Hydrate sediment ring shear experiment device and method
By designing a hydrate sediment experimental device including a ring shear box and a pressure volume controller, the problems of long experimental period and large gas consumption were solved, and accurate measurement and inconsistency of the large deformation force of hydrate sediments were achieved. The control of drainage status simulates the mechanical properties of hydrates during submarine landslides, providing safety guarantee for the development of marine resources.
Patent Information
- Application Number
- CN202410914112.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2044-07-09
AI Technical Summary
The existing hydrate sediment ring shear experimental device has the problems of long experimental period, large gas consumption and insufficient control of the undrained state, and cannot effectively simulate the mechanical properties of hydrate sediments under large deformation.
A system including ring shear shear box, torsional and axial loading host, nitrogen gas source, methane gas source, pressure volume controller, water bath device, back pressure valve, gas-water separator, gas flow meter and data acquisition system was designed The device achieves precise measurement and control under low temperature and high pressure conditions by optimizing the structure and operating steps.
It achieves accurate measurement of the large deformation force of hydrate sediments, reduces gas consumption, ensures control of the undrained state of the experiment, simulates the mechanical properties of hydrates during submarine landslides, and provides more applicable engineering data.
Smart Images

Figure CN118746504A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of marine natural gas hydrate research, and in particular relates to a hydrate sediment ring shear experimental device and method. Background Art
[0002] Natural gas hydrates are a clean energy source with good development prospects, due to their high energy density, wide distribution, and large reserves. Due to their low temperature and high pressure formation conditions, hydrates are usually distributed in sediments on land permafrost, deep seabed, and at the edges of continents and islands. Global warming and ocean warming may make methane hydrates in slope sediments along the continental margin unstable, leading to slope damage. Therefore, it is urgent to simulate hydrate sediment landslide experimental devices in the laboratory to provide guarantees for the safe development of marine resources.
[0003] Due to the high pressure and low temperature conditions required for hydrate formation, existing conventional soil mechanics experimental devices cannot reflect the destruction characteristics of hydrate sediments under large deformation. Prior to the present invention, Qingdao Institute of Marine Geology proposed a ring shear failure simulation device and method for hydrate-containing sediments in 2021 (application number 202111439480.8); the device has some problems and shortcomings in hydrates and methods: 1. The experimental cycle is long. Since the reactor is full of gas and the thermal conductivity of the gas is low, a long time is required for temperature control to ensure temperature stability during the experiment; 2. Since hydrate formation only occurs inside the shear box in the experiment, a large amount of methane gas filled in the reactor is not used, the gas consumption is too large, and the hydrate saturation cannot be accurately measured; 3. Since the device uses a reactor to add a reactor outside the shear box, the ring shear experiment only occurs in the shear box. Due to the insufficient sealing of the shear box, the experiment cannot control the undrained state.
[0004] In response to the shortcomings in the Chinese invention patent with the invention name "A device and method for simulating ring shear failure of hydrate-containing sediments" and application number 202111439480.8, the applicant redesigned and optimized the hydrate sediment ring shear experimental device to overcome the defects of the above-mentioned device and provide strong hardware support for exploring the destruction mechanism of large deformation of hydrate sediments. Summary of the invention
[0005] The purpose of the present invention is to overcome the defects in the prior art and provide a hydrate sediment ring shear test device and method. The present invention can accurately measure the mechanical properties of hydrate sediments under large deformation, display them using a data acquisition system, and has simple operation and reliable structure.
[0006] The specific technical solutions adopted by the present invention are as follows:
[0007] In a first aspect, the present invention provides a hydrate sediment ring shear experimental device, including a ring shear shear box, a torsion and axial loading host, a nitrogen gas source, a methane gas source, a pressure volume controller, a water bath device, a back pressure valve, a gas-water separator, a gas flow meter and a data acquisition system;
[0008] The ring shear shear box comprises an upper pressure plate, an upper adapter, an upper heat insulation plate, a lower top cover, a base, a lower heat insulation plate, a lower adapter and a lower pressure plate which are coaxially connected in sequence from top to bottom; an annular groove for placing the sample is provided on the top of the base and serves as a pressure chamber, and an air inlet passage connected to the pressure chamber is provided on the base; an auxiliary inner ring and an auxiliary outer ring are respectively placed on the inner wall and the outer wall of the annular groove located in the upper half of the sample, and O-rings are respectively provided at the upper and lower ends of the auxiliary inner ring and the auxiliary outer ring, and an inner pressure plate and an outer pressure ring of the base for axial limiting are respectively provided on the top of the base above the auxiliary inner ring and the auxiliary outer ring; a temperature control cylinder is circumferentially provided on the outer side of the base; a groove is opened on the top of the lower top cover, and the groove A serpentine channel is provided at the bottom, and the notch at the upper part of the serpentine channel is sealed by the upper top cover; the serpentine channels of the temperature control cylinder and the lower top cover are connected to the water bath device for adjusting the temperature of the pressure chamber; an annular protrusion is provided at the bottom of the lower top cover, which extends into the pressure chamber and is sealingly and slidingly connected with the annular groove to make the pressure chamber in a sealed state; an air outlet channel connected to the pressure chamber is provided on the lower top cover, and a temperature sensor for measuring the temperature of the sample is provided on the lower top cover; the axial actuator at the upper end of the torsion and axial loading main machine is fixedly connected to the top of the upper pressure plate, and the torsion actuator at the lower end is fixedly connected to the bottom of the lower pressure plate, and the axial actuator, the ring shear box and the torsion actuator are coaxially arranged;
[0009] The air inlet channel is connected to the nitrogen gas source and the methane gas source respectively through a pipeline provided with a second valve, and the pipeline is also connected to the pressure volume controller through a branch provided with a first valve; the air outlet channel is connected to the third valve, the back pressure valve, the gas-water separator and the gas flow meter in sequence through the pipeline; the data acquisition system is connected to the pressure volume controller, the water bath device and the torsional and axial loading host.
