Agricultural light complementary system

By introducing efficiency evaluation, output regulation and coverage analysis modules into the agricultural photovoltaic complementary system, the problems of power generation efficiency monitoring and intelligent control are solved, efficient management of the photovoltaic power generation system is achieved, battery life is extended and energy waste is avoided.

CN118739409AActive Publication Date: 2024-10-01ANHUI WANNENG PHOTOVOLTAIC AGRI TECH INNOVATION CO LTD

Patent Information

Application Number
CN202410870394.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2024-10-01
Estimated Expiration
2044-07-01

AI Technical Summary

Technical Problem

It is difficult to monitor and analyze the power generation efficiency of existing agricultural photovoltaic complementary systems, which makes it difficult to intelligently control battery power, affects system efficiency and may cause energy waste.

Method used

An agricultural photovoltaic complementary system including an efficiency evaluation module, an output control module and a coverage analysis module is designed. By monitoring the power generation efficiency of photovoltaic power generation panels, it predicts the ideal output power, adjusts the charging capacity of the battery according to weather conditions, and cleans the surface in time. dust to improve power generation efficiency.

Benefits of technology

It realizes efficiency monitoring and intelligent control of photovoltaic power generation systems, extends battery life, avoids energy waste, and improves the overall efficiency of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739409A_ABST
    Figure CN118739409A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of photovoltaic power generation, in particular to an agriculture and light complementary system which comprises a plurality of photovoltaic power generation panels and a grid-connected power generation system with a storage battery. The grid-connected power generation system outputs electric energy to a storage battery in a direct current mode or merges the electric energy into the state grid through an inverter, a battery management system is arranged between the photovoltaic power generation panel and the storage battery, an installation area of the photovoltaic power generation panel is marked as an installation area, and the system further comprises an efficiency evaluation module, an output regulation and control module and a coverage analysis module. The output regulation and control module comprises an output prediction unit and an output control unit, the output prediction unit predicts the power generation efficiency of the photovoltaic power generation panel according to the power generation efficiency of the photovoltaic power generation panel and weather conditions within a certain time range in the future, and the output control unit regulates and controls the power generation output target of the photovoltaic power generation panel according to the predicted power generation amount. Therefore, the resource utilization efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic power generation, and in particular to an agricultural-photovoltaic complementary system. Background Art

[0002] The agricultural-photovoltaic complementary system, referred to as "agricultural-photovoltaic complementary", is a system that applies solar photovoltaic power generation technology to agricultural production. It installs photovoltaic panels above the farmland to provide necessary electricity for agricultural production without occupying ground space. At the same time, the construction of photovoltaic panels can also provide a suitable growth environment for crops, edible fungi and animal husbandry, realize the three-dimensional value-added utilization of land, improve land utilization, promote the development of green agriculture, and increase farmers' income. At present, the agricultural-photovoltaic complementary project has achieved remarkable results in practical applications, providing strong support for promoting the development of green energy and agriculture.

[0003] In the application process of large-scale single-unit agricultural-photovoltaic complementary power stations, the electric energy generated can be stored in batteries to provide necessary electricity for agricultural production, and can also be converted into alternating current through inverters and connected to the power grid, thereby realizing diversified utilization, making full use of the clean electricity generated while meeting the electricity demand necessary for agricultural production. However, the agricultural-photovoltaic complementary system in the prior art is difficult to predict the power generation situation, and it is difficult to intelligently control the adjustment of the battery storage power according to the prediction results, which is not conducive to maintaining the life of the battery, and is prone to energy waste, affecting the efficiency of the agricultural-photovoltaic complementary system. Summary of the invention

[0004] In view of the above-mentioned shortcomings of the prior art, the present invention provides an agricultural-photovoltaic complementary system, which can effectively solve the problem that the agricultural-photovoltaic complementary system in the prior art is difficult to monitor and analyze the abnormality of power generation efficiency and intelligently control the power of the battery, resulting in poor efficiency of the photovoltaic power generation system.

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0006] The present invention provides an agricultural photovoltaic complementary system, which at least includes: a plurality of photovoltaic panels and a grid-connected power generation system with a battery, a battery management system is provided between the photovoltaic panels and the battery, the area where the photovoltaic panels are installed is recorded as the installation area, and also includes an efficiency evaluation module, an output control module, and a coverage analysis module:

[0007] The efficiency evaluation module periodically monitors and analyzes the power generation efficiency of all photovoltaic panels, selects one of them as the target photovoltaic panel for comparison, monitors the changes in the solar radiation intensity value received by the target photovoltaic panel, calculates the power generation efficiency corresponding to the target photovoltaic panel at the moment of the highest solar radiation intensity value, and analyzes and compares the power generation efficiency of all photovoltaic panels to determine whether there is any abnormality in the working status of all photovoltaic panels;

[0008] The output control module includes an output prediction unit and an output control unit. The output prediction unit selects the appropriate working conditions according to the historical working conditions of the photovoltaic panels, and analyzes and calculates the ideal output power in combination with the power generation efficiency of the photovoltaic panels. The output control unit adjusts the output relationship between the photovoltaic panels and the battery according to the weather conditions within a certain time range in the future and the ideal output power, and controls the storage capacity of the battery.

