Information processing apparatus and information processing method

Through the information processing device, the traceability information and product relationship information of the supply chain enterprise are accessed, the update authority account is determined and the update is entrusted, which solves the problem of long information dissemination time and realizes the efficient collection of information in the supply chain.

CN118735532APending Publication Date: 2024-10-01TOYOTA JIDOSHA KK
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311777632.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-03-28
Filing Date
2023-12-22
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

When existing systems collect traceability-related information in the supply chain, information dissemination takes a long time and it is difficult to efficiently collect the latest information.

Method used

Access information related to supply chain enterprise products (first information) and information on relationships between products (second information) through the information processing device, obtain the update deadline, determine the account with update authority, and notify the entrusted party of the update before the update deadline information.

Benefits of technology

There is no need to relay information requests between companies, and each company is directly entrusted to update the information, which improves the collection efficiency of traceability information in the entire supply chain.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735532A_ABST
    Figure CN118735532A_ABST
Patent Text Reader

Abstract

The invention relates to an information processing apparatus and an information processing method. An information processing device is a device capable of accessing first information relating to the traceability of products of each enterprise included in a supply chain and second information indicating the relationship between products of each enterprise included in a target product. A control unit of an information processing apparatus acquires an update time limit of first information. A control unit of the information processing apparatus specifies a plurality of included products included in the target product and a plurality of first accounts each having an update authority for the first information of each of the plurality of included products by referring to the second information. Then, the control unit notifies, to each of the specified first accounts, a request relating to the update of the first information before the update deadline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to an information processing device and an information processing method. Background Art

[0002] Japanese Patent Laid-Open No. 2004-171146 discloses an inter-enterprise data communication system, which connects a supply chain consisting of multiple enterprises and a management server that manages data between multiple enterprises constituting the supply chain via a communication line. In the inter-enterprise data communication system disclosed in Japanese Patent Laid-Open No. 2004-171146, the management server has: a contract database that stores enterprise information of enterprises that have signed contracts and contract unique IDs corresponding to contracts; a transaction commodity database that stores commodity information of contracted commodities; and a transaction condition database that stores individual information on the seller side and the customer side for each contract unique ID of the signed contract. Then, in the inter-enterprise data communication system, the management server uses the signed contract unique ID as a keyword to retrieve the individual information on the seller side and the customer side stored in the transaction condition database, and performs code translation on the individual information on the seller side and the customer side. Summary of the invention

[0003] An object of the present disclosure is to provide a technology capable of efficiently collecting the latest information related to traceability in the entire supply chain.

[0004] An information processing device according to a first aspect of the present disclosure is capable of accessing first information and second information, wherein the first information is information related to the traceability of products of each enterprise included in a supply chain, and the second information is information indicating a relationship between products of each enterprise included in a target product, wherein the information processing device includes a control unit configured to perform the following operations:

[0005] Obtaining the update period of the first information;

[0006] By referring to the second information, determining a plurality of included products included in the target product and a plurality of first accounts having update authority for the first information of the respective plurality of included products; and

[0007] A request for updating the first information is notified to each of the identified first accounts before the update deadline.

[0008] The information processing method of the second aspect of the present disclosure is an information processing method executed by a computer capable of accessing first information and second information, wherein the first information is information related to the traceability of products of each enterprise included in the supply chain, and the second information is information indicating the relationship between products of each enterprise included in the target product, wherein the information processing method comprises:

[0009] Obtaining the update period of the first information;

[0010] By referring to the second information, determining a plurality of included products included in the target product and a plurality of first accounts having update authority for the first information of the respective plurality of included products; and

[0011] A request for updating the first information is notified to each of the identified first accounts before the update deadline.