[0010] Preferably, the auxiliary inner ring and the auxiliary outer ring are both made of 316L stainless steel, the lower top cover and the base are both made of 316L stainless steel, and the O-ring is made of Teflon.
[0011] Preferably, the air inlet channel is located below the pressure chamber, and the air outlet channel is located above the pressure chamber.
[0012] Preferably, the pressure chamber is a stepped structure along the vertical direction, and the cross-section of the annular groove in the upper half of the sample is larger than the cross-section of the annular groove in the lower half of the sample, and is used to place the auxiliary inner ring and the auxiliary outer ring.
[0013] Preferably, a water-permeable plate is detachably fixed to the bottom of the annular groove of the base and the bottom of the annular protrusion of the lower top cover, and a rib for transmitting torque is provided on one side of the water-permeable plate adjacent to the sample.
[0014] Preferably, a serpentine channel for the passage of water bath liquid is provided inside the temperature control cylinder along the circumference of the base.
[0015] Preferably, sealing rings and guide rings are sequentially sleeved on both inner and outer sides of the annular protrusion at the bottom of the lower top cover from bottom to top for sealing and sliding connection with the inner and outer walls of the pressure chamber.
[0016] Preferably, the inner pressure plate of the base, the outer pressure ring of the base and the top of the base are all detachably connected.
[0017] Preferably, sealing rings are provided between the auxiliary outer ring and the outer wall of the base pressure chamber, and between the auxiliary inner ring and the inner wall of the base pressure chamber.
[0018] In a second aspect, the present invention provides a testing method using any one of the hydrate sediment ring shear test devices described in the first aspect, which is as follows:
[0019] S1: Control the axial displacement loading of the torsion and axial loading host to make the lower top cover move downward into the base to seal the pressure chamber; close the first valve, the second valve, the third valve and the back pressure valve, open the nitrogen gas source, and then open the first valve, the second valve and the third valve in sequence, use a leak detection liquid to check for leaks at the pipeline connection to confirm that there is no leakage in the pipeline, and close the nitrogen gas source after the inspection;
[0020] S2: Perform axial loading longitudinal motion wear calibration and torsional loading friction resistance calibration on the torsional and axial loading hosts to determine the normal pressure loss P0 and torsional loss torque M0 during axial loading;
[0021] S3: Mix deionized water and soil sample evenly, put the mixed soil sample into the sample preparation mold, compact it layer by layer using a compaction tool, and take out the prepared sample after freezing it for 24 hours below zero;
[0022] S4: Open the back pressure valve to exhaust the gas in the pipeline; control the axial displacement loading of the torsion and axial loading host to move the lower cover upward, open the lower cover, and fix the ribbed permeable plate at the bottom of the annular groove of the base and the bottom of the annular protrusion of the lower cover respectively; place filter paper at the upper and lower ends of the sample respectively, and then put the whole into the annular groove of the base so that it is located between the two permeable plates, and then extend the annular protrusion of the lower cover into the pressure chamber to keep the pressure chamber sealed;
[0023] S5: Open the first valve and the second valve, open the back pressure valve and adjust it to the maximum opening; open the methane gas source, and inject methane gas into the pressure volume controller and the pressure chamber through the pipeline; when the pressure of the pressure volume controller rises to 0.5MPa, close the methane gas source, adjust the back pressure valve to the minimum opening, and close the third valve; adjust the pressure volume controller to control the pore pressure until the pore pressure of the pressure volume controller reaches 12Mpa; adjust the pressure volume controller to enter the constant pressure mode, and use the pressure volume controller to introduce methane gas into the pressure chamber; use the water bath device to adjust the temperature in the pressure chamber to 15°C to melt the ice in the sample; when the volume of methane gas in the pressure volume controller is no longer consumed, it is considered that the sample has reached full gas saturation, and S6 is performed to generate hydrates in situ;
