The dynamic programming method is used to calculate the optimal residence time of each coverage area to achieve agile control of the phased array beam, solve the problem of uneven resource allocation, improve resource utilization efficiency, and ensure the transmission resources within the phased array beam. Take full advantage.
Patent Information
- Application Number
- CN202410731286.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-06
AI Technical Summary
In the beam-hopping control of existing phased array antennas, uneven resource allocation leads to a decrease in resource utilization, and the dwell time cannot be dynamically adjusted according to the business needs of each coverage area.
The dynamic planning method is used to calculate the optimal residence time of each coverage area based on the service application and resource requirements of the ground terminal, to achieve agile control of the phased array beam and ensure full utilization of resources.
The resource utilization efficiency is improved, the transmission resources within the phased array beam are fully utilized, the problem of uneven resource allocation is solved, and the overall resource utilization efficiency is improved.
Smart Images

Figure CN118738879A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of satellite communications, and in particular to a beam hopping control method for a communication satellite phased array antenna. Background Art
[0002] Phased array antennas have the characteristics of high gain and flexible pointing. When used in satellite communications, beam hopping is often used. The satellite controls the phased array beam to jump between multiple scattered coverage areas in time. Each time it covers an area, it stays in the area for a period of time. During this period, each satellite terminal in the area can carry out business communications. Through the above beam hopping method, the link transmission capacity of the phased array beam is kept equivalent to that of the traditional narrow spot beam, and the coverage capacity can reach the level of the regional wide beam, achieving a win-win situation for transmission and coverage.
[0003] During the phased array antenna beam hopping control process, the allocation of dwell time in each coverage area needs to be solved. At present, the average allocation method is usually adopted, that is, equal coverage is adopted for each area. Considering that the business requirements and station type capabilities of satellite terminals in each area are different, the average allocation will inevitably cause resource shortage in some areas and idle resources in other areas, resulting in a decrease in resource utilization. Summary of the invention
[0004] In view of this, the present invention proposes a beam hopping control method for a communication satellite phased array antenna, which can be used for broadband communication satellites with on-board processing capabilities and equipped with phased array antennas to achieve business-driven phased array beam agile control and improve resource utilization efficiency.
[0005] In order to achieve the above object, the technical solution adopted by the present invention is:
[0006] A beam hopping control method for a communication satellite phased array antenna is applied to a broadband communication satellite equipped with a phased array beam and having onboard processing and multi-carrier parallel demodulation capabilities; a single phased array beam of the satellite is equipped with multiple carrier groups, each carrier group contains one or more subcarriers with the same carrier rate and equally spaced center frequencies, each subcarrier in the same carrier group uses a time division multiple access mode and each subcarrier has the same number of time slots; the minimum number of subcarrier time slots of each carrier group of the phased array beam is the basic number of time slots N of the phased array beam bslot , the number of subcarrier time slots in each carrier group is an integer multiple of the number of basic time slots; each carrier group of the phased array beam has the same frame period, and the frame period divided by the number of basic time slots is the unit dwell time of the phased array beam; the phased array beam supports agility between multiple discrete coverage areas, and resides in each coverage area according to an integer multiple of the unit dwell time;
[0007] The method comprises the following steps:
[0008] Step A. The satellite network control collects the ground terminal service applications within one frame period of the phased array beam, each service application includes the location of the ground terminal sending the application, the available carrier group and the resource demand information estimated according to its service data flow;
[0009] Step B. The satellite network control counts the number of coverage areas N of the ground terminal distribution under the phased array beam according to the location information in the service application. spot , the coverage area is from 0 to N spot -1, and are organized into multiple service application sets according to the coverage area;
[0010] Step C. The onboard network control maintains a variable step and initializes it to N spot -1;
[0011] Step D. Onboard network control maintains an N bslot +1 row, N bslot +1 column matrix M, whose rows are from 0 to N bslot Number, columns from 0 to N bslot Number and initialize all elements in the matrix to a constant value with an extreme value;
