Asphalt pavement recycling method and equipment
By obtaining and utilizing the construction reference information of asphalt pavement, distinguishing asphalt areas of different qualities for targeted construction, the problem of uneven quality in asphalt pavement recycling in the existing technology is solved, and the efficiency and quality of asphalt pavement recycling are improved.
Patent Information
- Application Number
- CN202411078125.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-10-11
AI Technical Summary
The existing technology cannot distinguish asphalt with different qualities during the recycling process of asphalt pavement, resulting in a reduction in the average quality of recycled asphalt materials.
By obtaining the construction reference information of asphalt pavement, including basic pavement information and asphalt quality information, determine the simulated construction information, including construction path information and equipment parameter information, control the asphalt pavement recycling equipment for construction, and use different methods for different areas according to the asphalt quality information. construction method.
It improves the work efficiency of asphalt pavement recycling projects, avoids errors caused by manual subjective judgment, improves the accuracy of construction operations and project quality, reduces later maintenance costs, reduces resource waste, and improves road safety.
Smart Images

Figure CN118756537A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of asphalt pavement recycling, and in particular, relates to a method and equipment for recycling asphalt pavement. Background Art
[0002] Asphalt pavement recycling refers to the crushing and recycling of old asphalt pavement, adding new asphalt and other recycled materials, and forming reusable asphalt materials through heating, mixing and other processes.
[0003] In the prior art, during the asphalt pavement recycling process, the entire section of the pavement is recycled in the same way, and asphalt of different qualities cannot be distinguished, which will cause asphalt pavements of originally acceptable quality to be mixed with asphalt pavements of poor quality, thereby reducing the average quality of the recycled asphalt material. Summary of the invention
[0004] The embodiments of the present application provide a method and device for recycling asphalt pavement, which can solve the problem of low average quality of recycled asphalt due to failure to distinguish between asphalts of different qualities during asphalt pavement recycling.
[0005] In a first aspect, an embodiment of the present application provides an asphalt pavement recycling method, which is applied to an asphalt pavement recycling device, and the method comprises:
[0006] Acquire construction reference information of asphalt pavement; the construction reference information includes basic pavement information and asphalt quality information;
[0007] Determine simulated construction information according to the construction reference information; the simulated construction information includes construction path information and equipment parameter information;
[0008] According to the simulated construction information, the asphalt pavement recycling equipment is controlled to perform construction.
[0009] The above technical solutions in the embodiments of the present application have at least the following technical effects:
[0010] The asphalt pavement recycling method provided by the present application obtains the construction reference information of the asphalt pavement; the construction reference information includes the basic information of the pavement and the asphalt quality information; the simulation construction information is determined according to the construction reference information; the simulation construction information includes the construction path information and the equipment parameter information; according to the simulation construction information, the asphalt pavement recycling equipment is controlled to perform construction. In the process of asphalt pavement recycling, the method can implement different construction methods on the asphalt pavement with different equipment parameters according to the asphalt quality information of the asphalt pavement, thereby improving the work efficiency of the asphalt pavement recycling project, and can avoid the errors caused by manual subjective judgment, so that the obtained simulation construction information is more in line with the actual situation, which is conducive to improving the accuracy of construction operations, thereby improving the project quality, reducing the cost of maintaining the asphalt pavement in the later stage, reducing resource waste, and improving the safety of the pavement.
[0011] In a possible implementation manner of the first aspect, obtaining the construction reference information of the asphalt pavement includes:
[0012] The asphalt pavement recycling equipment measures the asphalt pavement to obtain basic information of the pavement; the basic information of the pavement includes pavement length data and pavement width data;
[0013] Acquire an image of the asphalt road surface; the image of the asphalt road surface is marked with basic information of the road surface;
[0014] Inputting the image of the asphalt road surface into a road surface analysis model; wherein the road surface analysis model is trained using multiple sets of training data, each set of training data in the multiple sets of training data includes an asphalt road surface image, area information for identifying the position and area of areas of different quality in the asphalt road surface image, and asphalt quality information of each area;
[0015] The output information of the pavement analysis model is obtained; wherein the output information includes the area information corresponding to the image of the asphalt pavement and the asphalt quality information, and the asphalt quality information corresponds to the area information in a one-to-one manner.
[0016] In a possible implementation manner of the first aspect, determining the simulated construction information according to the construction reference information includes:
[0017] Obtaining construction path information according to the basic road surface information;
[0018] According to the asphalt quality information, the equipment parameter information is obtained;
[0019] According to the output information of the pavement analysis model, establishing a corresponding relationship between the construction path information and the equipment parameter information;
[0020] According to the corresponding relationship between the construction path information and the equipment parameter information, the simulated construction information is obtained.
[0021] In a possible implementation manner of the first aspect, obtaining the construction path information according to the basic road surface information includes:
[0022] Acquire the effective construction width data of the asphalt pavement recycling equipment; the effective construction width data is the width of the groove formed by the asphalt pavement recycling equipment cutting the pavement asphalt;
[0023] The construction path information is obtained according to the basic road surface information and the effective construction width data.