[0024] S6: Use a water bath to adjust the temperature in the pressure chamber to 1°C so that the temperature of the sample is lower than the hydrate phase equilibrium temperature; when the volume of methane gas in the pressure volume controller does not change significantly again, it indicates that the water in the pores of the sample has completely reacted with the methane gas to form methane hydrate; according to the volume change of methane gas in the pressure volume controller when it is stable in S5 and S6, calculate the saturation of methane hydrate;
[0025] S7: According to the actual working conditions, the control mode of the pressure volume controller is determined, and the stress control and strain control at different loading rates are selected by the torsion and axial loading host to perform sample shearing, so that the sample forms a shear band at the bottom cross section of the auxiliary inner ring and the auxiliary outer ring; the stress control is a control method for controlling the rate of change of the stress increment, and the strain control is a control method for controlling the rate of change of the displacement; during the test, the torsion angle sensor reading, stress sensor reading, torque sensor reading, displacement sensor reading and pore pressure sensor reading are collected and recorded by the data acquisition system, and the mechanical properties of the large displacement shear of the hydrate are analyzed based on the collected data and the calibration parameters obtained in S2.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] (1) The present invention innovatively overcomes the drawback that the existing soil mechanics ring shear test device cannot conduct experimental research on the mechanical properties of hydrate sediments under large deformation under low temperature and high pressure conditions. An auxiliary ring is used to induce the sample to form a shear band in a specific area.
[0028] (2) The present invention can effectively control the undrained state of the experiment, accurately measure the pore pressure and temperature of the sample, and simulate the mechanical properties of hydrates under large deformation during submarine landslides, making the mechanical property indicators of hydrates obtained in the experiment more suitable for actual engineering.
[0029] (3) The testing method of the present invention is simple in overall operation, the instrument is easy to operate, and the results are accurate. It is of great significance in studying the mechanism of large deformation and destruction of hydrate sediments, and provides data support for subsequent research on experimental simulation of hydrate sediment landslides. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is an overall structural diagram of a hydrate sediment ring shear experimental device;
[0031] Figure 2 It is a structural diagram of a ring shear box of a hydrate sediment ring shear experimental device;
[0032] In the figure: 1 ring shear shear box; 2 torsion and axial loading main machine; 3 nitrogen gas source; 4 methane gas source; 5 pressure volume controller; 6 water bath device; 7 back pressure valve; 8 gas-water separator; 9 gas flow meter; 10 data acquisition system; 11a first valve; 11b second valve; 11c third valve; 12 upper pressure plate; 13 upper adapter; 14 upper insulation board; 15 upper top cover; 16 temperature sensor; 17 lower top cover; 18 air inlet channel; 19 temperature control cylinder; 20 lower insulation board; 21 lower adapter; 22 lower pressure plate; 23 base inner pressure plate; 24 base outer pressure ring; 25 auxiliary inner ring; 26 auxiliary outer ring; 27 test specimen; 28 water permeable plate; 29 air outlet channel; 30 base. DETAILED DESCRIPTION
[0033] The present invention is further described and illustrated below in conjunction with the accompanying drawings and specific embodiments. The technical features of each embodiment of the present invention can be combined accordingly without conflicting with each other.
[0034] like Figure 1 As shown, a hydrate sediment ring shear experimental device provided by the present invention mainly includes a ring shear shear box 1, a torsion and axial loading host 2, a nitrogen gas source 3, a methane gas source 4, a pressure volume controller 5, a water bath device 6, a back pressure valve 7, a gas-water separator 8, a gas flow meter 9 and a data acquisition system 10.
[0035] The structure and connection method of each component will be described in detail below.
[0036] In the present invention, if Figure 2 As shown, the ring shear box 1 includes an upper pressing plate 12, an upper adapter 13, an upper heat insulation plate 14, a lower top cover 17, a base 30, a lower heat insulation plate 20, a lower adapter 21 and a lower pressing plate 22 which are coaxially connected from top to bottom. An annular groove is provided on the top of the base 30 and serves as a pressure chamber. The annular groove is used to place a hollow cylindrical sample 27, that is, the cross section of the sample 27 is an annular structure matching the annular groove. An air inlet channel 18 connected to the pressure chamber is provided on the base 30, and an air outlet channel 29 connected to the pressure chamber is provided on the lower top cover 17.
