Engineering construction intelligent management platform and method based on digital delivery

By analyzing the acceleration trend and stress tendency of building stress data on the intelligent management platform of engineering construction, the problem of low accuracy of building quality detection in the existing technology is solved, and an intelligent judgment on the safety of building structures is achieved. and guarantee of quality and safety.

CN118735369BActive Publication Date: 2024-11-22BEIJING ZHONGKE FULONG TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411232411.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-22
Estimated Expiration
2044-09-04

AI Technical Summary

Technical Problem

During the construction process, the accuracy of the existing technology for building quality inspection is not high enough, especially in harsh environments, the accuracy and reliability of stress sensor data are affected, resulting in high cost and low accuracy of manual inspection.

Method used

By obtaining the stress data of the building, analyzing the acceleration trend and stress tendency of the stress data in timing, and using the intelligent management platform for engineering construction for automatic inspection to ensure the safety of the building structure.

Benefits of technology

It improves the accuracy of project quality inspection, realizes intelligent judgment on the safety of building structures, reduces manual inspection costs, and ensures building quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735369B_ABST
    Figure CN118735369B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of data processing technology, and in particular to an engineering construction intelligent management platform and method based on digital delivery, the method comprising: obtaining stress data of a building; determining the acceleration trend of the stress data in time series; determining the stress tendency based on the acceleration trend and the stress data; and detecting the structural safety of the building based on the stress tendency on the engineering construction intelligent management platform. The method comprehensively considers the acceleration trend and stress tendency of the stress data through the engineering construction intelligent management platform, can more intelligently judge the structural safety of the building, and improves the accuracy of engineering quality detection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing technology, and in particular to an engineering construction intelligent management platform and method based on digital delivery in the field of data processing technology. Background Art

[0002] With the rapid development of information technology, digital delivery has become an important development trend in the field of engineering construction. Traditional engineering construction management methods face problems such as inefficiency and waste of resources. Digital delivery introduces advanced information technology means, such as building information modeling, the Internet of Things, and cloud computing. The quality and safety of engineering construction is one of the core concerns in the field of engineering construction. With the continuous advancement of science and technology, the application of new technologies has brought unprecedented opportunities and challenges to the quality and safety management of engineering construction.

[0003] In the process of engineering construction, the safety of engineering quality is the most important part of the engineering construction field. If any engineering construction does not have strict quality management, it will eventually be full of hidden dangers and crises. Buildings that do not meet the quality standards will not only cause huge property losses, but also affect the industry status and reputation of the construction party itself. Therefore, it is very important to control the quality and safety of the building. At present, in order to ensure the safety and stability of the building during the construction process, various professional stress sensors are usually selected to transmit the collected data to the engineering construction intelligent management platform. Due to the harsh environment of the construction site during construction, the stress sensor may be exposed to high temperature, humidity, rain soaking and other environments, which will affect the accuracy, reliability and long-term performance of the stress sensor. The data of the stress sensor becomes abnormal, and it is difficult to accurately judge the abnormality of the data; and the existing detection method is the method of manual investigation. Due to the complexity of various formwork supports, anchoring structures, etc. on the construction site, the cost of manual investigation is high, and the accuracy of engineering quality detection is not high enough. Summary of the invention

[0004] In order to solve the technical problem that the accuracy of engineering quality detection in the prior art is not high enough, the purpose of the present invention is to provide an engineering construction intelligent management platform and method based on digital delivery. The technical solutions adopted are as follows:

[0005] In a first aspect, an embodiment of the present invention provides a method for intelligent management of engineering construction based on digital delivery, the method comprising:

[0006] Obtain stress data of buildings;

[0007] To determine stress tendencies based on acceleration trends and stress data;

[0008] On the intelligent management platform for engineering construction, the structural safety of buildings is detected based on stress tendency.

[0009] Secondly, it provides an intelligent management platform for engineering construction based on digital delivery, which includes:

[0010] An acquisition module, used to obtain stress data of a building;

[0011] A first determination module is used to determine the acceleration trend of stress data in time series;

[0012] A second determination module is used to determine stress tendency based on the acceleration trend and stress data;

[0013] A detection module is used to detect the structural safety of a building based on stress tendency on an engineering construction intelligent management platform. In a third aspect, a computer program product is provided, the computer program product comprising: a computer program code, when the computer program code is run on a computer, the computer executes the method in the first aspect or any possible implementation of the first aspect.

