Island micro-grid toughness improving method considering ship mobile power resource influence

By modeling typhoon wind fields and constructing a post-disaster optimal dispatch model for island microgrids, combining distributed power sources and ship mobile power resources, optimizing the spatiotemporal dynamic dispatch of ship mobile power resources solves the problem of island microgrid load reduction in extreme natural disasters. , which improves the resilience and power supply stability of island microgrids.

CN118739282AInactive Publication Date: 2024-10-01STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO +1
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202410799814.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Island microgrids are susceptible to extreme natural disasters, and existing research fails to effectively consider ship mobile power resources, resulting in insufficient resilience and difficulty in coping with post-disaster load reduction issues.

Method used

By modeling typhoon wind fields, calculating wind speed and transmission branch failure probability, we build an island microgrid post-disaster optimal dispatch model, combine distributed power sources and ship mobile power resources, and use a second-order cone mixed integer linear programming algorithm to optimize ship mobile power resources. Space-time dynamic dispatching reduces load shedding and improves the resilience of island microgrids.

Benefits of technology

It effectively improves the resilience and power supply stability of the island microgrid, enhances its ability to respond to extreme scenarios, adapts to different load demands and environmental changes, and improves power supply reliability and flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739282A_ABST
    Figure CN118739282A_ABST
Patent Text Reader

Abstract

The invention relates to an island micro-grid toughness improving method considering the influence of ship mobile power resources, and the method comprises the following steps: carrying out the modeling of a wind field of a typhoon, and calculating the wind speeds of an island in a time dimension and a space dimension; calculating the fault probability of each power transmission branch in the micro-grid based on the wind speed; based on a pre-constructed island micro-grid post-disaster optimization scheduling model considering ship mobile power resource access, minimizing the sum of weighted load active power reduction power of each node in each fault time period as an optimization target; and calculating the active and reactive power output of the optimized distributed power supply and the charging and discharging power of the ship mobile power resource, thereby improving the toughness of the island micro-grid. Compared with the prior art, the method has the advantages that the ship mobile power resources in the island micro-grid are optimized and dispatched, so that the load loss is remarkably reduced, the post-disaster recovery time is shortened, and the toughness of the island micro-grid is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of island microgrids, and in particular to a method for improving the resilience of an island microgrid by taking into account the influence of mobile power resources of ships. Background Art

[0002] In recent years, the development and utilization of oceans and islands has grown rapidly around the world, and more and more islands have been developed and utilized. These islands not only connect land and sea space, but also develop abundant renewable energy in the surrounding areas, helping to expand the scope of human activities and improve the quality of life of residents. At present, the development and utilization of islands is gradually emerging, but due to the large number of islands, huge differences in load levels and energy types, it still faces many challenges.

[0003] Due to its special geographical location, island microgrids are vulnerable to extreme natural disasters such as earthquakes, tsunamis, and typhoons, which can lead to serious power outages. The island power supply system must have sufficient resilience to cope with these disasters.

[0004] However, most existing resilience research focuses on land power grids, mainly focusing on post-disaster rapid maintenance and pre-disaster optimization configuration. Unlike land power grids, island microgrids are limited by the land area and load distribution of islands, and face greater challenges in pre-disaster optimization configuration and post-disaster rapid maintenance. Load reduction is relatively large after a disaster.

[0005] In summary, the current research on island microgrid resilience lacks consideration of the impact of ship mobile power resources. Summary of the invention

[0006] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and to provide a method for improving the resilience of an island microgrid taking into account the influence of ship mobile power resources, thereby improving the resilience of the island microgrid by optimizing the scheduling of ship mobile power resources in the island microgrid.