[0037] In the present invention, if Figure 2 As shown, the inner wall and outer wall of the annular groove in the upper half of the sample 27 are respectively fixed with an auxiliary inner ring 25 and an auxiliary outer ring 26, and the upper and lower ends of the auxiliary inner ring 25 and the auxiliary outer ring 26 are respectively provided with O-rings, and the top of the base 30 located above the auxiliary inner ring 25 and the auxiliary outer ring 26 is respectively provided with a base inner pressure plate 23 and a base outer pressure ring 24 for axial limiting. The base inner pressure plate 23 and the base outer pressure ring 24 are detachably connected to the top of the base 30 to prevent the lower cover 17 from sliding up and down during the experiment, which causes the auxiliary ring to slide up and down.
[0038] In actual use, the auxiliary inner ring 25 and the auxiliary outer ring 26 can be made of stainless steel, and the O-rings arranged at the upper and lower ends can be made of corrosion-resistant organic materials (such as Teflon) with extremely small friction coefficients. The auxiliary inner ring 25 and the auxiliary outer ring 26 can induce the sample to form a shear band in a specific area (i.e., the O-ring at the bottom) during the shear process.
[0039] In actual use, in order to ensure a better installation effect, the pressure chamber can be set as a stepped structure in the vertical direction, and the cross section of the annular groove located in the upper half of the sample 27 is larger than the cross section of the annular groove located in the lower half of the sample 27, so as to facilitate the installation of the auxiliary inner ring 25 and the auxiliary outer ring 26 at the upper half of the annular groove. A ribbed permeable plate 28 is fixed to the bottom of the annular groove of the base 30, and a ribbed permeable plate 28 is fixed to the bottom of the annular protrusion of the lower top cover 17. Both permeable plates 28 are provided with ribs on one side adjacent to the sample 27, and the ribs are used to embed in the sample to transmit torque.
[0040] In actual use, a sealing ring can be provided between the auxiliary outer ring 26 and the outer wall of the pressure chamber of the base 30, and a sealing ring can be provided between the auxiliary inner ring 25 and the inner wall of the pressure chamber of the base 30. A sealing ring and a guide ring are sleeved on the annular protrusion at the bottom of the lower top cover 17, which are used for sealing and sliding connection with the inner and outer walls of the pressure chamber. Among them, the diameter of the guide ring in contact with the outer wall is slightly larger than the outer diameter of the part of the annular protrusion at the bottom of the lower top cover 17 entering the pressure chamber cavity of the base 30, and the diameter of the guide ring in contact with the inner wall is slightly smaller than the inner diameter of the part of the annular protrusion of the lower top cover 17 entering the pressure chamber cavity of the base 30, so as to avoid eccentricity of the lower top cover 17 during the experiment and realize high-pressure sealing of the experimental device.
[0041] In the present invention, if Figure 2As shown, a temperature control cylinder 19 is provided circumferentially on the outside of the base 30. A groove is provided on the top of the lower cover 17, and a serpentine channel is provided at the bottom of the groove. The notch on the upper part of the serpentine channel is sealed by the upper cover 15. In actual use, a serpentine channel for the passage of water bath liquid can also be provided inside the temperature control cylinder 19 along the circumference of the base 30. The serpentine channel can allow the liquid of the water bath device 6 to pass through, which can increase the heat exchange area and better and more accurately control the temperature inside the pressure chamber. The serpentine channel of the temperature control cylinder 19 and the lower cover 17 are both connected to the water bath device 6 for adjusting the temperature of the pressure chamber. An annular protrusion is provided at the bottom of the lower cover 17, which extends into the pressure chamber and is sealed and slidably connected with the annular groove to make the pressure chamber in a sealed state. A temperature sensor 16 for measuring the temperature of the sample 27 is provided on the lower cover 17. The sealing sliding here includes that the annular protrusion can make the lower cover 17 move vertically up and down in a sealed manner under the limit of the annular groove and the base 30 rotates in a sealed manner in a circumferential direction.
[0042] In actual use, the lower top cover 17 and the base 30 are made of corrosion-resistant and high-pressure resistant alloy (such as 316L stainless steel), which can prevent acidic substances from corroding the ring shear box 1.
[0043] In actual use, in order to facilitate the installation of the temperature sensor 16, a through hole for placing the temperature sensor 16 can be opened on the lower top cover 17, a channel for placing the temperature sensor 16 can be set on the upper adapter 13, and a through hole for the temperature sensor 16 to pass through can be set on the upper insulation board 14.