[0014] In a fourth aspect, a computer-readable storage medium is provided, which stores a computer program code. When the computer program code runs on a computer, the computer executes the method in the above-mentioned first aspect or any possible implementation manner of the first aspect.

[0015] The present invention has the following beneficial effects: after obtaining the stress data of the building, by analyzing the changes in the stress data in time series, the acceleration trend of the stress data in time series is calculated, so that the change trend of the stress data in time series can be accurately reflected through the acceleration trend. Afterwards, based on the acceleration trend and the stress data, the stress tendency is determined, and the structural safety of the building is detected based on the stress tendency on the engineering construction intelligent management platform. In this way, the stress data of the building is analyzed through the engineering construction intelligent management platform, and by analyzing the acceleration trend and stress tendency of the stress data, it is possible to accurately judge whether the structural safety of the building is abnormal, so as to ensure the quality and safety of the engineering building; in this way, by comprehensively considering the acceleration trend and stress tendency of the stress data through the engineering construction intelligent management platform, the structural safety of the building can be judged more intelligently, and the accuracy of engineering quality detection is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is a schematic diagram of the implementation process of the engineering construction intelligent management method based on digital delivery provided by an embodiment of the present invention;

[0018] Figure 2 It is another implementation flow diagram of the engineering construction intelligent management method based on digital delivery provided by an embodiment of the present invention;

[0019] Figure 3 It is another implementation flow diagram of the engineering construction intelligent management method based on digital delivery provided by an embodiment of the present invention;

[0020] Figure 4 It is a schematic diagram of an application scenario of the engineering construction intelligent management method based on digital delivery provided by an embodiment of the present invention;

[0021] Figure 5 This is another application scenario schematic diagram of the engineering construction intelligent management method based on digital delivery provided by an embodiment of the present invention;

[0022] Figure 6 It is a schematic diagram of another application scenario of the engineering construction intelligent management method based on digital delivery provided by an embodiment of the present invention;

[0023] Figure 7 It is a schematic diagram of the composition structure of the engineering construction intelligent management platform based on digital delivery provided by an embodiment of the present invention;

[0024] Figure 8 It is a structural schematic diagram of a computer device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0025] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation method, structure, characteristics and effects of the engineering construction intelligent management method based on digital delivery proposed by the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0026] Among them, in the description of the embodiments of the present invention, unless otherwise specified, " / " means or, for example, A / B can mean A or B: "and / or" in the text is only a way to describe the association relationship of associated objects, indicating that there can be three relationships, for example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, in the description of the embodiments of the present invention, "multiple" refers to two or more than two.

[0027] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as suggesting or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features.

[0028] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0029] The specific scheme of the engineering construction intelligent management method based on digital delivery provided by the present invention is explained in detail below with reference to the accompanying drawings.

[0030] See also Figure 1 , which shows a flowchart of an implementation method of a smart engineering construction management method based on digital delivery provided by an embodiment of the present invention. The method can be implemented by the following steps:

[0031] 101, obtain stress data of the building.

[0032] Here, stress data is obtained by determining multiple stress sensors uniformly arranged on the same plane of the building and using the multiple stress sensors to collect data on the building. Here, the multiple stress sensors are set at different positions on the same plane of the building. The multiple stress sensors can collect data from different angles of the building to obtain relatively rich stress data, so as to detect whether the structure of the building is safe through the stress data.

[0033] In some possible implementations, a suitable type of stress sensor is selected according to the actual situation of the engineering construction. According to the specific structural characteristics of the engineering construction, stress sensors are evenly arranged on the same plane; and according to different building types, stress sensors are installed at the structural stress points of the building to detect stress changes in the building and various safety performances of the building. Taking the building as a house building as an example, stress sensors for detecting the structural safety of the house building are installed at the structural stress points of the house building, and they are evenly arranged on the same plane at the bottom of the floor (such as the four structural corner points of a standard conventional floor). The embodiment of the present application selects data of the stress dimension to detect the quality and safety of the house building; real-time acquisition is performed at a collection frequency of 1 time / second (s) to obtain stress data.