[0007] The purpose of the present invention can be achieved by the following technical solutions:

[0008] One aspect of the present invention provides a method for improving the resilience of an island microgrid considering the impact of mobile power resources of ships, comprising the following steps:

[0009] By modeling the typhoon's wind field, the wind speed of the island in the time and space dimensions is calculated;

[0010] Based on the wind speed, calculating the failure probability of each transmission branch in the microgrid;

[0011] Based on the pre-built post-disaster optimization scheduling model of the island microgrid taking into account the access of mobile power resources of ships, the optimization goal is to minimize the sum of the weighted active power reduction of each node in each fault period. The active and reactive output of the optimized distributed power source and the charging and discharging power of the mobile power resources of ships are calculated to improve the resilience of the island microgrid.

[0012] As a preferred technical solution, the construction process of the island microgrid post-disaster optimization dispatching model includes:

[0013] Constructing the radiation topology constraints of island microgrid based on single commodity flow method;

[0014] construct load shedding constraints;

[0015] Construct distributed generation output constraints;

[0016] Constructing island microgrid operation constraints;

[0017] Construct spatiotemporal dynamic scheduling constraints for propagating mobile power resources;

[0018] Construct the ship's charging and discharging power and charge state constraints.

[0019] As a preferred technical solution, the spatiotemporal dynamic scheduling constraints of the ship's mobile power resources are:

[0020]

[0021] V i ME (t) = V i,0 e -1,7c

[0022] in, is the travel time of mobile power resource i between node m and node n, L m,n (t) is the equivalent travel distance between node m and node n, V i ME (t) is the actual speed of the ship's mobile power resources, L m,n,0 is the road distance between node m and node n, V i,0 is the sailing speed under normal circumstances, and c is the influence coefficient of typhoon disaster on the ship speed.

[0023] As a preferred technical solution, the charging and discharging power and charge state constraints of the ship are:

[0024]

[0025] Among them, t0 is the initial time of the fault, is the connection status between electric boat i and node j in time t, and They are the charging and discharging status signs of the electric boat respectively. and is the upper limit of the charging and discharging active power of the electric boat, and are the upper limits of reactive power for charging and discharging, The charging and discharging efficiency of the electric boat, It is the upper limit of energy storage capacity of electric boats.

[0026] As a preferred technical solution, the island microgrid radiation topology constraint is:

[0027]

[0028] -M1α ij ≤F ij ≤M1α ij

[0029]

[0030] Among them, Ω B is a branch set, is a 0-1 variable that marks the virtual source node, α ij The variable value of 0-1 indicates the connection status of the ship's mobile power resources, N B is the total number of nodes, F ij is the branch virtual power flow, F i VS is the virtual power emitted by the node, and M1 is a very large number.

[0031] As a preferred technical solution, the process of calculating the failure probability of each transmission branch in the microgrid based on the wind speed includes the following steps:

[0032] Dividing a single transmission branch into a plurality of transmission sections and a plurality of towers, and calculating the cumulative failure probability of each transmission section and tower within the typhoon impact time based on the wind speed;

[0033] Based on the cumulative failure probability of each transmission line section and tower during the typhoon impact period, the failure probability of each transmission branch is calculated.

[0034] As a preferred technical solution, the failure probability of each transmission branch is calculated by treating the transmission branch as a series model formed by multiple transmission sections and multiple towers connected in series.

[0035] As a preferred technical solution, the active and reactive output of distributed power sources and the charging and discharging power of ship mobile power resources are optimized by adopting a second-order cone mixed integer linear programming algorithm.

[0036] As a preferred technical solution, the typhoon wind field is modeled by constructing a Batts typhoon wind field model.

[0037] Another aspect of the present invention provides an electronic device, comprising: one or more processors and a memory, wherein the memory stores one or more programs, and the one or more programs include instructions for executing the aforementioned method for improving the resilience of the island microgrid taking into account the impact of ship mobile power resources.

[0038] Another aspect of the present invention provides a computer-readable storage medium comprising one or more programs for execution by one or more processors of an electronic device, wherein the one or more programs include instructions for executing the aforementioned method for improving the resilience of an island microgrid taking into account the impact of mobile power resources of ships.