[0012] According to the present disclosure, it is possible to efficiently collect the latest information related to traceability in the entire supply chain. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Features, advantages, and technical and industrial significance of exemplary embodiments of the present invention will be described below with reference to the accompanying drawings, in which like reference numerals represent like elements, and in which:

[0014] Figure 1 is a diagram showing a schematic structure of an information processing system;

[0015] Figure 2 This is a diagram illustrating an example of the relationship between products supplied by a supply chain;

[0016] Figure 3 This is a block diagram schematically showing an example of the software structure of the server;

[0017] Figure 4 is a diagram showing an example of a table structure of tree information held in a tree information database;

[0018] Figure 5 is a diagram showing an example of a table structure of traceability information held in a traceability information database;

[0019] Figure 6 is a flowchart of a first information process executed by a control unit of a server;

[0020] Figure 7 is a flowchart of a second information process executed by a control unit of the server; and

[0021] Figure 8 This is a flowchart of the third information processing executed by the control unit of the server. DETAILED DESCRIPTION

[0022] Consider a situation where a product is supplied by a supply chain including multiple companies. In such a supply chain, there is a need to obtain information related to traceability, such as the total amount of greenhouse gas emitted in the manufacture of the final product. To achieve this, it is necessary to collect information related to traceability, such as the amount of greenhouse gas emitted in the production of intermediate products, from multiple companies included in the supply chain.

[0023] In the previous system, in order to collect information related to traceability, it is necessary to exchange information between multiple companies included in the supply chain. For example, consider a method of relaying a request for each company to input information related to traceability from the downstream side of the supply chain to the upstream side. However, if such a method is adopted, the information propagation takes time and it is difficult to efficiently collect information related to traceability. The information processing device of the first method of the present disclosure solves such a problem.

[0024] The information processing device of the first mode of the present disclosure is a device capable of accessing the first information and the second information. Here, the first information is information related to the traceability of the products of each enterprise included in the supply chain. In addition, the second information is information indicating the relationship between the products of each enterprise included in the target product. The control unit of the information processing device of the first mode of the present disclosure obtains the update deadline of the first information. In addition, the control unit of the information processing device determines the multiple included products included in the target product and the multiple first accounts that have the update authority for the first information of each of the multiple included products by referring to the second information. Then, the control unit notifies each of the determined first accounts of the commission related to the update of the first information before the update deadline.

[0025] As described above, the first account is determined based on the second information by the information processing device. Then, the first account is requested to update the first information including the product by the information processing device. Thus, even without using the method of relaying a request for inputting information (first information) related to traceability between enterprises as described above, each enterprise can update the first information. As a result, the collection of the latest information related to traceability in the entire supply chain can be made more efficient.

[0026] The following describes specific embodiments of the present disclosure based on the drawings. Unless otherwise specified, the hardware configuration, module configuration, functional configuration, etc. described in each embodiment do not limit the scope of protection of the disclosure to these.

[0028] System Overview

[0029] based on Figure 1 An information processing system 1 in this embodiment will be described. Figure 11 is a diagram showing a schematic structure of an information processing system 1. The information processing system 1 is configured to include a plurality of enterprise terminals 100 and a server 200. In the information processing system 1, the enterprise terminals 100 and the server 200 are connected to each other via a network. The network may be, for example, a world-wide public communication network such as the Internet, i.e., a wide area network (WAN).

[0030] First, an example of the structure of a supply chain is described. Figure 1 In the example, the supply chain includes an original equipment manufacturer (OEM) company and multiple supplier companies (Companies A, B and C). The OEM company is a company that assembles the final product. In addition, the supplier company (a company that serves as a supplier) is, for example, a company that supplies parts, raw materials, components, etc. for manufacturing the final product. Each supplier company produces multiple products and delivers the products to the company at the next level. Multiple companies repeat this process and assemble the final product in the final process. It should be noted that the structure of the supply chain may not be limited to such an example. The companies that constitute the supply chain can be appropriately determined based on the implementation method. In another example, the supply chain may also include companies that transport, import, store, wholesale, etc. products.

[0031] In this embodiment, the side that delivers products in a certain level is called the upstream side, and the side that purchases the products and produces new products is called the downstream side. In this specification, the company located on the upstream side is called the upstream company, and the company located on the downstream side is called the downstream company. In addition, the products produced by the upstream company are called upstream products, and the products produced by the downstream company are called downstream products. The downstream products include the upstream products.