[0034] 102, determine the accelerating trend of stress data in time series.

[0035] Here, stress changes are analyzed by stress data, so that the acceleration trend of stress changes in time series can be accurately analyzed. In some possible implementations, the above step 102 can be performed by Figure 2 The steps shown achieve:

[0036] 201, based on the stress data, determining stress changes over time.

[0037] Here, according to the stress values ​​corresponding to each time point in the stress data, the distribution of the stress values ​​changing with time series can be obtained, that is, the stress changes in time series can be obtained to reflect the changes in the stress values ​​changing with time series.

[0038] 202, determine the accelerating trend of stress changes in time series.

[0039] Here, the stress difference between any two moments is determined in time series through stress changes; and based on the stress difference, the acceleration trend of stress changes in time series is determined. Among them, since the stress change includes the stress value at each time point, the difference between the stress values ​​at any two moments, that is, the stress difference, can be obtained through the stress change. Then, by combining the stress difference with the slope of the corresponding curve of the stress value at any two moments, the acceleration trend of stress changes in time series can be calculated. In this way, by analyzing the stress changes of stress data in time series, the stress differences between different moments can be analyzed, and then the acceleration trend of stress changes in time series can be accurately analyzed through the stress difference.

[0040] In some possible implementations, when the structure of a building is unstable, its stress will change greatly in time series. When a building is unstable, the force balance of the building is broken, and the stress of stress sensors in various parts of the building changes. Because the force balance of the building is broken, the part with greater force is subjected to greater force, and as time goes by, this uneven force inclination will increase, causing the force changes in various parts of the building to become larger (or smaller) with time, and its stress changes have a certain acceleration trend in the time series. During the construction process, when external forces such as electric drills and electric hammers are used to smash walls and open holes in buildings, the vibration impact on the building is continuous in a short period of time; because the output power of tools such as external forces is certain, and the stress changes caused by external forces on the building in the time series are short-term and have a certain regularity, that is, the impact of each external force on the stress change of the building is consistent, and there is no accelerated change with the passage of time.

[0041] Based on this, the acceleration trend of the stress change of the stress sensor in time series is calculated, as shown in formula (1):

[0042] (1);

[0043] in, Indicates the acceleration trend of stress change of the stress sensor at the zth moment in the time series; represents the stress value on the stress sensor at the zth moment in the time series. Similarly, represents the stress value on the stress sensor at the xth moment in the time series, It represents the stress value of the stress sensor at the x+1th moment in the time series, and X represents the data of a total of X moments in the time series. It represents the slope of the stress value at the xth moment and the stress value at the x+1th moment in the time series.

[0044] It represents the stress difference of the stress sensor at time z and time x. The larger the value is, the greater the stress difference at that moment is, and the greater the degree of stress change is. Indicates the trend of stress change in time series. The larger it is, the greater the trend of stress change; It indicates the magnitude of the stress change slope between the xth moment and the adjacent x+1th moment in the time series. When the stress change trend is greater, the degree of change of its slope is greater; therefore, when the cumulative stress change in the entire time series is greater, that is, The larger the value is, the greater the acceleration trend of the stress change of the stress sensor in the time series.

[0045] 103. Determine stress tendency based on acceleration trend and stress data.

[0046] Here, the stress tendency is used to characterize the tendency of stress change of a single stress sensor. In some possible implementations, the above step 103 can be performed by Figure 3 The steps shown achieve:

[0047] 301 , based on the stress data, determining a target stress sensor having a maximum collected stress value.

