By detecting filling levels and predicting assembly operations, combined with ideal and real operating information, it accurately predicts the refilling time of assembly materials, solves the problem of insufficient materials and shutdowns in the assembly line, and improves the efficiency and automation level of the assembly line.
Patent Information
- Application Number
- CN202410353740.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-03-28
- Filing Date
- 2024-03-27
- Publication Date
- 2024-10-01
AI Technical Summary
It is difficult to accurately predict the assembly material reloading time of the automatic assembly machine of the assembly line with the existing technology, which may lead to insufficient materials or unexpected shutdowns during the operation of the assembly line, affecting efficiency.
By detecting the current filling level of the component transport device, knowing the planned assembly operation and determining the position of the component carrier, predicting the refill time based on ideal and real operating information ensures that there is always an adequate supply of assembly materials on the assembly line and optimizes the use of assembly materials. Reload sequence and path.
It improves the operating efficiency of the assembly line, reduces unexpected downtime, ensures the continuous supply of assembly materials, reduces manual operation costs, and improves the automation level of the assembly line.
Smart Images

Figure CN118742002A_ABST
Abstract
Description
Technical Field
[0001] The invention generally relates to the production of electronic components by means of an assembly line having at least one and typically a plurality of automatic assembly machines connected one behind the other. The invention particularly relates to (i) a method for predicting the time for recharging a first assembly station of an assembly line with assembly material, (ii) a method for predicting the time for recharging assembly material on different predetermined conveying tracks of at least one assembly station of an assembly line, (iii) a method for determining the time sequence for recharging assembly material on at least two conveying tracks of an assembly line and (iv) an assembly line having a data processing device configured to implement the method or to control its flow. Background Art
[0002] The assembly of component carriers, such as circuit boards or substrates, with electronic components is achieved with the aid of an automatic assembly machine. The automatic assembly machine has an assembly head which (i) picks up the electronic component at a pick-up position of a component transport device, (ii) transports the electronic component in an assembly area of the automatic assembly machine, in which the component carrier to be assembled is located, and (iii) places the picked-up component on the component carrier at a predetermined assembly position.
[0003] In order to manufacture electronic assemblies composed of a component carrier and a plurality of different types of components, a plurality of automatic assembly machines are typically utilized for the assembly of the relevant component carriers. Here, a plurality of component conveying devices are provided for each automatic assembly machine, and different types of electronic components are conveyed to the assembly process using these component conveying devices.
[0004] Automatic assembly machines for manufacturing components are typically arranged one after another in an assembly line, and the component carrier is transported through the assembly areas of different automatic assembly machines by means of a conveying device. Then at least part of the relevant component carrier is assembled in different assembly areas.
[0005] In order to ensure that the assembly line operates as uninterrupted as possible, it must be ensured that a sufficiently large amount of assembly material or a sufficiently large number of components is always available for each component transport device. This can be done in different ways (A) and (B):
[0006] (A) Threshold monitoring:
[0007] In this variant, each individual component transport device is assigned the current filling level of assembly material at each point in time. If components are assembled, the filling level is updated. With the help of software, the consumption of assembly material for an optimally functioning assembly line can be predicted. If a certain material threshold is exceeded, a task is generated at the relevant component transport device for refilling assembly material. This task is then carried out by an operator or a robot, which transfers new assembly material to the relevant component transport device.
[0008] (B) Calculation of assembly material requirements:
[0009] This is achieved with the help of a software-supported logical workflow solution, which ensures and monitors the continuous supply of assembly materials on the assembly line. Based on the planned and actual material consumption and the amount of material currently present on the assembly line, the required electronic components are prepared in a central material storage device, which are packaged in component tapes. This preparation includes winding the component tape with a suitable length on a tape reel. Alternatively, the tape reel with the already wound component tape can also be provided to the central material storage device by the manufacturer or distributor. The number of the required prepared tape reels is determined and the transmission to the assembly line is achieved, for example, in an hourly cycle. Here, the actual refilling process on the relevant automatic assembly machine or more precisely on the relevant component transport device is not monitored.
[0010] Currently, the continuous supply of assembly material on a component conveying device includes so-called splicing. During the splicing process, the end of the component tape (which appears briefly due to the removal of the components) is consumed, and the beginning of a new component tape is connected to the end by means of a connecting element. In this way, the component tape that is about to be consumed is extended and a continuous supply of assembly material is ensured. Splicing is typically performed manually by an operator. In order to avoid idling of the component conveying device, the operator can only use a limited time period, within which the splicing process must be carried out or ended.
[0011] In order to automate the refilling process of components, component transport devices are known that have a housing in which the tape reel is located. After the component or material refilling process on the so-called component transport track of the automatic assembly machine, the entire component transport device is replaced, which can be performed automatically by means of a robot. In order to avoid downtimes of the automatic assembly machine, the component transport device must be replaced as soon as it is emptied. Therefore, it is necessary to predict the time point of this replacement as accurately as possible. Only in this way can the assembly line be operated with high efficiency without long downtimes of at least several automatic assembly machines.
[0012] The object of the present invention is to improve the efficiency of an assembly line by supplying assembly materials to an automatic assembly machine of the assembly line, in particular in an automated manner. Summary of the invention
[0013] This object is achieved by the subject matter of the independent claims. Advantageous embodiments of the invention are described in the dependent claims.
[0014] According to a first aspect of the present invention, a method is described for predicting the time for refilling assembly material for a first assembly station of an assembly line, the assembly line having at least: (i) a first assembly station, which is supplied with assembly material by a first component transport device on a (selected) first transport track, and (ii) a second assembly station, which is supplied with assembly material by a second component transport device on a second transport track, wherein the second assembly station is arranged upstream of the first assembly station along a transport section (a predetermined transport direction) for component carriers to be assembled. The method comprises: (a) detecting a current filling level of assembly material of a first component transport device; (b) obtaining at least planned assembly operations with assembly material assigned to the first transport track, which are still necessary in order to assemble all component carriers currently manufactured in a batch in a first assembly station; (c) determining a current position of at least one component carrier along a conveying section, which component carrier has been assembled in a second assembly station and is to be assembled in the first assembly station; and (d) predicting a time for refilling assembly material on the first transport track based on the current filling level detected by (d1), the planned assembly operations obtained by (d2) and the current position determined by (d3).
