For each decision tree, the divided training set is used for training, and the best division features and division points are selected according to the information gain of the features; the tree is continuously grown until the conditions for stopping growth are met.

[0108] Preferably, the Bootstrap Sampling method is used to extract samples from the training set with replacement to construct different training sets. The specific steps are as follows:

[0109] Random sampling: For the original training set D, let it contain n samples; for each sampling, randomly select n samples from D that have playback to form a new training set D i ;

[0110] Repeated sampling: Repeat random sampling to obtain multiple different training sets D1, D2, ..., D k , a total of k;

[0111] Use each sampled training set D i To train an independent decision tree, we get a random forest containing k decision trees.

[0112] Preferably, the specific steps of selecting the best partitioning features and partitioning points according to the information gain of the features are as follows:

[0113] Calculate the information entropy of a data set:

[0114] For a given node, calculate the information entropy of the samples it contains to measure the purity of the sample set:

[0115]

[0116] Where: D represents the sample set of the current node; m represents the number of categories; p i Represents the proportion of the i-th sample in D;

[0117] Calculate the information gain for each feature:

[0118] For each feature A, calculate its information gain for the sample set D, and select the best partitioning feature:

[0119]

[0120] Where: V is the number of values ​​of feature A; D v represents the sample subset corresponding to the value v of feature A; |D v | represents the sample subset Dv The size of; |D| represents the total size of the sample set D;

[0121] Select the feature with the largest information gain: Select the feature with the largest information gain from all features as the partition feature of the current node;

[0122] Determine the split point:

[0123] Based on the Gini index, the optimal partition point is determined according to the selected partition features;

[0124] Divide the dataset:

[0125] According to the selected partitioning features and partitioning points, the sample set D of the current node is divided into multiple sub-sets, and each sub-set corresponds to a sub-node.

[0126] Step 5: Analyze the quality risk level of the construction project based on the trained quality risk prediction model and generate a risk assessment report.

[0127] In summary, this embodiment improves the consistency and integrity of data by fusing and integrating data from different data sources. By aligning and interpolating data, errors and deviations caused by inconsistent data are eliminated, making the data more comparable and interpretable.

[0128] The features from different data sources are integrated to form a more comprehensive feature vector, which is conducive to the comprehensive analysis of the overall situation of the construction site. At the same time, quality control, detection and correction of outliers ensure the accuracy and reliability of the data.

[0129] The principal component analysis method is used to reduce the dimension of the fused data and identify key features related to building quality. These features can more accurately reflect the actual situation of the construction site and provide an important basis for subsequent modeling and prediction.

[0130] The random forest model is constructed based on the extracted key features, which improves the reliability and accuracy of modeling. The random forest model can handle a large amount of data and features, has strong generalization ability, and can better adapt to the complex construction site environment.

[0131] Using the trained quality risk prediction model to analyze the quality risk level of construction projects can accurately assess the quality status of construction sites and promptly identify potential risks, which helps to take appropriate measures for adjustment and improvement.

[0132] The generated risk assessment report provides detailed quality information and prediction results, and provides managers with a scientific basis and decision-making support, which helps to adjust construction plans in a timely manner, strengthen quality control, minimize the probability of quality risks, and ensure the quality and safety of construction projects.

[0133] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. An intelligent building quality risk prediction method, characterized in that: The following steps are involved: Step 1: Collect environmental data and structural data of the construction site and pre-process the collected data; Step 2: Based on data fusion technology, the pre-processed data is fused with multi-source data; Step 3: Use machine learning algorithms to extract features from the multi-source data fusion data and identify key features related to building quality; Step 4: construct a building quality risk prediction model, and train the building quality risk prediction model based on the extracted key features to obtain a trained building quality risk prediction model; Step 5: Analyze the quality risk level of the construction project based on the trained quality risk prediction model and generate a risk assessment report.

2. The intelligent building quality risk prediction method according to claim 1 is characterized in that: The step 2 comprises the following steps: Data source integration: Integrate the collected environmental data and structural data into a unified data set; Data alignment: Time alignment of data from different data sources; interpolation or downsampling of data with different sampling frequencies; Feature fusion: Combine the features of different data sources to form a new feature vector: Fusion feature =[Teature1,Feature2,...,Feature n ]; Where: Fusion feature is the vector after feature fusion; Feature i Represents the characteristics of the i-th data source; Quality control: Perform quality control on the fused data to detect whether there are outliers or erroneous data. If so, correct or eliminate them.