[0044] That is to say, for the ring shear shear box 1, the bottom of the upper pressure plate 12 is connected to the top of the upper adapter 13, the bottom of the upper adapter 13 is connected to the top of the upper insulation board 14, the bottom of the upper insulation board 14 is connected to the top of the lower top cover 17, the upper top cover 15 is fixed in the groove at the upper end of the lower top cover 17, the lower top cover 17 is slidably arranged in the annular pressure cavity of the base 30, the temperature control cylinder 19 is wrapped outside the base 30, the base outer pressure ring 24 and the base inner pressure ring 23 are respectively fixed on the outer ring and the inner ring at the top of the base 30, the upper and lower ends of the auxiliary outer ring 26 are respectively placed on the outer O-ring, the upper and lower ends of the auxiliary inner ring 25 are respectively placed on the inner O-ring, and the auxiliary outer ring 26 and the auxiliary inner ring 25 are respectively placed on the outer wall and the inner wall inside the pressure cavity of the base 30. A water-permeable plate 28 is fixed at the bottom of the annular groove of the base 30, and another water-permeable plate 28 is fixed on the top of the protrusion of the lower top cover 17. The sample 27 is placed inside the pressure cavity of the base 30 , the bottom of the base 30 is connected to the top of the lower insulation board 20 , the bottom of the lower insulation board 20 is connected to the top of the lower adapter 21 , and the bottom of the lower adapter 21 is connected to the top of the lower pressure plate 22 .
[0045] It should be noted that, in the present invention, unless otherwise specified, "upper adapter" and "lower adapter" refer to the names of connecting components and belong to the mechanical structure. The upper adapter 13 is used to connect the upper pressure plate 12 and the upper heat insulation plate 14, and the lower adapter 21 is used to connect the lower heat insulation plate 20 and the lower pressure plate 22.
[0046] In the present invention, if Figure 1 As shown, the torsion and axial loading main machine 2 adopts the device structure in the prior art, which includes an axial actuator at the upper end, a torsion actuator at the lower end, a force and torque sensor (for recording stress sensor readings and torque sensor readings), a displacement sensor, a torsion angle sensor, etc. The specific structure is not repeated here. Among them, the axial actuator at the upper end is fixedly connected to the top of the upper pressing plate 12, and the torsion actuator at the lower end is fixedly connected to the bottom of the lower pressing plate 22. The axial actuator, the ring shear box 1 and the torsion actuator are coaxially arranged.
[0047] In the present invention, if Figure 1 As shown, the air inlet channel 18 is connected to the nitrogen gas source 3 and the methane gas source 4 respectively through a pipeline provided with a second valve 11b, and the nitrogen gas source 3 and the methane gas source 4 are respectively provided with valves for controlling opening and closing. The air inlet channel 18 is also connected to the pressure volume controller 5 through a branch provided with a first valve 11a. Along the flow direction of the medium, the air outlet channel 29 is connected to the third valve 11c, the back pressure valve 7, the gas-water separator 8 and the gas flow meter 9 in sequence through a pipeline. The data acquisition system 10 is connected to the pressure volume controller 5, the water bath device 6 and the torsion and axial loading host 2.
[0048] Using the above hydrate sediment ring shear test device, the present invention also provides a testing method, which is specifically as follows:
[0049] Before the experiment, Figure 1 Check whether the pipelines of the device are connected correctly, as shown below:
[0050] The water bath channel on the temperature control cylinder 19 is connected to the water bath device 6 using a flexible pipeline (such as a rubber tube) to achieve temperature control of the ring shear shear box 1. The air inlet channel 18 is connected to the pressure volume controller 5, the methane gas source 4 and the nitrogen gas source 3 through the first valve 11a and the second valve 11b respectively using a pressure-resistant pipeline (such as a steel pipe) to achieve pore pressure control of the sediment sample. Among them, the methane gas source 4 provides the sediment sample with the gas supply required for the in-situ generation of hydrates, and the nitrogen gas source 3 is mainly used for pipeline leak detection. The outlet channel 29 of the hydrate sediment ring shear experimental device is connected to the back pressure valve 7, the gas-water separator 8 and the gas flowmeter 9 through the third valve 11c respectively using a pressure-resistant pipeline to achieve back pressure control of the sediment sample. Among them, the gas flowmeter 9 is used to calculate the hydrate saturation change of the sediment sample in the decomposition experiment. The temperature sensor 16, the pressure volume controller 5, the torsion and axial loading host 2, and the water bath device 6 are connected to the data acquisition system 10 to achieve data acquisition of the device of the present invention during the experiment.
[0051] After confirming that all pipelines in the device are connected correctly, perform the following operations in sequence:
[0052] S1, experimental leak detection:
[0053] Control the axial displacement loading of the torsion and axial loading host 2 to make the lower cover 17 move downward into the base 30 to form a closed pressure chamber. Close the first valve 11a, the second valve 11b, the third valve 11c and the back pressure valve 7, open the nitrogen source 3, and then open the first valve 11a, the second valve 11b and the third valve 11c in sequence, use a leak detection liquid to check for leaks at the pipeline connection to confirm that there is no leakage in the pipeline. If there is a leak, the corresponding valve nut needs to be retightened. After the inspection, close the nitrogen source 3.
