Machine learning and integrated metrology for inter-run optimization of chip-to-wafer alignment accuracy
By integrating the machine learning process in the bonding system, the misalignment between the chip and the substrate is measured and corrected, solving the problems of slow chip-to-wafer alignment process and prone to human error in the existing technology, achieving efficient and real-time Alignment optimization.
Patent Information
- Application Number
- CN202380023511.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-02-25
- Filing Date
- 2023-02-23
- Publication Date
- 2024-10-08
AI Technical Summary
The existing chip-to-wafer bonding alignment process relies on manual measurement and compensation of offsets, which is slow and prone to human error, and optimization is only performed after part replacement, failing to achieve precise alignment between real-time runs.
Employing a machine learning process in the integrated bonding system, the misalignment between the chip and the substrate is measured via an onboard inspection tool, a machine learning algorithm is used to determine corrective measurements, and these corrective measurements are applied in the bonder to optimize the alignment process.
Improves the accuracy and efficiency of chip-to-wafer alignment, reduces human error, enables real-time correction, and is suitable for continuous optimization between runs.
Smart Images

Figure CN118749131A_ABST
Abstract
Description
Technical Field
[0001] Embodiments of the present disclosure generally relate to methods, apparatuses, and systems for processing substrates. More specifically, embodiments of the present disclosure relate to methods, apparatuses, and systems for improving chip-to-wafer bonding alignment accuracy. Background Art
[0002] Accurate chip-to-wafer (C2W) alignment is critical to ensure electrical connectivity. Currently, alignment optimization typically relies on post-bonding misalignment measurements on a stand-alone tool and manually inputting the compensation offset into the bonder. This process is slow, prone to human error, and has limited optimization rounds. Further, this process is typically performed only after a part change to meet bonder alignment performance, rather than on a timely run-to-run (R2R) basis. Summary of the invention
[0003] A method for optimizing bonding alignment between a die and a substrate in an integrated bonding system comprises the following steps: using a bonder of the integrated bonding system, bonding a first die to a first substrate using a preset alignment setting; using a transfer arm / robot of the integrated bonding system, transferring the bonded die-substrate combination to an on-board inspection tool of the integrated bonding system; at the on-board inspection tool, inspecting the alignment of the bonding between the die and the substrate in the bonded die-substrate combination to determine a misalignment measurement representing the misalignment of the bonding between the die and the substrate in the bonded die-substrate combination; using a machine learning process, determining a correction measurement to be communicated to the bonder based on the misalignment measurement; and in the bonder, bonding different dies to different substrates using the determined machine learning-based correction measurement.
[0004] In some embodiments, the method may further include the steps of comparing the determined misalignment measurement to a threshold value to determine whether the determined misalignment of bonding between the die and the substrate in the bonded die-substrate combination is within an acceptable tolerance, and if the determined misalignment is determined to be not within an acceptable tolerance, then determining a correction measurement, and if the determined misalignment is determined to be within an acceptable tolerance and the determined misalignment is determined to be getting worse, then determining a correction measurement. The determined machine learning-based correction measurement may then be used to bond different dies to different substrates.
[0005] An apparatus for optimizing bonding alignment between a die and a substrate in an integrated bonding system includes a processor and a memory coupled to the processor, wherein the memory stores at least one of a program or instructions. The program or instructions, when executed by the processor, configure the apparatus to: cause a bonder of the integrated bonding system to bond a first die to a first substrate using a preset alignment setting; cause a transfer arm / robot of the integrated bonding system to transfer the bonded die-substrate combination to an onboard inspection tool of the integrated bonding system; cause the onboard inspection tool to inspect the alignment of bonding between the die and the substrate in the bonded die-substrate combination to determine a misalignment measurement representing the misalignment of bonding between the die and the substrate in the bonded die-substrate combination; determine a correction measurement to be communicated to the bonder based on the misalignment measurement using a machine learning process; and cause the bonder to bond different dies to different substrates using the determined correction measurement based on the machine learning.
[0006] In some embodiments, the apparatus further compares the determined misalignment measurement to a threshold value to determine whether the determined misalignment of bonding between the die and the substrate in the bonded die-substrate combination is within an acceptable tolerance, and if the determined misalignment is determined not to be within the acceptable tolerance, then a correction measurement is determined. If the determined misalignment is determined to be within the acceptable tolerance range, and the determined misalignment is determined to be increasingly severe, then a machine learning-based correction measurement may be determined, and a different die may be bonded to a different substrate using the determined machine learning-based correction measurement.
[0007] An integrated bonding system for optimizing bonding alignment between a die and a substrate comprises: a bonder that bonds a first die to a first substrate using a preset alignment setting; a transfer arm / robot that transfers the bonded die-substrate combination to an onboard inspection tool of the integrated bonding system; and an onboard inspection tool that inspects the alignment of the bonding between the die and the substrate in the bonded die-substrate combination to determine a misalignment measurement that represents the misalignment of the bonding between the die and the substrate in the bonded die-substrate combination, and uses a machine learning process to determine a correction measurement to be communicated to the bonder based on the misalignment measurement; wherein the bonder uses the determined machine learning-based correction measurement to bond different dies to different substrates.
[0008] In some embodiments, the onboard inspection tool further compares the determined misalignment measurement to a threshold value to determine whether the determined misalignment of bonding between the die and the substrate in the bonded die-substrate combination is within an acceptable tolerance, and if the determined misalignment is determined not to be within the acceptable tolerance, then a correction measurement is determined. If the determined misalignment is determined to be within the acceptable tolerance range, and the determined misalignment is determined to be increasingly severe, then a correction measurement is determined, and a different die is bonded to a different substrate using the determined machine learning-based correction measurement.
[0009] Other and further embodiments of the disclosure will be described below. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Embodiments of the present disclosure briefly summarized above and discussed in more detail below may be understood by reference to the illustrative embodiments of the present disclosure depicted in the accompanying drawings. However, the accompanying drawings illustrate only typical embodiments of the present disclosure and are therefore not to be considered limiting of scope, as the present disclosure may admit to other equally effective embodiments.
[0011] Figure 1 depicts a functional flow diagram of a typical chip-to-wafer (C2W) bonding process.
[0012] Figure 2 Depicted is a high-level block diagram of an integrated bonding system 100 , in accordance with an embodiment of the present principles.
[0013] Figure 3 A flow chart is depicted of a method in an integrated bonding system of the present principles for bonding a die and substrate / wafer(s) including alignment correction based on machine learning, according to an embodiment of the present principles.
[0014] Figure 4 Depicted is a diagram of an embodiment of the present principles in the context of a single die type on a substrate where misalignment is detected. Figure 3 Functional diagram of an embodiment of a method for bonding a die and substrate / wafer(s) including alignment correction based on machine learning.
[0015] Figure 5 A flow chart depicting an alternative method in an integrated bonding system of the present principles for bonding a die and substrate / wafer(s) including alignment correction based on machine learning and including a threshold comparison procedure, according to an embodiment of the present principles.