[0039] Compared with the prior art, the present invention has at least one of the following beneficial effects:

[0040] (1) Improving the resilience of island microgrids: Based on the unique geographical location of the island, the present invention constructs a mathematical model of the island microgrid system and its supporting equipment and extreme typhoon disasters. Based on the overall failure probability of each line in the island microgrid, a post-disaster optimization scheduling model for the island microgrid is constructed that takes into account the access of ship mobile power resources. Combined with the output characteristics of distributed power sources and ship mobile power resources, the load reduction of the island microgrid in typhoon scenarios is reduced, thereby improving the resilience of the island microgrid.

[0041] (2) Enhance the stability and reliability of power supply: By considering the fault characteristics of island microgrids under extreme scenarios, ship power resources are used to provide emergency power support when island microgrids encounter extreme scenarios, reduce load shedding, and enhance the stability and reliability of power supply.

[0042] (3) Strong adaptability: The present invention makes full use of photovoltaic, wind power and ship power resources, deploys and adjusts them according to actual needs, improves the resilience and flexibility of the island microgrid, and adapts to different load demands and environmental changes.

[0043] (4) Fast optimization speed: By adopting the second-order cone mixed integer linear programming algorithm, the distributed power sources and ship mobile power resources in the island microgrid are optimized and scheduled at multiple time scales, further improving the power supply reliability and stability of the island microgrid. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 It is a flow chart of a method for improving the resilience of an island microgrid taking into account the influence of mobile power resources of ships in an embodiment;

[0045] Figure 2 Schematic diagram of the island microgrid model in the embodiment;

[0046] Figure 3 A diagram showing the charging state and access position of an electric ship in an embodiment;

[0047] Figure 4 Graph showing load power and node recovery ratio in each period under a typhoon scenario in the embodiment. DETAILED DESCRIPTION

[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0049] Example 1

[0050] In response to the problems existing in the aforementioned prior art, this embodiment provides a method for improving the resilience of island microgrids taking into account the impact of ship mobile power resources. On the basis of constructing an island microgrid, it fully considers the evolution process of typical extreme disasters represented by typhoons, establishes a common cause failure model between multiple components, and fully taps the ability of ship power resources to reduce load shedding and ensure power supply to important loads in extreme scenarios. The optimization solver is used to solve the mixed integer second-order cone programming problem, and the multi-time scale access location and charging and discharging power of ship mobile power resources are optimized, thereby effectively improving the resilience of the island microgrid.

[0051] See also Figure 1 , the method comprises the following steps:

[0052] Step S1, constructing a typhoon wind field model.

[0053] The typhoon wind field model is an important component of studying the impact of typhoon disasters on the power transmission network. This embodiment implements the construction of the wind field model based on the Batts typhoon wind field model. It has the advantages of simple form, fast solution speed, and the ability to simulate the development and change process of typhoon disasters. It not only meets the requirements of simulation accuracy, but also takes into account calculation efficiency. The wind field model assumes that the central air pressure of the typhoon does not decay before landing, and is the same as the central air pressure at the starting point; after landing, the typhoon decays and moves in a straight line. In the model, the attenuation of the typhoon after landing is caused by the decrease in the pressure difference between the center and the periphery of the typhoon, after the typhoon lands. The change in the central air pressure difference at time t is expressed as:

[0054]

[0055] Among them, ΔH(t) represents the central pressure difference of the typhoon after landing at time t, ΔH0 is the central pressure difference at the initial time of typhoon landing; C x is the calculation coefficient; It represents the angle between the typhoon's moving direction and the north direction; θ represents the angle between the landing island and the north direction, with clockwise direction being positive; t represents the landing time in hours.

[0056] The maximum wind speed radius is used to reflect the impact range of a typhoon during its movement. The maximum wind speed radius of a typhoon is the distance from the maximum wind speed point inside the horizontal structure of the typhoon to the center of the typhoon. The maximum wind speed radius of a typhoon at time t is:

[0057] r max (t) = C r ΔH(t) -ψ (2)

[0058] Among them, r max (t) is the maximum wind speed radius of the typhoon at time t, in kilometers; C r is the air pressure coefficient; ψ is the model coefficient of the air pressure difference in the center of the typhoon.

