Method for judging pile slipping in piling process based on energy conservation principle

By using a method based on the principle of energy conservation to calculate the pile tip and side friction resistance, and using the kinetic energy theorem to judge the pile slipping situation, the accuracy problem of pile slipping judgment in the existing technology is solved, and the safety and efficiency of offshore piling projects are improved.

CN118745747APending Publication Date: 2024-10-08POWERCHINA HUADONG ENG CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410729649.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

When calculating the bearing capacity of large-diameter steel pipe piles with existing technology, it is difficult to accurately judge the phenomenon of pile slippage, leading to safety and efficiency problems. In particular, changes in the physical and mechanical properties of the soil during the dynamic piling process affect the bearing characteristics of the pile foundation.

Method used

Using a method based on the principle of energy conservation, by collecting on-site information, calculating pile tip and side friction, and using kinetic energy theorem and fitting formulas to judge pile slippage, the calculation steps are simplified and accuracy is improved.

Benefits of technology

It achieves accurate prediction of the pile sliding process, reduces the loss of human and financial resources, improves the safety and stability of the pile foundation, and provides a more reliable basis for offshore piling projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745747A_ABST
    Figure CN118745747A_ABST
Patent Text Reader

Abstract

The invention discloses a method for judging whether pile slipping occurs in a pile driving process based on an energy conservation principle, aiming at a pile slipping phenomenon frequently occurring on the sea, the invention firstly provides a reduction formula for calculation of soil resistance in a pile slipping dynamic process, and the reduction formula is used for fitting in combination with a plurality of actual cases on the basis of ICP-05 and UWA-13; then, the reduction method is used for calculating the soil resistance after hammering, the buoyancy is calculated at the same time, and an equilibrium equation of the pile movement process is established; the unit displacement is set, the change of the pile speed after the unit displacement is determined through energy conservation, if the speed is larger than 0, the unit displacement continues to be increased for cyclic calculation, and otherwise, it is indicated that the pile stops moving within the displacement range. According to the method, the number of required parameters is small, calculation is easy and convenient, the pile sliding condition can be judged before hammering, and the method has important significance in actual engineering.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for calculating the bearing capacity of a dynamic pile foundation, and in particular to a method for judging whether a pile slips during a piling process based on the energy conservation principle. Background Art

[0002] With the rapid development of offshore wind power projects, large-diameter steel pipe piles have been widely used for their large bearing capacity and convenient installation. At present, about 90% of marine structures adopt the type of pile foundation. However, large-diameter steel pipe piles often slip in the actual engineering application. The slip phenomenon refers to the phenomenon that the pile suddenly sinks to a certain depth automatically after a hammering or vibration under the weight of the pile body or the combined weight of the pile hammer during the pile sinking process. Slipping piles are a very dangerous phenomenon. Its occurrence can easily cause damage to the pile and the pile hammer, seriously affecting the efficiency of piling and increasing the cost of piling. If the speed of the slipping pile is too fast, it may also cause the pile driving ship to capsize, causing serious safety accidents. In addition, the slipping pile phenomenon will cause project personnel to question the soil survey data and cannot guarantee the safety and stability of the pile foundation. Therefore, if the slipping pile process can be well predicted, it can avoid a lot of manpower and financial losses, which is of great significance in actual engineering.

[0003] The current mainstream analysis method for pile slippage is to use the API method to calculate the bearing capacity. However, there is a big discrepancy between the API method and the actual physical process. For example, the API method assumes that the pile end resistance and pile side friction resistance are proportional to the vertical effective stress. In fact, this assumption is not reasonable. Moreover, the current design methods are mostly obtained based on standard static load tests and are suitable for static or quasi-static processes. However, for dynamic processes such as pile slippage, the changes in the physical and mechanical properties of the soil caused by the rapid and continuous pile sinking effect will seriously affect the bearing characteristics of the pile foundation. Therefore, how to reasonably reduce the pile side friction resistance and pile end resistance during the pile slippage process is a problem that many scholars are concerned about. Summary of the invention

[0004] In view of this, the purpose of the present invention is to solve the shortcomings of the prior art and propose a method for judging whether the pile is slipping during the piling process based on the principle of conservation of energy. This method overcomes the shortcomings of the existing design method in calculating the bearing capacity of the pile foundation, and uses the pile foundation bearing capacity reduction algorithm of the dynamic process to judge the situation of pile slipping through the energy conservation analysis after hammering.