[0016] Fig. 6A A flow chart depicting a first portion of an alternative method in an integrated bonding system of the present principles for a multi-die bonding process on a substrate including alignment correction based on machine learning, according to an embodiment of the present principles.
[0017] Figure 6B A flow chart depicting a second portion of an alternative method in an integrated bonding system of the present principles for a multi-die bonding process on a substrate including alignment correction based on machine learning, according to an embodiment of the present principles.
[0018] Figure 7 Depicted is a functional diagram of an implementation of the method of FIG. 6 according to an embodiment of the present principles for bonding dies and substrate(s) / wafers including machine learning based alignment correction in a multi-die on substrate type scenario where misalignment is detected.
[0019] Figure 8 Depicted is a high-level block diagram of a controller / computing device suitable for use with embodiments of an integrated bonding system according to the present principles.
[0020] To facilitate understanding, the same reference numerals are used, where possible, to designate the same elements common to the drawings. The drawings are not drawn to scale and may be simplified for clarity. Elements and features of one embodiment may be beneficially incorporated into other embodiments without further description. DETAILED DESCRIPTION
[0021] Embodiments of methods, devices, and systems for improving chip-to-wafer alignment accuracy are provided herein. For example, methods, devices, and systems for improving chip-to-wafer alignment accuracy may include a bonder having an onboard inspection tool to enable inline measurement of any misalignment between a die and (multiple) substrates. Measurements from the onboard inspection tool may be communicated to a machine learning process / database that provides feedback to the bonder to correct any measured misalignment between (multiple) dies and (multiple) substrates based on the feedback. In some embodiments, measurements from the onboard inspection tool may be performed continuously, or, additionally or alternatively, measurements from the onboard inspection tool may be performed at predetermined intervals or dynamically determined intervals.
[0022] FIG1 depicts a functional flow chart 100 of a typical chip-to-wafer (C2W) bonding process. In FIG1 , the flow chart 100 is divided into a die side 110 and a substrate side 150. The die side 110 of FIG1 illustratively includes an upstream process 112, which may include patterning, chemical mechanical polishing / planarization (CMP), back-grinding, dicing, etc. The die side 110 of FIG1 further includes a die separation process 114, a wet cleaning process 116, a degassing process 118, a plasma process 120, a UV process 122, a die ejection and pick-up process 124, and a die flip 126 for a bonding process.
[0023] In the flowchart 100 of FIG. 1 , the substrate of the substrate side 150 may include a wafer with or without a silicon support or a glass supported silicon wafer, depending on the process flow and use case. In FIG. 1 , the substrate side 150 illustratively includes an upstream process 152, which may include a CMP process. The substrate side 150 of FIG. 1 further includes a plasma process 154, and a bonding die process / tool 156 to create a bonded wafer / die. In some embodiments of the present principles, the substrate side 150 may further include an optional wet cleaning process (not shown), and an optional degassing process (not shown). As depicted in FIG. 1 , after the bonding die process 156, the bonded wafer / die is transported to a separate post-bonding misalignment measurement process on an independent misalignment measurement tool 160. Any measured misalignment between the wafer and the die measured by the independent misalignment measurement tool 160 may be manually input into the bonding die process / tool 156 as a compensation offset to attempt to correct the measured misalignment. It should be noted that the illustrated process depicted in FIG. 1 is not intended to be a complete list or sequence of processes that may be included in a typical chip-to-wafer (C2W) bonding process, which may include more or fewer processes in the same or different sequence.
[0024] Figure 2 Depicted is a high-level block diagram of an integrated bonding system 100 , in accordance with an embodiment of the present principles. Figure 2 The integrated bonding system 100 illustratively includes a transfer arm / robot (not shown) in a main body 201, an integrated bonder 202, and an onboard misalignment measurement tool (illustratively an onboard metrology tool) 204. Figure 2 As depicted in FIG. 1 , at least one die (illustratively a plurality of singulated dies) 206 and at least one substrate / wafer 208 (illustratively a single substrate / wafer with organic tape) are input to Figure 2 The integrated bonding system 100 of the present invention is shown in FIG. The die 206 is bonded to the substrate / wafer 208 in the bonder 202, and then the misalignment between the die(s) 206 and the substrate / wafer 208 is measured in the onboard metrology tool 204 to determine any misalignment between the die(s) 206 and the substrate / wafer 208. In some embodiments of the present principles, the die(s) 206 may be bonded to the substrate / wafer 208 one at a time, and then the alignment may be measured according to the present principles. In alternative embodiments of the present principles, more than one die 206 may be bonded to the substrate / wafer 208 at a time, and then the alignment may be measured according to the present principles.
[0025] As in Figure 2 Described in Figure 2The integrated bonding system 200 may further include a plurality of other optional pre-processing chambers, illustratively including: a degas chamber 218 for, for example, reducing moisture and other volatiles from the tape; a plasma chamber 220 for cleaning surface residues, surface activation, and redox; a UV release chamber 222 for releasing the die from the dicing tape for die pick-up; a wet clean chamber 216 for cleaning the front and back sides of the substrate / wafer 208 and hydrating the substrate / wafer 208; and a factory interface and single or multiple atmospheric hosts (FI and AMM) integrated chamber 209 for achieving better Q time control and environmental control, such as particle control, light control, and humidity control. Figure 2 The integrated bonding system 200 may further include a controller / computing device 800 for performing the methods and processes of the present principles (described in more detail below). According to embodiments of the present principles, the controller / computing device 800 may be a local device or a remote server (such as a field service server) connected to the tool via means such as Ethernet. For example, in some embodiments of the present principles, the controller / computing device 800 may be connected to an onboard misalignment measurement tool of the present principles (such as Figure 2 More specifically, in some embodiments, the controller / computing device 800 may communicate with, and in some embodiments may be incorporated into, at least one of the bonder and / or the onboard misalignment measurement tool of the present principles.
[0026] Although for Figure 2 The integrated bonding system 200 depicts a specific number and type of optional chambers, but other embodiments of the integrated bonding system of the present principles may include more or fewer and different types of optional chambers in the same or different order as needed to complete the bonding process.
[0027] As mentioned above about Figure 2 As depicted, an integrated bonding system of the present principles (such as Figure 2 The integrated bonding system 200 may include a controller / computing device 800 (described in more detail below), for example, in the form of a computing device, to perform methods and computing functions of the present principles, such as machine learning processes. In various embodiments described in the present disclosure, the controller / computing device 800 of the present principles is specifically described as a computing device. For example, in some embodiments, the onboard metrology tool 204 may implement the computing device 800 to perform a machine learning process and provide a Figure 2The bonder 202 of the integrated bonding system 200 provides feedback information / data to correct any misalignment between the die and the substrate / wafer measured by the onboard metrology tool 204. According to the present principles, data associated with the computing device (e.g., machine learning data, measurement data) can be stored in the computing device (reference Figure 8 described in more detail) or any other memory accessible to the computing device.
