Cable joint, preparation method thereof and control method for preparing cable joint
By arranging a fire-extinguishing layer and shell around the insulating prefabricated parts of the cable joint, combined with quartz sand and Kevlar fiber materials, the problem of breakdown and explosion when the high-voltage cable joint fails is solved, and the explosion-proof and fire-proof performance and heat dissipation efficiency are improved. , reducing costs and construction difficulty.
Patent Information
- Application Number
- CN202410812325.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-01
AI Technical Summary
High-voltage cable joints can easily lead to breakdown and explosion when they fail. Existing explosion-proof and fire-proof measures improve safety by adding protective devices, but they affect the heat dissipation performance and current carrying capacity of the joints, and increase the cost and construction difficulty.
A cable joint is designed, which has a fire extinguishing layer and a shell around the insulating prefabricated part. The fire extinguishing layer contains oxidants, flammable agents and chemical cooling agents, combined with quartz sand and Kevlar fiber materials to form a fire prevention and buffer layer. The air layer is located Between the outer shell and the fire extinguishing layer, the need for additional protective devices is avoided.
Under high temperature conditions, the fire extinguishing agent produces water through an endothermic reaction to achieve fire extinguishing effects. At the same time, it improves the heat dissipation efficiency of the cable joint, reduces the risk of fault expansion, and saves material loss and preparation costs.
Smart Images

Figure CN118739175A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of cable joints, and in particular to a cable joint and a preparation method thereof, and a control method for preparing the cable joint. Background Art
[0002] High-voltage power cables are widely used in urban underground power grids, power plants, substations and other places. However, in recent years, with the rapid expansion of new cable projects, high-voltage cables and joints have frequently failed, seriously affecting the safe and reliable operation of the power grid. Several major power grid accidents in recent years were caused by cable failures, which caused huge economic losses and serious social impacts. Cable joints are the weak link in the operation of high-voltage power cables. Once a failure occurs, it will cause serious power accidents such as breakdown and explosion of the cable joints. At present, the explosion-proof and fire-proof measures for the explosion problem of 220kV cable intermediate joints are mainly to add protective devices to the cable joints. Although the cable joint protection device has excellent explosion-proof and fire-proof properties, the addition of the protection device will affect the heat dissipation of the joint and reduce the current carrying capacity of the cable. In addition, the protection device is huge in size, which not only increases the cost but also brings inconvenience to the construction.
[0003] In response to the above problems, the development of a new type of transmission cable intermediate joint with fire and explosion-proof functions is a transformation of the existing joint, which can effectively reduce the additional temperature rise and the primary investment cost, and has good technical and economic benefits and promotion value. How to integrate fire extinguishing technology into explosion-proof cable joints is the key issue. Summary of the invention
[0004] The present application provides a cable joint and a preparation method thereof and a control method for preparing the cable joint, so as to solve the problem in the related art that adding an external protective device to the cable joint improves the explosion-proof and fire-proof performance, but causes difficulty in heat dissipation of the cable joint.
[0005] According to one aspect of the present application, a cable joint is provided, comprising: an insulating preform; a fire extinguishing layer located at the periphery of the insulating preform, the fire extinguishing layer having a fire extinguishing agent; and an outer shell located at the periphery of the fire extinguishing layer.
[0006] Optionally, the fire extinguishing agent includes an oxidant, a combustible agent and a chemical cooling agent.
[0007] Optionally, the cable joint further comprises a fireproof layer, wherein the fireproof layer is located between the fire extinguishing layer and the insulating preform.
[0008] Optionally, the cable joint further comprises a buffer layer, wherein the buffer layer is located between the fire-proof layer and the fire-extinguishing layer.
[0009] Optionally, there is an air layer between the outer shell and the fire extinguishing layer.
[0010] Optionally, the material of the buffer layer includes Kevlar fiber.
[0011] Optionally, the material of the fireproof layer includes quartz sand.
[0012] Optionally, the thickness of the fire extinguishing layer is 3 mm to 9 mm.