[0005] The object of the present invention can be achieved by the following technical scheme: A method for judging whether a pile slips during piling based on the principle of energy conservation, characterized in that it comprises the following steps:

[0006] (1) Based on the field test results, determine and collect various types of information including at least soil layer classification information, machine position CPT data, basic information of piles and pile hammers, and pile driving record information;

[0007] (2) Determine the pile depth at the beginning of piling and judge the initial velocity v0 of the pile and the pile hammer after a single piling process;

[0008] (3) Determine the buoyancy of soil and water on the pile after hammering;

[0009] (4) Calculate the pile end resistance and side friction resistance in the sand layer and clay layer;

[0010] (5) Using the fitted reduction formula to reduce the calculated pile end resistance and side friction resistance, determine the total resistance of the pile during the final driving process;

[0011] (6) Analyze the force on the pile after hammering, determine the change in pile hammer speed based on the kinetic energy theorem, and determine whether the pile is slipping based on the speed change.

[0012] Preferably, the initial speed of the pile hammer in step (2) can be calculated by the following formula:

[0013]

[0014] Where f is the hammer energy conversion efficiency; m p is the pile mass; m h is the mass of the hammer.

[0015] Preferably, the soil buoyancy in step (3) is calculated by the following formula:

[0016] F b,soil =γ s πDt·z tip (2)

[0017] Where γ s is the soil weight, D is the outer diameter, t is the wall thickness, z tip is the depth of pile bottom.

[0018] Preferably, in step (4), the equivalent diameter D eq Instead of the diameter D used in the original design method to calculate the average cone tip resistance, that is:

[0019]

[0020] Where A re is the effective area ratio.

[0021] Preferably, the step (4) specifically comprises:

[0022] ICP-05 is used to calculate the bearing capacity of sand and clay layers. The corresponding calculation formula is as follows:

[0023]

[0024] q b =A r ·q c,avg (5)

[0025] Q s =πD∫τ f dz (6)

[0026] Q b =q b πD 2 / 4 (7)

[0027] UWA-13 is used to calculate the bearing capacity in clay, and the corresponding calculation formula is as follows:

[0028] τ f =0.055q t [max(h / R * ),1] 0.2 (8)

[0029] q b =A r ·q c,avg (9)

[0030] Where τ f is the unit lateral friction, a and b are constant parameters, σ′ v0 is the vertical effective stress, h is the current depth of the pile tip, and p a is the reference stress value, R * is the equivalent pile radius, δ f is the friction angle of pile-soil interface, q b is the unit pile end resistance, A r is the area ratio, q c,avg The cone tip resistance q is the range of ±1.5D from the pile tip c The average value, Q s is the total pile side friction, Q b is the total pile end resistance, q t To correct the cone tip resistance.

[0031] Preferably, in step (5), the calculated total pile end resistance and total pile side friction resistance are reduced using a fitting formula, and the reduction equation is:

[0032] Q=a'Q b +b'Q s (10)

[0033] Where a' and b' are reduction factors.

[0034] Preferably, the reduction coefficients a' and b' are determined by fitting the existing pile sliding data of multiple piles using the nlinfit tool in Matlab.

[0035] Preferably, in step (6), the movement of the final pile is determined according to the kinetic energy theorem, assuming that the pile hammer does not move with the pile, and the formula is as follows:

[0036]

[0037] Where W p is the deadweight of the pile, F b is the buoyancy of the pile, Q is the sum of the friction resistance and pile end resistance of the pile calculated by the reduction method, Δh i is the preset unit displacement increment, m p Pile mass, v i is the pile displacement Δh i The speed after that, i = 1, 2, 3...; v0 is the initial speed; calculate v by the energy conservation formula i , if v i If it is greater than 0, then v i Instead of v0, establish the second Δh i The shifted equation is repeated until v i = 0, thus obtaining the actual displacement of the pile after the hammering. According to the actual displacement after the hammering and the normal displacement combined with v i Comprehensively judge whether pile slippage occurs.

[0038] Compared with the prior art, the present invention has the following advantages: the present invention first simulates the most suitable bearing capacity reduction coefficient through the calculation results of multiple actual cases, and then establishes the energy conservation equation by solving the forces in the pile displacement process, thereby judging the speed change of the pile, and further proves the reliability and accuracy of the method through examples. The calculation steps of this method are simpler, fewer parameters are required, and it can more accurately predict the pile slipping situation, give a specific pile slipping range, and provide a basis for actual offshore piling projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 Slip pile judgment flow chart;

[0040] Figure 2 Schematic diagram of load during hammering process;

[0041] Figure 3 Example of pile velocity change curve after hammering. DETAILED DESCRIPTION

[0042] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, but are not to be construed as limiting the present invention.

[0043] like Figure 1 As shown, the present invention provides a method for judging whether a pile slips during piling based on the principle of energy conservation, comprising the following steps:

[0044] (1) Based on the field test results, determine the soil layer division information, collect the CPT data of the machine position, basic information of the pile and pile hammer, and pile driving records;

[0045] (2) Determine the pile depth at the beginning of piling and judge the initial velocity v0 of the pile and pile hammer after a single piling process. According to the pile-hammer interaction relationship, the initial velocity of the pile is related to the hammer energy. Considering the energy loss during the piling process, the initial velocity of the pile hammer can be calculated by the following formula:

[0046]

[0047] Where f is the hammer energy conversion efficiency, usually 85%; m p is the pile mass; m h is the mass of the hammer.