[0009] Coverage analysis module: The coverage analysis module dynamically monitors and analyzes the power generation efficiency of photovoltaic panels, calculates the power abnormality value based on the usage time of the photovoltaic panels, generates a surface coverage abnormality signal when the power abnormality value exceeds the preset range, and cleans the dust on the surface of the corresponding photovoltaic panels.

[0010] Furthermore, the comparative analysis process of the efficiency evaluation module is as follows:

[0011] Step 1: Obtain the effective area of ​​each photovoltaic panel, obtain the rated power of the photovoltaic panel, obtain the sunrise time and sunset time of the installation area every day, and record the time interval from sunrise time to sunset time as the monitoring time interval;

[0012] Step 2: Within the monitoring time interval, one of the photovoltaic panels is recorded as the target photovoltaic panel, the solar radiation intensity value on the surface of the target photovoltaic panel is obtained in real time, the current ambient temperature value is obtained in real time, the output current and output voltage of each photovoltaic panel are obtained in real time, and the product of the output current and the output voltage is calculated and recorded as the output power;

[0013] Step 3: Extract the maximum solar radiation intensity value within the most recent complete monitoring time interval and the ambient temperature value T at the corresponding time MAX , the maximum solar radiation intensity value is recorded as the maximum radiation value I MAX , extract the maximum output power of each photovoltaic panel within the most recent complete monitoring time interval and record it as the output maximum value P i OUT , extract the output power of the target photovoltaic panel at the time of the maximum radiation value and record it as the target power P real , where i represents the serial number of each photovoltaic panel;

[0014] Step 4: Set the ambient temperature value T MAX , Radiation Maximum I MAX , Rated power P of photovoltaic panels STC Substitute into the formula Calculate in and get the theoretical maximum power P of the target photovoltaic panel MAX , where: α is the preset temperature coefficient, which represents the percentage of relative change in the output power of the photovoltaic panel per degree Celsius change; ISTC is the light intensity under standard test conditions; T STC is the panel temperature under standard test conditions, and the target power P of the target photovoltaic panel real The theoretical maximum power P MAX Substitute into the formula XL BZ =P real / P MAX Calculate the standard maximum efficiency XL BZ ;

[0015] Step 5: Extract the maximum output value of the target photovoltaic panel and the corresponding recording time and compare it with the target power P real and the corresponding recording time. If the power values ​​are the same and the corresponding recording time is also consistent, then go to step 6. Otherwise, generate a recording abnormality signal and send it to the staff's handheld terminal.

[0016] Step 6: Use the formula Calculate the measured maximum efficiency XL of each photovoltaic panel i The measured maximum efficiency of the target photovoltaic panel is its standard maximum efficiency. The measured maximum efficiency XL of each photovoltaic panel is calculated. i With standard maximum efficiency XL BZ The difference is recorded as the efficiency deviation, and an efficiency difference threshold is preset. The efficiency deviation of each photovoltaic panel is compared with the efficiency difference threshold. When its efficiency deviation and the efficiency difference threshold are less than or equal to the efficiency difference threshold, a stable output signal is generated. When its efficiency deviation and the efficiency difference threshold are greater than the efficiency difference threshold, a stable abnormal signal is generated and the photovoltaic panel status is marked as abnormal. At the same time, the serial numbers of all abnormal photovoltaic panels are sent to the staff's handheld terminal.

[0017] Furthermore, the absolute value of the efficiency deviation of each photovoltaic panel is obtained, and the photovoltaic panel whose absolute value of efficiency deviation is greater than the efficiency difference threshold is recorded as a problematic photovoltaic panel, and the measured maximum efficiency XL of the problematic photovoltaic panel is recorded as i Minus the standard Max Efficiency XL BZ If the result is greater than 0, the problematic photovoltaic panel is recorded as an abnormal photovoltaic panel, and the number of abnormal photovoltaic panels is counted. When the number of abnormal photovoltaic panels is greater than or equal to the preset number threshold, an abnormal signal of the target photovoltaic panel is generated, and the average of the measured maximum efficiency of all abnormal photovoltaic panels is calculated as the standard maximum efficiency, and step six is ​​repeated.