[0013] According to another aspect of the present application, a method for preparing a cable joint is provided, comprising: providing an insulating preform; forming a fire extinguishing layer on the periphery of the insulating preform, the fire extinguishing layer having a fire extinguishing agent; and forming an outer shell on the periphery of the fire extinguishing layer.
[0014] According to another aspect of the present application, a control method for preparing a cable joint is provided, comprising: obtaining a preset measurement of a fire extinguishing agent; controlling the preparation equipment of the cable joint to form a fire extinguishing layer on the periphery of an insulating preform according to the preset measurement of the fire extinguishing agent; controlling the preparation equipment of the cable joint to form the outer shell on the periphery of the fire extinguishing layer to obtain the cable joint.
[0015] The technical solution of the present application proposes a cable joint, which has an insulating preform, and a fire extinguishing layer and an outer shell are arranged on the periphery of the insulating preform. In the present application, the fire extinguishing layer is placed in the cable joint structure, and no additional fire extinguishing device is required. The fire extinguishing agent in the fire extinguishing layer can undergo an endothermic reaction at high temperature and produce water to extinguish the fire. While improving the explosion-proof and fire-proof performance of the cable joint, the heat dissipation efficiency of the cable joint is also improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0017] Figure 1 A cross-sectional schematic diagram of a cable connector structure provided in an embodiment of the present application is shown;
[0018] Figure 2 A cross-sectional schematic diagram of another cable connector structure provided in an embodiment of the present application is shown;
[0019] Figure 3 A schematic diagram of a process for preparing a cable connector provided in an embodiment of the present application is shown;
[0020] Figure 4 is Figure 3 In the method for preparing a cable joint, a schematic diagram of a cross-sectional structure of a base body after providing an insulating preform;
[0021] Figure 5 is Figure 4A schematic diagram of a cross-sectional structure of a substrate after a fireproof layer, a buffer layer and a fire extinguishing layer are sequentially formed on the insulating prefabricated member provided in the embodiment;
[0022] Figure 6 A hardware structure block diagram of a mobile terminal according to a control method for preparing a cable connector provided in an embodiment of the present application is shown;
[0023] Figure 7 A schematic flow chart of a control method for preparing a cable connector provided in an embodiment of the present application is shown;
[0024] Figure 8 Shows Figure 7 A schematic diagram of the principle flow of the finite element calculation software in the control method for preparing the cable joint;
[0025] Fig. 9 The figure shows the relationship between the thickness of the fire extinguishing layer and the time when hydrogen stops being produced during the fire extinguishing process of the fire extinguishing layer.
[0026] The above drawings include the following reference numerals:
[0027] 10. Insulation prefabricated parts; 20. Fire extinguishing layer; 30. Shell; 40. Fireproof layer; 50. Buffer layer; 60. Air layer; 102. Processor; 104. Memory; 106. Transmission equipment; 108. Input and output equipment. DETAILED DESCRIPTION
[0028] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0029] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0030] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0031] In the prior art, the explosion-proof and fire-proof measures for the explosion of cable intermediate joints are mainly to add protective devices to the cable joints. Although the cable joint protective devices have excellent explosion-proof and fire-proof performance, adding protective devices will affect the heat dissipation of the joints and reduce the current carrying capacity of the cable. In addition, the protective devices are huge in size, which not only increases the cost but also brings inconvenience to the construction.
[0032] In order to solve the above problems, according to one embodiment of the present application, a cable connector is proposed, such as Figure 1 As shown, it includes: an insulating preform 10; a fire extinguishing layer 20 located at the periphery of the insulating preform 10, and the fire extinguishing layer 20 has a fire extinguishing agent; and an outer shell 30 located at the periphery of the fire extinguishing layer 20.
[0033] The present application has an insulating preform through the cable joint, and a fire extinguishing layer and an outer shell are arranged on the periphery of the insulating preform. In the present application, the fire extinguishing layer is placed in the cable joint structure, and no additional fire extinguishing device is added. The fire extinguishing agent in the fire extinguishing layer can undergo an endothermic reaction at high temperature and produce water to play a fire extinguishing role. While improving the explosion-proof and fire-proof performance of the cable joint, the heat dissipation efficiency of the cable joint is also improved.