[0032] In addition, in this specification, the levels included in the supply chain are referred to as Tiers. Tier 0 is the lowest level for assembling the final product (corresponding to the OEM company), and it migrates to the upstream side as it enters Tier 1, 2, and 3. Depending on the level of interest, downstream companies sometimes become upstream companies. For example, company B in Tier 2 is a downstream company in the relationship with Tier 3, but an upstream company in the relationship with Tier 1. In this way, the definition of upstream companies and downstream companies may change for each level.

[0033] Figure 2 This is a diagram illustrating an example of the relationship between products supplied by a supply chain. Figure 2 In , the supply relationship of multiple products that constitute the final product X is represented by a tree diagram. Figure 2In the example shown, the final product X is produced by assembling products A1, B1, C1, and D1. In addition, product A1 is produced by assembling products A11, A12, and A13. In this way, the relationship between the multiple products constituting the final product X can be represented by a tree diagram in which each product becomes a node. In this embodiment, the relationship between the multiple products is maintained by the tree information described later. The tree information is an example of the second information.

[0034] exist Figure 2 In the example, Company A in Tier 1 produces products A1, B1, C1, and D1, and delivers each product to OEM company in Tier 0. Company B in Tier 2 produces products A11, A12, and A13, and delivers each product to Company A in Tier 1. Company C in Tier 3 produces products A111, A121, A122, and A123, and delivers each product to Company B in Tier 2. It should be noted that multiple companies can be in each Tier, and the products produced by each company can be delivered to upstream companies (companies one tier lower).

[0035] The final product X may be any product. In one example, the final product X may be a battery. The final product X may be, for example, a battery mounted on a vehicle. The battery mounted on a vehicle may be a battery for supplying power to a motor driving the vehicle. The battery mounted on a vehicle may also be a battery for assisting a battery. In addition, the final product X may also be, for example, a stationary storage battery.

[0036] Enterprise Terminal

[0037] The enterprise terminal 100 is a terminal associated with each supplier enterprise. The enterprise terminal 100 accepts input of product information about the products produced by each enterprise. The enterprise terminal 100 sends the product information to the server 200 via the network. At this time, the enterprise terminal 100 can accept the input of product information and send product information by logging into the information processing system 1 with an account assigned to each enterprise. That is, an account with the right to update product information is granted to each enterprise. In addition, the enterprise terminal 100 can receive various information from the server 200 by logging into the information processing system 1 with an account assigned to each enterprise.

[0038] Product information includes information related to traceability (hereinafter also referred to as traceability-related information). Traceability-related information is an example of the first information. In one example, traceability-related information may include at least one of the following information: the amount of greenhouse gas emissions when the enterprise produces the product, the recycling rate of the predetermined raw materials used in the product, and due diligence-related information. In addition, the product information may further include an identifier (enterprise ID) for identifying the enterprise that produces the product, and an identifier (product ID) for identifying the product.

[0039] The information associated with the emission of greenhouse gases is information indicating the emission of greenhouse gases emitted when an enterprise produces a product. In one example, the emission of greenhouse gases included in the product information of the target enterprise indicates the amount of greenhouse gases emitted in the target enterprise, and may not include the amount of greenhouse gases emitted before obtaining the upstream product on the upstream side of the target enterprise. The predetermined raw materials are, for example, lithium, nickel, cobalt, lead, graphite, etc. In one example, the information associated with the recycling rate of the predetermined raw materials may include the comprehensive measurement of the predetermined raw materials used in the production process (the total of the original materials and the recycled materials) and the total amount of the recycled materials. In another example, the information associated with the recycling rate of the predetermined raw materials may include the total amount of the original materials of the predetermined raw materials used in the production process and the total amount of the recycled materials. In addition, the information associated with due diligence may include at least one of the score related to due diligence and the information related to due diligence (for example, a certificate, etc.).

[0040] Input and transmission of product information can be performed by, for example, an operator such as a staff member of each company. The company terminal 100 transmits product information about a product to the server 200 via the network.

[0041] server

[0042] The server 200 is a device for managing information (product information) of products produced by each enterprise included in the supply chain. As a method for collecting the latest (current) information related to traceability through the server 200, a method can be considered in which each enterprise included in the supply chain is determined through individual communication between enterprises from the most downstream enterprise to the most upstream enterprise in the supply chain, and the update of product information is notified to each determined enterprise. However, if such a method is adopted, it is assumed that it will take time to collect the latest product information of each enterprise.

