Method for rapidly evaluating ground stress state of railway tunnel based on hydraulic fracturing test

The in-situ stress parameters are obtained through hydraulic fracturing tests, combined with the rock soft and hard coefficients, to calculate the in-situ stress state evaluation index Gi, which solves the problems of long cycle and high cost of traditional in-situ stress assessment methods, and achieves rapid and economical in-situ stress state assessment. , improving the timeliness and efficiency of construction.

CN118746497APending Publication Date: 2024-10-08CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410924231.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The traditional in-situ stress state assessment method requires rock strength testing in the laboratory, which has a long cycle and high cost, affecting the timeliness and safety of construction.

Method used

Hydraulic fracturing tests are used to obtain parameters such as rupture pressure, reopening pressure, closing pressure, and rock mass pore water pressure on site. Combined with the rock soft and hard coefficients, the horizontal maximum principal stress and vertical stress are calculated, and the in-situ stress state assessment is calculated through formulas. Indicator Gi can quickly assess the state of geostress.

Benefits of technology

It achieves rapid on-site assessment of ground stress status, eliminating sampling and indoor testing links, shortening the cycle, reducing costs, and improving the timeliness and efficiency of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118746497A_ABST
    Figure CN118746497A_ABST
Patent Text Reader

Abstract

The invention discloses a method for rapidly evaluating a railway tunnel crustal stress state based on a hydraulic fracturing test, and aims to rapidly evaluate the crustal stress state through in-situ test key parameters obtained by the on-site hydraulic fracturing test, guide construction in time and improve the working efficiency. Comprising the following steps that a hydraulic fracturing test is conducted in a drill hole, and key parameters are obtained and comprise the fracture pressure Pb, the reopening pressure Pr, the closing pressure Ps, the rock mass pore water pressure P0 and the pressure Pw of a water column in a drill rod; determining a rock hardness coefficient k value; calculating the horizontal maximum principal stress SH and the vertical stress Sv according to the data obtained by the hydraulic fracturing test to obtain the maximum initial crustal stress sigma max; calculating a crustal stress state evaluation index Gi value; and quickly evaluating the crustal stress state on the basis of the crustal stress state evaluation index Gi value and the maximum initial crustal stress sigma max value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of railway tunnel engineering geological survey, and in particular to a method for quickly evaluating the ground stress state of a railway tunnel based on a hydraulic fracturing test. Background Art

[0002] The scale of railway construction in mountainous areas is increasing year by year. There will be more and more ultra-deep and ultra-long railway tunnels, and the high ground stress problem faced by tunnel construction is becoming more and more prominent. The traditional ground stress state is mainly evaluated by the ratio of rock strength to ground stress, and the ground stress value is obtained on-site by hydraulic fracturing. Rock strength needs to be completed in the laboratory, through sampling, transportation, grinding into standard specimens, and then testing. This step cycle is often too long, which affects the timely prediction of rock bursts and large deformations during construction. In addition, the test requires large equipment, which increases costs.

[0003] Therefore, using the key in-situ test parameters obtained from the on-site hydraulic fracturing test to directly evaluate the ground stress state can save the sampling and indoor testing steps, reduce costs, shorten the cycle, and timely guide the adjustment of the construction plan. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a method for quickly evaluating the geostress state of a railway tunnel based on a hydraulic fracturing test, so as to realize rapid evaluation of the geostress state by using key in-situ test parameters obtained through on-site hydraulic fracturing tests, timely guide construction, and improve work efficiency.

[0005] The technical solution adopted by the present invention to solve the technical problem is as follows:

[0006] The present invention provides a method for quickly evaluating the ground stress state of a railway tunnel based on a hydraulic fracturing test, comprising the following steps:

[0007] S1: By conducting hydraulic fracturing tests in the borehole, key parameters including fracture pressure P are obtained. b , reopening pressure P r , closing pressure P s , rock pore water pressure P0 and water column pressure in drill pipe P W ;

[0008] S2: Determine the rock hardness coefficient k value, and select it according to the rock type in the tunnel site according to the rock hardness coefficient k value table in Table 1 below:

[0009] Table 1

[0010]

[0011] S3: Calculate the maximum horizontal principal stress S from the data obtained from the hydraulic fracturing test H and vertical stress SV Get the maximum initial ground stress σ max ; When the maximum horizontal principal stress S H Greater than the vertical stress S v When the maximum initial ground stress σ max Equal to the maximum horizontal principal stress S H ; When the vertical stress S v Greater than the maximum horizontal principal stress S H When the maximum initial ground stress σ max Equal to the vertical stress S V ;

