Uninterruptible power dismantling method for temporary bridge crane of underground powerhouse
By gradually dismantling and hoisting the components of the temporary bridge crane, and using the hoisting operation of the truck crane to continuously drive the movement of the bridge crane, the problem of low demolition efficiency of the temporary bridge crane in the underground factory was solved, an efficient dismantling process was achieved, and construction costs and time were reduced.
Patent Information
- Application Number
- CN202411078116.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-10-08
AI Technical Summary
During the demolition process of the temporary bridge crane in the underground factory, due to the small space and limited lifting height, the existing technology has low dismantling efficiency and long time, and the bridge crane cannot move by itself when the power is cut off, which increases the difficulty and time.
By gradually dismantling the components of the temporary bridge crane, including trolleys, carts and girders, and using the lifting operations of truck cranes to continuously drive the movement of the bridge crane, in conjunction with the hoisting operations, the difficulty and time of dismantling are reduced, and efficiency is improved. The specific steps include: dismantling the traveling mechanism of the trolley and the cart, dismantling and hoisting the end beams, using temporary power to drive the axle machine movement, and cooperating with the hoisting operations of the truck crane.
It overcomes the problem of small underground factory space, reduces the difficulty and time of demolition, improves the efficiency of demolition, and reduces construction costs and time.
Smart Images

Figure CN118744935A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field related to underground power plant construction, and more specifically, to a method for dismantling a temporary bridge crane in an underground power plant without power outage. Background Art
[0002] The underground powerhouse is an important part of the pumped-storage power station. Its internal structure is complex and the construction is difficult. During the construction of the underground powerhouse, a temporary bridge crane is usually required to carry out various construction operations. However, when the permanent bridge crane is installed and before the stator of the first unit is hoisted, the temporary bridge crane needs to be dismantled. The existing technology usually uses a car crane to dismantle the entire unit. However, the underground powerhouse has a small operating space and a limited hoisting height. The dismantling process is difficult and time-consuming. In addition, the bridge crane cannot move on its own when the power is off, which further increases the difficulty and time of dismantling, and thus the dismantling efficiency is low. Therefore, it is necessary to design a technical solution that can overcome the above-mentioned defects. Summary of the invention
[0003] One purpose of the present invention is to provide a method for dismantling a temporary bridge crane in an underground factory building without power outage, thereby improving the dismantling efficiency of the temporary bridge crane in the underground factory building.
[0004] In order to achieve these objects and other advantages of the present invention, according to one aspect of the present invention, the present invention provides a method for dismantling a temporary bridge crane in an underground factory building without power outage, wherein the temporary bridge crane includes a trolley, a small trolley, two large beams and two end beams, including: S1: supplying power to the trolley traveling mechanism to drive the temporary bridge crane to move until it reaches the lifting position; S2: operating the truck crane to make the hook of the truck crane reach above the lifting position; S3: removing the small trolley from the temporary bridge crane, retaining the trolley traveling mechanism and the power system of the temporary bridge crane, connecting the hook of the truck crane to the small trolley, operating the truck crane to lift the small trolley to stably hang in the air, operating the trolley traveling mechanism to drive the temporary bridge crane to move to a predetermined position in the opposite direction of the truck crane; S4: operating the truck crane to lower the small trolley and lift it to the installation room.
[0005] Furthermore, it also includes: S5: dismantling the power supply system of the trolley traveling mechanism, providing temporary power supply for the trolley traveling mechanism, operating the trolley traveling mechanism, and driving the temporary bridge crane to move to the lifting position; S6: dismantling the end beam from the temporary bridge crane, connecting the hook with the first beam close to the automobile crane, lifting the first beam to stably hang in the air, and at the same time providing temporary power supply for the trolley traveling mechanism belonging to the second beam, driving the second beam to move in the opposite direction to the predetermined position; S7: operating the automobile crane to lower the first beam and lift it to the installation room.
[0006] Furthermore, it also includes: S8: providing a temporary power supply to the trolley travel mechanism to which the second beam belongs, driving the second beam to move to the hoisting position, and using the vehicle to hoist it to the installation room.