[0059] At time t, the gradient wind speed at the maximum wind speed radius can be expressed as:

[0060]

[0061] Where K is the empirical coefficient, which is set between 6.93 and 6.97; V gt (t) is the gradient wind speed at the maximum wind speed radius; f is the Coriolis parameter, f=2wsinδ, w is the angular velocity of the earth's rotation, and δ is the latitude of the typhoon center.

[0062] The typhoon wind speed reaches its maximum value at the maximum wind speed radius. Inside and outside the typhoon wind field, the farther away from the maximum wind speed radius, the smaller the wind speed. The wind speed at the maximum wind speed radius is expressed as:

[0063] V max (t) = C gt V gt (t)+C T V T (4)

[0064] Among them, V max (t) is the wind speed at the maximum wind speed radius; V T Indicates the moving speed of the typhoon in m / s; C gt and C T They are the gradient wind speed coefficient and the typhoon moving speed coefficient respectively.

[0065] The wind speed at any point in the typhoon wind field is calculated by the following formula:

[0066]

[0067] Where d(t) is the distance between the desired point and the typhoon center at time t; V d (t) is the wind speed at the point at time t; C p is the wind speed radius calculation coefficient.

[0068] Step S2: construct a transmission branch vulnerability model.

[0069] The strong impact of typhoon disasters on the power transmission network may cause mechanical or electrical failures of transmission line sections and equipment such as poles and towers, resulting in the suspension of transmission branches and may even cause regional or large-scale power outages.

[0070] Since the evolution of typhoon disasters is a moving and attenuating process, the real-time wind speed at any point within the island is calculated based on the wind field model. This step establishes a transmission branch failure probability vulnerability model that reflects the impact of typhoon disasters from two dimensions: time and space. The wind speed information that changes with time and space in the typhoon wind field is used as input, and the cumulative failure probability of the transmission section-level tower during the impact of the typhoon disaster is obtained based on the wind speed changes at the locations of the transmission lines and towers. Furthermore, according to the calculation method of the failure probability of the series model in the reliability assessment theory, the failure probability of each transmission branch is obtained.

[0071] A transmission branch is divided into L transmission sections and K towers. The total duration of the typhoon is T w Divided into T time intervals. The failure probability of the lth transmission line segment in the tth time interval can be calculated by the following formula:

[0072]

[0073] In the formula, λ n,l (t) is the failure probability of the lth transmission line section in the nth transmission line at time t; V n,l (t) represents the typhoon wind speed borne by the lth transmission line section of the nth transmission line in the tth time interval, V d,l represents the design wind speed of the transmission line section, and Δl represents the length of the transmission line section.

[0074] Since the typhoon wind speed remains constant within the length range of each transmission line segment and the selected typhoon impact time interval, the failure rate of a single transmission line segment remains constant. At this time, the lth transmission line segment of the nth transmission branch line has a failure rate of 1. w The cumulative failure probability within can be calculated by the following formula:

[0075]

[0076] Among them, P n,l is the typhoon impact time T w The cumulative failure probability within .

[0077] Similarly, the kth transmission tower of the nth transmission branch has a w The failure rate in the tth time interval can be calculated as follows:

[0078]

[0079] Among them, λ n,k (t) is the failure probability of the lth transmission line section in the nth transmission line at time t; V n,k (t) represents the wind speed borne by the kth transmission tower of the nth transmission branch, and the typhoon wind speed borne in the tth time interval; γ is the model coefficient; V d,t represents the design wind speed of the transmission tower, which is related to the design standard of the local tower. w The cumulative failure probability within is expressed as:

[0080]

[0081] Among them, P n,k is the kth transmission tower of the nth transmission branch at the typhoon impact time T w The cumulative failure probability within .