[0012] S4: Calculate the ground stress state evaluation index G according to the following formula i value:

[0013] When the horizontal stress is the maximum initial ground stress, the ground stress state evaluation index G i The value calculation formula is:

[0014]

[0015] In the formula, G i is the evaluation index of ground stress state, P b is the burst pressure, P r is the reopening pressure, k is the rock hardness coefficient, P s is the closing pressure, P w is the water column pressure in the drill pipe, P0 is the pore water pressure in the rock mass;

[0016] When the vertical stress is the maximum initial ground stress, the ground stress state evaluation index G i The value calculation formula is:

[0017]

[0018] In the formula, G i is the evaluation index of ground stress state, P b is the burst pressure, P r is the reopening pressure, k is the rock hardness coefficient, ρ is the rock density, g is the gravity acceleration, and H is the depth of the overlying rock above the measuring point;

[0019] S5: Evaluation of the ground stress state index G i Value and maximum initial geostress σ max Based on the value, quickly evaluate the ground stress state according to the ground stress state classification table in Table 2:

[0020] Table 2

[0021]

[0022] The beneficial effects of the present invention are that the ground stress state is rapidly evaluated by utilizing the hydraulic fracturing test, which eliminates the need for sampling and indoor testing, is simple to operate, can greatly shorten the cycle and reduce costs, can timely guide construction and effectively improve work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] This specification includes the following four drawings:

[0024] Figure 1 It is a flow chart of a method for quickly evaluating the ground stress state of a railway tunnel based on a hydraulic fracturing test of the present invention;

[0025] Figure 2 is a test pressure curve diagram of Example 1;

[0026] Figure 3 is a test pressure curve diagram of Example 2;

[0027] Figure 4 It is the test pressure curve diagram of Example 3. DETAILED DESCRIPTION

[0028] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0029] Reference Figure 1 A method for rapidly evaluating the ground stress state of a railway tunnel based on a hydraulic fracturing test of the present invention comprises the following steps:

[0030] S1: By conducting hydraulic fracturing tests in the borehole, key parameters including fracture pressure P are obtained. b , reopening pressure P r , closing pressure P s , rock pore water pressure P0 and water column pressure in drill pipe P w ;

[0031] S2: Determine the rock hardness coefficient k value, and select it according to the rock type in the tunnel site according to the rock hardness coefficient k value table in Table 1 below:

[0032] Table 1

[0033]

[0034] S3: Calculate the maximum horizontal principal stress S from the data obtained from the hydraulic fracturing test H and vertical stress S V Get the maximum initial ground stress σ max ; When the maximum horizontal principal stress S H Greater than the vertical stress S V When the maximum initial ground stress σ max Equal to the maximum horizontal principal stress S H ; When the vertical stress SV Greater than the maximum horizontal principal stress S H When the maximum initial ground stress σ max Equal to the vertical stress S V ;

[0035] S4: Calculate the ground stress state evaluation index G according to the following formula i value:

[0036] When the horizontal stress is the maximum initial ground stress, the ground stress state evaluation index G i The value calculation formula is:

[0037]

[0038] In the formula, G i is the evaluation index of ground stress state, P b is the burst pressure, P r is the reopening pressure, k is the rock hardness coefficient, P s is the closing pressure, P w is the water column pressure in the drill pipe, P0 is the pore water pressure in the rock mass;

[0039] When the vertical stress is the maximum initial ground stress, the ground stress state evaluation index G i The value calculation formula is:

[0040]

[0041] In the formula, G i is the evaluation index of ground stress state, P b is the burst pressure, P r is the reopening pressure, k is the rock hardness coefficient, ρ is the rock density, g is the gravity acceleration, and H is the depth of the overlying rock above the measuring point;

[0042] S5: Evaluation of the ground stress state index G i Value and maximum initial geostress σ max Based on the value, quickly evaluate the ground stress state according to the ground stress state classification table in Table 2:

[0043] Table 2

[0044]

[0045] In step S3, when the horizontal maximum principal stress S H Greater than the vertical stress S V When the maximum initial ground stress σ max Equal to the maximum horizontal principal stress S H ; When the vertical stress S V Greater than the maximum horizontal principal stress S H When the maximum initial ground stress σmax Equal to the vertical stress S V .

[0046] In step S5, the evaluation of the ground stress state should simultaneously meet the ground stress state evaluation index G i Value and maximum initial geostress σ max Two indicators; the ground stress state includes low ground stress, medium ground stress, high ground stress and extremely high ground stress.