[0024] In a possible implementation manner of the first aspect, obtaining the equipment parameter information according to the asphalt quality information includes:
[0025] Establishing an asphalt quality scoring database; wherein the asphalt quality scoring database includes a plurality of asphalt quality scoring data, and the plurality of asphalt quality scoring data has a corresponding relationship with a plurality of asphalt quality information;
[0026] According to the asphalt quality information, the corresponding asphalt quality score data is matched in the asphalt quality score database;
[0027] The equipment parameter information is obtained according to the asphalt quality score data.
[0028] In a possible implementation of the first aspect, the asphalt pavement recycling equipment includes a crushing device, and the crushing device includes a plurality of retractable crushing rods; the equipment parameter information is obtained according to the asphalt quality score data, including:
[0029] According to the asphalt quality scoring data, the asphalt pavement crushed particle diameter data is obtained;
[0030] According to the asphalt pavement crushed particle diameter data, the crushing interval distance data of the crushing drill is obtained;
[0031] The equipment parameter information is obtained according to the crushing interval distance data of the crushing drill.
[0032] In a possible implementation of the first aspect, obtaining the equipment parameter information according to the crushing interval distance data of the crushing drill includes:
[0033] Acquiring forward speed data of the asphalt pavement recycling equipment;
[0034] According to the forward speed data and the crushing interval distance data, the expansion and contraction frequency data of the crushing drill are obtained;
[0035] The telescoping frequency data is determined as the device parameter information.
[0036] In a possible implementation manner of the first aspect, establishing a correspondence between the construction path information and the equipment parameter information according to the output information of the pavement analysis model includes:
[0037] According to the output information of the pavement analysis model and the construction path information, marking a construction path and a plurality of areas of different qualities on the image of the asphalt pavement;
[0038] Establishing a coordinate system on the image of the asphalt pavement with the midpoint of the asphalt pavement recycling equipment located at the starting point of the construction path as the origin;
[0039] According to the construction path and the multiple areas of different quality marked on the image of the asphalt pavement, and the coordinate system, asphalt quality score data corresponding to the areas where all construction points on the image of the asphalt pavement are located are obtained;
[0040] According to the asphalt quality score data of the area where any of the construction sites is located, obtaining equipment parameter information corresponding to any of the construction sites;
[0041] Marking a straight line segment with a length equal to the effective construction width data of the asphalt pavement recycling equipment at random on the image of the asphalt pavement; wherein the midpoint of the straight line segment is located on the construction path, and the straight line segment is perpendicular to the construction path;
[0042] The set of the equipment parameter information of all construction points on the straight line segment and the coordinates of the midpoint of the straight line segment are combined into a data group; the data group is used to reflect the corresponding relationship between the construction path information and the equipment parameter information.
[0043] In a possible implementation manner of the first aspect, obtaining the simulated construction information according to the correspondence between the construction path information and the equipment parameter information includes:
[0044] sorting the plurality of data groups according to the order of the coordinates of the midpoints of the straight line segments on the construction path;
[0045] The sorting result is determined as the simulated construction information.
[0046] In a second aspect, an embodiment of the present application provides an asphalt pavement recycling system, comprising:
[0047] An acquisition unit, used to acquire construction reference information of an asphalt pavement; the construction reference information includes basic pavement information and asphalt quality information;
[0048] A determination unit, configured to determine simulated construction information according to the construction reference information; the simulated construction information includes construction path information and equipment parameter information;
[0049] A control unit is used to control the asphalt pavement recycling equipment to perform construction according to the simulated construction information.
[0050] In a third aspect, an embodiment of the present application provides an asphalt pavement recycling device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements a method as described in any one of the first aspects above when executing the computer program.
[0051] In a fourth aspect, an embodiment of the present application provides a computer program product. When the computer program product is run on an asphalt pavement recycling device, the asphalt pavement recycling device executes the asphalt pavement recycling method described in any one of the first aspects above.
[0052] It can be understood that the beneficial effects of the second to fourth aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0054] Figure 1 It is a schematic diagram of a process of an asphalt pavement recycling method provided in one embodiment of the present application;
[0055] Figure 2 is a flow chart of step S100 in the asphalt pavement recycling method provided in one embodiment of the present application;
[0056] Figure 3 is a flow chart of step S200 in the asphalt pavement recycling method provided in one embodiment of the present application;
[0057] Figure 4 It is a flow chart of step S210 in the asphalt pavement recycling method provided in one embodiment of the present application;
[0058] Figure 5It is a flow chart of step S220 in the asphalt pavement recycling method provided in one embodiment of the present application;
[0059] Figure 6 It is a flow chart of step S223 in the asphalt pavement recycling method provided in one embodiment of the present application;
[0060] Figure 7 It is a flow chart of step S2233 in the asphalt pavement recycling method provided in one embodiment of the present application;
[0061] Figure 8 is a flow chart of step S230 in the asphalt pavement recycling method provided in one embodiment of the present application;
[0062] Fig. 9 It is a flow chart of step S240 in the asphalt pavement recycling method provided in one embodiment of the present application;
[0063] Fig.10 It is a structural schematic diagram of an asphalt pavement recycling system provided in one embodiment of the present application;
[0064] Fig.11 It is a structural schematic diagram of an asphalt pavement recycling device provided in one embodiment of the present application;
[0065] Fig.12 It is a structural schematic diagram of a control device of an asphalt pavement recycling equipment provided in one embodiment of the present application.