[0043] Therefore, in this embodiment, the server 200 determines the account with the authority to update the product information as the object through the tree information described later, and sends the first notification information for requesting the update of the product information to the determined account (the enterprise terminal 100 associated with each enterprise) via the network. As a result, the product information is prompted to be updated in each enterprise. The server 200 receives information for updating the product information (hereinafter sometimes referred to as "update information") sent by the enterprise terminal 100 associated with each enterprise via the network. Then, the server 200 updates the product information using the received update information.

[0044] Here, the update information may be, for example, the product information itself whose internal data is updated. In addition, the update information may be, for example, information containing only data that needs to be updated in the product information.

[0045] In addition, the first notification information may also include information for inquiring whether there is data to be updated in the data included in the product information (such as greenhouse gas emissions, recycling rates of scheduled raw materials, and information related to due diligence). In this case, if there is no data to be updated in the data included in the product information, the update information may also be information indicating that there is no data to be updated. Details of the method for the server 200 to send the first notification information to the enterprise terminal 100 associated with each enterprise will be described later.

[0046] The server 200 is configured to include a computer having a processor 210, a main storage unit 220, an auxiliary storage unit 230, and a communication interface (communication I / F) 240. The processor 210 is, for example, a central processing unit (CPU) or a digital signal processor (DSP). The main storage unit 220 is, for example, a random access memory (RAM). The auxiliary storage unit 230 is, for example, a read-only memory (ROM). In addition, the auxiliary storage unit 230 is, for example, a hard disk drive (HDD), or a disk recording medium such as a CD-ROM, a DVD disk, or a Blu-ray disk. In addition, the auxiliary storage unit 230 may also be a removable medium (removable storage medium). Here, as a removable medium, for example, a USB memory or an SD card is exemplified. The communication I / F 240 is, for example, a local area network (LAN) interface board or a wireless communication circuit for wireless communication.

[0047] In the server 200, an operating system (OS), various programs, various information tables, etc. are stored in the auxiliary storage unit 230. In addition, in the server 200, the processor 210 can realize the various functions (software modules) described later by loading the program stored in the auxiliary storage unit 230 into the main storage unit 220 and executing it. Among them, part or all of the functions in the server 200 can also be realized by a hardware circuit (hardware module) such as ASIC or FPGA. It should be noted that the server 200 does not necessarily need to be realized by a single physical structure, and can also be composed of multiple computers that cooperate with each other. It should be noted that the enterprise terminal 100 is also configured to include a computer in the same way as the server 200.

[0048] Software Structure

[0049] Next, based on Figure 3 to Figure 5The software configuration of the server 200 constituting the information processing system 1 will be described. Figure 3 2 is a block diagram schematically showing an example of the software configuration of the server 200. The server 200 includes a control unit 201, a communication unit 202, a tree information database 203 (tree information DB203), and a traceability information database 204 (traceability information DB204).

[0050] The control unit 201 is configured to execute arithmetic processing for controlling the server 200 . The control unit 201 may be configured by a processor 210 . The communication unit 202 is configured to execute an operation of connecting the server 200 to a network (transmission / reception of data). The communication unit 202 may be configured by a communication I / F 240 .

[0051] The tree information DB 203 is configured to store tree information. The tree information is configured to represent the relationship between products of each company included in the supply chain. Figure 4 2 is a diagram showing an example of a table structure of tree information stored in the tree information DB 203. The tree information DB 203 can be formed by the auxiliary storage unit 230. The tree information has a company ID field, a Tier field, a product ID field, a delivery destination company ID field, and an account field.

[0052] In the Enterprise ID field, an identifier (Enterprise ID) for identifying each enterprise included in the supply chain is stored. In the Tier field, information indicating the Tier of the enterprise corresponding to the Enterprise ID stored in the Enterprise ID field is stored. In the Product ID field, an identifier (Product ID) for identifying the product produced by the enterprise corresponding to the Enterprise ID stored in the Enterprise ID field is stored. In the Delivery Target Enterprise ID, an identifier (Delivery Target Enterprise ID) for identifying the enterprise of the delivery target of the product corresponding to the Product ID stored in the Product ID field is stored. In the Account field, information indicating the account (account with the authority to update product information) granted to the enterprise corresponding to the Enterprise ID stored in the Enterprise ID field is stored.