[0007] Further, in S6, the end beam is removed from the first beam, so that the end beam moves in the opposite direction following the second beam to the predetermined position, and the end beam is removed from the second beam at the predetermined position.
[0008] Furthermore, in S8, after the second beam is connected to the hook, the temporary power supply is removed.
[0009] Furthermore, after the end beam is removed, it is temporarily fixed on the bridge crane track, and after the second beam is hoisted to the installation room, the end beam is hoisted to the installation room.
[0010] Furthermore, the method further comprises: disassembling the removed parts in the installation room and transporting them out.
[0011] Furthermore, in S2, the trolley is lifted to a position 20-50 cm above the bridge crane track and is stably suspended in the air.
[0012] The present invention has at least the following beneficial effects: The present invention dismantles the traveling mechanisms of the trolley and the carriage in sequence without cutting off the power supply during the dismantling process, drives the temporary bridge crane to move as needed, and cooperates with the lifting operation of the automobile crane, thus overcoming the problem of the narrow space of the underground workshop, reducing the difficulty of dismantling and improving the dismantling efficiency.
[0013] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A three-dimensional diagram of a temporary bridge crane according to an embodiment of the present application; Figure 2 A side view of a temporary bridge crane according to an embodiment of the present application; Figure 3 A top view of a dismantled state of an embodiment of the present application; Figure 4 This is a side view of a dismantled state of one embodiment of the present application. DETAILED DESCRIPTION
[0015] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0016] It should be understood that the terms such as "having", "including" and "comprising" used in the embodiments of the present application do not exclude the existence or addition of one or more other elements or their combinations. All directional indications (such as up, down, left, right, front, back...) in the embodiments of the present application are only used to explain the relative position relationship, movement, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly. When an element is referred to as "fixed on" or "set on" another element, it can be directly on the other element or there may be a centering element at the same time. When an element is referred to as "connecting" another element, it can be directly connected to another element or it can be indirectly connected to another element through a centering element. The description of "first", "second", etc. in the embodiments of the present application is only for descriptive purposes, and cannot be understood as indicating or implying its relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" can explicitly or implicitly include at least one of the features.
[0017] It should be noted that the technical solutions between the various embodiments of the present application can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0018] like Figure 1-4 As shown, the embodiment of the present application provides a method for dismantling a temporary bridge crane in an underground factory building without power outage, wherein the temporary bridge crane comprises a trolley traveling mechanism 3, a trolley 2, and two beams 1 (hereinafter referred to as the first beam and the second beam, both beams are connected to the trolley traveling mechanism, see Figure 1 ) and two end beams 4, see Figure 1 and Figure 2 ; The specific removal methods include: S1: supplying power to the trolley travel mechanism 3 to drive the temporary bridge crane to move until it reaches the hoisting position; This step determines the hoisting position according to the arm parameters of the mobile crane 6 and the actual size of the underground workshop. It needs to be close to the mobile crane 6 and ensure the lifting of the trolley 2. For example, a general underground factory building has a steel grid roof. The hoisting position can be determined according to actual needs, and the corresponding area of the steel truss roof can be removed to allow the boom of the truck crane 6 to extend. Figure 4 Middle demolition area 7; S2: operate the truck crane 6 to make the hook reach above the lifting position; In this step, the vehicle crane 6 is operated according to the hoisting position so that the hook reaches above the hoisting position, which facilitates the lifting of the trolley 2; S3: Remove the wiring and power system of the trolley 2 from the temporary bridge crane, retain the trolley travel mechanism 3 and its power system of the temporary bridge crane, connect the hook of the truck crane 6 to the trolley 2, operate the truck crane 6, lift the trolley 2 to be stably suspended