[0018] Furthermore, the output prediction unit obtains the measured maximum efficiency and efficiency deviation of each photovoltaic power generation panel obtained from the most recent monitoring. When the efficiency deviations of all photovoltaic power generation panels are less than or equal to the efficiency difference threshold, the minimum value of all measured maximum efficiencies is extracted and recorded as the efficiency prediction value XL min, obtain the lowest value of direct solar radiation intensity in the installation area throughout the year as the radiation standard value, draw a curve of solar radiation intensity value over time in each monitoring time interval as a radiation intensity change graph, extract the radiation intensity change graph in the most recent month and perform screening processing;

[0019] A straight line represented by the radiation standard value is drawn in the radiation intensity change diagram. When the straight line intersects the radiation intensity change curve in the radiation intensity change diagram, the projection length of the part of the radiation intensity change curve located above the straight line on the time axis is calculated and recorded as the effective duration. The effective duration is calculated and divided by the total duration of the corresponding monitoring duration interval to obtain the effective proportion. An effective proportion threshold is set. When the effective proportion value is greater than or equal to the effective proportion threshold, the corresponding radiation intensity change diagram is recorded as the ideal intensity change diagram.

[0020] Calculate the mean value of the solar radiation intensity in the ideal intensity variation diagram and record it as the ideal intensity value I HP , get the average temperature T of the day HP , substitute into the formula Calculate in and get the ideal output power OP MAX .

[0021] Furthermore, the output control unit obtains the ideal output power OP MAX , set a future time interval, the calculation formula for the duration T of the future time interval is in Indicates that the value is not greater than The largest integer, W all , W e Respectively represent the total power of the battery and the average daily power consumption of the power facilities, obtain the weather conditions of each day in the future time interval of the installation area, and divide the weather into two types: sunny and non-sunny according to the weather conditions, and preset an appropriate storage ratio;

[0022] When the future time interval is all sunny, the battery capacity is adjusted to the total capacity multiplied by the appropriate storage ratio;

[0023] When there are some sunny days in the future time interval, the time difference between the last sunny day and the current day is calculated as T′, and the battery is charged and the charging time is controlled. The charging time calculation formula is: Where W NOW , W′ respectively represent the current storage capacity and the storage capacity under the appropriate storage ratio state, and charging continues until the battery is fully charged or the charging time ends;

[0024] When there is no sunny day in the future time interval, the control fully charges the battery.

[0025] Furthermore, the analysis process of the coverage analysis module is specifically as follows:

[0026] The maximum efficiency of each photovoltaic panel after installation is obtained and recorded as the initial efficiency XL i Z , obtain the most recently monitored maximum efficiency of each photovoltaic panel and record it as the current efficiency XL i N , calculate the time interval between the current time and the installation completion time as the working time t, and substitute it into the formula UX=XL i Z *(1-t*k)-XL i N Calculation is performed in which k is the preset time influence coefficient, and the power abnormality value UX is obtained. A power abnormality threshold is preset. When the power abnormality value is greater than or equal to the power abnormality threshold, a surface coverage abnormality signal is generated, the surface of the photovoltaic panel is cleaned and dusted, and the power abnormality value is recalculated and recorded as UX′. If the power abnormality value is still greater than or equal to the power abnormality threshold, a corresponding photovoltaic panel abnormality signal is generated.

[0027] Compared with the known prior art, the technical solution provided by the present invention has the following beneficial effects:

[0028] 1. The efficiency evaluation module of the present invention takes the target photovoltaic panel as the power generation efficiency standard, and determines the error degree between the power generation efficiency of all photovoltaic panels and the standard reference through the comparison process, because the maximum power generation efficiency of photovoltaic panels installed at the same time should be consistent under the same working environment, and even if there is an error, it should be within the set error range, otherwise it can be judged that the photovoltaic panel has a functional failure, thereby quickly distinguishing photovoltaic panels with abnormal power generation efficiency, facilitating the staff to carry out targeted inspection and maintenance, which is conducive to ensuring power generation efficiency

[0029] 2. The present invention dynamically analyzes the daily change in solar radiation intensity within the most recent month, and selects the daily sunshine duration under relatively good lighting conditions, thereby selecting the sunshine duration under full sunshine conditions in a day according to the length of sunshine duration, and then analyzing to obtain the ideal output power that can be achieved at present, so as to facilitate the subsequent prediction of the power generation efficiency of the photovoltaic panels. In addition, according to different weather conditions in the future, the power flow of the photovoltaic panels is controlled to charge the batteries, and the charging time and charging amount are intelligently adjusted, so that the battery power is in an appropriate power range during daily use, and the battery life is extended as much as possible. At the same time, it can prevent the battery from powering the facilities when the photovoltaic panels cannot generate electricity, fully utilize the generated electricity, and reasonably plan the battery power storage. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0031] Figure 1 It is the overall module block diagram of the present invention. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] The present invention will be further described below in conjunction with the embodiments.