[0082] Normally, the distance between the busbars of the transmission network is far, and the actual transmission branches often cross multiple typhoon intensity areas. From a macroscopic perspective, the transmission branch can be regarded as a series model formed by multiple transmission line segments and multiple transmission towers in series. According to the failure probability calculation method of this model, assuming that the failures of each transmission line segment and tower are independent of each other, the failure of any transmission line segment or tower may cause the power transmission of the entire transmission branch to be interrupted. The failure probability of the nth transmission branch can be calculated by the following formula:

[0083]

[0084] Among them, P n is the failure probability of the nth transmission branch, L represents the number of transmission sections contained in the nth transmission branch; K represents the number of transmission towers contained in the nth transmission branch. According to the typhoon data model and island microgrid equipment data under different scenarios, the failure probability of the island microgrid line under extreme scenarios is calculated. The Monte Carlo method is used to simulate the failure process and determine the transmission branches with high failure probability, which provides the prerequisite for the subsequent formulation of the optimal scheduling plan for the access of ship mobile power resources to the island microgrid under the corresponding scenario.

[0085] Step S3, a post-disaster optimization dispatch model of the island microgrid taking into account the access of ship mobile power resources.

[0086] After the disaster, the island microgrid loses the main grid power supply. The duration of the fault can be predicted based on the disaster intensity and the number of emergency repair resources. With the goal of minimizing the weighted value of load reduction power during the fault duration, the active and reactive output of distributed power sources and the charging and discharging power of mobile power resources on ships are used as optimization variables to establish a multi-source coordinated post-disaster recovery optimization scheduling model. By dynamically scheduling mobile energy storage, the resilience of the island microgrid is maximized. The objective function is as follows:

[0087]

[0088] Where: Ω T is the set of failure periods; is the load active reduction power at node i at time t; m i is the load weight of node i.

[0089] The scheduling model includes the following constraints:

[0090] Radiation topology constraints of island microgrids: While ensuring the radiation topology constraints, the virtual source node flag 0-1 variable is introduced to consider the situation of island fusion and island without power supply. The number of islands after network reconstruction is added to the optimization process to form an improved single commodity flow constraint. The large number method is used to relax the virtual power flow to ensure that the island microgrid meets the radial topology requirements during the recovery process, which is specifically expressed as follows:

[0091]

[0092] -M1α ij ≤F ij ≤M1α ij (14)

[0093]

[0094] Where: Ω B is the branch set; α ij The variable value of 0-1 indicates the connection status of the ship's mobile power resources; N B is the total number of nodes; F ij is the branch virtual power flow; F i VS is the virtual power emitted by the node; M1 is a very large number.

[0095] Load reduction constraint: Assuming the load power factor is fixed, the load reduction power constraint can be expressed as:

[0096]

[0097] Where: and are the maximum reactive and active power of the load respectively; P i Ls and is the active and reactive power reduction of node i.

[0098] Distributed power output constraint: The output of distributed power at each node should not exceed its output upper limit. Assuming that the mobile power resources of the ship are fully charged before the disaster occurs, the upper limit of the charge and discharge power is taken as its output upper limit. In addition, there are constraints between the active power, reactive power and power factor of the distributed power. The output constraint of the distributed power is expressed as follows:

[0099]

[0100] Where: M, E, D, and P are mobile energy storage, electric boat charging pile, generator, and photovoltaic node set respectively; Indicates the connection status of various distributed power sources and node i; and They are respectively the upper limits of active and reactive output of distributed generation; and They are the upper and lower limits of the power factor of distributed power sources respectively.

[0101] Operation constraints of island microgrid: For radial distribution networks, the distributed power flow equation is used. Since the network topology changes with the state of the line switches, the large number method is used to relax the voltage equation. The system operation constraints can be expressed as:

[0102]

[0103] Where: R ij and X ij are branch resistance and reactance respectively; P ij and Q ij are the active and reactive powers flowing through the branch respectively; P i DG and are the active and reactive outputs of distributed power sources respectively; and are the upper and lower limits of the square term of the node voltage respectively; is the upper limit of the square term of the branch current; I ij sqr is the square term of the branch current; V i sqr is the square term of the node voltage.