[0048] (3) Determine the buoyancy of soil and water on the pile after hammering, where the soil buoyancy is calculated using the following formula:

[0049] F b,soil =γ s πDt·z tip (2)

[0050] Where γs is the soil weight, D is the outer diameter, t is the wall thickness, z tip is the depth of pile bottom;

[0051] (4) The pile tip resistance and side friction resistance of the pile in the sand layer and clay layer are calculated by ICP-05 and UWA-13 methods respectively, with the equivalent diameter D eq Instead of the diameter D used in the original design method to calculate the average cone tip resistance:

[0052]

[0053] Where A re is the effective area ratio;

[0054] The specific calculation process is:

[0055] ICP-05 is used to calculate the bearing capacity of sand and clay layers. The corresponding calculation formula is as follows:

[0056]

[0057] q b =A r ·q c,avg (5)

[0058] Q s =πD∫τ f dz (6)

[0059] Q b =q b πD 2 / 4 (7)

[0060] UWA-13 is used to calculate the bearing capacity in clay, and the corresponding calculation formula is as follows:

[0061] τ f =0.055q t [max(h / R * ),1] 0.2 (8)

[0062] q b =A r ·q c,avg (9)

[0063] Where τ f is the unit lateral friction, a and b are constant parameters, σ′ v0 is the vertical effective stress, h is the current depth of the pile tip, and p a is the reference stress value, R * is the equivalent pile radius, δ f is the friction angle of pile-soil interface, q b is the unit pile end resistance, A r is the area ratio, q c,avg The cone tip resistance q is the range of ±1.5D from the pile tip c The average value, Q s is the total pile side friction, Q b is the total pile end resistance, q t To correct the cone tip resistance.

[0064] (5) The calculated pile end resistance and side friction resistance are reduced by using the fitted reduction formula to determine the total resistance of the pile during the final driving process. The reduction equation is:

[0065] Q=a'Q b +b'Q s (10)

[0066] Where a' and b' are reduction coefficients, which are obtained by fitting the existing sliding pile data of multiple piles using the nlinfit tool in Matlab. The value of a' is 0.6 and the value of b' is 0.22.

[0067] (6) Analyze the force on the pile after hammering, determine the change in the speed of the pile hammer according to the kinetic energy theorem, and determine whether the pile is slipping according to the speed change. The final movement of the pile is determined according to the kinetic energy theorem, assuming that the pile hammer does not move with the pile. The formula is as follows:

[0068]

[0069] Where W p is the deadweight of the pile, F b is the buoyancy of the pile, Q is the sum of the friction resistance and pile end resistance of the pile calculated by the reduction method, m p Pile mass, v i is the pile displacement Δh i The speed after that, i = 1, 2, 3..., v0 is the initial speed, the initial depth is determined to be z0, and the unit displacement increment Δh is set i , find out at z0+Δh i / 2, and then use the energy conservation formula to calculate v i :

[0070] like Less than 0, indicating the setting unit displacement increment Δh i Too large, the pile depth after hammering is less than z0+Δh i , then it is necessary to reduce Δh i , and return to the previous step to recalculate at z0+Δh i / 2 pile force, and enter the cycle until Determine the final displacement of the pile after hammering;

[0071] If v i = 0, which means the unit displacement increment Δh i Set it appropriately and confirm that the pile depth after hammering is equal to z0+iΔh i , and the pile speed is zero;

[0072] If v i >0, let i=i+1, at this time, v i Replace v0 and continue to build on the second Δh i The displacement equation is z0+Δh i Replace the previous z0 and proceed to the next cycle until v i=0, thereby obtaining the displacement of the pile after the hammering and judging whether the pile slipped: if the final displacement of the pile is within the normal displacement range after the hammering, the pile slipped event did not occur at this time; if the final displacement of the pile is much larger than the normal displacement after the hammering, it indicates that the pile slipped at this time.

[0073] The principle and mechanism of this method is further explained below by combining an example of a pile sliding project.

[0074] The pile slipped during the piling process. According to the pile sinking report, the pile sank 23m under its own weight. After 50 hammer strikes, the pile began to slip 24m below the mud surface. The last hammer strike had an energy of 373kJ. The pile stopped after slipping 16.5m. The force analysis of the pile hammer during the pile slip is as follows: Figure 2 shown.

[0075] Based on the energy conversion, the initial velocities of the pile and hammer after the 50th hammering are calculated. According to the on-site data, the pile weight is 8927 kN and the pile hammer weight is 5769 kN. Finally, the initial velocity v0 is calculated to be 0.464 m / s.

