Underwater heavy-load operation equipment laying and recovery system

By using the compensation arm in the underwater heavy-load operation equipment deployment and recovery system to adjust the tension of the umbilical cord and the steel cable to bear the weight of the equipment, the problem of damage caused by the frequent rewinding and release of the umbilical cord is solved, automatic tension compensation is achieved and the equipment can safely enter the water. Extended umbilical cable life.

CN118753452AActive Publication Date: 2024-10-11DALIAN MARITIME UNIVERSITY

Patent Information

Application Number
CN202411244271.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-10-11
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

The umbilical cords of existing underwater heavy-duty operation equipment are frequently rolled up and released during use, resulting in excessive or too small tension, which makes them easily damaged, and it is difficult to effectively compensate for tension fluctuations caused by displacement changes, affecting the service life.

Method used

A deployment and recovery system for underwater heavy-load operation equipment is designed. The compensation arm drives the compensation arm to move the fairlead to swing up and down to adjust the tension of the umbilical cable and reduce the frequent winding and release of the umbilical cable storage winch. Steel cables are used Bear the weight of the equipment and reduce the bending and damage of the umbilical cord.

Benefits of technology

Automatic compensation of the umbilical cord tension is realized, extending the service life of the umbilical cord, reducing the shaking of the equipment before entering the water, ensuring system safety, reducing damage to the umbilical cord, and reducing the system's footprint for easy maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118753452A_ABST
    Figure CN118753452A_ABST
Patent Text Reader

Abstract

The invention discloses an underwater heavy-load operation equipment laying and recovery system, and relates to the technical field of marine devices, and the underwater heavy-load operation equipment laying and recovery system comprises a take-up and pay-off system tower; the steel cable laying and recycling system is mounted on the take-up and pay-off system tower and connected with a heavy-load equipment take-up and pay-off support through a steel cable, and the heavy-load equipment take-up and pay-off support can be connected with underwater heavy-load operation equipment in a locked mode and used for laying and recycling the underwater heavy-load operation equipment; the compensation device comprises a compensation arm, a compensation arm moving fairlead wheel is arranged at the tail end of the compensation arm, and the tail end of the compensation arm can drive the compensation arm moving fairlead wheel to swing up and down; an umbilical cable is wound on the umbilical cable storage winch, and one end of the umbilical cable bypasses the compensation arm moving cable guide wheel and then is connected with underwater heavy-load operation equipment. The compensation arm is used for driving the compensation arm moving fairlead wheel to swing up and down, the tension of the umbilical cable wound on the compensation arm moving fairlead wheel is changed, and therefore the tension of the umbilical cable can be adjusted and compensated without frequent winding and releasing of the umbilical cable by the umbilical cable storage winch.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of marine devices, and in particular to a deployment and recovery system for underwater heavy-load operation equipment. Background Art

[0002] With the increasing demand for ocean exploration and deep-sea mineral resources, many underwater heavy-duty equipment connected by umbilical cables have emerged. Umbilical cables are a special type of combined cable, which mainly consists of cables (power cables or signal cables), optical cables (single-mode or multi-mode optical cables), hydraulic or chemical pipes (steel pipes or hoses), etc. The design and function of umbilical cables play a vital role in marine engineering, especially in deepwater oil and gas exploration and development.

[0003] Due to its heavy weight, underwater heavy-load operation equipment poses a challenge to the safe operation of the ship's deployment and recovery system. In addition, due to its working characteristics, underwater heavy-load operation equipment needs to be equipped with a large umbilical cable for operation. The umbilical cable is an important lifeline for underwater heavy-load operation equipment, and the operation quality of the umbilical cable affects the safe operation of the system. During use, the umbilical cable needs to have a certain tension, but too much or too little tension may cause damage to the umbilical cable, thereby reducing its service life. One end of the umbilical cable is located on the umbilical cable storage winch on the ship, and the other end is connected to the underwater heavy-load operation equipment. The umbilical cable between the umbilical cable storage winch and the underwater heavy-load operation equipment needs to maintain the set tension. Due to the complexity of the marine environment, when the underwater heavy-load operation equipment is operating underwater, it often has a relatively small displacement change with the ship. When the displacement of the two changes, the tension on the umbilical cable needs to be compensated in time to avoid excessive tension or relaxation of the umbilical cable, which causes damage.