[0012] Step E. Onboard network control maintains an N spot Row, N bslot +1 column matrix U, whose rows are from 0 to N spot -1 numbering, columns from 0 to N bslot Number and initialize all elements in the matrix to 0;
[0013] Step F. Onboard network control maintains an N bslot +1 column vector The elements of this vector range from 0 to N. bslot Number and initialize all elements in the vector to 0;
[0014] Step G. The onboard network control updates the value of each element in the matrix M;
[0015] Step H. Onboard network control update vector The value of each element in the vector The i-th column element of is assigned the maximum value of the i-th column element of the matrix M; if the constant value in step D is a maximum value, the maximum value here is a minimum value; if the constant value in step D is a minimum value, the maximum value here is a maximum value;
[0016] Step I. The onboard network control updates the values of each element in the step-th row of the matrix U, and assigns the row number of the maximum value element in the j-th column of the matrix M to the element in the step-th row and j-th column of the matrix U; if the constant value in step D is a maximum value, the maximum value here is a minimum value; if the constant value in step D is a minimum value, the maximum value here is a maximum value;
[0017] Step J. The onboard network control reduces the value of step by 1 and resets all elements in the matrix M to their initial values;
[0018] Step K. The onboard network control checks whether step is less than 0. If so, the value of step is set to 0 and the subsequent steps are executed; otherwise, jump to step G;
[0019] Step L: The onboard network control maintains a variable state and initializes it to N bslot ;
[0020] Step M. Onboard network control maintains an N spot Vector of columns The elements of this vector range from 0 to N. spot -1 numbering and initializing all elements in the vector to 0;
[0021] Step N. The onboard network control reads the value of the step-th row and the state-th column of the matrix U and assigns it to the vector The step column of
[0022] Step O: The onboard network control subtracts the value read in step N from the current value of state, and uses the result to update state;
[0023] Step P. The onboard network control checks whether state is less than 0. If so, it jumps to step R; otherwise, it increases the value of step by 1 and executes the subsequent steps;
[0024] Step Q. The onboard network control checks whether step is equal to N spot If yes, execute the subsequent steps; otherwise, jump to step N;
[0025] Step R. Onboard network control reads vector The value of each column, the product of each value and the unit residence time is taken as the residence time in the corresponding number coverage area;
[0026] Step S: The satellite network control schedules the phased array beams from 0 to N in turn according to the dwell time calculated in step R. spot -Agility is implemented in coverage area 1.
[0027] Furthermore, in step G, for an element in the matrix M, the updating method is:
[0028] a) The onboard network control checks whether the row number of the current element is greater than the column number. If so, the value of the element is set to 0; otherwise, the subsequent steps are executed;
[0029] b) The onboard network control uses the row number of the current element multiplied by the unit dwell time, and the product is used as the dwell time in the coverage area of step number to calculate the allocation value of the coverage area;
[0030] c) The onboard network control uses the column number of the current element minus the row number and uses the result as the index to retrieve the vector The corresponding element of
[0031] d) The onboard network control adds the search result of step c) and the assigned value of step b) to obtain the updated value of the current element.
[0032] Furthermore, in step b), the calculation method of the distribution value is:
[0033] 1) The satellite network control determines the carrier group of each ground terminal in the coverage area according to the available carrier group and resource demand information in the service application of the current coverage area;
[0034] 2) The satellite network control calculates the number of applied time slots r and the number of allocated time slots a of each ground terminal according to the resource demand information in the service application of the current coverage area and the carrier group information of each ground terminal determined in step 1);
[0035] 3) The satellite network control calculates the allocation value v of each ground terminal: If the initial value of each element of the matrix M is a very large constant value, then v = max(0, ra) 2 +min(0,ra); if the initial value of each element of the matrix M is a very small constant value, then v=-max(0,ra) 2 -min(0,ra);
[0036] 4) The satellite network control sums the allocation values of all ground terminals in the coverage area to obtain the allocation value of the coverage area.
[0037] Compared with the background technology, the present invention has the following beneficial effects:
[0038] 1. The present invention adopts a dynamic programming method to dynamically calculate the dwell time of the phased array beam in different coverage areas, and can adjust the agile control strategy of the phased array beam in real time based on the service flow demand during the ground terminal communication process.