[0048] Here, when the building loses balance (e.g. Figure 4 As shown in the building 401 in FIG. 1 , the main view of the building is as follows Figure 5 As shown in the main view 51 in FIG. 5 , the plan view of the building is as follows Figure 5As shown in the plan view 52 in the figure, as the original force balance is broken, the building on the side that tends to fall will tilt more and more over time, and the tilt degree will be more severe; on the opposite side of the tilted side of the building, the building's center of gravity shifts over time, and the shift to the tilted side causes the stress of the building to change in a tendency, that is, the stress change of the stress sensor installed in the building is large; and the positive stress change of the stress sensor on the offset side of the building is getting bigger and bigger, that is, the stress value of the stress sensor is getting bigger and bigger. On the opposite side of the offset of the building, the negative stress change of the stress sensor is getting bigger and bigger. Because of the different building structures, the number and point positions of the stress sensors are different. When multiple stress sensors are arranged on the building for simultaneous measurement, the multiple stress sensors are installed on a horizontal plane. From the plane, the stress change of each stress sensor has a certain direction directivity; therefore, the stress change of a single stress sensor has a certain tendency. That is, the stress change of multiple stress sensors on the same plane at the same time has a certain directionality and tendency. Record the stress values ​​of all stress sensors at time z, and mark the location of the stress sensor with the largest stress value at time z (i.e., the target stress sensor) according to the different stress values ​​on the stress sensors (i.e., the location information of the target stress sensor), recorded as S .

[0049] 302 , determining stress tendency based on position information of the target stress sensor, position information of other stress sensors, and acceleration trend.

[0050] Here, the location information of the target stress sensor is the coordinate of the target stress sensor in the building, and the location information of other stress sensors is the coordinate of other stress sensors in the building. The two coordinates are combined with the acceleration trend to calculate the stress tendency.

[0051] In some possible implementations, the above step 302 may be implemented by the following steps 321 and 322 (not shown):

[0052] 321 , based on the position information of the target stress sensor and the position information of the other stress sensors, determine the shortest straight-line distance between the target stress sensor and the other stress sensors.

[0053] Here, the straight-line distance between the target stress sensor and each other stress sensor is calculated by the coordinates of the target stress sensor in the building and the coordinates of the other stress sensors in the building, so as to obtain the shortest straight-line distance.

[0054] 322, determine stress tendency based on shortest straight line distance and acceleration trend.

[0055] Here, at the location of other stress sensors, the stress gradient vector at the location of the stress sensor is obtained. . And the direction of its stress gradient points to the place where the stress is greater. Calculate whether the extension direction of the stress gradient vector at the location of the target stress sensor c and other stress sensors v intersects at one point, then there is , represents the shortest straight-line distance between stress sensor c and stress sensor v. When the shortest straight-line distance is 0, it means that the stress gradient vectors at the locations of stress sensor c and stress sensor v can intersect at one point. Figure 6 As shown, stress gradient vectors 61, 62 and 63 at different positions can intersect at one point. In this way, the target stress sensor is determined from multiple stress sensors through stress data, so that the stress tendency can be accurately calculated by analyzing the position information of the target stress sensor and the position information of other stress sensors and combining the acceleration trend.

[0056] In some possible implementations, first, the stress position matching between the target stress sensor and other stress sensors is determined by the shortest straight line distance; for example, the intersection distance between the target stress sensor and the other stress sensors is calculated. The smaller the distance between the intersection points of the target stress sensor and the other stress sensors, that is, the more the intersection points of the extended lines of the stress gradient vectors are concentrated at one point, the better the stress position matching of the target stress sensor is. The stress position matching between the target stress sensor c and the other stress sensors v is shown in formula (2):

[0057] (2);

[0058] in: represents the stress position matching of the target stress sensor c, It means that there are V stress sensors installed on the floor plane of the same building. The larger the value, the better the stress position matching of the target stress sensor c. exp() represents an exponential function with a natural constant as the base.

[0059] Then, based on the stress position matching and acceleration trend, the stress tendency is determined.

[0060] Here, the difference information between the stress data collected by the target stress sensor and other stress sensors at the same time is determined; and based on the difference information, the stress position matching and acceleration trend are adjusted to obtain the stress tendency. For example, the stress tendency of the target stress sensor c is shown in formula (3):

[0061] (3);

[0062] Among them, sigmoid() represents the activation function, which is used to convert Mapped between 0 and 1. represents the stress tendency of stress sensor c at time z; It represents the acceleration trend of the stress change of stress sensor c at time z in the time series, and represents the confidence level of the stress change of stress sensor c in the formula. represents the stress value on stress sensor c at time z. Similarly, represents the stress value on the stress sensor v at time z; Indicates that there are V stress sensors in total; represents the straight-line distance between stress sensor c and stress sensor v; Indicates the stress position matching between stress sensor c and stress sensor v at time z.