[0104] Spatiotemporal dynamic scheduling constraints of ship mobile power resources: In the power grid-traffic integration system, the scheduling state of ship mobile power resources is determined by its charging and discharging state and transportation state, which has spatiotemporal coupling characteristics. Consider the traffic travel time of ship mobile power resource i between node m and node n. and ship access time T j , establish a spatiotemporal dynamic scheduling model for mobile power resources of ships, assuming that ships do not consume electricity during transportation. The maritime transportation network is affected by typhoon disasters. In different disaster periods and different locations, the actual travel time of ships on the same route is different. This embodiment takes this into account. In order to ensure the reliability of the passage of mobile power resources of ships in typhoon scenarios, the impact of typhoon disasters on the speed of ships is taken into account, and the traffic integration coefficient is used to reflect the spatial scheduling relationship between the actual navigation speed of ships and the equivalent travel distance. The travel time, equivalent travel distance and actual navigation speed of mobile power resource i at node m and node n can be expressed as:

[0105]

[0106] V i ME (t) = V i,0 e -1,7c (28)

[0107] Where: is the travel time of mobile power resource i between node m and node n; L m,n (t) is the equivalent travel distance between node m and node n; V i ME (t) is the actual speed of the ship's mobile power resources; L m,n,0 is the road distance between node m and node n; V i,0 is the sailing speed under normal circumstances; c is the impact coefficient of typhoon disaster on ship speed; it is estimated by the intensity of typhoon disaster and the disaster situation of island microgrid.

[0108] In addition, the ship must be connected to one node during the scheduling period before it can be charged and discharged. The ship's charging and discharging power and charge state constraints can be expressed as:

[0109]

[0110] Where: t0 is the initial time of fault, is the connection status between electric boat i and node j in time t; and They are respectively the charging and discharging status signs of the electric boat; and The upper limit of the charging and discharging active power of the electric boat; and are the upper limits of reactive power for charging and discharging respectively; Charging and discharging efficiency for electric boats; It is the upper limit of energy storage capacity of electric boats.

[0111] Based on typhoon disaster data, this method establishes a typhoon disaster model, calculates the real-time wind speed of each device in the island microgrid, and identifies the fault line in the typhoon scenario through the vulnerability model of the transmission line and tower. Figure 2 As shown. An intelligent optimization algorithm is used to achieve optimal scheduling of ship mobile power resources connected to the island microgrid. Based on the second-order cone mixed integer linear programming algorithm, the connection status of ship power resources and nodes in each time period is selected; the active and reactive output of distributed power sources and the charging and discharging power of ship mobile power resources are used as optimization variables, and the active power reduction of node load is used as the optimization target. In order to describe the spatiotemporal characteristics of ship mobile power resources and take into account the scheduling time scale under disaster conditions, the scheduling interval is set to 1 hour, so as to determine the optimal scheduling plan for ship mobile power resources.

[0112] In order to verify the effectiveness of this method, this section Figure 2 The island microgrid model is used as the object for simulation. The basic parameters of the island microgrid are as follows: the electrical distance between adjacent nodes is 2km, the transportation network topology is assumed to be the same as the power grid topology, the conductor model is LGJ-240 / 30, the typhoon center moves at 30° to the horizontal axis, the moving speed is 25km / h, the upper limit of the electric ship capacity is 0.6MWh, the lower limit of the capacity is 0.09MWh, the upper limit of the active charge and discharge power of the ship is 0.2MWh, the upper limit of the reactive charge and discharge power is 0.17MWh, and the charge and discharge efficiency is 0.98. Assuming that the disaster occurs at 4:00, according to the typhoon data model and the island microgrid equipment data, the island microgrid fault lines 0-1, 1-2, 21-22, 29-30, 30-31, and 31-32 are obtained.

[0113] By solving the mixed integer linear programming model, the real-time position and charging and discharging power of the electric ship are obtained, as shown in Table 1.