[0034] See also Figure 1 , an agricultural-photovoltaic complementary system, at least includes: a plurality of photovoltaic panels and a grid-connected power generation system with a battery, the plurality of photovoltaic panels absorb solar energy to generate electrical energy, the grid-connected power generation system outputs the electrical energy to the battery in the form of direct current or is connected to the national power grid through an inverter, a battery management system (BMS) for adjusting the charging current and voltage stability is provided between the photovoltaic panels and the battery, the area where the photovoltaic panels are installed is recorded as the installation area, and also includes an efficiency evaluation module, an output control module, and a coverage analysis module.

[0035] The efficiency evaluation module monitors the power generation efficiency of all photovoltaic panels, selects one of them as a target photovoltaic panel for comparison, and analyzes whether the working status of all photovoltaic panels is abnormal based on the power generation efficiency of the target photovoltaic panel.

[0036] The comparative analysis process is as follows: Step 1: Obtain the effective area of ​​each photovoltaic panel (the effective area refers to the surface area of ​​the photovoltaic panel that can convert solar energy into electrical energy, excluding the fixed frame around the solar panel), and obtain the rated power of the photovoltaic panel (the rated power refers to the unit area of ​​the photovoltaic panel under standard test conditions, that is, STC: 1000W / m 2The solar radiation intensity, the ambient temperature of 25°C and the power generation under the spectral distribution of AM1.5) are obtained to obtain the daily sunrise and sunset times of the installation area (which can be obtained through the meteorological data of the local meteorological station), and the time interval from sunrise to sunset is recorded as the monitoring time interval. By using the current monitoring time interval, invalid data can be avoided and the monitoring efficiency can be improved;

[0037] Step 2: within the monitoring time interval, obtain the solar radiation intensity value of one of the photovoltaic panels at an angle in real time and record the photovoltaic panel as the target photovoltaic panel (the solar radiation intensity value can be directly measured by a solar radiation measuring instrument in the prior art, and the solar radiation intensity value at an angle can be measured by installing the measuring instrument on the target photovoltaic panel), obtain the current ambient temperature value in real time, obtain the output current and output voltage of each photovoltaic panel in real time, and calculate the product of the output current and the output voltage as the output power;

[0038] Step 3: Extract the maximum solar radiation intensity value within the most recent complete monitoring time interval and the ambient temperature value T at the corresponding time MAX , the maximum solar radiation intensity value is recorded as the maximum radiation value I MAX , extract the maximum output power of each photovoltaic panel within the most recent complete monitoring time interval and record it as the output maximum value P i OUT , extract the output power of the target photovoltaic panel at the time of the maximum radiation value and record it as the target power P real , where i represents the serial number of each photovoltaic panel;

[0039] It should be noted that the photovoltaic panels in a single agricultural-photovoltaic complementary power station are generally installed in a centralized manner, that is, the hardware data parameters of the photovoltaic panels are kept consistent, and the installation locations of multiple photovoltaic panels are all in the same solar exposure area. Therefore, if not affected by external factors, the maximum value of the solar radiation intensity value corresponding to a single photovoltaic panel can be used as the maximum value of the solar radiation intensity value absorbed by each photovoltaic panel, and if not affected by other factors in the same area, the ambient temperature of each photovoltaic panel can also be considered to be the same.

[0040] Step 4: Set the ambient temperature value T MAX , Radiation Maximum I MAX , Rated power P of photovoltaic panels STC Substitute into the formula Calculate in and get the theoretical maximum power P of the target photovoltaic panel MAX , where: α is the preset temperature coefficient, which represents the relative percentage change in the output power of the photovoltaic panel per degree Celsius change (% / ℃), generally provided by the manufacturer; I STCis the light intensity under standard test conditions (W / m 2 );T STC is the panel temperature under standard test conditions, usually 25°C, and the target power P of the target photovoltaic panel real The theoretical maximum power P MAX Substitute into the formula XL BZ =P real / P MAX Calculate the standard maximum efficiency XL BZ ;

[0041] Step 5: Extract the maximum output value of the target photovoltaic panel and the corresponding recording time and compare it with the target power P real and the corresponding recording time. If the power values ​​are the same and the corresponding recording time is also consistent, then go to step 6. Otherwise, generate a recording abnormality signal and send it to the handheld terminal of the staff, and the staff will check the target photovoltaic panel and its corresponding one.