[0063] In formula (3), It represents the difference information of stress data between stress sensors c and v at the same time. When the main axis of the building is offset, that is, the structure is unbalanced, the stress between the stress sensors changes. The farther the distance between any two stress sensors, the greater the stress difference information between the stress sensors. The bigger. The formula represents the evaluation of the stress change of stress sensor c and stress sensor v; the greater the stress position matching of stress sensor c and stress sensor v, the higher the evaluation coefficient of the stress change of stress sensor c and stress sensor v. The greater the stress tendency of stress sensor c at time z, the greater the possibility of structural imbalance in the building at this time, that is, the greater the possibility of danger to the building.

[0064] 104. On the intelligent management platform for engineering construction, the structural safety of buildings is detected based on stress tendency.

[0065] Here, if the stress tendency is greater than or equal to the preset tendency threshold, an alarm message is generated to indicate that the structural safety of the building is abnormal, wherein the alarm message can be output in the form of voice, text or image, etc.; the alarm message is output using the engineering construction intelligent management platform. In some possible implementations, the preset tendency threshold can be custom set, for example, .when When the building is considered to have a high probability of structural safety anomalies, the intelligent management platform for engineering construction will issue early warning prompts, that is, output alarm information, such as by lighting up lights or using buzzers. When the building is considered to have a structural safety anomaly, it is considered that the possibility of abnormalities in the building's structure is small, and the digital engineering construction intelligent management platform displays it normally, indicating that there is no need for excessive safety inspections, thus saving manpower and material resources.

[0066] In an embodiment of the present invention, by analyzing the change of stress data in time series to calculate the acceleration trend of stress data in time series, the change trend of stress data in time series can be accurately reflected through the acceleration trend. Afterwards, based on the acceleration trend and stress data, the stress tendency is determined, and the structural safety of the building is detected based on the stress tendency on the engineering construction intelligent management platform. In this way, the stress data of the building is analyzed through the engineering construction intelligent management platform, and by analyzing the acceleration trend and stress tendency of the stress data, it is possible to accurately judge whether the structural safety of the building is abnormal, so as to ensure the quality and safety of the engineering building; in this way, through the engineering construction intelligent management platform combined with the acceleration trend and stress tendency of stress data, the structural safety of the building can be judged more intelligently, and the safety of the building can be detected in real time at every critical moment, so that the safety of the building is more guaranteed.

[0067] The embodiment of the present invention provides an engineering construction intelligent management platform based on digital delivery, such as Figure 7 As shown, platform 700 includes:

[0068] An acquisition module 701 is used to acquire stress data of a building;

[0069] The first determination module 702 is used to determine the acceleration trend of stress data in time series;

[0070] The second determination module 703 is used to determine the stress tendency based on the acceleration trend and the stress data;

[0071] The detection module 704 is used to detect the structural safety of the building based on stress tendency on the engineering construction intelligent management platform.

[0072] In some possible implementations, the acquisition module 701 is further used to determine a plurality of stress sensors uniformly arranged on the same plane of the building; and use the plurality of stress sensors to collect data on the building to obtain stress data.

[0073] In some possible implementations, the first determination module 702 is further configured to determine stress changes in time series based on the stress data; and determine an acceleration trend of the stress changes in time series.

[0074] In some possible implementations, the first determination module 702 is further configured to determine the stress difference between any two moments in time series based on the stress change; and determine the acceleration trend of the stress change in time series based on the stress difference.

[0075] In some possible implementations, the second determination module 703 is further used to determine the target stress sensor with the largest collected stress value based on the stress data; and determine the stress tendency based on the position information of the target stress sensor, the position information of other stress sensors and the acceleration trend.