[0028] An embodiment of the present principles provides a method for optimizing bonding alignment between at least one die and at least one substrate in an integrated bonding system, the method may include at least the following steps: using a bonder of the integrated bonding system, bonding a first die to a first substrate using a preset alignment setting; using a transfer arm / robot to transfer the bonded die-substrate combination to an onboard inspection tool of the integrated bonding system; at the onboard inspection tool, inspecting the alignment of the bonding between the die and the substrate in the bonded die-substrate combination to determine a misalignment measurement, the misalignment measurement representing the misalignment of the bonding between the die and the substrate in the bonded die-substrate combination; using a machine learning process, determining a correction measurement to be communicated to the bonder based on the misalignment measurement; and in the bonder, bonding different dies to different substrates using the new machine learning-based correction measurement.
[0029] For example, in some embodiments of the present principles, a machine learning process is used to train a model that represents acceptable (e.g., within tolerance) alignments between (multiple) dies and (multiple) substrates. That is, during training, the machine learning process can be exposed to examples of acceptably aligned dies and substrates and unacceptably aligned dies and substrates. During training, the machine learning process can learn to identify bonded dies and substrates with within-tolerance alignments, using a loss function in some embodiments. The machine learning process of the present principles can be further trained on the amount of adjustment to be made to, for example, a bonder so that the bonder improves the alignment between the bond between the die and the substrate in a more accurate manner (i.e., without overcorrection or undercorrection). Subsequently, during bonding of the die and substrate, a neural network can be used in the machine learning process of the present principles to identify acceptable (i.e., within tolerance) bonding between the die and substrate and unacceptable (i.e., out of tolerance) dies.
[0030] Figure 3 An integrated bonding system of the present principles (such as Figure 2 Flowchart of method 300 in an integrated bonding system 200 of the present invention for bonding a die and a substrate / wafer including alignment correction based on machine learning. Method 300 begins at 302 during which a bonder (such as Figure 2The bonder 202 of the integrated bonding system 200 of the embodiment of the present invention bonds the first die to the first substrate using a preset / historical alignment setting of the bonder 202. The method 300 may continue at 304.
[0031] At 304, an integrated bonding system of the present principles (such as Figure 2 The bonded die / substrate is transferred to an onboard integrated inspection tool (such as a Figure 2 The method 300 may continue to 306 .
[0032] At 306, an on-board integration inspection tool of the present principles (such as the on-board metrology tool 204) inspects the alignment of the bond between the die and the substrate to determine whether a misalignment (or, in some embodiments described below, an out-of-tolerance misalignment) exists between the die and the substrate to which the die is bonded. If a misalignment exists, the on-board metrology tool 204 measures the misalignment, the bonded first die / first substrate is discarded, and the method 300 proceeds to 308. If a misalignment does not exist, the bonded fist die / first substrate is saved, and the method 300 can proceed to 312.
[0033] At 308, a machine learning process of a computing device of an integrated inspection tool of the present principles (such as a machine learning process implemented by computing device 800 of onboard metrology tool 204) determines a correction signal / measurement to be communicated to a bonder of the present principles (such as bonder 202) based on the misalignment measurement to enable the bonder to correct, for example, a misalignment between a first die and a first substrate. In some embodiments, the machine learning process of computing device 800 takes into account previous and current measurements to determine a correction signal / measurement to be communicated to bonder 202 to accurately adjust any measured misalignment between the first die and the first substrate, for example, without overcorrecting or undercorrecting for greater accuracy. In some embodiments, the collected and determined data and machine learning data may be sent to an associated machine learning database to be stored for future use. That is, in accordance with the present principles and as described above, data associated with a computing device (e.g., machine learning data) may be stored on the computing device (referenced Figure 8 The method 300 may continue to 310.
[0034] At 310, the determined correction signal / measurement is communicated to a binder of the present principles (such as Figure 2 The method 300 may continue to 312.
[0035] At 312, an integrated bonding system of the present principles (such as Figure 2 The integrated bonding system 200 of the embodiment of the present invention determines whether there are any additional dies to be bonded to any substrate. For example, in some embodiments, the bonder 202 can determine whether there are any additional dies to be bonded to any substrate. If it is determined that there are more dies to be bonded to any substrate, the method can continue to 314 for at least one of the remaining dies. If it is determined that there are no more dies to be bonded to any substrate, the method 300 can be exited.
[0036] At 314, a binder (such as Figure 2 The bonder 202 of the integrated bonding system 200 of the present invention can compensate for the measured misalignment based on the correction signal / measurement determined by machine learning when bonding the second die to the second substrate. That is, according to the present principles, a different die is bonded to a different substrate using a new alignment setting based on machine learning. The method 300 can then return to 304, where the bonded die / substrate is transferred to the onboard metrology tool 204 using, for example, a transfer arm / robot, and the method 300 can proceed as before. Figure 3 The method 300 may end when there are no more dies to be bonded to any more substrates.
[0037] Figure 4 Depicted is a diagram of an embodiment of the present principles in the context of a single die type on a substrate where misalignment is detected. Figure 3 Functional diagram 400 of an embodiment of method 300 for bonding a die and substrate / wafer(s) including alignment correction based on machine learning.
[0038] At 402 , a bonder bonds first die(s) of type A to a first substrate S1 with a preset / historical alignment setting.
[0039] At 404, use e.g. Figure 2 The transfer arm / robot of the main body 201 of the integrated bonding system 200 transfers the bonded die / substrate S1-A to an onboard inspection tool (such as Figure 2 An onboard metrology tool 204 of the integrated bonding system 200).
[0040] At 406, the onboard inspection tool of the present principles measures the misalignment between the bonded die A and the substrate S1. In some embodiments, a correction signal / measurement is determined using a machine learning process of the onboard metrology tool 204 to correct the misalignment between the bonded die and the substrate. The collected and determined data may be sent to an associated machine learning database to be stored for future use.
[0041] exist Figure 4In the embodiment of the present invention, 450 depicts an illustrative top view of the misalignment between the bonded die A and the substrate S1, and 460 depicts an illustrative side view of the same misaligned bonding of the bonded die A and the substrate S1 (as shown by the corresponding copper bonding pads in the die A and the substrate S1).
[0042] At 408, the correction signal / measurement determined by the onboard metrology tool of the present principles is communicated to the bonder.
[0043] exist Figure 4 In the example of , 404, 406 and 408 are considered together as an onboard alignment check and machine learning loop. Figure 4 In the middle, there is an onboard alignment check and machine learning loop 1.
[0044] At 410 , the bonder counteracts the bonding misalignment between die A and substrate S1 based on the received correction signals / measurements.
[0045] At 412, the bonder bonds a different die A of the same type to a different substrate S2 with a new alignment setup based on the received correction signals / measurements.