[0047] Embodiment 1:

[0048] A railway tunnel is a single-hole double-track tunnel with a total length of 21.785 km. At the mileage DK353+110, the overburden rock is buried at a depth of 1200 m, the surrounding rock grade is classified as Grade III, and the lithology is the lower section of the Limahe Formation of the Lower Proterozoic (Pt1l 1 ) slate, the rock mass is tightly embedded with only rough unweathered joints, and the joint spacing is 1 to 3 meters. Vertical downward drilling and hydraulic fracturing method were carried out for test work. The test pressure curve at the drilling depth of 13.10m is as follows Figure 2 shown.

[0049] According to the test pressure curve, the burst pressure P is obtained. b is 21.51MPa, reopening pressure P r is 15.76MPa, closing pressure P s is 10.16MPa, and the water column pressure in the drill pipe is P w The rock mass pore water pressure P0 is 0.13MPa. The rock type in the tunnel site is slate, and the rock hardness coefficient k value is selected.

[0050] is 14. Calculate the maximum horizontal principal stress S of the rock mass H is 14.85MPa, vertical stress S V is 32.75MPa; vertical stress S V Greater than the maximum horizontal principal stress S H , take the maximum initial geostress σ max Equal to the vertical stress S V , which is 32.75MPa. The vertical stress is the principal stress, and the following formula is used for calculation:

[0051]

[0052] Calculation results Earth stress state evaluation value G i is 3.78, according to σ max =32.75MPa, G i =2.45, the evaluation result is: extremely high ground stress state.

[0053] At the same time, samples were taken near this measuring point for indoor testing. The test results showed that the natural uniaxial compressive strength of rock was R C is 33.8MPa. According to the classification criteria of "Appendix H High Ground Stress Assessment and Rockburst and Large Deformation Classification" of "Regulations on Unfavorable Geological Survey for Railway Engineering" (TB 10027-2022), the rock strength stress ratio R C / σ max is 1.03, and the assessment result is: extremely high ground stress state.

[0054] The results are consistent with those of indoor tests, indicating that this method is effective and reliable.

[0055] Embodiment 2:

[0056] Taking another railway tunnel as an example, the total length of a tunnel is 14.720 km. At the mileage DK206+753.9, the overburden rock is buried at a depth of 320 m, the surrounding rock grade is classified as Grade V, and the lithology is the Xujiahe Formation (T3 xj )Silty sandstone, the rock mass is relatively intact, and the joints are slightly disturbed. Vertical downward drilling and hydraulic fracturing were carried out for testing. The test pressure curve at the drilling depth of 27.00m is as follows Figure 3 shown.

[0057] According to the test pressure curve, the burst pressure P is obtained. b is 12.10MPa, reopening pressure P r is 8.60MPa, closing pressure P s is 7.20MPa, and the water column pressure in the drill pipe is P w is 0.27MPa, the pore water pressure of the rock mass P 0 is 0.27MPa. The rock type in the tunnel site is siltstone, and the rock hardness coefficient k is selected as 14. The maximum horizontal principal stress S of the rock mass is calculated. H is 13.27MPa, vertical stress S V is 9.02MPa; the maximum horizontal principal stress S H Greater than the vertical stress S V , take the maximum initial geostress σ max Equal to the maximum horizontal principal stress S H , which is 13.27MPa. Horizontal stress is the principal stress, and the following formula is used for calculation:

[0058]

[0059] Calculation results Earth stress state evaluation value G i is 3.36, according to σ max =13.27MPa, G i =3.36, the evaluation result is: extremely high ground stress state.

[0060] At the same time, samples were taken near this measuring point for indoor testing. The test results showed that the natural uniaxial compressive strength of rock was R C is 15.0MPa. According to the classification criteria of "Appendix H High Ground Stress Assessment and Rockburst and Large Deformation Classification" of "Regulations on Unfavorable Geological Survey for Railway Engineering" (TB 10027-2022), the rock strength stress ratio R C / σ max is 1.13, and the assessment result is: extremely high ground stress state.

[0061] The results are consistent with those of indoor tests, indicating that this method is effective and reliable.

[0062] Embodiment 3:

[0063] Taking another railway tunnel as an example, at the mileage DY5K824+920, the overlying rock is buried at a depth of 337m, the surrounding rock grade is classified as Grade V, and the lithology is the Atula Formation (T3 a ) siltstone, the rock mass is tightly inlaid with only rough unweathered joints, and the joint spacing is 1 to 3m. Vertical downward drilling and hydraulic fracturing are carried out for test work. The test pressure curve at the drilling depth of 24.60m is as follows Figure 4 shown.