[0042] It should be noted that under normal circumstances, the moment when the photovoltaic panel generates the highest power should correspond to the moment when the intensity of solar radiation it receives is the highest, because when the intensity of solar radiation is the highest, the more solar energy it absorbs, and accordingly, the higher the output power.

[0043] Step 6: Use the formula Calculate the measured maximum efficiency XL of each photovoltaic panel i The measured maximum efficiency of the target photovoltaic panel is its standard maximum efficiency. The measured maximum efficiency XL of each photovoltaic panel is calculated. i With standard maximum efficiency XL BZ The difference is recorded as efficiency deviation, and an efficiency difference threshold is preset. The efficiency deviation of each photovoltaic panel is compared with the efficiency difference threshold. When its efficiency deviation and the efficiency difference threshold are less than or equal to the efficiency difference threshold, a stable output signal is generated. When its efficiency deviation and the efficiency difference threshold are greater than the efficiency difference threshold, a stable abnormal signal is generated and the photovoltaic panel status is marked as abnormal. At the same time, the serial numbers of all abnormal photovoltaic panels are sent to the staff's handheld terminal.

[0044] The target photovoltaic panel is used as the power generation efficiency standard, and the degree of error between the power generation efficiency of all photovoltaic panels and the standard reference is determined through a comparison process, because the maximum power generation efficiency of photovoltaic panels installed at the same time should be consistent under the same working environment. Even if there is an error, it should be within the set error range. Otherwise, it can be judged that the photovoltaic panel has a functional failure, thereby quickly distinguishing photovoltaic panels with abnormal power generation efficiency, making it convenient for staff to carry out targeted inspection and maintenance, which is conducive to ensuring power generation efficiency.

[0045] Furthermore, the absolute value of the efficiency deviation of each photovoltaic panel is obtained, and the photovoltaic panels whose absolute value of efficiency deviation is greater than the efficiency difference threshold are recorded as problematic photovoltaic panels, and the measured maximum efficiency XL of the problematic photovoltaic panels is recorded as i Minus the standard Max Efficiency XL BZ If the result is greater than 0, the problematic photovoltaic panel is recorded as an abnormal photovoltaic panel, and the number of abnormal photovoltaic panels is counted. When the number of abnormal photovoltaic panels is greater than or equal to a preset number threshold (in a specific embodiment, the number threshold is equal to the total number of photovoltaic panels multiplied by 5%), an abnormal signal of the target photovoltaic panel is generated, and the staff performs maintenance on the target photovoltaic panel. At the same time, the average measured maximum efficiency of all abnormal photovoltaic panels is calculated as the standard maximum efficiency, and step six is ​​repeated.

[0046] The output regulation module includes an output prediction unit and an output control unit. The output prediction unit screens according to the historical operating conditions of the photovoltaic panels, selects appropriate operating conditions, analyzes and calculates the power generation efficiency of the photovoltaic panels to obtain their ideal output power, and the output control unit adjusts the output relationship between the photovoltaic panels and the batteries according to the weather conditions within a certain time range in the future and the ideal output power, and controls the battery's storage capacity.

[0047] The output prediction unit obtains the measured maximum efficiency and efficiency deviation of each photovoltaic panel obtained from the most recent monitoring. When the efficiency deviations of all photovoltaic panels are less than or equal to the efficiency difference threshold, the minimum value of all measured maximum efficiencies is extracted and recorded as the efficiency prediction value XL. min , obtain the lowest value of direct solar radiation intensity in the installation area throughout the year (that is, the lowest value of radiation intensity in the target area under direct sunlight throughout the year, which means the lowest radiation intensity in the area under direct sunlight) and record it as the radiation standard value, draw a curve of solar radiation intensity value over time in each monitoring time interval and record it as a radiation intensity change graph, extract the radiation intensity change graph in the most recent month and perform screening processing, the screening processing process is as follows:

[0048] Draw a straight line represented by the radiation standard value in the radiation intensity change graph. When the straight line intersects the radiation intensity change curve in the radiation intensity change graph, calculate the projection length of the part of the radiation intensity change curve above the straight line on the time axis and record it as the effective duration. Calculate the effective duration and divide it by the total duration of the corresponding monitoring duration interval to get the effective proportion. Set an effective proportion threshold. When the effective proportion value is greater than or equal to the effective proportion threshold, record the corresponding radiation intensity change graph as the ideal intensity change graph. Select the ideal intensity change graph closest to the current date for further analysis.