[0034] In the above embodiments of the present application, Figure 1 and Figure 2 As shown, a fire extinguishing layer 20 is provided on the periphery of the insulating preform 10, and a fire extinguishing agent is contained in the fire extinguishing layer 20. The fire extinguishing agent may be a hot aerosol agent. A shell 30 is provided on the periphery of the fire extinguishing layer 20, wherein the material of the insulating preform 10 may be silicone rubber or ethylene propylene rubber, and the material of the shell 30 may be copper.
[0035] In the above optional embodiment, the insulating preform is filled with a filling material, which may be an epoxy resin, the pyrolysis products of which include methane, ethane, ethylene, propane, propylene, isobutane, n-butane, hydrogen, carbon monoxide, carbon dioxide and other gases.
[0036] In some optional embodiments, the fire extinguishing agent includes an oxidant, a combustible agent and a chemical cooling agent.
[0037] In some optional embodiments, the fire extinguishing agent may be a hot aerosol agent, which includes an oxidant, a combustible agent, and a chemical cooling agent. The oxidant may be strontium nitrate and potassium nitrate, the ratio of strontium nitrate to potassium nitrate is (1:3), and the oxidant may account for 40% of the hot aerosol agent. The combustible agent may be urea, dicyandiamide, and carbon powder, and the combustible agent may account for 45% of the hot aerosol agent. The chemical cooling agent may be Na 2 B 4 O 7 10H 2 O and H 3 BO 3 , the above-mentioned chemical cooling agent can account for 15% of the thermal aerosol agent.
[0038] In some optional embodiments, such as Figure 1 and Figure 2 As shown, the cable joint further comprises a fireproof layer 40, and the fireproof layer 40 is located between the fire extinguishing layer 20 and the insulating preform 10; the material of the fireproof layer 40 comprises quartz sand.
[0039] In the above optional implementation, if Figure 1 and Figure 2 As shown, the material of the fireproof layer 40 can be quartz sand. When a short circuit occurs in the cable joint, the short-circuit arc causes the cable joint to generate high-temperature and high-pressure gas. When the gas passes through the fireproof layer 40, it will partially gasify the quartz sand and absorb heat. At the same time, quartz sand has fluidity. After the arc is extinguished, the quartz sand covers the breakdown part of the insulating preform 10 to prevent the insulating preform 10 from continuing to pyrolyze. The present application uses quartz sand to replace the combustible material (ab glue) of the traditional cable joint, which greatly reduces the combustible gas and weakens the scale of the flash explosion.
[0040] In some optional embodiments, such as Figure 1 and Figure 2 As shown, the cable joint further comprises a buffer layer 50, and the buffer layer 50 is located between the fireproof layer 40 and the fire extinguishing layer 20; the material of the buffer layer 50 comprises Kevlar fiber.
[0041] In the above optional implementation, if Figure 1 and Figure 2As shown, the material of the buffer layer 50 can be Kevlar fiber. When a short circuit occurs in the cable joint, the short-circuit arc causes the cable joint to generate high-temperature and high-pressure gas. The high-temperature and high-pressure gas will break through the buffer layer 50, but will only burn through the buffer layer material on the path. Before the heat transfer causes a large area of the cable joint to burn, the Kevlar fiber will deform and break to absorb energy, so that the temperature of the cable joint drops. The fireproof layer 40 covers the breakdown part of the insulating preform 10, prevents the insulating preform 10 from continuing to pyrolyze, and can balance the impact of the high-pressure gas on the buffer layer 50.
[0042] In the above optional implementation, when a short circuit accident occurs in the cable joint, the insulating prefabricated part explodes, and the fireproof layer and the buffer layer fail, the high-temperature and high-pressure flammable and explosive gas rapidly expands in the cable joint and fully mixes with the air. When the flammable and explosive gas diffuses to a certain extent and fully contacts with oxygen, a flash explosion will occur. The flash explosion ignites the cables and combustibles around the cable joint, causing a fire in the cable tunnel. At this time, the fire extinguishing layer needs to be activated to extinguish the fire.