[0046] At 414, a second onboard alignment check and machine learning loop is then performed. Figure 4 In the embodiment of FIG. 1 , after the bonder bonds different dies A of the same type to different substrates S2 using a new alignment setting, using, for example, Figure 2 The transfer arm / robot of the main body 201 of the integrated bonding system 200 transfers the bonded die / substrate S2-A to the onboard inspection tool of the present principle, which measures the misalignment between (multiple) bonded dies A and the substrate S2, and in some embodiments, uses a machine learning process to determine a second correction signal / measurement based on the latest misalignment data and historical data to correct the misalignment between the bonded die and the substrate, and conveys the correction signal / measurement determined by the onboard metrology tool of the present principle to the bonder.
[0047] exist Figure 4 In the embodiment of FIG. 4 , 470 depicts an illustrative top view of the misalignment between the bonded die A and the second substrate S2 as shown by the corresponding copper bonding pads in the die A and the substrate S2 .
[0048] exist Figure 4 In the example of , at 416 , the bonder counteracts the bonding misalignment between die A and substrate S2 based on the received second correction signal / measurement.
[0049] At 418, the bonder bonds a different third die A of the same type to a different third substrate S3 using a new alignment setup based on the received second correction signal / measurement.
[0050] In some embodiments of the present principles, the misalignment measurement may be compared to at least one threshold measurement to determine whether the misalignment needs to be corrected according to the present principles, or whether the misalignment is within an acceptable tolerance for completing electrical contact between the bonded die and the substrate. Figure 5 An integrated bonding system of the present principles (such as Figure 2 Flowchart of an alternative method 500 in an integrated bonding system 200 of the present invention for bonding a die and a substrate / wafer including alignment correction based on machine learning and including a threshold comparison procedure. The method 500 begins at 502 during which a bonder (such as Figure 2 The bonder 202 of the integrated bonding system 200 of the embodiment of the present invention bonds the first die to the first substrate using a preset / historical alignment setting of the bonder 202. The method 500 may continue at 504.
[0051] At 504, an integrated bonding system of the present principles (such as Figure 2 The integrated bonding system 200) uses, for example Figure 2 The transfer arm / robot of the main body 201 of the integrated bonding system 200 transfers the bonded die / substrate to an onboard integrated inspection tool (such as Figure 2 The method 500 may continue to 506 .
[0052] At 506, an onboard integration inspection tool of the present principles, such as the onboard metrology tool 204, inspects the alignment of the bonding between the first die and the first substrate to determine if there is a misalignment between the first die and the first substrate to which the first die is bonded. If there is a misalignment, the onboard metrology tool 204 measures the misalignment, the first bonded die / substrate is discarded, and the method 500 proceeds to 508. If there is no misalignment, the bonded die / substrate S1-A is saved, and the method 500 can jump to 514.
[0053] At 508, the measured misalignment value may be compared to a threshold value representing a maximum acceptable misalignment measurement. For example, in some embodiments of the present principles, the threshold value representing the maximum acceptable misalignment measurement may be stored, for example, in a memory of a computing device of the present principles (such as the computing device 800 of the onboard metrology tool 204). That is, according to the present principles, data associated with the computing device (e.g., threshold data) may be stored in the computing device (referenced to Figure 8 In a memory of the computing device 800 (described in more detail) or any other memory accessible to the computing device 800.
[0054] At 508, if the misalignment measurement is greater than the threshold, the method 500 may proceed to 510. If the misalignment measurement is less than the threshold, the method 500 may jump to 514. However, in some embodiments, when the misalignment measurement is less than the threshold, but based on the stored data of the previous runs, the amount of misalignment is trending upward / worsening, the method 500 may take preventive action based on machine learning / AI-enabled predictive analysis to provide the bonder with an updated correction offset so that the misalignment measurement can always be maintained at a minimum value. More specifically, in some embodiments, when the misalignment measurement is less than the threshold, but the amount of misalignment is trending upward / worsening, the method 500 may proceed to 510 instead of jumping to 514.
[0055] At 510, a machine learning process of a computing device of an integrated inspection tool of the present principles (such as a machine learning process implemented by a computing device 800 of an onboard metrology tool 204) determines a correction signal / measurement to be communicated to the bonder 202 based on the misalignment measurement (either outside a threshold tolerance, or within a threshold tolerance but trending upward / worsening) to enable the bonder to correct, for example, the misalignment between the first die and the first substrate. In some embodiments, the machine learning process of the computing device 800 takes into account previous and current measurements to determine the correction signal / measurement to be communicated to the bonder 202 to accurately adjust any measured misalignment between the first die and the first substrate, for example, without overcorrecting or undercorrecting for higher accuracy. The method 500 may continue to 512.
[0056] At 512, the determined correction signal / measurement is communicated to a binder of the present principles (such as Figure 2 The method 500 may continue to 514.
[0057] At 514, an integrated bonding system of the present principles (such as Figure 2 The integrated bonding system 200 of the embodiment of the present invention determines whether there are any additional dies to be bonded to any substrate. If it is determined that there are more dies to be bonded to any substrate, the method can continue to 516 for at least one of the remaining dies. If it is determined that there are no more dies to be bonded to any substrate, the method 500 can be exited.
[0058] At 516, a binder (such as Figure 2 The bonder 202 of the integrated bonding system 200 of the embodiment of the present invention can compensate the measured misalignment when bonding the selected remaining die to the substrate based on the correction signal / measurement determined by machine learning. That is, according to the present principles, the selected remaining die is bonded to the substrate using the new alignment setting based on machine learning. Then, the method 500 can return to 504, where the alignment setting is determined using, for example, Figure 2The transfer arm / robot of the body 201 of the integrated bonding system 200 transfers the bonded die / substrate to the onboard metrology tool 204 and the method 500 can proceed as before.
[0059] In some embodiments of the present principles, the same or different adhesives (such as Figure 2 In the integrated bonding system 200 of the bonding device 202), multiple dies are bonded to the same or different substrates. For example, Fig. 6A and Figure 6B (collectively referred to herein as FIG. 6 ) together depict an integrated bonding system of the present principles (such as Figure 2 6 ) is a flow chart of an alternative method 600 for a bonding process of multiple dies on a substrate, including alignment correction based on machine learning. An embodiment of the method 600 of FIG. 6 relates to an instance in which a first bonder is implemented to bond a first type of die to a substrate, and a second bonder is implemented to bond a second type of die to the same or different substrate.
[0060] The method 600 of FIG. 6 begins at 602 , during which a first bonder bonds a first die of a first type to a first substrate using a preset / historical alignment setting of the first bonder. The method 600 may continue at 604 .
[0061] At 604, an integrated bonding system of the present principles (such as Figure 2 The integrated bonding system 200 of the present invention transfers the bonded first die / first substrate to an onboard integrated inspection tool (such as Figure 2 The method 600 may continue to 606.