[0004] The existing umbilical cable compensation devices often use multiple pulleys and cooperate with the umbilical cable storage winch. When the displacement of the ship and the underwater heavy-load operation equipment changes slightly, the tension compensation function is achieved by frequently winding or releasing the umbilical cable between the ship and the underwater heavy-load operation equipment. The umbilical cable is a bending-sensitive cable, and frequent winding and releasing will greatly reduce the life of the cable. Therefore, it is urgent to design a solution that can compensate the tension of the umbilical cable without frequently winding and releasing the umbilical cable. Summary of the invention

[0005] The object of the present invention is to provide an underwater heavy-load operation equipment deployment and recovery system to solve the problems existing in the above-mentioned prior art. The compensating arm drives the compensating arm movable cable guide wheel to swing up and down, thereby changing the tension of the umbilical cable wound around the movable cable guide wheel of the compensating arm, thereby eliminating the need for the umbilical cable storage winch to frequently reel in and release the umbilical cable to adjust and compensate its tension.

[0006] To achieve the above object, the present invention provides the following solutions: The present invention provides a system for deploying and recovering underwater heavy-load operation equipment, comprising: Retractable system tower; The steel cable deploying and recovering system is installed on the tower of the deploying and recovering system, and is connected to a heavy-duty equipment deploying and recovering bracket through a steel cable. The heavy-duty equipment deploying and recovering bracket can be locked and connected with the underwater heavy-duty operation equipment to realize the deployment and recovery of the underwater heavy-duty operation equipment. The locking connection method of the heavy-duty equipment deploying and recovering bracket and the underwater heavy-duty operation equipment is not specifically limited. A metal structure with magnetic attraction ability such as an iron block can be fixedly set on the top of the underwater heavy-duty operation equipment, and an electromagnet is set at the bottom of the heavy-duty equipment deploying and recovering bracket. The adsorption locking and release unlocking of the underwater heavy-duty operation equipment can be realized by turning the power on and off of the electromagnet. Other structures can also be used. For example, a hanging ring is fixedly set on the top of the underwater heavy-duty operation equipment, and a clamp driven by an oil cylinder is set at the bottom of the heavy-duty equipment deploying and recovering bracket. The hanging ring is clamped by the clamp to realize the locking of the underwater heavy-duty operation equipment. When the underwater heavy-duty operation equipment is deployed, the hanging ring is released by controlling the clamp by the oil cylinder, so that the deployment of the underwater heavy-duty operation equipment can be realized.

[0007] The compensation device comprises a compensation arm, wherein a compensation arm movable fairlead wheel is provided at the end of the compensation arm, and the end of the compensation arm can drive the compensation arm movable fairlead wheel to swing up and down; The umbilical cable storage winch is wound with an umbilical cable. One end of the umbilical cable passes around the compensation arm and moves the cable guide wheel before being connected to the underwater heavy-duty operation equipment, thereby reducing damage to the umbilical cable. The umbilical cable storage winch is connected to an umbilical cable motor, which can control the rotation of the umbilical cable roller on the umbilical cable storage winch. The umbilical cable roller is used to wind the umbilical cable, thereby realizing the retraction and release of the umbilical cable. The steel cable of the steel cable laying and recovery system is used to bear the main weight of the underwater heavy-duty operation equipment during the water entry stage, thereby reducing the swaying of the equipment before entering the water. This fully ensures the operational safety of the umbilical cable, greatly reduces the bending of the umbilical cable, limits the swaying of the equipment before entering the water, ensures the operational safety of the system, increases the system life, and reduces the system footprint, thereby facilitating safe operation and maintenance.

[0008] Optionally, the retracting and launching system tower is arranged on one side of the ship deck; the retracting and launching system tower comprises an upper frame and a lower frame, the lower frame is fixed on the ship deck, the lower frame is provided with an umbilical cable storage winch slide rail, and the umbilical cable storage winch is slidably provided on the umbilical cable storage winch slide rail; the umbilical cable storage winch moves along the bow and stern direction of the ship on the umbilical cable storage winch slide rail, and a horizontally arranged hydraulic cylinder can be arranged here to control the horizontal sliding of the umbilical cable storage winch on the umbilical cable storage winch slide rail, and a screw nut mechanism can also be used to realize the sliding of the umbilical cable storage winch on the umbilical cable storage winch slide rail, the screw is arranged in parallel with the umbilical cable storage winch slide rail, the screw nut is connected with the umbilical cable storage winch, and the screw is driven to rotate by the screw nut motor, so that the screw nut drives the umbilical cable storage winch to move horizontally along the umbilical cable storage winch slide rail. When the umbilical cable completes one circle of storage on the umbilical cable storage winch, it moves a cable diameter to ensure that the umbilical cable is neatly arranged on the umbilical cable storage winch. Otherwise, the cables will cross due to poor cable arrangement quality on the umbilical cable storage winch, causing damage to the umbilical cable. The umbilical cable storage winch arranged in the manner of the present invention does not introduce additional bends during the cable arrangement process, fully protecting the umbilical cable. The upper frame is a T-shaped platform structure, and the upper frame is provided with the compensation arm and the steel cable laying and recovery system.