[0015] The method is based on the knowledge that, in order to predict the time required for recharging assembly material on the first transport track, not only information about the ideal operation of the assembly line but also information about the current, real operation of the assembly line is taken into account. The current, real operation is characterized by more or less large disturbances compared to the ideal assembly operation, which lead to deviations from the ideal assembly operation. Therefore, the method according to the invention makes it possible to determine the time for recharging assembly material with greater accuracy than with known methods, in which only the operating conditions of the ideal assembly operation are taken into account.
[0016] The method can be used to ensure that an assembly line with a plurality of assembly stations and typically a plurality of component transport devices for each assembly station is always supplied with sufficient assembly material even in actual or real operation, so that undesirable downtimes of the assembly line can be avoided. Specifically, by accurately predicting the time required for refilling the corresponding transport track with assembly material, it can be ensured that a sufficient supply of assembly material is available on site in a timely manner.
[0017] Providing enough assembly materials can be done manually by the operator. Alternatively or for the selected conveying track, the assembly materials can also be provided by the robot before refilling. By accurately predicting the refilling time for different and preferably all conveying tracks, the order for refilling assembly materials on different conveying tracks can also be determined. Therefore, the assembly materials on those conveying tracks that are "threatened" by the consumption of the currently existing assembly materials in the next step can be refilled preferentially. In addition, the conveying tracks on different assembly stations can also be prioritized according to the occupation or full load of the temporarily stored component carriers in the buffer area, which is provided in a known manner along the conveying section before and / or after each assembly area of the assembly station. In this way, for example, the conveying station of the assembly area can have a higher priority to be used, and many component carriers accumulate or jam in front of the assembly area. Thus, undesirable jams can be eliminated as quickly as possible. These considerations are particularly suitable for automatically refilling assembly materials with the help of at least one robot, which extracts new assembly materials from the (intermediate) storage device and conveys them to the respective conveying tracks. In addition, in the robot that can simultaneously convey multiple types of assembly materials, the moving path can also be optimized if necessary. Thus, for example, the recharging of the first assembly material that was originally required next can be shifted back in time if there is still enough time until the respective predicted time point for recharging of the second assembly material on another transport track, which is less urgent in time. Of course, in the case of manual recharging of assembly material by an operator, both the described prioritization and the described optimization of the transport path can also be performed.
[0018] Deviations from the idealized assembly operation may be caused by a plurality of different, smaller or larger disturbances. In particular, smaller disturbances can often be eliminated autonomously and automatically by an assembly line or a related automatic assembly machine. For example, the loss of components to be assembled caused by the failed component accommodation on the component picking position and / or the non-optimal (negative) suction pressure on the tip of the component holding device configured as a suction claw at the assembly head belongs to this smaller disturbance. The larger disturbance that can typically only be eliminated by the corrective operation intervention of the operator is, for example, the crack of the covering film of the component belt, in which the component is contained in a so-called holding bag in a known manner and is transported to the component picking position. That is, such a covering film is pulled down in an equally known manner directly before the planned component picking on the related component picking position, so that the assembly head or more precisely the suction claw of the assembly head can act on the component to be picked up from above. The interference of the assembly operation can also be generated by the (unintentional or necessary) opening of the protective cover of at least one assembly station. This opening, that is, causes the assembly operation of the related assembly station to stop for safety reasons.
[0019] It should be noted that the interference does not necessarily lead to a time delay in the assembly operation. Interference can also be, for example, in the case of a larger component carrier with a plurality of so-called component parts, before or during assembly, it is confirmed that (at least) one component part can no longer be meaningfully assembled. This can be due, for example, to the fact that the component carrier has damage, in particular in the area of the relevant component part, so that further processing and in particular further assembly of this component part no longer makes sense. Since all component parts are no longer assembled for this special component carrier, the assembly of the component carrier can be ended more quickly. Therefore, the component carrier can be transported from one assembly station to the next assembly station along the conveying section earlier than in an idealized assembly operation.
[0020] The two assembly stations can be directly adjacent along the conveying section, that is to say, directly follow each other from the perspective of the component carrier being conveyed. Alternatively, the two assembly stations can also be spaced farther apart from each other, wherein another assembly station or another station of the assembly line is also arranged between the second assembly station and the first assembly station. Such other stations can be, for example, measuring stations, by means of which the assembly results in the second assembly station are optically detected, wherein the measurement results of such measuring stations can, for example, be used for quality monitoring of assembly operations.
[0021] The second assembly station can be any arbitrarily selected assembly station of the assembly line, except for the last assembly station along the conveying section. The first assembly station can be any arbitrarily selected assembly station (including the last assembly station of the assembly line) within the framework of the description used here, as long as it is arranged downstream of the second assembly station. From the perspective of the component carrier transported along the conveying section, the assembly in the second assembly station is carried out before the assembly in the first assembly station in time.
[0022] In this document, the method according to the invention is described (usually) from the perspective of the first assembly station arranged downstream, more precisely from the perspective of the selected first transport track or the (selected) first component transport device assigned to the selected first transport track. However, it should be pointed out that the method can also be carried out (simultaneously) for at least another first transport track of the first assembly station or another first component transport device assigned to another first transport track. In this way, it is possible to predict not only the refilling time on the first transport track, but also, in principle, the refilling time on all other first transport tracks of the first assembly station. This makes it possible to comprehensively and accurately predict the refilling time on multiple and preferably all first transport tracks of the first assembly station.
[0023] It should be noted that at least three assembly stations arranged along the conveying section are provided in the assembly line, wherein a third assembly station to which assembly material is supplied by a third component conveying device on (at least) a third conveying track is arranged upstream of the second assembly station, and the method described can also be performed from the perspective of at least one second conveying track of the second assembly position. In this case, the filling level of the relevant second component conveying device is then (additionally) detected. In addition, the planned assembly operation is (additionally) known, and it is also necessary for the assembly operation to assemble all component carriers currently manufactured in batches in the second assembly station. In addition, the current position of at least one component carrier along the conveying section is also determined (additionally), which component carrier has been assembled in the third assembly station and is to be assembled in the second assembly station (and in the first assembly station). In principle, it is thus possible to predict the refilling time of assembly material for all conveying tracks for the assembly line with high accuracy, except for such conveying tracks, that is, such conveying tracks are assigned to the following assembly stations, in which assembly stations the assembly of component carriers by the assembly line begins.
[0024] In simple terms, when predicting at least one "assembly material refilling time" according to the invention, the "reality" of the assembly operation is taken into account in that a possible blockage in the transport along the conveying section is detected by determining the current position of (at least) one component carrier, which must still be assembled by the corresponding (first) assembly station arranged downstream. In this context, it is obvious that such a blockage can only be eliminated and / or its intensification can be prevented if the further transport of the component carrier is not hampered by a delay in the first assembly station arranged downstream, wherein such a delay is caused in a significant manner by the delayed refilling of the assembly material.