[0062] At 606, an onboard integration inspection tool of the present principles, such as the onboard metrology tool 204, inspects the alignment of the bonding between the first die and the first substrate to determine if there is a misalignment between the bonded first die / first substrate. If there is a misalignment, the onboard metrology tool 204 measures the misalignment, the bonded first die / first substrate is discarded, and the method 600 proceeds to 608. If there is no misalignment, the bonded first die / first substrate is saved, and the method 600 can proceed to 612 and proceed to 616 in parallel.
[0063] At 608, a machine learning process of a computing device of an integrated inspection tool of the present principles (such as a machine learning process implemented by computing device 800 of onboard metrology tool 204) determines a correction signal / measurement to be communicated to the first bonder based on the misalignment measurement to enable the bonder to correct the bond misalignment of the bond between the first die and the first substrate. Method 600 may continue to 610.
[0064] At 610 , the determined correction signal / measurement is communicated to the first bonder. Method 600 may continue at 612 .
[0065] At 612, an integrated bonding system of the present principles (such as Figure 2 The integrated bonding system 200 of the embodiment of the present invention may determine whether there are any other first-type dies to be bonded to any substrate. For example, in some embodiments, the first bonder may determine whether there are any other first-type dies to be bonded to any substrate. If it is determined that there are any more first-type dies to be bonded to any substrate, the method may continue to 614. If it is determined that there are no more dies to be bonded to any substrate, the method 600 may be exited.
[0066] At 614, the first bonder compensates for the measured bonding misalignment when bonding the selected remaining first type of die to the selected different substrate based on the correction signal / measurement determined by the machine learning. For example, in some embodiments, the first bonder bonds the second die of the first type to the second substrate using the correction signal / measurement determined based on the machine learning. The method 600 can then return to 604, where the bonded second die of the first type and the second substrate are transferred to the onboard metrology tool 204, and the method 600 can proceed as before.
[0067] At 616, the second bonder bonds the second type of die to the substrate having the first type of die bonded thereon using the preset / historical alignment settings of the second bonder. That is, in some embodiments, the detection of misaligned first type of die bonded on the substrate by the first bonder can be used as gating for bonding the second type of die on the substrate in the second bonder. The method 600 can proceed to 618.
[0068] At 618, an integrated bonding system of the present principles (such as Figure 2 The integrated bonding system 200 of the present invention transfers the bonded first-second die type / substrate combination to an on-board integrated inspection tool (such as Figure 2 The method 600 may continue to 620.
[0069] At 620, an onboard integration inspection tool of the present principles (such as onboard metrology tool 204) inspects the alignment of the bonding between the second type of die and the substrate on which the first type of die is bonded to determine if there is a misalignment between the bonded second type of die and the substrate on which the first type of die is bonded. If there is a misalignment, the misalignment is measured, the bonded first-second die type / substrate is discarded, and the method 600 proceeds to 622. If there is no misalignment, the bonded first-second die substrate is saved, and the method 600 can proceed to 626.
[0070] At 622, a machine learning process of a computing device of an integrated inspection tool of the present principles (such as a machine learning process implemented by computing device 800 of onboard metrology tool 204) determines a correction signal / measurement to be communicated to the second bonder based on the misalignment measurement to enable the bonder to correct the bond misalignment of the bond between the second die and the substrate. Method 600 may continue to 624.
[0071] At 624 , the determined correction signal / measurement is communicated to the second bonder. Method 600 may continue at 626 .
[0072] At 626, an integrated bonding system of the present principles (such as Figure 2 The integrated bonding system 200 of the embodiment of the present invention may determine whether there are any other second type of dies to be bonded to any substrate. For example, in some embodiments, the second bonder may determine whether there are any other second type of dies to be bonded to any substrate. If it is determined that there are any more second type of dies to be bonded to any substrate, the method may continue to 628. If it is determined that there are no more dies to be bonded to any substrate, the method 600 may be exited.
[0073] At 628, the second bonder compensates for the measured bonding misalignment when bonding the selected remaining second type of die to the selected different substrate based on the correction signal / measurement determined by machine learning. For example, in some embodiments, the second bonder bonds another different second type of die to the different substrate using the correction signal / measurement determined based on machine learning. The method 600 can then return to 618, where the bonded different second type of die and the different substrate are transferred to the onboard metrology tool 204, and the method 600 can proceed to 620 and continue as before.
[0074] Embodiments of the present principles for bonding multiple types of dies (such as method 600 of FIG. 6 ) may further include a threshold measurement procedure to determine whether a threshold measurement is required as in Figure 5In an embodiment of method 600, misalignment is corrected according to the present principles. For example, in an alternative embodiment of method 600 including a threshold comparison (referred to herein as method 600A), the misalignment measured at step 606 can be compared with a threshold representing a maximum acceptable misalignment measurement, for example, in step 607A (not shown). At step 607B (not shown), if the misalignment measurement is greater than the threshold, method 600A can proceed to 608 of method 600 described above. If the misalignment measurement is less than the threshold, method 600A can jump to 612 of method 600 described above. However, in some embodiments, when the misalignment measurement is less than the threshold, but based on stored data from previous runs, the amount of misalignment is trending upward / worsening, method 600A can take preventive action based on predictive analysis enabled by machine learning / AI to provide updated correction offsets to the bonder so that the misalignment measurement can always be kept at a minimum. More specifically, in some embodiments, when the misalignment measurement value is less than the threshold value, but the misalignment amount has an increasing / worsening trend, method 600A may continue to 608 instead of jumping to 612. Then, method 600A may proceed as described above in method 600.
[0075] Furthermore, although the embodiment of FIG. 6 depicts bonding of two types of dies, in some embodiments of the present principles, an integrated bonding system of the present principles (such as Figure 2 The integrated bonding system 200 ) may be implemented to bond more than two types of dies according to the present principles.
[0076] Figure 7 A functional diagram 700 depicts an implementation of a method 600 for bonding dies and substrate(s) / wafers including machine learning based alignment corrections in accordance with an embodiment of the present principles in a multi-die on substrate type scenario where misalignment is detected. Figure 7 In the example of FIG. 1 , the first bonder (bonder A) is implemented to bond a die of the first type (type A) to the substrate S. Further, in Figure 7 In the embodiment of FIG. 5 , the second bonder (bonder B) is implemented to bond the die of the second type (type B) to the substrate S.
[0077] exist Figure 7 In the example of FIG. 5 , at 702 , a first bonder (bonder A) bonds a first type of die A to a first substrate S1 using a preset / historical alignment setting of the first bonder (bonder A).
[0078] At 704, an onboard integration inspection tool of the present principles (such as onboard metrology tool 204) inspects the misalignment of the bond between die A and first substrate S1 and determines that there is misalignment between die A and first substrate S1 to which the die is bonded. Figure 7In the example of FIG. 1 , the onboard metrology tool 204 measures the misalignment and the bonded die / substrate S1 -A is discarded without bonding a second type of die B in a second bonder B, thereby preventing further loss of dies and substrates.
