Small-section high pier column construction method

By adopting the form-turning method, pre-embedding square steel pipes, and setting up corbels, diagonal braces, and flexible heads in the construction of high piers and columns, the problems of high lateral stress and low formwork turnover efficiency caused by the high position of the pier caps of high piers and columns are solved. problem, achieving stable construction of pier columns and reducing costs.

CN118745705APending Publication Date: 2024-10-08CHINA RAILWAY CONSTR GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411071885.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

In areas with large construction height differences, the pier caps of tall pier columns are located higher, resulting in large lateral stress on the pier columns, small cross-sections, and prone to cracks. In addition, the traditional construction method has low template turnover efficiency, resulting in high construction costs.

Method used

The pier columns are constructed using the form-turning method, square steel pipes are pre-embedded and core rods are set under the formwork. Corbels, diagonal braces and flexible heads are installed. These devices are used to offset the horizontal thrust, avoid cracks in the pier columns, and improve the turnover efficiency of the formwork.

Benefits of technology

It effectively avoids cracks caused by load during the construction process of pier columns, improves the turnover efficiency of formwork, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745705A_ABST
    Figure CN118745705A_ABST
Patent Text Reader

Abstract

According to the small-section high pier column construction method, during pier column construction, a square steel pipe is pre-buried, and a cross-core rod is arranged below a formwork. The problem that when the pier cap is constructed, due to the fact that the load is large, the construction requirement cannot be met only by means of friction force of the pier column formwork, and the pier column formwork slides downwards is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of building construction, and in particular relates to a pier column construction method. Background Art

[0002] The pier column refers to the pier of the column structure, including round column, square column, vase-shaped column top, etc. It is mainly used to bear the upper load, some of which are borne by the cap beam, some are directly consolidated or directly borne. A cap is generally set under the pier column, and everything below the cap is called the foundation.

[0003] In some areas, due to the large height difference in construction, the pier cap is designed to be high and the pier column structure is slender, forming a pier column with a small cross-section. When pouring the pier cap concrete, the pier column is subjected to greater force at the lateral position, and the pier column has a relatively small cross-section. After receiving the horizontal thrust, the pier column is prone to cracks. At the same time, due to the high pier column, the traditional construction method has low template turnover efficiency, resulting in high construction costs. Summary of the invention

[0004] The purpose of the present invention is to provide a small-section high pier construction method to solve the technical problems that the pier has a small cross-section and a high height, the pier top adopts a vase-type pier cap structure, the template materials of the traditional construction method cannot be turned over, and the pier is prone to cracks.

[0005] In order to solve the above technical problems, the specific technical solutions of the present invention are as follows: A method for constructing a small-section high pier column, characterized in that it comprises the following steps: Step 1: Use the overmolding method to construct the pier column; Step 2: When the construction reaches the junction between the pier column and the pier cap, install the corbel on the formwork of the pier column; Step 3: Install the pier cap formwork; Step 4: Install diagonal braces between the pier cap formwork and the corbel; Step 5: Install the flexible joints between the piers; Step 6: Pour the pier cap.

[0006] Furthermore, in step 1, a square steel pipe is pre-buried on the pier column during the construction of the pier column, and a through rod is inserted into the square steel pipe, and the through rod is located at the lower edge of the template.

[0007] Furthermore, a plurality of auxiliary supports are provided between the diagonal brace and the pier cap formwork.

[0008] Furthermore, the movable head is directly opposite to the position of the corbel.

[0009] Furthermore, in step 1, the first casting height of the mold turning method is 8m, the top 2m formwork is retained and not removed, and the removed 6m formwork is flipped upward in sequence and connected to the retained 2m formwork. The height of the pier column is 6m each time the mold is turned over until it is cast to the junction of the pier column and the pier cap.

[0010] Furthermore, the number of the active heads is two.

[0011] Furthermore, a telescopic rod is provided on the diagonal support.

[0012] Furthermore, the telescopic rod is a screw rod.

[0013] The technical solution of the present invention has the following advantages: 1. Pre-embed square steel pipes during pier construction and set through-rods under the formwork. This avoids the situation where the friction of the pier formwork alone cannot meet the construction requirements due to the large load during pier cap construction, causing the pier formwork to slide downward.