[0053] The control unit 201 can understand the supply relationship of multiple products constituting the final product X in the supply chain by referring to the tree information stored in the tree information DB 203. It should be noted that the data format of the tree information can be any format as long as the supply relationship of multiple products constituting the final product X in the supply chain can be understood.

[0054] The control unit 201 receives product information from the enterprise terminal 100 associated with each enterprise included in the supply chain via the communication unit 202. The control unit 201 stores the product information about each enterprise in the traceability information stored in the traceability information DB 204. In addition, the control unit 201 receives update information from the enterprise terminal 100 associated with each enterprise included in the supply chain via the communication unit 202. The control unit 201 updates the traceability information stored in the traceability information DB 204 using the received update information. That is, the control unit 201 updates the product information about each enterprise according to the update information.

[0055] The traceability information DB 204 is configured to store traceability information. The traceability information includes product information received from a plurality of companies included in the supply chain. The traceability information DB 204 may be configured by the auxiliary storage unit 230 . Figure 5 2 is a diagram showing an example of the table structure of the traceability information stored in the traceability information DB 204. The traceability information includes a company ID field, a product ID field, a greenhouse gas field, a recycling rate field, a DD information field, and an update date and time field.

[0056] The enterprise ID field stores the enterprise ID for identifying the enterprise that sent the product information. The product ID field stores the product ID included in the product information. The greenhouse gas field stores information related to the emission of greenhouse gases included in the product information. The recycling rate field stores information related to the recycling rate of the predetermined raw materials included in the product information. The DD information field stores information related to due diligence included in the product information. The update date and time field stores information indicating the date and time when the enterprise corresponding to the enterprise ID stored in the enterprise ID field last sent update information.

[0057] The control unit 201 can obtain information related to greenhouse gas emissions, recycling rates of scheduled raw materials, and due diligence of products produced by each enterprise by acquiring traceability information from the traceability information DB 204. In addition, the control unit 201 can obtain the date and time when each enterprise last updated product information by acquiring traceability information from the traceability information DB 204.

[0058] The control unit 201 obtains the deadline (hereinafter sometimes referred to as the "update deadline") for the traceability information (product information about each company) that needs to be updated. The control unit 201 may also obtain the update deadline input by the administrator of the server 200, for example. In addition, the control unit 201 may also obtain the update deadline determined by the rules related to the update deadline of the product information. In addition, when the control unit 201 is obliged to update the product information according to the law, etc., it may also obtain the update deadline specified by the law. In addition, the control unit 201 may also obtain the update deadline set at predetermined intervals. In addition, the update deadline is, for example, the final deadline of the product information that needs to be updated. In addition, the update deadline may also be a tentative deadline.

[0059] The control unit 201 obtains information of a designated target product (hereinafter sometimes referred to as "designated information"). Here, the target product is, for example, the final product X. In addition, the target product may also be a product (intermediate product) produced by a company located upstream of the OEM company. The control unit 201 refers to the tree information maintained in the tree information DB 203 to determine the products included in the target product designated by the designated information (hereinafter sometimes referred to as "included products"). In addition, the control unit 201 refers to the tree information maintained in the tree information DB 203 to determine the company that produces the included product (hereinafter sometimes referred to as "target company"). Specifically, the control unit 201 obtains the tree information and refers to the supply relationship of multiple products constituting the final product X to determine the included product and the target company.

[0060] Here, when the target product is the final product X, all products produced by companies located upstream of the OEM company become included products. In addition, all companies located upstream of the OEM company become target companies. Figure 2 In the example shown, all companies in Tier 1 to Tier 3 (Companies A, B, and C) become target companies, and all products produced by Companies A, B, and C become included products. Figure 2 In the example shown, when the target product is product A1, products A11, A12, A13, A111, A121, A122, and A123 are included products. In this case, companies located in Tier 2 and Tier 3 (Companies B and C) are targeted companies.