[0076] In some possible implementations, the second determination module 703 is further used to determine the shortest straight-line distance between the target stress sensor and the other stress sensors based on the position information of the target stress sensor and the position information of the other stress sensors; and determine the stress tendency based on the shortest straight-line distance and the acceleration trend.

[0077] In some possible implementations, the second determination module 703 is further configured to determine stress position matching between the target stress sensor and other stress sensors based on the shortest straight-line distance; and determine stress tendency based on stress position matching and acceleration trend.

[0078] In some possible implementations, the second determination module 703 is further used to determine difference information between stress data collected by the target stress sensor and other stress sensors at the same time; and adjust the stress position matching and acceleration trend based on the difference information to obtain stress tendency.

[0079] In some possible implementations, the detection module 704 is also used to generate an alarm message for indicating that an abnormality has occurred in the structural safety of the building if the stress tendency is greater than or equal to a preset tendency threshold; and output the alarm message using an engineering construction intelligent management platform.

[0080] Optionally, the transmission medium may be a wired link (such as but not limited to coaxial cable, optical fiber and digital subscriber line (DSL), etc.) or a wireless link (such as but not limited to wireless Fidelity (WIFI), Bluetooth and mobile device network, etc.). It should be noted that the device provided in the above embodiment is only illustrated by the division of the above functional modules. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the computer device is divided into different functional modules to complete all or part of the functions described above. In addition, the method embodiments provided in the above embodiments belong to the same concept. The specific implementation process is detailed in the method embodiments, which will not be repeated here.

[0081] Figure 8 is a schematic diagram of the structure of a computer device provided by an embodiment of the present invention. Figure 8As shown, the computer device 800 includes: a memory 801, a processor 802, and a computer program 803 stored in the memory 801 and running on the processor 802, wherein when the processor 802 executes the computer program 803, the computer device can execute any one of the engineering construction intelligent management methods based on digital delivery introduced above.

[0082] In addition, an embodiment of the present invention also protects a device, which may include a memory and a processor, wherein an executable program code is stored in the memory, and the processor is used to call and execute the executable program code to execute the engineering construction intelligent management method based on digital delivery provided by the embodiment of the present invention. In this embodiment, the functional modules of the device can be divided according to the above method example. For example, it can correspond to each functional module, or two or more functions can be integrated into one processing module. The above integrated module can be implemented in the form of hardware. It should be noted that the division of modules in this embodiment is schematic, which is only a logical function division, and there may be other division methods in actual implementation. It should be noted that all relevant contents of each step involved in the above method embodiment can be referred to the functional description of the corresponding functional module, which will not be repeated here.

[0083] It should be understood that the device provided in this embodiment is used to execute the above-mentioned engineering construction intelligent management method based on digital delivery, so the same effect as the above-mentioned implementation method can be achieved. In the case of an integrated unit, the device may include a processing module and a storage module. Among them, when the device is applied to a device, the processing module can be used to control and manage the actions of the device. The storage module can be used to support the device to execute mutual program codes, etc. Among them, the processing module can be a processor or a controller, which can implement or execute various exemplary logic boxes, modules and circuits described in conjunction with the disclosure of the present invention. The processor can also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of digital signal processing (DSP) and a microprocessor, etc., and the storage module can be a memory.

[0084] In addition, the device provided in the embodiment of the present invention may be specifically a chip, a component or a module, and the chip may include a connected processor and a memory; wherein the memory is used to store instructions, and when the processor calls and executes the instructions, the chip can execute the engineering construction intelligent management method based on digital delivery provided in the above embodiment. This embodiment also provides a computer-readable storage medium, in which a computer program code is stored, and when the computer program code is run on a computer, the computer executes the above-mentioned related method steps to implement the engineering construction intelligent management method based on digital delivery provided in the above embodiment.

[0085] This embodiment also provides a computer program product, when the computer program product is run on a computer, the computer executes the above-mentioned related steps to implement the engineering construction intelligent management method based on digital delivery provided by the above embodiment. Among them, the device, computer-readable storage medium, computer program product or chip provided in this embodiment are all used to execute the corresponding method provided above, so the beneficial effects that can be achieved can refer to the beneficial effects in the corresponding method provided above, and will not be repeated here. Through the description of the above implementation mode, the technicians in the relevant field can understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example. In practical applications, the above-mentioned function allocation can be completed by different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In the embodiments provided by the present invention, it should be understood that the disclosed device and method can be implemented in other ways. For example, the device embodiment described above is only schematic, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another device, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interface, device or unit, which may be electrical, mechanical or other forms.