[0025] The filling level of the assembly material of the (selected) first component transport device can be detected in a known manner by suitable sensors. Alternatively or in combination, the filling level can also be detected by a (central) machine control of the relevant assembly station or the entire assembly line, which controls or coordinates the assembly operation and generally detects the filling level of all currently used component transport devices.
[0026] Using the assembly material assigned to the first transport track, the determination of the assembly operations still required for the current series production can also be carried out by the machine control, in particular by the machine control of the entire assembly line. In this context, the number of assembly operations still required is particularly significant, since it indicates how much assembly material is still required for the current series production on the (selected) first transport track. In other words, the determination of the (number) of planned assembly operations provides an estimate of the expected assembly material consumption, which is of decisive importance for a reliable prediction of the refilling time.
[0027] The term "assembly operation" in this document shall refer in particular to the assembly of components. This includes (i) gripping a component from a component pick-up position by means of a component holding device of an assembly head, (ii) conveying the gripped component to an assembly area of an associated assembly station, (iii) placing the conveyed component on an associated component carrier at a predetermined assembly position, and (iv) moving the assembly head back to a component pick-up position or an adjacent component pick-up position of a component transport system having a plurality of component transport devices in order to be able to grip the next component for the next assembly operation.
[0028] The term "assembly station" is to be understood in this context as a single automatic assembly machine. In the case of larger automatic assembly machines, the assembly station can also be part of an automatic assembly machine with its own assembly area, wherein the assembly area is typically equipped with at least one own assembly head which can be moved by means of a gantry system between (i) a component pick-up position and (ii) a component carrier accommodated in the assembly area.
[0029] The term “series production” is intended in this context to refer in particular to the assembly or production of a specific type of component carrier, which is to be assembled within the scope of a production batch and / or in an assembly line (in total) with a specific assembly order.
[0030] The current position of at least one component carrier along the conveying path, which has been assembled in the second assembly station and is to be assembled in the first assembly station, can likewise be determined by means of suitable sensors and / or by means of a (central) machine control. In other words, the position of an at least partially assembled component carrier or the positions of a plurality of at least partially assembled component carriers, which are located upstream of the selected first assembly station with respect to the conveying direction, is determined.
[0031] By means of the position determination described, the information is obtained in an intuitive manner, i.e., how much time is available or how long the next component carrier is transported until the first assembly station. The next component carrier is here a component carrier whose assembly in the second assembly station has been completed and which can therefore be transported to the first assembly station and which can also be transported in an optimal assembly operation without a blockage of the component carrier (at the first assembly station).
[0032] According to one embodiment of the present invention, the assembly material has electronic components, which are in particular accommodated in a component tape or a component box. Here, the component box can have a two-dimensional array structure, in which a plurality of box-accommodating areas are spatially arranged along two axes that are preferably perpendicular to each other. The component box can also have a one-dimensional array structure, in which a plurality of box-accommodating areas are arranged along the longitudinal direction of the box.
[0033] The storage of electronic components on a component tape and the transport of the electronic components to an assembly head which can pick up the components directly from the receptacles or pockets of the component tape by means of a component gripping process has the advantage that the filling level of the relevant assembly material can be detected particularly reliably. Compared to the transport of the components as bulk material, the components in the component tape are reliably separated in a known manner, so that components that have been consumed so far can be detected in a simple manner and, if the number of components originally present in the component tape is known, the number of components still present in the relevant component tape or the amount of assembly material that has not yet been consumed can also be detected in a simple manner.
[0034] According to another embodiment of the invention, the method comprises: determining a batch size of a current batch manufacturing, wherein the prediction of a time for reassembling the material on the first transport track is also based on the determined batch size.
[0035] The term "batch" in this context shall particularly refer to the number of component carriers to be assembled of the current batch production. The batch can be the number of component carriers which are (as a whole) within the scope of a production batch and / or are (to be) assembled with a specific assembly order. Alternatively, however, the term "batch" can also be understood as the number of component carriers which are still to be assembled after the current batch production has begun, wherein the batch changes continuously with the increasing progress of the current batch production.
[0036] The batch size is a very easy-to-determine variable that characterizes the operation of an assembly line. Taking the batch size into account for predicting the refilling time contributes to a high prediction accuracy for the predicted refilling time, especially at the beginning or in the early stages of the current batch production. In this context, it should be mentioned that refilling of assembly material may also be necessary at the beginning of batch production, because a larger amount of assembly material is not always available to the transport tracks at the beginning. This is because batch production, at least on the individual transport tracks, often begins with a surplus of assembly material that is still left over from other previous batch productions and, of course, should be used up for cost reasons.
[0037] According to another embodiment of the present invention, the method also includes determining a duration for transporting at least one component carrier that has been assembled in the second assembly station and is to be assembled in the first assembly station from the second assembly station to the first assembly station, wherein a prediction of a refilling time for the assembly material on the first transport track is also based on the determined duration.
[0038] The duration of the component carrier transport is also an important variable for the expected refilling time. It directly describes the "arrival" of the relevant component carrier in or on the first assembly station. Therefore, considering it can help to (further) improve the accuracy of the prediction of the refilling time.
[0039] The duration can be determined, for example, by means of a sensor which detects, for example, optically, other component carriers located between the relevant component carrier and the first assembly station on the conveying path. In this context, it is obvious that at least one of these other component carriers will hinder the conveying of the relevant component carrier to the first assembly station, since the relevant component carrier must be placed "towards the back".
[0040] According to another embodiment of the invention, the method further comprises refilling the assembly material on the (selected) first conveyor track before the predicted time in time (or in time), thereby ensuring that there is always (sufficient amount of) assembly material on the selected conveyor track.
[0041] As mentioned above, the method according to the invention is described herein essentially from the perspective of one or selected first transport track of the first assembly station. However, the method according to the invention can also be carried out (simultaneously) for other transport tracks of the first assembly station or also for other transport tracks of other assembly stations, wherein it is only necessary that the determination of the current position of at least one (partially assembled) component carrier along the conveying line relates to the component carrier located upstream, which component carrier should also be (further) assembled in the first assembly station (located downstream). Therefore, the reloading described here can also relate to all possible transport tracks of all possible assembly stations of the assembly line, except for assembly stations that are directly or completely located at the beginning of the conveying section along the conveying direction.