[0066] Among them, the reference numerals in the figure are:
[0067] 100. Asphalt pavement recycling equipment; 10. Moving device; 20. Crushing device; 201. Crushing drill; 30. Control device. DETAILED DESCRIPTION
[0068] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0069] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0070] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0071] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.
[0072] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0073] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0074] In the related art, during the asphalt pavement recycling process, the entire section of the pavement is recycled in the same way, and asphalt of different qualities cannot be distinguished, which will cause the asphalt pavement of originally acceptable quality to be mixed with the asphalt pavement of poor quality, thereby reducing the average quality of the recycled asphalt material.
[0075] To solve the above problems, the embodiment of the present application provides a method and equipment for recycling asphalt pavement. In the method, the construction reference information of the asphalt pavement is obtained; the construction reference information includes basic pavement information and asphalt quality information; the simulated construction information is determined according to the construction reference information; the simulated construction information includes construction path information and equipment parameter information; according to the simulated construction information, the asphalt pavement recycling equipment is controlled to perform construction. In the process of recycling asphalt pavement, the method can implement different construction methods on the asphalt pavement with different equipment parameters according to the asphalt quality information of the asphalt pavement, thereby improving the work efficiency of the asphalt pavement recycling project, and can avoid errors caused by manual subjective judgment, so that the obtained simulated construction information is more in line with the actual situation, which is conducive to improving the accuracy of construction operations, thereby improving the quality of the project, reducing the cost of maintaining the asphalt pavement in the later stage, reducing resource waste, and improving the safety of the pavement.
[0076] The asphalt pavement recycling method provided in the embodiment of the present application can be applied to the asphalt pavement recycling equipment 100. In this case, the asphalt pavement recycling equipment 100 is the executor of the asphalt pavement recycling method provided in the embodiment of the present application. The embodiment of the present application does not impose any restrictions on the specific type of the asphalt pavement recycling equipment 100.
[0077] In some embodiments, see Fig.11 The asphalt pavement recycling equipment 100 may include a mobile device 10, a crushing device 20 and a control device 30, wherein the mobile device 10 is electrically connected to the control device 30, and the mobile device 10 is used to carry other devices and move; the crushing device 20 includes a plurality of retractable crushing drills 201, and the plurality of crushing drills 201 are perpendicular to the forward direction of the mobile device 10 and are arranged on the mobile device 10 at intervals, and are arranged perpendicular to the forward direction of the mobile device 10; the crushing drill 201 may include a telescopic rod and a crushing head, and the telescopic rod may be an electric telescopic rod or a hydraulic telescopic rod, but is not limited thereto; the plurality of crushing drills 201 are arranged on the mobile device 10 at intervals, and are arranged perpendicular to the forward direction of the mobile device 10; the crushing drill 201 may include a telescopic rod and a crushing head, and the telescopic rod may be an electric telescopic rod or a hydraulic telescopic rod, but is not limited thereto; The drills 201 are electrically connected to the control device 30 respectively. The crushing drills 201 are used to crush and decompose the asphalt pavement to be recycled; the control device 30 is set on the mobile device 10, and is used to control the operation of the mobile device 10 and the crushing device 20. The control device 30 is a device that can receive, process, and send information. For example, the control device 30 can be a tablet computer, a vehicle-mounted device, a laptop computer, a netbook, a desktop computer, a handheld device with wireless communication function, a computing device or other processing devices connected to a wireless modem, a vehicle-mounted device, a computer, a laptop computer, a handheld communication device, a handheld computing device, etc.
[0078] In order to better understand the asphalt pavement recycling method provided in the embodiment of the present application, the specific implementation process of the asphalt pavement recycling method provided in the embodiment of the present application is exemplarily introduced below.
[0079] Figure 1 A schematic flow chart of an asphalt pavement recycling method provided in an embodiment of the present application is shown, and the asphalt pavement recycling method includes:
[0080] S100, obtaining construction reference information of an asphalt pavement; the construction reference information includes basic pavement information and asphalt quality information.
[0081] It can be understood that the construction reference information may include basic pavement information and asphalt quality information, which can be directly measured when the asphalt pavement is recycled. Basic pavement information may include information about geometric features such as the length, width, and slope of the asphalt pavement. Asphalt quality information may include information about the aging degree, hardness, thickness, and flatness of the asphalt on the pavement.
[0082] As an optional embodiment of this application, please refer to Figure 2 , S100, obtains construction reference information of asphalt pavement, including:
[0083] S110, the asphalt pavement recycling device 100 measures the asphalt pavement to obtain basic pavement information; the basic pavement information includes pavement length data and pavement width data.
[0084] It can be understood that the asphalt pavement recycling equipment 100 includes a device capable of measuring the asphalt pavement, such as a total station or a laser rangefinder, but not limited thereto.
[0085] S120, acquiring an image of an asphalt road surface; the image of the asphalt road surface is marked with basic road surface information.
[0086] It is understood that the image of the asphalt pavement can be captured manually and then input into the asphalt pavement recycling device 100, or a camera can be set on the asphalt pavement recycling device 100 to collect the image, but it is not limited thereto. The basic information of the pavement can be manually marked on the image of the asphalt pavement, or it can be marked on the image of the asphalt pavement by an image processing program, but it is not limited thereto.