[0049] Calculate the mean value of the solar radiation intensity in the ideal intensity variation diagram and record it as the ideal intensity value I HP , get the average temperature T of the day HP, substitute into the formula Calculate in and get the ideal output power OP MAX .

[0050] By dynamically analyzing the daily changes in solar radiation intensity in the past month, the daily sunshine duration under relatively good lighting conditions is screened out, and then the sunshine duration under full sunshine conditions in a day is screened out based on the length of sunshine duration, and then the ideal output power that can be achieved is analyzed to facilitate the subsequent prediction of the power generation efficiency of photovoltaic panels.

[0051] Output control unit obtains ideal output power OP MAX , set a future time interval, the calculation formula for the duration T of the future time interval is in Indicates that the value is not greater than The largest integer, W all , W e Respectively represent the total power of the battery and the average daily power consumption of the power facilities (including all DC power equipment in the installation area), obtain the daily weather conditions in the future time interval of the installation area (obtained through the weather forecast of the local meteorological station), and divide the weather into two types: sunny and cloudy according to the weather conditions, and preset an appropriate storage ratio;

[0052] When the future time interval is all sunny, the battery capacity is adjusted to the total capacity multiplied by the appropriate storage ratio. The battery capacity is adjusted to an appropriate ratio by controlling the charge and discharge, thereby extending the battery life as much as possible and ensuring the battery storage effect.

[0053] When there are some sunny days in the future time interval, the time difference between the last sunny day and the current day is calculated as T' (in days), the battery is charged and the charging time is controlled. The charging time calculation formula is: Where W NOW , W′ respectively represent the current storage capacity and the storage capacity under the appropriate storage ratio state, and charging continues until the battery is fully charged or the charging time ends;

[0054] When there is no sunny day in the future time interval, the control fully charges the battery.

[0055] According to different weather conditions in the future, the power flow of photovoltaic panels is controlled to charge the battery, and the charging time and charging amount are intelligently adjusted, so that the battery power is in an appropriate range during daily use, and the battery life is extended as much as possible. At the same time, it can avoid the battery being able to power facilities when the photovoltaic panels cannot generate electricity, fully utilize the generated electricity, and reasonably plan the battery power storage.

[0056] Coverage analysis module: The coverage analysis module analyzes and judges the abnormal conditions of photovoltaic panels, generates corresponding abnormal data signals, and reminds staff to clean the dust on the surface of photovoltaic panels in time, thereby helping to improve the power generation efficiency of photovoltaic panels.

[0057] The analysis process of the coverage analysis module is as follows:

[0058] The maximum efficiency of each photovoltaic panel after installation is obtained and recorded as the initial efficiency XL i Z , obtain the most recently monitored maximum efficiency of each photovoltaic panel and record it as the current efficiency XL i N , calculate the time interval between the current time and the installation completion time as the working time t, and substitute it into the formula UX=XL i Z *(1-t*k)-XL i N , where k is a preset time influence coefficient, and a power abnormality value UX is obtained. A power abnormality threshold is preset. When the power abnormality value is greater than or equal to the power abnormality threshold, in a specific embodiment, the power abnormality threshold is 10%, and a surface coverage abnormality signal is generated. The surface of the photovoltaic panel is cleaned and dusted (the cleaning and dust removal can be done by a handheld cleaner by the staff, or by mechanized equipment), and the power abnormality value is recalculated and recorded as UX′. If the power abnormality value is still greater than or equal to the power abnormality threshold, a corresponding photovoltaic panel abnormality signal is generated, and the staff performs inspection and maintenance on the corresponding photovoltaic panel.

[0059] It should be noted that when the power of a photovoltaic panel drops abnormally, that is, it drops due to non-aging reasons, it is generally caused by dust coverage, and dust coverage usually causes the power of the photovoltaic panel to drop by more than 10%. Therefore, by analyzing the power drop of the photovoltaic panel, it can help the staff to promptly discover the situation where the photovoltaic panel is covered by dust, which is convenient for the staff to clean it in time. Compared with regular cleaning, it is more efficient, and after eliminating the cause of dust coverage, an abnormal signal of the corresponding photovoltaic panel can be generated, which is convenient for the staff to promptly check the photovoltaic panels with abnormal functions, and further optimize and improve the efficiency guarantee of the photovoltaic panels.

[0060] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the protection scope of the technical solutions of the embodiments of the present invention.