3. The intelligent building quality risk prediction method according to claim 1 is characterized in that: In step 3, the principal component analysis method is used to identify key features. The specific steps are as follows: Data standardization: standardize the multi-source fused data to make its mean 0 and standard deviation 1; Feature extraction: The principal component analysis method is used to obtain the eigenvector of each principal component, and the number of principal components is retained according to the variance explanation ratio of the principal component; the original features are converted into new spatial features using the selected principal components, and the coordinates of each sample in the new feature space are its corresponding principal component coefficients, representing the projection value of the sample on each principal component; based on this, the key features related to building quality are obtained.

4. The intelligent building quality risk prediction method according to claim 3 is characterized in that: The specific steps of feature extraction are as follows: Calculate the covariance matrix: Calculate the standardized data set X and the covariance matrix ∑. The covariance matrix represents the degree of correlation between the various features of the data: Where: X represents the standardized data set, the size is m×d, where m represents the number and d represents the feature dimension; Represents the mean vector of each feature; n represents the number of samples; Solve the eigenvalues ​​and eigenvectors: Perform eigenvalue decomposition on the covariance matrix ∑ to obtain the eigenvalues ​​and corresponding eigenvectors: ∑·V=A·V; Where: V represents the eigenvector matrix, each column is an eigenvector, the size is d×d; Λ represents the diagonal matrix, the elements on the diagonal are eigenvalues, the size is d×d; Select principal components: Select principal components that can retain more than 90% of the total variance; Feature transformation: The original features are transformed into a new feature space using the selected principal components: Z=X·V k ; Where: Z represents the transformed feature matrix, the size is m×k, k is the number of principal components selected; V k Represents the matrix consisting of the first k eigenvectors selected by u, with a size of d×k.

5. The intelligent building quality risk prediction method according to claim 1 is characterized in that: The building quality risk prediction model adopts a random forest model, and the specific structure is as follows: The random forest model consists of multiple decision trees, each of which is independent and randomly generated; Each decision tree consists of multiple nodes and leaf nodes. The nodes are used for feature division, and the leaf nodes are used for final prediction. Each node will be divided according to the value of the feature, and the feature that can maximize the purity of information after division is selected as the division criterion.

6. The intelligent building quality risk prediction method according to claim 5 is characterized in that: The training steps of the random forest are as follows: In the training process of each tree, Bootstrap Sampling method is used to extract samples from the training set with replacement to construct different training sets; For each decision tree, the divided training set is used for training, and the best division features and division points are selected according to the information gain of the features; the tree is continuously grown until the conditions for stopping growth are met.

7. The intelligent building quality risk prediction method according to claim 6 is characterized in that: The specific steps of extracting samples with replacement from the training set using the Bootstrap Sampling method to construct different training sets are as follows: Random sampling: For the original training set D, let it contain n samples; for each sampling, randomly select n samples from D that have playback to form a new training set D i ; Repeated sampling: Repeat random sampling to obtain multiple different training sets D1, D2, ..., D k , a total of k; Use each sampled training set D i To train an independent decision tree, we get a random forest containing k decision trees.

8. The intelligent building quality risk prediction method according to claim 6 is characterized in that: The specific steps for selecting the best partitioning features and partitioning points based on the information gain of the features are as follows: Calculate the information entropy of a data set: For a given node, calculate the information entropy of the samples it contains to measure the purity of the sample set: Where: D represents the sample set of the current node; m represents the number of categories; p i Represents the proportion of the i-th sample in D; Calculate the information gain for each feature: For each feature A, calculate its information gain for the sample set D, and select the best partitioning feature: Where: V is the number of values ​​of feature A; D v represents the sample subset corresponding to the value v of feature A; |D v | represents the sample subset D v The size of; |D| represents the total size of the sample set D; Select the feature with the largest information gain: Select the feature with the largest information gain from all features as the partition feature of the current node; Determine the split point: Based on the Gini index, the optimal partition point is determined according to the selected partition features; Divide the dataset: According to the selected partitioning features and partitioning points, the sample set D of the current node is divided into multiple sub-sets, and each sub-set corresponds to a sub-node.

Citation Information

Patent Citations

  • Road traffic accident risk factor analysis method based on random forest

    CN110276370A

  • Building safety monitoring and early warning system and method based on multi-source data

    CN112017419A

  • Automatic diagnosis method for experimental data of power system

    CN116226767A

  • Diabetes risk early warning method based on big data analysis

    CN117253614A

Cited By

  • Large model-based risk building identification method, system and equipment and medium

    CN119863120A

  • Historic building structure disease modeling analysis method and system based on multivariate data

    CN119989205A

  • Universal operation robot intelligent control method and system based on AI

    CN122210666A