[0087] S130, inputting the image of the asphalt pavement into the pavement analysis model; wherein the pavement analysis model is trained using multiple sets of training data, each set of the multiple sets of training data includes the asphalt pavement image, regional information for identifying the position and area of regions of different quality in the asphalt pavement image, and asphalt quality information of each region.
[0088] It can be understood that the asphalt pavement images in the training data can be images collected during past construction, or images of pavement constructed in a laboratory according to simulated road conditions, but are not limited thereto. The area information marked on the asphalt pavement image is used to represent the geometric information such as the position, shape, and area of areas of different quality. The areas of different quality on the asphalt pavement image can be regular shapes or irregular shapes, and the specific situation varies according to different road conditions. The pavement analysis model uses the asphalt pavement image as input and the corresponding asphalt pavement image marked with area information and asphalt quality information as output to train the initial machine learning model to obtain a trained pavement analysis model.
[0089] S140, obtaining output information of the pavement analysis model; wherein the output information includes area information corresponding to the image of the asphalt pavement and asphalt quality information, and the asphalt quality information corresponds to the area information one by one.
[0090] It can be understood that the output information of the pavement analysis model includes an image of the asphalt pavement, regional information of regions of different qualities in the image, and asphalt quality information.
[0091] In this way, by collecting the image of the asphalt pavement, the basic information of the pavement is marked on the image of the asphalt pavement, and then the image of the asphalt pavement is analyzed by the pavement analysis model to obtain the image of the asphalt pavement output by the pavement analysis model and the regional information and asphalt quality information of each area of different quality in the image. In this way, the efficiency of the image analysis of the asphalt pavement can be improved, the workload of manual labor can be reduced, and the work efficiency of the asphalt pavement recycling project can be improved. In addition, the errors caused by manual subjective judgment can be avoided, so that the regional information and asphalt quality information obtained are more accurate, which is conducive to improving the accuracy of subsequent construction, thereby improving the quality of the project, reducing the cost of maintaining the asphalt pavement in the later stage, reducing resource waste, and improving the safety of the pavement.
[0092] S200, determining simulated construction information according to the construction reference information; the simulated construction information includes construction path information and equipment parameter information.
[0093] It can be understood that the construction path information includes the travel direction and travel distance of the asphalt pavement recycling equipment 100, and the equipment parameter information includes the travel speed of the asphalt pavement recycling equipment 100, the telescopic length of the crushing drill 201, and the like.
[0094] As an optional embodiment of this application, please refer to Figure 3 , S200, determining simulated construction information according to the construction reference information, including:
[0095] S210, obtaining construction path information according to basic road surface information.
[0096] It can be understood that according to basic road surface information such as road surface length data, width data and curve angle data, the construction path is planned by manual setting or using a route planning system to obtain construction path information including travel direction and travel distance.
[0097] Optionally, see Figure 4 , S210, obtain construction path information based on basic road surface information, including:
[0098] S211, obtaining effective construction width data of the asphalt pavement recycling equipment 100; the effective construction width data is the width of the groove formed by the asphalt pavement recycling equipment 100 when cutting the asphalt on the pavement.
[0099] It can be understood that the effective construction width data is the distance between the two breaking bars 201 on the asphalt pavement recycling equipment 100 that are the farthest apart in a direction perpendicular to the traveling direction of the asphalt pavement recycling equipment 100 .
[0100] S212, obtaining construction path information according to basic road surface information and effective construction width data.
[0101] It can be understood that when the width data of the asphalt pavement to be constructed is greater than the effective construction width data of the asphalt pavement recycling equipment 100, the asphalt pavement recycling equipment 100 needs to go back and forth multiple times to completely construct the asphalt pavement to be constructed. The asphalt pavement to be constructed can be divided into multiple construction belt areas in the length direction according to the effective construction width data, and the multiple construction belt areas are connected in series in sequence to form construction path information; it can also be based on the effective construction width data, starting from the edge of the asphalt pavement, and constructing inward in a "U"-shaped route to form construction path information, but it is not limited to this.
[0102] With such a configuration, the construction path information can be planned based on the effective width of the asphalt pavement recycling equipment 100 and the basic information of the pavement, and the route with the shortest construction time can be screened out, which can significantly improve the work efficiency of asphalt pavement recycling, reduce unnecessary energy consumption, reduce the cost of asphalt pavement recycling, and improve the benefits of asphalt pavement recycling.
[0103] S220, obtaining equipment parameter information according to the asphalt quality information.
[0104] It can be understood that for asphalt pavements with different asphalt quality information, different equipment parameter information can be used to control the asphalt pavement recycling equipment 100 to perform crushing and recycling.
[0105] Optionally, see Figure 5 , S220, according to the asphalt quality information, obtain equipment parameter information, including:
[0106] S221, establishing an asphalt quality scoring database; wherein the asphalt quality scoring database includes a plurality of asphalt quality scoring data, and the plurality of asphalt quality scoring data has a corresponding relationship with a plurality of asphalt quality information.