[0079] exist Figure 7 In the example of FIG. 7 , 750 depicts an illustrative side view of a bonded die A and substrate S1 with offset bonding shown by corresponding copper bond pads in die A and substrate S1 .
[0080] At 706, bonder A counteracts the measured bonding misalignment based on the machine learning determined correction signal / measurement determined from the measured misalignment and bonds another die of type A to the second substrate S2 using the new machine learning based alignment setting.
[0081] exist Figure 7 In the example of FIG. 7 , at 708 , an onboard integrated inspection tool of the present principles (such as onboard metrology tool 204 ) inspects the alignment of the bond between die A and second substrate S2 and determines that there is only a slight misalignment within an acceptable tolerance between die A and first substrate S1 to which the die is bonded. Figure 7 In the example of FIG. 2 , the onboard metrology tool 204 measures the misalignment and the bonded die / substrate S2 -A is saved.
[0082] exist Figure 7 In the example of FIG. 7 , 760 depicts an illustrative side view of a first type of die A and substrate S2 showing acceptable bonding within tolerance as shown by corresponding copper bond pads in die A and substrate S2 .
[0083] exist Figure 7 In the example of , at 710, bonder A counteracts the measured bonding misalignment based on the machine learning determined correction signal / measurement determined from the measured misalignment of die A on substrate S2, and bonds another die of type A to a third substrate S3 using a new machine learning based alignment setting in an attempt to optimize the alignment of the bond between the first type of die A and substrate S3. For example, in Figure 7 In the example of , 770 depicts an illustrative side view of a first type of die A and substrate S3 with optimized bonding alignment shown by corresponding copper bonding pads in die A and substrate S3. Figure 7 In the example of , the bonding of the first type of die A and the third substrate S3 is optimal, as depicted by 770 .
[0084] At 712, the process continues with an on-board integration inspection tool of the present principles, such as the on-board metrology tool 204, inspecting the alignment of the bond between the die A and the third substrate S3 to determine if there is any misalignment between the first type of die A and the third substrate S3.
[0085] exist Figure 7 In the example of , in parallel with 712 , and because the bonded alignment between die A and second substrate S2 is within acceptable tolerances, at 714 , a second bonder B bonds a second type of die B to the bonded substrate S2 -A using a preset / historical alignment setting.
[0086] At 716, an onboard integration inspection tool of the present principles (such as onboard metrology tool 204) inspects the alignment of the bond between the second type of die B and the bonded substrate S2-A and determines that there is only a slight misalignment within an acceptable tolerance between the die B and the bonded substrate S2-A to which the second type of die B is bonded. Figure 7 In the example of FIG. 2 , the onboard metrology tool 204 measures the misalignment and the bonded die / substrate S2 -AB is saved.
[0087] exist Figure 7 In the example of FIG. 7 , 780 depicts an illustrative side view of a second type of die B and a bonded substrate S2 -A showing acceptable bonding within tolerance as shown by corresponding copper bond pads in the die B and the bonded substrate S2 -A.
[0088] exist Figure 7 In the example of , at 718, the second bonder B counteracts the measured bonding misalignment based on the machine learning determined correction signal / measurement determined from the measured misalignment of die B on the bonded substrate S2-A and bonds another die of type B to the bonded substrate S3-A using the new machine learning based alignment setting in an attempt to optimize the alignment of the bond between the second type of die B and the bonded substrate S3-A. For example, in Figure 7 In the example of , 790 depicts an illustrative side view of a second type of die B and a bonded substrate S3-A, shown by corresponding copper bonding pads in the die B and the bonded substrate S3-A. Figure 7 In the example of , the bonding of the second type die B and the bonded substrate S3 -A is optimal, as depicted at 790 .
[0089] At 720, the process continues with an onboard integration inspection tool of the present principles, such as onboard metrology tool 204, inspecting the alignment of the bond between die B and bonded substrate S3-A to determine if there is any misalignment between the second type of die B and the bonded substrate S3-A.
[0090] Although in the above-described embodiments of the present principles, the embodiments are described as performing misalignment checks on the bonding of each die on each substrate in accordance with the present principles, the granularity of the frequency or amount of misalignment checks on the bonding in accordance with the present principles may be variable. For example, in some embodiments, the granularity of the frequency or amount of misalignment checks on the bonding may be based on at least one of the amount of time available to perform the bonding process and the amount of processing power / memory power of the integrated bonding system of the present principles. In some embodiments, the granularity of the frequency or amount of misalignment checks on the bonding may be based on predictions of the machine learning process / artificial intelligence process of the present invention, which may predict when a changing misalignment measurement may be out of tolerance based on trends in previous and current misalignment measurements.
[0091] In some embodiments, the inspection granularity can be dynamic. For example, in some embodiments, the sampling rate can depend on the maturity and stability of the bonding process. That is, the initial sampling rate can be very high, reaching 100% (all dies are inspected for all bonded substrates). Subsequently, for example, during the ramp-up of manufacturing volume, the sampling rate can be 20-80%. Then, during mass production of a very stable process with a proven high yield, the sampling rate can be <10%. The inspection granularity described above is exemplary only, and according to the present principles, the frequency of bonding inspection can include substantially any frequency.
[0092] According to the present principles, there can be multiple measurement points for die / substrate bonding. For example, in some embodiments, for thin dies (<200um thick), measurements can be taken at 4 points (such as at the corners of the die) or even at 5 points (corner + center) to capture potential misalignment caused by die warpage. In other embodiments, for thicker dies (>200um thick), measurements can be taken at 4 points, however, if the Cu bonding pad is large (>10um size) and the specifications / tolerances are not strict, it is possible to reduce the measurement to 2 die corners for quick inspection during mass production.
[0093] In some embodiments of the present principles, and as described above, some alignment measurements may include 5 measurements (4 corners and 1 center) sampled per die, and there may be up to 500 dies per wafer. Therefore, the control system dimension may be as large as 2500 control loops (5×500). Since there is no interaction between each control loop, these control loops may be viewed as 2500 single-input and single-output control loops, which the inventors view as multiple single-input and single-output (MSISO). The inventors herein propose an MSISO control system, which is designed on top of an exponentially weighted moving average (EWMA) model. The MSISO control system of the present principles enables configuration of multiple SISO parameters with the same context. That is, the MSISO control model design of the present principles simplifies configuration of multiple SISO parameters by reducing the strategy logic of multiple parameters in a single operation. The MSISO control system of the present principles supports control systems with a large number of inputs and outputs, such as systems with 1000 inputs and 1000 outputs. The benefit of the MSISO design of the present principles is that all 2500 control loops can be calculated at once, rather than looping through each control loop (2500 loops) one by one. The MSISO method of the present principles significantly improves the calculation time (or reduces the calculation load) relative to the currently available methods for processing control loops individually.