in the air, operate the trolley travel mechanism 3, and drive the temporary bridge crane to move in the opposite direction of the truck crane 6 to a predetermined position; In this step, the wiring and power supply system of the trolley 2 are removed from the terminal box, but at least the trolley travel mechanism 3 and its power supply system are retained so that the trolley travel mechanism 3 can be driven and the temporary bridge crane can still move; the hook of the automobile crane 6 is securely connected to the trolley through a steel wire rope, the trolley 2 is lifted to a certain height and kept stable, the trolley travel mechanism is operated in the control cabinet, the trolley travel mechanism 3 is driven, and the temporary bridge crane with the trolley 2 removed reaches the predetermined position; For example, the predetermined position is a safe position in the opposite direction of the vehicle crane 6, which will not affect the safety of personnel and will not affect the descent of the trolley 2; see Figure 4 , the intended location is Figure 4 The right side of the temporary bridge crane; S4: operating the vehicle crane 6 to lower the trolley 2 and lift it to the installation room; In this step, after the temporary bridge crane leaves the lifting position, space is left below, and the boom can be shortened to facilitate the trolley 2 to be lowered and lifted to the installation room; in the prior art, since the temporary bridge crane cannot be moved, there is no extra space below the trolley 2 and the boom cannot be shortened, so a large area of the grid roof needs to be removed to accommodate the lifting of the trolley 2 by the automobile crane 6; see Figure 4 The installation room is located at Figure 4 The left side of the middle truck crane 6; It can be seen that in this embodiment, the trolley 2 is first dismantled, and the trolley walking mechanism 3 is not dismantled. During the dismantling process, the power is not cut off, and the temporary bridge crane is driven to move, and the lifting operation of the automobile crane 6 is cooperated to leave space for the lifting trolley 2. The boom can be shortened and a higher lifting height is not required, thereby overcoming the problems of small space and limited lifting height in the underground factory, reducing the difficulty of dismantling, improving the dismantling efficiency, reducing the dismantling time, eliminating the need to dismantle a large area of the grid roof, and reducing the construction cost.
[0019] In another embodiment, it further includes: S5: dismantling the power supply system of the trolley traveling mechanism 3, providing temporary power supply for the trolley traveling mechanism 3, operating the trolley traveling mechanism, and driving the temporary bridge crane to move to the hoisting position; In this step, the original power supply system of the trolley travel mechanism 3 is dismantled, and a temporary power supply is used, such as a three-phase contactor control box, to facilitate subsequent dismantling, and the trolley travel mechanism can be operated in the driver's cab; this step is carried out at the same time when the trolley 2 is hoisted to the installation room, that is, the hoisting of the trolley 2 and the dismantling of the power supply system are carried out simultaneously, which saves dismantling time and further improves dismantling efficiency; it should be noted that after turning off the main power supply, the main power supply of the bridge crane sliding line is temporarily disconnected, and the temporary bridge crane sliding line cutter head is removed to ensure that the bridge crane is disconnected from the main power supply; S6: remove the end beam 4 from the temporary bridge crane, connect the hook to the first beam 1 close to the truck crane 6, lift the first beam 1 to be stably suspended in the air, and provide temporary power to the trolley travel mechanism 3 to which the second beam belongs, so as to drive the second beam to move in the reverse direction to the predetermined position; In this step, the end beam 4 is removed to separate the first beam 1 from the second beam. The second beam is driven by the trolley travel mechanism 3 to move to a predetermined position to provide a descending space for the hoisting of the first beam 1. S7: operating the truck crane 6 to lower the first beam 1 and lift it to the installation room; In this step, after the second beam leaves the hoisting position, space is left below to facilitate the first beam 1 to be lowered and hoisted to the installation room.
[0020] In another embodiment, it also includes: S8: providing a temporary power supply to the trolley travel mechanism 3 of the second beam, driving the second beam to move to the hoisting position, and hoisting it to the installation room by the truck crane 6; In this step, the trolley travel mechanism 3 is used again to move the second beam back to the hoisting position to achieve dismantling.