[0061] The control unit 201 refers to the account field in the tree information and determines the account corresponding to the target enterprise (hereinafter sometimes referred to as the "target account"). Then, the control unit 201 sends the first notification information to the target account before the update deadline. Here, the first notification information includes information specifying the deadline for sending the update information to the server 200 (hereinafter sometimes referred to as the "sending deadline"). As a result, the enterprise terminal 100 associated with the target enterprise can receive the notification of the request to update the product information before the sending deadline by logging into the information processing system 1 using the target account. Here, as the sending deadline, a deadline that is earlier than the update deadline is set. In addition, as the sending deadline, a deadline that is the same as the update deadline can also be set.

[0062] Here, the control unit 201 determines the timing of sending the first notification information (hereinafter sometimes referred to as "sending timing"). Here, the control unit 201 determines that the sending timing is before the update deadline. For example, the control unit 201 determines the sending timing as the timing after a predetermined date and time has passed since the date and time when the update deadline is specified by the administrator of the server 200.

[0063] In addition, the control unit 201 may determine the transmission timing at a time before the scheduled date and time of the transmission deadline. In addition, the transmission timing may be a date and time specified by the administrator of the server 200 and a date before the update deadline. In addition, the transmission timing may be a time when the update deadline is specified. In this case, when the administrator of the server 200 inputs the update deadline, the control unit 201 immediately starts executing the process for transmitting the first notification information.

[0064] The control unit 201 receives the update information as a response to the request related to the update of the product information based on the first notification information. In this way, the control unit 201 accepts the response to the request related to the update of the product information based on the first notification information from the target account. On the other hand, the updated product information may not be updated before the scheduled time. Here, the scheduled time is, for example, the sending deadline. In addition, the scheduled time may also be a time before or after the scheduled time of the sending deadline. In addition, the scheduled time may also be the update deadline. In addition, the scheduled time may also be a time before or after the scheduled time of the update deadline.

[0065] The control unit 201 determines whether there are any target enterprises (hereinafter sometimes referred to as "non-sending enterprises") that have not sent update information at a predetermined time. Specifically, the control unit 201 determines whether there are non-sending enterprises by referring to the update date and time field in the traceability information stored in the traceability information DB 204. At this time, if there is a target enterprise stored in the update date and time field whose last update information was sent by the target enterprise before the date and time of sending the first notification information, the control unit 201 determines that there are non-sending enterprises. In addition, for all target enterprises stored in the update date and time field, if the date and time of the last update information sent is after the date and time of sending the first notification information, the control unit 201 determines that there are no non-sending enterprises.

[0066] When it is determined that there is an unsent enterprise, the control unit 201 determines the enterprise located downstream of the unsent enterprise (hereinafter sometimes referred to as the "target downstream enterprise"). Specifically, the control unit 201 determines the target downstream enterprise by referring to the tree information maintained in the tree information DB 203. Here, the target downstream enterprise is typically an enterprise located downstream of the unsent enterprise, and is an enterprise whose Tier is one level lower than the Tier of the target enterprise. The target downstream enterprise may also be an enterprise whose Tier is one level or more lower than the Tier of the target enterprise. In addition, the control unit 201 refers to the tree information to determine the account of the target downstream enterprise.

[0067] The control unit 201 transmits information (hereinafter sometimes referred to as "second notification information") for entrusting the non-sending enterprise with requesting the non-sending enterprise to send update information to the account of the target downstream enterprise (hereinafter sometimes referred to as "target downstream account"). Then, the target downstream enterprise located downstream of the non-sending enterprise that did not send update information at the predetermined timing requests the non-sending enterprise to send update information, thereby prompting the non-sending enterprise to send update information.

[0068] In addition, the control unit 201 may store a flag indicating that the target enterprise (non-sending enterprise) corresponding to the non-sending account is a non-sending enterprise in the traceability information stored in the traceability information DB 204. That is, the control unit 201 may store a flag indicating that the non-sending enterprise has not sent update information in the traceability information stored in the traceability information DB 204. Therefore, the control unit 201 can make various notifications to the account of the non-sending enterprise by referring to the flag indicating that the update information has not been sent.