Claims

1. An agricultural photovoltaic complementary system, comprising a plurality of photovoltaic panels and a grid-connected power generation system with a battery, wherein a battery management system is provided between the photovoltaic panels and the battery, characterized in that: The area where the photovoltaic panels are installed is recorded as the installation area, and also includes an efficiency evaluation module, an output control module, and a coverage analysis module: The efficiency evaluation module periodically monitors and analyzes the power generation efficiency of all photovoltaic panels, selects one of them as the target photovoltaic panel for comparison, monitors the changes in the solar radiation intensity value received by the target photovoltaic panel, calculates the power generation efficiency corresponding to the target photovoltaic panel at the moment of the highest solar radiation intensity value, and analyzes and compares the power generation efficiency of all photovoltaic panels to determine whether there is any abnormality in the working status of all photovoltaic panels; The output control module includes an output prediction unit and an output control unit. The output prediction unit selects the appropriate working conditions according to the historical working conditions of the photovoltaic panels, and analyzes and calculates the ideal output power in combination with the power generation efficiency of the photovoltaic panels. The output control unit adjusts the output relationship between the photovoltaic panels and the battery according to the weather conditions within a certain time range in the future and the ideal output power, and controls the storage capacity of the battery. Coverage analysis module: The coverage analysis module dynamically monitors and analyzes the power generation efficiency of photovoltaic panels, calculates the power abnormality value based on the usage time of the photovoltaic panels, generates a surface coverage abnormality signal when the power abnormality value exceeds the preset range, and cleans the dust on the surface of the corresponding photovoltaic panels.

2. The agricultural-photovoltaic complementary system according to claim 1, characterized in that: The comparative analysis process of the efficiency evaluation module is as follows: Step 1: Obtain the effective area of ​​each photovoltaic panel, obtain the rated power of the photovoltaic panel, obtain the sunrise time and sunset time of the installation area every day, and record the time interval from sunrise time to sunset time as the monitoring time interval; Step 2: Within the monitoring time interval, one of the photovoltaic panels is recorded as the target photovoltaic panel, the solar radiation intensity value on the surface of the target photovoltaic panel is obtained in real time, the current ambient temperature value is obtained in real time, the output current and output voltage of each photovoltaic panel are obtained in real time, and the product of the output current and the output voltage is calculated and recorded as the output power; Step 3: Extract the maximum solar radiation intensity value within the most recent complete monitoring time interval and the ambient temperature value T at the corresponding time MAX , the maximum solar radiation intensity value is recorded as the maximum radiation value I MAX , extract the maximum output power of each photovoltaic panel within the most recent complete monitoring time interval and record it as the output maximum value P i OUT , extract the output power of the target photovoltaic panel at the time of the maximum radiation value and record it as the target power P real , where i represents the serial number of each photovoltaic panel; Step 4: Set the ambient temperature value T MAX , Radiation Maximum I MAX , Rated power P of photovoltaic panels STC Substitute into the formula Calculate in and get the theoretical maximum power P of the target photovoltaic panel MAX , where: α is the preset temperature coefficient, which represents the percentage of relative change in photovoltaic panel output power per degree Celsius change; I STC is the light intensity under standard test conditions; T STC is the panel temperature under standard test conditions, and the target power P of the target photovoltaic panel real The theoretical maximum power P MAX Substitute into the formula XL BZ =P real / P MAX Calculate the standard maximum efficiency XL BZ ; Step 5: Extract the maximum output value of the target photovoltaic panel and the corresponding recording time and compare it with the target power P real and the corresponding recording time. If the power values ​​are the same and the corresponding recording time is also consistent, then go to step 6. Otherwise, generate a recording abnormality signal and send it to the staff's handheld terminal. Step 6: Use Formula XL i =P i OUT P MAX Calculate the measured maximum efficiency XL of each photovoltaic panel i The measured maximum efficiency of the target photovoltaic panel is its standard maximum efficiency. The measured maximum efficiency XL of each photovoltaic panel is calculated. i With standard maximum efficiency XL BZ The difference is recorded as efficiency deviation, and an efficiency difference threshold is preset. The efficiency deviation of each photovoltaic panel is compared with the efficiency difference threshold. When its efficiency deviation and the efficiency difference threshold are less than or equal to the efficiency difference threshold, a stable output signal is generated. When its efficiency deviation and the efficiency difference threshold are greater than the efficiency difference threshold, a stable abnormal signal is generated and the photovoltaic panel status is marked as abnormal. At the same time, the serial numbers of all abnormal photovoltaic panels are sent to the staff's handheld terminal.