[0107] Exemplarily, asphalt quality score data is data used to indicate the quality of asphalt pavement. Asphalt pavements of different qualities can be distinguished according to the asphalt quality score data. According to the quality from good to bad, the asphalt quality score data can be "100", "80", "60", "40", etc., or "A", "B", "C", "D", etc., but not limited thereto. For example, asphalt quality information can be "unaged, hard texture, smooth surface", and the corresponding asphalt quality score data can be "100"; or asphalt quality information can be "slightly aged, slightly softened texture, basically smooth surface", and the corresponding asphalt quality score data can be "80"; or asphalt quality information can be "moderately aged, slightly soft texture, slightly undulating surface", and the corresponding asphalt quality score data can be "60"; or asphalt quality information can be "severely aged, soft texture, uneven surface", and the corresponding asphalt quality score data can be "40". It should be noted that the above given values do not represent actual data, but are only set for the convenience of understanding. The specific asphalt quality score data depends on the actual situation and will not be repeated here.
[0108] S222: According to the asphalt quality information, obtain corresponding asphalt quality score data in the asphalt quality score database.
[0109] It can be understood that, according to the asphalt quality information of different areas obtained on the image of the asphalt road surface, different asphalt quality score data corresponding to different areas can be matched in the asphalt quality score database.
[0110] S223, obtaining equipment parameter information based on the asphalt quality score data.
[0111] It can be understood that the equipment parameter information may include information including the travel speed of the asphalt pavement recycling equipment 100 during operation, the crushing speed of the crushing device, the crushing force and other data. For asphalt pavements of different qualities, different equipment parameters are used for construction, and asphalt pavements of different qualities can be distinguished. For example, the asphalt pavement with an asphalt quality score of "100" is finely constructed to decompose the asphalt pavement into fine particles, and the asphalt pavement with an asphalt quality score of "40" is roughly constructed to decompose the asphalt pavement into large blocks. This is only an example and does not represent the actual construction method. The specific equipment parameter information and construction method are set according to the actual situation.
[0112] With such a setting, asphalt pavements of different qualities in different areas are distinguished by different asphalt quality scoring data, and different equipment parameter information is used to recycle the asphalt pavements according to the asphalt quality scoring data. The asphalt pavements are differentiated and screened in the recycling stage, which can reduce the time of subsequent processes, effectively reduce the working hours of asphalt pavement recycling, improve the work efficiency of asphalt pavement recycling, improve the quality of the products obtained by asphalt pavement recycling, save the energy consumed in asphalt pavement recycling, and improve the work efficiency of asphalt pavement recycling.
[0113] In a possible implementation, the asphalt pavement recycling device 100 includes a crushing device 20, and the crushing device 20 includes a plurality of retractable crushing rods 201, see Figure 6 , S223, according to the asphalt quality score data, obtain equipment parameter information, including:
[0114] S2231, obtaining the asphalt pavement crushed particle diameter data based on the asphalt quality score data.
[0115] Exemplarily, the asphalt pavement crushed particle diameter data represents the diameter of the asphalt pavement fragments obtained after crushing by the asphalt pavement recycling equipment 100. For asphalt pavements with different asphalt quality score data, the particle diameters that need to be crushed are different. The asphalt pavement crushed particle diameter data can be set manually or according to the construction accuracy of the asphalt pavement recycling equipment 100, but it is not limited thereto. For example, the crushed particle diameter data corresponding to the asphalt quality score data can be matched in the preset database. For the asphalt pavement with an asphalt quality score data of "100", the matched asphalt pavement crushed particle diameter data is set to 5cm; for the asphalt pavement with an asphalt quality score data of "80", the matched asphalt pavement crushed particle diameter data is set to 10cm; for the asphalt pavement with an asphalt quality score data of "60", the matched asphalt pavement crushed particle diameter data is set to 20cm; for the asphalt pavement with an asphalt quality score data of "40", the matched asphalt pavement crushed particle diameter data is set to 30cm. It should be noted that the above given values do not represent actual data, but are only set for the convenience of understanding. The specific asphalt pavement crushed particle diameter data depends on the actual situation and will not be repeated here.
[0116] S2232, obtaining the crushing interval distance data of the crushing drill 201 according to the crushed particle diameter data of the asphalt pavement.
[0117] It can be understood that the crushing interval distance data of the crushing drill 201 represents the distance between two adjacent contact points between the crushing drill 201 and the asphalt pavement, that is, the diameter data of the crushed particles of the asphalt pavement obtained after the crushing drill 201 crushes the asphalt pavement. Assuming that the diameter data of the crushed particles of the asphalt pavement is 5cm, the crushing interval distance data of the crushing drill 201 is 5cm; or the diameter data of the crushed particles of the asphalt pavement is 10cm, the crushing interval distance data of the crushing drill 201 is 10cm; the diameter data of the crushed particles of the asphalt pavement is 20cm, the crushing interval distance data of the crushing drill 201 is 20cm; the diameter data of the crushed particles of the asphalt pavement is 30cm, the crushing interval distance data of the crushing drill 201 is 30cm. It should be noted that the above given values do not represent actual data, but are only set for the convenience of understanding, and will not be repeated here.
[0118] S2233, obtaining equipment parameter information according to the crushing interval distance data of the crushing drill 201.
[0119] It can be understood that the crushing interval distance data of the crushing bar 201 is related to the travel speed in the equipment parameter information of the asphalt pavement recycling equipment 100 and the frequency of the crushing bar 201 falling.