[0069] First Information Processing

[0070] Next, based on Figure 6 The first information processing executed by the control unit 201 of the server 200 in the information processing system 1 will be described. Figure 62 is a flowchart of a first information process executed by the control unit 201 of the server 200. The first information process is a process for determining a transmission timing. The first information process is started when an update deadline is designated.

[0071] In the first information processing, first, the update deadline is acquired in S101. Next, the transmission timing is determined in S102. Then, the first information processing ends.

[0072] Second Information Processing

[0073] Next, based on Figure 7 The second information processing executed by the control unit 201 of the server 200 in the information processing system 1 will be described. Figure 7 2 is a flowchart of the second information process executed by the control unit 201 of the server 200. The second information process is a process for transmitting the first notification information. The second information process starts when the transmission timing arrives.

[0074] In the second information processing, first, designated information is acquired in S201. Next, in S202, tree information is acquired from tree information DB 203. Next, in S203, the included products included in the target product and the target account corresponding to the included products are determined by referring to the tree information. Next, in S204, the first notification information is sent to the target account. Next, in S205, in order to accept the update information, the update information is received. Then, the second information processing ends.

[0075] Next, based on Figure 8 The third information processing executed by the control unit 201 of the server 200 in the information processing system 1 will be described. The third information processing is a process of transmitting the second notification information for requesting the target downstream account to transmit the update information to the non-transmitting enterprise. Figure 8 2 is a flowchart of the third information process executed by the control unit 201 of the server 200. The third information process starts execution when a predetermined timing comes.

[0076] In the third information processing, first, in S301, traceability information is obtained from the traceability information DB 204. Next, in S302, it is determined whether there is an unsent account with reference to the traceability information. Specifically, if there is a target account whose last update information sent date and time stored in the update date and time field is before the date and time of sending the first notification information, the control unit 201 determines that there is an unsent account. If a negative determination is made in S302, since there is no unsent account, the third information processing ends.

[0077] When a positive determination is made in S302, in S303, the non-sending enterprise and the included products produced by the non-sending enterprise are determined by referring to the traceability information. Next, in S304, the tree information is acquired. Next, in S305, the target downstream enterprise is determined by referring to the tree information. Next, in S306, the target downstream account is determined by referring to the traceability information. Next, in S307, the second notification information is sent to the target downstream account. Then, the third information processing ends.

[0078] At this time, the server 200 may also execute the process of sending the second notification information to the target downstream account again if the non-sending enterprise still does not send the update information after the predetermined date and time from the predetermined timing. If the non-sending enterprise does not send the update information, the process may be repeated. In this case, the server 200 may also shorten the execution interval according to the number of times of the process. By repeatedly sending the second notification information to the target downstream account, the non-sending enterprise can be urged to send the update information more strongly.

[0079] As described above, in the information processing system 1 of the present embodiment, the target account is determined. Then, in the information processing system 1, the target account is requested to send the update information including the product. Thus, even if the notification requesting the sending of the product information to the server 200 is not relayed between enterprises, the sending of the update information can be directly requested to the target enterprise, and the information related to traceability can be efficiently collected.

[0080] In addition, if the target enterprise does not respond to the notification, the server 200 sends a second notification message to the target downstream account. As a result, the target downstream enterprise is prompted to request the target enterprise corresponding to the non-sending account to send update information. Therefore, since the target downstream enterprise is a customer of the target enterprise, the target enterprise corresponding to the non-sending account is strongly urged to send update information. As a result, the latest information related to traceability in the entire supply chain can be reliably collected.

[0081] Modifications

[0082] In the present embodiment, the server 200 stores the tree information in the tree information DB 203 in the server 200. However, the server 200 does not have to store the tree information in the tree information DB 203 in the server 200. In another example, the server 200 may also access the information of the enterprise to which each enterprise delivers products, which is stored in the enterprise terminal 100 associated with each enterprise. Moreover, the server 200 may also obtain the tree information by aggregating the information of the enterprise to which each enterprise delivers products. In another example, the product information of each enterprise may include information (association information) indicating the association relationship between at least one of the upstream products and downstream products related to the target product of the company. In this case, the tree information may also be composed of association information stored as a segment of the product information of each enterprise.