[0042] According to another embodiment of the present invention, reloading of assembly material includes (a) removing a first component transport device from a first transport track, wherein a possible remaining amount of unconsumed assembly material is removed together with the first component transport device; and (b) installing another first component transport device together with new assembly material on a (selected) first transport track, wherein the new assembly material is in or on another first component transport device.
[0043] The described recharging of assembly material in connection with the replacement of a component conveying device has the advantage that the recharging can be realized in a simple and error-robust manner. Compared to a recharging in which the (first selected) component conveying device remains on the (first selected) conveying track and in which the assembly material is realized, for example, only in the form of a component tape wound on a tape reel, the replacement of the entire component conveying device does not, for example, require the beginning of the component tape to be manually and error-pronely inserted into the guide channel of the relevant component conveying device, which in practice must also be carried out by the operating personnel often under great time pressure in order to ensure an uninterrupted supply of assembly material to the entire assembly line. The component conveying device on which or in which the assembly material is mounted or accommodated can be prefabricated in batches in advance in an (intermediate) storage device in the production hall, so that the replacement of the component conveying device with the assembly material can be carried out not only particularly reliably but also particularly quickly.
[0044] According to another embodiment of the invention, the removal of the first component transport device and the installation of the further first component transport device are performed automatically by means of a robot.
[0045] By means of the automatic component exchange conveying device, the manual operation expenditure required for operating the assembly line can be significantly reduced, thereby reducing the manufacturing costs of the electronic components in an advantageous manner.
[0046] According to another embodiment of the invention, the method further comprises determining a further current position of at least one further component carrier along the conveying path, the further component carrier having been assembled in the third assembly station and further to be assembled in the first assembly station and / or the second assembly station. In this case, the third assembly station is arranged upstream of the second assembly station along the conveying path. In addition, a time for reloading assembly material onto the first conveying path is predicted based on the further current position determined.
[0047] The described consideration of the position of at least one further component carrier located behind the aforementioned (at least one) first component carrier in the conveying direction allows a particularly comprehensive picture of the current "component carrier jam" before or upstream of the first assembly station. As a result, a particularly high degree of accuracy can be achieved when predicting the refilling time on the (selected) first transport track of the (selected) first assembly station.
[0048] According to another aspect of the invention, a method is described for predicting (at least two) times for refilling assembly material on different predetermined conveying tracks of at least one assembly station of an assembly line, the assembly line having a plurality of assembly stations, which are arranged one after the other along a conveying section of the assembly line for component carriers to be assembled (in a predetermined conveying direction). The method is performed (separately) for two different conveying tracks. Accordingly, the method comprises, on the one hand, the execution of the above method, wherein the first conveying track is a first predetermined conveying track of the assembly line, and the predicted time is a first refilling time, which is assigned to the first predetermined conveying track. On the other hand, the method comprises the execution of the above method, wherein the (now) first conveying track is a second predetermined conveying track of the assembly line, and the predicted time is a second refilling time assigned to the second predetermined conveying track.
[0049] The method for predicting at least two refilling times is based on the knowledge that an uninterrupted supply of assembly material can be ensured on a plurality of predetermined conveyor tracks and preferably on all conveyor tracks of an assembly line, provided that it is ensured that the refilling of assembly material takes place in a timely manner in all relevant conveyor tracks, i.e. before the respectively determined refilling time. Thus, a continuous supply of assembly material can be ensured with high reliability over the entire assembly line and undesired downtimes of the assembly line or also downtimes of only sections of the assembly line can be minimized.
[0050] According to another embodiment of the invention, the method further comprises, based on the first refilling time and the second refilling time, determining a time sequence for (i) refilling the assembly material on the first predetermined conveying track and (ii) refilling the assembly material on the second predetermined conveying track. By determining the described time sequence of at least two "refillings", the logistics of supplying the assembly line with assembly material can be optimized. This applies not only to automatic refilling of the assembly material using at least one robot, but also to manual refilling by at least one operator.
[0051] According to another embodiment of the invention, the determined time sequence determines a priority, according to which assembly material (of the first predetermined transport track and the second predetermined transport track) is first reloaded in the predetermined transport track that is assigned to the earlier reloading time (of the first reloading time and the second reloading time). The described priority of reloading is particularly important for a reliable supply of assembly material when reloading until at least the earlier reloading time is reached no longer lasts a long time and / or when the two reloading times are close to each other. Timeliness is then provided for not missing the earlier reloading time.
[0052] According to another embodiment of the invention, the first refilling time is located before the second refilling time in time, and the described method also has: (a) refilling the assembly material on the second predetermined conveying track, and thereafter (b) refilling the assembly material on the first predetermined conveying track. In particular, when the determined time sequence also lasts for a relatively long time interval until the two refilling times are reached, such a time reversal can be performed on the determined time sequence on different predetermined conveying tracks with respect to the corresponding refilling or refilling process. The advantages of the described time reversal can be, for example, that in some operating scenarios, the movement path of the robot for automatically refilling the assembly material can be shortened or the walking path of the operator who manually performs the refilling of the assembly material can also be shortened. This is particularly applicable when the relevant robot or the relevant operator can simultaneously transport two types of assembly materials to the corresponding predetermined conveying track. Therefore, by the described reversal, at least in some operating scenarios, the entire logistics of providing the assembly material without interruption can be achieved more effectively. Another advantage of the described time reversal may also be that in many situations that occur in practice, an undesired blockage of component carriers in an intermediate storage which is provided along the conveying path upstream of the assembly area can be eliminated as quickly as possible.
[0053] It should be noted that for the actual reloading of the assembly material, a change of the determined time sequence towards the inversion or from the inversion back to the previously described prioritization after the predicted reloading time can be made before the robot for automatically reloading the assembly material leaves the (intermediate) storage device for the assembly material. In some operating scenarios, the change of the determined time sequence can also be made at a later point in time, that is, when the robot is already on the path to the transport track. Intuitively expressed, this means that the change of the determined time sequence prompts the corresponding robot to change the section of the path "in motion" of the robot and / or the order of reloading during its transportation of assembly material.
[0054] According to another aspect of the invention, a method for determining a time sequence for reloading assembly material on at least two conveyor tracks of an assembly line is described, the assembly line having at least two assembly stations for assembling component carriers, wherein each assembly station has an assembly area and at least two buffer areas for intermediate storage of component carriers, wherein the assembly area and the buffer area are arranged along a conveyor line (predetermined conveying direction) of the assembly line, and wherein each assembly area is respectively assigned upstream (i.e., against the conveying direction) to one of the two buffer areas. The method described by this aspect of the invention has: (a) detecting an occupancy state of at least one of the two buffer areas; and (b) determining a time sequence based on (in particular based on) at least one detected occupancy state.