[0086] It should be noted that the sequence of the above-mentioned embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. The process depicted in the accompanying drawings does not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multi-tasking and parallel processing are also possible or may be advantageous. The various embodiments in this specification are described in a progressive manner, and the same and similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments. The above content is only a specific implementation method of the present invention, but the protection scope of the present invention is not limited to this. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered within the protection scope of the present invention.

Claims

1. The intelligent management method of engineering construction based on digital delivery is characterized by: Methods include: Obtain stress data of buildings; Determine the accelerating trend of stress data in time series; Determine stress tendency based on acceleration trend and stress data; On the engineering construction intelligent management platform, the structural safety of buildings is detected based on stress tendency; Based on the stress data, determine the stress changes in time series; Based on the stress change, the stress difference between any two moments is determined in the time series; Based on the stress difference, the acceleration trend of stress change in time series is determined, and the calculation formula is: ; in, Indicates the acceleration trend of stress change of the stress sensor at the zth moment in the time series; represents the stress value on the stress sensor at the zth moment in the time series, represents the stress value on the stress sensor at the xth moment in the time series, represents the stress value of the stress sensor at the x+1th moment in the time series, X represents the data of X moments in the time series, It represents the slope of the stress value at the xth moment and the stress value at the x+1th moment in the time series; Based on the stress data, determine the target stress sensor with the largest collected stress value; based on the position information of the target stress sensor and the position information of other stress sensors, determine the shortest straight-line distance between the target stress sensor and the other stress sensors; based on the shortest straight-line distance, determine the stress position matching between the target stress sensor and the other stress sensors; determine the difference information between the stress data collected by the target stress sensor and the other stress sensors at the same time; adjust the stress position matching and acceleration trend based on the difference information to obtain the stress tendency; The calculation formula for the stress position matching is: in, represents the stress position matching of the target stress sensor c, It means that there are V stress sensors installed on the floor plane of the same building; represents the shortest straight-line distance between stress sensor c and stress sensor v; the calculation formula of the stress tendency is: ; Among them, sigmoid() represents the activation function, which is used to convert Mapped to between 0 and 1; represents the stress tendency of stress sensor c at time z; It represents the acceleration trend of stress change of stress sensor c at time z in time series, and represents the confidence level of stress change of stress sensor c in the formula; represents the stress value on stress sensor c at time z, represents the stress value on the stress sensor v at time z; Indicates that there are V stress sensors in total; represents the straight-line distance between stress sensor c and stress sensor v; Indicates the stress position matching between stress sensor c and stress sensor v at time z.

2. The engineering construction intelligent management method based on digital delivery according to claim 1 is characterized in that: Obtain stress data for buildings, including: determining a plurality of stress sensors uniformly arranged on the same plane of a building; Multiple stress sensors are used to collect data from buildings and obtain stress data.

3. The engineering construction intelligent management method based on digital delivery according to claim 1 is characterized in that: On the engineering construction intelligent management platform, the structural safety of buildings is detected based on stress tendency, including: If the stress tendency is greater than or equal to a preset tendency threshold, an alarm message is generated to indicate that the structural safety of the building is abnormal; Use the engineering construction intelligent management platform to output alarm information.

4. The engineering construction intelligent management platform based on digital delivery is characterized by: The platform is used to implement the steps of the engineering construction intelligent management method based on digital delivery as described in any one of claims 1 to 3, and the platform includes: An acquisition module, used to obtain stress data of a building; A first determination module is used to determine the acceleration trend of stress data in time series; A second determination module is used to determine stress tendency based on the acceleration trend and stress data; The detection module is used to detect the structural safety of buildings based on stress tendency on the engineering construction intelligent management platform.

Citation Information

Cited By

  • Engineering construction intelligent management platform and method based on digital delivery

    CN120355278A