[0039] 2. The present invention can fully utilize the transmission resources within the phased array beam, while solving the problem of agile control of the phased array beam over multiple coverage areas, and at the same time improve the overall efficiency of resource utilization. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a schematic diagram of an application scenario of the present invention. DETAILED DESCRIPTION
[0041] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0042] A beam hopping control method for a communication satellite phased array antenna, wherein the satellite-borne network control periodically collects service applications from ground terminals under the phased array beam, and counts the number of coverage areas that need to be agile in the current period of the phased array beam; then, the satellite-borne network control uses a dynamic programming method to calculate the optimal number of resident time slots in each coverage area, and controls the phased array beam to perform agile according to the calculation result.
[0043] Figure 1 The figure shows the application scenario of this method. The satellite is equipped with onboard network control and phased array beams. Two carrier groups are configured in the phased array beam. Carrier group 1 has 8 1Msps subcarriers, each with 24 time slots; carrier group 2 has 4 2Msps subcarriers, each with 48 time slots. The ground terminals under the phased array beam are distributed in 4 hot spots. The onboard network control controls the phased array beam to perform agile coverage on these 4 areas.
[0044] The method comprises the following steps:
[0045] A. The satellite network control collects the ground terminal service applications within one frame period of the phased array beam. Each service application contains information such as the location of the ground terminal sending the application, the available carrier group, and the resource requirements estimated based on its service data flow;
[0046] B. Based on the location information in the service application, the onboard network control counts the number of coverage areas of the ground terminal distribution under the phased array beam (4 in this example), numbers these coverage areas in order from 0 to 3, and organizes them into multiple service application sets according to the coverage areas;
[0047] C. The onboard network control maintains a variable step and initializes it to 3;
[0048] D. The onboard network control maintains a matrix M with 25 rows and 25 columns (the rows of the matrix are numbered from 0 to 24, and the columns are numbered from 0 to 24), and initializes all elements in the matrix to a very large constant value;
[0049] E. The onboard network control maintains a 4-row, 25-column matrix U (the rows of the matrix are numbered from 0 to 3, and the columns are numbered from 0 to 24), and initializes all elements in the matrix to 0;
[0050] F. The onboard network control maintains a 25-column vector (The elements of the vector are numbered from 0 to 24) and all elements in the vector are initialized to 0;
[0051] G. The value of each element in the onboard network control update matrix M;
[0052] Among them, in step G, the method for the onboard network control to update the element values of specific rows and columns in the matrix M includes the following steps:
[0053] a) The onboard network control checks whether the row number of the current element is greater than the column number. If so, the value of the element is set to 0; otherwise, the subsequent steps are executed;
[0054] b) The onboard network control uses the row number of the current element multiplied by the unit dwell time, and the product is used as the dwell time in the coverage area of step number to calculate the allocation value of the coverage area;
[0055] Wherein, in said step b), the method for calculating the allocation value of a specific coverage area by the satellite-borne network control comprises the following steps:
[0056] 1) The satellite network control determines the carrier group of each ground terminal in the coverage area according to the available carrier group and resource demand information in the service application of the current coverage area;
[0057] 2) The satellite network control calculates the number of applied time slots r and the number of allocated time slots a of each ground terminal according to the resource demand information in the service application of the current coverage area and the carrier group information of each ground terminal determined in step 1);
[0058] 3) The satellite network control calculates the allocation value v = max(0, ra) of each ground terminal 2 +min(0,ra);
[0059] 4) The satellite network control sums the allocation values of all ground terminals in the coverage area to obtain the allocation value of the coverage area.
[0060] c) The onboard network control uses the column number of the current element minus the row number and uses the result as the index to retrieve the vector The corresponding element of
[0061] d) The onboard network control adds the search result of step c) and the assigned value of step b) to obtain the value of the current element.