[0055] The method is based on the recognition that the occupancy state of component carriers in a buffer area arranged upstream in the conveying section (in addition to other current operating state variables) is an important indicator of when the assembly of the next component carrier can be started in the next (downstream) assembly station after the assembly of the previous component carrier. The point in time when the assembly of the next component carrier is started will of course influence the consumption of assembly material and therefore the time at which new assembly material must be provided on the relevant transport track at the latest in order to prevent undesired loss of assembly material and thus prevent interruption of the assembly operation at least at the relevant assembly station.
[0056] The determined order can determine the priority of the actual refilling. However, as mentioned above, the determined time sequence for the actual refilling can also be changed or reversed.
[0057] The buffer area in the technical sense described in this article can be understood as any arbitrary design of the intermediate storage for the component carrier. The component carrier occupancy state of the buffer area can be detected by means of a suitable (optical) sensor, for example. Alternatively or in combination, the current component carrier occupancy state can also be monitored and / or controlled and (then) output by the control device of the relevant assembly station and in particular by the central control device of the entire assembly line.
[0058] According to another embodiment of the invention, the method described further comprises respectively detecting a current filling level of the assembly material on at least two conveyor tracks, wherein determining the time sequence is also based on the detected current filling levels.
[0059] As already described above, the filling level can be detected by suitable sensors of or on the relevant component transport device. Alternatively or in combination, the filling level can also be detected by a (central) machine control of the relevant assembly station or the entire assembly line, which controls or coordinates the assembly operation and generally detects the filling level of all currently used component transport devices.
[0060] According to another embodiment of the invention, the method further comprises (a) obtaining knowledge of planned assembly operations which are to be performed at least with assembly material which is provided to at least one of the at least two transport tracks in order to assemble all component carriers currently being mass-produced.
[0061] In the case of the described knowledge of the planned assembly operations, in particular the number of assembly operations still required until the current batch production is completed can be known. As a result, the time sequence for recharging assembly material can be determined with particularly high reliability. Thus, for example, it can be avoided that, when the filling level of assembly material is low, assembly material is recharged unnecessarily when the current batch production is almost completed and (before switching to the next batch production) assembly material is provided that is no longer required for the current batch production and is completely unnecessary for the next batch production. In general, a possibly unnecessary recharging of assembly material can be prevented in an effective manner.
[0062] According to another aspect of the invention, an assembly line for automatically assembling component carriers with electronic components is described, which are transported as assembly material on a transport track to individual assembly stations of the assembly line by means of a component transport device in each case. The assembly line (in particular) comprises a data processing device which is configured (programmed) to implement one of the above-described methods.
[0063] The described assembly line is also based on the recognition that, in order to predict the time required for recharging assembly material on at least one conveyor track, the data processing device takes into account not only information about the ideal operation of the assembly line, but also information about the current, actual operation of the assembly line. The current, actual operation is characterized by more or less large disturbances compared to the ideal assembly operation, which lead to deviations from the ideal assembly operation. Therefore, for a selected conveyor track or for a plurality of selected conveyor tracks, the time for recharging assembly material is determined with a higher accuracy than would be possible in known assembly lines (without the data processing device according to the invention), in which only the operating conditions for the ideal assembly operation are taken into account for predicting the assembly material recharging time.
[0064] The data processing device can be part of a (central) control device of an assembly line or part of at least one assembly station. The data processing device can be implemented by means of software, by means of hardware or by a combination of software and hardware.
[0065] It is noted that embodiments of the invention are described with reference to different inventive subject matters. In particular, some embodiments of the invention with device claims and other embodiments of the invention with method claims are described. However, a person skilled in the art will immediately understand when reading this document that, in addition to the combination of features belonging to one type of inventive subject matter, any combination of features belonging to different types of inventive subject matter is also possible, unless otherwise explicitly stated.
[0066] Further advantages and features of the invention emerge from the following exemplary description of currently preferred embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0067] Figure 1 The automatic supply of an assembly line with assembly material is shown in a block diagram, the assembly material comprising components which are accommodated in component tapes, wherein the component tapes are respectively contained in component transport devices.
[0068] Figure 2 The working sequence of a robot is shown for transporting a component transport device filled with assembly material from an intermediate storage device to an assembly line and for transporting a component transport device at least partially emptied of assembly material back to the intermediate storage device.
[0069] Figure 3 An assembly line is shown having three assembly stations connected in series, each of which has an assembly area and two buffer areas for storing component carriers during this time.
[0070] Figure 4A and 4BThe transport of component carriers in an ideal operation of an assembly line or in a real operation of an assembly line that occurs regularly in practice is shown.
[0071] Figure 5A The calculation of the point in time when the assembly material present at the assembly station is (possibly) consumed is shown in a flow chart. Figure 5B The calculation of the time when the next component carrier is (possibly) present in the assembly area of the assembly station is shown in a flow chart.
[0072] Fig. 6A and 6B The transport of component carriers in an ideal operation of an assembly line or in real operation of an assembly line is shown, wherein a jam of component carriers occurs in a buffer area upstream of an assembly station.
[0073] Fig. 7A and 7B For an assembly line with four assembly stations, a comparison with an ideal assembly operation shows a meaningful change in the sequence for changing the component transport devices for the actual operation of the assembly line (with disrupted transport of component carriers).
[0074] Fig. 8A and 8B For an assembly line with four assembly stations, a comparison with an ideal assembly operation shows that for the actual operation of the assembly line a meaningful maintenance of the sequence for the replacement of the component transport devices is achieved.