[0094] In some embodiments of the present principles, an onboard integrated inspection tool (such as Figure 2 The alignment measurements taken by the onboard metrology tool 204 of the integrated bonding system 200 of the embodiment of the present invention are weighted so that less trustworthy measurements (i.e., measurements taken under less than ideal conditions) are weighted less than trustworthy measurements (i.e., measurements taken under better conditions). For example, in some embodiments, the current last data point that appears unstable may be weighted 30%, and the historical, more reliable measurement may be weighted 70%. The weights may be tuning parameters that may be adjusted by the user.
[0095] Embodiments of the present principles may further implement a moving horizon technique that may be applied in each control loop. For example, an adjustment control loop for determining the alignment of a bonded die and substrate may be based on the last 10 data points (or a moving window of 10 data points). In the depicted example, the horizon length (e.g., 10) is a tuning parameter that may be adjusted by the user.
[0096] Figure 8 Depicted are integrated bonding systems suitable for use with the present principles, such as Figure 2A high-level block diagram of a controller / computing device 800 for use with an embodiment of an integrated bonding system 200 of the present invention. In some embodiments, the computing device 800 may be configured to implement the methods of the present principles in various embodiments as processor-executable executable program instructions 822 (e.g., program instructions that may be executed by processor(s) 810).
[0097] exist Figure 8 In an embodiment of the present invention, the computing device 800 includes one or more processors 810a-1110n coupled to a system memory 820 via an input / output (I / O) interface 830. The computing device 800 further includes a network interface 840 coupled to the I / O interface 830, and one or more input / output devices 850, such as a cursor control device 860, a keyboard 870, and (multiple) displays 880. In various embodiments, a user interface can be generated and displayed on the display 880. In some cases, it is contemplated that the embodiments can be implemented using a single instance of the computing device 800, while in other embodiments, multiple such systems, or multiple nodes constituting the computing device 800, can be configured to host different parts or instances of various embodiments. For example, in one embodiment, some elements can be implemented via one or more nodes of the computing device 800, which are different from the nodes implementing other elements. In another example, multiple nodes can implement the computing device 1100 in a distributed manner.
[0098] In different embodiments, computing device 800 may be any of various types of devices including, but not limited to, a personal computer system, a desktop computer, a laptop computer, a notebook computer, a tablet or netbook computer, a mainframe computer system, a handheld computer, a workstation, a network computer, a camera, a set-top box, a mobile device, a consumer device, a video game console, a handheld video game device, an application server, a storage device, a peripheral device such as a switch, a modem, a router, or generally any type of computing or electronic device.
[0099] In various embodiments, computing device 800 may be a uniprocessor system including one processor 810, or a multiprocessor system including several processors 810 (e.g., two, four, eight, or another suitable number). Processor 810 may be any suitable processor capable of executing instructions. For example, in various embodiments, processor 810 may be a general-purpose processor or an embedded processor implementing any of a variety of instruction set architectures (ISAs). In a multiprocessor system, each of processors 810 may typically, but not necessarily, implement the same ISA.
[0100] The system memory 820 may be configured to store program instructions 822 and / or data 832 that may be accessed by the processor 810. In various embodiments, the system memory 820 may be implemented using any suitable memory technology, such as static random access memory (SRAM), synchronous dynamic RAM (SDRAM), non-volatile / flash type memory, or any other type of memory. In the illustrated embodiment, program instructions and data for implementing any of the elements of the above-described embodiments may be stored within the system memory 820. In other embodiments, program instructions and / or data may be received, sent, or stored on different types of computer accessible media or on similar media separate from the system memory 820 or computing device 800.
[0101] In one embodiment, the I / O interface 830 may be configured to coordinate I / O traffic between the processor 810, the system memory 820, and any peripheral devices in the device (including the network interface 840 or other peripheral interfaces, such as the input / output device 850). In some embodiments, the I / O interface 830 may perform any necessary protocol, timing, or other data transformations to convert data signals from one component (e.g., the system memory 820) into a format suitable for use by another component (e.g., the processor 810). In some embodiments, the I / O interface 830 may include support for devices attached via various types of peripheral buses, such as a variant of the peripheral component interconnect (PCI) bus standard or the universal serial bus (USB) standard. In some embodiments, the functionality of the I / O interface 830 may be divided into two or more separate components, such as, for example, a north bridge and a south bridge. Moreover, in some embodiments, some or all of the functionality of the I / O interface 830 (such as an interface to the system memory 820) may be directly incorporated into the processor 810.
[0102] The network interface 840 may be configured to allow data to be exchanged between the computing device 800 and other devices (such as one or more external systems) attached to a network (e.g., network 890) or between nodes of the computing device 800. In various embodiments, the network 890 may include one or more networks, including, but not limited to, a local area network (LAN) (e.g., an Ethernet network or an enterprise network), a wide area network (WAN) (e.g., the Internet), a wireless data network, some other electronic data network, or some combination of the above. In various embodiments, the network interface 840 may support communication via a wired or wireless general data network (such as any suitable type of Ethernet network); via a digital fiber optic communication network; via a storage area network such as a Fibre Channel SAN; or via any other suitable type of network and / or protocol.
[0103] In some embodiments, input / output device 850 may include one or more display terminals, keyboards, keypads, touchpads, scanning devices, voice or optical recognition devices, or any other device suitable for inputting or accessing data by one or more computer systems. Multiple input / output devices 850 may exist in a computer system, or may be distributed on various nodes of computing device 800. In some embodiments, similar input / output devices may be separate from computing device 800 and may interact with one or more nodes of computing device 800 through a wired or wireless connection (such as via network interface 840).
[0104] Those skilled in the art will appreciate that computing device 800 is merely illustrative and is not intended to limit the scope of the embodiments. In particular, computer systems and devices may include any combination of hardware or software that may perform the indicated functions of various embodiments, including computers, network devices, Internet devices, PDAs, wireless phones, pagers, etc. Computing device 800 may also be connected to other devices not described, or may be operated as an independent system. In addition, in some embodiments, the functions provided by the described components may be combined in fewer components or distributed in additional components. Similarly, in some embodiments, the functions of some components in the described components may not be provided, and / or other additional functions may be available.
[0105] The computing device 800 can communicate with other computing devices based on various computer communication protocols, such as Wi-Fi, Bluetooth.RTM (and / or other standards for exchanging data over short distances, including protocols using short-wavelength radio transmissions), USB, Ethernet, cellular, ultrasonic local area communication protocols, etc. The computing device 800 may further include a web browser.
[0106] Although the computing device 800 is depicted as a general-purpose computer, the computing device 800 is programmed to perform various specialized control functions and is configured to act as a specialized, specific computer according to the present principles, and the embodiments may be implemented in hardware, such as an application-specific integrated circuit (ASIC). Therefore, the process steps described herein are intended to be broadly interpreted as being equivalently executable by software, hardware, or a combination thereof.
[0107] While the foregoing is directed to embodiments of the present disclosure, other and further embodiments of the present disclosure may be devised without departing from the basic scope thereof.