[0014] A top support device is set at the position of the corbel to offset the horizontal thrust and avoid cracks in the pier column. At the same time, since the formwork is equipped with corbels, it does not need to be pre-buried on the pier, which facilitates the turnover of the formwork in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the present invention. DETAILED DESCRIPTION

[0016] In order to better understand the purpose, structure and function of the present invention, a small-section high pier construction method of the present invention is further described in detail below in conjunction with the accompanying drawings.

[0017] Example 1 like Figure 1 As shown, in this embodiment, a small-section high pier construction method of the present invention includes the following steps: Step 1: construct pier 6 by using the overmolding method; Step 2: When the construction reaches the junction of the pier column 6 and the pier cap 5, a corbel 21 is installed on the formwork 2 of the pier column 6; Step 3: Install the pier cap formwork 3; Step 4: Install the diagonal brace 22 between the pier cap formwork 3 and the corbel 21; Step 5: Install the movable head 4 between the piers 6; Step 6: Cast pier cap 5.

[0018] Specifically, in step 1, when constructing the pier 6, a square steel pipe 1 is pre-buried on the pier 6 for forming a hole, and a through rod is inserted into the square steel pipe 1. After the through rod is inserted, the upper edge of the through rod is located at the lower edge of the template 2, which supports the template 2 and is easy to remove.

[0019] The pier cap template 3 is hinged to the end of the diagonal brace 22, and the middle of the diagonal brace 22 is connected to the pier cap template 3 through the auxiliary support 23. The number of the auxiliary supports 23 is set according to the site conditions, and the auxiliary supports 23 are perpendicular to the bottom of the pier cap template 3.

[0020] Specifically, the active head 4 is directly opposite to the position of the corbel 21, and the horizontal thrusts of the active head 4 and the corbel 21 offset each other. The active head 4 is provided in two pieces to maintain uniform distribution of the force.

[0021] In the process of implementing the application itself, the first pouring height of the mold turning method in step 1 is 8m. After the pouring is completed, the top 2m formwork is retained when the formwork is removed, and the removed 6m formwork is flipped upward in turn and connected to the retained 2m formwork. The height of the pier 6 is 6m each time the mold is turned over until it is poured to the junction of the pier 6 and the pier cap 5.

[0022] Example 2 In this embodiment, a telescopic rod 24 is provided on the diagonal brace 22 to facilitate adjustment of the length of the diagonal brace 22, thereby ensuring that the position of the pier cap formwork 3 meets the requirements.

[0023] In a specific application process, the telescopic rod 24 is selected as a screw rod.

[0024] It is to be understood that the present invention is described by some embodiments, and it is known to those skilled in the art that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.

Claims

1. A construction method for high piers with small cross-sections, It is characterized in that The steps include: Step 1: construct the pier column (6) by using the overmolding method; Step 2: When the construction reaches the junction between the pier column (6) and the pier cap (5), a corbel (21) is installed on the formwork (2) of the pier column (6); Step 3: Install the pier cap formwork (3); Step 4: Install the diagonal brace (22) between the pier cap formwork (3) and the corbel (21); Step 5: Install the flexible head (4) between the piers (6); Step 6: Cast the pier cap (5).

2. The method for constructing a high pier with a small cross section according to claim 1, It is characterized in that In the step 1, when constructing the pier column (6), a square steel pipe (1) is pre-buried on the pier column (6), and a through-rod is inserted into the square steel pipe (1), wherein the through-rod is located at the lower edge of the template (2).

3. The method for constructing a high pier with a small cross section according to claim 2, It is characterized in that A plurality of auxiliary supports (23) are provided between the diagonal brace (22) and the pier cap formwork (3).

4. The method for constructing a high pier with a small cross section according to claim 3, It is characterized in that The movable head (4) is located directly opposite to the position of the corbel (21).

5. The method for constructing a high pier with a small cross section according to claim 4, It is characterized in that In step 1, the first casting height of the mold turning method is 8m, the top 2m template is retained and not removed, and the removed 6m template is successively turned upward and connected to the top of the retained 2m template. The height of the pier column (6) is 6m each time the mold is turned and cast until the pier column (6) and the pier cap (5) are cast to the junction position.

6. The method for constructing a high pier with a small cross section according to claim 5, It is characterized in that The number of the movable heads (4) is two.

7. The method for constructing a high pier with a small cross section according to claim 6, It is characterized in that A telescopic rod (24) is provided on the diagonal support (22).

8. The method for constructing a high pier with a small cross section according to claim 6, It is characterized in that The telescopic rod (24) is a screw rod.