3. The agricultural-photovoltaic complementary system according to claim 2, characterized in that: Obtain the absolute value of the efficiency deviation of each photovoltaic panel, record the photovoltaic panel whose efficiency deviation absolute value is greater than the efficiency difference threshold as a problematic photovoltaic panel, and record the measured maximum efficiency XL of the problematic photovoltaic panel as i Minus the standard Max Efficiency XL BZ If the result is greater than 0, the problematic photovoltaic panel is recorded as an abnormal photovoltaic panel, and the number of abnormal photovoltaic panels is counted. When the number of abnormal photovoltaic panels is greater than or equal to the preset number threshold, an abnormal signal of the target photovoltaic panel is generated, and the average of the measured maximum efficiency of all abnormal photovoltaic panels is calculated as the standard maximum efficiency, and step six is ​​repeated.

4. The agricultural-photovoltaic complementary system according to claim 2, characterized in that: The output prediction unit obtains the measured maximum efficiency and efficiency deviation of each photovoltaic power generation panel obtained from the most recent monitoring. When the efficiency deviations of all photovoltaic power generation panels are less than or equal to the efficiency difference threshold, the minimum value of all measured maximum efficiencies is extracted and recorded as the efficiency prediction value XL min , obtain the lowest value of direct solar radiation intensity in the installation area throughout the year as the radiation standard value, draw a curve of solar radiation intensity value over time in each monitoring time interval as a radiation intensity change graph, extract the radiation intensity change graph in the most recent month and perform screening processing; A straight line represented by the radiation standard value is drawn in the radiation intensity change diagram. When the straight line intersects the radiation intensity change curve in the radiation intensity change diagram, the projection length of the part of the radiation intensity change curve located above the straight line on the time axis is calculated and recorded as the effective duration. The effective duration is calculated and divided by the total duration of the corresponding monitoring duration interval to obtain the effective proportion. An effective proportion threshold is set. When the effective proportion value is greater than or equal to the effective proportion threshold, the corresponding radiation intensity change diagram is recorded as the ideal intensity change diagram. Calculate the mean value of the solar radiation intensity in the ideal intensity variation diagram and record it as the ideal intensity value I HP , get the average temperature T of the day HP , substitute into the formula Calculate in and get the ideal output power OP MAX .

5. The agricultural-photovoltaic complementary system according to claim 4, characterized in that: The output control unit obtains the ideal output power OP MAX , set a future time interval, the calculation formula for the duration T of the future time interval is in Indicates that the value is not greater than The largest integer, W all , W e Respectively represent the total power of the battery and the average daily power consumption of the power facilities, obtain the weather conditions of each day in the future time interval of the installation area, and divide the weather into two types: sunny and non-sunny according to the weather conditions, and preset an appropriate storage ratio; When the future time interval is all sunny, the battery capacity is adjusted to the total capacity multiplied by the appropriate storage ratio; When there are some sunny days in the future time interval, the time difference between the last sunny day and the current day is calculated as T′, and the battery is charged and the charging time is controlled. The charging time calculation formula is: Where W NOW , W′ respectively represent the current storage capacity and the storage capacity under the appropriate storage ratio state, and charging continues until the battery is fully charged or the charging time ends; When there is no sunny day in the future time interval, the control fully charges the battery.

6. The agricultural-photovoltaic complementary system according to claim 2, characterized in that: The analysis process of the coverage analysis module is as follows: The maximum efficiency of each photovoltaic panel after installation is obtained and recorded as the initial efficiency XL i Z , obtain the most recently monitored maximum efficiency of each photovoltaic panel and record it as the current efficiency XL i N , calculate when The time interval from the previous time to the installation completion time is recorded as the working time t, and substituted into the formula UX = XL i Z *(1-t*k)-XL i N Calculation is performed in which k is the preset time influence coefficient, and the power abnormality value UX is obtained. A power abnormality threshold is preset. When the power abnormality value is greater than or equal to the power abnormality threshold, a surface coverage abnormality signal is generated, the surface of the photovoltaic panel is cleaned and dusted, and the power abnormality value is recalculated and recorded as UX′. If the power abnormality value is still greater than or equal to the power abnormality threshold, a corresponding photovoltaic panel abnormality signal is generated.

Citation Information

Patent Citations

  • Agricultural light complementary photovoltaic module

    CN109495073A

  • Photovoltaic module dust cleaning decision-making method, monitoring system and cleaning system

    CN111628721A

  • Off-grid power generation energy storage power supply system

    CN117200329A

  • Photovoltaic solar monitoring method and system based on Internet of Things

    CN117833475A

Cited By

  • New energy equipment management method based on big data

    CN119482441A

  • Distributed optical energy storage management method based on string type energy storage system

    CN119965922A

  • A distributed energy management method for photovoltaic and energy storage based on string energy storage systems

    CN119965922B

  • Photovoltaic-edible mushroom collaborative intelligent agricultural industry fusion management and control method and system

    CN121168882A