[0043] In some optional embodiments, such as Figure 1 and Figure 2 As shown, there is an air layer 60 between the housing 30 and the fire extinguishing layer 20 .
[0044] In the above optional implementation, if Figure 1 and Figure 2 As shown, the air layer 60 is located between the outer shell 30 and the fire extinguishing layer 20. Since the air layer 60 stores air, when the Kevlar fiber material in the buffer layer 50 is deformed and broken, the shape of the air layer 60 will change as the Kevlar fiber is deformed and broken, thereby reserving space for the deformation of the buffer layer 50, ensuring that the buffer layer 50 can be deformed and broken, and smoothly absorb heat energy.
[0045] In some optional embodiments, the thickness of the fire extinguishing layer is 3 mm to 9 mm.
[0046] In the above optional implementation manner, when the thickness of the fire extinguishing layer is within the above range, the fire extinguishing and explosion-proof performance of the cable joint can be guaranteed, and the loss of the preparation materials of the cable joint can be saved, thereby reducing the preparation cost.
[0047] Exemplarily, the outside of the silicone rubber preform is a quartz sand fireproof layer, the outside of the fireproof layer is wrapped with a Kevlar fiber buffer layer, the outside of the buffer layer is a hot aerosol agent fire extinguishing layer, the outside of the fire extinguishing layer is an air layer, and the outside of the air layer is a copper shell. In the case where a short circuit occurs in the cable joint but no explosion occurs: when a short circuit occurs in the cable joint, the electric arc breaks through the silicone rubber preform, and the silicone rubber preform instantly pyrolyzes and gasifies into a large amount of hydrogen, methane, carbon dioxide and other gases, and the above gases form high-temperature and high-pressure gas. The high-temperature and high-pressure gas passes through the quartz sand fireproof layer, and the quartz sand is partially vaporized, absorbing the heat of the high-temperature and high-pressure gas. At the same time, quartz sand has fluidity. After the arc is extinguished, the quartz sand covers the breakdown part of the silicone rubber preform, preventing the rubber preform from continuing to pyrolyze, and balancing the impact of the high-pressure gas on the buffer layer. If the buffer layer is penetrated by high-temperature and high-pressure gas, the buffer material on the path of the high-temperature and high-pressure gas burning through the buffer layer will be burned, and the buffer layer (Kevlar fiber) will deform. Before the heat transfer causes a large area of the cable joint to burn, it will deform and break, absorbing the energy of the high-temperature and high-pressure gas. At this time, the air layer provides deformation space for the buffer layer, further ensuring that the buffer layer can deform and break smoothly and absorb heat.
[0048] In another exemplary case, in the case of explosion caused by short circuit in the cable joint, when the short circuit occurs in the cable joint, the short circuit arc breaks through the silicone rubber preform and the filling material therein, and finally breaks through the copper shell, causing an explosion. In the process of arc breaking through the silicone rubber preform, the silicone rubber preform and the filling material undergo thermal cracking. Among them, the pyrolysis products include gases such as methane, ethane, ethylene, propane, propylene, isobutane, n-butane, hydrogen, carbon monoxide and carbon dioxide. Under the action of the high-temperature arc, the macromolecular alkane gas continues to be pyrolyzed into small molecular gases such as hydrogen and methane. Since gases such as methane, carbon monoxide and hydrogen are flammable gases. Gases such as methane, carbon monoxide and hydrogen expand due to the heating of the high-temperature arc, and form high-temperature and high-pressure plasma gas together with the arc. The fire extinguishing layer includes a hot aerosol agent, and the high-temperature and high-pressure gas triggers the reaction of the hot aerosol agent, and the oxidant and the combustible agent generate nitrogen, carbon dioxide and solid metal particles. Inert gases such as nitrogen will reduce the oxygen concentration and block the full contact between methane and hydrogen and oxygen. During the reaction of the hot aerosol agent, some solid metal particles will generate metal oxides, which will be vaporized and undergo a strong endothermic reaction. The metal oxides will react with carbon ions and absorb a large amount of heat. Under the action of heat, the solid metal elements in the hot aerosol may be vaporized and exist in the form of steam or cations, and chain reactions will occur with free radicals in the high-temperature and high-pressure plasma, consuming and inhibiting the active groups and the exothermic reactions between free radicals. The solid particles in the hot aerosol have a large surface area and surface energy. It takes a certain amount of time for them to be heated and cracked in the high-temperature and high-pressure gas, and they cannot be completely cracked or vaporized. These solid particles are much larger than the active groups. They are impacted by the cracking products of the silicone rubber preform, and the active groups collide and adsorb, and continuously react with free radicals, converting the hydrogen and oxygen elements produced in the reaction process into water. The purpose of cable joint fire extinguishing is achieved by blocking the full contact between methane, hydrogen and oxygen, reducing the ambient temperature and producing water.