[0009] Optionally, the steel cable laying and recovery system includes two steel cable winches symmetrically arranged on both sides of the compensating arm, the steel cable winch transmission is connected to a steel cable retracting and discharging motor, and the retraction and release of the steel cable is achieved by controlling the rotation of the roller on the steel cable winch, and a steel cable is wound on the steel cable winch; steel cable guide pulley brackets are symmetrically provided on both sides of the end of the compensating arm, and a steel cable guide pulley is movably provided on the steel cable guide pulley bracket, one end of the steel cable on the steel cable winch is connected to the heavy-load equipment retracting and releasing bracket after passing through the steel cable guide pulley on the same side, the steel cable guide pulleys are arranged on both sides of the compensating arm and can be driven to deflect, the steel cable extends out from a steel cable winch, passes through the steel cable guide pulley on the same side, and is connected to the steel cable bearing heads arranged in pairs through the cable holes. Before the underwater heavy-load operation equipment enters the water, the main load-bearing of the steel cable winch and the steel cable is borne to avoid the load-bearing of the umbilical cable and damage to the equipment. In other embodiments, the steel cable bearing head can be arranged on the underwater heavy-load operation equipment according to actual needs. After the underwater heavy-load operation equipment is deployed, it is always connected to the steel cable to facilitate dragging the underwater heavy-load operation equipment to the heavy-load equipment retracting bracket. When the steel cable bearing head is set on the heavy-load equipment retracting bracket, when the underwater heavy-load operation equipment is recovered, the underwater heavy-load operation equipment is dragged and moved by the umbilical cable. Due to the buoyancy in the sea, the dragging of the umbilical cable does not require a lot of force, which can reduce the damage to the umbilical cable, and it is only briefly dragged to the heavy-load equipment recovery bracket during recovery. When the underwater heavy-load operation equipment is locked and connected with the heavy-load equipment recovery bracket, the umbilical cable is no longer needed to provide dragging force, and the steel cable is used to provide the force to drag the equipment up and recover.

[0010] Optionally, the upper frame is provided with an extension extending out of the ship's side near the sea surface; the steel cable deployment and recovery system includes a deployment track vertically fixed at the bottom of the extension, and the heavy-load equipment retracting bracket can move up and down along the deployment track; the deployment track is fixed on the outside of the retracting and releasing system tower and extends below the water surface. During the release of the underwater heavy-load operating equipment, the steel cable winch synchronously releases the cable, driving the heavy-load equipment retracting and releasing bracket to steadily lower the underwater heavy-load operating equipment along the deployment track until it is completely submerged in water, and the heavy-load equipment retracting and releasing bracket disconnects the locking connection with the underwater heavy-load operating equipment. The deployment track mainly has the function of limiting the freedom of the underwater heavy-load operating equipment before entering the water.

[0011] Optionally, the compensation device also includes a compensation arm fixing a fairlead wheel, and a horizontally arranged fairlead wheel shaft is installed on the end of the upper frame away from the sea surface through a connecting frame, and the fairlead wheel shaft is sleeved with the compensation arm fixing fairlead wheel, and the compensation arm fixing fairlead wheel can rotate on the fairlead wheel shaft; both ends of the fairlead wheel shaft are connected to one end of the compensation arm away from the compensation arm moving fairlead wheel; the lower part of the compensation arm is connected to a driving device, and the driving device can drive the compensation arm to rotate up and down around the fairlead wheel shaft.