[0075] Description of reference numerals:
[0076] 100 Assembly Line
[0077] 102 Data processing organization
[0078] 120 Intermediate storage device
[0079] P1 First Assembly Station
[0080] P2 Second Assembly Station
[0081] Tp transmission line
[0082] Td Conveying direction
[0083] F Component transport device
[0084] A Accommodation Area
[0085] C Assembly materials / component tapes / electronic components
[0086] R Robot
[0087] Rf Outbound
[0088] Rb Return
[0089] P3 The third assembly station
[0090] P4 Fourth Assembly Station
[0091] 300 Assembly Line
[0092] Pa Assembly area
[0093] Pb buffer area
[0094] PCB component carrier
[0095] PCB1 First component carrier
[0096] PCB2 Second component carrier
[0097] PCB3 Third component carrier
[0098] PCB4 Fourth component carrier
[0099] S1 First step (query)
[0100] S2 Second step (calculation)
[0101] S3a / b Step 3 (Calculation)
[0102] 600 Assembly Line
[0103] 700 Assembly Line
[0104] 800 Assembly Line
[0105] t1 and t2 are used to indicate the time point when the transport device is empty. DETAILED DESCRIPTION
[0106] It should be noted that in the following detailed description, features or components of different embodiments whose corresponding features or components are identical or at least functionally identical according to another embodiment have the same reference numerals or have reference numerals that are identical in the last two digits to the reference numerals of the corresponding identical or at least functionally identical features or components. In order to avoid unnecessary repetitions, features or components that have already been explained with the aid of the previously described embodiments will not be elaborated in detail below.
[0107] It should also be noted that the embodiments described below are only a limited selection of possible implementation variants of the invention. In particular, it is possible to combine the features of the individual embodiments with one another in a suitable manner, so that a plurality of different embodiments can be considered as clearly disclosed for a person skilled in the art using the implementation variants explicitly shown here.
[0108] Figure 1The automated supply of an assembly line 100 with assembly material C, which includes electronic components, is shown in a block diagram. The electronic components are accommodated in a known manner in component tapes, which are not shown in detail, and are transported to the assembly process on so-called transport tracks by means of component tapes and appropriately constructed component transport devices F. According to the embodiment shown here, one component tape is accommodated in a receiving area A of the component transport device F. If the component tape is emptied by the continuous removal of electronic components, the relevant component transport device F must be replaced at the latest by a new component transport device F, which contains new assembly material C in the form of component tapes that have not yet been consumed.
[0109] The assembly line 100 has a plurality of assembly stations. According to the embodiment shown here, the assembly line 100 has two assembly stations, namely a first assembly station P1 and a second assembly station P2. The two assembly stations P1 and P2 are connected to each other via a conveying section Tp, on which the Figure 1 The component carrier or circuit board not shown in the figure can be transported from the second assembly station P2 to the first assembly station P1 along the conveying direction Td. This means that the second assembly station P2 is arranged upstream of the first assembly station P1 with respect to the conveying direction Td. Therefore, in the embodiment shown here, a group of electronic components can first be (partially) assembled for the component carrier with the aid of the second assembly station P2 in a known manner. After such partial assembly, the component carrier can be assembled with another group of electronic components with the aid of the second assembly station P2.
[0110] Of course, other assembly stations can also be arranged along the conveyor line Tp, which can provide further contributions to the assembly of component carriers. In the embodiment described below with more than two automatic assembly machines, the assembly of component carriers begins at the third assembly station or the fourth assembly station.
[0111] The assembly operation by means of the assembly line 100 is controlled by a data processing device 102. The data processing device 102 can directly control the individual assembly stations P2, P1. Alternatively or in combination, the data processing device 102 can also be a superior data processing device, which controls the assembly operation through the individual assembly stations P2, P1 via the subordinate data processing devices of the assembly stations P2, P1.
[0112] According to the embodiment shown here, an "old" component conveying device (whose assembly material is at least approximately exhausted) is automatically replaced with a "new" component conveying device (with "fresh" assembly material) by means of a robot R. The robot R takes out the "new" component conveying devices filled with assembly material from the intermediate storage device 120 and transports these component conveying devices to the assembly station P2 or P1, where the relevant "old" component conveying device F that is at least approximately emptied of assembly material is located on the conveying track of the assembly station. After arriving at the relevant assembly station P2 / P1, the robot R removes the "old" component conveying device F from the conveying track assigned to it and installs the "new" component conveying device F on the relevant conveying track of the assembly stations P2, P1. Figure 1 In FIG. 1 , the outward journey of the robot R from the intermediate storage device 120 to the assembly line 100 is indicated by the arrow Rf. The return journey from the assembly line 100 to the intermediate storage device 120 is indicated by the arrow Rb. It should be noted that the robot R can also transport a plurality of “new” component transport devices F along the outward journey Rf. The same applies to the return journey Rb, on which the robot R can transport a plurality of “old” component transport devices F back to the intermediate storage device 120.
[0113] Figure 2 The working process of the robot R for automatically supplying assembly materials to the assembly line 100 is shown. According to the embodiment shown here, the assembly line 100 includes four assembly stations, namely the fourth assembly station P4, the third assembly station P3, the second assembly station P2 and the first assembly station P1. The conveying path of the component carrier to be assembled (not shown) on the conveying section Tp extends along the conveying direction Td, so it extends from the fourth assembly station P4 through the third assembly station P3 and the second assembly station P2 to the first assembly station P1.
[0114] The robot R transports a "new" component transport device F filled with assembly material from the intermediate storage device 120 shown to the assembly line 100. This takes place along the outbound path Rf. In addition, the robot R transports an "old" component transport device F, whose assembly material has been at least largely consumed, from the assembly line 100 back to the intermediate storage device 120. This takes place along the return path Rb. Preferably, the robot F is configured so that it can accommodate a plurality of transport devices F. Thus, the robot can replace a plurality of "old" transport devices F with "new" transport devices F on each transport track of different assembly stations P4, P3, P2 and P1 with larger transport or work processes.
[0115] Figure 3An assembly line 300 having three assembly stations P3, P2 and P1 connected in sequence is shown. Each of the three assembly stations P3, P2, P1 has an assembly area Pa and two buffer areas Pb for storing component carriers PCB during this period. According to the embodiment shown here, in each of the three assembly stations P3, P2, P1, one of the two buffer areas Pb is arranged upstream of the assembly area Pa along the conveying direction Td, and the other of the two buffer areas Pb is arranged downstream of the assembly area Pa.
[0116] exist Figure 3 In the running state of the assembly line 300 shown, there is a blockage in the conveyance of the component carrier PCB before the assembly area Pa of the second assembly station P2. This means that the component carrier PCB that has been assembled by the third assembly station P3 is located in the buffer area Pb arranged upstream of the second assembly station P2. This is because the assembly of the "previous" component carrier PCB in the assembly area Pa of the second assembly station P2 has not yet been completed.
[0117] According to the exemplary operating state of the assembly line 300 shown here, no other component carrier PCB has been moved into the third assembly station P3. Therefore, the assembly area Pa of the third assembly station P3 is not occupied by a component carrier PCB.
[0118] Figure 4A The transport of component carriers PCBs in an ideal operation of the assembly line 300 is shown. Figure 4B The transport of component carriers during real operation of an assembly line 300 which occurs regularly in practice is shown.