[0054] S2, loss calibration:
[0055] The torsion and axial loading main machine 2 is subjected to axial loading longitudinal motion wear calibration and torsion loading friction resistance calibration to determine the normal pressure loss P0 and torsion loss torque M0 during axial loading.
[0056] S3, sample preparation:
[0057] According to the working conditions required by the experiment, deionized water and the soil sample are uniformly mixed, the mixed soil sample is placed in a sample preparation mold, and compacted in layers (e.g., 8 layers) using a compaction tool, and the prepared sample 27 is placed in a refrigerator and taken out after being frozen below zero for 24 hours.
[0058] S4, specimen installation:
[0059] Open the back pressure valve 7 to remove the gas in the pipeline; control the axial displacement loading of the torsion and axial loading host 2 to move the lower cover 17 upward, open the lower cover 17, and fix the ribbed permeable plate 28 at the bottom of the annular groove of the base 30 and the bottom of the annular protrusion of the lower cover 17; place filter papers at the upper and lower ends of the sample 27, and then put the sample 27 and the filter papers on both sides of it into the annular groove of the base 30 as a whole, so that the whole is located between the two permeable plates 28, and then extend the annular protrusion of the lower cover 17 into the pressure chamber to keep the pressure chamber sealed, and the two permeable plates 28 clamp the sample 27. Among them, the ribs of the permeable plate need to be pressed into the sample to facilitate the transmission of torque.
[0060] S5, sample saturation:
[0061] Open the first valve 11a and the second valve 11b, open the back pressure valve 7 and adjust it to the maximum opening. Open the methane gas source 4, and inject the methane gas into the pressure volume controller 5 and the pressure chamber through the pipeline. When the pressure of the pressure volume controller 5 rises to 0.5MPa, close the methane gas source 4, adjust the back pressure valve 7 to the minimum opening, and close the third valve 11c. Adjust the pressure volume controller 5 to control the pore pressure until the pore pressure of the pressure volume controller 5 reaches 12Mpa. Adjust the pressure volume controller 5 to enter the constant pressure mode (i.e. stabilize at 12Mpa), and use the pressure volume controller 5 to introduce methane gas into the pressure chamber. Use the water bath device 6 to adjust the temperature in the pressure chamber to 15°C to melt the ice in the sample 27. When the volume of methane gas in the pressure volume controller 5 is no longer consumed, it is considered that the sample 27 has reached complete gas saturation, and S6 is performed to generate hydrates in situ.
[0062] S6, hydrate in situ generation:
[0063] The temperature in the pressure chamber is adjusted to 1°C by using the water bath device 6, so that the temperature of the sediment sample 27 is lower than the hydrate phase equilibrium temperature. When the volume of the methane gas in the pressure volume controller 5 does not change significantly again, it indicates that the water in the pores of the sample 27 has completely reacted with the methane gas to form methane hydrate. The saturation of methane hydrate is calculated based on the volume change of the methane gas in the pressure volume controller 5 when it is stable in S5 and S6.
[0064] S7, specimen shear:
[0065] According to the actual working conditions, the control mode of the pressure volume controller is determined, and the torsion and axial loading host 2 is used to select and use different control loading methods according to the actual working conditions, that is, stress control and strain control are selected to perform a shear test on the sample 27, so that the sample 27 forms a shear band at the bottom cross section of the auxiliary inner ring 25 and the auxiliary outer ring 26. Among them, stress control is a control method for controlling the rate of change of stress increment, and strain control is a control method for controlling the rate of change of displacement. Both sets of control methods can determine different loading rates according to needs. During the test, it can be stopped manually or automatically stopped by setting the failure criterion. At the same time, during the test, the torsion angle sensor degree, stress sensor reading, torque sensor reading, displacement sensor reading and pore pressure sensor reading are collected and recorded by the data acquisition system 10. According to the collected data and the calibration parameters obtained by S2, the mechanical properties of hydrate large displacement shear are analyzed.
[0066] Compared with the existing technology (including the Chinese invention patent with the invention name of "A device and method for simulating ring shear failure of hydrate-containing sediments" and application number 202111439480.8), the present invention can effectively control the undrained state of the experiment, reduce gas consumption, accurately measure the hydrate saturation, and accurately control the temperature of the hydrate sediment sample, while being able to generate hydrate sediments in situ in the shear box and obtain the mechanical strength of the hydrate sediments under large deformation, thereby providing strong hardware support for exploring the deformation mechanism of hydrate sediment landslides.