[0021] In another embodiment, in S6, the end beam 4 is removed from the first beam 1, so that the end beam 4 moves in the opposite direction following the second beam to the predetermined position, and the end beam 4 is removed from the second beam at the predetermined position; This step is performed simultaneously with S6, that is, the hoisting of the first beam 1 and the removal of the end beam 4 from the second beam are performed simultaneously, so as to further reduce the removal time and improve the removal efficiency.
[0022] In another embodiment, in S8, after the second beam is connected to the hook, the temporary power supply is removed; this step removes the temporary power supply, which is easier to remove than the original power supply system, thereby improving the removal efficiency.
[0023] In another embodiment, after the end beam 4 is removed, it is temporarily fixed on the bridge crane track 5, and after the second beam is hoisted to the installation room, the end beam 4 is hoisted to the installation room; this step completes the hoisting of the end beam 4.
[0024] In another embodiment, the process further includes: dismantling the removed components in the installation room, transporting them to a material warehouse, cleaning the site, and resuming normal production.
[0025] In another embodiment, in S2, the trolley 2 is lifted to a position about 20-50 cm above the bridge crane track 5 and stably suspended in the air, preferably 20 cm, so that the remaining part of the temporary bridge crane can move to the predetermined position.
[0026] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. A method for dismantling a temporary bridge crane in an underground powerhouse without power outage, wherein the temporary bridge crane comprises a trolley traveling mechanism, a trolley, two girders and two end beams, and is characterized in that: include: S1: Power the trolley travel mechanism to drive the temporary bridge crane to move until it reaches the hoisting position; S2: operating the mobile crane so that the hook of the mobile crane reaches above the lifting position; S3: Remove the trolley wiring and its power system from the temporary bridge crane, retain the trolley travel mechanism and its power system of the temporary bridge crane, connect the hook of the truck crane to the trolley, operate the truck crane, lift the trolley to be stably suspended in the air, operate the trolley travel mechanism, and drive the temporary bridge crane to move in the opposite direction of the truck crane to a predetermined position; S4: operate the truck crane to lower the trolley and lift it to the installation room.
2. The method for dismantling a temporary bridge crane in an underground powerhouse without power outage as claimed in claim 1, characterized in that: Also includes: S5: dismantle the power supply system of the trolley traveling mechanism, provide temporary power supply for the trolley traveling mechanism, operate the trolley traveling mechanism, and drive the temporary bridge crane to move to the hoisting position; S6: removing the end beam from the temporary bridge crane, connecting the hook to the first beam close to the truck crane, lifting the first beam to be stably suspended in the air, and providing a temporary power supply to the trolley travel mechanism of the second beam, driving the second beam to move in the reverse direction to the predetermined position; S7: operate the truck crane to lower the first beam and lift it to the installation room.
3. The method for dismantling a temporary bridge crane in an underground powerhouse without power outage as claimed in claim 2, characterized in that: Also includes: S8: Provide temporary power to the trolley travel mechanism of the second beam, drive the second beam to move to the hoisting position, and use the truck to hoist it to the installation room.
4. The method for dismantling a temporary bridge crane in an underground powerhouse without power outage as claimed in claim 3, characterized in that: In S6, the end beam is removed from the first beam, so that the end beam moves in the opposite direction following the second beam to the predetermined position, and the end beam is removed from the second beam at the predetermined position.
5. The method for dismantling a temporary bridge crane in an underground powerhouse without power outage as claimed in claim 3, characterized in that: In S8, after the second beam is connected to the hook, the temporary power supply is removed.
6. The method for dismantling a temporary bridge crane in an underground powerhouse without power outage as claimed in claim 3, characterized in that: After the end beam is removed, it is temporarily fixed on the bridge crane track. After the second beam is hoisted to the installation room, the end beam is hoisted to the installation room.
7. The method for dismantling a temporary bridge crane in an underground powerhouse without power outage as claimed in claim 3, characterized in that: Also includes: The removed parts are disassembled in the installation room and transported out.
8. The method for dismantling a temporary bridge crane in an underground powerhouse without power outage as claimed in claim 3, characterized in that: In S2, the trolley is lifted to a position 20-50 cm above the bridge crane track and is stably suspended in the air.