[0114] Table 1 Results of dynamic dispatch of ship power resources

[0115]

[0116] From Table 1, Figure 3 and Figure 4It can be seen that at the time of the disaster, the two mobile energy storage devices were located at nodes 12 and 24 respectively, and the microgrid was divided into multiple isolated islands. During the post-disaster recovery period, the recovery ratio of the node load remained above 90%, and the maximum power supply load was 2114kW. Since node 24 is an important load, electric ship No. 2 gives priority to supplying power to node 24, and the No. 1 electric ship equipment enters the No. 6 important load node for power supply after 1 hour of scheduling. After completing the power supply of the No. 24 important load node, the No. 2 electric ship runs to the No. 3 important load node for power supply. During the 04:00-05:00 period, affected by the disaster scene, MESS1 was at node 12 and had not yet reached node 6. Only MESS2 restored power supply in the auxiliary island microgrid. During the 05:00-06:00 period, MESS1 arrived at the important load node 6 for three hours of power supply, with a maximum power supply of 157.37kW, and MESS2 drove to the No. 3 important load node for power supply, with a maximum power supply of 170kW. Finally, MESS1 and MESS2 were connected to nodes 25 and 24 for power supply at 13:00 and 14:00 respectively. At this time, the photovoltaic output was large, the important loads were fully restored, and the load recovery rate of ordinary nodes reached 91%. Therefore, the island microgrid resilience improvement method considering the impact of ship mobile power resources provided in this embodiment effectively reduced the load reduction of the island microgrid in the typhoon scenario and significantly improved the resilience of the island microgrid.

[0117] This method has the following beneficial effects:

[0118] (1) Considering the fault characteristics of island microgrids under extreme scenarios, ship power resources are used to provide emergency power support when island microgrids encounter extreme scenarios, reduce load shedding, and enhance the stability and reliability of power supply.

[0119] (2) Make full use of photovoltaic, wind power and ship power resources, deploy and adjust them according to actual needs, improve the resilience and flexibility of island microgrids, and adapt to different load demands and environmental changes.

[0120] (3) A second-order cone mixed integer linear programming algorithm is used to optimize the multi-time scale scheduling of distributed power sources and ship mobile power resources in the island microgrid, further improving the power supply reliability and stability of the island microgrid.

[0121] (4) The implementation of this plan is of great significance to improving the disaster response capabilities of island microgrids and reducing the failure losses of island microgrids during extreme weather. On the basis of other resilience studies, it provides an effective reference for the planning and construction of island microgrids with higher resilience.

[0122] (5) Connecting electric ships as mobile power resources to the island microgrid provides a new solution to improve the resilience of the island microgrid, which helps reduce the impact of extreme natural disasters on the island microgrid system and provides a stable energy supply for the island microgrid.

[0123] (6) This plan will effectively help promote the development of island microgrids.

[0124] Example 2

[0125] This embodiment provides an electronic device, including: one or more processors and a memory, wherein the memory stores one or more programs, and the one or more programs include instructions for executing the method for improving the resilience of an island microgrid taking into account the impact of mobile power resources of ships as described in Example 1.

[0126] Example 3

[0127] This embodiment provides a computer-readable storage medium, including one or more programs for execution by one or more processors of an electronic device, wherein the one or more programs include instructions for executing a method for improving the resilience of an island microgrid taking into account the impact of mobile power resources of ships as described in Example 1.

[0128] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A method for improving the resilience of island microgrids considering the impact of ship mobile power resources, characterized in that: The steps include: By modeling the typhoon's wind field, the wind speed of the island in the time and space dimensions is calculated; Based on the wind speed, calculating the failure probability of each transmission branch in the microgrid; Based on the pre-built post-disaster optimization scheduling model of the island microgrid taking into account the access of mobile power resources of ships, the optimization goal is to minimize the sum of the weighted active power reduction of each node in each fault period. The active and reactive output of the optimized distributed power source and the charging and discharging power of the mobile power resources of ships are calculated to improve the resilience of the island microgrid.