[0076] Assuming the unit displacement increment Δh is 1m, the external force on the pile after each displacement increment is as shown in Table 1:

[0077] Table 1 Pile force after unit displacement

[0078]

[0079]

[0080] Then, according to the kinetic energy theorem, the velocity curve of the pile after hammering is obtained as follows: Figure 3 It can be found that the maximum pile speed calculated by this method is 7.22m / s during the pile sliding process, and the final pile sliding stop position is about 40m below the mud surface, and the pile sliding distance is 16m, which is very close to the actual result of 16.5m.

[0081] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.

Claims

1. A method for judging whether a pile slips during piling based on the principle of energy conservation, characterized in that: The following steps are involved: (1) Based on the field test results, determine and collect various types of information including at least soil layer classification information, machine position CPT data, basic information of piles and pile hammers, and pile driving record information; (2) Determine the pile depth at the beginning of piling and judge the initial velocity v0 of the pile and the pile hammer after a single piling process; (3) Determine the buoyancy of soil and water on the pile after hammering; (4) Calculate the pile end resistance and side friction resistance in the sand layer and clay layer; (5) Using the fitted reduction formula to reduce the calculated pile end resistance and side friction resistance, determine the total resistance of the pile during the final driving process; (6) Analyze the force on the pile after hammering, determine the change in pile hammer speed based on the kinetic energy theorem, and determine whether the pile is slipping based on the speed change.

2. A method for judging whether a pile slips during piling based on the principle of energy conservation according to claim 1, characterized in that: The initial speed of the pile hammer in step (2) can be calculated by the following formula: Where f is the hammer energy conversion efficiency; m p is the pile mass; m h is the mass of the hammer.

3. A method for judging whether a pile slips during piling based on the principle of energy conservation according to claim 1, characterized in that: In step (3), the buoyancy of the soil body is calculated by the following formula: F b,soil =γ s πDt z tip ; Where γ s is the soil weight, D is the outer diameter, t is the wall thickness, z tip is the depth of pile bottom.

4. A method for judging whether a pile slips during piling based on the principle of energy conservation according to any one of claims 1 to 3, characterized in that: In the step (4), the equivalent diameter D eq Instead of the diameter D used in the original design method to calculate the average cone tip resistance, that is: Where A re is the effective area ratio.

5. A method for judging whether a pile slips during piling based on the principle of energy conservation according to claim 4, characterized in that: The step (4) specifically includes: using ICP-05 to calculate the bearing capacity of the sand layer and the clay layer, and the corresponding calculation formula is as follows: q b =A r ·q c,avg ; Q s =πD∫τ f dz; Q b =q b πD 2 / 4; UWA-13 is used to calculate the bearing capacity in clay, and the corresponding calculation formula is as follows: t f =0.055q t [max(h / R * ),1] 0.2 ; q b =A r ·q c,avg ; Where τ f is the unit lateral friction, a and b are constant parameters, σ' v0 is the vertical effective stress, h is the current depth of the pile tip, and p a is the reference stress value, R * is the equivalent pile radius, δ f is the friction angle of pile-soil interface, q b is the unit pile end resistance, A r is the area ratio, q c,avg The cone tip resistance q is the range of ±1.5D from the pile tip c The average value, Q s is the total pile side friction, Q b is the total pile end resistance, q t To correct the cone tip resistance.

6. A method for judging whether a pile slips during piling based on the principle of energy conservation according to claim 5, characterized in that: In the step (5), the calculated total pile end resistance and total pile side friction resistance are reduced using a fitting formula, and the reduction equation is: Q=a'Q b +b'Q s ; Where a' and b' are reduction factors.

7. A method for judging whether a pile is slipping during piling based on the principle of energy conservation according to claim 6, characterized in that: The reduction coefficients a' and b' are determined by fitting the existing pile sliding data of multiple piles using the nlinfit tool in Matlab.

8. A method for judging whether a pile is slipping during piling based on the principle of energy conservation according to claim 7, characterized in that: In step (6), the motion of the final pile is determined according to the kinetic energy theorem, assuming that the pile hammer does not move with the pile. The formula is as follows: Where W p is the deadweight of the pile, F b is the buoyancy of the pile, Q is the sum of the friction resistance and pile end resistance of the pile calculated by the reduction method, Δh i is the preset unit displacement increment, m p Pile mass, v i is the pile displacement Δh i The speed after that, i = 1, 2, 3...; v0 is the initial speed; calculate v by the energy conservation formula i , if v i If it is greater than 0, then v i Instead of v0, establish the second Δh i The shifted equation is repeated until v i = 0, thus obtaining the actual displacement of the pile after the hammering. According to the actual displacement after the hammering and the normal displacement combined with v i Comprehensively judge whether pile slippage occurs.