[0012] Optionally, the driving device includes a compensating arm hydraulic cylinder, the bottom of which is fixedly arranged on the tower of the retracting and releasing system, the end of the telescopic rod of the compensating arm hydraulic cylinder passes through the through hole of the upper frame and is connected to the lower part of the compensating arm, and the compensating arm hydraulic cylinder drives the compensating arm to swing, and the compensating arm moves, so that the mobile fairlead wheel moves in the direction of at least a vertical main component relative to the tower of the retracting and releasing system. During the compensation process, the up and down movement of the mobile fairlead wheel compensates for the movement of the underwater heavy-load operation equipment relative to the deployment and recovery system, so as to keep the movement of the mobile fairlead wheel relative to the underwater heavy-load operation equipment smaller than the vertical component of the movement of the deployment and recovery system relative to the underwater heavy-load operation equipment. When the compensating arm hydraulic cylinder is in the middle position, the mobile fairlead wheel and the fixed fairlead wheel are at approximately the same height, and when the compensating arm hydraulic cylinder is extended, the compensating arm swings upward to increase the distance, and the compensating arm hydraulic cylinder is fully extended, and is now in the highest position, and the compensating arm hydraulic cylinder is retracted to reduce the distance, and the compensating arm hydraulic cylinder is fully retracted, and is now in the lowest position.

[0013] Optionally, the extension portion is provided with a cable hole or a U-shaped groove for the steel cable and the umbilical cable to pass through.

[0014] Optionally, an umbilical cable channel is provided on the heavy-load equipment retracting and releasing bracket, and after one end of the umbilical cable passes through the umbilical cable channel, it is connected to the underwater heavy-load operating equipment through the umbilical cable load-bearing head; an umbilical cable detection device is provided at the umbilical cable channel, and the umbilical cable detection device may include a visual sensor, a photoelectric sensor, a tension sensor, a tension tester, etc., which belongs to the existing technology structure and is used to detect the state of the umbilical cable, including the tension of the umbilical cable, the degree of surface damage, etc., and the detection data can be transmitted to the control system. The operator controls the compensation arm to swing up and down through the data of the control system to realize the tension compensation of the umbilical cable. The control system can adopt computers, numerical control devices, etc. in the existing technology, so no further details will be given, thereby realizing the state detection and management of the umbilical cable throughout its life cycle.

[0015] Optionally, a plurality of steel cable load-bearing heads are fixedly provided on the top of the heavy-load equipment retracting and releasing bracket, and one end of the steel cable is fixedly connected to the steel cable load-bearing head on the same side thereof.

[0016] Optionally, a bracket roller is provided on the inner side of the heavy-load equipment retracting bracket, and the bracket roller is rollingly arranged on the deployment track, so that the heavy-load equipment retracting bracket can only move along the deployment track direction, limiting the freedom of the underwater heavy-load operation equipment before entering the water, and reducing the swaying of the equipment. In addition to the underwater heavy-load operation equipment and the heavy-load equipment retracting bracket, the remaining structures of the present invention are arranged on the inner tower of the ship's side. During the operation and maintenance of the equipment, they are all easy to operate and well-lit open layouts. Reduce the safety risks of working outside the ship.

[0017] Compared with the prior art, the present invention has achieved the following technical effects: The umbilical cable of the present invention is connected to the underwater heavy-load operation equipment after passing through the compensation arm moving fairlead wheel. When the ship and the underwater heavy-load operation equipment are slightly away from each other, the tension on the umbilical cable increases, and the compensation arm is used to control the compensation arm moving fairlead wheel to swing downward, so that the tension on the umbilical cable decreases. When the ship and the underwater heavy-load operation equipment are slightly close to each other, the tension on the umbilical cable decreases, and the compensation arm is used to control the compensation arm moving fairlead wheel to swing upward, so that the tension on the umbilical cable increases, thereby eliminating the need to frequently reel in or release the umbilical cable, and realizing the tension compensation function of the umbilical cable. During the deployment and recovery of the underwater heavy-load operation equipment, the steel cable bears the gravity of the underwater heavy-load operation equipment, thereby avoiding excessive force on the umbilical cable during the deployment and recovery process, and reducing damage to the umbilical cable. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 This is a schematic diagram of the structure of the deployment and recovery system of the underwater heavy-load operation equipment of the present invention; Figure 2 It is a schematic diagram of lowering underwater heavy-load operation equipment of the underwater heavy-load operation equipment deployment and recovery system of the present invention; Figure 3 It is a schematic diagram of umbilical cable compensation of the underwater heavy-load operation equipment deployment and recovery system of the present invention; Figure 4 It is a schematic diagram of the cable storage state of the umbilical cable storage winch of the underwater heavy-load operation equipment deployment and recovery system of the present invention.