[0049] According to another embodiment of the present application, a method for preparing a cable connector is also provided. Figure 3 As shown, including:
[0050] Step S100: providing an insulating prefabricated component;
[0051] Step S200: forming a fire extinguishing layer on the outer periphery of the insulating preform, wherein the fire extinguishing layer contains a fire extinguishing agent;
[0052] Step S300: forming an outer shell around the fire extinguishing layer.
[0053] By adopting the above-mentioned preparation method of the cable joint of the present application, the prepared cable joint has an insulating preform, and a fire extinguishing layer and an outer shell are arranged on the periphery of the insulating preform, wherein the fire extinguishing layer is placed in the cable joint structure in the present application, and no additional fire extinguishing device is added, and the fire extinguishing agent in the fire extinguishing layer can undergo an endothermic reaction at high temperature and produce water to play a role in extinguishing fire, thereby improving the explosion-proof and fire-proof performance of the cable joint and also improving the heat dissipation efficiency of the cable joint.
[0054] The exemplary embodiments of the method for preparing a cable connector provided by the present invention will be described in more detail below in conjunction with the accompanying drawings. However, these exemplary embodiments can be implemented in a variety of different forms and should not be construed as being limited to the embodiments described herein. It should be understood that these embodiments are provided to make the disclosure of this application thorough and complete, and to fully convey the concepts of these exemplary embodiments to those of ordinary skill in the art.
[0055] First, if Figure 4 As shown, step S100 is performed: providing an insulating preform 10 .
[0056] Specifically, the material of the insulating preform 10 may be silicone rubber or ethylene propylene rubber, and the material of the insulating preform 10 is not specifically limited.
[0057] After providing the insulation prefabricated parts, such as Figure 5 As shown, step S200 is performed: a fire extinguishing layer 20 is formed on the outer periphery of the insulating preform 10, and the fire extinguishing layer 20 contains a fire extinguishing agent.
[0058] Specifically, before forming the fire extinguishing layer 20 , a fireproofing layer 40 and a buffer layer 50 may be first formed on the periphery of the insulation preform 10 .
[0059] In the above optional implementation, the material of the fireproof layer can be quartz sand. When a short circuit occurs in the cable joint, the short-circuit arc causes the cable joint to generate high-temperature and high-pressure gas. When the gas passes through the fireproof layer, it partially vaporizes the quartz sand and absorbs heat. At the same time, quartz sand has fluidity. After the arc is extinguished, the quartz sand covers the breakdown part of the insulating preform and prevents the insulating preform from continuing to pyrolyze. The present application uses quartz sand to replace the combustible material (ab glue) of the traditional cable joint, which greatly reduces the combustible gas and weakens the scale of the flash explosion.
[0060] In the above optional embodiment, the material of the buffer layer can be Kevlar fiber. When a short circuit occurs in the cable joint, the short-circuit arc causes the cable joint to generate high-temperature and high-pressure gas. The high-temperature and high-pressure gas will break through the buffer layer, but will only burn through the buffer layer material on the path. Before the heat transfer causes a large area of the cable joint to burn, the Kevlar fiber will deform and break to absorb energy, so that the temperature of the cable joint drops. The above fireproof layer covers the breakdown part of the insulating preform, preventing the insulating preform from continuing to pyrolyze, and can balance the impact of the high-pressure gas on the buffer layer.