[0119] As from Figure 4A As can be seen, from the perspective of the component carrier material flow along the conveying direction Td, the first component carrier PCB1 is located in the first assembly station P1 and is assembled with electronic components in its assembly area Pa. The second component carrier PCB2 is assembled in the second assembly station P2, and the third component carrier PCB3 is assembled in the third assembly station P3.
[0120] In the next cycle of the assembly line 300, the first component carrier PCB1 has been assembled and transported out of the first assembly station P1. Now, the second component carrier PCB2 is assembled in the first assembly station P1, and the third component carrier PCB3 is assembled in the second assembly station P2. In addition, another fourth component carrier PCB4 is assembled in the third assembly station P32.
[0121] exist Figure 4BIn the operation of the assembly line shown (due to intermittent interruptions in the component carrier material flow), there is no component carrier in the second assembly station P2. Therefore, the first component carrier PCB1 is assembled in the first assembly station P1, while the second component carrier PCB2 is assembled in the third assembly station P3.
[0122] In the next cycle of the assembly line 300, the first component carrier PCB1 has been assembled and has been transported out of the first assembly station P1. Therefore, the assembly area Pa of the first assembly station P1 becomes idle. In addition, the second component carrier PCB2 is now located in the second assembly station P2 and is assembled there. In addition, during this period, the third component carrier PCB3 is transported to the third assembly station P3 and is assembled in the third assembly station P3.
[0123] In the next cycle of the assembly line 300, the second component carrier PCB2 is located in the first assembly station P1, and the third component carrier PCB3 is located in the second assembly station P2. In addition, the fourth component carrier PCB4 is transported to the third assembly station P3 and assembled during this period.
[0124] Figure 5A The flow chart shows the calculation of the time point when the assembly material present at the assembly station is (possibly) consumed. This calculation is always repeated and also carried out for all possible transport paths of the relevant assembly station in order to always know (estimate) when new assembly material will be needed.
[0125] exist Figure 5A The calculation process shown in starts at "start". In step S1, it is queried whether a component carrier is present at the relevant assembly station. If this is the case, then in step S3a, it is calculated when the relevant assembly material will be (estimated) consumed based on the number of assembly operations that also require assembly material from the relevant transport track in order to assemble this component carrier and the remaining component carriers of the current batch.
[0126] If the query step S1 shows that there is currently no component carrier at the assembly station, then in step S2 it is calculated when the next component carrier is (possibly) present in the assembly area of the assembly station. For this purpose, at least the position of one or the next component carrier along the conveyor line is taken into account, which is located upstream of the relevant assembly station. After the calculation of the component carrier availability has been carried out, the result of the calculation of the component carrier availability is additionally taken into account in the already described step S3a.
[0127] Figure 5B The calculation of the time point at which the next component carrier (possibly) is present in the assembly area of an assembly station is shown in a flow chart. For this calculation, the current operating state of the assembly station arranged upstream is taken into account.
[0128] from Figure 5A and Figure 5B It can be seen from the comparison that for the two calculation processes, steps S1 and S2 are the same. Figure 5B In a calculation step S3b, the (estimated) remaining production time for the assembly of the component carrier currently located in the relevant assembly station is reported.
[0129] exist Figure 5B The calculation process shown in FIG. 1 can be performed in time Figure 5A The calculation process shown in is performed or called before. In addition, Figure 5B The calculation process can also be called up automatically if, for example, no component carrier is currently present in the relevant assembly station.
[0130] Fig. 6A and Figure 6B The component carrier PCB is shown in an ideal operation of the assembly line 600 (see Fig. 6A ) or the conveying situation in the actual operation of the assembly line 600. In the ideal operation, there is exactly one component carrier PCB in each assembly station P1, P2, P3. The buffer area of the assembly stations P1, P2, P3, which is not shown here, is not occupied.
[0131] exist Figure 6B In the actual operation of the assembly line 600 shown, an unexpected disturbance occurs in the first assembly station P1. This disturbance may be caused, for example, by the machine cover being opened and the assembly operation in the assembly station P1 being interrupted for safety reasons. As a result, the component carrier transport is disturbed, so that two component carriers PCB are blocked upstream before the still occupied assembly area Pa of the first assembly station P1, and thus one buffer area of each of the two assembly stations P1 and P2 is already occupied.
[0132] Fig. 7A and Figure 7B For an assembly line 700 having four assembly stations P1, P2, P3 and P4, the actual operation of the assembly line 700 (with disrupted transport of component carriers) shows a meaningful change in the sequence for changing the component transport devices based on a comparison with an ideal assembly operation.
[0133] exist Fig. 7A In the ideal assembly operation shown in FIG, there is exactly one component carrier PCB in each assembly station P1, P2, P3, P4. Figure 5A and 5BThe calculation process shown in (in each case without step S2) shows that first at time t1 the relevant assembly material is consumed for the transport track of the component transport device F of the third assembly station P3, and then at a later time t2 the relevant assembly material is consumed for the transport track of the component transport device F of the second assembly station P2. Therefore, the recharging of assembly material is coordinated in such a way that first the relevant transport track of the third assembly station P3 is recharged with assembly material, and then the relevant transport track of the second assembly station P2 is recharged with assembly material.
[0134] exist Figure 7B In the real assembly operation shown in , the component carrier transport is disrupted in such a way that the assembly area Pa of the third assembly station P3 is not occupied. It is therefore meaningful to first reload the assembly material onto the associated transport track of the second assembly station P2 at time t1 and only then onto the associated transport track of the third assembly station P2.
[0135] According to the embodiment described here, as described above, refilling with assembly material is performed by replacing an "old" at least partially emptied assembly material component transport device with a "new" component transport device with new assembly material. Preferably, the replacement of the component transport device is performed automatically by means of a robot.
[0136] Fig. 8A and 8B For an assembly line 800 having four assembly stations P1, P2, P3, and P4, according to the comparison with the ideal assembly operation of the assembly line 800 (see Fig. 8A ) for the actual operation of assembly line 800 (see Figure 8B ) shows the meaningful maintenance of the time sequence for replacing the component transport device or for refilling the assembly material.
[0137] Specifically according to the embodiment shown here, according to Figure 5A and 5B The calculation process shown in (in each case without step S2) shows that first at time t1 the corresponding assembly material is consumed for the transport track of the component transport device F of the first assembly station P1, and then at a later time t2 the corresponding assembly material is consumed for the transport track of the component transport device F of the fourth assembly station P4. The recharging of assembly material is therefore coordinated in such a way that first the relevant transport track of the first assembly station P1 is recharged with assembly material, and then the relevant transport track of the fourth assembly station P4 is recharged with assembly material.