[0062] H. Onboard network control update vector The value of each element in the vector The i-th column element of is assigned the minimum value of the i-th column element of matrix M;
[0063] I. The onboard network control updates the values of each element in the step-th row of the matrix U, and assigns the row number of the minimum value element in the j-th column of the matrix M to the element in the step-th row and j-th column of the matrix U;
[0064] J. The onboard network control reduces the value of step by 1 and resets all elements in the matrix M to their initial values;
[0065] K. The onboard network control checks whether step is less than 0. If so, it sets the value of step to 0 and executes the subsequent steps; otherwise, it jumps to step G;
[0066] L The onboard network control maintains a variable state and initializes it to 24;
[0067] M. The onboard network control maintains a 4-column vector (The elements of the vector are numbered from 0 to 3) and all elements in the vector are initialized to 0;
[0068] N. The onboard network control reads the value of the step row and state column of the matrix U and assigns it to the vector The step column of
[0069] O. The onboard network control subtracts the value read in step 1 from the current value of state and uses the result to update state.
[0070] P. The onboard network control checks whether state is less than 0. If so, it jumps to step R; otherwise, it increases the value of step by 1 and executes the subsequent steps;
[0071] Q. The onboard network control checks whether step is equal to 4. If so, it executes the subsequent steps; otherwise, it jumps to step N;
[0072] R. Onboard network control reads vector The value of each column, the product of this value and the unit residence time is taken as the residence time in the corresponding number coverage area;
[0073] S. The satellite-borne network control schedules the phased array beam according to the dwell time calculated in step R to implement agility in coverage areas from 0 to 3 in turn.
[0074] In summary, the present invention has created an original beam-hopping control method for a communication satellite phased array antenna, which can be applied to high- and low-orbit broadband communication satellites with on-board processing and multi-carrier parallel demodulation capabilities and equipped with phased array beams, to achieve business-driven agile control of phased array beams, solve the problem of business-driven on-demand dynamic scheduling of phased array beams, and improve resource utilization efficiency.
[0075] Those skilled in the art will appreciate that a satellite phased array beam agility control method can be implemented through hardware or software related to program instructions, and when the program is executed, the steps of the above method embodiment are executed.
[0076] Finally, it should be noted that the above is only a preferred example of the present invention. Although the present invention has been described in detail with reference to the above embodiments, it is still possible for those skilled in the art to modify the technical solutions of the aforementioned embodiments or to make equivalent substitutions for other parts of the technical features. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A beam hopping control method for a communication satellite phased array antenna, characterized in that: The invention is applied to a broadband communication satellite equipped with a phased array beam and having on-board processing and multi-carrier parallel demodulation capabilities; a single phased array beam of the satellite is equipped with multiple carrier groups, each carrier group contains one or more subcarriers with the same carrier rate and equally spaced center frequencies, each subcarrier in the same carrier group adopts a time division multiple access mode and each subcarrier has the same number of time slots; the minimum number of subcarrier time slots of each carrier group of the phased array beam is the basic number of time slots N of the phased array beam bslot , the number of subcarrier time slots in each carrier group is an integer multiple of the number of basic time slots; each carrier group of the phased array beam has the same frame period, and the frame period divided by the number of basic time slots is the unit dwell time of the phased array beam; The phased array beam supports agile switching between multiple discrete coverage areas, and resides in each coverage area according to an integer multiple of the unit dwell time; The method comprises the following steps: Step A. The satellite network control collects the ground terminal service applications within one frame period of the phased array beam, each service application includes the location of the ground terminal sending the application, the available carrier group and the resource demand information estimated according to its service data flow; Step B. The satellite network control counts the number of coverage areas N of the ground terminal distribution under the phased array beam according to the location information in the service application. spot , the coverage area is from 0 to N spot -1, and are organized into multiple service application sets according to the coverage area; Step C. The onboard network control maintains a variable step and initializes it to N spot -1; Step D. Onboard network control maintains an N bslot +1 row, N bslot +1 column matrix M, the rows of which are from 0 to N bslot Number, columns from 0 to N bslot Number and initialize all elements in the matrix to a constant value with an extreme value; Step E. Onboard network control maintains an N spot Row, N bslot +1 column matrix U, whose rows are from 0 to N spot -1 numbering, columns