[0020] Explanation of the reference numerals: 1-umbilical cable storage winch; 2-umbilical cable; 3-compensating arm fixed cable guide wheel; 4-compensating arm; 5-compensating arm movable cable guide wheel; 6-umbilical cable detection device; 7-umbilical cable bearing head; 8-heavy-load equipment retracting and lowering bracket; 9-underwater heavy-load operation equipment; 10-retracting and lowering system tower; 11-umbilical cable storage winch slide rail; 12-cable winch; 13-cable; 14-cable guide pulley; 15-cable guide pulley bracket; 16-cable bearing head; 17-compensating arm hydraulic cylinder; 18-laying track; 19-bracket roller. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] The object of the present invention is to provide an underwater heavy-load operation equipment deployment and recovery system to solve the problems existing in the above-mentioned prior art. The compensating arm drives the compensating arm movable cable guide wheel to swing up and down, thereby changing the tension of the umbilical cable wound around the movable cable guide wheel of the compensating arm, thereby eliminating the need for the umbilical cable storage winch to frequently reel in and release the umbilical cable to adjust and compensate its tension.

[0023] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0024] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, this embodiment provides a system for laying and recovering underwater heavy-loaded operation equipment, including an umbilical cable processing system with a compensation function, a steel cable laying and recovery system, a tower 10 for the collection and release system, and a heavy-loaded equipment collection and release bracket 8; the umbilical cable processing system with a compensation function includes a movable umbilical cable storage winch 1 and a compensation arm 4; the steel cable laying and recovery system includes a pair of steel cable winches 12, a heavy-loaded equipment collection and release bracket 8, and a laying track 18, which is used to bear the main weight of the underwater heavy-loaded operation equipment 9 during the water entry stage and reduce the swaying of the underwater heavy-loaded operation equipment 9 before entering the water; the umbilical cable processing system with a compensation function is compactly arranged on the tower 10 for the collection and release system located on the side. The umbilical cable processing system with a compensation function fully guarantees the operation safety of the underwater heavy-loaded operation equipment 9, and greatly reduces the bending of the umbilical cable 2, ensures the safety of the system, and increases the system life. It also reduces the system footprint, making it convenient to carry out safe operation and maintenance.

[0025] In this embodiment, the tower 10 of the retractable system is arranged on one side of the ship deck to support all the components. The tower 10 of the retractable system is divided into two layers, the lower layer is fixed on the ship deck, and is provided with an umbilical cable storage winch slide rail 11 and an umbilical cable storage winch 1. The upper layer is a T-shaped platform, on which a compensation arm 4, a pair of steel cable winches 12 and a steel cable guide pulley 14 are provided. The tower 10 of the retractable system is provided with an extension part facing the sea surface, and a laying track 18 extending to the bottom of the extension part is provided, and the upper layer is provided with two central holes for the movement of the compensation arm hydraulic cylinder 17 and the free entry and exit of the cable.

[0026] In this embodiment, the compensating arm hydraulic cylinder 17 is hinged between the compensating arm 4 and the tower 10 of the retracting and releasing system, and is used to drive the compensating arm 4 to swing up and down. A compensating arm fixed fairlead 3 is provided at one end of the compensating arm 4, and the compensating arm fixed fairlead 3 is connected to the tower 10 of the retracting and releasing system, and the compensating arm fixed fairlead 3 can rotate around the fairlead shaft, and the other end of the compensating arm 4 is a compensating arm movable fairlead 5, and the compensating arm hydraulic cylinder 17 drives the compensating arm 4 to swing around the fairlead shaft, and the movement of the compensating arm 4 causes the compensating arm movable fairlead 5 to move up and down, and one end of the umbilical cable passes through the compensating arm fixed fairlead 3 and the compensating arm movable fairlead 5 in turn, and is connected to the underwater heavy-load operation equipment through the umbilical cable bearing head 7.

[0027] In this embodiment, during the compensation process, the movement of the compensation arm mobile fairlead 5 compensates for the movement of the underwater heavy-load operation equipment 9 relative to the deployment and recovery system, so as to keep the movement of the compensation arm mobile fairlead 5 relative to the underwater heavy-load operation equipment 9 smaller than the vertical component of the movement of the deployment and recovery system relative to the underwater heavy-load operation equipment 9. When the compensation arm hydraulic cylinder 17 is in the middle position, the compensation arm mobile fairlead 5 and the compensation arm fixed fairlead 3 are at approximately the same height, and when the compensation arm hydraulic cylinder 17 is extended, the compensation arm 4 swings upward to increase the distance, and the compensation arm hydraulic cylinder 17 is fully extended, and is now in the highest position, and the compensation arm hydraulic cylinder 17 is retracted to reduce the distance, and the compensation arm hydraulic cylinder 17 is fully retracted, and is now in the lowest position.