2. According to claim 1, a method for improving the resilience of an island microgrid considering the impact of mobile power resources of ships is characterized in that: The construction process of the island microgrid post-disaster optimization dispatching model includes: Constructing the radiation topology constraints of island microgrid based on single commodity flow method; construct load shedding constraints; Construct distributed power generation output constraints; Constructing island microgrid operation constraints; Construct spatiotemporal dynamic scheduling constraints for propagating mobile power resources; Construct the ship's charging and discharging power and charge state constraints.

3. A method for improving the resilience of an island microgrid considering the impact of mobile power resources of ships according to claim 2, characterized in that: The spatiotemporal dynamic scheduling constraints of the ship's mobile power resources are: in, is the travel time of mobile power resource i between node m and node n, L m,n (t) is the equivalent travel distance between node m and node n, V i ME (t) is the actual speed of the ship's mobile power resources, L m,n,0 is the road distance between node m and node n, V i,0 is the sailing speed under normal circumstances, and c is the influence coefficient of typhoon disaster on the ship speed.

4. A method for improving the resilience of an island microgrid considering the impact of mobile power resources of ships according to claim 2, characterized in that: The charging and discharging power and charge state constraints of the ship are: Among them, t0 is the initial time of the fault, is the connection status between electric boat i and node j in time t, and They are the charging and discharging status signs of the electric boat respectively. and is the upper limit of the charging and discharging active power of the electric boat, and are the upper limits of reactive power for charging and discharging, The charging and discharging efficiency of the electric boat, It is the upper limit of energy storage capacity of electric boats.

5. A method for improving the resilience of an island microgrid considering the impact of mobile power resources of ships according to claim 2, characterized in that: The island microgrid radiation topology constraints are: -M1a ij ≤F ij ≤M1a ij Among them, Ω B is a branch set, is a 0-1 variable that marks the virtual source node, α ij The variable value of 0-1 indicates the connection status of the ship's mobile power resources, N B is the total number of nodes, F ij is the branch virtual power flow, is the virtual power emitted by the node, and M1 is a very large number.

6. A method for improving the resilience of an island microgrid considering the impact of mobile ship power resources according to claim 1, characterized in that: The process of calculating the failure probability of each transmission branch in the microgrid based on the wind speed comprises the following steps: Dividing a single transmission branch into a plurality of transmission sections and a plurality of towers, and calculating the cumulative failure probability of each transmission section and tower within the typhoon impact time based on the wind speed; Based on the cumulative failure probability of each transmission line section and tower during the typhoon impact period, the failure probability of each transmission branch is calculated.

7. A method for improving the resilience of an island microgrid considering the impact of mobile ship power resources according to claim 1, characterized in that: The active and reactive output of distributed power sources and the charging and discharging power of ship mobile power resources are optimized by adopting the second-order cone mixed integer linear programming algorithm.

8. A method for improving the resilience of an island microgrid considering the impact of mobile power resources of ships according to claim 1, characterized in that: By constructing the Batts typhoon wind field model, the typhoon wind field can be modeled.

9. An electronic device, characterized in that: include: One or more processors and a memory, wherein the memory stores one or more programs, and the one or more programs include instructions for executing a method for improving the resilience of an island microgrid taking into account the impact of mobile power resources of ships as described in any one of claims 1-8.

10. A computer-readable storage medium, characterized in that: It includes one or more programs for execution by one or more processors of an electronic device, and the one or more programs include instructions for executing a method for improving the resilience of an island microgrid taking into account the impact of mobile power resources of ships as described in any one of claims 1-8.

Citation Information

Cited By

  • Multi-mode operation demand-oriented electric propulsion ship power dispatching optimization method

    CN120601551A

  • A power scheduling optimization method for multi-mode operation requirement of electric propulsion ship

    CN120601551B

  • Power distribution network mobile energy storage optimal configuration method and equipment considering fault evolution under typhoon disaster

    CN120855465A

  • Optimal allocation method and device for mobile energy storage of distribution network under typhoon disaster considering fault evolution

    CN120855465B