[0061] After the step of forming the fire extinguishing layer, Figure 2 As shown, step S300 is performed: forming an outer shell 30 on the outer periphery of the fire extinguishing layer 20 .
[0062] Specifically, the material of the shell may be copper.
[0063] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 6 FIG. 1 is a hardware structure block diagram of a mobile terminal for a control method for preparing a cable connector according to an embodiment of the present invention. Figure 6 As shown, the mobile terminal may include one or more ( Figure 6 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 6 The structure shown is for illustration only and does not limit the structure of the mobile terminal. Figure 6 More or fewer components as shown, or with Figure 6 Different configurations are shown.
[0064] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the control method for preparing a cable joint in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0065] In this embodiment, a control method for preparing a cable connector that runs on a mobile terminal, a computer terminal or the like is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0066] Figure 7 1 is a flow chart of a control method for preparing a cable connector according to an embodiment of the present application. Figure 7 As shown, according to one aspect of the present application, a control method for preparing a cable joint is provided, the method comprising:
[0067] Step S400: obtaining a preset measurement of the fire extinguishing agent;
[0068] Specifically, finite element calculation software (for example, multi-physics field simulation software COMSOL) can be used to establish a three-dimensional structure model, and various material parameters of the cable joint can be input, such as the measurement of the quartz sand of the fireproof layer, the thickness of the Kevlar fiber of the buffer layer, and other parameters. COMSOL will pyrolyze part of the insulating prefabricated area with arc energy, thereby generating high-temperature and high-pressure gas, and simulate the process of generating hot aerosols by actively triggering the energy absorbed by the fireproof layer and the fire extinguishing layer, that is, the finite element calculation of the three-phase coupling of heat-fluid-chemical, that is, using the method of thermal field, fluid field and chemical coupling, wherein heat represents the heat transfer between the heat source and each material, flow represents the movement of the gas generated by the pyrolysis or gasification of the solid material in the whole reaction process, and chemical represents the chemical reaction between the solid material, the pyrolysis gas, and the hot aerosol agent in the whole reaction process. COMSOL will obtain the preset measurement of the fire extinguishing agent required for the fire extinguishing layer of the thickness through finite element calculation according to the thickness of the fire extinguishing layer. The fire extinguishing agent can be a hot aerosol agent, and the hot aerosol agent includes an oxidant, a combustible agent and a chemical cooling agent.
[0069] In the above optional implementation, if Figure 8 As shown, Figure 8 The figure below is the schematic diagram of the simulation using COMSOL software. The finite element calculation is performed using the heat-fluid-chemical three-phase coupling. The material pyrolysis and reaction rate use the pyrolysis reaction equation and the combustion reaction equation, the heat convection uses the heat transfer equation and the fluid dynamics equation, the mass transfer uses the mass transfer equation, and the reaction heat uses the combustion reaction equation.
[0070] Solids or liquids undergo pyrolysis at high temperatures, producing combustible gases and solid residues. The pyrolysis reaction can usually be described by the Arrhenius equation (pyrolysis reaction equation): Among them, ω pyrolysis is the pyrolysis reaction rate, k pyrolysis is the pre-exponential factor, C is the concentration of combustibles, n is the reaction order, E a is the activation energy, R is the gas constant, and T is the temperature of the corresponding material.
[0071] The combustible gas produced by pyrolysis reacts with oxygen to form a combustion reaction, which can be described by the chemical kinetic equation (combustion reaction equation): where ω combustion is the combustion reaction rate, k combustion is the combustion reaction rate constant, [O 2 ] is the oxygen concentration, [Fuel] is the fuel concentration, m and l are the reaction orders associated with the combustion reaction, E a,combustion is the activation energy of the combustion reaction, R is the gas constant, and T is the temperature of the corresponding material.