[0120] With such arrangement, the crushed particle diameter data of the asphalt pavement is obtained according to the asphalt quality scoring data, and then the crushing interval distance data of the crushing bar 201 is obtained, and finally the equipment parameter information is determined. Through multiple related data, it is beneficial to improve the accuracy of the equipment parameter information, and then improve the construction accuracy, accurately distinguish asphalt of different qualities, and can effectively improve the quality of the products obtained by recycling asphalt pavement. In addition, using different construction parameters for asphalt pavements of different qualities can reduce unnecessary energy consumption and improve the work efficiency of asphalt pavement recycling.
[0121] Optionally, see Figure 7 , S2233, according to the crushing interval distance data of the crushing drill 201, obtain equipment parameter information, including:
[0122] S22331, obtaining the forward speed data of the asphalt pavement recycling equipment 100.
[0123] It can be understood that the forward speed data of the asphalt pavement recycling equipment 100 represents the distance that the asphalt pavement recycling equipment 100 can travel per unit time, which can be found on the equipment nameplate of the asphalt pavement recycling equipment 100, or can be obtained by measurement and calculation using a timer and a distance meter at the work site, but is not limited to this.
[0124] S22332, obtaining the telescopic frequency data of the crushing drill 201 according to the forward speed data and the crushing interval distance data.
[0125] Exemplarily, the telescopic frequency data of the crushing rod 201 represents the number of times the crushing rod 201 contacts the ground per unit time. The telescopic frequency data of the crushing rod 201 is equal to the forward speed data divided by the crushing interval distance data. Assuming that the forward speed data of the asphalt pavement recycling equipment 100 is 0.1m / s, and the crushing interval distance data is 0.05m, the telescopic frequency data of the crushing rod 201 is 2 times / s (0.1 / 0.05=2); or the forward speed data of the asphalt pavement recycling equipment 100 is 0.5m / s, and the crushing interval distance data is 0.2m, then the telescopic frequency data of the crushing rod 201 is 2.5 times / s (0.5 / 0.2=2). It should be noted that the above given values do not represent actual data, but are only set for ease of understanding. The specific telescopic frequency data depends on the actual situation and will not be repeated here.
[0126] S22333, determine the telescopic frequency data as device parameter information.
[0127] It can be understood that the crushing drill 201 of the crushing device 20 is controlled to work according to the expansion and contraction frequency data.
[0128] S230: Establishing a correspondence between the construction path information and the equipment parameter information according to the output information of the pavement analysis model.
[0129] It can be understood that the correspondence between the construction path information and the equipment parameter information includes the equipment parameter information applicable to all positions on the construction path.
[0130] Optionally, see Figure 8 , S230, establishing a corresponding relationship between the construction path information and the equipment parameter information according to the output information of the pavement analysis model, including:
[0131] S231, marking a construction path and a plurality of areas of different qualities on the image of the asphalt pavement according to the output information of the pavement analysis model and the construction path information.
[0132] It can be understood that according to the travel direction and travel distance of the asphalt pavement recycling equipment 100 in the construction path information, a specific construction path can be marked on the image of the asphalt pavement.
[0133] S232: Establish a coordinate system on the image of the asphalt pavement with the midpoint of the asphalt pavement recycling equipment 100 located at the starting point of the construction path as the origin.
[0134] It can be understood that the asphalt pavement recycling equipment 100 located at the starting point of the construction path faces the same direction as the forward direction of the point in the construction path information.
[0135] S233, obtaining asphalt quality score data corresponding to the areas where all construction points on the asphalt pavement image are located according to the construction path and multiple areas of different quality marked on the asphalt pavement image, as well as the coordinate system.
[0136] It can be understood that the construction point is the point on the image of the asphalt pavement where the asphalt pavement recycling equipment 100 operates at the highest telescopic frequency data during the process of the asphalt pavement recycling equipment 100 moving along the construction path, and all the positions where the crushing bars 201 contact the asphalt pavement are mapped.
[0137] S234, obtaining equipment parameter information corresponding to any construction point according to the asphalt quality score data of the area where any construction point is located.
[0138] It can be understood that the asphalt quality score data of the construction site is the asphalt quality score data of the area where the construction site is located.
[0139] S235, arbitrarily mark a straight line segment on the asphalt pavement image, the length of which is equal to the effective construction width data of the asphalt pavement recycling equipment 100; wherein the midpoint of the straight line segment is located on the construction path, and the straight line segment is perpendicular to the construction path.
[0140] It can be understood that all construction points passed by any straight segment are positions where all crushing bars 201 can contact the asphalt pavement when the asphalt pavement recycling equipment 100 reaches the coordinate position corresponding to the midpoint of the straight segment during the movement of the asphalt pavement recycling equipment 100 along the construction path.
[0141] S236, combining the set of equipment parameter information of all construction points on the straight line segment and the coordinates of the midpoint of the straight line segment into a data group; the data group is used to reflect the corresponding relationship between the construction path information and the equipment parameter information.
[0142] It can be understood that the data set consisting of the set of equipment parameter information of all construction points on the straight segment and the coordinates of the midpoint of the straight segment can represent the overall equipment parameter information of the asphalt pavement recycling equipment 100 when the midpoint of the asphalt pavement recycling equipment 100 moves to the coordinates of the midpoint of the straight segment.