[0064] According to the test pressure curve, the burst pressure P is obtained. b is 13.00MPa, reopening pressure P r is 7.80MPa, closing pressure P s is 5.90MPa, and the water column pressure in the drill pipe is P w is 0.25MPa, and the pore water pressure P0 of the rock mass is 0.25MPa. The rock type in the tunnel site is siltstone, and the rock hardness coefficient k is selected as 14. The maximum horizontal principal stress S of the rock mass is calculated. H is 10.15MPa, vertical stress S V is 9.76MPa; the maximum horizontal principal stress k is greater than the vertical stress S V , take the maximum initial geostress σ max Equal to the maximum horizontal principal stress S H , which is 10.15MPa. Horizontal stress is the principal stress, and the following formula is used for calculation:

[0065]

[0066] Calculation results Earth stress state evaluation value G i is 7.17, according to σ max =10.15MPa, G i =7.17, the evaluation result is: high ground stress state.

[0067] At the same time, samples were taken near this measuring point for indoor testing. The test results showed that the natural uniaxial compressive strength of rock was R C is 29.5MPa. According to the classification criteria of "Appendix H High Ground Stress Assessment and Rockburst and Large Deformation Classification" of "Regulations on Unfavorable Geological Survey for Railway Engineering" (TB 10027-2022), the rock strength stress ratio R C / σ max is 2.91, and the assessment result is: high ground stress state.

[0068] The results are consistent with those of indoor tests, indicating that this method is effective and reliable.

Claims

1. A method for rapidly evaluating the ground stress state of a railway tunnel based on a hydraulic fracturing test, comprising the following steps: S1: By conducting hydraulic fracturing tests in the borehole, key parameters including fracture pressure P are obtained. b , reopening pressure P r , closing pressure P s , rock pore water pressure P0 and water column pressure in drill pipe P w ; S2: Determine the rock hardness coefficient k value, and select it according to the rock type in the tunnel site according to the rock hardness coefficient k value table in Table 1 below: Table 1 S3: Calculate the maximum horizontal principal stress S from the data obtained from the hydraulic fracturing test H and vertical stress S V Get the maximum initial ground stress σ max ; When the maximum horizontal principal stress S H Greater than the vertical stress S V When the maximum initial ground stress σ max Equal to the maximum horizontal principal stress S H ; When the vertical stress S V Greater than the maximum horizontal principal stress S H When the maximum initial ground stress σ max Equal to the vertical stress S V ; S4: Calculate the ground stress state evaluation index G according to the following formula i value: When the horizontal stress is the maximum initial ground stress, the ground stress state evaluation index G i The value calculation formula is: In the formula, G i is the evaluation index of ground stress state, P b is the burst pressure, P r is the reopening pressure, k is the rock hardness coefficient, P s is the closing pressure, P w is the water column pressure in the drill pipe, P0 is the pore water pressure in the rock mass; When the vertical stress is the maximum initial ground stress, the ground stress state evaluation index G i The value calculation formula is: In the formula, G i is the evaluation index of ground stress state, P b is the burst pressure, P r is the reopening pressure, k is the rock hardness coefficient, ρ is the rock density, g is the gravity acceleration, and H is the depth of the overlying rock above the measuring point; S5: Evaluation of the ground stress state index G i Value and maximum initial geostress σ max Based on the value, quickly evaluate the ground stress state according to the ground stress state classification table in Table 2: Table 2 2. A method for rapidly evaluating the geostress state of a railway tunnel based on a hydraulic fracturing test according to claim 1, characterized in that: In step S3, when the maximum horizontal principal stress S H Greater than the vertical stress S V When the maximum initial ground stress σ max Equal to the maximum horizontal principal stress S H ; When the vertical stress S V Greater than the maximum horizontal principal stress S H When the maximum initial ground stress σ max Equal to the vertical stress S V .

3. A method for rapidly evaluating the geostress state of a railway tunnel based on a hydraulic fracturing test according to claim 1, characterized in that: In step S5, the evaluation of the ground stress state should simultaneously meet the ground stress state evaluation index G i Value and maximum initial geostress σ max Two indicators.

4. A method for rapidly evaluating the ground stress state of a railway tunnel based on a hydraulic fracturing test according to claim 1, characterized in that: In step S5, the ground stress state includes low ground stress, medium ground stress, high ground stress and extremely high ground stress.