[0072] The heat transfer equation above is: Where, ρ is the density, including the density of the above-mentioned insulation prefabricated parts, fire extinguishing layer (fire extinguishing agent), buffer layer, air layer and shell, C p is the specific heat capacity, T is the temperature of the corresponding material, k is the thermal conductivity, Q pyrolysis and Q combustion are the heat released by pyrolysis and combustion, Q conv and Q rad are the heat transferred by convection and radiation respectively.
[0073] The above fluid dynamics equation is: Wherein, ρ is the density, including the density of the reaction products of nitrogen, oxygen, hydrogen, methane, carbon dioxide and fire extinguishing agent generated by the reaction, and the density of the products after the reaction products react with hydrogen and / or methane, u is the velocity vector, t is the variable, the reaction time starting from zero, p is the pressure corresponding to the above-mentioned gases such as nitrogen, oxygen, hydrogen, methane, and carbon dioxide, μ is the dynamic viscosity coefficient, and f is the volume force (such as gravity).
[0074] Mass transfer equation: Where C is the concentration of the combustibles or combustion products, u is the fluid velocity vector, D is the diffusion coefficient, S is the source term representing the species produced due to the chemical reaction, and t is the variable, the reaction time starting from zero.
[0075] The arc energy is equivalent to an ellipsoidal heat source, and the heat exchange between the insulation preform material and the heat source is calculated. The temperature rise of the material is calculated by presetting the material parameters. When the temperature of the insulation preform reaches the pyrolysis temperature, the insulation material pyrolyzes to generate gases such as hydrogen and methane, and the pyrolysis process is accompanied by the absorption of heat. As the high-temperature gas increases, the pressure increases accordingly. The quartz sand of the fireproof layer melts, sublimates, and absorbs heat under the heat transfer of the arc equivalent heat source and the high-temperature and high-pressure gas; the quartz sand flows to cover the pyrolysis part of the insulation material, absorbs the heat of the insulation material, and prevents the insulation material from continuing to pyrolyze; the hot aerosol agent of the fire extinguishing layer reacts at high temperature to produce nitrogen and metal oxide particles, and the heat absorbed by the sublimation of the metal oxide particles is calculated, as well as the metal oxide reacts with hydrogen and methane to produce carbon dioxide and water, reducing the concentration of combustible gases.
[0076] Step S500: According to the preset measurement of the fire extinguishing agent, the cable joint preparation device is controlled to form a fire extinguishing layer on the periphery of the insulating preform;
[0077] Specifically, according to the preset measurement of the fire extinguishing agent obtained above, the preparation equipment is controlled to prepare the fire extinguishing layer.
[0078] Step S600: Controlling the cable joint preparation equipment to form the shell on the periphery of the fire extinguishing layer to obtain the cable joint.
[0079] Specifically, the preparation equipment is controlled to deposit a shell material on the periphery of the fire extinguishing layer to form a shell, and the shell material may be copper.
[0080] The above-mentioned cable connector of the present application will be described in detail below in conjunction with specific embodiments.
[0081] A cable joint is provided in Examples 1-11 respectively, and the cable joint includes: an insulating preform, a fireproof layer, a buffer layer, a fire extinguishing layer, an air layer and an outer shell, wherein the insulating preform is made of silicone rubber, the fireproof layer is located at the periphery of the above-mentioned insulating preform, and the material is quartz sand, the buffer layer is located at the periphery of the above-mentioned fireproof layer, and the material is Kevlar fiber, the above-mentioned fire extinguishing layer is located at the periphery of the buffer layer, and the material is a hot aerosol agent, the air layer is located between the fire extinguishing layer and the outer shell, and the outer shell material is copper.
[0082] The cable joint structures in Examples 1 to 11 are as above, the only difference being that the thicknesses of the fire extinguishing layers are different, which are 1 mm, 2 mm, 3 mm, 4 mm, 5 mm, 6 mm, 7 mm, 8 mm, 9 mm, 10 mm, and 11 mm respectively.