[0108] In the above description, many specific details, examples and scenarios are set forth in order to provide a more thorough understanding of the present principles. However, it will be understood that embodiments of the present principles can be practiced without these specific details. Further, such examples and scenarios are provided for illustration and are not intended to limit the teachings in any way. With the included description, one of ordinary skill in the art should be able to implement the appropriate functions without unnecessary experimentation.
[0109] References to "one embodiment" and the like in this specification indicate that the described embodiment may include a particular feature, structure, or characteristic, but every embodiment may not necessarily include the particular feature, structure, or characteristic. Such phrases do not necessarily refer to the same embodiment. In addition, when a particular feature, structure, or characteristic is described in conjunction with an embodiment, it is considered to be within the knowledge of those skilled in the art to implement such feature, structure, or characteristic in conjunction with other embodiments, whether or not explicitly indicated.
Claims
1. A method for optimizing bonding alignment between a die and a substrate in an integrated bonding system, the method The following steps are involved: Using a bonder of the integrated bonding system, bonding the first die to the first substrate using a preset alignment setting; using a transfer robot of the integrated bonding system, transferring the bonded die-substrate combination to an onboard inspection tool of the integrated bonding system; inspecting, at the onboard inspection tool, an alignment of the bond between the die and the substrate in the bonded die-substrate combination to determine a misalignment measurement representative of a misalignment of the bond between the die and the substrate in the bonded die-substrate combination; using a machine learning process, determining a correction measurement to be communicated to the bonder based on the misalignment measurement; as well as In the bonder, different dies are bonded to different substrates using the determined machine learning based correction measurements.
2. The method of claim 1, further comprising: The following steps are involved: Determine if there are any additional dies to be bonded to any substrates.
3. The method of claim 1, further comprising: The following steps are involved: The determined misalignment measurement is compared to a threshold value to determine whether the determined misalignment of the bond between the die and the substrate in the bonded die-substrate combination is within an acceptable tolerance. 4 . The method of claim 3 , wherein the threshold value represents a maximum allowable misalignment of the bond between the die and the substrate in the bonded die-substrate combination.
5. The method of claim 3, wherein if the determined misalignment is determined not to be within the acceptable tolerance, then determining the correction measure, and if the determined misalignment is determined to be within the acceptable tolerance, then enabling bonding of another die to the first substrate.
6. The method of claim 3, wherein the correction measure is determined if the determined misalignment is determined to be within an acceptable tolerance and the determined misalignment is determined to be getting worse. 7 . The method of claim 3 , wherein the another die comprises at least one of: a different type of die, and a die bonded to the first substrate using a different bonder of the integrated bonding system.
8. The method of claim 1, further comprising: The following steps are involved: After the step of bonding the different die to the different substrate using the determined machine learning based correction measurements, the method of claim 1 returns to the step of transferring the bonded die-substrate combination to the onboard inspection tool of the integrated bonding system.
9. A device for optimizing bonding alignment between a die and a substrate in an integrated bonding system, the device include: processor; as well as A memory, the memory being coupled to the processor, wherein at least one of a program or an instruction is stored in the memory, and the program or the instruction can be executed by the processor to configure the apparatus to: causing a bonder of the integrated bonding system to bond the first die to the first substrate using a preset alignment setting; causing a transfer robot of the integrated bonding system to transfer the bonded die-substrate combination to an onboard inspection tool of the integrated bonding system; causing the onboard inspection tool to inspect an alignment of the bond between the die and the substrate in the bonded die-substrate combination to determine a misalignment measurement representative of a misalignment of the bond between the die and the substrate in the bonded die-substrate combination; using a machine learning process, determining a correction measurement to be communicated to the bonder based on the misalignment measurement; as well as The bonder is caused to bond different dies to different substrates using the determined machine learning based correction measurements.
10. The apparatus of claim 9, wherein the apparatus is further configured to: Determine if there are any additional dies to be bonded to any substrates.
11. The apparatus of claim 9, wherein the apparatus is further configured to: The determined misalignment measurement is compared to a threshold value to determine whether the determined misalignment of the bond between the die and the substrate in the bonded die-substrate combination is within an acceptable tolerance.
12. The apparatus of claim 11, wherein the threshold represents a maximum allowable misalignment of the bond between the die and the substrate in the bonded die-substrate combination.
13. The apparatus of claim 11, wherein if the determined misalignment is determined not to be within the acceptable tolerance, then the correction measurement is determined, and if the determined misalignment is determined to be within the acceptable tolerance, then another die can be bonded to the first substrate.
14. The apparatus of claim 13, wherein the another die comprises at least one of: a different type of die, and a die bonded to the first substrate using a different bonder of the integrated bonding system.
15. The apparatus of claim 11, wherein the correction measure is determined if the determined misalignment is determined to be within an acceptable tolerance and the determined misalignment is determined to be getting worse.
16. The apparatus of claim 9, wherein the apparatus is further configured to: After the step of bonding the different die to the different substrate using the determined machine learning based correction measurements: again transferring the bonded die-substrate combination to the onboard inspection tool of the integrated bonding system ; again causing the onboard inspection tool to inspect the alignment of the bond between the die and the substrate in the bonded die-substrate combination to determine a misalignment measurement representative of the misalignment of the bond between the die and the substrate in the bonded die-substrate combination; determining, based on the misalignment measurement, a correction measurement to be communicated to the bonder, again using a machine learning process; and again causing the bonder to bond a different die to a different substrate using the determined machine learning based correction measurement.
17. An integrated bonding system for optimizing bonding alignment between a die and a substrate, the integrated bonding system include: a bonder that bonds the first die to the first substrate using a preset alignment setting; a transfer robot that transfers the bonded die-substrate combination to an onboard inspection tool of the integrated bonding system; as well as an on-board inspection tool that inspects alignment of the bond between the die and the substrate in the bonded die-substrate combination to determine a misalignment measurement representative of misalignment of the bond between the die and the substrate in the bonded die-substrate combination and determines, using a machine learning process, a correction measurement to be communicated to the bonder based on the misalignment measurement; wherein the bonder uses the determined machine learning based correction measurements to bond different dies to different substrates.
18. The system of claim 17, further comprising at least one of a plasma chamber, a UV release chamber, a wet clean chamber, an integration chamber, and a degas chamber for pre-processing at least one of the die and the substrate.
19. The system of claim 17, further comprising a different bonder for bonding at least one die of a different type than the first die to at least one substrate, the at least one substrate including the first substrate.
20. A system as claimed in claim 17, wherein the on-board inspection tool further compares the determined misalignment measurement with a threshold value to determine whether the determined misalignment of the bonding between the die and the substrate in the bonded die-substrate combination is within an acceptable tolerance, and if the determined misalignment is determined to be not within the acceptable tolerance, then determine the correction measurement, and if the determined misalignment is determined to be within the acceptable tolerance and the determined misalignment is determined to be increasingly severe, then determine the correction measurement, and the bonder uses the determined machine learning-based correction measurement to bond different dies to different substrates.