[0138] exist Figure 8B In the state of the assembly line 800 shown, the assembly area Pa of the two assembly stations P2 and P3 (unfortunately) remains idle due to the interruption of the transport of the component carriers. In particular, however, Figure 5A and Figure 5B The calculation process (including calculation step S2) shows that, in this case, it is meaningless to change the order of recharging the assembly materials in order to ensure an uninterrupted supply of assembly materials throughout the assembly line 800.
[0139] It should be noted that the term "having" does not exclude other elements, and "a" does not exclude a plurality. Furthermore, elements described in connection with different embodiments may be combined. It should also be noted that the reference signs in the claims should not be interpreted as limiting the scope of the claims.
Claims
1. A method for predicting the time for refilling assembly material (C) for a first assembly station (P1) of an assembly line (100), the assembly line having at least (i) a first assembly station (P1) supplied with assembly material (C) by a first component transport device (F) on a first transport track, and (ii) a second assembly station (P2), the second assembly station being supplied with assembly material (C) by a second component transport device (F) on a second transport track, wherein the second assembly station (P2) is arranged upstream of the first assembly station (P1) along a conveying line (Tp) for a component carrier (PCB) to be assembled, the method comprising the following steps: detecting a current filling level of assembly material (C) of a first component transport device (F); At least the assembly material (C) assigned to the first transport track is used to determine the planned assembly operation, which is also required to assemble all component carriers (PCBs) currently manufactured in the first assembly station (P1); Determining the current position of at least one component carrier (PCB) along the conveyor line (Tp), said component carrier having been assembled in the second assembly station (P2) and to be assembled in the first assembly station (P1); and A time for refilling the first transport track with assembly material (C) is predicted based on (i) the detected current filling level, (ii) the known planned assembly operations and (iii) the determined current position.
2. The method according to claim 1, wherein The assembly material (C) comprises electronic components which are accommodated in particular in a component tape or in a component magazine.
3. The method according to claim 1, further comprising Determine the batch size of the current batch manufacturing, where The prediction of the time for refilling the first conveyor track with assembly material (C) is also based on the determined batch size.
4. The method according to claim 1, further comprising A duration is determined for conveying at least one component carrier (PCB) which has been assembled in the second assembly station (P2) and is to be assembled in the first assembly station (P1) from the second assembly station (P2) to the first assembly station (P1), wherein The prediction of the time for refilling the first conveyor track with assembly material (C) is also based on the determined duration.
5. The method according to claim 1, further comprising The first transport track is reloaded with assembly material (C) in good time before the predicted time.
6. The method according to claim 5, wherein For refilling of assembly material (C) there are: Removing the first component transport device (F) from the first conveyor track, wherein any remaining amount of unconsumed assembly material (C) is removed together with the first component transport device (F); and installing another first component transport device (F) together with new assembly material (C) on the first transport track, in, New assembly material (C) is located in or on another first component transport device (F).
7. The method according to claim 6, wherein The removal of the first component transport device (F) and the installation of the further first component transport device (F) are performed automatically by means of a robot (R).
8. The method according to claim 1, further comprising Determining another current position of at least one further component carrier (PCB) along the conveyor line (Tp), the further component carrier having been assembled in the third assembly station (P3) and also to be assembled in the first assembly station (P1) and / or the second assembly station (P2), wherein The third assembly station (P3) is arranged upstream of the second assembly station (P2) along the conveying line (Tp), and wherein The prediction of the time for refilling the first conveyor track with assembly material (C) is also based on a further determined current position.
9. A method for predicting the time for refilling assembly material (C) on different predetermined conveying tracks of at least one assembly station (P1) of an assembly line (100), the assembly line having a plurality of assembly stations, the assembly stations being arranged one behind the other along a conveyor line (Tp) of the assembly line (100) for component carriers to be assembled, the method comprising: Executing the method according to claim 1, in, The first transport track is a first predetermined transport track of the assembly line (100), and the predicted time is a first refill time, the first refill time being assigned to the first predetermined transport track; and The method according to claim 1 is performed, wherein the first transport track is a second predetermined transport track of the assembly line (100) and the predicted time is a second refilling time which is assigned to the second predetermined transport track.
10. The method according to claim 9, further comprising Based on the first refilling time and the second refilling time, a time sequence (t1, t2) is determined for (i) refilling the assembly material (C) on the first predetermined conveying track and (ii) refilling the assembly material (C) on the second predetermined conveying track.
11. The method according to claim 10, wherein The determined chronological order determines a priority according to which the assembly material (C) is refilled first in that predetermined transport track which is assigned to an earlier refilling time.
12. The method according to claim 10, in, The first refill time is located before the second refill time in time, and wherein the method further comprises: The assembly material (C) is refilled on the second predetermined conveying track and subsequently the assembly material (C) is refilled on the first predetermined conveying track.
13. A method for determining a time sequence for reloading assembly materials (C) on at least two conveying tracks of an assembly line (100, 700), the assembly line having at least two assembly stations (P1, P2, P3, P4) for assembling component carriers (PCBs), wherein each assembly station (P1, P2, P3, P4) has an assembly area (Pa) and at least two buffer areas (Pb) for intermediate storage of component carriers (PCBs), wherein the assembly area (Pa) and the buffer area (Pb) are arranged along a conveying line (Tp) of the assembly line (100, 700), and wherein each assembly area (Pa) is respectively assigned one of the two buffer areas (Pb) upstream, the method include: detecting an occupancy state of at least one buffer area (Pb) of the two buffer areas (Pb); as well as A temporal order is determined based on at least one detected occupancy state.
14. The method according to claim 13, further comprising The current filling level of the assembly material (C) on the at least two conveyor tracks is detected accordingly; wherein The determination of the chronological sequence is also based on the detected current filling level.
15. The method according to claim 13, further comprising The planned assembly operations are known, which are to be carried out at least with the assembly material (C) which is assigned to at least one of the at least two transport tracks in order to assemble all component carriers (PCBs) currently being produced in series.
16. An assembly line (100) for automatically assembling electronic components on a component carrier (PCB), wherein the components are transported as assembly materials (C) to respective assembly stations (P1, P2) of the assembly line (100) on a transport track by means of a component transport device (F), the assembly line (100) comprising: A data processing device (102) configured to implement the method according to any one of the preceding claims.