[0083] In addition, in the present embodiment, the server 200 stores the traceability information in the traceability information DB 204 in the server 200. However, the server 200 does not necessarily store the traceability information in the traceability information DB 204 in the server 200. In this case, the server 200 may access the product information about each enterprise stored in the enterprise terminal 100 associated with each enterprise. Furthermore, the server 200 may also obtain the traceability information by collecting the product information about the products of each enterprise.

[0084] In addition, in the present embodiment, at least a portion of the processing of the server 200 can be performed by the terminal of each enterprise (typically the most downstream enterprise). In one example, product information is maintained at the terminal of each enterprise, and the terminal of the most downstream enterprise can communicate with the terminal of each enterprise via a network to collect product information of each enterprise. In this case, the terminal of the most downstream enterprise can maintain tree information about the final product of the object, or can refer to the maintained tree information to access the terminal of each enterprise to collect product information (traceability related information). Alternatively, the terminal of the most downstream enterprise can access the terminal of the Tier 1 enterprise in sequence, and by referring to the related information, trace the product information of the next upstream enterprise from the product information of each enterprise until it reaches the most upstream enterprise, thereby collecting the product information of each enterprise up to the most upstream enterprise (traceability related information).

[0085] Other Implementations

[0086] The above-mentioned embodiment is only an example, and the present disclosure can be implemented with appropriate changes within the scope of the gist thereof. In addition, the processes and components described in the present disclosure can be implemented in combination as long as no technical contradiction occurs.

[0087] In addition, a process described as being performed by one device may be shared and executed by multiple devices. Alternatively, a process described as being performed by different devices may be executed by one device. In a computer system, it is possible to flexibly change which hardware structure (server structure) implements each function.

[0088] The present disclosure can also be implemented in the following manner: a computer program having the functions described in the above embodiments is supplied to a computer, and one or more processors of the computer read and execute the program. Such a computer program can be provided to the computer by a non-volatile computer-readable storage medium that can be connected to the system bus of the computer, or provided to the computer via a network. Non-volatile computer-readable storage media include, for example, any type of disk (floppy disk (registered trademark) or hard disk drive (HDD)), optical disk (CD-ROM, DVD disk, or Blu-ray disk, etc.), read-only memory (ROM), random access memory (RAM), EPROM, EEPROM, magnetic card, flash memory, or any type of medium suitable for storing electronic instructions such as an optical card.

Claims

1. An information processing device capable of accessing first information and second information, wherein the first information is information related to the traceability of products of each enterprise included in a supply chain, and the second information is information indicating the relationship between the products of each enterprise included in a target product, wherein: The information processing device includes a control unit configured to perform the following operations: Obtaining the update period of the first information; By referring to the second information, determining a plurality of included products included in the target product and a plurality of first accounts having update authority for the first information of the respective plurality of included products; as well as A request for updating the first information is notified to each of the identified first accounts before the update deadline.

2. The information processing device according to claim 1, wherein: The control unit is configured to further execute: receiving a response to the request related to the update from each of the first accounts; and If there is no response by the scheduled time, By referring to the second information, specifying a second account of a second enterprise located downstream of a first enterprise corresponding to the first account that does not have the answer in the supply chain of the target product; as well as The specified second account is notified of a request to the first enterprise to update the first information.

3. The information processing device according to claim 1 or 2, wherein: The first information is configured to include at least one of information related to an emission amount of greenhouse gas, a recycling rate of a planned raw material, and due diligence.

4. The information processing device according to claim 1 or 2, wherein: The target product is a battery-related product.

5. An information processing method, the method being executed by a computer capable of accessing first information and second information, wherein the first information is information related to the traceability of products of each enterprise included in a supply chain, and the second information is information indicating the relationship between products of each enterprise included in a target product, wherein: The information processing method includes: Obtaining the update period of the first information; By referring to the second information, determining a plurality of included products included in the target product and a plurality of first accounts having update authority for the first information of the respective plurality of included products; and A request for updating the first information is notified to each of the identified first accounts before the update deadline.

Citation Information

Patent Citations

  • Inter-enterprise data communication system and method in multi-stage supply chain

    JP2004171146A