from 0 to N bslot Number and initialize all elements in the matrix to 0; Step F. Onboard network control maintains an N bslot +1 column vector The elements of this vector range from 0 to N. bslot Number and initialize all elements in the vector to 0; Step G. The onboard network control updates the value of each element in the matrix M; Step H. Onboard network control update vector The value of each element in the vector The i-th column element of is assigned the maximum value of the i-th column element of the matrix M; if the constant value in step D is a maximum value, the maximum value here is a minimum value; if the constant value in step D is a minimum value, the maximum value here is a maximum value; Step I. The onboard network control updates the values of each element in the step-th row of the matrix U, and assigns the row number of the maximum value element in the j-th column of the matrix M to the element in the step-th row and j-th column of the matrix U; if the constant value in step D is a maximum value, the maximum value here is a minimum value; if the constant value in step D is a minimum value, the maximum value here is a maximum value; Step J. The onboard network control reduces the value of step by 1 and resets all elements in the matrix M to their initial values; Step K. The onboard network control checks whether step is less than 0. If so, the value of step is set to 0 and the subsequent steps are executed; otherwise, jump to step G; Step L: The onboard network control maintains a variable state and initializes it to N bslot ; Step M. Onboard network control maintains an N spot Vector of columns The elements of this vector range from 0 to N. spot -1 numbering and initializing all elements in the vector to 0; Step N. The onboard network control reads the value of the step-th row and the state-th column of the matrix U and assigns it to the vector The step column of Step O: The onboard network control subtracts the value read in step N from the current value of state, and uses the result to update state; Step P. The onboard network control checks whether state is less than 0. If so, it jumps to step R; otherwise, it increases the value of step by 1 and executes the subsequent steps; Step Q. The onboard network control checks whether step is equal to N spot If yes, execute the subsequent steps; otherwise, jump to step N; Step R. Onboard network control reads vector The value of each column, the product of each value and the unit residence time is taken as the residence time in the corresponding number coverage area; Step S: The satellite network control schedules the phased array beams from 0 to N in turn according to the dwell time calculated in step R. spot -Agility is implemented in coverage area 1.
2. The beam hopping control method of a communication satellite phased array antenna according to claim 1, characterized in that: In step G, for an element in matrix M, the update method is: a) The onboard network control checks whether the row number of the current element is greater than the column number. If so, the value of the element is set to 0; otherwise, the subsequent steps are executed; b) The onboard network control uses the row number of the current element multiplied by the unit dwell time, and the product is used as the dwell time in the coverage area of step number to calculate the allocation value of the coverage area; c) The onboard network control uses the column number of the current element minus the row number and uses the result as the index to retrieve the corresponding element of the vector f; d) The onboard network control adds the search result of step c) and the assigned value of step b) to obtain the updated value of the current element.
3. The beam hopping control method of a communication satellite phased array antenna according to claim 2, characterized in that: In step b), the calculation method of the distribution value is: 1) The satellite network control determines the carrier group of each ground terminal in the coverage area according to the available carrier group and resource demand information in the service application of the current coverage area; 2) The satellite network control calculates the number of applied time slots r and the number of allocated time slots a of each ground terminal according to the resource demand information in the service application of the current coverage area and the carrier group information of each ground terminal determined in step 1); 3) The satellite network control calculates the allocation value v of each ground terminal: If the initial value of each element of the matrix M is a very large constant value, then v = max(0, ra) 2 +min(0,ra); if the initial value of each element of the matrix M is a very small constant value, then v=-max(0,ra) 2 -min(0,ra); 4) The satellite network control sums the allocation values of all ground terminals in the coverage area to obtain the allocation value of the coverage area.
Citation Information
Patent Citations
System for simplification of reconfigurable beam-forming network processing within a phased array antenna for a telecommunications satellite
CN101803113A
Method for scheduling resources based on beam hopping
CN109121147A
Hopping beam satellite system workflow and signaling frame design method for controlling associated service
CN111835409A
Beam hopping resource allocation method taking user service weight gain as objective function
CN113873658A
Space-ground cooperative beam hopping control system and method based on satellite processing
CN114050860A
Cited By
Communication satellite phased array beam residence time distribution method
CN121664285A
A method for allocating phased array beam dwell times for a communication satellite
CN121664285B