[0067] The above-described embodiment is only a preferred solution of the present invention, but it is not intended to limit the present invention. A person skilled in the relevant technical field may make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, any technical solution obtained by equivalent replacement or equivalent transformation falls within the protection scope of the present invention.
Claims
1. A hydrate sediment ring shear test device, characterized in that: It comprises a ring shear box (1), a torsion and axial loading main machine (2), a nitrogen gas source (3), a methane gas source (4), a pressure volume controller (5), a water bath device (6), a back pressure valve (7), a gas-water separator (8), a gas flow meter (9) and a data acquisition system (10); The ring shear box (1) comprises an upper pressure plate (12), an upper adapter (13), an upper heat insulation plate (14), a lower top cover (17), a base (30), a lower heat insulation plate (20), a lower adapter (21) and a lower pressure plate (22) which are coaxially connected in sequence from top to bottom; an annular groove for placing a sample (27) is provided on the top of the base (30) and serves as a pressure chamber, and an air inlet channel (18) connected to the pressure chamber is provided on the base (30); an auxiliary inner ring (25) and an auxiliary outer ring (26) are respectively placed on the inner wall and outer wall of the annular groove located in the upper half of the sample (27), and O-rings are respectively provided at the upper and lower ends of the auxiliary inner ring (25) and the auxiliary outer ring (26); a base inner pressure plate (23) and a base outer pressure ring (24) for axial limiting are respectively provided on the top of the base (30) located above the auxiliary inner ring (25) and the auxiliary outer ring (26); the outer side of the base (30) is circumferentially A temperature control cylinder (19) is provided; the top of the lower cover (17) is grooved, and a serpentine channel is provided at the bottom of the groove, and the groove at the upper part of the serpentine channel is sealed by the upper cover (15); the temperature control cylinder (19) and the serpentine channel of the lower cover (17) are both connected to the water bath device (6) for adjusting the temperature of the pressure chamber; the bottom of the lower cover (17) is provided with an annular protrusion, which extends into the pressure chamber and is sealed and slidably connected with the annular groove so that the pressure chamber is in a sealed state; an air outlet channel (29) connected to the pressure chamber is provided on the lower cover (17), and a temperature sensor (16) for measuring the temperature of the sample (27) is provided on the lower cover (17); the axial actuator at the upper end of the torsion and axial loading main machine (2) is fixedly connected to the top of the upper pressure plate (12), and the torsion actuator at the lower end is fixedly connected to the bottom of the lower pressure plate (22), and the axial actuator, the ring shear box (1) and the torsion actuator are coaxially arranged; The air inlet channel (18) is connected to a nitrogen gas source (3) and a methane gas source (4) respectively through a pipeline provided with a second valve (11b), and the pipeline is also connected to a pressure volume controller (5) through a branch provided with a first valve (11a); the air outlet channel (29) is connected to a third valve (11c), a back pressure valve (7), a gas-water separator (8) and a gas flow meter (9) in sequence through a pipeline; the data acquisition system (10) is connected to the pressure volume controller (5), a water bath device (6) and a torsional and axial loading host (2).
2. A hydrate sediment ring shear test device according to claim 1, characterized in that: The auxiliary inner ring (25) and the auxiliary outer ring (26) are both made of 316L stainless steel, the lower top cover (17) and the base (30) are both made of 316L stainless steel, and the O-ring is made of Teflon.
3. A hydrate sediment ring shear test device according to claim 1, characterized in that: The air inlet channel (18) is located below the pressure chamber, and the air outlet channel (29) is located above the pressure chamber.
4. A hydrate sediment ring shear test device according to claim 1, characterized in that: The pressure chamber is a stepped structure along the vertical direction. The cross section of the annular groove in the upper half of the sample (27) is larger than the cross section of the annular groove in the lower half of the sample (27), and is used to place the auxiliary inner ring (25) and the auxiliary outer ring (26).
5. The hydrate sediment ring shear test device according to claim 1, characterized in that: The bottom of the annular groove of the base (30) and the bottom of the annular protrusion of the lower top cover (17) are respectively detachably fixed with a water-permeable plate (28), and a rib for transmitting torque is arranged on one side of the water-permeable plate (28) adjacent to the sample (27).
6. A hydrate sediment ring shear test device according to claim 1, characterized in that: The temperature control cylinder (19) is provided with a serpentine channel along the circumference of the base (30) for the water bath liquid to pass through.
7. A hydrate sediment ring shear test device according to claim 1, characterized in that: The inner and outer sides of the annular protrusion at the bottom of the lower top cover (17) are sleeved with sealing rings and guide rings in sequence from bottom to top, which are used for sealing and sliding connection with the inner wall and outer wall of the pressure chamber.