[0143] In this way, by pre-simulating and generating the equipment parameter information of the asphalt pavement recycling equipment 100 when it moves to each position, it is possible to avoid real-time calculation during the recycling process, reduce human intervention, reduce the possibility of subjective errors, and facilitate scheduling and adjustment according to actual conditions, thereby effectively improving work efficiency, reducing unnecessary movement and operation, reducing energy consumption, and improving construction safety.
[0144] S240, obtaining simulation construction information according to the correspondence between the construction path information and the equipment parameter information.
[0145] It can be understood that the correspondence between the construction path information and the equipment parameter information includes the equipment parameter information of the asphalt pavement recycling equipment 100 when the asphalt pavement recycling equipment 100 moves to any position on the construction path. The simulated construction information includes the equipment parameter information of the asphalt pavement recycling equipment 100 at any position on the construction path.
[0146] Optionally, see Fig. 9 , S240, according to the correspondence between the construction path information and the equipment parameter information, obtain the simulated construction information, including:
[0147] S241, sorting the multiple data groups according to the order of the coordinates of the midpoints of the straight line segments on the construction path.
[0148] It can be understood that the coordinates of the midpoint of the straight line segment are on the construction path of the asphalt pavement recycling equipment 100 .
[0149] S242, determining the sorting result as simulated construction information.
[0150] With this setting, simulated construction information can be obtained based on the construction path information and equipment parameter information. Advance planning can be made before construction begins, and corresponding adjustments can be made based on site conditions. This is conducive to improving construction safety and flexibility, optimizing on-site resource allocation, improving work efficiency, and reducing production energy consumption.
[0151] S300: Control the asphalt pavement recycling equipment 100 to perform construction according to the simulated construction information.
[0152] With such an arrangement, the asphalt pavement recycling equipment 100 is controlled to perform construction according to the simulated construction information, which is convenient for on-site monitoring and scheduling, reduces the response time, makes the entire asphalt pavement recycling process more controllable, improves the quality of the products obtained from the asphalt pavement recycling, makes the construction results predictable, facilitates equipment maintenance, improves production safety, is conducive to the rational allocation of equipment resources, reduces energy consumption, and significantly improves work efficiency.
[0153] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0154] Corresponding to the asphalt pavement recycling method described in the above embodiment, the embodiment of the present application also provides an asphalt pavement recycling system, and the various units of the system can implement the various steps of the asphalt pavement recycling method. Fig.10A structural block diagram of an asphalt pavement recycling system provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.
[0155] Reference Fig.10 The system comprises:
[0156] An acquisition unit is used to acquire construction reference information of the asphalt pavement; the construction reference information includes basic pavement information and asphalt quality information;
[0157] A determination unit, used to determine simulated construction information according to the construction reference information; the simulated construction information includes construction path information and equipment parameter information;
[0158] The control unit is used to control the asphalt pavement recycling equipment 100 to perform construction according to the simulated construction information.
[0159] It should be noted that the information interaction, execution process and other contents between the above-mentioned units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0160] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional units is used as an example for illustration. In practical applications, the above-mentioned functions can be assigned to different functional units as needed, that is, the internal structure of the system can be divided into different functional units to complete all or part of the functions described above. The functional units in the embodiment can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0161] The embodiment of the present application further provides an asphalt pavement recycling device 100, which includes a control device 30. Fig.12 FIG. 1 is a schematic diagram of the structure of a control device 30 provided in an embodiment of the present application. Fig.12 As shown, the control device 30 of this embodiment includes: at least one processor 31 ( Fig.12 Only one is shown), at least one memory 32 ( Fig.12Only one is shown in the figure) and a computer program 33 stored in the at least one memory 32 and executable on the at least one processor 31. When the processor 31 executes the computer program 33, the asphalt pavement recycling equipment 100 implements the steps in any of the above-mentioned asphalt pavement recycling method embodiments, or the asphalt pavement recycling equipment 100 implements the functions of each unit in the above-mentioned device embodiments.
[0162] Exemplarily, the computer program 33 may be divided into one or more units, which are stored in the memory 32 and executed by the processor 31 to complete the present application. The one or more units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program 33 in the control device 30.
[0163] The control device 30 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The control device 30 may include, but is not limited to, a processor 31 and a memory 32. Those skilled in the art will appreciate that Fig.12 This is only an example of the control device 30 and does not constitute a limitation on the control device 30. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, buses, etc.
[0164] The processor 31 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0165] In some embodiments, the memory 32 may be an internal storage unit of the control device 30, such as a hard disk or memory of the control device 30. In other embodiments, the memory 32 may also be an external storage device of the control device 30, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the control device 30. Further, the memory 32 may also include both an internal storage unit of the control device 30 and an external storage device. The memory 32 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program. The memory 32 may also be used to temporarily store data that has been output or is to be output.
[0166] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.
[0167] An embodiment of the present application provides a computer program product. When the computer program product is run on the asphalt pavement recycling device 100, the asphalt pavement recycling device 100 implements the steps in any of the above-mentioned method embodiments.
[0168] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium can at least include: any entity or device that can carry the computer program code to the asphalt pavement recycling equipment 100, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, RandomAccess Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.