[0028] In this embodiment, the umbilical cable storage winch 1 is located on the side of the retracting and releasing system tower 10 away from the sea surface, and is arranged on the umbilical cable storage winch slide rail 11. The umbilical cable storage winch 1 moves along the bow and stern direction of the ship on the umbilical cable storage winch slide rail. When the umbilical cable 2 completes one circle of storage on the umbilical cable storage winch 1, the umbilical cable storage winch slide rail 11 moves a cable diameter to ensure the neat arrangement of the umbilical cable 2 on the umbilical cable storage winch 1, otherwise the poor cable arrangement quality on the umbilical cable storage winch 1 will cause the cables to cross, resulting in damage to the umbilical cable 2. The umbilical cable storage winch that arranges the cables in this way does not introduce additional bends during the cable arrangement process, fully protecting the umbilical cable.

[0029] In this embodiment, the underwater heavy-load operation equipment 9 mainly bears the weight before entering the water, and the steel cable winch system is responsible for preventing the umbilical cable 2 from bearing the weight and causing damage to the umbilical cable 2. Two steel cable winches 12 are arranged in pairs on the tower 10 of the retracting and releasing system, and are arranged symmetrically relative to the compensation arm 4. The steel cable guide pulleys 14 are arranged on both sides of the compensation arm 4 through the steel cable guide pulley bracket 15, and can be driven to deflect. The steel cable 13 extends from a steel cable winch 12, bypasses the steel cable guide pulley 14 on the same side, and is connected to the steel cable bearing heads 16 arranged in pairs on the heavy-load equipment retracting and releasing bracket 8 from the middle hole of the upper frame. In other embodiments, the steel cable bearing heads 16 can be arranged on the underwater heavy-load operation equipment 9 according to actual needs.

[0030] In this embodiment, a support roller 19 is provided on the heavy-load equipment retracting support 8 near the retracting system tower 10, and the support roller 19 is connected to the heavy-load equipment retracting support 8, and the support roller 19 is rollingly arranged in the deployment track 18. The heavy-load equipment retracting support 8 can only move up and down along the deployment track 18, limiting the freedom of the underwater heavy-load operation equipment 9 before entering the water, and reducing the shaking of the equipment.

[0031] In this embodiment, the deployment track 18 is fixed to the outside of the tower 10 of the retracting system and extends below the water surface. During the release process of the underwater heavy-load operation equipment 9, the steel cable winch 12 synchronously releases the cable, driving the heavy-load equipment retracting bracket 8, and smoothly lowers the equipment along the deployment track 18 until it is completely immersed in the water. The heavy-load equipment retracting bracket 8 disconnects the locking connection with the underwater heavy-load operation equipment 9. The deployment track 18 mainly has the function of limiting the degree of freedom of the equipment before entering the water, and does not limit the layout of the deployment track 18. It can also be designed as other forms such as telescopic according to the needs of the actual ship configuration, or other layout positions.

[0032] In this embodiment, the umbilical cable 2 always passes through the umbilical cable channel in the middle of the retractable system tower 10, and an umbilical cable detection device 6 is provided above the channel to perform status detection and management of the umbilical cable throughout its life cycle.

[0033] In this embodiment, except for the underwater heavy-load operation equipment 9 and the heavy-load equipment storage and release bracket 8, the rest of the storage and release system is arranged on the storage and release system tower 10 inside the ship's side. During the operation and maintenance of the equipment, it is an open layout that is easy to operate and well-lit, reducing the safety risks of working outside the ship.

[0034] In this embodiment, the underwater heavy-load operating equipment 9 is moved underwater and controlled by the control cabin on board. When the position of the equipment changes, the ship's dynamic positioning system controls the ship to always move synchronously with the underwater heavy-load operating equipment 9, and adjusts the swing of the compensation arm 4 at any time to compensate for the tension of the umbilical cable 2. During operation, the bending of the umbilical cable 2 is avoided, and the umbilical cable 2 is always ensured to work in a vertical state.