[0083] The model was established based on the size of the 220 kV cable intermediate joint, and simulation calculations were performed on Examples 1 to 11. The hydrogen stopping time corresponding to the fire extinguishing layer of different thicknesses is shown in Table 1:
[0084] Table 1
[0085]
[0086] The fire is successfully extinguished when the pyrolysis gas of the insulating prefabricated parts in the space around the cable joint stops increasing. The thickness of the fire extinguishing layer is selected according to the fire extinguishing time of fire extinguishing layers of different thicknesses. The standard for successful fire extinguishing is that the insulating material stops pyrolyzing, that is, the hydrogen generation rate is zero.
[0087] like Fig. 9 As shown in the figure, the thicker the fire extinguishing layer, the weaker the improvement of the fire extinguishing effect. When the thickness of the fire extinguishing layer is 3mm, the time for the insulation preform to stop pyrolysis is about 27.6s, which can meet the fire extinguishing requirements of the cable joint. The thicker the fire extinguishing layer is, the more the amount of hot aerosol agent is required. However, the thicker the fire extinguishing layer is, the better the improvement of the fire extinguishing effect will be, and the waste of materials will be generated. Taking into account the fire extinguishing effect and cost, the thickness of the fire extinguishing layer is 3mm~9mm, and the amount of hot aerosol agent is about 3.2L~3.8L.
[0088] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:
[0089] 1) This application is based on the modification of the cable joint itself, and the fire extinguishing layer is set in the cable joint, which saves the space occupied by the cable joint and reduces the difficulty of installation.
[0090] 2) The present application uses quartz sand to replace the AB glue of the traditional cable joint, which greatly reduces the combustible gas and weakens the scale of the flash explosion, can play the role of extinguishing the fire in the first time and reduce the risk of the accident expanding.
[0091] 3) The fire extinguishing layer used in the present application contains a hot aerosol agent, which will undergo an oxidation-reduction reaction under the action of high-temperature plasma, thereby suppressing the formation of fire in many aspects.
[0092] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0093] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0094] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0095] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0096] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0097] In a typical configuration, a computer device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0098] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0099] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0100] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0101] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. A cable connector, It is characterized in that include: Insulation prefabricated parts; A fire extinguishing layer, located at the periphery of the insulating preform, the fire extinguishing layer having a fire extinguishing agent; The outer shell is located at the outer periphery of the fire extinguishing layer.
2. The cable connector according to claim 1, It is characterized in that The fire extinguishing agent includes an oxidant, a combustible agent and a chemical cooling agent.
3. The cable connector according to claim 1, It is characterized in that The cable joint further comprises a fireproof layer, wherein the fireproof layer is located between the fire extinguishing layer and the insulating preform.
4. The cable connector according to claim 3, It is characterized in that The cable joint also includes a buffer layer, which is located between the fire-proof layer and the fire-extinguishing layer.
5. The cable connector according to claim 4, It is characterized in that An air layer is provided between the outer shell and the fire extinguishing layer.
6. The cable connector according to claim 4, It is characterized in that The material of the buffer layer includes Kevlar fiber.
7. The cable connector according to claim 4, It is characterized in that The material of the fireproof layer includes quartz sand.
8. The cable connector according to claim 6, It is characterized in that The thickness of the fire extinguishing layer ranges from 3 mm to 9 mm.
9. A method for preparing a cable joint according to any one of claims 1 to 8, It is characterized in that include: Provide prefabricated insulation components; forming a fire extinguishing layer on the outer periphery of the insulation preform, wherein the fire extinguishing layer has a fire extinguishing agent; An outer shell is formed on the outer periphery of the fire extinguishing layer.
10. A control method for preparing a cable joint, It is characterized in that include: Obtaining a preset measurement of fire extinguishing agent; According to the preset measurement of the fire extinguishing agent, controlling the cable joint preparation equipment to form a fire extinguishing layer on the periphery of the insulating preform; The preparation equipment of the cable joint is controlled to form the outer shell on the periphery of the fire extinguishing layer to obtain the cable joint according to any one of claims 1 to 8.