8. The hydrate sediment ring shear test device according to claim 1, characterized in that: The base inner pressure plate (23) and the base outer pressure ring (24) are all detachably connected to the top of the base (30).
9. A hydrate sediment ring shear test device according to claim 1, characterized in that: Sealing rings are provided between the auxiliary outer ring (26) and the outer wall of the pressure chamber of the base (30), and between the auxiliary inner ring (25) and the inner wall of the pressure chamber of the base (30).
10. A testing method using the hydrate sediment ring shear test device according to any one of claims 1 to 9, characterized in that: The details are as follows: S1: Control the axial displacement loading of the torsion and axial loading main machine (2) to make the lower top cover (17) move downward into the base (30) to seal the pressure chamber; close the first valve (11a), the second valve (11b), the third valve (11c) and the back pressure valve (7), open the nitrogen gas source (3), then open the first valve (11a), the second valve (11b) and the third valve (11c) in sequence, use a leak detection liquid to check for leaks at the pipeline connection to confirm that there is no leakage in the pipeline, and close the nitrogen gas source (3) after the inspection is completed; S2: Perform axial loading longitudinal motion wear calibration and torsional loading friction resistance calibration on the torsional and axial loading main machine (2), and determine the normal pressure loss P0 and torsional loss torque M0 during axial loading; S3: Evenly mix the deionized water and the soil sample, put the mixed soil sample into a sample preparation mold, compact it layer by layer using a compaction tool, and take out the prepared sample (27) after freezing it at sub-zero temperature for 24 hours; S4: Open the back pressure valve (7) to discharge the gas in the pipeline; control the axial displacement loading of the torsion and axial loading main unit (2) to move the lower cover (17) upward, open the lower cover (17), and fix the ribbed water-permeable plate (28) at the bottom of the annular groove of the base (30) and at the bottom of the annular protrusion of the lower cover (17); place filter paper at the upper and lower ends of the sample (27), and then put the whole sample (27) into the annular groove of the base (30) so that it is located between the two water-permeable plates (28), and then extend the annular protrusion of the lower cover (17) into the pressure chamber to keep the pressure chamber sealed; S5: Open the first valve (11a) and the second valve (11b), open the back pressure valve (7) and adjust it to the maximum opening; open the methane gas source (4), and inject the methane gas into the pressure volume controller (5) and the pressure chamber through the pipeline; when the pressure of the pressure volume controller (5) rises to 0.5MPa, close the methane gas source (4), adjust the back pressure valve (7) to the minimum opening, and close the third valve (11c); adjust the pressure volume controller (5) to control the pore pressure until the pore pressure of the pressure volume controller (5) reaches 12Mpa; adjust the pressure volume controller (5) to enter the constant pressure mode, and use the pressure volume controller (5) to introduce methane gas into the pressure chamber; use the water bath device (6) to adjust the temperature in the pressure chamber to 15°C to melt the ice in the sample (27); when the volume of methane gas in the pressure volume controller (5) is no longer consumed, it is considered that the sample (27) has reached full gas saturation, and S6 is performed to generate hydrates in situ; S6: Using a water bath device (6), the temperature in the pressure chamber is adjusted to 1°C, so that the temperature of the sample (27) is lower than the hydrate phase equilibrium temperature; when the volume of the methane gas in the pressure volume controller (5) does not change significantly again, it indicates that the water in the pores of the sample (27) has completely reacted with the methane gas to form methane hydrate; based on the volume change of the methane gas in the pressure volume controller (5) when it is stable in S5 and S6, the saturation of methane hydrate is calculated; S7: According to the actual working conditions, the control mode of the pressure volume controller (5) is determined, and the stress control and strain control at different loading rates are selected by the torsion and axial loading host (2) to shear the sample (27), so that the sample (27) forms a shear band at the bottom cross section of the auxiliary inner ring (25) and the auxiliary outer ring (26); the stress control is a control method for controlling the stress increment change rate, and the strain control is a control method for controlling the displacement change rate; during the test, the torsion angle sensor reading, the stress sensor reading, the torque sensor reading, the displacement sensor reading and the pore pressure sensor reading are collected and recorded by the data acquisition system (10), and the mechanical properties of the hydrate large displacement shear are analyzed based on the collected data and the calibration parameters obtained in S2.
Citation Information
Patent Citations
Ring shear apparatus testing system for land-rock contact face
CN110044726A
Rotary ball stacked ring type shear box and ring shear apparatus with same
CN113252471A
Hydrate-containing sediment ring shear failure simulation device and method
CN114252351A
Device and method for testing interface mechanical parameters of hydrated soil containing natural gas
CN116448594A
Large bidirectional dynamic ring shear test system, test method and shear box
CN117538181A
Cited By
Hydrate-containing sediment ring shear-electrical property combined test device and method
CN119290621A