[0169] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0170] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0171] In the embodiments provided in the present application, it should be understood that the disclosed asphalt pavement recycling system, equipment and method can be implemented in other ways. For example, the embodiments of the asphalt pavement recycling system and equipment described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces or units, which can be electrical, mechanical or other forms.
[0172] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0173] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A method for recycling asphalt pavement, characterized in that: Applied to asphalt pavement recycling equipment, the method comprises: Acquire construction reference information of asphalt pavement; the construction reference information includes basic pavement information and asphalt quality information; Determine simulated construction information according to the construction reference information; the simulated construction information includes construction path information and equipment parameter information; According to the simulated construction information, the asphalt pavement recycling equipment is controlled to perform construction.
2. The asphalt pavement recycling method according to claim 1, characterized in that: The obtaining of the construction reference information of the asphalt pavement includes: The asphalt pavement recycling equipment measures the asphalt pavement to obtain basic information of the pavement; the basic information of the pavement includes pavement length data and pavement width data; Acquire an image of the asphalt road surface; the image of the asphalt road surface is marked with basic information of the road surface; Inputting the image of the asphalt road surface into a road surface analysis model; wherein the road surface analysis model is trained using multiple sets of training data, each set of training data in the multiple sets of training data includes an asphalt road surface image, area information for identifying the position and area of areas of different quality in the asphalt road surface image, and asphalt quality information of each area; The output information of the pavement analysis model is obtained; wherein the output information includes the area information corresponding to the image of the asphalt pavement and the asphalt quality information, and the asphalt quality information corresponds to the area information in a one-to-one manner.
3. The asphalt pavement recycling method according to claim 2, characterized in that: The determining of the simulated construction information according to the construction reference information comprises: Obtaining construction path information according to the basic road surface information; According to the asphalt quality information, the equipment parameter information is obtained; According to the output information of the pavement analysis model, establishing a corresponding relationship between the construction path information and the equipment parameter information; According to the corresponding relationship between the construction path information and the equipment parameter information, the simulated construction information is obtained.
4. The asphalt pavement recycling method according to claim 3, characterized in that: The obtaining of construction path information according to the basic road surface information includes: Acquire the effective construction width data of the asphalt pavement recycling equipment; the effective construction width data is the width of the groove formed by the asphalt pavement recycling equipment cutting the pavement asphalt; The construction path information is obtained according to the basic road surface information and the effective construction width data.
5. The asphalt pavement recycling method according to claim 4, characterized in that: The device parameter information is obtained according to the asphalt quality information, including: Establishing an asphalt quality scoring database; wherein the asphalt quality scoring database includes a plurality of asphalt quality scoring data, and the plurality of asphalt quality scoring data has a corresponding relationship with a plurality of asphalt quality information; According to the asphalt quality information, the corresponding asphalt quality score data is matched in the asphalt quality score database; The equipment parameter information is obtained according to the asphalt quality score data.
6. The asphalt pavement recycling method according to claim 5, characterized in that: The asphalt pavement recycling equipment includes a crushing device, and the crushing device includes a plurality of retractable crushing drills; The equipment parameter information is obtained according to the asphalt quality score data, including: According to the asphalt quality scoring data, the asphalt pavement crushed particle diameter data is obtained; According to the asphalt pavement crushed particle diameter data, the crushing interval distance data of the crushing drill is obtained; The equipment parameter information is obtained according to the crushing interval distance data of the crushing drill.
7. The asphalt pavement recycling method according to claim 6, characterized in that: The device parameter information is obtained according to the crushing interval distance data of the crushing drill, including: Acquiring forward speed data of the asphalt pavement recycling equipment; According to the forward speed data and the crushing interval distance data, the expansion and contraction frequency data of the crushing drill are obtained; The telescoping frequency data is determined as the device parameter information.
8. The asphalt pavement recycling method according to claim 5, characterized in that: The establishing a correspondence between the construction path information and the equipment parameter information according to the output information of the pavement analysis model includes: According to the output information of the pavement analysis model and the construction path information, marking a construction path and a plurality of areas of different qualities on the image of the asphalt pavement; Establishing a coordinate system on the image of the asphalt pavement with the midpoint of the asphalt pavement recycling equipment located at the starting point of the construction path as the origin; According to the construction path and the multiple areas of different quality marked on the image of the asphalt pavement, and the coordinate system, the asphalt quality score data corresponding to the areas where all the construction points on the image of the asphalt pavement are located are obtained; According to the asphalt quality score data of the area where any of the construction sites is located, obtaining the equipment parameter information corresponding to any of the construction sites; Marking a straight line segment with a length equal to the effective construction width data of the asphalt pavement recycling equipment at random on the image of the asphalt pavement; wherein the midpoint of the straight line segment is located on the construction path, and the straight line segment is perpendicular to the construction path; The set of the equipment parameter information of all construction points on the straight line segment and the coordinates of the midpoint of the straight line segment are combined into a data group; the data group is used to reflect the corresponding relationship between the construction path information and the equipment parameter information.
9. The asphalt pavement recycling method according to claim 8, characterized in that: The obtaining of simulated construction information according to the correspondence between the construction path information and the equipment parameter information includes: sorting the plurality of data groups according to the order of the coordinates of the midpoints of the straight line segments on the construction path; The sorting result is determined as the simulated construction information.
10. An asphalt pavement recycling device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 9 is implemented.