[0035] The working process of the present invention is: During the deployment phase, before the underwater heavy-loaded operation equipment 9 begins to be lowered, it is locked and connected with the heavy-loaded operation equipment retracting bracket 8. At this time, the umbilical cable 2 is already connected to the underwater heavy-loaded operation equipment 9, and the steel cable 13 also passes through the steel cable guide pulley 14 and is connected to the steel cable bearing head 16. At this time, the heavy-loaded operation equipment retracting bracket 8 is in the highest position, the bracket roller 19 is located in the deployment track 18, and the underwater heavy-loaded operation equipment 9 is located outside the ship's side. When the underwater heavy-loaded operation equipment 9 begins to be deployed, the umbilical cable storage winch 1 releases the umbilical cable 2, so that the umbilical cable 2 is in a slightly relaxed state, so that the steel cable 13 bears the full weight of the underwater heavy-loaded operation equipment 9. At this time, the steel cable winch 12 acts synchronously, so that the underwater heavy-loaded operation equipment 9 is released at a uniform speed, and the underwater heavy-loaded operation equipment 9 is lowered along the deployment track 18 together with the heavy-loaded operation equipment retracting bracket 8. During this process, the support roller 19 is limited by the deployment track 18 to prevent the equipment from swaying during the water entry stage. When all the equipment is in the water, the heavy-load equipment retracting bracket 8 unlocks the underwater heavy-load operation equipment 9, and the underwater heavy-load operation equipment 9 is lowered.

[0036] In the compensation stage, since the underwater heavy-load operation equipment deployment and recovery system of the present invention is located on a floating ship, due to the heave movement, the position between the underwater heavy-load operation equipment 9 and the deployment and recovery system will frequently change. When the ship's posture changes, the tension of the umbilical cable 2 also changes slightly at any time. At this time, the compensation arm hydraulic cylinder 17 is actuated to control the compensation arm 4 to swing up and down, and the compensation arm moves the cable guide wheel 5 up and down to tension or relax the umbilical cable 2, and change the tension of the umbilical cable 2 to compensate for the movement of the ship. The action of the compensation arm hydraulic cylinder 17 can be active or passive, and can be controlled by the control system of the control cabin on the ship. The compensation arm fixed cable guide wheel 3 itself can rotate freely at its installation position, so the compensation movement at this stage will not cause the compensation arm fixed cable guide wheel 3 and the umbilical cable 2 to slide, thereby improving the equipment life. The compensation of this embodiment can also be adjusted in the deployment stage, during the deployment of the underwater heavy-load operation equipment 9, according to the real-time deployment position of the underwater heavy-load operation equipment 9, and the up and down swing position of the compensation arm 4 can also be adjusted to compensate for the tension of the umbilical cable 2 during the deployment process.

[0037] During the recovery phase, when the underwater heavy-load operating equipment 9 completes the operation, the umbilical cable storage winch 1 is controlled to reel in the umbilical cable 2, and the underwater heavy-load operating equipment 9 is recovered until it reaches the heavy-load equipment retracting and releasing bracket 8 under the water surface. After the underwater heavy-load operating equipment 9 is connected and locked with the heavy-load equipment retracting and releasing bracket 8, the tension on the umbilical cable 2 is released, and the steel cable winch 12 reels in the steel cable 13, thereby lifting the underwater heavy-load operating equipment 9 to its original position.

[0038] The present invention reduces the frequent bending caused by ensuring the neat arrangement of the umbilical cable 2 during the compensation process and ensures the storage quality of the umbilical cable 2 through the design of a movable umbilical cable storage winch 1. The compensation arm 4 drives the compensation arm to move the cable guide wheel 5 to perform heave compensation, reduce the tension change of the umbilical cable 2, and achieve heave compensation. And when the steel cable is required to connect the operating equipment, synchronous compensation can be achieved. The steel cable 13 bears the main weight of the equipment on the water surface, and cooperates with the laying track 18 during the dangerous operation stage of the equipment entering the water, which limits the degree of freedom of the equipment before entering the water, reduces the swaying of the equipment, and protects the umbilical cable 2 from frequent tension fluctuations. At the same time, it reduces the power required by the equipment and reduces the size of the equipment. The equipment that needs to be operated and maintained is arranged on the inside of the ship's side, and the structure is compactly arranged to reduce the area occupied by the deck, which is convenient for the safe operation and maintenance of the equipment.

[0039] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A system for deploying and recovering underwater heavy-load equipment. Features: include: Retractable system tower; A steel cable deployment and recovery system is installed on the tower of the deployment and recovery system, and is connected to a heavy-duty equipment deployment and recovery bracket via a steel cable. The heavy-duty equipment deployment and recovery bracket can be locked and connected with the underwater heavy-duty operation equipment to achieve the deployment and recovery of the underwater heavy-duty operation equipment; The compensation device comprises a compensation arm, wherein a compensation arm movable fairlead wheel is provided at the end of the compensation arm, and the end of the compensation arm can drive the compensation arm movable fairlead wheel to swing up and down; An umbilical cable storage winch, on which an umbilical cable is wound, one end of the umbilical cable is connected to the underwater heavy-load operation equipment after passing over the compensation arm mobile fairlead wheel; the retracting and releasing system tower comprises an upper frame and a lower frame; the upper frame is provided with the compensation arm and the steel cable laying and recovery system; the compensation device also comprises a compensation arm fixed fairlead wheel, and a horizontally arranged fairlead wheel shaft is installed on the end of the upper frame away from the sea surface through a connecting frame, and the compensation arm fixed fairlead wheel is sleeved on the fairlead wheel shaft, and the compensation arm fixed fairlead wheel can rotate on the fairlead wheel shaft; both ends of the fairlead wheel shaft are connected to one end of the compensation arm away from the compensation arm mobile fairlead wheel; a driving device is connected to the lower part of the compensation arm, and the driving device can drive the compensation arm to rotate up and down around the fairlead wheel shaft; the driving device comprises a compensation arm hydraulic cylinder.

2. The underwater heavy-load operation equipment deployment and recovery system according to claim 1, Features: The tower of the retracting and launching system is arranged on one side of the ship deck; the lower frame is fixed on the ship deck, and the lower frame is provided with an umbilical cable storage winch slide rail, and the umbilical cable storage winch is slidably provided on the umbilical cable storage winch slide rail; the upper frame is a T-shaped platform structure.

3. The underwater heavy-load operation equipment deployment and recovery system according to claim 2, Features: The steel cable laying and recovery system includes two steel cable winches symmetrically arranged on both sides of the compensation arm, and steel cables are wound on the steel cable winches; steel cable guide pulley brackets are symmetrically provided on both sides of the end of the compensation arm, and steel cable guide pulleys are movably provided on the steel cable guide pulley brackets, and one end of the steel cable on the steel cable winch passes around the steel cable guide pulley on the same side and then is connected to the heavy-load equipment retracting and releasing bracket.

4. The underwater heavy-load operation equipment deployment and recovery system according to claim 2, Features: The upper frame is provided with an extension portion extending out from the ship's side close to the sea surface; the steel cable laying and recovery system includes a laying track vertically fixed at the bottom of the extension portion, and the heavy-load equipment retracting and releasing bracket can move up and down along the laying track.

5. The underwater heavy-load operation equipment deployment and recovery system according to claim 1, Features: The bottom of the compensation arm hydraulic cylinder is fixed on the tower of the retractable system, and the end of the telescopic rod of the compensation arm hydraulic cylinder passes through the through hole of the upper frame and is connected to the lower part of the compensation arm.

6. The underwater heavy-load operation equipment deployment and recovery system according to claim 4, Features: The extension portion is provided with a cable hole or a U-shaped groove for the steel cable and the umbilical cable to pass through.

7. The underwater heavy-load operation equipment deployment and recovery system according to claim 1, Features: An umbilical cable channel is provided on the heavy-load equipment retracting and releasing bracket. After one end of the umbilical cable passes through the umbilical cable channel, it is connected to the underwater heavy-load operating equipment through the umbilical cable bearing head; an umbilical cable detection device is provided at the umbilical cable channel for detecting the status of the umbilical cable.

8. The underwater heavy-load operation equipment deployment and recovery system according to claim 3, Features: A plurality of steel cable load-bearing heads are fixedly provided on the top of the heavy-load equipment storage and unfolding bracket, and one end of the steel cable is fixedly connected to the steel cable load-bearing head on the same side thereof.

9. The underwater heavy-load operation equipment deployment and recovery system according to claim 4, Features: A support roller is provided inside the heavy-load equipment storage and placing support, and the support roller is rollingly arranged on the placing track.

Citation Information

Patent Citations

  • Throwing and recovering machine for ship-based underwater robot

    CN105644744A

  • Spacecraft offshore recovery method and equipment

    CN107487424A

  • ARV optical fiber compensator winding and unwinding device

    CN111332412A

  • Submersible laying and recovering device and method

    CN111959723A

  • Cable arranging device of winch

    CN202208618U

Cited By

  • Polar region moon pool ROV (Remote Operated Vehicle) retracting and releasing system

    CN119590571A

  • Laying winch capable of compensating tension

    CN119660610A

  • Deep-sea mining laying and recycling system and method

    CN119734796A

  • Load-adjustable deep sea umbilical cable stress release device

    CN120793036A

  • Adjustable load deep sea umbilical stress relief device

    CN120793036B